MINING PLAN (ALONG WITH MINE CLOSURE PLAN) FOR JHINGURDAH OPENCAST PROJECT (5 Mtpa) NORTHERN COALFIELDS LIMITED September 2018 Prepared By Mine Planning Division REGIONAL INSTITUTE VI P.O: Jayant, Dist. Singrauli, MP-486890 STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL / Government. cmpdi सीएमपीडीआई A Mini Ratna Company

Upload: others

Post on 16-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • MINING PLAN

    (ALONG WITH MINE CLOSURE PLAN)

    FOR

    JHINGURDAH OPENCAST PROJECT

    (5 Mtpa)

    NORTHERN COALFIELDS LIMITED

    September – 2018

    Prepared By

    Mine Planning Division

    REGIONAL INSTITUTE – VI

    P.O: Jayant, Dist. Singrauli, MP-486890

    STRICTLY RESTRICTED FOR COMPANY USE ONLY

    RESTRICTED The information given in this report is

    not to be communicated either directly

    or indirectly to the press or to any

    person not holding an official position

    in the CIL / Government. cmpdi

    सीएमपीडीआई

    A Mini Ratna Company

  • /

    MINING PLANFOR

    HINGURDAH OPENGAST PROJEGT(s Mtpa)

    NO THERN GOALFIELDS LIMITED

    SEPTEMBER - 20,l8

    T

  • MINING PLANFOR

    JHINGURDAH OPENCAST PROJECT

    CONTENTS

    Subiect Page No.

    A MINING PLAN

    lntroduction 1-3

    2 Project Sile lnformation 35

    3 5-7Geology

    4 Geo-Mining Parameters

    tvlining TechnologY 9-111

    11-20lnfrastructure

    7 20 21

    21-228 Land Acquisition & Rehabililation

    9 Safety & Conservation

    10

    '11

    Environmental Management

    Capital Provision

    22

    Mining Plan of Jhingurdah OCP

    Sl. No.

    1

    6

    Manpower & ProductivityI

  • MINING PLAN

    FORJHINGURDAH OPENCAST PROJECT

    B MINE CLOSURE PLAN

    lntroduction 28-33

    2 Mine Description 33-34

    3 Closure Plan 34-47

    4 Time Scheduling for Abandonment 47

    5 Abandonment Cost 48-49

    6 FinancialAssurance 50

    7 Responsibililies of Mine Closure 51-52

    Provision for Mine Closure 52-53

    Mining Plan of Jhingurdah OCP

    CONTENTS

    1I

    8

  • MINING PLAN

    FORJHINGURDAH OPENCAST PROJECT

    LIST OF PLATES

    Land Reclamation Plan 7

    SI, N o Descnption Plate No

    1 Location Plan 1

    2 Final Stage Quarry Plan 2

    3 Final Stage Dump Plan 3

    4Plan showing the existing posilion of Mineworking as on 01.08.2018

    4

    5 Quarry Cross-Sections (C-C' & D-D') 5(A)

    6Final Dump Cross-Sections(A-A', & B-B) 5(B)

    7 Land Use Plan 6

    8

    Mrning Plan of Jhingurdah OCP

  • MINING PLANOF

    JHINGURDAH OPENCAST PROJECT

    11

    1.0 INTRODUCTION

    A preliminary Project Report for Jhingurdah OCP in Singrauli Coalfieldwas prepared by NCDC in November, '1963 and sanctioned by the Govl.

    vide letter no. C2'5(271163 dated 02.03.65. As per the above report it was

    enyisaged to produce 1.80 Ml coal per annum at an average stripping

    b of 0.92 m3/t and an estimated capital expenditure of

  • The Augmentation Scheme for liquidation of OB backlog and for creating

    a bench configuration tor arresting decline in coal production wasprepared by CMPDI in 1992 for a capital investment of

  • 1.7

    He

    Jhi

    Year

    182.30

    un(

    However, as per Ministry of Environment, Forest and Climate Change,Government of lndia, letter No.L-110'11/69/2014JA.11(M) dated

    04.2018, mining projects which were granted environmental clearance

    der the EIA Notificalion, 1994, and but not obtained environmental

    arance for expansion/modernization/amendment under the EIA

    06

    cle

    Notification, 2006 are required to obtain environmental clearance under

    EIA Notiflcation. 2006

    , this Mining Plan is solely prepared for regularization of EC of the

    rdah OCP.

    2-O PROJECT SITE INFORMATIONATION

    Jhi urda Opencast Project is located in the Jhingurda Block, in thetern part of Singrauli coatfields in Singrauli district of MP

    Actual reported by the Projectsl.No, OBR(Mm3)

    106coal

    1 61

    1 .13 0.87

    I

    11

    2011-12

    2013 142412-13

    't.56

    2.27 4601213

    2014- 1 5

    2015-16 251 491224 29541

    1

    2016-172417-18 2.63 9.33

    TOTAL 137.33

    2.1

    No

    Page-3 Mining Plan lor Jhingurdah OCP

    10

    EC'EUP STATUS

    The Projec't has received Environment clearance from the Ministry ofEnyironment and Forest, Government of lndia for a production capacity of

    5 IIITPA vide letter No.J-1'lo15l171DOO3IA.ll(M) dated 1 1.05.2005.

    MIIIING PLAN FOR OBTAINING ENVIRONMENTAL CLEARANCE ASPER THE EIA NOTIFICATION, 2006

    Jhingurda Pmject was granted Environmental Clearance for 5 MTPAun{er the EIA Notification. 1994, vide letter no. J-11015/17'112003 -lA-ll

    (M) dated 11-05-2005.

  • 2.2

    2.3 PHYSIOGRAPHY & DRAINAGE

    Jhingurda Block has a high hill in the back ground with steep southem

    slopes covered with trees. The hilltop is about 500 m above MSL where

    as the cultivated area in forHround has an elevation ranging between360m to 385m above MSL.

    The hill area is cut by Jhingurdah nallah and it's large number of feeders,

    which flow from east to west and join the Chatka nallah in the west.During the dry season, there is hardly any flow of water in this nallah but

    during the monsoon the discharge is very heavy.

    2.4 CLIMATE

    The climate of the area is tropical. There is a welldefined winter fromNovember to February. Summer lrom April to June and rainy season from

    July to September. The lowest temperature recorded during winter(December to January) is generally 4"C and the maximum during thesame period is 21"C. ln summer (May/June), the maximum lemperatureas recorded goes up to 48"C and the minimum 21C". The average annual

    rainfall is generally 1000 mm out of which about 95% is during June toSeptember only.

    Page-4 ldining Plan for Jhingurdah OCP

    The block lies between latitudes 24" 10' 29" to 24o 12' 31" North and

    longitudes 82" 42' 00" to 82'44' 30" East.

    COMMUNICATION

    The nearest Railway Station Singrauli on Singrauli-Chopan of East-Cenlral Railway is located at a distance of 8 Kms from the proiect.

    The project is connected with the allweather metalled road to Shaktinagar

    and Renukut. The project is also approachable from the Company'sheadquarters at Singrauli by a fair weather road. The nearest air-strip is at

    Myorepur (UP), located at a distance of about 80 Kms from Singrauli.

  • MARKETABILITY

    The Jhingurdah Opencast Mine has in[ially linked to M/S Hindalco forRenusagar Power division and Obra thermal power station of UPSEB.Pr€

    NC

    3.0

    3.'l

    GE(

    Sta

    lsently, it serves as Basket Linkage to meet the overall demand oft_

    )LOGY

    tus of Exploration

    Geological Succession

    geological sequence established in Jhingurdah Block by detailedby GSl, NCDC & CMPDI is as follows.

    +125

    T

    any Bore holes. The Raniganl and Barren measures outcrop in the Block.

    Formations Lithology

    R( rcent to Sub-Recent Soil and Sub Soil 10 to 25

    Thickness(m)

    Unconformity

    Sandstone and Shale Up to 152.30Jhingurdah Top Seam(including Bands and parting)

    105.80-159 70

    25.00 to 58.00

    6.40,19.02nRa rganI

    About 60

    Bi rrren Measures

    Sandstone and Shale

    Jhingurdah Bottom Seam(including Bands and parting)

    Sandstone and Shale with thinCoal StringesFrom Coarse grained to clayeysandstone

    Page-5 Mining Plan for Jhingurdah OCP

    Jhingurdah area was first prospected by Geological Survey of lndia in1958. Only eight boreholes were then drilled by them in this block. Drilling

    was again undertaken from time to time and by NCDC & CMPDI andGeological Report is available.

    Barakars underlying Barren measures have not been encountered in

  • STRUCTURE/FAULT

    ln the Jhingurdah Block, the coal measures occur in the form of a sub-

    basin and the incrops of the coal seams exhibit crescent shape. The

    northem half of the sub-basin in fautted against the metamorphicsexposed in the north. The dips are centripelal and varies from 9o to '11o.

    From easl to west, the strike swings trom NE-SW to E-W to NW-SE.

    A total of '19 faults have been deciphered within the 2.0 Sq. Km. quarriable

    area ln general, lhere are two sets offault, one settrending ENE-WSW to

    NE-SW and the other set trending WNW-ESE to E-W. The northernboundary fault trends in an easlwest direction. Parallel to this a few

    sympathetic faults have also developed.

    3.4

    Jhlngurdah Bottom Seam

    The thickness of this seam varies from 9.38 m to 19.62 m. The seam is

    highly inter-banded in nature wilh Carb. Shale, grey shale, sandy shale

    and shaly coal of varying lhickness. On an average, the dirt bands within

    the coal seam constitute 50olo of the seam lhickness out of which dirt

    bands of ash content over 60yo are around 28% of the seam thickness.

    The coal from the entire thickness of Jhingurda Bottom Seam, including

    dirt bands but excluding partings of one meter and above, would normally

    analfze 6 to 7olo moisture and 43 to 47% ash.

    This seam has not considered in the Project Reports of Jhingurdah OCP.

    Jhingurda bottom seam reserves will be exploited after exhaustion ofreserves of Jhingurdah Top Seam.

    Page 6 Mining Plan for Jhingurdah OCP

    DESCRIPTION OF COAL SEAf,IS & GEOLOGICAL RESERVES

    Two coal seams occur in the block viz. Jhingurda Top Seam (131-138 m)

    and Jhingurda Bottom Seam (10 to 15 m). These seams are separated by

    massive sandstone parting varying in thickness from 31 lo 58.3 m. The

    detailed description ofthe two seams is given below:-

  • T

    Jh ngurdah Top Seam

    pa

    13

    Jhingurdah Top Seam overlies the Jhingurdah Bottom Seam after a

    ng of 31 to 58 melers. The full thickness of lhe seam varies from56 m in borehole SN 55 to 138.27 m in borehole NCSJ-73.1

    Thb seam is highly inter-banded and contains a number of bands of carb.

    Shale, grey shale, sandy shale, thin fire clay etc varying in thickness from

    0.O5 to 5-6m individually. These bands do not exhibit any systematicbehavior in their horizon, lithology and thickness.

