Presentation Outline
• Technical Services Structure
• Prioritization, National Standardization on Projects
• AANDC Infrastructure Investments
• Ontario Region Minor Capital Pilot
• ICMS Update
• Upcoming for 2013/14
• Questions and Discussion
2
Technical Services Structure
3
Richard Earl (North)Joan Broussard (South)
John Paul Fournier Art Mauro (North)Patrick Ku (South)
Gus Foresto (North)Rob Thomson (South)
Develop First Nations infrastructure projects
Implement the First Nations Water and Wastewater Action Plan (FNWWAP)
Manage the Circuit Rider Training Program (CRTP)
Manage the Safe Water Operations Program (SWOP)
Manage the Contaminated Sites Management Program
Manage the regional Fuel Tank Program
Manage regional Capital and Facilities Management Budget
Collaborate with various stakeholders to develop regional First Nations Infrastructure Investment Plans (FNIIP’s)
Provide technical input on infrastructure, education and environmental projects
Provide expertise on the capital plan, major capital program and other requests
Ensure submissions meet requirements and levels as indicated in implementation and policy documents
Evaluate and comment on studies and other project documents
Assure quality and value for money in projects
Provide technical support on the implementation of FNWWAP, CRTP, SWOP
Authority and oversight on regional asset management exercises
Manage the Integrated Capital Management System (ICMS)
Review and assure quality of information submitted in the Asset Condition Reporting System (ACRS)
Provide advice on O&M and maintenance practice incentives
Provide input on regional investment and recapitalization decisions
CapitalCapitalCapital
PlanningCapital
PlanningTechnicalServices
TechnicalServices
AssetManagement
AssetManagement
Paul Mountjoy
Director
Paul Mountjoy
Director
Prioritization, National Standardization on Projects
4
Reno- vation (F-1)
NCSCS Type 1 (E-1) (D-1) (C-1) (B-1) (A-1)
Protection of health and safety and
assets
New Const (F-2)
NCSCS Type 2 (E-2) (D-2) (C-2) (B-2) (A-2)
Health and safety
improvements
O & M (F-3)
NCSCS Type 3 (E-3) (D-3) (C-3) (B-3) (A-3)
Recap. / Major Maint.
New Const Grwth<2y (F-4) N/A (D-4) (C-4) (B-4) (A-4)
Growth / Need Less than 2 yrs
New Const Grwth>2y (F-5) N/A (D-5) (C-5) (B-5) (A-5)
Growth / Need After 2 yrs
HousingContam.
Sites 2Comm'ty
Infra.Education Facilities
Water / Sewer
Custodial Assets
Pro
gra
m A
ctiv
itie
s
Pro
gra
m A
ctiv
itie
s -
Cat
ego
ries
"A
" to
"D
"
INAC Capital Asset Funding Categories
AANDC Infrastructure Investments
Elements of Prioritization and Ranking
1.Obligation resulting from Recipient Contract for Approved Projects
2.National Priority Funding Evaluation by Category and Activity
a) Categories: Water, Wastewater, Education, Comm Infrastructure etc.,
b) Activities: Protection of Health and Safety and Assets., etc.,
3.National Assessment Design/Overall /Annual Inspection/ Water Wastewater Ranking Framework
4.National Schools Ranking Score,
5.Project Risk Assessment for projects greater than $5M
6.General Assessment scores
7.Population served by the Project
5
Ontario Region Minor Capital Pilot
6
EXISTING PROGRAM STREAMS
NEW PROGRAM STREAMS
Capital Investments
Asset Management
Proposal-based program stream Provide funding on a needs basis to
communities to: build or acquire new public infrastructure
assets carry out significant upgrades, renovation
or recapitalization of existing assets Scalable program controls based upon risk
Major Capital
O+M
Minor core capital
Formula-based program stream Provide funding to communities to assist in the
management of AANDC-funded assets, including operating, maintaining, repairing, modifying, replacing and decommissioning/disposing of the asset.
Risk-based program controls focused on outputs and outcomes
Minor non-core capital
7
ICMS Update
Received as of October 23, 2012: North South
DCI 1659542 14 of 22 10 of 12
(Triennial ACRS)
DCI 460649 7 of 23 22 of 55
(ACRS Proj. Annual Report)
DCI 41701 20 of 45 37 of 76
(Community Infrastructure and Housing Annual Report)
Upcoming for 2013/14
• Enhanced O&M for Water and Wastewater
– Initial allocation based on 50% of 2012-13 enhanced O&M
– Allocation of remaining 50% based on
– Updated enhanced O&M formula calculations for 2013/14
– Review support and funding provided under 24/7 emergency response program
– Community’s ability to effectively utilize their O&M funding (core and enhanced)
– Community’s efforts in addressing O&M activities identified in O&M plans
– Submission of an acceptable 2013/14 O&M plan
– Availability of First Nations Water and Wastewater Action Plan (FNWWAP) funding
• Training
– Notifications to go out early April, 2013
– $5,000 for urban and rural communities
– $10,000 for special access communities
8