a vision for the island county fairgrounds and a plan...

99
A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN TO ACCOMPLISH IT Prepared by: Martin Matthews Langley, Washington For The Port of South Whidbey January 12, 2016

Upload: others

Post on 27-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN TO ACCOMPLISH IT 

 

Prepared by: 

 

Martin Matthews 

Langley, Washington 

 

For The Port of South Whidbey 

January 12, 2016 

 

Page 2: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

 

2495 Goss Lake Rd, Langley, WA  98260  360‐331‐2996  [email protected] 

January12,2016

TotheCommissionersofthePortofSouthWhidbey:

Theessentialingredientsforanyprojectarethevisionoftheendresultandtheplantoaccomplishit.Thevisionisthecementthatholdstheplanandkeepsitorientedtotheendobjective.Itisthefoundationandtheplanflowsfromit.

Theplanisdynamic,atoolwhichprovidesthepathfortheprojectoveraperiodoftime,butitmustremainaresponsiveandflexibletool,adaptingtoeventsastheyunfold,alwayswithaneyetothevisionoftheprojectandtheendobjectiveitprovides.Inthetenyearsoftheplanmanyunforeseeneventswillimpactitandtheplanmusthandlethosewithinthevision,andthebroaderoutlineoftheplan.

Theprimarytaskistosimplyunderstandthevision,adjustitasneeded,andcommittoit.ThisagreementisneededbothbytheFairgroundsleadersandthelargercommunityforittobeavitalpartsupportingtheplan.ItisacommitmenttothefutureofthisvaluableWhidbeyIslandasset.

Inthevisionandplanthatthatisattached,entitledAVisionfortheIslandCountyFairgroundsandaPlantoAccomplishIt,IwilllayouthowIbelievethevisioncanbeachieved.Itoffersthreealternativepathsorscenariosforhowthevisioncanbemadearealityby2025.

IhavespentmanyyearsandenjoyedbeingaparticipantinmanyFairgroundsactivities,andIamhonoredtobeabletoparticipateinthiswayandtocontributetotheFairgroundsfuture.

OverthelastsixmonthsIhavededicatedmyselftolearningeverythingIpossiblycanaboutfairgroundsingeneralandtheIslandCountyFairgroundsinparticular.Ihavevisitedsevenotherfairgrounds,talkedtomanydifferentpeopleaboutthesubject,andobservedorparticipatedinmostFairgroundsactivitiesduringthattime.Addedtomyhistorywiththegroundsandbusinessplanningingeneral,IbelieveI’mwellpositionedtoseethevisionandwritethisplan.

Intheattachedplan,thereareanalmostinfinitenumberofalternativestothethreescenariosdescribe.Ibelieve,though,thatthethreechosenarerepresentativeofwhatmightberealized.

Thanksagainforgivingmethisopportunity.Ihaveenjoyeditgreatly.

MartinMatthews

Page 3: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page ii 

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

This Page Intentionally Left Blank 

   

Page 4: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page iii 

Port of South Whidbey 

Table of Contents List of Tables ................................................................................................ v 

List of Figures ............................................................................................... vi 

Acknowledgements ..................................................................................... vii 

VISION AND OVERVIEW ............................................................................... 1 

PLAN IMPLEMENTATION ........................................................................ 5 

Fairgrounds Marketing Plan ........................................................................ 5 

General Marketing .................................................................................... 5 

Targeted Marketing .................................................................................. 6 

Marketing Tasks ........................................................................................ 6 

Fairgrounds Demographics ....................................................................... 7 

Where Do Users Come From? ................................................................. 7 

What are the User Characteristics? ......................................................... 9 

What Do Users Like To Do? ................................................................... 10 

Fairgrounds Business Plan ........................................................................ 11 

Hire a Capable Staff ................................................................................ 11 

Bring in New Business ............................................................................. 11 

Raise Essential Capital ............................................................................. 12 

Fairgrounds Renovation Plan .................................................................... 13 

Tasks Needed to Renovate the Fairgrounds ........................................... 14 

Prepare Landscaping and Architectural Plans ....................................... 14 

