adventure gut presentation may 2010 comp

51
ADVENTURE GUT RESTORATION DEMONSTRATION PROJECT Michael Shaffer, EI Extension Associate, Biological & Agricultural Engineering North Carolina State University Julie Wright, RC&D Coordinator, USDA NRCS, USVI RC&D Council, Inc. Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University

Upload: michael-shaffer

Post on 27-Jun-2015

238 views

Category:

Education


1 download

TRANSCRIPT

Page 1: Adventure Gut Presentation May 2010 comp

ADVENTURE GUT RESTORATION DEMONSTRATION PROJECT

• Michael Shaffer, EIExtension Associate, Biological & Agricultural EngineeringNorth Carolina State University

• Julie Wright,RC&D Coordinator, USDA NRCS, USVI RC&D Council, Inc.

• Greg Jennings, PhD, PEProfessor, Biological & Agricultural EngineeringNorth Carolina State University

Page 2: Adventure Gut Presentation May 2010 comp
Page 3: Adventure Gut Presentation May 2010 comp

First, lets cover some stream and watershed basics

•Precipitation

•Infiltration

•Runoff

Stream Corridor Restoration: Principles, Processes, and Practices. 1998. Federal Interagency Stream Restoration Working Group.

Page 4: Adventure Gut Presentation May 2010 comp

Sediment Transport

Flowing water performs

work through:

• Overcoming Friction

• Erosion

• Movement & Deposition

(of stream materials)

http://www.uwsp.edu/gEo/faculty/ritter/geog101/textbook/fluvial_systems/geologic_work_of_streams.html

Page 5: Adventure Gut Presentation May 2010 comp

Bankfull Stage“corresponds to the discharge at which channel maintenance is the most effective, that is, the discharge at which moving sediment, forming or removing bars, forming or changing bends and meanders, and generally doing work results in the average morphologic characteristics” (Dunne and Leopold,1978)

Stream Corridor Restoration: Principles, Processes, and Practices. 1998. Federal Interagency Stream Restoration Working Group.

Page 6: Adventure Gut Presentation May 2010 comp

What are stable streams?Accessibility to a floodplain connection for any flows greater than bankfull allows the dissipation of stream energy, reducing erosive forces

Page 7: Adventure Gut Presentation May 2010 comp

What are unstable streams?Lack of a floodplain connection for the majority of stream flow,

concentrates the force of the water, putting all of the stream energy into the stream bed and banks.

Page 8: Adventure Gut Presentation May 2010 comp

Using a flood plain:Low flow and Flood

flow

Little Garvin Creek, Clemson, SC

Page 9: Adventure Gut Presentation May 2010 comp

• Dimension (bankfull & flood flow)• Pattern (meander)• Profile (bed profile)• Floodplain connection

Channel Morphology & Floodplain Connection

2005 NCSU Rocky Branch 2006

Page 10: Adventure Gut Presentation May 2010 comp

What did Adventure Gut look like?• Extremely incised

• Exposed raw earth banks• Fallen and falling trees

Page 11: Adventure Gut Presentation May 2010 comp

What problems do impaired streams cause?

Bank ErosionSediment Movement

Page 12: Adventure Gut Presentation May 2010 comp

2002

2002

1997

How does a stream become impaired?• Development or land use changes.

Page 13: Adventure Gut Presentation May 2010 comp

How does a stream become impaired?• Inappropriate agricultural and logging practices

Page 14: Adventure Gut Presentation May 2010 comp

How does a stream become impaired?

• Poor construction practices

Page 15: Adventure Gut Presentation May 2010 comp

How does a stream become impaired?

• Livestock impact

Page 16: Adventure Gut Presentation May 2010 comp

How does a stream become impaired?

• Roads, culverts and bridges

Page 17: Adventure Gut Presentation May 2010 comp

How does a stream become impaired?• Water impoundments and changes in water use

Irrigation

Impoundments

Page 18: Adventure Gut Presentation May 2010 comp

How do we reduce stream impairment?

• Maintain adequate riparian veg buffer• Low Impact Development (LID)• Livestock exclusion• Stream restoration

Page 19: Adventure Gut Presentation May 2010 comp

What is stream restoration?

• Recreating or modifying a stream channel to approximate a stable situation suited to the site and site conditions.

