Huawei Technologies Co., Ltd. All rights reserved Product Name 2G Network Swap procedures Document Version V1.0 Intended User Wireless BSS Engineer (GSM) Prepared by Bonisiwe BSS Wireless Engineer Due Date 15 August 2013 Reviewed by Fengsongjie/Jason Date: Approved by Date: Huawei MTN Project Team KZN Abis IP over E1 Swap experience Summary And Document Guide Hi Guys

Upload: sibusiso-v-mkhize

Post on 30-Nov-2015

190 views

Category:

Documents


16 download

DESCRIPTION

migration

TRANSCRIPT

Page 1: Abis Over TDM

Huawei Technologies Co., Ltd. All rights reserved

Product Name 2G Network Swap procedures Document Version V1.0Intended User Wireless BSS Engineer (GSM)Prepared by Bonisiwe BSS Wireless Engineer Due Date 15 August 2013Reviewed by Fengsongjie/Jason Date:Approved by Date:

Huawei MTN Project Team

KZN Abis IP over E1 Swap experience Summary

And

Document GuideHi Guys

Please find attached the new chapter to ABIS migration, starting somewhere next weekWhat is going to happen:we are going to use the existing E1 at the switch and sitewe will cut them from the DXX to OSN (wire Telkom Tie to OSN port on planning page)Telkom E1 stay as if its TDMChanges from original ABISoIPCommunication type is PPP/MP not PortIPTransmission Type is IP_over_E1 nor IP_over_FE/GEDestination is OTHER not BSCSpecify which Timeslots are used on your script

Page 2: Abis Over TDM

KZN Swap experience summary and document Guide

Contents

1. Introduction1.1 Objective of This Ducument

2. IP Requirements………………………………………………………...……………………..........................................

2.1 Hardware Requirements…………………………………………………………………………

2.1.1 FG2a/c………………………………………………………………………………………………………………………………………..

2.1.2 GOUa/c………………………………………………………………………………………………………………………………………

3. Hardware Planning Installation………………………………………………………………………………………………

3.1 Hardware Installation on BSC……………………………………………………………………………………………………….

3.2 Hardware Installation on BTS……………………………………………………………………………………………………….

4. Data Planning................................................ 4.1 IP Planning…………………………………………………………………………………………………………………………………….

4.2 Implementation ……………………………..…………………………………………………………………………………………….

5. Verification………………………………………………………………………………………………………………………………..

5.1 Verify Physical layer………………………………………………………………………………………………………………………

5.2 Verify IP layer……………………………………………………………………………………………………………………………….

5.3 Verify the BSS Equipment……………………………………………………………………………………………………………..

6. Team Spirit…………………………………………………………………………………………………………..

Page 3: Abis Over TDM

1. Introduction

The Purpose of this document describes the steps of Migrating a site from Abis over TDM to Abis over E1. Abis is the interface between the BSC and the BTS. The Abis interface has the features of high bandwidth and low cost, and is no longer a factor restricting the BSC capacity.

2. IP Requirements

2.1 Hardware Requirements

2.1.1 FG2a/c

Item Specification

Abis FG2a support TRX 384

Abis FG2c support TRX 2,048

2.1.2 GOUa/c

Item Specification

Abis GOUa support TRX 384

3. Hardware Planning Installation

3.1 Hardware installation on BSC

On the BSC side:

A GOUc/FG2c/GOUa/FG2a interface board is configured

Insert FG2x/GOUx cards into BSC to the correct slots

Connect the cable to the correct port.

Page 4: Abis Over TDM

3.2 Hardware installation on BTS

On the BTS side:

A GTMU or GTMUb board is configured.

No additional hardware required basic on existing TDM BTS.

Connect E1 cable on GTMU for IP over E1..

4. Data IP Planning

During Abis IP over E1migration we have to collect all data information that we will need from the customer to prepare the Abis IP over E1migration.

4.1 IP Planning

Pre Requisite

Before you can start with the BTS Abis IP over E1migration configuring the following IP information must be available:

BSC has an IP interface card connected to BSC IP Address and Mask BSC Gateway (CTN node) IP address BTS Gateway IP Address (CTN node) BSC can PING CTN CX???/CX??? node IP on site BTS ESN from all types of BTS cabinet:

ESN number for a normal BTS3900 Cabinet found in a BBU:

Page 5: Abis Over TDM

ESN number for BTS3900E

4.2 Implementation (Create New BTS IP site)

We have to prepare a new IP scripts for all the sites that will be migrated to IP no matter what type of BTS Cabinet as we have different type of BTS3900:

(i) BTS3900_GSM

(ii) BTS3900A_GSM

(iii) BTS3900E_GSM

(iv) BTS39000L_GSM

Before you making any changes on the site make sure that you have a backup of the TDM script configurations for each site, you can back up the script from M2000 using CME if it’s a live site.

