CURRICULUM VITAE QA/QC Manager ADNAN REHMAT PERSONAL Al-sahafa street Azizia Jeddah Saudi Arabia. Cell # 00966-535803093 & 00966-542323199 Email: [email protected] , [email protected] Profession & specialization : Quality Control /Assurance Date of birth :1977 Saudi Aramco SAP # 70015443 Member of Pakistan Engineering council. Member of Saudi Engineering council. OBJECTIVE Improving Quality standards of the company as seasoned Quality Control Manager. EDUCATION AND TRAININGS - BE Civil Engineering UET Peshawar 2001 - MBA Exec college of E-commerce USA, Islamabad 2003 - Quality Management System Principles and Practices - Occupational health and safety - Quality Management System Lead Auditor ISO 9001:2008 - Environmental Management System Lead Auditor ISO 14001:2004 - Occupational Health and Safety Auditor ISO 18001:2007 PROFESSIONAL EXPERIENCE SUMMARY: Adnan has more than 15 years of professional experience in quality control and quality assurance on construction projects. Throughout his career he has been involved in roles that are related to ensuring adherence to quality standards through application of project specifications and best engineering practices. He has proven track record of hiring and developing individual to become high performance team members. He has remained involved in various QA/ Qc roles in some iconic projects in Pakistan and Saudi Arabia including Layyari expressway, Jeddah storm water drainage Program and sea water system for Jizan integrated gasification combined 1

Upload: adnan-rehmat

Post on 13-Apr-2017

261 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

ADNAN REHMAT PERSONALAl-sahafa street Azizia Jeddah Saudi Arabia. Cell # 00966-535803093 & 00966-542323199 Email: [email protected] , [email protected]

Profession & specialization : Quality Control /AssuranceDate of birth :1977Saudi Aramco SAP # 70015443Member of Pakistan Engineering council. Member of Saudi Engineering council.

OBJECTIVE

Improving Quality standards of the company as seasoned Quality Control Manager.

EDUCATION AND TRAININGS

- BE Civil Engineering UET Peshawar 2001- MBA Exec college of E-commerce USA, Islamabad 2003- Quality Management System Principles and Practices- Occupational health and safety- Quality Management System Lead Auditor ISO 9001:2008- Environmental Management System Lead Auditor ISO 14001:2004- Occupational Health and Safety Auditor ISO 18001:2007

PROFESSIONAL EXPERIENCE SUMMARY:

Adnan has more than 15 years of professional experience in quality control and quality assurance on construction projects. Throughout his career he has been involved in roles that are related to ensuring adherence to quality standards through application of project specifications and best engineering practices. He has proven track record of hiring and developing individual to become high performance team members. He has remained involved in various QA/ Qc roles in some iconic projects in Pakistan and Saudi Arabia including Layyari expressway, Jeddah storm water drainage Program and sea water system for Jizan integrated gasification combined cycle. Right now he would like to join a company that has a friendly and vibrant atmosphere where his career can really take off.

PROFESSIONAL SKILLS

Remained involved in QA/QC roles related to ensuring adherence to Aramco quality standards, international standards, ISO requirements, Inspection test plan and inspection checklists and best engineering practices.

Supervised and managed a multi-discipline team of QC engineers and inspectors on site.

Ensured continual improvement within the quality control systems and culture.

1

Page 2: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

Ensured that all construction activities offered for inspection meets the customer requirements.

Ensured that all inspections as identified in approved inspection and test plan (ITP) are attended by the relevant QA/QC inspector.

Coordinated and scheduled the field inspections with the client representative to ensure inspections are carried expediently.

Ensured that inspections are carried out for the closure of EI (exception item) as documented in EIL during the walkthrough with customer and signed off as closed when activity is closed.

Prepared the quality personnel mobilization plan to ensure quality personnel coverage at project during all activities at all times and coordinate with the client approval of QA/QC personnel as required..

Ensured that all quality records are maintained, up-to date , traceable and retrievable.

Ensured that any survey and test equipment being utilized on project is calibrated. Continuous review of calibration log.

Well experienced in QMIS. Ensured use of latest revisions of IFC, MS, procedures, ITP,PQP, Project

specifications, engineering references and standards are maintained at sites. Developing and implementing quality control and quality assurance plans

on construction projects. Ensured smooth handing over of Project Documents. Maintained good relationship with customer and company personnel and

developed a professional team to establish a quality management system of the company in compliance with the relevant standards.

Ensured and communicated the implementation of storage procedure for correct identification of materials.

Established and maintained a system for the storage of quality assurance records and the associated updating of register.

Ensured that the quality objective of the project are coordinated and established.

Ensured that all deviations from the PQP and contract documents are documented and recorded.

Ensured that pro active continuous surveillance inspections are carried out to avoid non-conformance.

Participated in weekly progress meeting with the client and internal weekly meetings to communicate the quality levels at project site.