    The overall Coal ftom the entire seam on inclusion of all the shaly coaland also other evident dirt bands of less than one meter thickness butexcluding those of one meter and above in thickness would analyze 7.5-

    8.5olo moisture and 30-37% ash.

    Goological Reserve: Balance net geological reserve of Jhingurdah Top

    Seam as on 01.04.2018 is estimated to 8.56 Mt.

    4.O GEO.MINING PARAMETERS

    4.'l GEO-MINING CHARACTERISTICS

    The maximum strike length of the mine on the floor as per PR is about

    2800m and maximum width of the quarry along the floor as per PR is1030m. The gradient of the seam varies from 9o-11o. Present working

    depth of Jhingurdah OCP is around 323m.

    At . only Jhingurdah Top seam is being mined. Jhingurdahseam has not been considered in the PR. Table below shows the

    mi g and geological characteristics of Jhingurdah Top seam

    MINING & GEOLOGICAL CHARACTERISTICS

    Particulars Unit

    11-15

    S No

    1

    ab

    2m

    m

    131.00-138.00

    31.00 58.00

    9.38-19.62Thickness of parting between

    I seam thickness zone

    Jhi urdah To & Bollom seams

    Jh urdah To SeamJh urdah Bottom Seam

    Thickness of coal seam

    Deq3 Seam Gradient

    Page-7 Mining Plan for Jhingurdah OCP

  • GCV G-105

    6

    Quality of Coal of balanc€ reseryes

    Cat.

    m 2800

    Category of OB rocks

    rsQua

    Cat lll - 50%Cat-lV - 50%

    42

    Maximum strike length of the mineon the floor as per PRl\,laxrmum w dth of the quarry alongthe floor as per PR

    1030

    Coal Reserve and Overburden Estimate

    The Coal reserve and Overburden of Jhingurdah OCP as on 01.04.2018

    are giYen below:

    Coal Reserve

    1

    ParametersNet Geological

    Reserye( irt)

    MineableReseryG

    (M0Balance Coal ReseNes as on0'1.08.2018 as per assessment basedon updated plan and sections.

    637

    2 Coal production from April'18 to Ju y"l8 0.96 0.86

    3

    4

    Additional Coal ReseNes as perapproved scheme by NCL Board dated25 05 2018

    123 '1.11

    Balance CoalReseNes as on 01.(X.18('l+2+3)

    8.56 7.70

    OVERBUROENst.No

    Parameters Unit Value

    1 Overburden excluding band as on 01.04 2018 18.212 Re-handling of loose OB (BCum) as per approved

    $cheme dated 25.05 20'1810.17

    3 Total OB (Solid+RH) excluding band as ono1 .o4.201A

    l\4m3 28.38

    Volume of in seam band as on 01 08.2018 as perassessment based on updated plan and sections

    629

    5 Removal of in seam band from April''18 to July'18 4326 Volume of in sean band as on 01 04 2018 6617 Volume of in seam band as per approved scheme

    as on 01 04 20180.55

    8 Volume of in seam band (8+9) 7.16I Total OB (including in seam band)

    '10 Average SR (includrng in seam band) m3/t11 Average SR (excluding in seam band) m3/t 1:2 36

    Page-8 Mining Plan for Jhingurdah OCP

    a)

    b)m

    st.No.

    25.37

    1:3.29

  • PRODUCTION TARGET AND MINE LIFE

    Considering the balance mineable reserve as on 01.04.2018, the Mining

    plan for Jhingurdah OCP has been prepared. The life of the mine would

    be p lo 2021-22

    5.0 MINING TECHNOLOGY

    5,1 SCHEME OF OPERATION

    ngs of the mine are concentraled in eastern and north eastern sides

    mine. Jhingurdah Top seam is being worked by open cast method

    deploying shoveldumper combination in horizontal slicing

    Coal production & band removal is being done departmentally and OB

    rermoval is being done by outsourcing agency. '10 m3 Electric Rope shovel

    and 5.5 m3 diesel hydraulic shovel in conjunction with '100T/ 85T rear

    dumper are used in departmental coal winning and removal of band. 3.1

    m3 diesel hydraulic backhoe in conjunction with '19.1 m3 Trucks aredeployed for OB removal by outsourcing agency. The bench height for OB

    benches are 12 m and for coal benches 8-10 m.

    DI,.,IIPING STRATEGY

    There are eight external OB Dumps. Dump Nos. 2, 3, 4 & 5 are technically

    and biologically reclaimed whereas dump No.1, 6, 7 & I are active. Adetail map showing overburden dumps is shown in Plate No.3.

    Worki

    of the

    EXISTTNG HEITh4 list of existing HEMM on roll at the Project as on 01.04.'18 is given

    oelLw:

    4,10 H P 6

    st.No, Equipment Size

    Existing as on01.0/r.18

    '10m3

    5.5m3

    ,|

    1

    2.8 m3857 15

    1

    P&H Elec Rope shovel,

    Hyd. ShoveL

    Rear Dumper2

    2100 T

    3

    Rear Dumper

    Dozer

    Page-9 Mining Plan for Jhingurdah OCP

    4.3

    2

  • st.No

    Equipment Existing as on01.04.18Drill 160 mm 3

    4250 mm 4

    5

    DrillFE Loader 5.7 m3 1Water Sprinkler 70 KL 1

    28 KL 26 Water SprinklerWater Sprinkler 85 T (Converted) 3

    7 Grader 280 HP 2I 196 HPTyre handlerI Crane (Hvdraulic) 3t8t18t20r 4

    5.4 CALENDAR PROGRAMME OF EXCAVATION

    Out of total mineable coal reserve within the sanctioned quarry boundary

    of Jhingurdah OCP, 137.33 Mt coal has be€n extracted and 182.30 Mm3

    OB has been removed up to 31.03.2018.

    Thus, the balance mineable coal reserve as on 01.04.2018 is 7.70 Mt and

    corresponding total OB is 25.37 Mm3 with average stripping ratio of 3.29

    m3/t.

    The calendar programme of excavation has been prepared based on the

    above balance coal reserves and volume of OB as on 01.04.2018 and is

    given in the table below:

    Calendar Programme of Excavation

    YearCoal

    Production(Ml)

    OBRemoval

    (Mm3)

    ln SeamBand(Mm3)

    Total OBlncluding inSeam Band

    (Mm3)

    Rehandling(BCUM)(Mm3)

    2018-19 3.00 732 2.79 10.14 1.17

    2019-20 2.00 730 1.86 9.'16 5.00

    2020-21 2.00 3.59 '1.86 5.42 4.00

    2021-22 o.70 0.65 0.65

    Total 7.70 '18.2',1 7.16 10.17

    Page-10 Mining Plan for Jhingurdah OCP

    Size

  • 5.5 D LLING & BLASTING

    5.6

    Drilling and Blasting operations for loosening of OB rocks and Coal are

    neqessary betore excavation. Both coal and OB require drilling andblabting prior to excavation. RBH Drills of 160 mm dia are used for coal

    bench and RBH Electrical drills of 250 mm dia are used Ior OB removal

    (departrnental) worked by shovel- dumper system.

    EXFLOSIVE CONSUMPTION

    The following specific consumption of explosives has been adopted for

    estimating the annual requirement of explosives:

    ' OB from shovel benches - 2.05 m3/kg. Coal seam - 9.28 UKg. OB from HOE benches - 2.01 m3/kg

    The provisions of the Coal Mines Regulalaon 1957, other relsvant rules

    regulations and circulars shall be observed during the course ofa

    6.0

    6.1

    IN

    QUALITY

    RE

    P PING & DRAINAGE

    the quarry

    The planning of de-watering of the mine has been done in such a way that

    as tar as possible the working faces and haul roads remain dry

    Thd layoul of the quarry provides suitable gradient along the quarry floor

    and the benches to facilitate self-drainage of waler to the lowest level of

    uate no. of pumps and pipes have been provided. The details of the

    pu are given below:

    Page-11

    midinq operation.

    The average grade of ROM coal is G-10.

    Mining Plan for Jhingurdah OCP

  • 6.2

    6.2.'.|

    Sl No.Head(m)

    540 250

    OperatingVoltage (V)

    Motor Rating(KW)

    1 6600 595

    2 540 254 6600

    540 250 6600 5S5

    4 540 250 6600 595

    5 275 216 3300 190

    6 215 216 3300 190

    7 224 60 440 110

    COAL HANDLING PLANT

    INTRODUCTION

    A full-fledged coal handling plant for Jhangurda Opencast Project hasbe€n constructed.

    The coal handling plant have the facilities for receiving ROM coal from

    coal yard via grizzly, crushing the coal to a specific size, storage &reclamation, rope haulage loading system and belt transport between the

    intermediate points. The ROM coal has to be crushed down to a size of C)

    200 mm.

    System Capacity

    Th€ handling capacity of the CHP is in @mmensurate with the production

    capacity of the mine.

    Based on 330 working days per year and 5 hours per shift, and in order to

    meet the fluctuations of coal output from the mine due to irregularities of

    transport system and seasonal fluctuations, the system capacity of the

    CHP has been fixed at 800 TPH.

    Salient features of CHP

    - One Reciprocating Feeder of capacity 800 TPH feeds ROM Coal toHorizontal Crusher

    623

    Page-12 Mining Plan for Jhingurdah OCP

    Discharge(m3iho

    3

  • Horizontal Roll Crusher crushes the Coal to C)200 mm Size andsubsequently, feeds the crushed Coal to Conveyor

    From a network of 6 Conveyor Belts, Crushed Coal reaches Ground

    Bunker having capacity 5000 Tons

    ln the Ground Bunker, Eighteen Reciprocating Feeders of Capacity

    350 TPH each, feeds the Coal to Conveyor

    From a network of 14 Conveyor Belts, crushed coaleventually

    reaches wagons.

    One No. Rope Haulage System installed at Siding

    Necessary electrical and interlocking facilities.

    tem Description

    coal handling plant for Jhingurda OCP consists of 1 number ofroll crusher lo crush ROM coal lo -200 mm size, 1 number of

    ground bunker of 5000T capacity with associated belt conveyor andaccessories. lt has peak handling capacity of about 3.5 Mtpa.

    RailtYay Siding

    The existing public railway siding at Jhingurdah OCP has a capacity of full

    rake of Box-N, Box-C type which is in operation. The existing railway

    sidlng has following facilities:

    6.2.4

    6.2.5

    929 M

    929 M

    968 M

    i. Empty receiving lineii. Engine escape lineiii. Load line

    pty line receives empty rake with the help of rail engine. Then rail

    ine goes back through engine escape line. Then with the help of

    on hauler, the empty rake is placed to load line. After placement, the

    pty wagons are loaded with the help of wagon hauler

    POWER SUPPLY ARRANGEMENT

    Jhingurdah Project receives power at 33 KV from 132/33 KV Morwasubstation of MPSEB.