Steps to export the TDM script using CME:

Page 6: Abis Over TDM

Open your planned work Area on CME:

Select your planned work area name then click OK:

Page 7: Abis Over TDM

Once your planned work area is opened go to the site (T0703) you a backup script for, Right click on the site and do as shown below.

Therefore you can save the backup script file on your PC.

Steps to migrate the live site from TDM to E1:

Do the simple troubleshooting:

Check what is the active alarm before migrating the site, Check the status of all the RFU boards, Check the status of the channels

Page 8: Abis Over TDM

Then you can run the Abis IPo E1 script:

//*****************Deactivate and remove TDM connections************************//

DEA BTS: IDTYPE=BYNAME, BTSNAME="703";RMV BTSCONNECT: IDTYPE=BYNAME, BTSNAME="703", INPN=0, INCN=0, INSRN=0, INSN=6;RMV BTSCONNECT: IDTYPE=BYNAME, BTSNAME="703", INPN=1, INCN=0, INSRN=0, INSN=6;

//******************Changing from TDM to Abis IP over E1*************************//

SET BTSABISTROP: IDTYPE=BYNAME, BTSNAME="703", DETECTSWITCH=OFF;MOD BTS: IDTYPE=BYNAME, BTSNAME="703", SERVICEMODE=IP, IPPHYTRANSTYPE=IP_OVER_E1;

ADD IPLOGICPORT: SRN=1, SN=22, BT=GOUc, LPNTYPE=Leaf, LPN=101, CARRYT=ETHER, PN=1, RSCMNGMODE=SHARE, BWADJ=OFF, CIR=64, FLOWCTRLSWITCH=ON, TRMLOADTHINDEX=3, OPSEPFLAG=OFF; ADD ADJNODE: ANI = 1032, NAME = "703", NODET = ABIS, BTSID = 12;ADD IPRT: SRN=1, SN=22, DSTIP="10.50.72.0", DSTMASK="255.255.255.0", NEXTHOP="10.50.0.94", PRIORITY=HIGH, REMARK="To BTS";ADD BTSESN: IDTYPE = BYID, BTSID = 12, MAINDEVTAB = "21021127226TBC924925";

SET BTSIP: IDTYPE=BYNAME, BTSNAME="703", BTSCOMTYPE=PPP/MP, BTSIP="10.50.72.113", BSCIP="10.50.248.39", CFGFLAG=IPLGCPORT, SN=22, LPN=101;

ADD BTSCONNECT: IDTYPE=BYNAME, BTSNAME="703", INPN=0, INCN=0, INSRN=0, INSN=6, DESTNODE=OTHER;ADD BTSCONNECT: IDTYPE=BYNAME, BTSNAME="703", INPN=1, INCN=0, INSRN=0, INSN=6, DESTNODE=OTHER;

ADD BTSMPGRP: IDTYPE=BYNAME, BTSNAME="703", MPGRPN=0, CN=0, SRN=0, SN=6, LOCALIP="10.50.72.113", MASK="255.255.255.252", PEERIP="10.50.72.114", MPSWITCH=ENABLE, AUTHTYPE=NO_V;ADD BTSMPLNK: IDTYPE=BYNAME, BTSNAME="703", MPGRPN=0, PPPLNKN=0, PN=0, CN=0, SRN=0, SN=6, TSBITMAP=TS1-1&TS2-1&TS3-1&TS4-1&TS5-1&TS6-1&TS7-1&TS8-1&TS9-1&TS10-1&TS11-1&TS12-1&TS13-1&TS14-1&TS15-1&TS16-1&TS17-1&TS18-1&TS19-1&TS20-1&TS21-1&TS22-1&TS23-1&TS24-1&TS25-1&TS26-1&TS27-1&TS28-1&TS29-1&TS30-1&TS31-1;ADD BTSMPLNK: IDTYPE=BYNAME, BTSNAME="703", MPGRPN=0, PPPLNKN=1, PN=1, CN=0, SRN=0, SN=6, TSBITMAP=TS1-1&TS2-1&TS3-1&TS4-1&TS5-1&TS6-1&TS7-1&TS8-1&TS9-1&TS10-1&TS11-1&TS12-1&TS13-1&TS14-1&TS15-1&TS16-1&TS17-1&TS18-1&TS19-1&TS20-1&TS21-1&TS22-1&TS23-1&TS24-1&TS25-1&TS26-1&TS27-1&TS28-1&TS29-1&TS30-1&TS31-1;