Effectively communicated quality issues to subcontractors, engineering staff, construction team, consultants and client representative.

Ensured that materials used on site meets the clients requirements. Reviewed ITP, work procedures, method statements as required on the

project prior to submittal to client for approval. Follow up approval of ITP, procedures and method statements from the client.

Evaluated the skills and qualifications of quality personnel prior to submittal to the client for approval.

Initiate corrective actions for any raised non-conformance, and implement a preventive action plan to prevent the re-occurrence of non-conformance, all in coordination with the project QA/QC Engineers.

2

Page 3: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

Well experienced in preparing QMR and quality TWLA schedule. Recommends any necessary changes to the system.

Developed training program for all work supervisors responsible for implementing the QA/QC procedures at site. Training records were maintained.

Coordinated with the third parties for inspections as required at the project . Ensured inspections are carried out in their presence and recorded properly.

Coordinated and supported in the preparation of management review meeting and highlighted all site issues to QA manager in order to minimize the recurrence of non-conformance.

Ensured that all internal Audits and external Audits are carried out in accordance with project Audit Schedule and follow up closure of audit findings after verification of quality records.

A wide experience of handling and closing of shut down projects in oil & gas and petrochemical industry.

Sales of Construction Materials including Water Supply Pipes (PPRC, HDPE, UPVC), Sewerage Pipes (PVC, Asbestos Cement), Gas Distribution Pipes (HDPE), Electrical Conduits (PVC), Architectural Cladding Walls (Asbestos Cement), Landscape Irrigation System (HDPE) and Corrugated Sheets (Asbestos Cement).

Site Construction including Surveying, Leveling, Layout, Earth Works, Reinforced Cement Concrete (RCC) Works, Installation of Prefabricated Shelters, Steel Structures and Managing Labor and Staff.avw HnnnH

Vendor and Sub Contractors’ Management, Direct Interface with the Customer, Resource Management, Team Building and Team Work.

Solution Oriented, Dedicated, Team Player, Good Communication and Inter Personal Skills.

Can communicate in English (proficient), Urdu/Hindi (Proficient) and Arabic (Basic).

Computer Literacy including MS Office; Civil Engineering software like Sap90 and AutoCAD

PROFESSIONAL WORK HISTORY

January 2015 to December 2015EMPLOYER: CHEC (China Harbor Engineering Company ) Project : (Jizan Integrated combined cycle- Package 06 –Seawater system Jizan ) Position :QC Manager- Aramco ApprovedCHEC scope was to design, engineer, procure, verify, finalize, construct, test, pre-commission and assist in the successfully commissioning of project. It was EPC mega Project that involved multi disciplines.Project Scope includes construction of inlet canal, inlet screening section, pump station, intake channel, Inplant lagoon, discharge channel, storm water channel, collection basin, outfall tank, submarine outfall and mixing basin.JIGCC seawater system is designed to provide 501,000 cum/hr/of seawater to JIGCC and refinery for use as primary cooling medium via inplant lagoon and return it to the sea .

Sep 2013 to January 2015

3

Page 4: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

Employer : CCCC ( China Communication Construction Company ) Project : ( Aramco-Jeddah stormwater drainage program-Package 13- Wadi Qura & Muraygh channels and dam) Position :QC Manager-Aramco ApprovedProject Scope includes Construction of channels, main Dam and saddle dam together with its associated works, pedestrian bridges over the channels, installation of closed circuit television (CCTV) system at Dam and channels. Flood alarm system was to be provided at the Dam.

June 2012 to Sep 2013Employer: AIC ltd ( Asyad International Company ltd ) Project :(Aramco-Replace utilities control systems at Jeddah Refinery) Position :QA/QC Supervisor-Aramco approvedAIC scope includes construction/ installation of facilities in accordance with scope of work. Project scope includes providing and installing new equipment, associated piping, tie-ins to all electrical and non-electrical utilities, process control and monitoring equipment, civil foundations and structural works, and to replace utility boilers and desalination plant existing control system with digital control system, to transfer the process control and monitoring of utility boilers and desalination plant to central control room, to replace existing control system of air compressors with digital control and communication system.Supervised and monitor activities of multi discipline QA/ QC department for ongoing construction activities. Reviewed hydro-test package, Tie-In package, loop package, Procedures method statement and working instructions of Vendors/sub-contractors for adequacy in relation to ISO 9001:2008 and Saudi Aramco quality requirements. Coordinated with third party (testing agencies/batching plants) for in time delivery of concrete/ Asphalt. Ensuring the availability of QC inspector during any operation. Maintain quality records and ensures control of documents by advising document controller, QC Engineers. Supported internal and external Audits as per schedule.