    6.3

    Page-13 Mining Plan for Jhangurdah OCP

    Enl

    .nl*"J

    "a'l

  • 6.4

    6.4.1

    There is a 33/11KV main substation in the project of installed capacity

    1x3.'15 MVA & 2x 5 MVA. Out of these three, 3.15 MVA lransformer is for

    colony supply.

    From the main subslalion, power is transmifted al 1'l KV to the following

    substations:

    W6st Substation

    It has installed capacity of 2x3.15 MVA, 1'116.6 KV

    CHP Substation

    It has installed capacity of 2x2.5 MVA, l1/3.3 KV

    WORKSHOP

    INTRODUCTION

    To meet the maintenance and repair of HEMM, mechanical, electrical and

    other mining equipment, LMVS etc. the existing Jhingurdah OCP has

    following facilities:

    a) ExcaYation Workshop

    i) Base workshopii) Site/Field woIkshopE&M workshop

    Regional store and magazine

    b)

    c)

    Scope of Work

    a) Excavalion Workshop

    i) Preventive Maintenance

    . Daily maintenance including washing ofequipment

    . Scheduled maintenance including lubrication

    . lnspec{ion

    ii) lncidental minor repair/replacement of components and assembliesOf HEMM

    6 4.2

    Page-14 Mining Plan for Jhingurdah OCP

  • b)

    6.4.3 Exi

    iii) Routine inspection and scheduling for repair needs at centralworkshop

    iv) lncidental minor repairs of assemblies and sub-assemblies ofmining and mechanical equipment i.e. shovels, drills etc

    workshop:

    . Daily washing and inspection ofthe E&M equipment

    . Routine/scheduled maintenance of all E&M equipment

    . lncidental minor repair/replacement of sub-assemblies andcomponents of CHP equipment and accessories, water pumps

    and pumping installations and other E&M equipment.

    lsting Facilities

    a) Brse workshopThe Base workshop has following sections:

    . Dumper repair section

    . Dozer repair section

    . Light vehicle repair shed

    . Field equipment repair shedr Tyre shop. Machine shop

    Besides, there is facility of parking, canteen, site stores etc. Behind

    this workshop, there is a regional store.

    Ma.ior repairs like engine & transmission etc. are being done atCentral workshop, Jayant.

    Site workshop

    The site workshop is equipped with the following facilities:

    . Minor repairs

    . Fuelfilling

    . Air checking

    . Washing

    . Lubrication etc

    b

    Page-15 Mining Plan for Jhingurdah OCP

  • 6.5

    6.5.1

    c) E&M workshopThe E&M workshop is equipped with the facilities to repair and

    maintain pumps, motors, LMVS etc

    The existing facilities are sufficient to maintain the coal production

    at Jhingurda and hence, no further modmcation/addition isproposed.

    CIVIL CONSTRUCTION

    Residential Buildings

    The existing numbers of residential quarters in the Jhingurdah Project are

    1140. The status of total construcled residential buildings is given below:

    The manpower of other projects is also residing in the quarters ofJhingurdah colony.

    Type of Quarter Nos. (Existing)

    'D' Type Quarter 5'C' Type Quarter 56'A+B' Type Quarter'HB'Type Quarter 708'T1' Type Quarter 50

    1140

    SINo

    CategoryProvision ofHouses (%)

    Manpower(Nos. as on01.04.2018)

    ,1 Officers

    2 Monthly Rated Staff 1004k 129

    3 Daily Rated Workers 100% 328

    4 Overall Total 100 yo

    Page-'16 Mining Plan for Jhingurdah OCP

    The overall quarter satisfaction in the Jhingurda Project is 100%. Theprovision of residential buildings for employees as per manpower is given

    below:

    Total

    100%

    523

  • 6.5.2 S6fvice Buildings

    Provision of Service/Welfare Buildings

    The service buildings viz. Project office, Mine office, Township office,Ti4e & Security office. Worker's Training Centre, and Cycle shed/CarShFd in the office complex have been constructed.

    Statulory buildings like First Aid Centre, Rest shelter, Toilets, Trainingcentre, canteen etc. in the mine area have been constructed.

    Welfare building/community building such as Dispensary. Workerslnstitute, Bus shed, Cycle shed, Rest house, Officer's clubs, Toilet room,

    in the township have been construcled.

    Mine Development

    Community Development

    Arqoriculture

    For arresting dust and protection of the environmenl against pollution,

    plailtation and green belt development are being carried out around the

    6.5.3

    6.5.3.1

    6.5.3.2

    Development of land for residential & other purpose

    The existing quarters of the township are sufricient to cater the needs of

    the employees and adequale roads are already available in the township.

    6.5.3.4

    Page-'17

    Un0er the community development programme, the project arrangesperiodical health camps in the nearby villages. Two RO plants have been

    installed in the nearby villages for potable water. Hand pumps have also

    be6n installed in the nearby villages. Skill development training programs

    like bag making, beauty parlor, fashion/dress designing, floriculluremower

    deqoration, computer training, English speaking course etc. are being

    codducted on regular basis to promote self employmenl.

    Open Lungs

    The park for recreation of inhabitants in the colony has been made

    6.5.3.3

    Mining Plan for Jhingurdah OCP

  • 6 s.3.5

    industrial and colony areas. Around 17.60 plantations have been carried

    out up to 2017-18.

    Village Rehabilitation & Compensation against R&R

    A total of 63 families and 516 persons have been affected by the past

    mining activities and they have been rehabilitated in ChandrapurRehabilitalion Complex near Jhingurdah.

    Garland drains in th€ mining area

    Garland drains have been constructed in the mining area. The length of

    the existing garland drains is approximately 2.5 Kms.

    ROADS AND CULVERTS

    The requiremenl of roads & culverts has been assessed as per norms and

    plan

    Colony Roads and Culverts

    No additional provision of colony road has been made as the existing

    quarters of the township are sufficient to cater the needs of the employees

    and adequate roads are already available in the township.

    Service Roads and Culverts

    Service road includes Haul road, Heavy duty road to workshop andApproach road to project.

    A permanent 7.5 m wide and 3.0 Km long biluminous approach road from

    the township/office complex to project has been in place since long. The

    approach road also connects the haul road.

    A 20-30 m wide WBM Heavy duty road has been made within the mines

    and from workshop to mines.

    ln short, all lhe haul roads are WBM and all the approach roads arebituminous.

    Page-18 Mining Plan for Jhingurdah OCP

  • 6.5.4

    6.5.4 1

    For smooth movement of dumpers, concrete pavement has beencoristructed in the workshop. Sufficient parking space with pavement has

    also been given.

    Watsr Supply & Sewerage Oisposal Arrangement

    Thq existing system for drinkrng waler supply, industrial water supply and

    sewage disposal system has lo be conlinued as suitable provision forwatBr supply for industrial purpose and sewerage system has been made.

    Wale r Supply

    The water is supplied from lntegrated Water Supply Scheme (IWSS),

    Khadia, to Jhingurda Pump House which has a storage capacity of around

    3.2? Lakh Gallons. From Jhingurda pump house, water is pumped toOverhead Tanks and from there water is supplied to the Colony andMines Area for non lndustrial use. Mine Water is used for industrialpurbose. Sufficient provision has already been made to supply water to

    the existing township & mines and th€ same will be continued in the future

    as well.

    6.5.4.2 lndustrial, on-d nking Wat6r Supply

    Th€ demand of industrial water has b€en assessed as per norms for the

    reqqirements of technological needs of different wo*s in the mine.

    The need for water has been assessed mainly for the activities at the

    woftshop, CHP and Mine. Provision for fulfilling requirement ol water for

    indrlstrial use for these activities has been made accordingly. Mine water

    is tbed for industrial purpose. Suitable arrangement for industrial water

    recycling and reuse has been made for conservation of water.

    6.5.5

    Page-19

    SerJrage DispoealColbny Sewerage

    on{ centralized Sewerage Treabnent Plant (sTP) of capacity 1.5 MLDhas already been mnstructed for treatmenl of domeslic s€wage

    Mining Plan for Jhingurdah OCP

  • generated within the township. lt consists of sewage pumping stations,aeration tank, senling tank, sludge drying beds etc. with all necessary

    mechanical, electrical & olher instruments.

    The sewage from individual houses is collected through branch/trunk

    sewers and fed to the STP where it is treated betore flnal disposal. As the

    facilities at the existing STP are sufficient to cater to the needs ofmaintenance of coal production from Jhingurda Top Seam OCP, nobalance provision is required to be made.

    lndustrial Emuent

    The lndustrial waste water from workshop, CHP and other establishments

    is guided through oil and grease traps. The effluent coming out of the

    andustrial premises is channelized to close circuit waste water treatmentplant and recirculation plant where after passing through sedimentation

    tanks and filters, it would be recycled for industrial use.

    Zero water discharge is maintained and the treated effluent is complelely

    utilized for dust suppression, fire-fighting, horticutture and plantationactivities.

    lndustrial Fire Fiqhting Domand

    Water is being stored in the reservoir for tlrefighting purpose. Provision of

    reservoir, pumps and pipeline has been made for industrialfireflghting.

    Water Supply for Fire Fighting

    lndustrial Water is collected at the two different points in the mine area.

    One reservoir shall be used for quarry fire fighting and other one is used

    for workshop/CHP. Suitable pipeline network has been made as per the

    site condition.

    Page-20 Mining Plan for Jhingurdah OCP

    One centralized Emuent Treatment Plant (ETP) of capacity 300 cum/hr.

    has already been in plac, for treatment of effluent adsing out of themining activities.

  • Type Area (Ha)

    1 Mine Excavation

    2 ExternalOB Dumps 258

    3 I nfra struclu re 216

    4 Residential Colony '120

    5 Green belt 355

    6

    '1200

    it. No Type Area (Ha)

    I Tenancy Land 206

    2 748Forest Land

    3 Governmenl Land

    1200Total

    7.0

    7.'l

    7.2

    8.0

    POWER & PRODUCTIVITYM

    M

    t\.4a power requirement is assessed on the basis of 330 days of annual

    POWER

    ing. The sanclioned manpower (Non Executives) for FY 2018-19 is

    6 , whereas the total existing manpcr/eras on 0'1.04 2018 is 523

    DUCTtVtTY

    S of Jhingurdah Opencast Mine for the lasl Financial Year 2017-18 is

    total land required for mining and infrastructure etc. of Jhingurdancast Projecl is 1200 Ha which has already been acquired before

    The head-wise break-up of the land is given belowi

    Ag

    lype-wise land requirement viz. Forest land, Government land,

    ultural land is given below:

    ACQUISITION & REHABILITATION

    o7.

    o1

    Page-21 Nlining Plan for Jhingurdah OCP

    Unaffected Forestland

    Total

    246

    tsT N".

  • RESETTLEMENT/REHABILITATION

    A total of 63 tamilies and 516 persons have been affected by past mining

    activities and they have been rehabilitated in Chandrapur Rehabilitation

    complex near Jhingurdah.

