B0405 Room Data Sheet ADB Project: 7857 7857 Nottingham Uni Medical Centre Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England - list of rooms Room: B0405 Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds) Room Number: Revision Date: 01/03/2017 1) User may undress and dress in privacy. 2) Rest and relaxation or sleeping. 3) Patient may take meals or refreshments in bed, by the bed or in the sitting space. 4) Entertainment services system may be used. 5) Patient may receive visitors. 6) Clinical wash-hand basin may be used. 7) Patient records may be reviewed and recorded. 8) Electronic patient records (EPRs) may be accessed and updated. 9) Medicines for use by patients (self-medication) is stored securely in a 'personal' locker. 10) A working supply of linen and amenities is stored. 11) A working supply of consumables may be held/stored. 12) Personal belongings and clothing are stored. 13) Mobile hoist may be used. 14) Patient will receive therapeutic and clinical attention from healthcare staff . 15) Patient may be ambulant, in a wheelchair or on a trolley or bed 16) Carrying out examinations and assessment of patient. 17) Piped medical gases, vacuum and associated equipment may be used. Activities: Personnel: 4 x patients. 8 x others (staff and/or visitors). Planning Relationships: Close to social space. En-suite sanitary facilities. Space Data: Height (mm): 64.00 2,700 Area (m²): Notes: This room is based on the use of a trolley with a worktop. It is assumed that computers will be handheld or brought into the room on a trolley. The call repeat lamp is situated over the door outside the room. The following items may be provided: - a ceiling-mounted hoist; - when used for maternity post-natal provision of a cot(s) will be required. Separate data and voice outlets may be used where structure cabling solutions are not available. ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist equipment (chairs, drawer units, non-fixed medical equipment). 4. NHS IT equipment (nil cost to the project). 5. Dental supply and install. 6. Pharmacy supply and install. 7. UoN IT support and install. 8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage. 9. UoN F.O.C. Activity DataBase 01/03/2017

Upload: others

Post on 24-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

B0405Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: B0405 Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds)

Room Number: Revision Date: 01/03/2017

1) User may undress and dress in privacy.

2) Rest and relaxation or sleeping.

3) Patient may take meals or refreshments in bed, by the bed or in the sitting space.

4) Entertainment services system may be used.

5) Patient may receive visitors.

6) Clinical wash-hand basin may be used.

7) Patient records may be reviewed and recorded.

8) Electronic patient records (EPRs) may be accessed and updated.

9) Medicines for use by patients (self-medication) is stored securely in a 'personal' locker.

10) A working supply of linen and amenities is stored.

11) A working supply of consumables may be held/stored.

12) Personal belongings and clothing are stored.

13) Mobile hoist may be used.

14) Patient will receive therapeutic and clinical attention from healthcare staff .

15) Patient may be ambulant, in a wheelchair or on a trolley or bed

16) Carrying out examinations and assessment of patient.

17) Piped medical gases, vacuum and associated equipment may be used.

Activities:

Personnel: 4 x patients.

8 x others (staff and/or visitors).

Planning

Relationships:

Close to social space.

En-suite sanitary facilities.

Space Data: Height (mm): 64.00 2,700Area (m²):

Notes: This room is based on the use of a trolley with a worktop.

It is assumed that computers will be handheld or brought into the room on a trolley.

The call repeat lamp is situated over the door outside the room.

The following items may be provided:

- a ceiling-mounted hoist;

- when used for maternity post-natal provision of a cot(s) will be required.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 2: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data B0405ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: B0405 Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N/EM

Daytime General Service Illuminance (Lux): 100

Daytime Specific Service Illuminance (Lux): 300

Nighttime General Service Illuminance (Lux): 5

Nighttime Specific Service Illuminance (Lux): 0.5

Local Task Illuminance (Lux): 300

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: A

AStandby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

35

45

The LAmax,f dB noise limit applies only at night 23:00 to

07:00 hours.

Maximum Internal Noise from M&E Services (NR): 30 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 3: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character B0405

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds)B0405Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

3 sets of doors:

1 x personnel, wheelchair & equipment access (1000mm);

1 x personnel, trolley, wheelchair & equipment access (1300mm)

1 x personnel, bed, trolley, wheelchair & equipment access (1500mm)

Windows: Essential

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 4: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

B0405ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: B0405 Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1BED HEAD BUFFER/DOCKING device, bed and wall

protection, horizontal, wall mounted, (internal

clearance 1000-1400)

BED04033

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01944

1LUMINAIRE, bedhead, dimmable, patient reading

and general nursing care/examination

LIG00533

1SOCKET outlet, switched, 13 amp, singleOUT00522

1SOCKET outlet, switched, 13 amp, twinOUT01055

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13122

1RAIL, clinical equipment, wall mounted, 600mmRAI13022

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01311

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02333

1WORKTOP, clinical, for 3 x 400 facing modular

storage cabinets, 1365W 700D

SMW05311

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3BED variable height, two-way tilt, adjustable backrest

and knee-break, built-in bed extension with mattress

retainer, electrically operated, on castors, 380-780H

2260/2430L 1010W

BED01544

3CHAIR, easy, high back, with open arms,

upholstered, wipeable

CHA30744

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3MATTRESS, suitable for BED015MAT00844

3TABLE, overbed, cantileveredTAB07344

3ROBE-LOCKER combined, with lockable

section/drawer, towel rail at rear, on castors, 1430H

610W 530D

WAR02144

Activity DataBase 01/03/2017

Page 5: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

B0405ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: B0405 Patient Obs. Bays for no. 4 (based on Multi-bed room: 4 beds)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

8TRACK, blinds for windowsTRA90033

Activity DataBase 01/03/2017

Page 6: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

C0237Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: C0237 Consult / Exam (based on Consulting/examination room: double-sided couch

access)

Room Number: Revision Date: 01/03/2017

1) Consultations may take place.

2) Sterile supplies and consumables are stored on a trolley.

3) User may undress and dress in privacy.

4) Electronic patient records (EPRs) may be accessed and updated.

5) Clinical hand washing.

6) Discussions and interviews may take place.

7) Carrying out examinations and assessment of patient.

8) Patient may arrive on foot or in a wheelchair.

9) Examinations of the patient may be carried out from one or both sides of the couch.

10) Minimally invasive clinical procedures may be undertaken from one or both sides of the

couch.

11) Call systems may be used.

Activities:

Personnel: 1 x patient.

1-2 x staff.

1 x other (escort).

Planning

Relationships:

Space Data: Height (mm): 16.00 2,700Area (m²):

Activity DataBase 01/03/2017

Page 7: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Notes: This room includes a 3-section couch, alternatively, it may accommodate a 2-section

couch or specialist couch.

The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- patient/staff call (although expected where a patient will be left unattended);

- room in use switch and indicator.

The following items may be provided:

- a small printer;

- a small lockable drawer;

- dimming switch.

Piped medical gases may be required for some clinical specialties.

Workstations have been placed in Consult/ exam rooms at 900mmm. Local policy may

prefer a desk up to 1200mm to facilitate working practice.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 8: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data C0237ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0237 Consult / Exam (based on Consulting/examination room: double-sided couch

access)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300 WP

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 1000 Bed level (provided by the mobile examinantion lamp)

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 9: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character C0237

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Consult / Exam (based on Consulting/examination room: double-sided couch

access)

C0237Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Requirement for hinge protection when areas used by children

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 10: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C0237ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0237 Consult / Exam (based on Consulting/examination room: double-sided couch

access)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1PUSH BUTTON, patient/staff call (help) with socket

for patient hand-held unit

CAL00311

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK, cantilever, single pedestal 3 drawer, cable

management, modesty panel, 1800W 800D

DES02011

1HOOK, single, small, wall mountedHOO01955

1LUMINAIRE, examination, ceiling, adjustable, 1000

lux

LIG05311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01055

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13122

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01311

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02333

1WORKTOP, clinical, for 3 x 400 facing modular

storage cabinets, 1365W 700D

SMW05311

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31822

3COUCH, examination/treatment, (3 section), variable

height, retractable wheels, with paper roll holder

COU01011

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3HOLDER, sharps box, up to 7 litre capacity,

rail/trolley hang or wall mounted, 170H 125W 100D

HOL02011

Activity DataBase 01/03/2017

Page 11: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C0237ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0237 Consult / Exam (based on Consulting/examination room: double-sided couch

access)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3REFRIGERATOR, capacity 160 litre, automatic

defrost, stainless steel, underbench, external

temperature gauge, lockable, on castors, 850H

610W 600D

REF05811

3TROLLEY, modular storage, single open frame,

including handle and worktop, with up to 5 sets of

runners for 600 facing inserts, 850H 730W 450D

SMT00211

3TRACK, curtain, two sided, to suite room dimensionsTRA90111

4COMPUTER KEYBOARDCOM93311

4COMPUTER PRINTER, laser, A4, 250H 380W 385DCOM93811

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94911

4PRINTER, for labels, desk mountedPRI90022

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 12: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

C0515Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: C0515 Patient Test (based on Testing room: audiometric booth)

Room Number: Revision Date: 01/03/2017

1) Audiometric examination and test procedures may take place.

2) Recording patient data/notes.

3) Patient may be ambulant with/without walking aids, in a wheelchair or requiring assistance.

4) Recording equipment may be used.

5) Computer workstation(s) may be used.

6) Monitoring/diagnostic or therapeutic equipment may be used.

7) Specialised visual aids and multi-media equipment may be used.

8) Clinical hand washing may be undertaken.

Activities:

Personnel: 1 x patient.

1 x staff.

2 x others (escorts).

Planning

Relationships:

Easy access from waiting area.

Clinical handwash to be located outside of the room/booth.

Space Data: Height (mm): 8.00 2,000Area (m²):

Height is the nominal internal dimension of a standard booth and is subject to

design/local decision.

Room area includes booth wall thickness but excludes surrounding void and space for

basin.

Notes: Specialist equipment and associated services are a project team option.

Computer CPU, if provided, to be within an acoustic housing or situated within an

adjoining space.

The call repeat lamp is situated over the door outside the room.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 13: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data C0515ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0515 Patient Test (based on Testing room: audiometric booth)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 300 WP

Daytime Specific Service Illuminance (Lux): 150 During test

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

35

-

-

Specialist advice required.

Maximum Internal Noise from M&E Services (NR): 30 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 14: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character C0515

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Patient Test (based on Testing room: audiometric booth)C0515Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset - sound attenuating steel doors by specialist:

1 x personnel, wheelchair & equipment access (1000mm)

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 15: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C0515ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0515 Patient Test (based on Testing room: audiometric booth)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1LAMP INDICATING fire alarm initiation, wall mountedALA02011

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01044

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13133

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

3TYMPANOMETER, audiometrec testingAUD00611

3COMPUTER with built-in keyboard, 130H 465W

372D

AUD01511

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30122

3CHAIR, upright, upholstered, stacking, wipeableCHA31722

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3TABLE, 710H 600W 450DTAB00311

3TABLE, 720H 900W 700DTAB17711

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

Activity DataBase 01/03/2017

Page 16: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

C0522-04Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: C0522-04 Patient Recovery (based on Recovery room: 1 place)

Room Number: Revision Date: 01/03/2017

1) Examinations of the patient may be carried out from one or both sides of the couch.

2) Electronic patient records (EPRs) may be accessed and updated.

3) Clinical hand washing.

4) Call systems may be used.

5) Patient may be ambulant, in a wheelchair or on a trolley or bed

6) Patient may undress/dress in privacy.

7) Telephone(s) may be used.

8) Piped medical gases, vacuum and associated equipment may be used.

Activities:

Personnel: 1x Patient

1-2x Staff

1x Other (escort)

Planning

Relationships:

Space Data: Height (mm): 12.00 2,700Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- patient/staff call (although expected where a patient will be left unattended);

- room in use switch and indicator;

- clinical workstation;

- location of the privacy curtain (may be at door entrance, as shown, or between couch

and clinical workstation, see HBN 00-03).

Workstations have been placed in at 900mmm. Local policy may prefer a worktop up to

1200mm to facilitate working practice.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 17: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data C0522-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0522-04 Patient Recovery (based on Recovery room: 1 place)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 15

Ventilation Type: S/E

BalPressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N/S

Daytime General Service Illuminance (Lux): 500 WP

Daytime Specific Service Illuminance (Lux): 500 WP

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: A

AStandby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

35

45

The LAmax,f dB noise limit applies only at night 23:00 to

07:00 hours.

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 18: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character C0522-04

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Patient Recovery (based on Recovery room: 1 place)C0522-04Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Requirement for hinge protection when areas used by children

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 19: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C0522-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0522-04 Patient Recovery (based on Recovery room: 1 place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1PUSH BUTTON, patient/staff call (help) with socket

for patient hand-held unit

CAL00311

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01955

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01077

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13144

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 900W 700D

SMW06911

1SWITCH, lightSWC02511

1SWITCH, 'Room in use' illuminated sign.SWC07611

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRACK, curtain, door, C-shapeTRA14711

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2BRACKET, holder, suction unit.BRA00311

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3CHAIR, swivel, height adjustable, medium back,

wipeable, 5 star base, on castors

CHA30211

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3CHAIR, easy, reclining, wipeableCHA39111

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3HOLDER, sharps box, up to 7 litre capacity,

rail/trolley hang or wall mounted, 170H 125W 100D

HOL02011

3LOCKER, bedside, 4 compartment with lockable

section /drawer, towel rail at rear, on castors, 902H

485W 485D

LOC00411

3TROLLEY, modular storage, single open frame,

including handle and worktop, with up to 5 sets of

runners for 600 facing inserts, 850H 730W 450D

SMT00211

3STOOL, height adjustable, swivel, mobileSTO00411

Activity DataBase 01/03/2017

Page 20: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C0522-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C0522-04 Patient Recovery (based on Recovery room: 1 place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 21: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

C1023Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: C1023 Ophthalmic test room

Room Number: Revision Date: 01/03/2017

1) Interviewing and consultation.

2) Assessment for error of refraction when test type is situated behind the patient and viewed

by patient in a mirror sited 3 metres in front.

3) Examine the eye by means of a slit lamp.

4) Clinical hand washing.

5) Electronic patient records (EPRs) may be accessed and updated.

6) Computer workstation(s) may be used.

7) Telephone(s) may be used.

8) A working supply of stationery is held.

9) Patient to undergo optometry examination, (low vision assessment).

Activities:

Personnel: 1 x Patient

1 x Staff

1 x Other (escort)

Planning

Relationships:

Within ophthalmic clinic.

Space Data: Height (mm): 12.00 2,700Area (m²):

Notes: This room will accommodate: Vision Testing, Low Vision Assessment and Ophthalmic

Technical Consultation and can be used by Ophthalmology Consultants or Nurses ,

Orthoptists or Optometrists depending on the Project and local policy.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 22: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data C1023ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C1023 Ophthalmic test room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300 WP

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: 6500K Colour Temperature - Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 23: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character C1023

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Ophthalmic test roomC1023Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Requirement for hinge protection when areas used by children

Windows: Non-essential - Project Option

Clear glass with solar and privacy control. Blackout

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 24: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

C1023ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: C1023 Ophthalmic test room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CHAIR, treatment, reclining, height adjustable,

wipeable.

CHA37211

1HOOK, single, small, wall mountedHOO01933

1MIRROR, optical glass, 700H 400WMIR03111

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04944

1SOCKET outlet data/voice, double.OUT13122

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 1200W 700D

SMW07211

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DIAGNOSTIC SET, ophthalmoscope/auriscope with

handle, wall mounted

DIA03011

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2TEST Snellen, with controls, wall mountedTES00411

3CASE, trial lens, for use with electric

ophthalmoscope

CAS01111

3CHAIR, swivel, height adjustable, medium back,

wipeable, 5 star base, on castors

CHA30211

3CHAIR, swivel, height adjustable, medium back,

wipeable, 5 star base, on glides

CHA30411

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3TEST LogMAR visual acuity chartOPH01511

3SLIT LAMP, with accessories and height adjustable

stand

OPH02611

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

Activity DataBase 01/03/2017

Page 25: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

D0434-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: D0434-01 Dental Staff Rest (based on Rest room with beverages and snack preparation

bay: 10 places)

Room Number: Revision Date: 01/03/2017

1) Rest and relaxation or sleeping.

2) Small amounts of dry goods are stored in cupboard(s).

3) Holding/ storing food in refrigerator.

4) Crockery and cutlery are washed mechanically.

5) Hand-rinse basin may be used.

6) Consuming beverages, meals and snacks.

7) People preparing beverages, meals and snacks.

8) Telephone may be used and messages taken.

9) Laptop computer(s) may be used.

Activities:

Personnel: 10 x persons..

Planning

Relationships:

Staff use - located away from public areas.

Space Data: Height (mm): 20.50 2,700Area (m²):

Notes: The following items are shown on the room layout but are optional:

- telephone outlet;

- mini kitchen water boiler;

- mini kitchen microwave.

The following items may be provided:

- cube lockers for personal belongings;

- television, radio - generally not in staff rest areas;

- water cooler, or access.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 26: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data D0434-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: D0434-01 Dental Staff Rest (based on Rest room with beverages and snack preparation

bay: 10 places)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 – 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

-vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V/EM

Daytime General Service Illuminance (Lux): 50 Floor

Daytime Specific Service Illuminance (Lux): 200 On tables

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 300 At servery counter

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

High

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 27: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character D0434-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Dental Staff Rest (based on Rest room with beverages and snack

preparation bay: 10 places)

D0434-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 28: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

D0434-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: D0434-01 Dental Staff Rest (based on Rest room with beverages and snack preparation

bay: 10 places)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1BOARD, display/notice, wall mounted, 900H 600WBOA01211

1CUPBOARD, 2 adjustable shelves, wall mounted,

750H 600W 300D

CUP25211

1CUPBOARD, space for built in microwave, wall

mounted, 750H 600W 300D

CUP25911

1CUPBOARD, base, including sink panel, with door,

on plinth, 900H 600W 500D

CUP71511

1CUPBOARD/DRAWER UNIT, base, with door, on

plinth, 900H 600W 500D

CUP73111

1OUTLET cable, 13 ampOUT00233

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1CONNECTION UNIT, switched, 13 ampOUT05233

1SOCKET outlet data/voice, double.OUT13122

1OUTLET, cold water for equipmentOUT30111

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, pillar, high neck, long lever, pair hot and cold,

1/2 in.