Page 20: Adventure Gut Presentation May 2010 comp

Channel Evolution(Succession)

Stream response to incising forces

Stream Corridor Restoration: Principles, Processes, and Practices. 1998. Federal Interagency Stream Restoration Working Group.

Page 21: Adventure Gut Presentation May 2010 comp

Why Do Stream Restoration?

• Water quality improvements

• Groundwater impact

• Habitat gains

• Ecosystem improvement

• Stop land loss

• Safety concerns reduced

• Less infrastructure damage

• Reduced flood damage

• Aesthetic improvments

Page 22: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 23: Adventure Gut Presentation May 2010 comp

Adventure Gut demonstration project

• Basic design and background data• Determining bankful elevation• Locate and identify manmade constraints• (power lines, water lines sewage lines, etc.)• Plan for erosion and sediment control during

the project.

Page 24: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Excavation begins with invasive removal

Page 25: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Sadly, the necessary removal of a large mature tree

Page 26: Adventure Gut Presentation May 2010 comp

Adventure Gut demonstration project

Grading a new bankful level

Page 27: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 28: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 29: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 30: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project• Temporary bank stabilization

– Coir matting at toe of bank– Temporary seeding

Page 31: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 32: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

Page 33: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

• Steep gully from field runoff– Geotextile liner– Stone sizing for stability

• Resetting the bridge for the nature trail.

Page 34: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

• REVEGETATION• This is the key step.• Plant selection and plant density• Early nursery notification• Proper planting methods• Plan for animal impact• Continuing invasive plant control

Page 35: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration ProjectPerformance monitoring

• Fixed cross sections surveyed annually.

• Fixed photo points captured annually.

• Adjustments, repairs as required.

• Vegetation survival count annually.

• Exotics and invasive vegetation removed as required.

Page 36: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration ProjectField Day

Page 37: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

August, 2009 during construction

Page 38: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

August, 2009 after planting

Page 39: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

April, 2010

Page 40: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

August, 2009 during construction

Page 41: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

August, 2009 during planting

Page 42: Adventure Gut Presentation May 2010 comp

Adventure Gut Demonstration Project

April, 2010

Page 43: Adventure Gut Presentation May 2010 comp

August, 2009 before construction

Adventure Gut Demonstration Project

Page 44: Adventure Gut Presentation May 2010 comp

August, 2009 before construction

Adventure Gut Demonstration Project

Page 45: Adventure Gut Presentation May 2010 comp

August, 2009 during construction

Adventure Gut Demonstration Project

Page 46: Adventure Gut Presentation May 2010 comp

August, 2009 during construction

Adventure Gut Demonstration Project

Page 47: Adventure Gut Presentation May 2010 comp

April, 2010

Adventure Gut Demonstration Project

Page 48: Adventure Gut Presentation May 2010 comp

Some issues unique to the Virgin Islands.

• Seasonal rainfall, dry season, wet season.• Dramatic rainfall shadow areas on each island.• Major flow events from hurricanes and intense

rainstorms.• Only intermittent streams, no perennial

streams.• Historic land use impacts are very large.• Thin clay soils are easily eroded.

Page 49: Adventure Gut Presentation May 2010 comp

What’s the next step?

• Reference streams• Public awareness• Find other impaired streams• Develop support coalitions• Funding sources• Investigate the appropriate selection of

native vegetation

Page 50: Adventure Gut Presentation May 2010 comp

For more information• USVI RC&D Council, Inc. www.usvircd.org/

• USDA NRCS National Engineering Handbook, Part 654 Stream Restoration Design

• Stream Corridor Restoration by the Federal Interagency Stream Corridor Restoration Working Group www.nrcs.usda.gov/technical/stream_restoration/

• Watershed Assessment of River Stability & Sediment Supply (WARSSS), http://www.epa.gov/warsss/

• NCSU BAE Stream Restoration Program www.bae.ncsu.edu/programs/extension/wqg/srp/

• Michael Shaffer, NCSU Bio and Ag Engr. [email protected] Box 7612

Raleigh, NC 27695-7612

Page 51: Adventure Gut Presentation May 2010 comp

Thank you for your attention

Are there any questions?

Photo courtesy of Coral Bay Community Council