aerospace division anastasia project airborne communication and navigation satellite technologies...
TRANSCRIPT
Aerospace Division
Anastasia ProjectAirborne Communication and Navigation Satellite Technologies And
Techniques in a System Integrated Approach
Presentation to NexSat Steering Group
Alan Schuster Bruce, Thales Avionics UK
8 June 2004
2
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Contents
What is Anastasia
Scope
Workpackages
Schedule
Partners
Main Technical Issues
Inputs from NexSat Steering Group to Anastasia
Outputs from Anastasia to NexSat Steering Group
What Anastasia Is Not
Questions
3
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
What Is Anastasia
A Proposal Submitted in March 2004 for an EC 6th Framework Integrated Project to Investigate, Prototype and Demonstrate Advanced Satellite Technologies for Navigation and Communications for Civil Aircraft.
Status - bid is being evaluated
4 year project. Expected to start in Jan 2005.
This presentation just covers communication aspects
4
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Scope of Communication Aspects
‘….work will concentrate on the design and implementation of a prototype, affordable aeronautical satcom system that will meet the evolving European ATM requirements’. (Objective 1) ‘Evolving European ATM requirements’ primarily means NexSat
‘Affordable’ means based on existing or planned space segment (eg Inmarsat BGAN). It is assumed that civil aviation can not afford its own satellite system.
There is also a smaller amount of work on more long term avionic research including multi frequency antennas. ( Objective 2).
5
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Workpackages of Complete Project
WP 1 Management and coordination
Thales Avionics Toulouse
* WP 2 Needs and aircraft requirements
Airbus
WP 3 Navigation Space Based Technologies
Thales Avionics Valence
* WP 4 Communication Space Based Technologies
Thales AvionicsUK
* WP 5 Operational characterisation and evaluation
DLR
* WP 6 Dissemination Dassault
* Workpackages relevant to NexSat
6
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
WP4 Work Breakdown Structure
WP4.4.1Aircraft
TerminalDevelopment
WP4.4.4Analysis
WP4.4.2Ground
InfrastructureUpgrade
WP4.4.3End-to-End
SystemIntegration
WP4.3.4Avionics
ResearchLonger Term
WP4.3.3Ground
InfrastructureDesign
WP4.3.2Aircraft
TerminalDesign
WP4.3.1Aircraft Terminal
TechnologyAssessment
WP4.2.4Conclusions
& Reccs
WP4.2.2Critically Appraise
Architectures
WP4.2.3Commercial
Analysis
WP4.2.1Define
candidateArchitectures
WP4.1.1Existing and
Planned Systems
WP4.1.2Satellite Payload
WP4.2System Design
WP4.1Requirement &Technologies
WP4Communication Space
Based technologies
WP4.3Aircraft Terminal & Grnd Infrastructure
Design
WP4.4End-to-End
System Developm’t& Upgrade
7
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
WP4 Schedule
8
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Partners
Core Team Thales-Avionics, Airbus, Dassault-Aviation, DLR
Partners in communication Work Package(WP4): Airframers: Airbus France, Airbus Deutschland, Satellite operator: Inmarsat Research centres: DLR, NLR, Universities: Surrey Univ SME: TGS, Gatehouse, Industrials: Astrium, Thales Avionics UK, EADS CCR
9
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Main Technical Issues
Smallest aircraft for ‘easy install’
Is party line needed?
Call set up times (voice and data)
Repair times and consequent level of redundancy
Voice and data bandwidths and quality of service
TCPIP vs ATN
10
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
‘Inputs’ Needed From NexSat Steering Group to Anastasia
Top level requirements to feed into WP2 (Needs and Aircraft Requirements) by year end WP2 is led by Airbus Discussions between NexSat steering group and WP2
are foreseen
Support for presenting the Anastasia architecture to ICAO etc
11
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Outputs from Anastasia to NexSat Steering Group
Technical material
A demonstration of a next generation satcom system that meets NexSat requirements
A route to an implementation of NexSat
12
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
What Anastasia Is Not
It is not looking at the ground and air data applications/end systems.
It is not developing ‘certifiable avionics’
13
Pre
s ent
atio
n to
Ne x
Sa t
St e
eri n
g G
rou p
on
Ana
stas
ia 8
Jun
e 20
04
Aerospace Division
Questions
Any questions?