Cleanup and Beautify the Grounds ....................................................... 16 

Study Solar Power ................................................................................. 16 

Upgrade Fairgrounds Signage ............................................................... 16 

Repair, Revitalize, and Replace Buildings .............................................. 17 

Handle Storm Water and Bluffs ............................................................ 17 

Upgrade Both Kitchens .......................................................................... 18 

Improve RV Park and Campgrounds ..................................................... 18 

Improve and Add Parking ...................................................................... 18 

Add a Roof to the Arena and Improve the Footing ............................... 21 

Provide Shelter and Care in Emergencies ............................................. 21 

Using a Volunteer Work Force ................................................................ 21 

   

Page 5: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page iv 

Port of South Whidbey 

FAIRGROUNDS FINANCIAL PROJECTIONS ................................................... 23 

Capital Investment .................................................................................... 23 

Possible Capital Investment Estimates ................................................... 24 

Fairgrounds Revenue ................................................................................ 26 

RV Park and Campgrounds ..................................................................... 26 

Major Art Exhibit ..................................................................................... 29 

Major Swap Meet / Garage Sale ............................................................. 29 

Major Music Concerts and Festivals ....................................................... 30 

Weddings ................................................................................................ 30 

Smaller One‐Building Events ................................................................... 31 

Full Fairgrounds Events ........................................................................... 32 

Building Rental ........................................................................................ 32 

Kitchen Rental ......................................................................................... 33 

Boat and RV Storage ............................................................................... 33 

4‐H Programs .......................................................................................... 34 

Equestrian Events ................................................................................... 34 

Annual Fair .............................................................................................. 34 

Miscellaneous Income ............................................................................ 35 

Fairgrounds Expense ................................................................................. 36 

Payroll Expense ....................................................................................... 36 

Utilities Expense ...................................................................................... 36 

Marketing Expense ................................................................................. 37 

Tax Expense ............................................................................................ 37 

Other Expense ......................................................................................... 37 

APPENDICES ................................................................................................ 45 

A. Fairgrounds Buildings .......................................................................... 47 

B. CERB Requirements ............................................................................ 65 

C. Relevant Property Information ........................................................... 73 

D. Sources of Possible Grants and Loans ................................................ 77 

 

 

   

Page 6: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page v 

Port of South Whidbey 

List of Tables 

Table 1: Cumulative Projected Loss or Surplus ....................................................... 3 

Table 2: Possible Capital Investment Estimates ..................................................... 3 

Table 3: Attendance Distribution by ZIP Code ........................................................ 8 

Table 4: Interest in Events .................................................................................... 10 

Table 5: Vision Paths ............................................................................................. 12 

Table 6. Possible Implementation Task Scenarios ................................................ 15 

Table 7: Estimated Capital Investment Scenarios ................................................ 25 

Table 8: RV Park Revenue stream ......................................................................... 28 

Table 9: Major Art Event Revenue ........................................................................ 29 

Table 10: Major Swap Meets and Garage Sales Revenue .................................... 30 

Table 11: Major Music Concerts and Festivals Revenue ...................................... 30 

Table 12: Weddings Revenue ............................................................................... 31 

Table 13: Receptions and Smaller Events Revenue .............................................. 32 

Table 14: Full Fairgrounds Events Revenue .......................................................... 32 

Table 15: Building Rental Revenue ....................................................................... 32 

Table 16: Kitchen Rental Revenue ........................................................................ 33 

Table 17: Boat and RV Storage Revenue .............................................................. 34 

Table 18: 4‐H Program Revenue ........................................................................... 34 

Table 19: Equestrian Revenue .............................................................................. 35 

Table 20: Annual Fair Revenue ............................................................................. 35 

Table 21: Miscellaneous Revenue ........................................................................ 35 

Table 22: Fairgrounds Financial Projection – Conservative  ................................. 38 

Table 23: Fairgrounds Financial Projection – Middle‐of‐the‐Road ....................... 40 

Table 24: Fairgrounds Financial Projection – Aggressive ..................................... 42 

Table 25: List of Fairgrounds Buildings and Areas ................................................ 47 