ADD BTSIPRT: IDTYPE=BYNAME, BTSNAME="703", DSTIP="10.50.248.39", DSTMASK="255.255.255.255", RTTYPE=OUTIF, CN=0, SRN=0, SN=6, ITFType=MP, IFNO=0;

Page 9: Abis Over TDM

ADD IPPATH: ANI = 1032, PATHID = 1, ITFT = ABIS, PATHT = EF, TXBW =4096, RXBW = 4096, TRMLOADTHINDEX = 3, VLANFLAG = DISABLE, PATHCHK = DISABLED;ADD IPPATH: ANI = 1032, PATHID = 2, ITFT = ABIS, PATHT = AF31, TXBW = 4096, RXBW = 4096, TRMLOADTHINDEX = 3, VLANFLAG = DISABLE, PATHCHK = DISABLED;ADD ADJMAP: ANI = 1032, ITFT = ABIS, TMIGLD = 10, FTI = 1;

SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = OML, DSCP = 56, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = RSL, DSCP = 56, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = EML, DSCP = 10, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = ESL, DSCP = 56, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = CSVOICE, DSCP = 46, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = CSDATA, DSCP = 46, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = PSHIGHPRI, DSCP = 26, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = PSLOWPRI, DSCP = 26, VLANSWITCH=NO;SET BTSVLAN: IDTYPE = BYID, BTSID = 12, SERVICETYPE = OTHERDATA, DSCP = 56, VLANSWITCH=NO;

SET BSCABISPRIMAP: IDTYPE = BYID, BTSID = 12, TRANSTYPE = IP, OMLDSCP = 56, RSLDSCP = 56, EMLDSCP = 10, ESLDSCP = 56, VLANFLAG = DISABLE;

ACT BTS: IDTYPE=BYNAME, BTSNAME="703", TRXIDTYPE=BYID;

During ACTIVATION Period:

The RE should do the hard reset and it should take 5mins to come up if the site is not coming up within 5mins time starts troubleshooting:

PING Gateway IP , if you can’t be able to Ping it Double check the configures with Tx planning and Optimization Or double check CTN support. If everything is 100% correct to all sides Ask the RE to add the Status IP from the site using BTSM Tool.

BTS3900E IP Steps

The RE must add the Status IP to the site according to the design planning and he need to use the BTSM Tool, and then Query the Status whether he added the correct information.

Page 10: Abis Over TDM

After the adding the Status IP the RE need to give the BSS Engineer the ESN number and inform him/ her to add the IP Script remotely.

ESN number for BTS3900E

Activation steps:

When we activating the site we have to check the followings:

The site is activated as all the boards’ status showing Normal,

All the Sub-channels status should be working or in normal status:

Page 11: Abis Over TDM

Simple troubleshooting when the site is fully up:

We have to troubleshoot the alarms when the site is up and There mustn’t be any active alarms left over unless is a transmission issue.

Avoid too long Downtime

If the site it’s been down for so long that means the site is not carrying any traffic and the customer will complain. Try by all means to resolve the issue.

5. Verification

5.1 Verify physical layer

Check the ETH light on BSC IP Abis cards.

Check the E1 light on BTS ETH port.

Check the alarms on BSC WebLMT to see if there is any alarms like “Ethernet link fault”

Page 12: Abis Over TDM

5.2 Verify IP layer

Ping from BSC device IP to BTS port IP

Check if there is any “Path Fault” alarms (only support when switched on Ping Test)

5.3 Verify the BSS equipment

Check the FG2x/GOUx cards status on WebLMT to see if is any failures.

Check the BTS status on WebLMT to see if is any failures.

Check the alarms on WebLMT or M2000 to see if there is any alarms like “Board Failure”, “Cell out of service” “PS cell out of service”.

5.4 Verify the BSS service

Make a CS call to verify CS service on the IP site.

Make a PS call to verify PS service on the IP site.

Monitor the KPI for the IP site.