    SAFEW & CONSERVATION

    SaGty

    While carrying out different mining operation in the opencast mine, the

    safety rules in force as per rules and regulations made under mine Act

    1952 should be strictly followed and the desired safety measures adhered

    to various DGMS circulars issued from time to time regarding safety. ln

    order to ensure safety to the personnel and equipment of the mine, the

    Jhingurda OCP envisages following measures:

    / To prevent industrial accidents;/ To ensure stability of benches, batters and OB dumps;/ To ensure safety of equipment;/ To controlfire;r' To control dusl and emission of noxious gases, inundation and/ To control pollution

    During planning and design of the mine working and infrastructuralfacilities, provisions of safety rules in force and various DGMS circulars

    issued from time to time are kept in mind and are strictly adhered 10.

    CONSERVATION OF COAL

    irleasures have been taken to minimize coal losses during miningoperations The number of bands more than a meter in thickness are not

    consistent and it varies from 2 m to some limes as high as 10 or 11 m.

    These bands are removed separately as overburden/reject.

    9.2

    Page-22 Mining Plan for Jhingurdah OCP

    9.0

    9.1

  • 10.0

    ,10,1 EXISTING POLLUTION CONTROL MEASURES10.'1.1 Air Pollution Control Measures

    It cpn be seen from the environmental data, that main air pollutant inmining operation is dust. Keeping this in view, following control measures

    are being adopled:

    / The coal surface is watered during loading and transportalion./ Three nos. of lyater tankers (converted) having 42 KL capacity each

    and one no. of water tanker (converted) having 28 KL capacity and

    one no. of water tianker (Mist Spray Type) having capacity 70 KL

    are deployed for dust suppression on haul roads, service roads and

    coal stock piles.

    / Wet drilling is practiced/ Transportalion of Coal from CHP to siding occurs through a network

    of closed conveyor belts.

    / Fixed water sprinklers are provided at loading/unloading^ransferpoints in the CHP to check fugitive emissions from crushingoperations, conveying syslem, transfer points etc.

    r' Allservice roads/permanenl roads have been surfaced with asphalt.'( Cleaning and sweeping of coal transpo( road is done daily./ Vegetation/Plantation has been carried oul over the surface of

    dumps.

    / Green belts around colony. quarries, OB dumps and industrial areahas b€en provided and approx. '17.60 Lakhs saplings have been

    planted up to 2017-18.

    Page-23 Mining Plan for Jhingurdah OCP

    ENYIRONMENTAL MANAGEMENT

    Jhingurdah mine is operating since 1965. The mine has alreadyimplemented various pollution control measures for containing air, waterand noise pollution arising out of mining operation. An approximateamount of Rs126.49 Lakhs has been spent in lhe yeat 2017-18 fotenvironmental protection. The corresponding figure for the year 2016-17

    wad Rs 87.7s Lakhs.

  • 1O.1.2 Air Pollution Control at Source

    Haul Road

    Haul roads are major source for fugitive dust generation in coal projects.

    Following mitigation measures are taken for haul roads within the mine

    area;

    / Regular Water sprinkling.7 Lonq life WBM haul roads/ Proper lraintenance of HEI/Mr' Prevention of overloadinq

    Blasting

    Blasting releases a lot of dust if they are not planned well. Energyreleased by blasting is lost in powdering effect. This is avoided by proper

    design of blast geometry and charge weight.

    Plantation

    Extensive tree plantation has been carried out in open areas available

    within and around the mine premises and also on overburden dumps.About 17.60 plantations have been carried out up to 2017-18.

    10.1.3 Water Pollution Control Measures

    The existing water pollution control scheme incorporating various control

    measures is given belor,rt:

    Provision of Mine sump and Mine drainage

    The \,yater from the mine flows into the mine sump which acts as primary

    sedimentation. The settled water is being pumped out to ETP, which isproperly treated prior to its utilization in dust suppression, fire fighting,horticulture, dumper-dozer washing etc.

    Page 24 Mining Plan for Jhingurdah OCP

    Drilling

    Wet drilling is practiced to minimize any generation of dust during drilling

    process.

  • lndust al EmuentOne Effluent Treatment Plant (ETP) of capacity 300 cum/hr has been in

    plqce for treating the industrial effluent from mine sump, workshop, CHP

    and other establishments.

    The lndustrial waste water is guided through oil and grease trap to a close

    circuit effluent treatment plant where after passing through sedimentation

    taflk and clarifier, it is utilized for industrial use.

    Zero waler discharge is maintained and the treated effluent is completely

    utilized for dust suppression, fire-fighting, horticulture and plantation

    activities.

    Dornestic Effluent

    One centralized Sewerage Treatment Plant (STP) of capacity 1.5 MLD

    has already been conslructed for treatment of domestic sewagegenerated within the township. lt consists of sewage pumping stations,aeration tank, settling tank, sludge drying beds etc. with all necessary

    mechanical, electrical & other instruments. The sewage from individual

    houses is mllected through branch^runk sewers and fed to the STPwhere it is keated. As the tacilities at the existing STP are sufficient to

    cater to the needs of mainlenance of coal production from Jhingurda Top

    Seam OCP, no balance provision is required to be made.

    10.1 4 Noise Pollution Control Measures

    Following control measures are being adopted lo keep noise levels tonmt

    i)

    tmum

    Provision of noise-proof cabins for operators of drills, dumpers, shovels

    Routine maintenance of HEMM

    Provision of ear-muffs and ear-plugs as and when required.

    Blasting operation is carried out in between 2.00 pm to 3.00 pm

    Thick green belt has be€n developed around lhe colony. This acts as

    a barrier to the noise

    etc.iD

    iiD

    iv)

    v)

    Mining Plan for Jhingurdah OCPPage-25

  • 10 1 .5 Ground Vibration Control MeasuresThe following control measures are being adopted to control ground

    vibration:

    a) Design of optimum blast hole geometry considering bench height,dia of hole, type of explosive, nature of rock, leYel of fragmentation

    required etc.;

    b) Divide total charge/blast in several parts so as to keep minimumexplosive/delay.

    c) Use of relays;d) Reduce the depth of the holes (larger the depth, the ground

    vibration is felt over larger area);

    e) Plaster shooting is avoided to reduce air shock wave.

    Pollution Control Measures at coal Handling Plant

    Coal Crushing

    The coal crushing unit is enclosed and appropriate dust suppression and

    collection arrangements have been installed. Following control measures

    are being adopted for the existing mining operation:

    Transfer Pointg

    Crushed coal is transported by a system of closed conveyor belts. Fixed

    type water sprinklers are installed at transfer points.

    Ground Bunker

    Ground Bunker is provided with both dust extrac{ion and dust suppression

    system. Besides, lixed type water sprinklers are also installed at Ground

    Bunker.

    Pollution Control Measures at Railway Siding

    i) Water sprinkling arrangement during loading of coal;ii) Regular water spraying around Railway siding near loading and transfer

    point

    iii) Thick plantation along the raitway siding.

    10.1.7

    Page-26 Nrining Plan for Jhingurdah OCP

    10.1 .6

  • 10.2

    'l '1 .0

    Pollution Control Measures

    existing pollutaon control measures wrll be continued in the future

    AL PROVISION

    As is no enhancement ol the Coal production, thus, no additional

    is envisaged in the Mining Plan

    Page-27 Mining Plan for Jhingurdah OCP

  • '1.0.0

    1.0.1

    INTRODUCTION

    Name of Mine owner

    Lobati

    Shri G. Pandey, Director Technical (Operations)

    1.O.2 on and Extent of ProrecuLease Area

    Jhingurdah Opencast Project is located in the Jhingurdah Block, in theNonh-Eastern part of Singrauli coalfields in Singrauli district of MP. The

    total land requirement for Jhingurdah Opencast Project (Project areal

    area) has been estimated as 1200 Ha

    Delails about the location of the project are given in 2.1 of Mining Plan

    location map of Jhingurdah OCP is given in Plate No.1

    1.0.3 Type of ProjecuLease AreaT lease area consists of Forest and Non Forest Land

    Lelse

    1.O.4 P nt Land use pattern

    Total required Area (Ha)

    Sl. No. Particulaas Total Area (Ha)

    1 Forest 7442 Government Land 2463 206Tenancy/Agriculture Land

    Total 1200

    Sl. No.

    1

    Particulars

    235Quarry area

    2

    3

    56

    258

    2't6

    355

    External Dump area

    Tota I

    lnfrastructure

    Undisturbed AreaGreen Belt

    [rining Plan for Jhingurdah OCP

    MINE CLOSURE PLAN

    4 120Residential Colony

    16

    1200

    Page-28

  • 1.0.5 Method of Mining

    Details of mining technology and scheme of operation is given in 5.0 of

    Mining Plan.

    1.0.6 Coal Processing Operation

    There is no proposal for coal beneficiation for this mine. Detaileddescription of Coal Handling Plant and railway siding is given in 6.2 of

    Mining Plan.

    1.1.0 Reasons for closure1.1.1 Exhaustion of Minerals

    Depending on prevailing geo-mining & techno-economic conditions, it has

    been decided to mine coal up to exhauslion of reserve in the proposed

    block.

    As per the calendar programme of excavation (section 5.4 of the Mining

    Plan) the mineable mal reserve of the Jhingurdah top seam would beexhausted by lhe yeat 2021-22.

    As per the mining plan (section 3.4) the underlying seam i.e. Jhingurdah

    Bottom seam will be exploited later and after its exhaustion the mine will

    be closed.

    Lack of Demand

    The Jhingurdah mine is not to be closed due to lack of demand, but due to

    exhaustion of minerals.

    un-economic operatioos

    Jhingurdah mine is not to be closed due lo un-economic operations, buldue to exhaustion of minerals.

    1.1 2

    1.'1.3

    Page-29 Mining Plan for Jhingurdah OCP

  • 1.1.4

    1.'t.5

    Natural calamity

    Thd Jhingurdah mine is nol to be closed due to natural calamity, but due

    to dxhaustion of minerals.

    Dirfctionlcourt cases

    Jhihgurdah mine is not being closed due to direction/court cases, but due

    to exhaustion of mine.als

    ThE Mine Closure PIan has been prepared as per the Guidelinesapdroved by lhe Ministry of coal, Govl. of India and notifi€d videmrFmunication No. 55011-01-20O9-CPAM on dated 27h August, 2009,

    8h Feptember,2oog.

    11h January, 2012, 25s April, 2012 and 7r January,2013

    As per the notificalion all coal mine owners shall adopt a Mine Closure

    Plah for each of their mines comprising progressive Closure Plan and final

    Clobure Plan duly approved by the Comp€tent Authority.

    Page-30

    ln @mpliance of the notmcation this Mine Closure Plan for Jhingurdah

    Op+ncast Project has been prepared.

    Minp closure en@mpasses rehabilitation process as an ongoingprdlramme designed to restore physical and biological quality ofenvlronment disturbed by the mining to a level acceptable to allconberned. lt must also aim to creale a self-sustained ecosystem. Mine

    cloqure operation is a @ntinuous series of activities slarting from day one

    of ttfe initiation of mining project.