TAP35911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted recessed grated, metal, 1.1/2 in,

with plug and chain

WAS10311

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

1WATER BOILER, 2.5 litre, electric, wall mountedWAT00311

1WORKTOP, dished, stainless steel, with integral

centre sink bowl and 2 tap holes, 2100W 600D

WRT22111

5CHAIR, easy, low back, upholstered, wipeableCHA40566

5CHAIR, upright, upholstered, stacking, wipeableCHA41733

5DISPENSER, soap, wall mountedDIS12411

5HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL10611

5OVEN, microwave, capacity 18 litre, build in, (suitable

for CUP259)

OVE11611

5REFRIGERATOR, capacity 160 litre, automatic

defrost, stainless steel, underbench, external

temperature gauge, lockable, on castors, 850H

610W 600D

REF15811

5TABLE, 710H 900W 900DTAB10711

5TABLE, occasional, square, 415H 610W 610DTAB15333

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 29: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

D0434-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: D0434-03 Health Centre Rest Room (based on Rest room with beverages and snack

preparation bay: 20 places)

Room Number: Revision Date: 01/03/2017

1) Rest and relaxation or sleeping.

2) Small amounts of dry goods are stored in cupboard(s).

3) Holding/ storing food in refrigerator.

4) Crockery and cutlery are washed mechanically.

5) Hand-rinse basin may be used.

6) Consuming beverages, meals and snacks.

7) People preparing beverages, meals and snacks.

8) Telephone may be used and messages taken.

9) Laptop computer(s) may be used.

Activities:

Personnel: 20 x persons..

Planning

Relationships:

Staff use - located away from public areas.

Space Data: Height (mm): 35.50 2,700Area (m²):

Notes: The following items are shown on the room layout but are optional:

- telephone outlet;

- mini kitchen water boiler;

- mini kitchen microwave.

The following items may be provided:

- cube lockers for personal belongings;

- television, radio - generally not in staff rest areas;

- water cooler, or access.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 30: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data D0434-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: D0434-03 Health Centre Rest Room (based on Rest room with beverages and snack

preparation bay: 20 places)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 – 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

-vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V/EM

Daytime General Service Illuminance (Lux): 50 Floor

Daytime Specific Service Illuminance (Lux): 200 On tables

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 300 At servery counter

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

High

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 31: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character D0434-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Health Centre Rest Room (based on Rest room with beverages and snack

preparation bay: 20 places)

D0434-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 32: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

D0434-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: D0434-03 Health Centre Rest Room (based on Rest room with beverages and snack

preparation bay: 20 places)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1BOARD, display/notice, wall mounted, 900H 600WBOA01211

1CUPBOARD, 2 adjustable shelves, wall mounted,

750H 600W 300D

CUP25222

1CUPBOARD, space for built in microwave, wall

mounted, 750H 600W 300D

CUP25911

1CUPBOARD, base, including sink panel, with door,

on plinth, 900H 600W 500D

CUP71533

1OUTLET cable, 13 ampOUT00255

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01044

1CONNECTION UNIT, switched, 13 ampOUT05222

1SOCKET outlet data/voice, double.OUT13133

1OUTLET, cold water for equipmentOUT30111

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, pillar, high neck, long lever, pair hot and cold,

1/2 in.

TAP35922

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted recessed grated, metal, 1.1/2 in,

with plug and chain

WAS10311

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10822

1WATER BOILER, 2.5 litre, electric, wall mountedWAT00311

1WORKTOP, plain, stainless steel, with 2 sink bowls

&amp; drainers, cantilevered from wall, 2400W

650D, HTM63

WKT52011

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

3CHAIR, easy, low back, upholstered, wipeableCHA3051010

3CHAIR, upright, upholstered, stacking, wipeableCHA3171616

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3OVEN, microwave, light duty, 1000watt, capacity 26

litres, 295H 295W 410D

OVE01422

3REFRIGERATOR, capacity 385 litre, automatic

defrost, stainless steel, external temperature gauge,

lockable, on castors, 1995H 600W 700D

REF06722

3TABLE, circular, 760H 1100mm dia.TAB03044

3TABLE, occasional, square, 415H 610W 610DTAB05333

8TRACK, blinds for windowsTRA90022

Activity DataBase 01/03/2017

Page 33: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

G0180-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: G0180-01 Parking bay: resusitation trolley

Room Number: Revision Date: 01/03/2017

1) Mobile equipment may be parked and stored and/or recharged.

2) Equipment is placed on charge.

3) Carrying out routine checks on equipment.

Activities:

Personnel: Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 2.00 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 34: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data G0180-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0180-01 Parking bay: resusitation trolley

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): See HVAC notes 2

Ventilation Type: N

BalPressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes: Part of corridor space

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 35: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character G0180-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Parking bay: resusitation trolleyG0180-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 36: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

G0180-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0180-01 Parking bay: resusitation trolley

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, twinOUT01022

3TROLLEY, Stirling Medical - LX34RES5,

emergency/resuscitation, 1010H 690W 540D

TRO90011

Activity DataBase 01/03/2017

Page 37: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

G0400-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: G0400-03 Corridor

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel:

Planning

Relationships:

General circulation.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 2,500Area (m²):

Notes: General circulation.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 38: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data G0400-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-03 Corridor

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 39: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character G0400-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

CorridorG0400-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 40: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

G0400-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-03 Corridor

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1OUTLET cable, 13 ampOUT00211

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

9DISPENSER, disposable cup, wall mountedDIS01211

Activity DataBase 01/03/2017

Page 41: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

G0400-05Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: G0400-05 Corridor

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel:

Planning

Relationships:

General circulation.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 2,500Area (m²):

Notes: General circulation.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 42: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data G0400-05ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-05 Corridor

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 43: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character G0400-05

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

CorridorG0400-05Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 44: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

G0400-05ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-05 Corridor

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3SCALE, measuring machine, height weight and blood

pressure measure

SCA90011

Activity DataBase 01/03/2017

Page 45: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

G0400-06Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: G0400-06 Corridor

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel:

Planning

Relationships:

General circulation.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 2,500Area (m²):

Notes: General circulation.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 46: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data G0400-06ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-06 Corridor

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 47: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character G0400-06

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

CorridorG0400-06Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 48: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

G0400-06ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: G0400-06 Corridor

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1CUPBOARD, 2 adjustable shelves, wall mounted,

750H 600W 300D

CUP25222

1CUPBOARD, base, including sink panel, with door,

on plinth, 900H 600W 500D

CUP71522

1OUTLET cable, 13 ampOUT00211

1OUTLET, cold water for equipmentOUT30111

1SINK UNIT, 1 bowl and drainer, stainless steel,

variable height, motorised system, 650/910H 1200W

580D

SIN10511

1TAP, pillar, high neck, long lever, pair hot and cold,

1/2 in.

TAP35911

1WASTE, unslotted recessed grated, metal, 1.1/2 in,

with plug and chain

WAS10311

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

1WATER BOILER, 2.5 litre, electric, wall mountedWAT00311

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA36733

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 49: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

H1304-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: H1304-001 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

1) Seminars/conferences are held.

2) Multimedia equipment may be used.

3) Laptop computer(s) may be used.

4) Telephone(s) may be used.

Activities:

Personnel: 21 x persons (including lecturer).

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 28.00 2,700Area (m²):

Notes: For flexibility in use, direct access to a store is required.

The call repeat lamp is situated over the door outside the room.

The following items may be provided:

- a TV;

- an overhead projector;

- video-conferencing facilities;

- an induction loop hearing system;

- a public address system (in larger seminar rooms);

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

- audiovisual links to clinical areas for training purposes;

- shelving, desks/tables and computers for training use.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 50: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data H1304-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: H1304-001 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

BalPressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 100-150 On floor

Daytime Specific Service Illuminance (Lux): 300 Over working plane

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

53

-

-

Maximum Internal Noise from M&E Services (NR): 53 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 51: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character H1304-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Seminar room: 20 places (including 1 wheelchair place)H1304-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, wheelchair & equipment access (1500mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control.

Blinds will be required to darken room, full blackout is rarely required

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 52: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

H1304-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: H1304-001 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1HOOK, single, small, wall mountedHOO0191515

1OUTLET cable, fused, 13 amp, ceiling mountedOUT00411

1SOCKET outlet, switched, 13 amp, twinOUT0101010

1SOCKET outlet, computer data, doubleOUT13366

1SOCKET outlet, computer data, single, ceiling

mounted

OUT13511

1SOCKET outlet, telephoneOUT21511

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1THERMOSTATTHE00511

3BOARD, flip chart, height adjustable, freestandingBOA05111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA3182020

3CUPBOARD, steel, 2 adjustable shelves, 2 door,

lockable, 900H 900W 420D

CUP03611

3TABLE, 710H 1200W 600DTAB00833

770 inch screen to be controlled by local laptopSCR90111

8TRACK, blinds for windowsTRA90033

Activity DataBase 01/03/2017

Page 53: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

H1304-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: H1304-002 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

1) Seminars/conferences are held.

2) Multimedia equipment may be used.

3) Laptop computer(s) may be used.

4) Telephone(s) may be used.

Activities:

Personnel: 21 x persons (including lecturer).

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 28.00 2,700Area (m²):

Notes: For flexibility in use, direct access to a store is required.

The call repeat lamp is situated over the door outside the room.

The following items may be provided:

- a TV;

- an overhead projector;

- video-conferencing facilities;

- an induction loop hearing system;

- a public address system (in larger seminar rooms);

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

- audiovisual links to clinical areas for training purposes;

- shelving, desks/tables and computers for training use.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 54: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data H1304-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: H1304-002 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

BalPressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 100-150 On floor

Daytime Specific Service Illuminance (Lux): 300 Over working plane

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

53

-

-

Maximum Internal Noise from M&E Services (NR): 53 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 55: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character H1304-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Seminar room: 20 places (including 1 wheelchair place)H1304-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, wheelchair & equipment access (1500mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control.

Blinds will be required to darken room, full blackout is rarely required

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 56: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

H1304-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: H1304-002 Seminar room: 20 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01322

1HOOK, single, small, wall mountedHOO0191717

1OUTLET cable, fused, 13 amp, ceiling mountedOUT00411

1SOCKET outlet, switched, 13 amp, twinOUT0101010

1SOCKET outlet, computer data, doubleOUT13355

1SOCKET outlet, computer data, single, ceiling

mounted

OUT13511

1SOCKET outlet, telephoneOUT21511

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1THERMOSTATTHE00511

3BOARD, flip chart, height adjustable, freestandingBOA05111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA3182020

3CUPBOARD, steel, 2 adjustable shelves, 2 door,

lockable, 900H 900W 420D

CUP03611

3TABLE, 710H 1200W 600DTAB00833

770 inch screen to be controlled by local laptopSCR90111

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 57: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J0232-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J0232-001 Reception Dental Area (based on Reception: 2 person)

Room Number: Revision Date: 01/03/2017

1) Reception and registration of patients.

2) Maintaining appointments and attendance register.

3) Computer workstation(s) may be used.

4) Dealing with enquiries.

5) Telephone(s) may be used.

6) Controlling access to clinical or work area.

7) Staff notices, information and/or messages may be displayed.

Activities:

Personnel: 2 x staff.

2 x patients/visitors.

Planning

Relationships:

Close to, with clear view of, entrance and waiting area.

Close to self-registration point when provided.

Close to clinical or work area(s).

Easy access to records store when paper records are still used.

Access to a "safe haven" area.

Space Data: Height (mm): 11.00 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: The reception desk should be accessible to all users and provide security for staff .

In facilities for children and young people it should be child friendly.

The following items may be provided:

- a printer;

- a "controlled entry" system;

- a "next patient" call system;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 58: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J0232-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J0232-001 Reception Dental Area (based on Reception: 2 person)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

BalPressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 500 Over desk task area

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

58

-

-

Maximum Internal Noise from M&E Services (NR): 58 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 59: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J0232-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Reception Dental Area (based on Reception: 2 person)J0232-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 60: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J0232-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J0232-001 Reception Dental Area (based on Reception: 2 person)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BESPOKE RECEPTION DESK, console top, Custom

fit

COU90111

1SOCKET outlet, switched, 13 amp, singleOUT00522

1SOCKET outlet, switched, 13 amp, twinOUT01066

1SOCKET outlet data/voice, double.OUT13133

1PANEL, indicatorPAN06311

1SWITCH, lightSWC02522

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30133

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05611

4COMPUTER KEYBOARDCOM93333

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94933

Activity DataBase 01/03/2017

Page 61: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J0232-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J0232-002 Reception: 2 person

Room Number: Revision Date: 01/03/2017

1) Reception and registration of patients.

2) Maintaining appointments and attendance register.

3) Computer workstation(s) may be used.

4) Dealing with enquiries.

5) Telephone(s) may be used.

6) Controlling access to clinical or work area.

7) Staff notices, information and/or messages may be displayed.

Activities:

Personnel: 2 x staff.

2 x patients/visitors.

Planning

Relationships:

Close to, with clear view of, entrance and waiting area.

Close to self-registration point when provided.

Close to clinical or work area(s).

Easy access to records store when paper records are still used.

Access to a "safe haven" area.

Space Data: Height (mm): 11.00 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: The reception desk should be accessible to all users and provide security for staff .

In facilities for children and young people it should be child friendly.

The following items may be provided:

- a printer;

- a "controlled entry" system;

- a "next patient" call system;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 62: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J0232-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J0232-002 Reception: 2 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

BalPressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 500 Over desk task area

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

58

-

-

Maximum Internal Noise from M&E Services (NR): 58 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 63: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J0232-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Reception: 2 personJ0232-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 64: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J0232-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J0232-002 Reception: 2 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BESPOKE RECEPTION DESK, console top, Custom

fit

COU90211

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01066

1SOCKET outlet data/voice, double.OUT13133

1PANEL, indicatorPAN06311

1SWITCH, lightSWC02511

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40133

5COMPUTER KEYBOARDCOM13333

5COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM14933

5DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA15611

5PRINTER multifunction, network, floor standing, zone

1800W 750D

PRI21011

Activity DataBase 01/03/2017

Page 65: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-01ARoom Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-01A Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Adjacent to reception area.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 10.00 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 66: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-01AADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01A Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 67: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-01A

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Waiting area: 20 places (including 2 wheelchair places)J1155-01ARoom:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 68: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-01AADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01A Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA36733

3UNIT CHAIR, 2 seater, with arms, upholstered,

wipeable

CHA3681111

3UNIT CHAIR, 3 seater, with arms, upholstered,

wipeable

CHA36955

Activity DataBase 01/03/2017

Page 69: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-01BRoom Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-01B Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Activities:

Personnel:

Planning

Relationships:

Space Data: Height (mm): 10.00 2,700Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 70: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-01BADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01B Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

Heating Design Temperature (dry bulb)(degC):

Minimum Air Changes (AC/hr):

Ventilation Type:

Pressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control:

Daytime General Service Illuminance (Lux):

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: N

Colour Rendering Required Characteristics (Ra):

Unified Glare Rating Limit (UGRL):

Emergency Escape Route Lighting Required: N

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

Maximum Internal Noise from M&E Services (NR):

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Noise Sensitiviy:

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

Domestic Hot Water Discharge Temperature (DegC):

Maximum Cold Water Discharge Temperature (DegC):

General Notes:

Type of Automatic Fire Detection:

General Notes:

Activity DataBase 01/03/2017

Page 71: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-01B

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Waiting area: 20 places (including 2 wheelchair places)J1155-01BRoom:

01/03/2017Revision Date:Room Number:

Walls:

Floor:

Ceiling:

Doorsets:

Windows:

Internal Glazing:

Hatch:

Notes:

Activity DataBase 01/03/2017

Page 72: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-01BADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01B Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1OUTLET cable, 13 ampOUT00233

1SOCKET outlet data/voice, double.OUT13122

2TELEVISION monitor, colour, flat panel, large, wall

mounted

TVM00311

3RACK, magazine, 3 shelves, floor standing, fixed to

the wall, 1400H 900W 300D

RAC09111

4SCREEN, colour, check-in, required specialist socketSCR90033

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

Activity DataBase 01/03/2017

Page 73: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-01CRoom Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-01C Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Activities:

Personnel:

Planning

Relationships:

Space Data: Height (mm): 10.00 2,700Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 74: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-01CADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01C Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

Heating Design Temperature (dry bulb)(degC):

Minimum Air Changes (AC/hr):

Ventilation Type:

Pressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control:

Daytime General Service Illuminance (Lux):

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: N

Colour Rendering Required Characteristics (Ra):

Unified Glare Rating Limit (UGRL):

Emergency Escape Route Lighting Required: N

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

Maximum Internal Noise from M&E Services (NR):

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Noise Sensitiviy:

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

Domestic Hot Water Discharge Temperature (DegC):

Maximum Cold Water Discharge Temperature (DegC):

General Notes:

Type of Automatic Fire Detection:

General Notes:

Activity DataBase 01/03/2017

Page 75: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-01C

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Waiting area: 20 places (including 2 wheelchair places)J1155-01CRoom:

01/03/2017Revision Date:Room Number:

Walls:

Floor:

Ceiling:

Doorsets:

Windows:

Internal Glazing:

Hatch:

Notes:

Activity DataBase 01/03/2017

Page 76: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-01CADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-01C Waiting area: 20 places (including 2 wheelchair places)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1OUTLET, drinking water for equipmentOUT31511

3UNIT CHAIR, 2 seater, with arms, upholstered,

wipeable

CHA36822

3UNIT CHAIR, 3 seater, with arms, upholstered,

wipeable

CHA36922

Activity DataBase 01/03/2017

Page 77: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-02 Sub-Wait 01 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Adjacent to reception area.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 78: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-02 Sub-Wait 01 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 79: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Sub-Wait 01 (based on Waiting area: 20 places (including 2 wheelchair

places))

J1155-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 80: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-02 Sub-Wait 01 (based on Waiting area: 20 places (including 2 wheelchair places))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

2RACK, leaflet, wall mounted, 915H 250W 105DRAC44011

2TELEVISION monitor, colour, flat panel, large, wall

mounted

TVM00311

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA3671010

3TABLE, occasional, square, 415H 610W 610DTAB05322

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 81: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-03 Sub-Wait 02 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Adjacent to reception area.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 82: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-03 Sub-Wait 02 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 83: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Sub-Wait 02 (based on Waiting area: 20 places (including 2 wheelchair

places))

J1155-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 84: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-03 Sub-Wait 02 (based on Waiting area: 20 places (including 2 wheelchair places))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1OUTLET cable, 13 ampOUT00211

2RACK, leaflet, wall mounted, 915H 250W 105DRAC44011

2TELEVISION monitor, colour, flat panel, large, wall

mounted

TVM00311

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31844

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA3671010

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05722

3TABLE, circular, 760H 1100mm dia.TAB03011

3TABLE, occasional, square, 415H 610W 610DTAB05322

8TRACK, blinds for windowsTRA90011

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

9DISPENSER, disposable cup, wall mountedDIS01211

Activity DataBase 01/03/2017

Page 85: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-04Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-04 Sub-Wait 03 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Adjacent to reception area.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 86: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-04 Sub-Wait 03 (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 87: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-04

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Sub-Wait 03 (based on Waiting area: 20 places (including 2 wheelchair

places))

J1155-04Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 88: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-04 Sub-Wait 03 (based on Waiting area: 20 places (including 2 wheelchair places))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01322

1SOCKET outlet, switched, 13 amp, twinOUT01011

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA36744

Activity DataBase 01/03/2017

Page 89: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-05Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-05 First Floor Sub Wait (based on Waiting area: 20 places (including 2

wheelchair places))

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Space Data: Height (mm): 42.80 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 90: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-05ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-05 First Floor Sub Wait (based on Waiting area: 20 places (including 2

wheelchair places))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health

&apos;Acoustics: Technical design manual

4032:0.6:England&apos;.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): &lt;20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 91: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-05

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

First Floor Sub Wait (based on Waiting area: 20 places (including 2

wheelchair places))

J1155-05Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 92: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-05ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-05 First Floor Sub Wait (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SWITCH, lightSWC02511

2TELEVISION monitor, colour, flat panel, large, wall

mounted

TVM00311

3UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA36788

3UNIT CHAIR, 2 seater, with arms, upholstered,

wipeable

CHA36855

3RACK, leaflet/pamphlet, 4 sections, with adjustable

dividers, wall mounted, 300H 805W 215D

RAC08911

3RACK, magazine, 3 shelves, floor standing, fixed to

the wall, 1400H 900W 300D

RAC09111

3TABLE, occasional, square, 415H 610W 610DTAB05344

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

Activity DataBase 01/03/2017

Page 93: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1155-06Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1155-06 Dental Waiting Area (based on Waiting area: 20 places (including 2

wheelchair places))

Room Number: Revision Date: 01/03/2017

1) Patients, relatives and escorts wait to be seen.

2) Displaying information.

Activities:

Personnel: 20 x persons, including 2 x wheelchair user

Planning

Relationships:

Adjacent to reception area.

Close to clinical or work area.

Close to WC facilities.

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: Type of seating to be suitable for patient profile.

Method for calling patients into clinical rooms to be decided locally.

The following items may be provided:

- an enclosed noticeboard;

- background music and other entertainment facilities;

- television and internet access.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 94: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1155-06ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-06 Dental Waiting Area (based on Waiting area: 20 places (including 2

wheelchair places))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): -

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

63

-

-

Maximum Internal Noise from M&E Services (NR): 63 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 95: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1155-06

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Dental Waiting Area (based on Waiting area: 20 places (including 2

wheelchair places))

J1155-06Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control or Not applicable

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 96: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1155-06ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1155-06 Dental Waiting Area (based on Waiting area: 20 places (including 2 wheelchair

places))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SWITCH, lightSWC02511

5UNIT CHAIR, 1 seater, with arms, upholstered,

wipeable

CHA46733

5UNIT CHAIR, 3 seater, with arms, upholstered,

wipeable

CHA4691010

5RACK, leaflet/pamphlet, 4 sections, with adjustable

dividers, wall mounted, 300H 805W 215D

RAC18911

5RACK, magazine, 3 shelves, floor standing, fixed to

the wall, 1400H 900W 300D

RAC29111

Activity DataBase 01/03/2017

Page 97: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

J1414Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: J1414 Play area: 3 children

Room Number: Revision Date: 01/03/2017

1) Children accompanying relatives or waiting to be seen are able to play.

2) Toys, books and games are stored.

Activities:

Personnel: 3 x children

Planning

Relationships:

Off, and observable from, the waiting area.

Space Data: Height (mm): 4.50 2,400Area (m²):

2400 is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 98: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data J1414ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1414 Play area: 3 children

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N/EM

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

68

-

-

Maximum Internal Noise from M&E Services (NR): 68 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 99: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character J1414

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Play area: 3 childrenJ1414Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Non-essential - Project Option

Clear glass with solar control. Window opening restrictors max 100mm at bottom

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Desirable - Project Option

Clear safety glass when provided

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 100: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

J1414ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: J1414 Play area: 3 children

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

Activity DataBase 01/03/2017

Page 101: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

L1308Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: L1308 Near patient testing room

Room Number: Revision Date: 01/03/2017

1) Electronic patient records (EPRs) may be accessed and updated.

2) Clinical wash-hand basin may be used.

3) Patient records may be reviewed and recorded.

4) Performing electrolyte analysis.

5) Performing blood gas analysis.

6) Performing glucose analysis.

7) Computer workstation(s) may be used.

8) Displaying information.

9) Printer may be used.

Activities:

Personnel: 2 x staff.

Intermittent use.

Planning

Relationships:

This room is based on the use of an outward opening entrance door, where an entrance door

is not provided, the entrance must be within a secure staff area.

Space Data: Height (mm): 8.00 2,700Area (m²):

Notes: Type of analyser provided to suit range of tests to be undertaken .

The following items are shown on the room layout but are optional:

- door to room;

- a specimen fridge;

- a sink and demineralised water supply.

The following items may be provided:

- a pneumatic tube to/from pathology.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 102: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data L1308ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: L1308 Near patient testing room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 103: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character L1308

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Near patient testing roomL1308Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

Not applicable or 1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 104: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

L1308ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: L1308 Near patient testing room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1BOARD, display/notice, wall mounted, 900H 600WBOA01211

1HOOK, single, small, wall mountedHOO01911

1WORKBENCH laboratory, C-frame, freestanding,

920H 2000W 750D.

LWB08011

1WORKTOP, with right hand sink bowl (sink size

200x450x365), 920H 3000W 750D.

LWS19011

1OUTLET cable, 13 ampOUT00222

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01044

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT, switched, 13 ampOUT05211

1SOCKET outlet data/voice, double.OUT13144

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02322

1SWITCH, lightSWC02511

1TAP, laboratory, cold waterTAP02211

1TAP, laboratory, hot waterTAP02311

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted recessed grated, metal, 1.1/2 in,

with plug and chain

WAS10311

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01322

2DISPENSER, soap, wall mountedDIS02411

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

3CHAIR, swivel, height adjustable 540-790, tilting

back, adjustable footrest, wipeable, 5 star base, on

castors/glides

CHA30311

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 105: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0251-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0251-001 Office: 1 person

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Secure holding/storing of clothing and personal belongings.

8) Printer may be used.

9) Electronic patient records (EPRs) may be accessed and updated.

10) Staff notices, information and/or messages may be displayed.

11) Dealing with enquiries.

12) Information on computers may be accessed.

Activities:

Personnel: 1 x staff

Up to x 2 others.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Activity DataBase 01/03/2017

Page 106: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may provided;

- shelving;

- printer.

The following items may be provided if the office is used for clinical control :

- a small safe;

- a key cupboard;

- an alarm panel, see HTM 08-03;

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 107: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0251-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-001 Office: 1 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 108: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0251-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Office: 1 personM0251-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 109: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0251-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-001 Office: 1 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02611

1HOOK, single, small, wall mountedHOO01933

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SOCKET outlet data/voice, double.OUT13133

1SWITCH, lightSWC02511

3CABINET, lateral filing, 6 rails, 2 door, 1970H 1000W

470D

CAB04911

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31844

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05611

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05711

3TABLE, circular, 760H 1100mm dia.TAB03011

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04922

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 110: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0251-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0251-002 Office: 1 person

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Secure holding/storing of clothing and personal belongings.

8) Printer may be used.

9) Electronic patient records (EPRs) may be accessed and updated.

10) Staff notices, information and/or messages may be displayed.

11) Dealing with enquiries.

12) Information on computers may be accessed.

Activities:

Personnel: 1 x staff

Up to x 2 others.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Activity DataBase 01/03/2017

Page 111: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may provided;

- shelving;

- printer.

The following items may be provided if the office is used for clinical control :

- a small safe;

- a key cupboard;

- an alarm panel, see HTM 08-03;

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 112: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0251-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-002 Office: 1 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 113: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0251-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Office: 1 personM0251-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 114: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0251-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-002 Office: 1 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK, cantilever, single pedestal 3 drawer, cable

management, modesty panel, 1800W 800D

DES02011

1HOOK, single, small, wall mountedHOO01933

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SOCKET outlet data/voice, double.OUT13122

1SWITCH, lightSWC02511

3CABINET, lateral filing, 6 rails, 2 door, 1970H 1000W

470D

CAB04911

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, upholstered, stacking, wipeableCHA31722

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05611

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05711

7COMPUTER KEYBOARDCOM83311

7COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM84922

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 115: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0251-003Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0251-003 Office: 1 person

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Secure holding/storing of clothing and personal belongings.

8) Printer may be used.

9) Electronic patient records (EPRs) may be accessed and updated.

10) Staff notices, information and/or messages may be displayed.

11) Dealing with enquiries.

12) Information on computers may be accessed.

Activities:

Personnel: 1 x staff

Up to x 2 others.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Activity DataBase 01/03/2017

Page 116: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may provided;

- shelving;

- printer.

The following items may be provided if the office is used for clinical control :

- a small safe;

- a key cupboard;

- an alarm panel, see HTM 08-03;

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 117: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0251-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-003 Office: 1 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 118: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0251-003

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Office: 1 personM0251-003Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 119: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0251-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0251-003 Office: 1 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1HOOK, single, small, wall mountedHOO01922

1LUMINAIRE, indicating controlled drugs cupboard

repeat

LIG13811

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SOCKET outlet data/voice, double.OUT13122

1SWITCH, lightSWC02511

5BOARD, display/notice, wall mounted, 900H 1200WBOA11311

5CABINET, lateral filing, 6 rails, 2 door, 1970H 1000W

470D

CAB14911

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40111

5CHAIR, upright, upholstered, stacking, wipeableCHA41722

5COMPUTER KEYBOARDCOM13311

5COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM14911

5Stand Alone Desk, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES12611

5DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA15611

5DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA15711

5HOOK, single, small, wall mountedHOO11911

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 120: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0252-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0252-001 Admin (based on Office: 2 person)

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Staff notices, information and/or messages may be displayed.

8) Printer may be used.

9) Dealing with enquiries.

10) Information on computers may be accessed.

Activities:

Personnel: 2 x staff.

Up to 2 x others.

Planning

Relationships:

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may be provided if the office is used for clinical control :

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 121: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0252-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-001 Admin (based on Office: 2 person)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 122: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0252-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Admin (based on Office: 2 person)M0252-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 123: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0252-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-001 Admin (based on Office: 2 person)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1DESK UNIT, cantilever, L shape, cable management,

wall fixed, modesty panel, 2837W 2220L 750D

DES90111

1SOCKET outlet, switched, 13 amp, singleOUT00522

1SOCKET outlet, switched, 13 amp, twinOUT01044

1SOCKET outlet data/voice, double.OUT13133

1SHELF, custom to fit, L shape corner, 2837W 2220L

300D

SHE90011

1SWITCH, lightSWC02522

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30122

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05622

4COMPUTER KEYBOARDCOM03322

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94922

Activity DataBase 01/03/2017

Page 124: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0252-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0252-002 Office: 2 person

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Staff notices, information and/or messages may be displayed.

8) Printer may be used.

9) Dealing with enquiries.

10) Information on computers may be accessed.

Activities:

Personnel: 2 x staff.

Up to 2 x others.

Planning

Relationships:

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may be provided if the office is used for clinical control :

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 125: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0252-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-002 Office: 2 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 126: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0252-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Office: 2 personM0252-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 127: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0252-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-002 Office: 2 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1LUMINAIRE, indicating controlled drugs cupboard

repeat

LIG13811

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01044

1SOCKET outlet data/voice, double.OUT13144

1SWITCH, lightSWC02511

5BOARD, display/notice, wall mounted, 900H 1200WBOA11322

5CABINET, lateral filing, 6 rails, 2 door, 1970H 1000W

470D

CAB14911

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40122

5CHAIR, upright, upholstered, stacking, wipeableCHA41722

5COMPUTER KEYBOARDCOM13322

5COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM14922

5Stand Alone Desk, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES12622

5DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA15622

5DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA15722

5HOOK, single, small, wall mountedHOO11933

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 128: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0252-003Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0252-003 Office: 2 person

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Discussions and interviews may take place.

5) Files and records are stored.

6) Hanging outdoor clothing.

7) Staff notices, information and/or messages may be displayed.

8) Printer may be used.

9) Dealing with enquiries.

10) Information on computers may be accessed.

Activities:

Personnel: 2 x staff.

Up to 2 x others.

Planning

Relationships:

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: The following equipment is shown on the room layout but is optional:

- call repeat lamps for controlled drugs cupboards (but required if the office is used for

clinical control).

The following items may be provided if the office is used for clinical control :

- a dimming switch - recommended if the room is used for viewing digital images.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 129: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0252-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-003 Office: 2 person

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 130: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0252-003

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Office: 2 personM0252-003Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 131: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0252-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0252-003 Office: 2 person

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01322

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02622

1HOOK, single, small, wall mountedHOO01933

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01044

1SOCKET outlet data/voice, double.OUT13144

1SWITCH, lightSWC02511

3CABINET, filing, 4 drawer, 1320H 465W 620DCAB02544

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30122

3CHAIR, upright, upholstered, stacking, wipeableCHA31722

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05633

4COMPUTER KEYBOARDCOM03322

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04922

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 132: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0278-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0278-001 GPs' Admin Area (based on Administration area: shared use: 8 workstations *

2)

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Files and records are stored.

5) Secure holding/storing of clothing and personal belongings.

6) Hanging outdoor clothing.

7) Electronic patient records (EPRs) may be accessed and updated.

8) Dealing with enquiries.

9) Information on computers may be accessed.

10) Staff notices, information and/or messages may be displayed.

11) Patient records may be reviewed and recorded.

Activities:

Personnel: 8 x staff.

Up to 4 x others.

Planning

Relationships:

Space Data: Height (mm): 40.00 2,700Area (m²):

Notes: The layout illustrates socket outlets at desk height because they should be easily

accessible to enable equipment to be switched off for energy conservation .

Floor box services are discouraged as they make it harder to convert the space into a

clinical room in the future. It is therefore assumed that the workstations are wire

managed.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 133: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0278-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-001 GPs' Admin Area (based on Administration area: shared use: 8 workstations *

2)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 134: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0278-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

GPs' Admin Area (based on Administration area: shared use: 8 workstations *

2)

M0278-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 135: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0278-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-001 GPs' Admin Area (based on Administration area: shared use: 8 workstations *

2)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 600WBOA01222

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 1200H1800W

BOA10611

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES0261919

1SOCKET outlet, switched, 13 amp, singleOUT00533

1SOCKET outlet, switched, 13 amp, twinOUT0103333

1SOCKET outlet data/voice, double.OUT1311515

1SHELF, 900W 300DSHE21111

1WORKTOP, clinical, for 2 x 400 facing modular

storage cabinets, 910W 700D

SMW05211

1SWITCH, lightSWC02511

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA3011818

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31866

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA0561212

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA0571616

3SCREEN, dividing, 1500H 2000WSCR02666

3TABLE, 710H 1800W 900DTAB01411

4COMPUTER PRINTER, laser, A4, 250H 380W 385DCOM03833

4COMPUTER KEYBOARDCOM9331818

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM9491717

4PRINTER multifunction, network, floor standing, zone

1800W 750D

PRI91011

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 136: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0278-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0278-01 Dental Admin Area (based on Administration area: shared use: 4

workstations)

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Files and records are stored.

5) Secure holding/storing of clothing and personal belongings.

Activities:

Personnel: 4 x staff.

Up to 2 x others.

Planning

Relationships:

Space Data: Height (mm): 20.00 2,700Area (m²):

Notes: The layout illustrates socket outlets at desk height because they should be easily

accessible to enable equipment to be switched off for energy conservation .

