acrylic coating system - bonntile hong kong...

14
Acrylic Coating System 40-year R&D Experience Acrylic Coating System Pioneering Paint Technology Item No. 15503 & 15504 Bonntile Hong Kong Limited Flat C2, 11/F, Hang Fung Industrial Building Phase 2, 2G Hok Yuen Street, Hung Hom, Kowloon, Hong Kong (+852) 2341 9201 (+852) 2765 5348 [email protected] www.bonntile.com.hk

Upload: phungnhi

Post on 03-May-2018

238 views

Category:

Documents


5 download

TRANSCRIPT

  • Acrylic Coating System

    40-year R&D Experience

    Acrylic Coating System Pioneering Paint Technology

    Item No. 15503 & 15504

    Bonntile Hong Kong Limited Flat C2, 11/F, Hang Fung Industrial Building Phase 2, 2G Hok Yuen Street, Hung Hom, Kowloon, Hong Kong (+852) 2341 9201 (+852) 2765 5348

    [email protected] www.bonntile.com.hk

  • Acrylic Coating System

    1

    Table of Content

    Cost-Effective Colour Solution Advanced Cross-linking Technology P.2 Product Description P.2 Product Advantages P.2

    Recommended Usage Area of Use P.3 Application Substrate P.3 Storage Requirement P.3

    Technical Data Technical Specifications P.4 Test Reports P.4 Comparison of Test Results P.5

    Application Guideline Surface Preparation P.6 Package, Mixing, Coverage & Application P.7

    Technical Support & Quality Control Technical Support Service P.8 Quality Control Plan P.9

    Project Reference. Project Photos P.10 Project List P.11

    Appendix

  • Acrylic Coating System

    2

    Evaporation of Water

    Capillary action forces water out

    Formation of a tough coating

    Cross-linking Technology

    Cost-Effective Colour Solution

    Progressive Cross-linking Technology Acrylic Water Base System is a single pack, water-based acrylic topcoat composed of minute particles of plastic acrylic resin suspended in water (acrylic polymer emulsion) and pigment. With our distinctive and progressive Cross-linking Technology, the resin particles fuse together forming a strong durable paint as the water evaporates, providing a highly performed coloured coating for outdoor area of external wall, semi-open of corridor and indoor area of carpark, basement, etc. Acrylic Water Base System is also a good choice for renovation projects due to its competitive price and outstanding performance. Product Description Glossiness : Gloss, Semi-gloss or Matt Colour : Stand colour chart from Bonntile, tailor-made colour Package : New N-Sealer (18 kg/ can)

    Acrylic Water Base (New QWG) Topcoat (15 kg/ can) Application : Roller, Spray, Brush Procedure : 1) Apply 1 coat of BHK New N-Sealer

    2) Apply 2 coats of Acrylic Water Base (New QWG) Topcoat Product Advantages High-tech Protective Coating

    - Water & Alkali Resistance - Weather Resistance - UV Resistance - Fungus Resistance

    Excellent Performance - Good Adhesive Strength - Built-up surfaces remain free of cracks and chips.

    Easy Application - Pigment colors is easily soluble in water while wet; permanent,

    water insoluble, flexible colors when dry. User-friendly for application and time-saving.

    Good Washability - Surface of a dry acrylic painting can be easily cleaned by

    gently washing with soap and water. Odourless & Safe to Use

    - Special formulation with low emission of V.O.C. and other hazardous substances

    High Durability - Life span is much longer than conventional acrylic emulsion

    paints.

  • Acrylic Coating System

    3

    Recommended Usage

    Area of Use Recommended for application to exterior/ interior surface of the following locations:

    Walls and Columns Ceilings and Beams Fence Walls Roof Parapets Mouldings Bends, etc.

    Application Substrate

    Precast Concrete Poured in Place Concrete Plaster (Mortar) Stucco GRC Tile Filler Existing Painting Film (undercoating on all kinds of

    old films like acrylic resin, polyurethane resin, epoxy resin, etc for renovations)

    Storage Requirement In order to ensure product integrity prior to the application, it is mandatory to comply with the following requirements of storage:

    Store materials away from open flames or excessive heat

    Do not expose materials to sunlight for a long period of time

    Keep all containers away from moisture Do not expose materials to freezing conditions Keep containers air-tightly sealed

  • Acrylic Coating System

    4

    Technical Data Technical Specifications

    Commodity Main Component Function Application Method 1. Sealer Acrylic Synthetic Emulsion 80~90%

    Additives 1~5% Water 5~15% --------- Total 100%

    To provide undercoat and adhesion.