    MinF closure planning has to be carried out al the staning of the mine and

    neeps p€riodic reviewing and revision during its life cycle to cope withthe geo-technical constraints, safety risks and economic risks, social and

    envlronmental challenges. Some other obiectives of Mine ClosurePlanning are as follows:

    Mining Plan for Jhingurdah OCP

  • 1.2.0

    1.2.1

    a. To allow a produclive and sustainable after-use of the site which is

    acceptable to the mine owner, adjacent mine owners (since all the

    mines are owned by the same company therefore it is done in anintegrated manner), the regulatory authority, the local community and

    the other stake-holders

    c. To alleviate or eliminate environmental damage and therebyencourage environmental sustainability.

    d. To minimize adverse socio-economic impacts.

    Mine closure planning covers the progressive mining and post-mining

    phase of the project. Several attribute of progressive mine closureplanning have to be implemented and introduced during the period ofmine operation.

    Progressive mine closure process is undertaken concurrently with mine

    developmenU production aclivities.

    Statutory obligations

    Special conditions imposod while execution of lease deed

    Special condition imposed while execulion of lease deed is beingcomplied.

    Approval of Mining Plan

    The Mining Plan shall be approved by NCL Board

    Directivesl conditions imposed by MoCTMoEF/SPCBTCPCBThe directives /conditions imposed by the MoC/MoEF&CC/SPCB/CPCB &

    any other statutory agency shall be complied by the project.

    The existing Environment clearance conditions (EC for 5 Mtpa under EIA

    notification 1994) are enclosed as Annexure-1

    1 .2.2

    1.2.3

    Page-31 Mining Plan for Jhingurdah OCP

    b. To protect public health and safety.

  • conditions imposed under Air (Prevention and Control of pollution)

    1981 and Water (Prevention and Control of pollution) Act, 1974 white

    ting the consent by MPPCB are enclosed as Annexure-2

    Th re is a need to deflne the liabilities, responsibilities and authorities of

    the

    ments after mine closurc. Although no comprehensive legislation

    on mine closure, the following legislations are relevant to mines

    ex

    Mines Act, '1952

    oal l\rines Regulations (Amendment)-2017: Regulations 6, 66,107,108

    20, 124J37 , 249 ,etc. of Coal Mines Regulations (Amendment)-2017

    nd its related DGMS Circulars.

    he Coal Mines (Conservation and Development) Act, 1974.

    r (Prevention and Control of Pollution Act), '1974

    r (Prevention and Control of Pollution), Act 1981

    vironment (Protection) Act, 1986 and Environmenl Protectionment) Rule,2000

    he Hazardous Wasle (Management, Handling and Transboundaryovement) Fourth Amendment Rules, 2010.

    ines and Minerals (Development and Regulation) Act 1957, amended

    p to 20-'12-2009

    ineral Concession Rules 1960, amended up to '18-01-2000

    ln addition documents like EItuEMP submitled to MOEF and theitmenls made therein also have legal status

    Page-32

    mine management, other regulatory bodies, central and state

    aspects of Coal Mines

    [Iining Plan for Jhingurdah OCP

  • 1.3.0

    1.3.1

    2.O

    2.1

    2.1.1

    Considering the balance mineable reserve as on 01 04.2018, the Mining

    Plan for Jhingurdah OCP has been prepared for a mine life of 4 yrs up to

    2021-22. fhe coal reserve in the Jhingurdah bottom seam will remain tobe exploited allet 2021-22. The present closure plan is a conceptualclosure plan. Final decision of closure will be taken by the competent

    authority in appropriate time. The Final Stage Ouarry Plan of Jhingurdah

    OCP is given in Plate No.3.

    MINE DESCRIPTION

    Geology

    Topography

    Jhingurdah Block has a high hill in the back ground with steep southern

    slopes covered with trees. The hilltop is about 500 m above MSL whereas

    the cultivated area in forruround has an elevation ranging between 360

    m to 385 m above MSL.

    More details aboul the physiography and drainage of the area are given in

    section 2.3 of Mining Plan.

    Rock types

    Detailed description of geology of the block area s given in 3.0 of lvlining

    Plan.

    Toxic ElemenE Study

    Toxic elements sludy of coal samples from coal seams of NCL mines has

    been lested by llT BHU & CIMFR Dhanbad. Result shows elementalparameters are within permissible limits.

    Geological Structureg

    Details of the geological features of the area is given in 3.0 of Mining Plan.

    2.1 .4

    Page-33 Mining Plan for Jhingurdah OCP

    CLOSURE PLAN PREPARATION

    Decision of mine closure

    2.1.2

  • 2.1-5 FAULT

    2.2.O

    2.2.1

    Description of the faults existing in the Jhingurdah Block is given insection 3.3 of Mining Plan.

    RESERVE

    The balance mineable reserve for Jhingurdah Project is 7.70 Mt as on

    01 04 2018

    y about category of coal

    average grade of RON,I coal is G 10

    2.2.2 Bat nce quantity of Coal reserve at time of mine closure

    be

    ng to the mining plan the Jhingurdah bottom seam will remain to

    oiled after the ceasing of mine life of Jhingurdah Top Seam (2021-

    22\

    2.3.O NG METHOD

    ls of Mining Technology and Scheme of operations is given in 5.0 of

    Min Plan.

    3.0.0 RE PLAN

    3.1.0

    3.1.'l

    of 30 m and grading of slopes such that the overall slope of the

    MI ED OUT LAND

    Proposalllleasurea implementsd forreclamation

    The closure plan envisages @ncurent land reclamation of mined outlanj. The reclamation is to be done in lhree phases.

    !!69j Physical / Technical Roclamation

    Duq to steep gradient of coal seams and presence of Jhingurdah Bottom

    sealn most of rhe over burden has been dumped outside the quarry area

    as dxlernal dumps. Same practice will be followed in the future.

    The technical reclamation of the dumps is canied out by forming individual

    T

    du comes to be 28o

    Page-34 Mining Plan for Jhingurdah OCP

  • 3.1.2

    Phase-ll Biological Reclamation

    Biological reclamation is the Phase-ll of reclamation process. Thephysical, chemical and biological characteristic of lhe top surface of mine

    spoil is totally dffferent than the original soil, which can be seen from the

    analysis results of natural forest soil and OB material.

    The reclamation at the waste dump sites should be ecologicallysustainable The localspecies may be encouraged and species should be

    so chosen that the slope, bottom of dumps and top of the dumps are able

    to sustain these species.

    Rehabilitation of mined out land

    The reclamation of mined out land will be a concurrent with miningoperations. The post mining land use at the end of mine life will be asfollows:

    Re-vegetation covers in terms of grass & trees of appropriale species are

    raised over the physically reclaimed land. lt is to be ensured that in thefinal land use plan, major portion of land acquired for the project shall be

    reclaimed as forestland. Mined out area shall be suitably reclaimed for

    vegetation. The OB dumps should be scientifically vegetated with suitable

    nalive species to prevent erosion and surface runoff. ln critical area, use

    of geo textiles shall be undertaken for stabilization of the dump. Bothprogressive lechnological & biological reclamalion shall be carried out asper Environmental Management plan.

    Phase-lll HydroReclamation

    At the end of mine life a void of 205 Ha will be left in the excavated zone.

    (As per EMP of Jhingurdah Project). This void will be converted into a

    water body. The water body will recharge the ground waler of the regime.

    This water reservoir may be developed for pisci-culture.

    Page-35 M,nang Plan for Jhingurdah OCP

  • T MINING LAND USE

    3.1.3

    3.1.4

    3.1 .6 P

    Actua

    There

    I site restoration for post mining land use

    will be significant increase in forest cover post-mining due toproposed reclamation activities and aclual site restoration with improved

    green cover will be targeted in the final mine closure plan

    Th(

    Dur

    ) proposed Final Dump Plan is enclosed as Plate-3 and reclaimednp Plan at posl mining stage is enclosed as Plale-7.

    Mel

    Mel

    sec

    Afforestation in first phase mined out area while commencing themi ing in second phase

    Miriing is to be carried out in a phased manner initiating atforestation work

    in tre mined out area of the Iirst phase while commencing the mining inthe second phase i.e. continuation of mining activities from one phase to

    ot r indicating the sequence of operations depending on the geo-mining

    co ditions of the mine

    ressive mine closure plan shall be prepared for a period of fiveye rs from the beginning of the mining operation

    plans would be examined periodically in every five yearape od and be subjected to third party monitoring by the agencies

    by the Central Govemment

    Elod of restoration/reclamationrRehabilitation

    thod of restoration/reclamation/rehabilitation has been described in the

    tion 3.'1.1 .

    N

    I

    oArea(Ha)

    Reclaimed O.B Dump areaWater Body (with batter area)lnfrastructure 336Green BelUPlantationunaffecled forest land 16Total 1200

    3.1 .7

    ap

    Page 36 Mining Plan for Jhingurdah OCP

    Land Use

    258

    355

    same has been complied.

  • 3.2.0

    3.2.1

    These plans would be examined periodically in every five years period

    and be subjected to third party monitoring by the agencies approved by

    the Central Government like the Central Mine Planning and Designlnstitute (CMPDIL), National Environmental Engineering Researchlnstitute (NEERI), lndian School of Mines (lSM) etc. for the purpose.

    WATER OUALITY MANAGEiIENT

    Details of existing Surface and cround Water bodies in llLA

    The hill area of the project is cut by Jhingurdah Nalla and it's largenumber of feeders, which flow from east to west and join the Chatka

    Nallah in the west. During the dry season, there is hardly any flow of water

    in this nallah but during the monsoon the discharge is very heavy.

    There are two distinct ground water slorage in and around Jhingurdah

    project:

    a) Primary porosity system in sedimentary formationb) Secondary porosity system in the northern and the north-western

    part of the Jhingurdah Block consisting of Metamorphic gneisses

    and schists.

    Stops for Water Quality protection

    Following water quality protection measures are taken:

    a) Control of erosion: The possible sources of surface water erosion arethe OB dumps. ln order to prevent erosion from the OB surfacesmassive plantation is being done on it. Up to 2017-18,772753 planl,s

    have been planted on OB dumps.

    The slopes of OB dumps are reslricted to overall slope of 28o. Such a

    mild slope not only caters the stability requiremenl of dumps bul also

    decelerates the surface runoff thereby minimizing the erosion. The haul

    roads are properly paved and wherever possible black top roads areprovided to minimize erosion.

    Mining Plan for Jhtngurdah OCP

    1r,

    Page-37

  • b) Sedimentation: Sedimentation tanks and Siltation ponds have already

    Peen constructed. The requarement of more number of such siltation

    ponds should be assessed and constructed accordingly.

    c) piv6Bion of wetsr couraoa: therc was no need of diversion of aoyWater course for the proiect.

    d) fYater Treatnent:

    the effuent discharged from the mine, workshop & CHP are treated intn srP.