Table 26: Fairgrounds Plan Jobs Creation—Conservative  ................................... 69 

Table 27: Fairgrounds Plan Jobs Creation—Middle‐of‐the‐Road  ........................ 70 

Table 26: Fairgrounds Plan Jobs Creation—Aggressive ........................................ 71 

 

   

Page 7: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page vi 

Port of South Whidbey 

List of Figures 

Figure 1: Cumulative Projected Loss or Surplus ..................................................... 3 

Figure 2: Possible Capital Investment Estimates .................................................... 3 

Figure 3: Attendee ZIP Code Distribution ............................................................... 8 

Figure 4: Median Age .............................................................................................. 9 

Figure 5: Educational attainment ........................................................................... 9 

Figure 6: Mean Income ........................................................................................... 9 

Figure 7: Event Interest ......................................................................................... 10 

Figure 8: Fairgrounds Current and Potential Parking Areas ................................. 19 

Figure 9: Kwarsick 30 Vehicle RV Park Plan .......................................................... 26 

Figure 10: RV Park / Campground Growth ........................................................... 27 

Figure 11: September 2015 Fairgrounds Wedding ............................................... 31 

Figure 12: Thanksgiving Dinner in the Pole Kitchen and Dining Room ................ 33 

Figure 13: Fairgrounds Financial Projection – Conservative ................................ 39 

Figure 14: Fairgrounds Financial Projection – Middle‐of‐the‐Road ..................... 41 

Figure 15: Fairgrounds Financial Projection – Aggressive .................................... 43 

Figure 16: Island County Fairgrounds from Google Earth .................................... 48 

Figure 17: Fairgrounds Current and Potential Parking Areas ............................... 75 

 

   

Page 8: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page vii 

Port of South Whidbey 

ACKNOWLEDGEMENTS 

InpreparingthisplanIhavereceivedsubstantialassistanceintermsofinsight,

knowledge,andinformationaswellasmanysmallandlargekindnesses.Forallofit

Iammostgrateful.Theplancouldnothavebeendonewithoutit.Amongthose

responsibleforthisverygreathelpare:

CurtGordon Chairman,PortofSouthWhidbey

EdHalloran Commissioner,PortofSouthWhidbey

JackNg Commissioner,PortofSouthWhidbey

AngiMozer Exec.Dir.,PortofSouthWhidbey

MeleneThompson FairgroundsPropertyManager

JimLux FairgroundsMaintenanceManager

HelenPrice‐Johnson Commissioner,IslandCounty

JasonKalk FairAssociationPresident

WendySundquist FairAssociation

RayGabelein FairAssociation

GwendyGabelein FairAssociation

DianeDivelbess FairAssociation

VirginiaKeck FairAssociation

CarolCoble FairAssociation

KileyGrant FairAssociation

KimLarson 4‐H

SandeyBrandon RetiredFairgroundsManager

DanOllis Owner,WhidbeyCoffee

FredMcCarthy RetiredMayorofLangley

TimCallison Mayor,CityofLangley

MichaelDavolio RetiredPlanner,CityofLangley

KathyMcLaughlin‐McCabe Exec.Dir.,GoodCheer

DamianGreene SouthWhidbeySchoolBoard

RonNelson Exec.Dir.,IslandCountyEDC

HarrisonGoodall Historian

RobertLowery StructuralEngineer

GregGillis Builder

RickBrown Architect

PaulSamuelson RetiredMayorofLangley

Page 9: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page viii 

Port of South Whidbey 

LarryKwarsick RetiredMayorofLangley

TimLawrence WSUExtensionAgent

ElaineMarlow BudgetDirector,IslandCounty

RustyPalmer Chief,SouthWhidbeyFire/EMT

BobMcCaughn BuildingInspector,CityofLangley

FrankMestemacker SeattleCentralCommunityCollege

WaltBlackford PugetSoundEnergy

ToddWilliams President,eCameron,Inc.