Jul 2009 To June 2012Employer: Nokia Siemens Networks Project: Zain Telecom Position: Quality Control Engineer Project scope includes design, procure, construction and commissioning of GSM sites in the region.Monitor Inspection activities at the Construction Sites to verify compliance with NSN Standards and Company Specifications. Monitor Contractors’ Inspectors and Quality System to ensure adequate performance and compliance with the company standards. Prepare Surveillance and Inspection Report with Proactive Approach.Promote and Built Awareness of Project Quality Requirements. Performed focused assessment of specific work elements to ensure that the project quality activities and processes are effective. Track and maintain quality records related to project. Review internal and external audits and coordinate with concerned department.

Feb 2008 to Feb 2009 4

Page 5: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

ZAIN (MTC), Saudi Arabia Senior Civil Engineer

To Supervise Preliminary Civil Design (PCD) and allowing Vendor to start Civil Works at GSM Sites.To Supervise Site Construction Works with Quality Control including Site Layout, Excavation, RCC Foundations, RCC Columns, Backfilling, Finished Floor Level, Installation of Steel Structure (Towers), Installation of Telecom Equipment, Electrical, Earthing and Grounding WorksTo Monitor Materials and Material Reports for Quality Assurance including Soil Reports, Concrete Testing, Reinforced Steel Bars Testing, Tower paint, Tower Galvanization and Earthing ResistanceAcceptance of the Sites from Vendor, Approving Vendors’ Invoices and Maintaining Site Acceptance Record

May 2007 to Feb 2008Employer: REINFORCED EARTH (Pvt) Ltd. ISLAMABAD Project: Layyari Expressway Karachi Position: Construction EngineerScope of work was construction supervision and quality control of mechanically stabilized earth walls.To coordinate with the design department and monitor the required necessary changes in the drawings as per field requirements. Conduct Inspections to ensure the work has been done in compliance with contract, drawings and method statement. To witness the sampling ,daily field tests and issue non conformance if work done is not according to the standards. To ensure quality of precast panels at Casting Yard According to Standard Drawings and to Maintain Quality Control and Quality Assurance for Reinforced Steel and Concrete and getting Approval from the Client for Site Works and Invoices

March 2005 May 2007Employer: GLOBECOM (Pvt) Ltd. ISLAMABAD Project: Construction of GSM towers for Mobilink Position: Regional Manager-Centre 3 and Sindh

To Plan, Administrate, Supervise and Maintain Quality Control For Construction of GSM sites, from scratch to finish, including Site Acquisition, Drawing Evaluation, Site Layout, Excavation, RCC Foundations, RCC Columns, Backfilling, Compaction, Installation of Steel Towers as high as 90 M, Construction of Equipment & Generators Rooms, Electrical and Earthing Works.To Deal and coordinate with clients and consultants for the progress, construction and erection of different GSM Towers on technical grounds i.e. according to the design and specifications. Coordination and correspondence with the head office about the activities going on in the region.(Daily reports of staff, bills ,car maintenance etc)

April 2004 to March 2005DADEX ETERNIT (Pvt) Ltd. ISLAMABAD Assistant Sales Manager (Technical )

5

Page 6: Adnan Resume revised

CURRICULUM VITAE QA/QC Manager

To manage, discuss and coordinate with the clients/consultants for technical usage, design requirements/aspects etc. relating to the product installation.

To visit different architects, consultants, builders, public organizations, NGO's and Industries and coordinate about our products.

Maintaining the Quality Control, checking the usage of products and advise the site staff about the use of products.

To design, estimate, guide and survey of sites relating to installations of different Dadex Products including PVC/UPVC sanitary, sewerage & water supply pipes and fittings.

January 2004 to March 2004ARMY HOUSING DTE. GHQ Quality and Site Engineer Scope of work includes construction of houses, roads construction , laying of services and construction of overhead water tank.To participate in the communication meetings with contractors to identify problems and discuss possible solutions, analyzing the options and proposing the best option. To Study and monitor different designed aspects of construction and development works within the site. Quality Assurance within the specifications defined. To deliver presentations for Senior level staff and also to control supervisory staff and manage their respective duty and sites. To estimate quantities at sites and to approve Contractors’ invoices.

January 2001 to December 2003

Employer :KARCON (Pvt) LTD. ISLAMABAD Projects : National Police foundation ( E-11 and Lohi Bhair ) and GT-Road Rawalpindi Position : Quality Control/site SupervisorScope of work includes laying of services, construction of roads, concrete works, construction of culverts and construction of bridges. Supervised and managed quality control & project scheduling of different road projects in Rawalpindi & Peshawar (Pakistan).Quality Control of Materials at Concrete Batching Plant. Testing and quality control of concrete and Reinforced Bars. Issuance of safety instructions to all operators. Updating daily QC reports to undertake QC standards.

ACHEIVEMENTS

Letter of appraisal was awarded by the ex-employer , NSN, for timely achievements.

Letter of appraisal awarded by Ex employer CCCC for maintaining quality objectives and quality control at site.

Letter of appraisal was awarded by the Ex-Employer, Globcomm (pvt) Ltd , for carrying out the highest rollout for the company in Pakistan for the year 2006.

References: Can be furnished upon request.