Floor box services are discouraged as they make it harder to convert the space into a

clinical room in the future. It is therefore assumed that the workstations are wire

managed.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 137: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0278-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-01 Dental Admin Area (based on Administration area: shared use: 4

workstations)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 138: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0278-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Dental Admin Area (based on Administration area: shared use: 4

workstations)

M0278-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 139: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0278-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-01 Dental Admin Area (based on Administration area: shared use: 4 workstations)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01088

1SOCKET outlet data/voice, double.OUT13144

1SWITCH, lightSWC02511

5BOARD, display/notice, wall mounted, 900H 1200WBOA11311

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40144

5COMPUTER KEYBOARDCOM13344

5COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM14944

5Stand Alone Desk, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES12644

5DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA15666

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 140: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0278-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0278-02 Reception Combined (based on Administration area: shared use: 6

workstations)

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Computer workstation(s) may be used.

3) Telephone(s) may be used.

4) Files and records are stored.

5) Secure holding/storing of clothing and personal belongings.

6) Hanging outdoor clothing.

7) Information on computers may be accessed.

8) Printer may be used.

9) Electronic patient records (EPRs) may be accessed and updated.

10) Staff notices, information and/or messages may be displayed.

11) Dealing with enquiries.

12) Patient records may be reviewed and recorded.

13) Shredding documents.

Activities:

Personnel: 6 x staff.

Up to 3 x others.

Planning

Relationships:

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: The layout illustrates socket outlets at desk height because they should be easily

accessible to enable equipment to be switched off for energy conservation .

Floor box services are discouraged as they make it harder to convert the space into a

clinical room in the future. It is therefore assumed that the workstations are wire

managed.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 141: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0278-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-02 Reception Combined (based on Administration area: shared use: 6

workstations)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 142: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0278-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Reception Combined (based on Administration area: shared use: 6

workstations)

M0278-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 143: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0278-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0278-02 Reception Combined (based on Administration area: shared use: 6

workstations)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02666

1SOCKET outlet, switched, 13 amp, twinOUT0101010

1SOCKET outlet data/voice, double.OUT1311010

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30166

3CHAIR, upright, upholstered, stacking, wipeableCHA31722

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05666

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05711

4COMPUTER KEYBOARDCOM93366

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94966

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 144: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0281Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0281 Quiet workspace

Room Number: Revision Date: 01/03/2017

1) Clinical administration.

2) Laptop computer(s) may be used.

3) Telephone(s) may be used.

4) Carrying out administration and clerical duties.

5) Electronic patient records (EPRs) may be accessed and updated.

6) Information on computers may be accessed.

7) Staff notices, information and/or messages may be displayed.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Close to open plan workstation area.

Space Data: Height (mm): 6.00 2,400Area (m²):

Notes: The room has been sized to discourage users from feeling too comfortable and wishing

to monopolise the space.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 145: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0281ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0281 Quiet workspace

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Over workstations

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 146: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0281

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Quiet workspaceM0281Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

Not applicable or 1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 147: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0281ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0281 Quiet workspace

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SOCKET outlet data/voice, double.OUT13122

1SWITCH, lightSWC02511

5BOARD, display/notice, wall mounted, 900H 1200WBOA11311

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40122

5HOOK, single, small, wall mountedHOO11933

5SHELF, custom to fit, L shape corner, Width to fit,

300D

SHE90211

5WORKTOP, clinical, for 6 x 400 facing modular

storage cabinets, 2730W 700D

SMW15611

Activity DataBase 01/03/2017

Page 148: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0330-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0330-01 Library/GP training room

Room Number: Revision Date: 01/03/2017

1) Computer workstation(s) may be used.

2) Telephone(s) may be used.

3) Holding meetings.

4) Colleagues/visitors may be received for training/observation purposes

5) Library and reference material may be accessed.

6) Holding food trolleys (heated and unheated).

7) Instruction is undertaken with the aid of multimedia equipment.

Activities:

Personnel: Up to 10 x persons (meeting function).

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes:

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 149: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0330-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0330-01 Library/GP training room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300 Provide good vertical illumination

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to CIBSE Lighting Guide LG3 for areas with VDT’s

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

35

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 150: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0330-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Library/GP training roomM0330-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Non-essential - Project Option

Designation to be validated against current documentation. HTM 57 (Mar-2005)

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 151: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0330-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0330-01 Library/GP training room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02633

1HOOK, single, small, wall mountedHOO01933

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01055

1SOCKET outlet data/voice, double.OUT13133

1SHELF, custom to fit, L shape corner, Width to fit,

300D

SHE90111

1SWITCH, lightSWC02511

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30133

3CHAIR, upright, upholstered, stacking, wipeableCHA31733

4COMPUTER KEYBOARDCOM93333

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94933

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 152: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0410Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0410 Photocoping/printing room

Room Number: Revision Date: 01/03/2017

1) Carrying out printing activities.

2) Carrying out photocopying activities.

3) Shredding documents.

4) Stationery/paper is stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Within an administration space.

Space Data: Height (mm): 6.00 2,400Area (m²):

Notes: One photocopy/printing room, with multifunctional printer/copier and storage for

paper/printing supplies, for every 32 workstations.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 153: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0410ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0410 Photocoping/printing room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

High

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 154: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0410

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Photocoping/printing roomM0410Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 155: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0410ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0410 Photocoping/printing room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SOCKET outlet data/voice, double.OUT13111

1SHELF, 600W 300DSHE20111

1SHELF, 900W 300DSHE21111

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 600W 700D

SMW06611

1STORAGE UNIT, pigeon holes, 48 people, to

specialist design

STF90011

4PRINTER multifunction, network, floor standing, zone

1800W 750D

PRI91011

Activity DataBase 01/03/2017

Page 156: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0724-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0724-01 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

1) Discussions and interviews may take place.

2) Telephone(s) may be used.

3) Laptop computer(s) may be used.

4) Call systems may be used.

Activities:

Personnel: Up to 4 x persons.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- staff emergency call (not required if the room is for staff use only);

- telephone (should not be provided in rooms intended as quiet spaces);

- room in use switch and indicator.

The following items may be provided:

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 157: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0724-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-01 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 43

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 158: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0724-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Interview room: 4 places (including 1 wheelchair place)M0724-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 159: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0724-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-01 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02611

1HOOK, single, small, wall mountedHOO01944

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SOCKET outlet data/voice, double.OUT13122

1SWITCH, lightSWC02511

1SWITCH, 'Room in use' illuminated sign.SWC07611

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31833

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05711

3TABLE, occasional, circular, 415H 600mm dia.TAB90011

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04922

Activity DataBase 01/03/2017

Page 160: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0724-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0724-02 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

1) Discussions and interviews may take place.

2) Telephone(s) may be used.

3) Laptop computer(s) may be used.

4) Call systems may be used.

Activities:

Personnel: Up to 4 x persons.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- staff emergency call (not required if the room is for staff use only);

- telephone (should not be provided in rooms intended as quiet spaces);

- room in use switch and indicator.

The following items may be provided:

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 161: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0724-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-02 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 43

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 162: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0724-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Interview room: 4 places (including 1 wheelchair place)M0724-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 163: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0724-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-02 Interview room: 4 places (including 1 wheelchair place)

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1CUPBOARD, 1 shelf, lockable, on plinth, 750H 600W

500D

CUP02144

1OUTLET cable, fused, 13 amp, ceiling mountedOUT00411

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SOCKET outlet data/voice, double.OUT13122

1SOCKET outlet, computer data, single, ceiling

mounted

OUT13511

1WORKTOP, non-clinical, 2400W 600DWRT02411

2BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 1200H1800W

BOA00611

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31866

3TABLE, 710H 1800W 900DTAB01411

770 inch screen to be controlled by local laptopSCR90111

8TRACK, blinds for windowsTRA90033

Activity DataBase 01/03/2017

Page 164: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0724-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0724-03 MH Interview (based on Interview room: 4 places (including 1 wheelchair

place))

Room Number: Revision Date: 01/03/2017

1) Discussions and interviews may take place.

2) Telephone(s) may be used.

3) Laptop computer(s) may be used.

4) Call systems may be used.

Activities:

Personnel: Up to 4 x persons.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- staff emergency call (not required if the room is for staff use only);

- telephone (should not be provided in rooms intended as quiet spaces);

- room in use switch and indicator.

The following items may be provided:

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 165: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0724-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-03 MH Interview (based on Interview room: 4 places (including 1 wheelchair

place))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 43

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 166: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0724-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

MH Interview (based on Interview room: 4 places (including 1 wheelchair

place))

M0724-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 167: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0724-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-03 MH Interview (based on Interview room: 4 places (including 1 wheelchair

place))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 600H 900W

BOA13411

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02611

1HOOK, single, small, wall mountedHOO01977

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SOCKET outlet data/voice, double.OUT13133

1SWITCH, lightSWC02511

1SWITCH, 'Room in use' illuminated sign.SWC07611

3CABINET, filing, 2 drawer, 710H 800W 470DCAB02711

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31822

3DRAWER UNIT, 3 drawer, lockable, on castors, desk

height 715H 430W 600D

DRA05711

3TABLE, occasional, circular, 415H 600mm dia.TAB90011

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04922

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 168: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

M0724-04Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: M0724-04 UofN Service Area (based on Interview room: 4 places (including 1

wheelchair place))

Room Number: Revision Date: 01/03/2017

1) Discussions and interviews may take place.

2) Telephone(s) may be used.

3) Laptop computer(s) may be used.

4) Call systems may be used.

Activities:

Personnel: Up to 4 x persons.

Planning

Relationships:

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- staff emergency call (not required if the room is for staff use only);

- telephone (should not be provided in rooms intended as quiet spaces);

- room in use switch and indicator.

The following items may be provided:

- a clinical wash-hand basin and gel dispenser to allow for clinical use of the room;

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 169: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data M0724-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-04 UofN Service Area (based on Interview room: 4 places (including 1

wheelchair place))

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 43

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 170: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character M0724-04

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

UofN Service Area (based on Interview room: 4 places (including 1

wheelchair place))

M0724-04Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 171: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

M0724-04ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: M0724-04 UofN Service Area (based on Interview room: 4 places (including 1 wheelchair

place))

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BOARD, display/notice, wall mounted, 900H 1200WBOA01311

1BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 600H 900W

BOA13411

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02611

1HOOK, single, small, wall mountedHOO01944

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SOCKET outlet data/voice, double.OUT13111

1SWITCH, lightSWC02511

1SWITCH, 'Room in use' illuminated sign.SWC07611

3CABINET, filing, 2 drawer, 710H 800W 470DCAB02711

3CHAIR, upright, with arms, upholstered, stacking,

wipeable

CHA31833

3DRAWER UNIT, 2 drawer, lockable, on castors,

600H 410W 600D

DRA05611

3TABLE, occasional, circular, 415H 600mm dia.TAB90011

7COMPUTER KEYBOARDCOM83311

7COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM84911

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 172: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

N0111Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: N0111 Enhanced procedures room

Room Number: Revision Date: 01/03/2017

1) Patient is positioned on the operating table.

2) Surgical instruments on instrument trolley may be used.

3) Medical and surgical supplies are stored.

4) Viewing diagnostic images on VDT.

5) Used swabs may be checked, weighed and recorded.

6) Operating lists may be displayed.

7) Patient records may be reviewed and recorded.

8) Patient is transferred from operating table to bed/trolley.

9) Computer workstation(s) may be used.

10) Telephone(s) may be used.

11) Administration of sedation.

12) Minor surgical procedures may be performed under local anaesthetic.

13) Patient may arrive on foot or in a wheelchair.

14) Administration of sedation.

Activities:

Personnel: 1 x patient

4 x staff

Planning

Relationships:

Access to a separate preparation facility is optional depending on the nature/volume of

procedures to be undertaken

Space Data: Height (mm): 20.00 3,000Area (m²):

Notes: Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 173: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data N0111ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: N0111 Enhanced procedures room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: S

+vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 1000

Daytime Specific Service Illuminance (Lux): 500

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 30000 to 60000

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: A

AStandby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

40

50

The LAmax,f dB noise limit applies at any time.

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 43

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke Duct mounted on Supply

General Notes:

Activity DataBase 01/03/2017

Page 174: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character N0111

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Enhanced procedures roomN0111Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

1 x personnel, wheelchair & equipment access (1000mm);

1 x personnel, bed, trolley, wheelchair & equipment access (1500mm)

Windows: Non-essential - Project Option

Obscured glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 175: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

N0111ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: N0111 Enhanced procedures room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 600H 900W

BOA13422

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DESK UNIT, cantilever, cable management,

adjustable legs, modesty panel, 1400W 700D

DES02611

1LUMINAIRE operating (minor)LIG05011

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01066

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13111

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01311

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02333

1WORKTOP, clinical, for 3 x 400 facing modular

storage cabinets, 1365W 700D

SMW05311

1SWITCH, lightSWC02511

1SWITCH, 'Room in use' illuminated sign.SWC07611

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3CHAIR, swivel, height adjustable, medium back,

wipeable, 5 star base, on castors

CHA30211

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3HOLDER, sharps box, up to 7 litre capacity,

rail/trolley hang or wall mounted, 170H 125W 100D

HOL02011

3KICKABOUT, bowl stand, stainless steel, 360mm

dia.

KIC00122

3REFRIGERATOR, capacity 160 litre, automatic

defrost, stainless steel, underbench, external

temperature gauge, lockable, on castors, 850H

610W 600D

REF05811

Activity DataBase 01/03/2017

Page 176: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

N0111ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: N0111 Enhanced procedures room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3TROLLEY, modular storage, single open frame,

including handle and worktop, with up to 5 sets of

runners for 600 facing inserts, 850H 730W 450D

SMT00211

3STAND, infusion, twin hook, breaks, mobileSTA14211

3STOOL, surgeon/anaesthetist, height adjustable,

includes anti-static seat pads

STO00622

3TABLE, surgical procedures, radiotranslucen,t o/a

1005H 2100W 835D

TAB07711

3TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 750W 450D

TRO13311

3TROLLEY diathermy equipment, 1 shelf, 870H 490W

650D

TRO14011

4COMPUTER KEYBOARDCOM93311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94911

8TRACK, blinds for windowsTRA90022

Activity DataBase 01/03/2017

Page 177: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

P0625Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: P0625 Pantry/refreshment area

Room Number: Revision Date: 01/03/2017

1) Preparing beverages/snacks with patients.

2) Microwave oven may be used.

3) Small amounts of dry goods are stored in cupboard(s).

4) Provision of refrigerated storage.

5) Trays, crockery and cutlery are stored.

6) Disposal of waste and contaminated materials.

7) Hand-rinse basin may be used.

Activities:

Personnel: 1 - 2 x persons.

Intermittent use.

Planning

Relationships:

Located in staff, patient or visitors areas as appropriate.

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: The following items are included on the room layout but are optional:

- a microwave oven;

- a dishwasher.

The layout is suitable for ambulant/semi-ambulant users, consideration must be given to

wheelchair user provision.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 178: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data P0625ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: P0625 Pantry/refreshment area

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

-Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 60

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Heat

General Notes:

Activity DataBase 01/03/2017

Page 179: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character P0625

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Pantry/refreshment areaP0625Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 180: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

P0625ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: P0625 Pantry/refreshment area

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, stainless steel, apron front, 1 tap hole,

500W 400D

BAS01511

1CUPBOARD, base, with door, on plinth, 900H 400W

500D

CUP70311

1CUPBOARD, base, including sink panel, with door,

on plinth, 900H 600W 500D

CUP71511

1CUPBOARD/DRAWER UNIT, base, with door, on

plinth, 900H 600W 500D

CUP73122

1CUPBOARD, upper, with door, 600H 600W 300DCUP75322

1OUTLET cable, 13 ampOUT00222

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT, switched, 13 ampOUT05222

1OUTLET, cold water for equipmentOUT30122

1OUTLET, drainage, anti-syphonOUT34111

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, pillar, high neck, long lever, pair hot and cold,

1/2 in.

TAP35911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted recessed grated, metal, 1.1/2 in,

with plug and chain

WAS10311

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

1WATER BOILER, 2.5 litre, electric, wall mountedWAT00311

1WORKTOP, dished, stainless steel, with integral left

of centre sink bowl and 2 tap holes, 3500W 600D

WRT23711

2DISPENSER, paper towel roll, wall mountedDIS00711

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

2DISHWASHER, under bench, high temperatureWAS06511

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3OVEN, microwave, heavy duty, 1600watt, capacity 26

litre, 370H 465W 560D

OVE01311

3REFRIGERATOR, capacity 160 litre, automatic

defrost, stainless steel, underbench, external

temperature gauge, lockable, on castors, 850H

610W 600D

REF05811

Activity DataBase 01/03/2017

Page 181: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

R0902Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: R0902 Decontamination room: dirty instruments

Room Number: Revision Date: 01/03/2017

1) Soiled instruments may be cleansed, disinfected and sterilised

2) Sterilizer is loaded/unloaded.

3) Loading of medical devices into ultrasonic.

4) Cleaning endoscopes.

5) Automatic washing, disinfecting and sterilizing endoscopes.

6) Holding supplies of endoscope processing chemicals.

7) Sterilizing instruments and equipment.

8) Instruments or equipment are washed by hand.

9) Clinical wash-hand basin may be used.

10) Dispensing disposable aprons.

11) Dispensing disposable gloves.

Activities:

Personnel: Up to 2 staff.

Planning

Relationships:

Adjacent to decontamination suite clean instruments room

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: Reference should be made to HTM 01-01 and HTM 01-05 Decontamination in primary

care dental practices, figure 3 although it is believed that this room is suitable for other

similar decontamination purposes.

The room includes stainless steel worktops, where cleaning agents are used that may

damage stainless steel a solid core surface is recommended, subject to manufactures

and infection control recommendations.

Consideration must be given to COSHH requirements, appropriate PPE and any

necessary storage of cleaning supplies.

The following items are shown on the room layout but are optional:

- Ultrasonic cleaner. When not provided wash and rinse sinks should be located nearer

to each other to avoid manual handling risks.