TomBaenen RetiredPresident,GreenbankFarm

PageGilbert‐Baenen

KathleenLandel

RonDonovan

CaroleMatthews

InadditionIwaskindlyhostedbysevenfairgrounds,theirmanagersandstaff:

EvergreenStateFairgrounds,HalGausman,Manager,Monroe,WA

JeffersonCountyFairgrounds,BillMcIntire,President,PortTownsend,WA

ClallamCountyFairgrounds,ShariLoffrida,Manager,PortAngeles,WA

SkagitCountyFairgrounds,AricGaither,EventCoordinator,Mt.Vernon,WA

Stanwood‐CamanoFairgrounds,BelindaRoyal,Manager,Stanwood,WA

NorthwestWashingtonFairgrounds,JimBaron,GeneralManager,Lynden,WA

KittitasValleyEventCenter,MickeyWebb,Director,Ellensburg,WA

ToallIsendaheartfeltthanks!

Page 10: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016    Page 1 of 90 

Port of South Whidbey 

A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN TO ACCOMPLISH IT 

VISION AND OVERVIEW 

TheIslandCountyFairgroundsisauniqueandvaluablecommunityassetthatprovidesWhidbeyIslandwiththespace,buildings,andinfrastructuretocarryouttheWhidbeyAreaFair,theprogramsof4‐H,andprovidesopportunitiesforeconomicdevelopment.AttheheartoftheFairgroundsisrespectforitsheritageandhistoricbuildingsandtheuniqueruralcharacterandenvironmentofWhidbeyIslandandtheCityofLangley.

DuringthenexttenyearstheIslandCountyFairgroundswillbecomeanattractiveandvibrantcommunitygatheringplaceforrecreation,education,andentertainmentinadditiontohostingtheWhidbeyAreaFairandmany4‐Hactivities.Itwillalsobeanactivesourceofeconomicenhancementandstimulationfortheareawhilebecomingfinanciallyindependent.Indoingthisitwillretainpublicrespect,thehistoricpreservationofitsbuildings,andexemplifyallthebestofWhidbeyIsland.

TheFairgroundsattheendofthisplan,in2025,willhave:

AnenhancedWhidbeyAreaFairbringinginincreasinglymorefairgoersandrevenuewithrenovatedbuildings,enhancedandbeautifiedgroundswithacommonthemeand“look,”anupgradedRVPark,andimprovedparking.

Frequent,exciting,andinvitingeventsincludingmusicfestivals,garageandyardsales,wineandcheesetasting,gardeningshows,autoshows,andfarm‐to‐tableeventsonattractivegroundsandinappealing,heatedbuildings.

Manyequestrianeventsandotheroutdoorexhibitsinamultipurposearenawithimprovedarenafooting.

Numerousweddings,receptions,parties,conferences,andexhibitsinrenovated,heatedbuildings.

AnattractiveRVParkandCampgroundswithitsownbathroomfacilitiesandimproved,winterizedhookupswith50amppower,water,andsewerforallRVs.

Adequateautoparkingthatprovidesagoodrevenuesource. Increasedbuildingandgroundsrentalwithfulltimeuseofbothcommercialkitchens

andlongertermleasesforseveralofthebuildings. Acommittedanddedicatedvolunteerworkforce(similartoHeartsandHammers)that

willdrawthecommunityclosertotheFairgroundsandhelpwithmaintenanceneeds. Afacilityavailabletothegeneralpublicforshelterandcareduringemergencies.

Page 11: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 2 of 90 

Port of South Whidbey 

TheplantofulfillthisvisionfortheFairgroundscanbesummarizedinfourmajorefforts:

AcquiringfundsnecessaryforcapitalandoperatingneedsinordertorenovatetheFairgroundsandbringituptowhereitneedstobetoattractevents,activities,andrentalsforseveralareasofthebuildingsandgrounds.

FindingandhiringaFairgroundsmanagerofconsiderabletalentandskill,motivatedtofulfillthisvision,experiencedineasilyworkingwithandmanagingothersaswellaswithsignificantprojects,andabletomanagethegrowthoverthecomingyears.

Carryingoutamajormarketingcampaignwhileenlistingthesupportandbackingofthecommunityandbringinginsubstantialnewbusinesswithcommunityforums,anewwebsite,socialandtraditionalmediatools,andpublicrelationsefforts.