    By roller or

    By spray

    2. Topcoat Acrylic Water (QWG) Topcoat Synthetic Resin Emulsion 28% Pigment 19% Additives 8% Water 45% --------- Total 100%

    To provide a finishing coat. To give protection against

    water, chemicals and weathering.

    By roller or

    By spray

    Test Report New N Sealer

    Product Name (Sealer) New N Sealer Standard Company Standard

    Composition

    Ingredient % (by weight) Acrylic Synthetic Emulsion 80 ~ 90 Additives 1 ~ 5 Water 5 ~ 15 Total 100

    Test Results

    (Numerical values are standard values based on the actual performance) Test Items Results Standards

    Conditions in Container Passed There shall be no lumps, no separation and no coagulation of the ingredients. Hardness B Pencil scratch value

    Film Appearance Passed Little difference from samples JIS K5400

    Water Resistance Unchanged Immersed 96 hours in tap water JIS K5400

    Alkaliproof Unchanged Immersed 48 hours in saturated solution of calcium hydroxide JIS K5400

    Water Permeability 0.5 ml In accordance with Water Permeability Test B Method. After still standing for 24 hours, calculated from the height of water head in the measuring pipette. JIS A6909

  • Acrylic Coating System

    5

    Test Report Acrylic Water Base (New QWG) Topcoat

    Product Name (Topcoat) Acrylic Water Base (New QWG) Standard Company Standard

    Composition

    Ingredient % (by weight) Synthetic Resin Emulsion 28 Pigment 19 Additives 8 Water 45 Total 100

    Test Result

    (Numerical values are standard values based on the actual performance.) Test Items Results Standards

    Condition in Container Passed When agitated, absent of lumps and evenly mixed Graining () 20 30 or below Admixture Passed Evenly mixed consistency Drying Time (h) Passed Within 4 hours at 20oC

    Film Appearance Passed When observing the painted surface, the flatness shall be good, and there shall be no graining, wrinkles, unevenness, blisters, holes or peelings.

    Flexibility Passed After still standing for 7 days, it shall withstand the flexure stress caused by a mandrel with 10mm diameter.

    Cross cut test Passed It shall be 25/25

    Impact Passed When dropping a 300g weight from the height of 500mm, the impacted film surface shall have no cracks, peelings.

    Accelerated Weathering Passed The degree of change in color is not so large when compared it with the standard products.

    Comparison of Performance Test Results

    Arylic WaterBase System

    ConventionalArylic Paint A

    ConventionalArylic Paint B

    Performance of Fungus Resistance

    Performance of Water Resistance

    Arylic WaterBase System

    ConventionalArylic Paint A

    ConventionalArylic Paint B

    Arylic WaterBase System

    ConventionalArylic Paint A

    ConventionalArylic Paint B

    Performance of Weather Resistance

    Arylic WaterBase System

    ConventionalArylic Paint A

    ConventionalArylic Paint B

    Performance of Alkali Resistance

  • Acrylic Coating System

    6

    Application

    Guideline Surface Preparation 1. New Surface 1.1 Curing time for the following substrates:-

    Plaster (mortar), stucco : 2 weeks Precast concrete : 1 week minimum

    (forced curing) Poured in place concrete : 3 weeks minimum Moisture content is less than 10% and alkaline pH

    content is less than 10 1.2 Application surface must be smooth and free of voids or

    sharp projections. 1.3 Any application surface such as precast concrete, with

    excess pinholes, honeycomb, cracks, uneven or porous condition, should be filled up prior to the application.

    1.4 Any application surface, with laitance, efflorescence, dust, rust, oil grease, curing agent etc. must be removed completely by brushing, sanding or other effective means.

    1.5 Apply Tile Filler/Skim Coat onto sound, clean, dry and sufficiently smooth that accepted as an appropriate substrate for the application of Bonntile products.