The following items may be provided:

- COSHH cupboard for cleaning supplies.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 182: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data R0902ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: R0902 Decontamination room: dirty instruments

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 15

Ventilation Type: S/E

-vePressure Relative to Adjoining Space:

F9Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 183: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character R0902

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Decontamination room: dirty instrumentsR0902Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar control, sealed

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 184: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

R0902ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: R0902 Decontamination room: dirty instruments

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT switched 13amp, flex, indicator

light

OUT05911

1OUTLET isolator, equipment manufacturer's

specification

OUT07922

1SOCKET outlet data/voice, double.OUT13111

1SWITCH, lightSWC02511

1TAP, bib, lever, hospital pattern, pair hot and cold,

1/2 in.

TAP80922

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted flush-grated, metal, 1.1/2 in.WAS10222

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10822

1WORKTOP, plain, stainless steel, with 2 sink bowls

&amp; drainer, 3000W 700D

WKT52711

5BOTTLE, eye irrigation, emergency, with internal

application, fix panel

BOT10111

5DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS21111

5DISPENSER, disposable mask, wall mountedDIS53711

5HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL10622

5SCANNER: Bar-codeSCN10111

5REPROCESSOR, endoscope, pass throughSTE13311

5STERILIZER, built-in, pass-through autoclave, small

load

STE13511

5TRACK, blinds for windowsTRA90211

5TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 450W 450D

TRO23122

5ULTRASONIC CLEANER, bench top, (tank size

150x495x280mm), Includes basket and stainless

steel lid, heated, 280H 535W 355D

ULT10611

Activity DataBase 01/03/2017

Page 185: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

R0904Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: R0904 Decontamination room: clean instruments

Room Number: Revision Date: 01/03/2017

1) Clinical wash-hand basin may be used.

2) Sterilizer is loaded/unloaded.

3) Storage of flexible endoscopes in a security cupboard.

4) Processes and tests are recorded.

5) Secure storage of instruments.

Activities:

Personnel: Up to 2 x staff.

Planning

Relationships:

Adjacent to dirty instruments room

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: Reference should be made to HTM 01-01 and HTM 01-05 Decontamination in primary

care dental practices, figure 3 although it is believed that this room is suitable for other

similar decontamination purposes.

The room includes stainless steel worktops, where cleaning agents are used that may

damage stainless steel a solid core surface is recommended, subject to manufactures

and infection control recommendations.

Consideration must be given to COSHH requirements, appropriate PPE and any

necessary storage of cleaning supplies.

The following items may be provided:

- COSHH cupboard for cleaning supplies.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 186: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data R0904ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: R0904 Decontamination room: clean instruments

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 15

Ventilation Type: S/E

-vePressure Relative to Adjoining Space:

F9Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 187: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character R0904

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Decontamination room: clean instrumentsR0904Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Desirable - Project Option

Clear glass with solar control, sealed

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 188: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

R0904ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: R0904 Decontamination room: clean instruments

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT switched 13amp, flex, indicator

light

OUT05911

1SOCKET outlet data/voice, double.OUT13111

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 3000W 700D

SMW09011

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

5CABINET, endoscopy, 8 scopesCAB40111

5DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS21111

5HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL10622

5SCANNER: Bar-codeSCN10111

5TRACK, blinds for windowsTRA90211

5TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 450W 450D

TRO23122

Activity DataBase 01/03/2017

Page 189: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

S0012Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: S0012 Infant feeding room

Room Number: Revision Date: 01/03/2017

1) Mother breast or bottle feeding her baby.

2) Mother to express milk using breast pump.

3) Wash-hand basin may be used.

Activities:

Personnel: 1 x infant.

1 x parent/carer.

Planning

Relationships:

Easy access from waiting area.

Space Data: Height (mm): 6.00 2,400Area (m²):

Notes: Expressed milk must be stored elsewhere.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 190: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data S0012ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: S0012 Infant feeding room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 3

Ventilation Type: E/N

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL):

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

High

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 191: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character S0012

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Infant feeding roomS0012Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 192: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

S0012ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: S0012 Infant feeding room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, general pattern, vitreous china, 2

tap holes, no overflow, bottom outlet, 500W 400D.

BAS10711

1HOOK, single, small, wall mountedHOO01933

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1OUTLET, floor drainage and grating, 150 mm dia.

hospital pattern.

OUT34511

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SHELF, 1200W 400DSHE22211

1SWITCH, dimmer, modulatingSWC03411

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted recessed grated, metal, 1.1/4 in,

with plug and chain.

WAS10111

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

3CHAIR, easy, low back, upholstered, wipeableCHA30511

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3OVEN, microwave, light duty, 1000watt, capacity 26

litres, 295H 295W 410D

OVE01411

3RAIL for shower curtain, Width to fitRAI90011

3TABLE, occasional, square, 415H 610W 610DTAB05311

Activity DataBase 01/03/2017

Page 193: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

T0211-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: T0211-001 Staff communication base: 3 places

Room Number: Revision Date: 01/03/2017

1) Electronic patient records (EPRs) may be accessed and updated.

2) Computer workstation(s) may be used.

3) Dealing with enquiries.

4) Telephone(s) may be used.

5) Staff supervise and observe patients.

6) Carrying out administration and clerical duties.

7) Information may be provided to patients, carers and visitors.

8) Clinical administration.

9) Call systems may be used.

Activities:

Personnel: 3 x staff.

2 x other staff or patients/visitors.

Planning

Relationships:

Situated to allow easy access and good observation of the areas served.

Access to a "safe haven" area.

Space Data: Height (mm): 14.50 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: Clear access space around the staff communication base should be maintained even

when someone is standing at the front of the base.

The following items are shown on the room layout but are optional:

- call system alarm panel, see HTM 08-03;

The following items may be provided:

- controlled drugs cupboard alarm;

- departmental controlled entry system.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 194: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data T0211-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0211-001 Staff communication base: 3 places

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/V/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux): 30-200

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: A

AStandby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 195: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character T0211-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Staff communication base: 3 placesT0211-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 196: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

T0211-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0211-001 Staff communication base: 3 places

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 197: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

T0211-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: T0211-002 IT Communication Room

Room Number: Revision Date: 01/03/2017

1) Electronic patient records (EPRs) may be accessed and updated.

2) Computer workstation(s) may be used.

3) Dealing with enquiries.

4) Telephone(s) may be used.

5) Staff supervise and observe patients.

6) Carrying out administration and clerical duties.

7) Information may be provided to patients, carers and visitors.

8) Clinical administration.

9) Patient records may be reviewed and recorded.

10) Information on computers may be accessed.

11) Call systems may be used.

Activities:

Personnel: 2 x staff.

2 x other staff or patients/visitors.

Planning

Relationships:

Situated to allow easy access and good observation of the areas served.

Access to a "safe haven" area.

Space Data: Height (mm): 11.00 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: Clear access space around the staff communication base should be maintained even

when someone is standing at the front of the base.

The following items are shown on the room layout but are optional:

- call system alarm panel, see HTM 08-03;

The following items may be provided:

- controlled drugs cupboard alarm;

- departmental controlled entry system.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 198: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data T0211-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0211-002 IT Communication Room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: S/V/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux): 30-200

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: A

AStandby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 199: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character T0211-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

IT Communication RoomT0211-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 200: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

T0211-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0211-002 IT Communication Room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

Activity DataBase 01/03/2017

Page 201: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

T0531Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: T0531 Preparation room: catheter laboratories/enhanced procedures

Room Number: Revision Date: 01/03/2017

1) Holding/storing working supply of clean and sterile materials for immediate use.

2) Sterile pre-set trays are held/stored

3) A working supply of consumables is held/stored.

4) Operating lists may be displayed.

5) Sterile fluids are stored.

6) Trays are prepared and trolleys laid up for surgical /clinical procedures.

7) Instrument trolleys are held/stored.

Activities:

Personnel: 1-2 staff intermittently

Planning

Relationships:

Adjacent to enhanced procedures room.

Goods to be delivered from corridor.

Space Data: Height (mm): 9.00 2,700Area (m²):

Notes: The number and size of dressing/instrument trolleys is a project team option.

The following items may be provided:

- heated lotion cabinet which could be provided in a central store instead of within the

preparation room.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 202: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data T0531ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0531 Preparation room: catheter laboratories/enhanced procedures

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: S

+vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 500

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

50

The LAmax,f dB noise limit applies at any time.

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 203: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character T0531

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Preparation room: catheter laboratories/enhanced proceduresT0531Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel & equipment access (1000mm)

Windows: Non-essential - Project Option

Obscured glass with solar control, security control as necessary, see BS2881

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 204: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

T0531ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0531 Preparation room: catheter laboratories/enhanced procedures

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SOCKET outlet data/voice, double.OUT13111

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01322

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 2700W 700D

SMW08711

1SWITCH, lightSWC02511

2BOARD, marker, whiteboard, dry-wipe, with pen

holder, wall mounted, 600H 900W

BOA03411

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3STAND, 2 lotion bowls, stainless steel, (Bowls not

included).

STA10211

3TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 450W 450D

TRO13122

3TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 750W 450D

TRO13322

3TROLLEY, instruments, stainless steel, buffered,

870H 920W 620D

TRO20111

Activity DataBase 01/03/2017

Page 205: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

T0538Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: T0538 Clean utility room: without controlled drugs cupboard

Room Number: Revision Date: 01/03/2017

1) Dressing/instrument trolleys are held and prepared.

2) Sterile supplies and consumables are held.

3) Non-controlled medicines and pharmaceuticals are stored securely.

4) Provision of refrigerated storage.

5) Flammable medicines are stored.

6) Supplies trolleys are held/stored.

7) Clinical wash-hand basin may be used.

8) Bar coded items may be tracked.

9) Trolleys for clinical procedures are prepared and laid up .

10) Sterile packs, lotions and drugs may be prepared for immediate use.

11) Medication is prepared for administration.

12) Contrast media, I.V. injections and other sterile procedures may be prepared.

13) Computer workstation(s) may be used.

14) Telephone(s) may be used.

15) Infusion fluids are stored.

Activities:

Personnel: 2 x staff.

Planning

Relationships:

Close to clinical area, particularly treatment rooms.

Space Data: Height (mm): 8.00 2,400Area (m²):

Notes: See BS 2881 for requirements for medicines storage. This room does not include

controlled drugs cupboards.

The following items may be provided:

- a barcode reader and charger.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 206: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data T0538ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0538 Clean utility room: without controlled drugs cupboard

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S

+vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%):

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 150

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 207: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character T0538

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Clean utility room: without controlled drugs cupboardT0538Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Non-essential - Project Option

Obscured glass with solar control, security control as necessary, see BS2881

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 208: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

T0538ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: T0538 Clean utility room: without controlled drugs cupboard

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1CUPBOARD, flammable material, metal, adjustable

spillage tray and sump, lockable, 712H 355W 305D

CUP55011

1OUTLET cable, 13 ampOUT00211

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT, switched, 13 ampOUT05211

1SOCKET outlet data/voice, double.OUT13122

1CABINET, tall, modular storage, for 400 facing

inserts, open, on plinth, 2100H

SMC00133

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01322

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02344

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 2100W 700D

SMW08111

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

Activity DataBase 01/03/2017

Page 209: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0554Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0554 Staff communal changing room: 20 lockers

Room Number: Revision Date: 01/03/2017

1) User may undress and dress.

2) Changing into clean uniforms (including blues or greens).

3) Changing footwear.

4) Secure hanging of wet outdoor clothing.

5) Secure holding/storing of clothing and personal belongings.

6) Secure holding/storage of motorcycle and bicycle helmets.

7) Hanging outdoor clothing.

8) Disposal of dirty uniforms.

Activities:

Personnel: Up to 6 x staff.

Intermittent use.

Planning

Relationships:

Direct access to showers and/or individual changing room(s).

Close to WCs.

Close to uniform exchange, if provided.

Space Data: Height (mm): 20.00 2,700Area (m²):

Notes: It is assumed that this space is supported by one individual changing room. See V0725

for details of semi-ambulant individual changing room and V0276 for independent

wheelchair individual changing room.

The room layout illustrates space for all users but includes lockers for generally

ambulant users. A suitable number of lockers must comply with the requirements of

BS8300/ADM for wheelchair users depending upon the expected user group.

The following items may be provided:

- cube lockers for personal belongings will be required if staff are not allocated their own

changing lockers;

- shaver sockets, shelves and lights associated with mirrors.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 210: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0554ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0554 Staff communal changing room: 20 lockers

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke heat to be considered if adjacent to shower rooms

General Notes:

Activity DataBase 01/03/2017

Page 211: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0554

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Staff communal changing room: 20 lockersV0554Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, wheelchair & equipment access (1000mm)

Windows: Non-essential - Project Option

Obscured glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 212: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0554ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0554 Staff communal changing room: 20 lockers

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1DISH, soap, wall mountedDIS20011

1LUMINAIRE, single fluorescent lamp, wall, 8 watt,

300 mm

LIG06311

1MIRROR, wall mounted, 900H 300WMIR00211

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02633

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SOCKET outlet, shaverOUT02511

1RAIL for shower curtain, 1200mmRAI26211

1SEAT, bench, wall mounted, 480H 1300W 400DSEA00411

1SHOWER, slip resistant floor, with drainage outlet,

1000W 1200D

SHO00422

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01811

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02011

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10022

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 520-550 projection, hospital

pattern, rimless pan, vitreous china.

WCH00111

5DISPENSER, soap, wall mountedDIS12411

5HOOK, single, small, wall mountedHOO11922

5LOCKER clothes, triple, 1800H 300W 550DLOC8001313

5SHELF, raised edge, non-breakable, 300W 150DSHE30111

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 213: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0554-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0554-03 Staff communal changing room: 30 lockers

Room Number: Revision Date: 01/03/2017

1) User may undress and dress.

2) Changing into clean uniforms (including blues or greens).

3) Changing footwear.

4) Secure hanging of wet outdoor clothing.

5) Secure holding/storing of clothing and personal belongings.

6) Secure holding/storage of motorcycle and bicycle helmets.

7) Hanging outdoor clothing.

8) Disposal of dirty uniforms.

Activities:

Personnel: Up to 12 x staff.

Intermittent use.

Planning

Relationships:

Direct access to showers and/or individual changing room(s).

Close to WCs.

Close to uniform exchange, if provided.

Space Data: Height (mm): 30.00 2,700Area (m²):

Notes: It is assumed that this space is supported by one individual changing room. See V0725

for details of semi-ambulant individual changing room and V0276 for independent

wheelchair individual changing room.

The room layout illustrates space for all users but includes lockers for generally

ambulant users. A suitable number of lockers must comply with the requirements of

BS8300/ADM for wheelchair users depending upon the expected user group.

The following items may be provided:

- cube lockers for personal belongings will be required if staff are not allocated their own

changing lockers;

- shaver sockets, shelves and lights associated with mirrors.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 214: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0554-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0554-03 Staff communal changing room: 30 lockers

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke heat to be considered if adjacent to shower rooms

General Notes:

Activity DataBase 01/03/2017

Page 215: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0554-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Staff communal changing room: 30 lockersV0554-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Windows: Non-essential - Project Option

Obscured glass with solar control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 216: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0554-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0554-03 Staff communal changing room: 30 lockers

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10522

1BENCH, transfer, fixed, 300H 1200W 700DBEN00633

1DISH, soap, wall mountedDIS20022

1HOOK, single, small, wall mountedHOO01944

1LUMINAIRE, single fluorescent lamp, wall, 8 watt,

300 mm

LIG06322

1MIRROR, wall mounted, 900H 300WMIR00222

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02622

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1SOCKET outlet, shaverOUT02522

1RAIL for shower curtain, 1200mmRAI26222

1SHELF, raised edge, non-breakable, 300W 150DSHE10122

1SHOWER, slip resistant floor, with drainage outlet,

1000W 1200D

SHO00444

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01822

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02022

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28922

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10044

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10722

1WC/toilet pan with seat, 520-550 projection, hospital

pattern, rimless pan, vitreous china.

WCH00122

2DISPENSER, paper towel, wall mountedDIS01322

2DISPENSER, soap, wall mountedDIS02422

3LOCKER clothes, triple, 1800H 300W 550DLOC9001717

8TRACK, blinds for windowsTRA90022

Activity DataBase 01/03/2017

Page 217: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0653Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0653 Locker bay: 12 small lockers

Room Number: Revision Date: 01/03/2017

1) Secure holding/storing of clothing and personal belongings.Activities:

Personnel: Intermittent use.

Planning

Relationships:

Convenient to circulation route.

Space Data: Height (mm): 1.50 2,400Area (m²):

2400 mm is the anticipated minimum ceiling height. Should be sized to suit surrounding

area/design.

Notes: Lockers included for generally ambulant users. A suitable number of lockers must

comply with the requirements of BS8300/ADM for wheelchair users depending upon the

expected user group.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 218: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0653ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0653 Locker bay: 12 small lockers

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 100-150

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 219: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0653

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Locker bay: 12 small lockersV0653Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Not required - open to circulation area or part of another space

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 220: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0653ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0653 Locker bay: 12 small lockers

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3LOCKER, 4 compartments, 1800H 300W 450DLOC01433

Activity DataBase 01/03/2017

Page 221: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0725-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0725-01 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

1) Semi-ambulant person may undress/dress in privacy.

2) Hanging outdoor clothing.

3) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Adjacent to sub-waiting area (if provided).

Close to WC facilities.

May be use in conjunction with staff changing area.

Space Data: Height (mm): 2.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- patient/staff call (although required when for patient use);

The following items may be provided:

- a tip-up seat

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 222: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0725-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0725-01 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke heat to be considered if adjacent to shower rooms

General Notes:

Activity DataBase 01/03/2017

Page 223: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0725-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Changing room: semi-ambulantV0725-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 224: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0725-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0725-01 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1RESET UNIT, with repeat lamp, patient/staff callCAL01211

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1SEAT, bench, wall mounted, 480H 1300W 400DSEA00411

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SWITCH, lightSWC02511

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 225: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0725-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0725-02 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

1) Semi-ambulant person may undress/dress in privacy.