Creatingdetailarchitecturalandlandscapingthemesandplans,andundertakingtheworkcalledforinthoseplansforanextensiveupgradeoftheFairgroundswhilekeepingmanyofthebuildingsandrespectingthehistoricalheritageofthegrounds.

Sinceitsinception,theFairgrounds’majorfocushasbeentheannualFair,4‐Hprograms,andequestrianevents.Thebuildingsandinfrastructurewereconstructedforthosepurposesandthathasbeentheirprimaryuse.OverthelastnumberofyearstheFair,4‐H,andsporadicotheruseshavenotprovidedtheincomeneededtomaintainthebuildingsandtheCountyhasbeenunabletomakeupthedifference.Asaresult,thebuildingshaveincreasinglyfallenintodisrepairandsomeoftheproposednewusesrequirechanges,includingremodeling,heating,andelectricalwork.

Reversingthistrendwillbeaccomplishedinstagesoveraperiodoffivetotenyearsdependingonhowquicklythemoneycanberaised,theworkcanbedone,andthesuccessofthemarketingeffort.Inallcases,absentsomemajorwindfall,theFairgroundswilloperateatalossfortwoormoreyears,andrequireamajorcapitalinvestment.

Tocompensatefortheunknownsinimplementingthisplan,asjustdescribed,threealternativefinancialprojectionsandcapitalinvestmentestimateshavebeenpreparedcoveringconservative,middle‐of‐the‐road,andaggressiveprojectionsandestimates.Table1andFigure1showthecumulativelossorsurplusovertenyearsforeachofthealternates.Also,asignificantcapitalinvestmentwillneedtobemadetorenovatetheFairgroundsasshownwiththreepossiblecapitalinvestmentestimatesinTable2andFigure2.ThedetailbehindthesenumbersisdiscussedlaterinthisdocumentintheFairgroundsFinancialProjectionssection.

Thenumbersintherevenueandexpenseprojectionsandespeciallyinthecapitalinvestmentestimatesareonlyrepresentativeofpossibleoutcomesandarenotstatementsofwhatnecessarilywillhappen.Thecapitalinvestmentsinparticulararesubjecttofinancing,inflation,andpriorityatthetimetheyareconsidered.

Page 12: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 3 of 90 

Port of South Whidbey 

 

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Conservative (70,379)$     (142,588)$  (206,576)$  (228,105)$  (206,921)$  (102,434)$ 

Middle of the Road (54,180)$     (121,799)$  (164,206)$  (165,798)$  (121,482)$  14,563$     

Aggressive  (73,909)$     (132,992)$  (162,845)$  (114,775)$  11,365$      228,232$   

Table 1:                                 Fairgrounds Cumulative Loss or Surplus

 $(300,000)

 $(200,000)

 $(100,000)

 $‐

 $100,000

 $200,000

 $300,000

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Figure 1:              Fairgrounds Cumulative Loss or Surplus

Conservative Middle of the Road Aggressive

Table 2:                                      Possible Capital Investment Estimates

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Conservative 150,000$     380,000$     655,000$     805,000$     1,805,000$  1,855,000$ 

Middle  280,000$     725,000$     1,600,000$  3,100,000$  4,150,000$ 

Aggressive 380,000$     1,450,000$  3,850,000$  5,900,000$ 

 $‐

 $1,000,000

 $2,000,000

 $3,000,000

 $4,000,000

 $5,000,000

 $6,000,000

 $7,000,000

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Figure 2:                           Possible Capital Investment Estimates                 

Conservative Middle Aggressive

Page 13: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 4 of 90 

Port of South Whidbey 

Carryingoutthisplanwillrequiresignificantdedicationtothevisionandadherencetotheplanbyalltheindividualsinvolvedwiththisproject,butmostimportantlybytheFairgroundsManager.Itwillalsotakesignificantperseverance.ThelinesinFigure1maylookencouraging,butinrealitythatsmoothpathseldomhappensandallinvolvedhavetobereadyforsomelowsalongwiththehighs.TheFairgroundsisacomplexentitywithbuildingsapproaching80yearsoldandmanypassionatepeoplewhohaveinvestedagoodpartoftheirlivesintoit.Witheffortandcareandawillingnesstoworkthroughunknownbutprobableroadblocks,thevisiondescribedherecanbeachievedandprovideWhidbeyIslandwithanassetofsubstantialvalue.