    1.6 Curing time for Tile Filler/Skim Coat : three (3) days minimum Moisture content is less than 10% and alkaline pH

    content is less than 10 2. Old Surface 2.1 All loose coating on the application surface should be

    removed by wire brushing, sanding or other effective means. 2.2 Any laitance, efflorescence, dust, rust or oil grease must be removed completely by brushing,

    sanding or other effective means. 2.3 All defective areas, hollow plasters and spoiling concrete must be hacked off. 2.4 Defective wall surfaces must be repaired by filling cracks or re-plastering of hacked off portions. 2.5 To paint areas must be cleansed by high pressure water jet at 1,500 psi and all surfaces should be

    of the sound, clean, dry and sufficiently smooth that accepted as an appropriate substrate for the application of Bonntile products.

  • Acrylic Coating System

    7

    Package, Mixing, Coverage & Application 1. New N-Sealer 1.1 Package, Thinning Ratio and Coverage Rate

    Substrate Net Weight Thinner Dilution Coverage (Approx.) Precast Concrete, Concrete, CAB, Plaster (Mortar), Stucco, Existing Painting

    18 kg/can Water 100% 0.1 kg/m2/coat

    1.2 Mixing Instructions Mix thoroughly in proportions as outlined above. 1.3 Application Method Apply sealer with a roller or by conventional spray. (Do not apply below 5oC) 1.4 Drying Time 20oC over 30 minutes Sealer becomes clear when dry. 1.5 Coverage The coverage of New N-Sealer depends on the porosity

    of substrate. 2. Topcoat 2.1 Package, Thinning Ratio and Coverage Rates

    Substrate Net Weight Thinner Dilution Coverage (Approx.) Precast Concrete, Concrete, CAB, Plaster (Mortar), Stucco, Existing Painting

    15 kg/can Water 6% (Approximately) 0.32~0.4 kg/m2/

    2 coats

    2.2 Application Procedure Shake and stir Topcoat thoroughly to get a complete dispersion of pigment. Use standard practice, either by rolling or spraying, to ensure conformance to specification

    requirement. Brush may be used for small areas or touch up only. For the application of topcoat in confined areas, workers are required to wear masks, and

    exhaust ventilation must be properly supplied to the confined areas. 2.2 Coverage The coverage of Topcoat depends on the condition of substrate, such as pattern, uneven

    situation 2.3 Dilution The dilution ratio of Topcoat shall be adjusted and decided by mock-up on site, and

    maintained the same ratio for the whole project. The dilution ratio may vary highly depending on the colour and temperature during application

    Remarks 1. The recommended coverage rates, including those of normal wastage, are for reference only. Actual coverage may

    vary depending on the working condition of the site, the degree of evenness and smoothness of the substrate surface, and the pattern of the texture sample as selected and approved by the architect or client.

    2. We reserve the right to change or adjust the composition of material used in the specification of our products due to our constant research and development to improve the quality of our products.

  • Acrylic Coating System

    8

    Technical Support & Quality Control

    Technical Support Service Being a customer-focused company, Bonntile Hong Kong Limited makes every effort to provide the best technical support to customers. Experts from our technical department can assist customers in solving technical problems through mock-up service, incoming goods inspection, on-site training and continuous assessments. Customers always find it difficult to imagine the outcomes of newly painted buildings. In view of this, we specially set up a team of graphic professionals to tailor make 2D and 3D colour-matching simulation pictures of the buildings for customers reference.

    2D Colour-Matching Simulation Pictures (Elevation Drawings)

    3D Colour-Matching Simulation Picture (Building Photo)

    Before After

  • Acrylic Coating System

    9

    Quality Control Plan Bonntile Hong Kong Limited strives to excel and maintain the production of high quality products. Our stringent quality control system brings consistency and reliability to our valued clients. Products sold under the Quality Control Plan are warranted for a minimum of 3 years for free from peeling and remarkable discolouration.