    The domestic sewage is treated in a STP.

    e) Control of siltation: To arrest the silt brought by surface runoff Calchdrains have b€en constructed around the OB dumps which have their

    out let in a siltation pond made to collect these surface runoffs and

    mine water.

    . At lhe toe of the dump, a retaining wall has been provided.

    .l A series of open drains have been provided on dump body to arrestsurface run-off and prevent siltation.

    f) flydrogeology Strdy in the area:The detailed hydrogeological study of Singrauli Coalfield was carried

    out at the instance of World Bank. The hydrogeological investigation

    @mprised of well inventory of approximately 116 dugwells, drilling and

    oonstruclion and monitoring of 34 nos. of piezometers and pumping

    t€st at 5 different well field sites.

    major hydrogeological units identified in the area are as follows

    Coal seam-Jh urdah

    Coal Seam JhingurdahBottomSandstone and shale withincoal esFrom coarse grained tocla sandstone

    ThicknessHydrogeologicalunitWater Table aquifer and shale

    soil and sub-soil

    Folmation

    Sandstoneund

    Aquiclude

    '10 m to 152.3 m

    105.8 m to 159.7 m25mto58mt

    iclude

    Deeper aquife.-B

    6.4mto1902m

    About-60 m

    Deeper aquifer-C l\4ore than 125 m

    Page-38 Minang Plan for Jhingurdah OCP

    Sandstone and shale

  • 3.3.0

    3.3.1

    g) Water Balance chart

    Water Balance chart

    B

    0.023 Mm3

    2.83 tvlm3

    iii) Net Mine Discharge 10.86 Mm3

    Net Annual Ground water Draft 13.71 Mm3Balance Annual Ground water Recharge (A-B)

    Net Annual Ground water Recharge 31.85 Mm3

    Net Annual Ground water Draft

    ii) Community Use

    18.14 lvlm3

    To assess the impact of opencast mining on local water regime, a regular

    seasonal monitoring of ground water level and quality is being canied out

    by establishing a network of 59 no's exisling dug wells in the study areaand 2nos. piezometers in core zone ofthe project.

    Analysis of ground waler samples from monitoring wells aroundJhingurdah Project indicates that the water quality is generally suitable for

    domestic use. The pH ranges from 7.0 to 8.0 standard units,concentration of dissolved solid, sulphate, iron, manganese, nitrate,fluoride and other heavy melals are found within the drinking standard (lS-

    10500). ln the study area ground water level variation is as follows:

    st.No Season

    Water level (bgl) in m(Study area-10 Km radius)

    1 Pre-monsoon 4.89 - 9.042 3.04 to 5.93Post- monsoon

    AIR QUALITY MANAGEMENT PLAN

    Existing Air Quality Status:

    With progressive mine operation & closure, the Ambient air quality ofJhingurdah OCP is being monitored regularly on fortnightty basis for aseasons by measuring the concentration of SPM,RPM, SOz, NOx .

    Page-39 Mining Plan for Jhingurdah OCP

    h) Trea0nent ol Acid Mine Drainage;

    There is no such problem of Acid mine drainage al this mine.

    ! Ilslti.l ug"

  • sl.{o.

    Locationcode

    Category

    1 East section sub station JHA,I lndustrial2 West section sub-slation JHA2 lndustrial3 Regional Store Office JHA3 Residenlial4 E&M Office of Colony JHA4 Residential

    s Locationcode CategoryNo. Location

    JHA5 Residential1 ChandrapurRehabilitation Site

    2 CETI Singrauli HWAl Residential

    Vikash Kunj Singrauli HOA2 Residential

    KKA6 Residential4 AudiVillage

    fo

    existing ambient air quality of Jhingurdah OCP is being monitored at

    localions/ stations in core zone and four locations in buffer zone,

    h are as follows:

    Co Zone

    B

    ZO

    existing control measures, the ambient air quality of the core & buffer

    is found to be well within the permissible limit and therefore no

    surEs to control Air pollution:

    Fol ng mitigation measures are in vogue

    Approach roads to mine and service roads are provided with black

    topping to reduce dusl generation.

    Water sprinklers are provided for dust control on haul roads

    Green belts provided along roads & plantation in vacant land in

    industrial & township areas ior dust control

    ln coal Handling Plant (CHP), dust control system and automatic

    sprinklers are provided at coal receiving pits. Fixed sprinklers are

    provided for coal bunkers, transfer points and loading points.

    Page-40 Mining Plan for JhingLrrdah OCP

    Zonel

    additional control measures are required.

    Location

  • For Jhingurdah OCP, monitoring ot Ambient Air Quality and above Air

    Quality Control measures will continue for progressive mine operation &

    closure. After closure, Ambienl Air Quality will be monitored for a period of

    3 years, if required further control measures will be taken.

    3.4.0

    3.4.',|

    WASTE ]IIANAGEiIENT

    Dotails of typo, quality and quantity of OB, coal relects, location planlongitud6, latitude

    Solid waste that would be generaled in course of coal mining isoverburden material consisling of fragments of sandstone of assortedsize. They have not been found to generate acid mine drainage or leach

    high quantity of heavy metals.

    The quantity of OB has already been discussed in the earlier sections of

    mining plan.

    3.4.2 Year-wise progress of OB removal in terms of height of OB dumpand No, of b€nches etc.

    Proposed calendar programme of coal production & waste (OB)management is given in Mining Plan.

    3.4.3 Th6ir dlsposal practice

    Due to steep gradient of coal seams and underlying coal seam(Jhingurdah Botlom) the OB generated is dumped externally and same

    will be practiced in fulure.

    3.4.4

    Details have already been given in 3.1.1

    Measure for prevention of ailtation, erosion and dust generation, andtheir dispersal in the air, environment, leaching in the surface andoround water

    These details have already been discussed in the earlier sections.

    3 4.6

    Page41 Mining Plan for Jhingurdah OCP

    3.4.5

    Stabilization of waste-Physical, biological year wise progress to beachieved

    Oetails of reclamation and afforestation with mining activityDetails have already been given in 3.1.1.

  • 3 4.9 P

    3.5.0

    347

    3.4.8

    W6te material re-handled or back tilled in lhe final voids for safetyDue to steep gradient of coal seams and underlying coal seam(Jhingurdah Bottom) the OB generated is dumped externally and same

    will be practiced in future.

    Efforts for minimum land requirement and degradation of land due to

    exEmal OB

    While designing the OB dumps of the projecl, technical parameters such

    as width, height, slope of dump etc. have been taken into consideralion

    for safe OB dumping, so that there is minimum impact on environrnent

    land degradation.

    to recharge and stabilize the water table in the surroundingardaa

    Details have akeady been discussed in the earlier sections

    TOP SOIL MANAGETIENT

    Top soil replacement is effective way of enhancing the physical andnufient stalus of OB materiai. The top soil, if any, shall be temporarily

    stofed at earmarked site(s) only and it should not be kept unutilized for

    long.

    The topsoil shall be used for land reclamation and plantation. A proper top

    soil replacement can assure the following improvements in OB quality:

    a) lncreased water holding capacity

    b) lmproved nutrient supplying capability

    mproved buffering capacity

    ncreased plant root depth

    Delails of top soil available and its utilization

    At Jhingurdah OCP, it is found that there is hardly any top soil present in

    the lease hold area and the tolal terrain is hilly. Wherever lop soil will be

    found, it shall be stacked separately at earmarked sile.

    Page42 Mining Plan for Jhingurdah OCP

    c)

    d)

  • Quantity and details of preserving it

    Whenever top soilwill be found it will be presewed as follor4s

    a) Top soil removed will be stock-piled only when it is impractical topromptly redistribute on required area.

    b) Stock piled top soilshall be selectively placed on pre designed area

    c) A vegetative cover will be generated immediately on the stock pile toprevent erosion.

    36 MANAGEMENT OF COAL REJECTS FROM WASHERY

    There is no proposal for Coal Washery for this mine

    Decommissioning proposod and their dismanding and dispo3alP.oposal

    At the end of mining operations, il is proposed to decommission thelndustrial infrastructures. However, before such decommissioning other

    infrastructures like office complex, residential complex, roads, pipelines

    and transmission line and community facilities, the possibility of re-use of

    these infrastructures for the neighboring mines shall be explored.

    Salvaged materials/equipment would be used for creating infrastructures

    facilities for coal mines that are likely to be developed in the coatfield in

    future. The unusable materials will be disposed off.

    Page-43 Mining Plan for Jhingurdah OCP

    3.7.0

    3.7.1

    INFRASTRUCTURE

    Dotails of exbting infrastructural facilities

    Several infrastruc{ures have been provided that includes:

    i. Workshop facilitiesii. Oflice complexiii. Townshipsiv. Coal Handling Plantsv. Railway siding for transportation of coalvi. Power Netwo* including sub-stationsvii. lndustrial and municipal effluent lreatment plantsviii. Communityfacilities

  • 39

    After decommissioning of industrial infrastructure facilities, lhe leasehold

    area will be leveled.

    The community facilities developed during the mine life like educational

    ,acilities, health facilities etc. would be continued even after the mineclo$ure. The final closure plan will envrsage inleraclion ot mining company

    with the State or local bodles for running these facilities.

    DIdPOSAL OF MINING MACHINERY

    The machineries that can be used would be diverted to new /existingprojects. Other machineries that have exhausted its life will be dispos€d

    off by auctioning and removed trom the site.

    SAFETY & SECURITY

    While carrying out all kinds of mining and allied activities in the mine, the

    safety rules in force as per Rules & Regulations made under Mines Acl,'1992 is being observed and required safety measures are taken. There

    will be various elements of safety & security at the time of mine closure,

    whiph will be dealt under above Rules & Regulations. The Safety &Security hazard include the followings.

    Sabty hazards including management of fire:

    Management of Pit Slopes and Waste Dumps:

    The final quarry slopes has been so designed and then subsequently

    developed that afrer the closure of the mine, lhere is no likelihood of any

    slope failure. The final slope of the quarry has been designed with above

    comideration. However, strict compliance with the proposed final slope of

    quarry would be made as given in Quarry & Surface Layout Plan and

    sub6equent slope stability studies.

    Page-44

    3.8

    ln the Final mine closure plan, aclion for control of likely tire areas of the

    mines will be discussed. Action will also be suggested to cover all the

    safety aspects.

    Mining Plan for Jhingurdah OCP

  • 3.10.0

    3.10.1

    Waste OB Dumps:

    The external waste dump shall be developed as per the proposed design

    so lhat slope failures do not create any safety hazard to the localcommunity. The external dump will be formed in number of decks, each

    deck will have 30 m (maximum) height & slope of 37o (maximum) to avoid

    dump slope failure, overall dump slope shall be maintained within 28o.

    Waste dumps shall be provided with garland drains and vegetation cover

    on surface of these dumps-

    Fencing around mined out area:

    To prevent illegal mining and considering safety of human & fauna, mined

    out area shall be properly fenced and all the entries to the mine shall be

    effectively sealed.