ThegreatestbenefitofthisplanistheeconomicimpactitwillhaveonWhidbeyIsland,theSouthWhidbeycommunity,theCityofLangley,andontheFairgroundsitself.AstheFairgroundsactivitiesandrevenuegrow,itwillneedtoaddstaffandmorepeoplewillbedrawntoWhidbeyIsland,SouthWhidbey,andtheCityofLangley,increasingtaxdollars,theuseofhotels,motels,inns,andB&Bs,aswellasrestaurants,drinkingestablishments,shops,andotherestablishments.Thisinturncausestherelatedestablishmentstoaddemployeesandcreatenewestablishments,withsignificanteconomicimpacttoallinvolved.Thisimpact,whichcreatesatitspeakover113jobsisshowninthetablesinAppendixB.

ThecurrentleaseeoftheFairgrounds,thePortofSouthWhidbey,isinastrongpositiontooverseetheFairgroundsthroughouttheimplementationofthisplanbecause:

ItsprimarymissioniseconomicdevelopmentanditcanseetheimportanceoftheFairgroundsasapartoftheoverallcommunity’seconomicdevelopment.

Itsmanagementstructureisheadedbyelectedofficials. Ithasanon‐goingorganizationalstructurewithlegalresponsibilitiesaccountabletothe

public. Ithastaxingauthorityandtheabilitytoraisefundsthroughtaxinganddebt

instrumentstiedtotaxing. ItisindependentoftheWhidbeyArea/IslandCountyFairanditshistory,oranyother

organization,andthereforeabletobemoreneutralinitsperspectives.

ThereturnontheverysizableinvestmentproposedinthisplanisthatthecommunityassetthatistheFairgrounds,isrestoredandre‐invigoratedforthecommunity’suseandenjoyment.Acommunityneedsinvitingandenjoyablegatheringsitesofvarioussizesandqualities.ThevisionthatisthefoundationofthisplanistoprovidesuchacommunitysiteattheFairgrounds.

   

Page 14: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 5 of 90 

Port of South Whidbey 

PLAN IMPLEMENTATION 

TheFairgroundsPlanisthemeansofrealizingthevision.Ithasthreecomponents:

Amarketingplan Abusinessplan Arenovationplan

TheimplementationofthesethreeplanswillproducetheprojectedfinancialresultsandcapitalneedsdescribedintheFairgroundsFinancialProjectionslaterinthisdocument.

Fairgrounds Marketing Plan 

EffectivemarketingandpromotionoftheFairgroundsisasimportantasanythingelsetobedone.ThroughmarketingpeoplecanlearnabouttheFairgroundsandbecomeawareofitsresourcesandstrengths,aswellasitsactivitiesandopportunities.ItisthewaythattheFairgroundscommunicateswiththegreatercommunityandiscommunicatedabout.

ThepurposesofFairgroundsmarketingare:

ToimprovethegeneralawarenessoftheFairgroundsanditsresourceswithanunderlyingaimtoestablishanappreciationforandacommunityownershipintheFairground.

TocreateaninterestintheFairgroundsevents,buildings,andactivities. TobringpeopletotheFairgroundsforallthatitoffers. Tocreatepartnershipsandallianceswithotherbusinessesandresourcesformutual

benefit.

Marketingwillbeintwoforms:

General Marketing 

GeneralmarketingandpromotionoftheFairgroundswillbedonetobringineventplanners,full‐Fairgroundsevents(wheremultiplebuildingsandsitesareused),communityactivitiessuchasmeetings,receptions,andotherbuildinguses,andtointerestpeopleinvolunteeringontheFairgrounds.Generalmarketingwillhavethesecomponents:

AninteractivewebsitethatpromotesallaspectsoftheFairgroundswithpagesonitshistory,buildings,activitiesofitsfulltimerenters,andmajoreventsputonbytheFairgroundsitself.Itwillincludeacalendarofeventsandactivities,ablog,linkstorelatedwebsites,meanstocommunicate,andalertsandspecialnotices.