    Incoming raw materialQC

    In-process productionQC

    Finished goodsQC

    Incoming goodsQC

    Technical Training to Contractors / Applicators

    Detailed Product Catalogue, Method Statement & MSDS

    On-site Inspection on Substrate & Application /

    Mock up Test

    Written Record/Recommendation

    contractor rectification Adhesion test if necessary

    Continuous Assessment on All Layers &

    Rectification

    Issuance of Warranty

    Manufacturing Plant QC Process

    (in line with JIS 6909)

    Bonntile QC Process Substrate:

    Moisture content Smooth surface

    pH value

    Application: Skillful Worker

    Appoint approved applicator If needed

  • Acrylic Coating System

    10

    Project Reference Project Photos

    Residential Training Complex for Juveniles in Tuen Mun

    Block L & M, Stanley Prison LM

    2 Primary Schools in Yau Tong 2

    Pokfulam Fire Station

    HK Heritage Discovery Centre

    HK University of Science and Technology

  • Acrylic Coating System

    11

    Project List

    Project Name Square Meter (m)

    Project Name Square Meter (m)

    APB - 5,000 APB - 1,820

    APB - 190 APB - 10,115

    APB - 950 APB - 1,092.5

    APB - No. 4 Hospital Road, Conversion of Quarters

    to Office Building 2,142

    APB - 380

    APB - TCR052 2,083 APB - 76 142.5

    APB - 5,270 APB - 10 238

    APB - 1,900 APB - Eastern Street Methadone Clinic 714

    APB - 2,518 APB - Hill Road Playground 903

    APB - 1,950 APB - Java Road, North Point 325

    APB - 360 APB - King's College 1,710

    APB - 2,375 APB - Shek Tong Tsui Market 428

    APB - 1,520 APB - Victoria Park Centre Court 4,133

    APB - 13,965 APB - Western District Public Cargo Working Area 2,565

    APB - 2,992.5 APB -

    G 6,603

    APB - 95 APB - 15 12,141

    APB - 11, 13, 14 4,417.5 APB - 1,438

    APB - 12,352.5 APB - 618

    APB - 475 APB - 11,860

    APB - 475 APB - 1,663

    APB - 41,43 H I 950 APB - 238

    APB - 712.5 APB - 1 9,065

    APB - 427.5 APB - 333

    APB - 950 APB - 5,605

    APB - 10,293.5 APB - 4 5,590

    APB - 475 APB - 950

    APB - 11/F 1,662.5 APB - 2,185

    APB - 9,662 APB - 1,045

    APB - 535.5 APB - 1 2,375

    APB - 237.5 APB - 428

    APB - 1,187.5 APB - 665

  • Acrylic Coating System

    12

    Project Name Square Meter (m)

    Project Name Square Meter (m)

    APB - L&M 15,925 APB - 1,425

    APB - 380 APB - - 855

    APB - 520 APB - - 1,663

    APB - 475 APB - 50 3,570

    APB - 1,805 APB - 102 6,676

    APB - 4,275 APB - 79B 7,931

    APB - 4,608 APB - Fairmont Garden at No.39A Conduit Road,

    Hong Kong 22,873

    APB - 11,448 ASD A Secondary Primary School at Site 10 West

    Kowloon Reclamation, Shamshuipo 7,125

    APB - 25A 25B 3,515 ASD A Primary School in Area 31, Sheung Shui 6,318

    APB - 14,868 ASD - Contract No.TCP042, Shatin Park 475

    APB - 63 A 3,118 ASD - 2,600

    APB - 855 ASD - Construction of a Primary School at Hiu

    Kwong Street, Sau Mau Ping 5,178

    APB - 1,071 A&A Works for The Hong Kong University of

    Science & Technology 475

    APB - 119 1,379 Kowloon Park, 22 Austin Road, Tsim Sha Tsui 475

    APB - 2,613 St. Paul's Co-educational College Primary School at

    Nam Fung Path, Wong Chuk Hang 4,730

    APB - 998 1,045

    APB - 11,923 595

    APB - 6,175 99 190

    APB - 238 Contract No. HY/2004/02, Booster Pump House at

    East Tsing Yi Viaduct 880

    APB - 1 713 Renovation Works for Telford Annex (2007) for City

    University of Hong Kong 9,785

    APB - 333 New Private Independent School at Shum Wan

    Road, Aberdeen 7,838

    APB - A&B 6,650 Redevelopment of Yuen Long Chamber of

    Commerce Primary School 3,753

    APB - BarrackJ 950 Tuen Mun Town Park 5,178

  • Acrylic Coating System

    13

    Appendix