2) Hanging outdoor clothing.

3) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Adjacent to sub-waiting area (if provided).

Close to WC facilities.

May be use in conjunction with staff changing area.

Space Data: Height (mm): 2.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- patient/staff call (although required when for patient use);

The following items may be provided:

- a tip-up seat

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 226: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0725-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0725-02 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke heat to be considered if adjacent to shower rooms

General Notes:

Activity DataBase 01/03/2017

Page 227: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0725-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Changing room: semi-ambulantV0725-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 228: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0725-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0725-02 Changing room: semi-ambulant

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1RESET UNIT, with repeat lamp, patient/staff callCAL01211

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1SEAT, bench, wall mounted, 480H 1300W 400DSEA00411

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SWITCH, lightSWC02511

Activity DataBase 01/03/2017

Page 229: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0726Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0726 Changing room: independent wheelchair

Room Number: Revision Date: 01/03/2017

1) Wheelchair user may undress/dress independently in privacy.

2) Hanging clothing whilst seated.

3) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Adjacent to sub-waiting area (if provided).

Close to WC facilities.

Space Data: Height (mm): 4.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items may be provided:

- a bench (instead of the tip-up seat shown on the room layout).

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 230: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0726ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0726 Changing room: independent wheelchair

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke heat to be considered if adjacent to shower rooms

General Notes:

Activity DataBase 01/03/2017

Page 231: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0726

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Changing room: independent wheelchairV0726Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 232: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0726ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0726 Changing room: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1RAIL, grab, horizontal, wall mounted, 600mmRAI16122

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SEAT, tip-up, fixed heightSEA02211

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SWITCH, lightSWC02511

Activity DataBase 01/03/2017

Page 233: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0922-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0922-01 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

1) Independent wheelchair accessible toilet and adjacent hand-rinse basin may be used.

2) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 4.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 234: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0922-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-01 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 20

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 235: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0922-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

WC: independent wheelchairV0922-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 236: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0922-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-01 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1RAIL, grab, vertical, wall mounted, 600mmRAI04833

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SHELF, raised edge, non-breakable, 600W 200DSHE10011

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, small, freestandingHOL00311

Activity DataBase 01/03/2017

Page 237: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0922-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0922-02 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

1) Independent wheelchair accessible toilet and adjacent hand-rinse basin may be used.

2) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 4.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 238: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0922-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-02 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 20

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 239: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0922-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

WC: independent wheelchairV0922-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 240: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0922-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-02 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1RAIL, grab, vertical, wall mounted, 600mmRAI04833

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SHELF, raised edge, non-breakable, 600W 200DSHE10011

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, small, freestandingHOL00311

Activity DataBase 01/03/2017

Page 241: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V0922-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V0922-03 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

1) Independent wheelchair accessible toilet and adjacent hand-rinse basin may be used.

2) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 4.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 242: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V0922-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-03 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 20

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 243: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V0922-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

WC: independent wheelchairV0922-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 244: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V0922-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V0922-03 WC: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1RAIL, grab, vertical, wall mounted, 600mmRAI04833

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, horizontal, wall mounted, 600mmRAI16111

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SHELF, raised edge, non-breakable, 600W 200DSHE10011

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, small, freestandingHOL00311

Activity DataBase 01/03/2017

Page 245: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1010Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1010 WC: ambulant

Room Number: Revision Date: 01/03/2017

1) Toilet may be used by ambulant person.

2) Hand-rinse basin may be used.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 2.00 2,400Area (m²):

Notes: The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

- the shelf next to the basin.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 246: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1010ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1010 WC: ambulant

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 20

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 247: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1010

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

WC: ambulantV1010Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel access (900mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 248: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1010ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1010 WC: ambulant

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 520-550 projection, hospital

pattern, rimless pan, vitreous china.

WCH00111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

3HOLDER, sack, with lid foot operated, small,

freestanding

HOL00411

5BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN12811

5HOLDER, toilet roll, multi, largeHOL11611

5SHELF, raised edge, non-breakable, 300W 150DSHE30111

Activity DataBase 01/03/2017

Page 249: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1121Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1121 WC: semi-ambulant

Room Number: Revision Date: 01/03/2017

1) Toilet may be used by semi-ambulant person.

2) Hand-rinse basin may be used.

3) Call systems may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 2.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

- the shelf next to the basin.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

The following items may be provided:

- mirror.

Activity DataBase 01/03/2017

Page 250: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1121ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1121 WC: semi-ambulant

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 20

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 251: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1121

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

WC: semi-ambulantV1121Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 252: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1121ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1121 WC: semi-ambulant

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01211

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1HOOK, single, small, wall mountedHOO01911

1MIRROR, wall mounted, 650H 300WMIR00111

1RAIL, grab, vertical, wall mounted, 600mmRAI04844

1RAIL, grab, horizontal, wall / door mounted, 500mmRAI15811

1RAIL, grab, horizontal, wall mounted, 600mmRAI16111

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 520-550 projection, hospital

pattern, rimless pan, vitreous china.

WCH00111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, with lid foot operated, small,

freestanding

HOL00411

Activity DataBase 01/03/2017

Page 253: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1131Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1131 Nappy changing room

Room Number: Revision Date: 01/03/2017

1) Changing nappies.

2) Clinical waste may be disposed

3) Wash-hand basin may be used.

Activities:

Personnel: 1 x baby or infant.

1 x adult (ambulant).

Planning

Relationships:

Adjacent to waiting area and/or concourse

Space Data: Height (mm): 5.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The room includes a wall-mounted fold-down changing table, alternatively, it can

accommodate a fixed or mobile table.

The layout is suitable for ambulant and semi-ambulant users, where access is required

for wheelchair users, consideration must be given to the space within the room and

fixing height of the changing table.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 254: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1131ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1131 Nappy changing room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 255: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1131

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Nappy changing roomV1131Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 256: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1131ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1131 Nappy changing room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, general pattern, vitreous china, 2

tap holes, no overflow, bottom outlet, 500W 400D.

BAS10711

1HOOK, single, small, wall mountedHOO01922

1SOCKET outlet, switched, 13 amp, singleOUT00511

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SHELF, 600W 300DSHE20122

1WORKTOP, clinical, for 400 facing modular storage

cabinets, Width to fit, 700D

SMW90011

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted recessed grated, metal, 1.1/4 in,

with plug and chain.

WAS10111

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3Counter Top Baby Changing Unit MT80, Magrini

LTD., 160H 780W 565D

NCU90111

Activity DataBase 01/03/2017

Page 257: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1133Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1133 Changing room and toilet: accompanied: single-sided changing table access

Room Number: Revision Date: 01/03/2017

1) Independent wheelchair accessible toilet and adjacent hand-rinse basin may be used.

2) Adjustable height changing table with sides accessed from one side for changing nappies or

continence pads may be required.

3) Clinical waste may be disposed

4) Wash-hand basin may be used.

5) Call systems may be used.

Activities:

Personnel: 1 x young person (0-18 years) or adult with continence problems.

1 x accompanying carer (ambulant).

Planning

Relationships:

Adjacent to waiting area and/or concourse.

Space Data: Height (mm): 9.00 2,400Area (m²):

Notes: This room does not allow for the use of lifting aids for transfer to the toilet or changing

table. For guidance on public assisted changing spaces and the use of lifting aids go to

www.changingplaces.org. It is recommended that a risk assessment is carried out on the

use of public assisted changing spaces and the provision of lifting aids.

The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- paper roll dispenser associated with couch.

The following items may be provided:

- mirror, light and shaver outlet.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 258: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1133ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1133 Changing room and toilet: accompanied: single-sided changing table access

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 259: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1133

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Changing room and toilet: accompanied: single-sided changing table accessV1133Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 260: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1133ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1133 Changing room and toilet: accompanied: single-sided changing table access

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1BASIN, medium, general pattern, vitreous china, 2

tap holes, no overflow, bottom outlet, 500W 400D.

BAS10711

1PUSH BUTTON patient/staff call, wall mountedCAL00211

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1HOOK, single, small, wall mountedHOO01922

1SOCKET outlet, switched, 13 amp, singleOUT00511

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1RAIL, grab, vertical, wall mounted, 600mmRAI04833

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SHELF, 400W 300DSHE57711

1SWITCH, lightSWC02511

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted recessed grated, metal, 1.1/4 in,

with plug and chain.

WAS10111

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10722

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01322

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02422

2DISPENSER, wipes, door mountedDIS06411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3CHAIR, stacking, polypropylene, with back and seat

pads, wipeable.

CHA38311

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

Activity DataBase 01/03/2017

Page 261: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1133ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1133 Changing room and toilet: accompanied: single-sided changing table access

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3HOLDER, sack with lid foot operated, large,

freestanding, 960H 500W 415D

HOL00811

3TABLE/TROLLEY changing, variable height, with

sides and paper roll holder, on castors, 500-920H

1820W 700D

TAB09811

Activity DataBase 01/03/2017

Page 262: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1321Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1321 Shower room: ambulant

Room Number: Revision Date: 01/03/2017

1) Shower may be used by ambulant person.

2) User may undress and dress in privacy.

3) Hanging outdoor clothing.

4) Hanging clothes and towels.

Activities:

Personnel: 1 x person (staff or visitor).

Intermittent use.

Planning

Relationships:

Associated with staff changing area.

Close to a WC.

Space Data: Height (mm): 2.50 2,400Area (m²):

Notes: This room is not recommended for patient use.

The following items may be provided:

- inward opening door;

- full length mirror.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 263: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1321ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1321 Shower room: ambulant

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 100-150

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 264: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1321

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Shower room: ambulantV1321Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel access (900mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 265: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1321ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1321 Shower room: ambulant

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1DISH, soap, wall mountedDIS20011

1HOOK, single, small, wall mountedHOO01933

1LUMINAIRE, single fluorescent lamp, wall, 8 watt,

300 mm

LIG06311

1MIRROR, wall mounted, 900H 300WMIR00211

1SOCKET outlet, shaverOUT02511

1RAIL for shower curtain, 1000mmRAI26011

1SEAT, tip-up, wall mounted, 400 W 400DSEA02411

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SHOWER TRAY ceramic slip resistant base, with

drainage outlet, 800W 800D

SHO00911

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01811

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02011

1SWITCH 5amp ac single pole, 1 way, ceiling pull

cord

SWC01411

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

Activity DataBase 01/03/2017

Page 266: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1625Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1625 Shower, WC and wash: en-suite, assisted wheelchair accessible

Non-touch WC cistern

Room Number: Revision Date: 01/03/2017

1) Patient/user may be ambulant, or in a wheelchair.

2) Patient may arrive in sanitary chair.

3) Hanging clothes and towels.

4) Transfer patient to/from shower chair/seat.

5) Using shower.

6) Using WC.

7) Personal washing for a seated person.

8) Grooming for a seated person.

9) Using electric shaver.

10) Patient may require assistance during the activities.

Activities:

Personnel: 1 x Patient

1 x Staff

Planning

Relationships:

Easy access to/from patient bed areas.

En-suite to bedroom.

En-suite to overnight stay.

Space Data: Height (mm): 6.00 2,400Area (m²):

Notes: Adequate space should be allowed either or both sides of the WC for assist the patient.

Use of hoist/ceiling hoist.

For layout see HBN Hosp. acom for children and young people Appendix 4 sheet 1.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 267: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1625ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1625 Shower, WC and wash: en-suite, assisted wheelchair accessible

Non-touch WC cistern

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

45

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 268: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1625

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Shower, WC and wash: en-suite, assisted wheelchair accessible

Non-touch WC cistern

V1625Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 269: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1625ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1625 Shower, WC and wash: en-suite, assisted wheelchair accessible

Non-touch WC cistern

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00622

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1DISH, soap, wall mountedDIS20011

1HOOK, single, small, wall mountedHOO01911

1RAIL, grab, vertical, wall mounted, 600mmRAI04855

1RAIL, towel, single stainless steel, 15mm dia.

450mm

RAI06111

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, horizontal, cranked, L-shape, wall

mounted, 1550W 450D

RAI16411

1RAIL, grab, hinged, wall mounted, 650mmRAI17211

1SEAT, tip-up, wall mounted, 400 W 400DSEA02411

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SHOWER, slip resistant floor, with drainage outlet,

1600W 1100D

SHO00711

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01811

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02011

1STORAGE UNIT, mid, shelf, 150H 300W 150D,

HTM63

STF20011

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01322

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, small, freestandingHOL00311

3RAIL for shower curtain, Width to fitRAI90011

Activity DataBase 01/03/2017

Page 270: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1631Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1631 Shower room: independent wheelchair

Room Number: Revision Date: 01/03/2017

1) Shower may be used by a person who is an independent wheelchair user.

2) Independent wheelchair accessible toilet and adjacent hand-rinse basin may be used.

3) User may undress and dress in privacy.

4) Hanging outdoor clothing.

5) Hanging clothes and towels.

6) Use of shower chair.

7) Personal grooming by an individual.

8) Call systems may be used.

9) Wheelchair accessible hand-wash basin may be used.

Activities:

Personnel: 1 x person.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 7.00 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

- mirror, light and shaver outlet.

The following items may be provided:

- modular shelf;

- fixed shower head.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 271: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1631ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1631 Shower room: independent wheelchair

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 272: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1631

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Shower room: independent wheelchairV1631Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1000mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 273: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1631ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1631 Shower room: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, small, general pattern, vitreous china, 1 tap

right hand hole, no overflow, bottom outlet, 400W

300D

BAS10511

1BASIN, large, general pattern, vitreous china, 2 tap

holes, no overflow, bottom outlet, 600W 500D.

BAS10911

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00633

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01222

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1DISH, soap, wall mountedDIS20011

1HOOK, single, small, wall mountedHOO01922

1LUMINAIRE, single fluorescent lamp, wall, 8 watt,

300 mm

LIG06311

1MIRROR, wall mounted, 900H 300WMIR00211

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1SOCKET outlet, shaverOUT02511

1OUTLET, floor drainage and grating, 150 mm dia.

hospital pattern.

OUT34511

1RAIL, grab, vertical, wall mounted, 600mmRAI04855

1RAIL, grab, horizontal, with supports, wall mounted,

600mm

RAI15911

1RAIL, grab, horizontal, wall mounted, 600mmRAI16133

1RAIL, grab, hinged, wall mounted, 650mmRAI17222

1RAIL for shower curtain, L-shape, 920W 920DRAI27011

1SEAT, tip-up, fixed heightSEA02211

1SEAT, tip-up, wall mounted, 400 W 400DSEA02411

1SHELF, raised edge, non-breakable, 300W 150DSHE10111

1SHELF, raised edge, non-breakable, 200W 150DSHE10211

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01811

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02011

1SHOWER, slip resistant floor, with drainage outlet,

1040W 1040D

SHO03611

1SWITCH 5amp ac single pole, 1 way, ceiling pull

cord

SWC01411

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, pillar, short lever, pair hot and cold, 1/2 in.TAP34711

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted recessed grated, metal, 1.1/4 in,

with plug and chain.

WAS10111

Activity DataBase 01/03/2017

Page 274: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1631ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1631 Shower room: independent wheelchair

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10722

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01322

2DISPENSER, toilet paper, dispense individual

sheets, wall mounted

DIS01511

2DISPENSER, soap, wall mountedDIS02422

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, small, freestandingHOL00311

Activity DataBase 01/03/2017

Page 275: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

V1635-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: V1635-01 Shower room: assisted: in-patient

Room Number: Revision Date: 01/03/2017

1) Use of shower requires assistance. The shower may have an adjustable or fixed tip-up

shower seat.

2) Use of toilet requires assistance.

3) Wheelchair accessible hand-wash basin may be used.

4) User may undress and dress in privacy.

5) Hanging outdoor clothing.

6) Hanging clothes and towels.

7) Sanitary chair/commode may be used.

8) Use of shower chair.

9) Mobile hoist may be used.

10) Call systems may be used.

Activities:

Personnel: 1 x patient.

1-2 x assistants.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 6.50 2,400Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

The following items are shown on the drawing but are optional:

- the bin for the disposal of sanitary towels is only required in female WCs;

- mirror, light and shaver outlet.

The following items may be provided:

- modular shelf;

- fixed shower head;

- adjustable height basin;

- mobile shower chair in lieu of fixed seat;

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 276: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data V1635-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1635-01 Shower room: assisted: in-patient

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Omitted via risk assessment

General Notes:

Activity DataBase 01/03/2017

Page 277: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character V1635-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Shower room: assisted: in-patientV1635-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, wheelchair & equipment access (1500mm) - see HBN 00-02

Requirement for hinge protection when areas used by children

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 278: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

V1635-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: V1635-01 Shower room: assisted: in-patient

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BACKREST, WC/toilet, padded, wall mountedBAC00211

1BASIN, large, general pattern, vitreous china, 2 tap

holes, no overflow, bottom outlet, 600W 500D.

BAS10911

1PULL CORD, patient/staff call (help) with

reassurance lamp

CAL00633

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1RESET UNIT, with repeat lamp, patient/staff callCAL01211

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1CISTERN WC/toilet, concealed, reversible. To suit

WC

CIS00511

1HOOK, single, small, wall mountedHOO01922

1LUMINAIRE, single fluorescent lamp, wall, 8 watt,

300 mm

LIG06311

1MIRROR, wall mounted, 900H 300WMIR00211

1MIRROR, unbreakable, wall mounted, 1300H 500WMIR02611

1SOCKET outlet, shaverOUT02511

1OUTLET, floor drainage and grating, 150 mm dia.

hospital pattern.