AcomprehensivesetofsocialmediatoolsincludingaFairgroundsFacebookpage,TwitterandInstagramfeeds,blogs,ande‐mailblasts.

Page 15: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 6 of 90 

Port of South Whidbey 

Fulluseoftraditionalmediaincludingnewspaperandmagazinearticlesandads,aswellasoutdooradvertisingintheformofsignageandbanners.

Publicrelationseffortsincludingholdingpublicforums,discussiongroups,andfocusgroups,aswellasbuildingpartnershipsandotherrelationshipsandparticipatingincommunityactivities.

Thepublicforums,discussiongroups,andfocusgroupswillbeusedtoexplaintheplan,listentothepublic,gettheirfeedback,seekpublicacceptance,andgenerallyinvolvethepublicintheFairgroundsanditsrestoration.ItwillalsobeusedtoinvolvethepublicintheFairgroundsvolunteerworkforceandgetideasforalternativenamesfortheFairgroundsandforthevolunteergroup.

Inthisplan“Fairgrounds”hasbeenusedtorefertotheproperty,buildings,andinfrastructure,butanewnamemightbesoughtthatwillbemoreresonantwiththebroadercommunityuse.Anewnamewillbestowadifferentimageandexpectationstothesite.

Targeted Marketing 

TargetedmarketingwillbedonetobringinRVparking,weddings,Equestrianactivities,useofthecommercialkitchens,andFairgroundssponsoredevents.Targetedmarketingwillhavethesecomponents:

TargetedwebpagesfortheRVPark,thecommercialkitchens,andeventusageofthebuildings,thearena,andgrounds,alltiedtoaninteractivecalendar,andaone‐sourcereservationsystemthateventuallyincludesevent,ferry,andparking/RVfees.

PostingonFacebook,Twitter,andInstagram,aswellasblogentriesande‐mailblaststhataddressrelatedtargetmarketsandbothopportunitiesandeventsontheFairgrounds.Theselinkdirectlytothespecificwebpagesabouttheevent.

Magazine,newspaper,andplacedbrochureadvertisingforparticulartargetmarketssuchasRVandmotorcycleclubs,equestriangroups,autoclubs,andvariouscollectorgroups.

AttendvariouseventsandgatheringstopromotetheFairgroundsinanumberofgroups,suchasbridalshows,equestrianmeetings,autoandRVclubs,andamyriadofcommunitygroups.

EntriesandlinkstootherWhidbeyIslandwebsitesincludingchambersofcommerce,visitorbureaus,andothersupportingentities.

Marketing Tasks 

ThespecificmarketingtasksthatareneededtoadequatelypromotetheFairgroundsinclude,intheorderoftheirimportance:

Page 16: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 7 of 90 

Port of South Whidbey 

Explainthisplantothecommunitythrougharticles,communityforums,individualmeetings,andholdingapartyonthegroundstoacquaintpeoplewiththeproperty.

Createafirstclasswebsitewiththenecessarypagesandrequiredapplicationsforeventandactivitypromotionwithanalertsystem(emailforupcomingevents),RVParkandeventpromotionandreservations,kitchenandspaceschedulingandrental,andlinkstotheFair,thePort,andtolong‐termtenants’sites.

BuildasocialmedianetworkwithaFacebookpage,TwitterandInstagramfeeds,blogs,andemailblasts.

Generatetraditionalmediaadvertisingforlocalandregionalnewspapersandmagazinesincludingwritingorpromptingthemforarticles.

PreparesignageandbannersfortheFairgroundsandtheCityofLangleytopromotethegroundsandeventsitoritslong‐termtenantsaresponsoring.

DevelopbrochuresfortheFairgroundsRVPark,weddingvenue,sponsoredevents,andequestrianfacilities,andplacethesebrochuresonferries,B&Bs,hotels,motels,andrestaurants.

Attendshowsandexhibitions,suchasweddingshowsandequestriangatherings,topromotetheFairgroundsvenue.