    Management of final voids:

    At lhe time of final closure of mine, fencing with RCC post and barbedwire will be erected around the water body.

    ECONOiIIIC REPERCUSSIONS OF CLOSURE OF MINE

    a) Number of local residents employed

    The project has given employment to 58 Nos of local residents

    b) Status of continuation of family occupation

    There is less likelihood of their continuation of their family occupation

    as the land acquired will be used for plantation on closure.

    c) Scope ofroining the occupation backNear the end of the mine life, manpower will stan getting reduced. The

    reduction of manpower could be done as per the following options:

    Mining Plan for Jhingurdah OCP

    ln due course of time, dip side of void (205 Ha) will be filled with rain &ground water. This water reservoir may be developed for pisci-culture.

    Page{5

  • Natural retirement

    Retraining and redeployment of younger groups in other mine

    Transfer of experienced middle aged groups to other projects.

    3.10.2 a) Compensation giventotal of 63 families and 516 persons have been affected by the past

    ining activities and they have been rehabilitated in Chandrapurhabilitation Complex near Jhingurdah

    b) ompensation to Employees

    ince employees are to be redeployed on closure of mine, they willntinue to enjoy the regular pay and other benefits. As such there is

    need for additional compensation.

    Satellito Occupations connected to the mining industryi

    Number of satellite occupations like transport, explosive

    electrician, aulomobile mechanic, local shops, dairyconnected with the mining industry.

    ) Number of persons engaged therein

    No such study has been carried out to determine the number ofpersons engaged in satellite occupations.

    ) Continuance of such business after mine closure'Once lhe mine closes, some of these aclivities would be affected.

    But this effect would not be severe, as there are olher mines and

    townships close to this mine.

    Rehabilitated status of MLA

    3.'10.3

    3.10.4 a)

    industry,

    etc. is

    Page-46

    Persons affected by mining activities have been rehabilitated inChandrapur Rehabilitation complex near Jhingurdah.

    Rehabilitation complex is so planned that it constitutes part of theexisting village environment, so that while enjoying all the civicfacilities provided in the rehabilitation complex developed by NCL, the

    families continue to be in a rural matrix. The complex is on the road

    connecting to Jhingurdah OCP and Waidhan and villagers haveaccessibility to public transport syslem.

    Mining Plan for Jhingurdah OCP

  • b) Other Remnant activitiea

    The remaining rehabilitation activities will be carried out at the time of

    final mine closure.

    3 10.5 Expectation of society on closure of mine:

    The mine extends several community development facilities to thepopulation living in this vicinity. On closure of the mine this will cease.

    The project affected persons (PAPS) are provided many civic facilities on

    the line of the management of community facilities deatl above. The final

    closure plan will envisage interaction of mining company with the State or

    local bodies for running these facilities.

    4.0 Time scheduling for Abandonment

    lvline closure in terms of progressive dumping, technical & biologicalreclamation is crncurent with the mining process. The Reclaimed Final

    Stage Dump Plan is given in Plate No.7.

    Oetailed mine closure plan shall be prepared & submitted before aclual

    closure. However, tentative closure activities at the time of mine closure

    are scheduled below:

    No,Activities

    Year after closure

    1 Mine Prt &Manaqement

    Dump

    2 P( water body

    3 P antation and ils afler

    4 Disposal of MiningMachinery

    5 lnfrastruclure Dismantlrng

    6 Environmental Monito.ing

    7 Fencing

    Page47 Mining Plan for Jhingurdah OCP

    2'd Year 5'h

  • ndonment Cost

    N,4L lease hold area of Jhingurdah OCP = 1200 Ha

    for August 2009 = 129.6

    for July'20'18 = 119.7

    nt deposited up to March"lS in Escrow account = Rs.9973.16............. (iD

    ance mine closure cost = (i) - (ii) = Rs.404.62000unt to be deposited in first year i.e. 2018-19= Balance mine closure

    Ulife of mine from 2018-19=Rs.404.6214=Rs.101 .15500 lakhs

    tn

    amount deposited in the following years with 5 % increment (as given

    ne closure guidelines) is given in the following table:

    eslimated cost of various mine closure activities are given below

    Li ing Factor WPI (Base 2004 05) for 201 1-12 = 1 .561

    He ce WPI for July' 20'18 (Base year 2004-05) =186.8

    Mi e closure cosu Ha according to WPI of 2009 = Rs.6 lakhs

    M

    closure cosuHa according toWPl ofJuly'2018 = Rs.8.64815 lakhs

    closure cosl according to July, 2018 rate = Rs.8.64815 /Ha X 1200 Ha

    10377.78 |akhs....................... (i)

    Mi

    lak

    T

    5.1 T

    st.No. Year

    Amount to be deposited(Rs. Lakhs)

    1 20'r B-19 101.155002 20't9-20 106 212753 2020-21 1 11.52339

    2021 22 117.09956Total 435.99070

    Mine Clo6ure Cost Distribution olJhinguldah OC Mino

    sl.(% weishtase) (< Lakhs)

    Dismantlinq of Structure

    iervice Auildings 087198

    tesidenlial Bualdings 2.67 11 64095

    ndusldal structures like CHPA/orkshop, feld sub-station etc

    1 30797

    Page-48 Mining Plan for Jhingurdah OCP

    5.0

    4

    o.2

    03

  • B

    r5

    Permanent Fencing of nine void and other dangerous areaRandom rubble masonary ofheishl 1 2m includins levelins upin cement concrele 116:'12 in mud

    6 53986

    G6ding of high wallslopesCLeveling and gEdinq of high wall '1 77

    7 71743D OB Dump Reclamation

    88 66 386 54938

    71% for progre-ssive and 1756 7ofor fnal mine

    Handling/Dozing ol Oa dump andbackfilling

    Equal weghlage04 1 74396

    E

    0.31 30797

    Equal weightageLandscaping ofthe open space inleasehold area for improving itsaeslhetics and eco value.

    Plant3tion ove. dearedobtained aftord€mantlng 05 217995

    To be includad in

    plan

    Plantation arcund the quarry area0 87198

    Equal waEhlageF

    Plantalion over th€ enernal OB 0.02 0.0872Equal weighlage

    PostClosure Environment Monitoring/testing of par.meters for three years0.22 0 95918

    0.2 0 87198

    llEnterpleneurBhip Developmenl(Vocaliomusk l developmenllraining for slstainable rncome of o26 I 13358

    Equal w€ightagethrough,out the lile

    Mascellaneous and 20 8 71981Equal weightagethroughout the lile

    J 08Manpower cosi ror supervision

    TOTAL 100.00 435.9907

    The mine closure cost has been estimated as Rs.435.9907 Lakhs. Other

    than Mine closure activities this crst also anclude all post environmenlalmonitoring cost for 3 years, supervision charges for 3 years, power cost,

    protective and rehabilitation measures including their mainlenance and

    monitoring, miscellaneous charges etc.

    Page-49 Mining Plan for Jhingurdah OCP

    Technrcal and 8io-redamationincluding plsnlation and posi

    o2

    G

    I

    3 4A792

  • 6.0 Fi ancial Assurance

    flnancial assuranc€. Northern Coal Field Ltd has opened an Escrow

    Aciount with Union Bank of lndia, Morwa, Singrauli, with the CoalController Organization (on behatf of the Central Government) asexolusive beneficiary.

    The above annual closure msl compounded @ 5% annually will bedeposited annually for 4 years. Proposed schedule of Year wisedeposition of closure cosl is given in Section 5.0.

    Mining is to be c€rried out in a phased manner initiatingafforeslation/reclamation work an the mine out area of the lirst phase while

    commencing the mining in the second phase i.e. continuation of mining

    activities from one phase to other indicating the sequence of operations

    depending on the geo-mining conditions of the mine. Up to 80% of the

    total deposited amount including interest acqued in the Escrow account

    may be released alter every five years in line with the periodicexamination of the Closure Plan as per Clause 3.1 of the Annexure of the

    guUelines.

    The balance amount at the end of the Final Mine Closure shall bereleased to mine owner/leaseholder on compliance of all provisions ofc Plan duly signed by the lessee to the effect that said closure ofmi complied all statutory rules, regulations, orders made by the Central

    of Government, statutory organizations, court etc. and duly certified

    by the Coal Controller

    agreement, outlining detailed terms and conditions of operating the

    row Account, shall be executed amongst the mining company, the

    I Controller and the concerned bank in order to give effect this

    F

    C

    Page-50 lvlining Plan for Jhingurdah OCP

    The amount released should be equal to expenditure incurred on the

    Progressive Mine Closure in past live years or 8070 whichever is less.

  • 7.0 Responsibilities of Mine closure

    For the purpose of monitoring of mine closure aclivities, the unit as well

    as area and HQ levels of the production company should set standard

    system and form a mine closure cell. The team of monitoring at different

    level should consist of member each from Mining, Environment, E & M,

    Finance, Civil and Survey cadre etc.

    l\,lline Closure Organization has to be created in all subsidiaries and all

    areas of the subsidiaries. This organization is to be headed by a nodal

    officer preferably GM (Environment)/ HOD (Mine Closure Org.) of the

    subsidiary at the Head Ouarters. Below this Officer will be the Area Nodal

    Officer, preferably HOD (Env.) of the Area. The organization of the HQ

    and area will consist of executives lrom Finance, Civil, E&M, Mining and

    Survey. Organization chart is given below:

    Mine Closure orqanization at HQ Level

    Team should keep the accounting of technical and financial impacts of

    different mine closure activities stated in Mine Closure Plan.

    rnri-a .l^o!,. .r.^iGM (F-nv) / HoD

    Finance Civil SuncrF.&\4

    Page-51 Mining Plen for Jhingurdah OCP

    Mine Closure Organization at Area Level:

    E;r", _l

  • The company should also prepare accounting methodology by introducing

    separate code for each activity. All the expenditure should be booked

    under the said pretlxed code as also suggested by Finance Division.

    This will help CMPDIL or any other agency under Mine ClosureGuidelines to monitor mine closure activities of any mine of Production

    CoFpany. Company should have sufficient documentary evidences for

    reirFbursement from the Escrow account (duly signed by the above MCP

    corhmittee) after each progressive stage as well as after final stage of

    mine closure. Apart from above documentary evidences monitoringshould also include the following:

    (i) Satellite imagery of plantation.(i0 Audio - Visual documenlation of different mine closure activities.

    As ber final MCP. provision of additional fund to be added/assessed and

    included in final MCP. For abandoned and closed mines if there is noprovision of escrow accounl the subsidiary has to provide fund asrequired.

    Prdvision for Mine closuro

    Thd mine owner shall be required to obtain a mine closure certificate from

    Coal Controller to the effect that the protective, reclamation andrehabilitation works in accordance with the approved mine closureplan/final mine closure plan have been canied out by the mine owner for

    surrendering the reclaimed land to the State govemmenl concemed.