OUT34511

1RAIL, grab, vertical, wall mounted, 600mmRAI04844

1RAIL, grab, horizontal, wall mounted, 600mmRAI16122

1RAIL, grab, hinged, wall mounted, 650mmRAI17233

1RAIL, grab, hinged, wall mounted, 650mm with toilet

roll holder

RAI17411

1RAIL for shower curtain, L-shape, 920W 1200DRAI27211

1SEAT, tip-up, fixed heightSEA02211

1SHOWER, valve, thermostatic mixer (associated with

SHO020).

SHO01811

1SHOWER, adjustable shower head hand spray

(associated with SHO018).

SHO02011

1SWITCH 5amp ac single pole, 1 way, ceiling pull

cord

SWC01411

1TAP, pillar, short lever, pair hot and cold, 1/2 in.TAP34711

1WASTE, unslotted recessed grated, metal, 1.1/4 in,

with plug and chain.

WAS10111

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WC/toilet pan with seat, 700 mm projection, hospital

pattern, rimless pan, vitreous china.

WCH00511

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, wall mountedDIS02411

2SHELF, modular unitSHE10411

3BIN, disposal, sealed, operated with one hand,

nominal 420H 155W 490D

BIN02811

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

Activity DataBase 01/03/2017

Page 279: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W0274Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W0274 Store: medicines

Room Number: Revision Date: 01/03/2017

1) Non-controlled medicines and pharmaceuticals are stored securely.

2) Refrigerated storage of drugs/medicines.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Close to dispensary.

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: This is store is suitable for use as a:

- non-formulary drugs store;

- returned medicines store;

- clinical trials store;

- unlicensed medicines store.

The following items are shown on the room layout but are optional:

- freezer

The following items may be provided:

- Door alarm to provide access monitoring.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 280: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W0274ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W0274 Store: medicines

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 4

Ventilation Type: S/E

Bal or -vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 500

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 281: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W0274

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: medicinesW0274Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required - windows not desirable

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 282: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W0274ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W0274 Store: medicines

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

Activity DataBase 01/03/2017

Page 283: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W0812Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W0812 Store: records

Room Number: Revision Date: 01/03/2017

1) Secure storage.

2) Files and records are stored.

3) Rack(s) are used for storage.

4) Laptop computer(s) may be used.

5) Telephone(s) may be used.

Activities:

Personnel: 1-2 x staff.

Intermittent use.

Planning

Relationships:

Close to clinical area.

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 284: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W0812ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W0812 Store: records

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 300

Daytime Specific Service Illuminance (Lux): 200 at workstation

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 285: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W0812

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: recordsW0812Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Non-essential - Project Option

Obscured glass with solar control, security control as necessary, see BS2881

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 286: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W0812ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W0812 Store: records

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SOCKET outlet data/voice, double.OUT13111

1SWITCH, lightSWC02511

2RACK, vertical, open front, wall mounted, 1800H

1200W 300D

RAC19122

2RACK, metal, 1 bay, 4 shelves, 1980H 900W 650DRAC4061515

2RACK, metal, 1 bay, 4 shelves, 1980H 1200W 600DRAC41077

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3TABLE, 710H 900W 600DTAB00511

8TRACK, blinds for windowsTRA90022

Activity DataBase 01/03/2017

Page 287: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 12.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 288: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 289: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 290: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 465D

SMF01188

1SWITCH, lightSWC02511

Activity DataBase 01/03/2017

Page 291: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585-001Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585-001 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 292: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-001 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 293: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585-001

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585-001Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 294: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585-001ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-001 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 665D

SMF0131010

1SWITCH, lightSWC02511

Activity DataBase 01/03/2017

Page 295: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585-002Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585-002 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 296: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-002 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 297: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585-002

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585-002Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 298: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585-002ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-002 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01022

1SOCKET outlet data/voice, double.OUT13122

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 665D

SMF0131313

1SWITCH, lightSWC02511

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3DESK RETURN UNIT, cantilever, cable

management, adjustable legs, modesty panel,

freestanding, 1200W 600D

DES02811

4COMPUTER KEYBOARDCOM93311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94911

Activity DataBase 01/03/2017

Page 299: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585-003Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585-003 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 300: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-003 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 301: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585-003

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585-003Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 302: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585-003ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-003 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 665D

SMF01366

1SWITCH, lightSWC02511

7PRINTER multifunction, network, floor standing, zone

1800W 750D

PRI11011

Activity DataBase 01/03/2017

Page 303: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585-004Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585-004 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 304: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585-004ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-004 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 305: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585-004

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585-004Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 306: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585-004ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-004 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SWITCH, lightSWC02511

5SHELF, 1500W 300DSHE33188

5SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 465D

SMF11199

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 307: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

W1585-005Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: W1585-005 Store: general

Room Number: Revision Date: 01/03/2017

1) Miscellaneous equipment is stored.

2) Non-clinical supplies are stored.

Activities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Space Data: Height (mm): 16.00 2,400Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 308: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data W1585-005ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-005 Store: general

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux): 200/300 Subject to perception of detail required

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

55

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Low

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 309: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character W1585-005

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Store: generalW1585-005Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 310: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

W1585-005ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: W1585-005 Store: general

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELF, 900W 300DSHE2111010

1SHELF, 1500W 300DSHE23188

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 465D

SMF01177

1SWITCH, lightSWC02511

Activity DataBase 01/03/2017

Page 311: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

X0145Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: X0145 Treatment room: double-sided couch access

Room Number: Revision Date: 01/03/2017

1) Carrying out invasive clinical procedures from both sides of the couch.

2) User may undress and dress in privacy.

3) Trays/packs for clinical procedures are prepared.

4) Clinical wash-hand basin may be used.

5) Electronic patient records (EPRs) may be accessed and updated.

6) Sterile supplies and consumables are held/stored on a trolley.

7) Monitoring/diagnostic or therapeutic equipment may be used.

8) Use of mobile diagnostic and therapeutic equipment.

9) Patient may arrive on foot in a wheelchair or on a trolley

10) Preparation for clinical procedures is undertaken.

11) Dressing/instrument trolleys are held and prepared.

12) Sterile packs, lotions and drugs may be prepared for immediate use.

13) Piped medical gases, vacuum and associated equipment may be used.

14) Call systems may be used.

Activities:

Personnel: 1 x patient.

2 x staff.

Planning

Relationships:

Close to a clean utility room.

Close to a dirty utility room.

Space Data: Height (mm): 16.00 2,700Area (m²):

Activity DataBase 01/03/2017

Page 312: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Notes: This room includes a 3-section couch and is based on option 1 layout in HBN 00-03.

Alternatively, it may accommodate a 2-section couch or specialist treatment chair.

The room includes general engineering services for delivering treatments. For further

details see HTM 02-01 and HTM 08-03.

The call repeat lamp is situated over the door outside the room.

The following items are shown on the room layout but are optional:

- room in use switch and indicator.

- the location of the privacy curtain (may be at the door entrance instead of between the

couch and clinical workstation).

Where laser treatments are carried out, an illuminated "laser in use" sign must be

situated outside the room linked to a door locking mechanism.

Where the room includes a window, blackout blinds are recommended for flexibility in

use.

.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 313: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data X0145ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0145 Treatment room: double-sided couch access

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: S/E

+vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 500

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 1000

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80/90 Ra 90 required for examination/treatment

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 314: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character X0145

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Treatment room: double-sided couch accessX0145Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, trolley, wheelchair & equipment access (1500mm)

Requirement for hinge protection when areas used by children

Windows: Desirable - Project Option

Clear glass, openable, privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 315: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0145ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0145 Treatment room: double-sided couch access

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1HOOK, single, small, wall mountedHOO01922

1LUMINAIRE, examination, ceiling, adjustable, 1000

lux

LIG05311

1ILLUMINATED SIGN, 'Room in use'LIG07311

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01033

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13122

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01311

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02333

1WORKTOP, clinical, for 3 x 400 facing modular

storage cabinets, 1365W 700D

SMW05311

1WORKTOP, clinical, for 400 facing modular storage

cabinets, 900W 700D

SMW06911

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1SWITCH, 'Room in use' illuminated sign.SWC07611

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRACK, curtain, one sided, 3800LTRA17211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2BRACKET, holder, suction unit.BRA00311

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3CHAIR, swivel, height adjustable, medium back,

wipeable, 5 star base, on glides

CHA30411

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3COUCH, examination/treatment, (3 section), variable

height, retractable wheels, with paper roll holder

COU01011

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00622

3HOLDER, sharps box, up to 7 litre capacity,

rail/trolley hang or wall mounted, 170H 125W 100D

HOL02011

Activity DataBase 01/03/2017

Page 316: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0145ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0145 Treatment room: double-sided couch access

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3REFRIGERATOR, capacity 160 litre, automatic

defrost, stainless steel, underbench, external

temperature gauge, lockable, on castors, 850H

610W 600D

REF05811

3TROLLEY, modular storage, single open frame,

including handle and worktop, with up to 5 sets of

runners for 600 facing inserts, 850H 730W 450D

SMT00211

3STOOL, surgeon/anaesthetist, height adjustable,

includes anti-static seat pads

STO00611

3TROLLEY, dressing/instrument, stainless steel,

buffered, 870H 750W 450D

TRO13311

4COMPUTER KEYBOARDCOM93311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM94911

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 317: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

X0273Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: X0273 Consulting/ treatment room: multidisciplinary dental

Room Number: Revision Date: 01/03/2017

1) Dental procedures for all dental specialties (eg restorative, orthodontic, oral surgery, maxfax

etc) may be carried out by a practitioner.

2) Dental procedures for all dental specialties (eg restorative, orthodontic, oral surgery, maxfax

etc) may be carried out by a practitioner.

3) Imaging x-ray equipment may be used.

4) Diagnostic images are viewed on monitor.

5) Electronic patient records (EPRs) may be accessed and updated.

6) Preparation of moulds/casts

7) Clinical wash-hand basin may be used.

Activities:

Personnel: 1 x patient.

2 x staff.

2 x others (escorts).

Planning

Relationships:

Space Data: Height (mm): 20.10 2,700Area (m²):

Notes: This room includes a dental chair with attached cuspidor, separate dental light and

mobile dental unit.

Specific equipment requirements and arrangements for treating people in wheelchairs

should be determined locally.

The call repeat lamp is situated over the door outside the room.

An X-ray control panel is required for the intra-oral X-ray machine. It has not been shown

on the room layout as its location is subject to specialist advice.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 318: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data X0273ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0273 Consulting/ treatment room: multidisciplinary dental

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 25

Heating Design Temperature (dry bulb)(degC): 22

Minimum Air Changes (AC/hr): 10

Ventilation Type: S/E

+vePressure Relative to Adjoining Space:

F7Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/V

Daytime General Service Illuminance (Lux): 500

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux): 30000-60000

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 90

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 35 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Confidential

Typical

Reference to Table 3 of the Department of Health

&apos;Acoustics: Technical design manual

4032:0.6:England&apos;.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): &lt;20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 319: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character X0273

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Consulting/ treatment room: multidisciplinary dentalX0273Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, trolley, wheelchair & equipment access (1500mm)

Requirement for hinge protection when areas used by children

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 320: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0273ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0273 Consulting/ treatment room: multidisciplinary dental

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1CABINET, dental, 1 door, under bench, on plinth,

(internal fittings-project option), 890H 500W 450D

CAB16033

1CABINET, dental, 1 door, wash basin, on plinth,

890H 500W 450D

CAB16611

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01055

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04922

1SOCKET outlet data/voice, double.OUT13144

1SWITCH, lightSWC02511

1SWITCH, dimmer, modulatingSWC03411

1TAP, monobloc, pillar mixer, integral thermostatic,

short lever.

TAP28911

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1WORKTOP, with left of centre inset sink bowl, 30H

2000W 500D

WOR71111

1WORKTOP, 30H 1600W 500DWOR72111

1WORKTOP, 30H 1800W 500DWOR72311

5BRACKET, holder, suction unit.BRA10311

5CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA40111

5CHAIR, upright, upholstered, stacking, wipeableCHA41722

5CHAIR, dental treatment, fully reclining with headrest,

electrically height adjustable, wipeable.

CHA47011

5COMPUTER KEYBOARDCOM13311

5DENTAL UNIT, with multi-services terminal, mobileDEN11211

5DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS21111

5HOLDER, sack, with lid foot operated, small,

freestanding

HOL10411

5HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL10611

5HOLDER, sharps box, up to 7 litre capacity,

rail/trolley hang or wall mounted, 170H 125W 100D

HOL12011

5HOOK, single, small, wall mountedHOO11933

5MONITOR medical display 18 in.; digital image

viewer, wall mounted

IMG10211

5ILLUMINATED SIGN 'RADIATION ON', wall mountedLIG17111

5MICROSCOPE dentalMIC13811

Activity DataBase 01/03/2017

Page 321: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0273ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0273 Consulting/ treatment room: multidisciplinary dental

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

5TROLLEY, modular storage, single open frame,

including handle and worktop, with up to 5 sets of

runners for 600 facing inserts, 850H 730W 450D

SMT10211

5STOOL, dental, with back support, mobileSTO12422

5TABLE, 710H 1200W 600DTAB10811

5TRACK, blinds for windowsTRA90211

Activity DataBase 01/03/2017

Page 322: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

X0325Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: X0325 Activity area: physiotherapy: 5 places

Room Number: Revision Date: 01/03/2017

1) Clinical wash-hand basin may be used.

2) Carrying out administration and clerical duties.

3) Information may be provided to patients, carers and visitors.

4) Clinical administration.

5) Patient records may be reviewed and recorded.

6) Telephone(s) may be used.

7) Information on computers may be accessed.

8) Electronic patient records (EPRs) may be accessed and updated.

9) Foot operated treadle and bicycle equipment is used.

10) Rehabilitation exercises are undertaken.

Activities:

Personnel: Up to 5 x patients.

2-3 x staff.

Planning

Relationships:

Near to individual treatment room area. (Are these included in HBN 11 SoA)

Direct access/close to equipment store.

Close to any associated changing/shower provision.

Space Data: Height (mm): 64.00 3,000Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 323: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data X0325ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325 Activity area: physiotherapy: 5 places

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux):

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 324: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character X0325

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Activity area: physiotherapy: 5 placesX0325Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, trolley, wheelchair & equipment access (1500mm);

Requirement for hinge protection when areas used by children

Windows: Essential

Clear glass with solar control, high level

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 325: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0325ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325 Activity area: physiotherapy: 5 places

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1BOARD, display/notice, wall mounted, 900H 600WBOA01211

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00722

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1MIRROR, triple leaf, wall mounted, 1500H 1500WMIR00811

1OUTLET cable, 13 ampOUT00211

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01088

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT switched 13amp, indicatingOUT05811

1SOCKET outlet data/voice, double.OUT13122

1OUTLET, drinking water for equipmentOUT31511

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRACK, curtain, three sided, U-shape, 2900L 2700WTRA11622

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02622

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43822

2EXERCISE BARS, parallel, 3600mm longEXE00311

2PULLEY, exercise system, wall mounted, 1800H

560W

PUL01311

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, upholstered, stacking, wipeableCHA31722

3EXERCISE BENCH, 400H 2655W 300DEXE00811

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3MIRROR, unbreakable/safety glass, mobile, 1600H

500W

MIR01211

3PLINTH, Bobath centre, height adjustable

(380-910mm) and head section, 910H 1900W 1200D

PLI04022

3STOOL, height adjustable, 380H 480 dia.STO00222

3STOOL, wooden, 400H 400W 400DSTO01511

3TABLE, 710H 1200W 600DTAB00811

Activity DataBase 01/03/2017

Page 326: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0325ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325 Activity area: physiotherapy: 5 places

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

3TABLE, therapy treatment, quadriceps, folding, 710H

1240W 610D

TAB09111

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

5EXERCISE BICYCLE, ergometerEXE01411

5EXERCISE STEPSEXE01711

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

9DISPENSER, disposable cup, wall mountedDIS01211

Activity DataBase 01/03/2017

Page 327: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

X0325-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: X0325-01 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

1) Clinical wash-hand basin may be used.

2) Carrying out administration and clerical duties.

3) Information may be provided to patients, carers and visitors.

4) Clinical administration.

5) Patient records may be reviewed and recorded.

6) Telephone(s) may be used.

7) Information on computers may be accessed.

8) Electronic patient records (EPRs) may be accessed and updated.

9) Foot operated treadle and bicycle equipment is used.

10) Rehabilitation exercises are undertaken.

Activities:

Personnel: Up to 5 x patients.

2-3 x staff.

Planning

Relationships:

Near to individual treatment room area. (Are these included in HBN 11 SoA)

Direct access/close to equipment store.

Close to any associated changing/shower provision.

Space Data: Height (mm): 32.00 3,000Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 328: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data X0325-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325-01 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux):

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 329: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character X0325-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Activity area: physiotherapy: 5 places/2X0325-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, trolley, wheelchair & equipment access (1500mm);

Requirement for hinge protection when areas used by children

Windows: Essential

Clear glass with solar control, high level

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 330: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0325-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325-01 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00722

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1OUTLET cable, 13 ampOUT00211

1SOCKET outlet, switched, 13 amp, twinOUT01066

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1SOCKET outlet data/voice, double.OUT13122

1OUTLET, drinking water for equipmentOUT31511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRACK, curtain, three sided, U-shape, 2900L 2700WTRA11611

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3MIRROR, unbreakable/safety glass, mobile, 1600H

500W

MIR01211

3PLINTH, Bobath centre, height adjustable

(380-910mm) and head section, 910H 1900W 1200D

PLI04011

3STOOL, height adjustable, 380H 480 dia.STO00211

3TABLE, 710H 1200W 600DTAB00811

3TABLE, therapy treatment, quadriceps, folding, 710H

1240W 610D

TAB09111

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

8TRACK, blinds for windowsTRA90033

9DISPENSER, cooler, drinking water, (fountain),

(capacity 63.3 l/hr), floor standing

DIS00211

9DISPENSER, disposable cup, wall mountedDIS01211

Activity DataBase 01/03/2017

Page 331: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

X0325-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: X0325-02 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

1) Clinical wash-hand basin may be used.