    The balance amounl at the end of the final Mine Closure shall be released

    to rhine owner on compliance of all provisions of Closure Plan duly signed

    by lhe mine owner to the effect that said closure of mine complied with all

    stalutory rules, regulations, orders made by the Central or Stategovernment, statutory organizations, court elc. and duly certiried by the

    coal Controller. This should also indicate the estimated extractable coal

    restrves and coal aclually mrne out.

    Page-52 Mining Plan for Jhingurdah OCP

    8.0

  • lf the coal Controller has reasonable grounds for believing that theprotective, reclamation and rehabiiitation measures as envisaged in the

    approved mine closure plan in respect of which financial assurance was

    given has not been or will not be carried out in accordance with mine

    closure plan, either fully or partially, coal controller shall give the mine

    owner a written notice of his intention to issue the orders for forfeiling the

    sum assured at least thirty days prior to the date of the order to be issued

    after giving an opportunity to be heard.

    Page-53 Mining Plan for Jhlnqurdah OCP

  • -n

    LOCATION PLAN

    it -.*--.-=-=\

    I

    !-

  • I

    :

    +

    rl7l

    I-s l-T--ITlo.l=

    'n

    'l@

    dd

    c-

    \

    0.

    o

    (

    ,l

    K\

    7-

    +,

    +

    +

    :

    + +

    +

  • +

    1

    i! 1

    ,

    I

    ?I:

    g

    +--s.I

    I

    it-f_

    I

    (

    t,I

    B

    7

    +

    +

    +II

    I:

    ll

  • ii

    !

    v/

    i

    i

    itt

    lI

    I

    II

    il

    I

  • l,'lNAt. QIIARRY t-AYout SL,C',IION

    u PLATE . 5(A)Norll Hl,RN ( (){l.tr it,DS LrMll rD

    au.RrYcRosssr(noi rN

    :Url

    I

    ]-,JJ

    tf

  • =

    zc

    I

    l

    /

    q

    c

  • a

    =

    I+

    I

    h

  • t tt ?I r? ?l? ? I?? ?t

    ?I? , I? ??

    I, ??

    ?ta

    ?t? ?

    ????

    l????t r?? r

    I'.??

    t?

    t??

    ? ?t?

    "?tl?t??

    t?

    ??

    ??

    ?"? i??ll ,??? ,

    t"tt

    "t;rtQ

    ? ??,E

    ???? ?? ta? ??

    ?I

    t?

    ? t?l

    F$-.\-" )

    v+

    i

    r<

    l"

    I

    I

    t!!lI

    CulloDer lo|{'l ttUtali CoALFtEtDs l,tvn tiD

    s!b.,". LAND rDclaM TtoN pLAr

    ) l.l# I

    + + -t-

    t

    -

    F

    t

  • {

    ANNEXT URC - 7

    {Ai !ffi

  • G

    |' .: .,(. I 1rC1Sl1r1/2m3-lAn (M)

    Golad4st of lid'.i'n ltrY or E.wdm.nt a^d fo€s!5

    !o!, Faa, t.' o€ r ! Io 001

    satt::\€:] Y./ ?5o5

    O'r.

  • orh.66n oI the rorni€ rll !t tll t{ or oum$ .n6 oa b.6ie to ctccr rn-dl .iln 3talon rtwrd b€ b6.d 6n d. r. i l. dat!G.s bclt .hodd b. .e.d t, hn oy oanr.o th. n.iw30d tw.d ir til .o. 6 4m9 gt€ , cHp. ..ronv .. n @run r6nwrn ora l@loFo / Al.to q! o€r..tm6t thp d.^sw ot the llG shouro b.ra,6d 2500 d.m! oi h.,. p.!Fd .cttunty irtlE Foi@€.i slr.br. .d*tuao. o..s!83 roalom.it 9r!md Erlr racrc h ft. .o. L. dnsuruno. rtrh $. Re94n.!,ctDr, c6t6r 6@nd tv.!e. ad^dr.CU[r fion,ton.o o, o.s"d st r ra{r .^! q!. ty sh&r, * 4-.d od by.n U'$,nl , n.twork oa cLtlnC relk and .oirl.!d,nqdurnE ft€ o,Ing op.rdn Th. Mita..C.hd,. b..a-,el ou! lcur nn6 'nit ve, - od-dorE@n (rtf,Lx.y), mo6@h {Aueurt), @st mon5o.{rbwemh.i) and sntr ()[email protected]) .M trE 6!t r^6 .orr..t 6 fay b. ..t4oulany t fioEr. cFrr.r G..!na w.6

    ^chdrt.Endr6rd.rd r!!a eoa'd

    ()

    (iv)

    6 .!bF

  • 1/t- w

    iv) rlqIv€ drst .mc$o"tmon't ren rnd Jdt2 [email protected] pr.9€r1y. w.ter spr.y.o araaeedenls e. harroadt/ waloi:ordri!, drmps, ro.drno & u.rdd.g 9..rs sio

    (Y)st

    ^o.rds reorrc's ena.qd rn br.sum a.d dnn,n! oDerlrc^r oDe.arcrs ot

    HEfiH, et. snoL ! be D"ov@€d {th s. prws/mufis

    lv,l rdu*,ar w.

  • @BebB.r@rd b. k.!a !nd.r ont6r ..d r.g!l.ny mon!!s€o.

    lo oretulltd lid !.!Ediqr d.idrm.nd f.u r(h n bdr,l&or.d, ?vdrd .id !..cl.9ott!d h d{ .rldv are. m .onsklM xnt drdEr.d ro.6t .ind.6 ldn ra. t!. 61*{.tr or ad.nq€..6 f.oorrald ba F.o.6d .nd anlniE d b rr. fi6r.t v .nd it' R.!'onrr cll'e alfln

    ^ ri€r i'e cr@- t{.6 .t,nS *ii r,.ad. o. co.rur Fud shoou b.

    runnil.d b th. rirr.r3try of Eddmq* tr r66t5 s y.a6 Ln .dvatre or n@ltue d6@ to .oo.ov.l.

    116

    ll

    rt€ @F( &rtdA ihqro ner tb r.r., r.qui?Fer o .(dtu, rir.ce(r)rir 6* $E v'lhqe *rs 06 dil .lr to d.,r.t6rl9 or 1r r'.e

    +m.so" i6- !h€ @o.r.d .,.,r,lonr! .iEd b. oh.,m ,o. d..r., o'*.rq frF a-!6d 6.n v hnr srF6r lb. do.Gt. *

    (ol n ndl,E er.rrlq€ oG !rov6.d wrdr .dq!.re .urb€, d h.!h .n

  • n:

    3 D6trtd co kor 5 ah, oGtrta, r.dfu? F.d.3h

    il

    I

    I

    :

    (r! 0 rne DrcF

  • -

    L./'(

    chEl Gq@r HanalEr, c@l lhn,a L6tted,4cr3, sLrv.G.rnhi xag, ,td oclni l1o 0!1

    ,,r'n rtrv ol E.vionoant lt FNst!/ Et DrvE@n, New Deli

  • ANNexTaRE - 2!,

    r M.1,. l,.llutior CoDrn Bo.rdE-5, Aror, Cinoi\

    P,narrnh P!ns,r, BhoD.l - 16 Ml,Tcle : (t5+2{66191. !ar-11755-2rc712

    var-IDrr lA/s,): 31/o1larcv^uDrr tH): 30/ r r/ 2o2

    ofcon*rl udcr rctio 25 ofrhe wster (PEvelaion & crntrcl ofPollqtiotr) A.t,l9?.4 oderAir (Prevtntion & C.nt6l of Poll utioD) a.t t9t1and auiln'riz.tioh und€r Uazardou( and olh&

    & THnsboud.ry Mo!.hent) RuI.s, 2016.Appli..rion R&ipt No 321a94 Dt z$ltlD$ll.Rei YnuronliM

    yoE above appu.ati@ litr 6eual ot @Bl h6ta @tsidd.dbdqtte ald,eidAdsdd distin8nl6 th6m Th.M PW6te Rul6 6 relirr€d abovq up !o ll&r2018 subjct 1o Oe liriiuhall of the terms & @dilims, qclosed *ilh tlus le1lq ed

    Cdlrol Bed has asst to grmt 6rht Mder Air ad WaiE Ac! & ruLhdMt@ wrtq laEdols

    dn6r td !1 stolt onb. h at.a,e lJryt thp bdhtis up 1o 3lm124la and tls to be Eadl before apiry of @st i€ridiry or in€ alpliatid droreh

    fe6 in tliis rcsard slEI bc sbmi&d to this ofie 6 mMlhs before .ryiry ofthe .onerAuthdiztidB@d rc$fi6 rhe ri9.lt

    ' CM.ttiN @.t rr C@diiN un lat' C .lnifu dd.t

    @ed/cecel / revoke the atDve @Ddilim in IE t d snob as aid st'a requncd

    aon\enr No A\IH r-ll? V

    /#,*,cHD a,36. NULL.INDORE- 4520r0, MADHYA PRADESII

    MembcrS..r.rnr\c s'End On 2,1 l0 201- 12 J5.2i'

    (orsani. Auth.nti.otion on,{ADHAR frcm UIDAI rkrrer)TPAV # FO155R2K.I

    ,d Vrlidih:30/: ID{1X2. Ourt.rd No:5ar35.2rrl{v2ltl?. I PAV # FOISSRII(i

    ,€,

    Poduct CCA Qty5.0 Milii@ ToE Per year

    . ssnsd Gt'rftrr skmiur. NoT ..quis)

    7

  • Coflsent Order M P Pollurion (onrrol 8,,E-5, Atu.a (i'lon:

    Parya\.nn Pans2r, Bhopal - 16 Ml'T.:L r 0?5!2d66191. Far {1755-21(n7{2

    CO]YDI?IO,VS PTR TO WATER IPREW'IIION & CONAEOZ oF poit/-ufloN ACT 7974I Tle daly q@li1y ot t att efltMl al our fall ottE uri( shall not dcat 1275 (tO KL/da!, aid the daily qumfr! of*s!sc br ou toll ol tfi{.r $aI nor'a@ed M0.040 Kl rdr\z Tradc Efil@l lrc.hsl:-The apptcml slull frouite conprdflsive emuerl lratnen *s1dn and $arta fic me ]tqrqly 10 achieve folhwh8

    I'or.thd pannam s*.dt eqtu dt of dska'g.6 n rifud utL, EPA$ I9E6 sh4ll b. oPPlkobl43.&rag€Trc.tment:'neappllcantshauFovrdetumflchosivcswaetrelJrstsys(tuddmintainrle$mertropqiy 10 a.hide follo$Dg s&dard$

    Sr

    2

    I n6r / tjt.EiL \lkhing

    4 The efllual dEll he tr€ted up to Fs.ibrd standdds dd de in 0t FilGi for cooling ad fd grd b€ltdelolvdergedoing wi0in p.mis. tl6ce 260 di$iDrgc .ddiaion $all be Felied. L no ce t€ated eflluGt $allbe disch