2) Carrying out administration and clerical duties.

3) Information may be provided to patients, carers and visitors.

4) Clinical administration.

5) Patient records may be reviewed and recorded.

6) Telephone(s) may be used.

7) Information on computers may be accessed.

8) Electronic patient records (EPRs) may be accessed and updated.

9) Foot operated treadle and bicycle equipment is used.

10) Rehabilitation exercises are undertaken.

Activities:

Personnel: Up to 5 x patients.

2-3 x staff.

Planning

Relationships:

Near to individual treatment room area. (Are these included in HBN 11 SoA)

Direct access/close to equipment store.

Close to any associated changing/shower provision.

Space Data: Height (mm): 32.00 3,000Area (m²):

Notes: The call repeat lamp is situated over the door outside the room.

Separate data and voice outlets may be used where structure cabling solutions are not

available.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 332: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data X0325-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325-02 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 21

Minimum Air Changes (AC/hr): 6

Ventilation Type: S/E/N

Bal or -vePressure Relative to Adjoining Space:

G4Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: S/N

Daytime General Service Illuminance (Lux):

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 19

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

40

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Moderate

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Medium

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

43

Domestic Hot Water Discharge Temperature (DegC): 41

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 333: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character X0325-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Activity area: physiotherapy: 5 places/2X0325-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

2 sets of doors:

2 x personnel, trolley, wheelchair & equipment access (1500mm);

Requirement for hinge protection when areas used by children

Windows: Essential

Clear glass with solar control, high level

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 334: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

X0325-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: X0325-02 Activity area: physiotherapy: 5 places/2

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1BOARD, display/notice, wall mounted, 900H 600WBOA01211

1PULL/PUSH BUTTON, staff emergency call, reset

and integral/adjacent indicator lamp

CAL00711

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1MIRROR, triple leaf, wall mounted, 1500H 1500WMIR00811

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01066

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CONNECTION UNIT switched 13amp, indicatingOUT05811

1SOCKET outlet data/voice, double.OUT13122

1SWITCH, lightSWC02511

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1TRACK, curtain, three sided, U-shape, 2900L 2700WTRA11611

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, Medical hand sanitizer, lever action,

wall mounted

DIS02611

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

2PULLEY, exercise system, wall mounted, 1800H

560W

PUL01311

3CHAIR, swivel, height adjustable, high back, with

arms, wipeable, 5 star base, on castors

CHA30111

3CHAIR, upright, upholstered, stacking, wipeableCHA31711

3EXERCISE BENCH, 400H 2655W 300DEXE00811

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00611

3PLINTH, Bobath centre, height adjustable

(380-910mm) and head section, 910H 1900W 1200D

PLI04011

3STOOL, height adjustable, 380H 480 dia.STO00211

3STOOL, wooden, 400H 400W 400DSTO01511

3TABLE, 710H 1200W 600DTAB00811

4COMPUTER KEYBOARDCOM03311

4COMPUTER MONITOR, 17"; TFT, digital flat panel

display, high-resolution screens, desk top

COM04911

5EXERCISE BICYCLE, ergometerEXE01411

5EXERCISE STEPSEXE01711

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 335: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Y0431Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: Y0431 Dirty utility room

Room Number: Revision Date: 01/03/2017

1) Disposal of liquid waste.

2) Holding SHARPS in a container.

3) Items requiring disposal or reprocessing may be held/stored.

4) Clinical wash-hand basin may be used.

5) Urine specimens may be tested.

6) Clinical waste may be disposed

7) Disposal of waste and contaminated materials.

8) Disposal of used protective clothing.

9) Disposal of non-clinical waste.

Activities:

Personnel: 2 x staff.

Intermittent use.

Planning

Relationships:

Close to clinical area, particularly treatment rooms.

Space Data: Height (mm): 8.00 2,700Area (m²):

Notes: ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 336: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data Y0431ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y0431 Dirty utility room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): 6

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N/S

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes: Refer to SLL Lighting Guide 2 for more detailed guidance

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

High

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 337: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character Y0431

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Dirty utility roomY0431Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1000mm)

Windows: Non-essential - Project Option

Clear glass with solar and privacy control

Designation to be validated against current documentation (HTM 55 archived).

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 338: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

Y0431ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y0431 Dirty utility room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1BASIN, medium, hospital pattern, vitreous china, no

tap holes, no overflow, integral back outlet, 500W

400D.

BAS10111

1LAMP, repeat call, patient/staff or staff emergency or

cardiac call

CAL03411

1DISPOSAL UNIT, plain top, right hand drainer, with

sink and hopper with flushing rim, 110mm outlet, no

tap holes no overflow, back inlet, stainless steel,

1600W 600D.

DSU00611

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1CONNECTION UNIT, switched, 13 amp, flex outletOUT04911

1CABINET, base, modular storage, for 400 facing

inserts, with door, on plinth, 900H

SMC01322

1CABINET, upper, modular storage, for 400 facing

inserts, with door, 750H

SMC02322

1WORKTOP, clinical, for 2 x 400 facing modular

storage cabinets, 910W 700D

SMW05211

1SWITCH, lightSWC02511

1TAP, bib, lever, hospital pattern, pair hot and cold,

1/2 in.

TAP80911

1TAP, bib, 2x8 mm thermostatic mixer, automatic

action, sensor operated, non-touch,

TAP89211

1WASTE, unslotted flush-grated, metal, 1.1/2 in.WAS10211

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

2DISPENSER, paper towel roll, wall mountedDIS00711

2DISPENSER, barrier cream, disposable single

cartridge, wall mounted

DIS01111

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

2DISPENSER, disposable gloves set of 3 and

disposable apron, wall mounted

DIS43811

3HOLDER, sack, with lid foot operated, medium,

freestanding, 875H 430W 385D

HOL00644

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 339: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Y0642Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: Y0642 Disposal hold: 1700 litres

Room Number: Revision Date: 01/03/2017

1) Holding domestic, clinical and recyclable waste for disposal or reprocessingActivities:

Personnel: 1 x staff.

Intermittent use.

Planning

Relationships:

Adjacent to main circulation route.

Space Data: Height (mm): 8.00 2,700Area (m²):

Ceiling height must allow bin lids to open fully.

Notes: Separate bins/areas must be provided for:

- clinical waste;

- domestic waste;

- recyclable items;

- linen;

- equipment requiring reprocessing.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 340: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data Y0642ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y0642 Disposal hold: 1700 litres

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 80

Unified Glare Rating Limit (UGRL): 22

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting:

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 40 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Smoke

General Notes:

Activity DataBase 01/03/2017

Page 341: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character Y0642

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Disposal hold: 1700 litresY0642Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel, trolley, & equipment access (1500mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 342: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

Y0642ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y0642 Disposal hold: 1700 litres

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SOCKET outlet, switched, 13 amp, twinOUT01011

1SHELVING FRAME, modular storage, 1 bay, with 5

shelves, 2130H 1000W 665D

SMF01311

1SWITCH, lightSWC02511

3BIN wheelie, 240 litre, 1060H 600W 730DBIN03411

3BIN wheelie, 1100 litre, 1470H1370W 1115DBIN03811

Activity DataBase 01/03/2017

Page 343: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Y1510-01Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: Y1510-01 Cleaners' room

Room Number: Revision Date: 01/03/2017

1) Disposal of liquid waste.

2) Filling and emptying cleaning equipment and containers.

3) Holding/storing cleaning equipment.

4) Cleaning equipment may be parked and/or stored.

5) Hand-rinse basin may be used.

6) Sink may be used.

7) Janitorial unit may be used.

Activities:

Personnel: 2 x staff.

Intermittent use.

Planning

Relationships:

Close to areas served.

Space Data: Height (mm): 8.00 2,400Area (m²):

If large equipment is stored elsewhere, the size of this room can be reduced.

Notes: This room represents a typical traditional cleaners' room with space for storing a vacuum

cleaner, scrubbing/polishing machine (for hard floors) and mop and bucket (stored on

the cleaners' trolley).

It includes a combined bucket sink and hand-rinse basin (janitorial unit) and separate

sink.

The following items are shown on the room layout but are optional:

- small cube lockers.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 344: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data Y1510-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-01 Cleaners' room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 22

Unified Glare Rating Limit (UGRL): 80

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Heat

General Notes:

Activity DataBase 01/03/2017

Page 345: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character Y1510-01

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Cleaners' roomY1510-01Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1500mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 346: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

Y1510-01ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-01 Cleaners' room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1HOOK, single, large, wall mountedHOO02022

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELF, 900W 300DSHE21111

1SINK and BASIN combination Janitorial unit, hinged

bucket grating to sink and monobloc mixer tap with

swivel nozzle, stainless steel, 900H 500W 600D.

SIN01311

1SWITCH, lightSWC02511

1TAP, bib, lever, hospital pattern, pair hot and cold,

1/2 in.

TAP80911

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted flush-grated, metal, 1.1/2 in.WAS10222

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

3HOLDER, sack, with lid foot operated, large, capacity

120 litre, mobile

HOL01411

8TRACK, blinds for windowsTRA90011

Activity DataBase 01/03/2017

Page 347: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Y1510-02Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: Y1510-02 Cleaners' room

Room Number: Revision Date: 01/03/2017

1) Disposal of liquid waste.

2) Filling and emptying cleaning equipment and containers.

3) Holding/storing cleaning equipment.

4) Cleaning equipment may be parked and/or stored.

5) Hand-rinse basin may be used.

6) Sink may be used.

7) Janitorial unit may be used.

Activities:

Personnel: 2 x staff.

Intermittent use.

Planning

Relationships:

Close to areas served.

Space Data: Height (mm): 8.00 2,400Area (m²):

If large equipment is stored elsewhere, the size of this room can be reduced.

Notes: This room represents a typical traditional cleaners' room with space for storing a vacuum

cleaner, scrubbing/polishing machine (for hard floors) and mop and bucket (stored on

the cleaners' trolley).

It includes a combined bucket sink and hand-rinse basin (janitorial unit) and separate

sink.

The following items are shown on the room layout but are optional:

- small cube lockers.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 348: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data Y1510-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-02 Cleaners' room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 22

Unified Glare Rating Limit (UGRL): 80

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Heat

General Notes:

Activity DataBase 01/03/2017

Page 349: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character Y1510-02

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Cleaners' roomY1510-02Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1500mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 350: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

Y1510-02ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-02 Cleaners' room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1CLIP, spring, 32mm dia. 3, mounted on a wooden

batten, wall mounted

CLI01711

1HOOK, single, large, wall mountedHOO02022

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELF, 1500W 300DSHE23111

1SINK and BASIN combination Janitorial unit, hinged

bucket grating to sink and monobloc mixer tap with

swivel nozzle, stainless steel, 900H 500W 600D.

SIN01311

1SWITCH, lightSWC02511

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted flush-grated, metal, 1.1/2 in.WAS10222

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

2DISPENSER, paper towel, wall mountedDIS01311

2DISPENSER, soap, disposable single cartridge, lever

action, wall mounted

DIS03011

3HOLDER, sack, with lid foot operated, large, capacity

120 litre, mobile

HOL01411

3LADDER, 3 tread, platform type 750mm height,

folding

LAD00211

Activity DataBase 01/03/2017

Page 351: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Y1510-03Room Data SheetADB

Project: 7857 7857 Nottingham Uni Medical Centre

Department: PRI Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

Room: Y1510-03 Cleaners' room

Room Number: Revision Date: 01/03/2017

1) Disposal of liquid waste.

2) Filling and emptying cleaning equipment and containers.

3) Holding/storing cleaning equipment.

4) Cleaning equipment may be parked and/or stored.

5) Hand-rinse basin may be used.

6) Sink may be used.

7) Janitorial unit may be used.

Activities:

Personnel: 2 x staff.

Intermittent use.

Planning

Relationships:

Close to areas served.

Space Data: Height (mm): 8.00 2,400Area (m²):

If large equipment is stored elsewhere, the size of this room can be reduced.

Notes: This room represents a typical traditional cleaners' room with space for storing a vacuum

cleaner, scrubbing/polishing machine (for hard floors) and mop and bucket (stored on

the cleaners' trolley).

It includes a combined bucket sink and hand-rinse basin (janitorial unit) and separate

sink.

The following items are shown on the room layout but are optional:

- small cube lockers.

ADB Group Definitions:

1. Contractor supply and install.

2. Supply by others, contractor install.

3. UoN supply – loose equipment and specialist equipment (chairs, drawer units,

non-fixed medical equipment).

4. NHS IT equipment (nil cost to the project).

5. Dental supply and install.

6. Pharmacy supply and install.

7. UoN IT support and install.

8. UoN supply and install (tacks and blinds; fire extinguishers; UoN signage.

9. UoN F.O.C.

Activity DataBase 01/03/2017

Page 352: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

7857 Nottingham Uni Medical Centre7857Project:

Room Environmental Data Y1510-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-03 Cleaners' room

Room Number: Revision Date: 01/03/2017

Permissible Space Temerature Range(dry bulb) (degC):

TEMPERATURE AND VENTILATION Requirements Notes

18 - 28

Heating Design Temperature (dry bulb)(degC): 18

Minimum Air Changes (AC/hr): 3

Ventilation Type: E

-vePressure Relative to Adjoining Space:

Supply Air: Final Filter Class

Permisiible Relative Humidity Range (%): Uncontrolled

General Notes:

LIGHTINGType Of Control: N

Daytime General Service Illuminance (Lux): 200

Daytime Specific Service Illuminance (Lux):

Nighttime General Service Illuminance (Lux):

Nighttime Specific Service Illuminance (Lux):

Local Task Illuminance (Lux):

Colour Rendering Required: Y

Colour Rendering Required Characteristics (Ra): 22

Unified Glare Rating Limit (UGRL): 80

Emergency Escape Route Lighting Required: In accordance with BS 5266 and Health Technical

MemorandumsY

Standby Lighting Grade - General Lighting: B

Standby Lighting Grade - Local Lighting:

General Notes:

RISKClinical Risk Category:

Non-clinical Business Continuity Risk Category:

General Notes:

Noise Intrusion (dB) 1hr day:

NOISE

Noise Intrusion (dB) 1hr night:

Noise Intrusion (dB) f night:

50

-

-

Maximum Internal Noise from M&E Services (NR): 45 Total noise of MEP services under normal operation across

the range 63Hz to 4kHz inclusive.

Room Sound-insulation Parameters - Privacy:

Room Sound-insulation Parameters - Noise Generation:

Not Private

Typical

Reference to Table 3 of the Department of Health 'Acoustics:

Technical design manual 4032:0.6:England'.

Noise Sensitiviy: Not Sensitive

Sound-insulation Rating (dB D nT,w):

General Notes:

Maximum Surface Temperature (DegC):

SAFETY/FIRE

82

Domestic Hot Water Discharge Temperature (DegC): 41/>55

Maximum Cold Water Discharge Temperature (DegC): <20

General Notes:

Type of Automatic Fire Detection: Heat

General Notes:

Activity DataBase 01/03/2017

Page 353: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

ADB Room Design Character Y1510-03

Project: 7857 7857 Nottingham Uni Medical Centre

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Cleaners' roomY1510-03Room:

01/03/2017Revision Date:Room Number:

Walls: Wall finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Wall finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Floor: Floor finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Floor finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Ceiling: Ceiling finishes to comply with Performance Requirements for Building Elements Used in

Healthcare Facilities 8941:0.6 England.

Ceiling finishes to be selected using the "Selection Procedure for Finishes" included in 8941:06:

England.

Doorsets: Configuration, glazing, fire rating, security, etc. to be determined by Project Team.

HTM 58 (Mar-2005)

Refer to HBN 00-04 (May-2007) for effective clear door widths.

1 doorset:

1 x personnel & equipment access (1500mm)

Windows: Not required

Internal Glazing: Not required

Hatch: Not required

Notes: All finishes selected must have an appropriate risk assessment to accompany the design

decision.

Infection Control must be consulted as described in Performance Requirements for Building

Elements Used in Healthcare Facilities 8941:0.6 England.

Activity DataBase 01/03/2017

Page 354: ADB Room Data Sheet B0405 - Microsoft...ADB Group Definitions: 1. Contractor supply and install. 2. Supply by others, contractor install. 3. UoN supply – loose equipment and specialist

Schedule of Components by Room

Project: 7857 7857 Nottingham Uni Medical Centre

Y1510-03ADB

Facilities for Primary and Community Care Design Guidance 1183: England -

list of rooms

PRIDepartment:

Room: Y1510-03 Cleaners' room

Room Number: Revision Date: 01/03/2017

Key: (n-old qty) Deletions m-new qty Additions m (n) Quantity changes since audit dateAudit Date: 2-Mar-2017

DescriptionCodeTotalTransNew

GrpAlt. CodeQuantity

1SOCKET outlet, switched, 13 amp, singleOUT00511

1SHELF, 1500W 300DSHE23122

1SINK and BASIN combination Janitorial unit, hinged

bucket grating to sink and monobloc mixer tap with

swivel nozzle, stainless steel, 900H 500W 600D.

SIN01311

1SWITCH, lightSWC02511

1WASTE, unslotted flush-grated, metal, 1.1/4 in. .WAS10011

1WASTE, unslotted flush-grated, metal, 1.1/2 in.WAS10222

1TRAP, bottle, 1.1/4 in, plastic resealing.WAS10711

1TRAP, bottle, 1.1/2 in, plastic resealing.WAS10811

3HOLDER, sack, with lid foot operated, large, capacity

120 litre, mobile

HOL01411

3Floor Standing LOCKER , single, 1800H 300W 550DLOC10522