Participateandworkwithotherlocalandgovernmentalorganizationstosupporttheirefforts,taptheirresources,developpartnershipsandsynergisticrelationships,andreachsharedaudiences.

ThroughouttherejuvenationoftheFairgrounds,marketingwillrecognizeandpromotethemanychangestotheFairgroundssuchasbeautification,heatingofbuildings,addedparking,RVParkandcampgroundsupgrade,andthecoveringofthearena,tobuildonthoseaccomplishments.

Fairgrounds Demographics 

ForFairgroundsmarketingtobeeffectiveitmustfullyunderstandandfocusonthepeopleandorganizationswhowilluseit.TheFairgroundsislocatedonthesouthendofWhidbeyIslandwithintheboundariesoftheSouthWhidbeySchoolDistrictandtheCityofLangley.TounderstandthepeoplewhomightattendeventsandparticipateinactivitiesattheFairgrounds,anumberofsourceswerereviewedandseveralsurveysweretakentoanswerthreequestions:wheredothesepeoplecomefrom,whataretheircharacteristics,andwhatdotheyliketodo.

Where Do Users Come From? 

ThefirststepwastoseewherepeoplewhohaveormightvisittheFairgroundscomefrombycollectingtheirZIPcodes.Thiswasdonethroughsurveystakenatthe2015WhidbeyAreaFair,the10‐17‐2015BayviewFarmersMarketandthe10‐24‐2015BayviewMuttStrut.ThedistributionofZIPcodesinthesethreesurveysisshowninTable3andFigure3.

Page 17: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 8 of 90 

Port of South Whidbey 

Table 3: Attendance Distribution by ZIP Code 

   Fair  Market  Dogs 

South Whidbey  51%  59%  75% 

 Central Whidbey  9%  5%  12% 

North Whidbey  10%  1%  6% 

Bellevue, Kirkland  3%  7%  2% 

Seattle  8%  13%  0% 

Everett, Skagit Co.  3%  5%  4% 

All Other  16%  11%  2% 

Figure 3: Attendee ZIP Code Distribution 

   

Approximately50%ofthepeoplewhousetheFairgroundscomefromtheSouthWhidbeyIslandareadefinedbytheClinton,Langley,andFreelandZIPcodes,approximatingtheSouthWhidbeySchoolDistrict.Inthe2010Censusthisareahadapopulationof15,336andagrowthof0.95%peryear.1

Approximately20%ofFairgroundsuserscomefromtheremainderofWhidbeyIsland,theareanorthofSouthWhidbeydefinedbytheGreenbank,Coupeville,andOakHarborZIPcodesandtheCoupevilleandOakHarborschooldistricts.Thetotal2010Censuspopulationforthisareais47,509withagrowthof0.75%peryear.

Theremaining30%ofFairgroundsuserscomefromofftheisland,abouthalffromthegreaterPugetSoundarea,includingthecitiesofEverett,Bellevue,andSeattle,andtheremainderfromallotherareas.ThevastmajorityofthesecometotheIslandviatheWashingtonStateferryfromMukilteotoClinton.ThetotalMukilteo‐Clintonridersin2014were3,834,967,2ofwhichthepercentageofwestboundriderstravelingforrecreational

                                                            1 Source: 2010 Census from the U.S. Census Bureau’s American FactFinder 2 Source: Washington State Ferries annual 2014 Traffic Statistics Rider Segment Report dated 1/22/2015 

0%

10%

20%

30%

40%

50%

60%

70%

80%

SouthWhidbey

CentralWhidbey

NorthWhidbey

Bellevue,Kirkland

Seattle Everett,SkagitCo.

All Other

Fair

Market

Dogs

Page 18: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 9 of 90 

Port of South Whidbey 

37.143.2

52.7

0

20

40

60

WashingtonState

Island County Port of SouthWhidbey

purposesis28%,representing1,108,268ridersor“visitors”totheisland.Ofthesevisitors,roughly60%,or665,000,3stayinSouthWhidbey.Thisisgrowingatabout0.5%peryear.

Insummary,usingtheprojectedgrowthrates,the2016populationfromwhichtheFairgroundscandrawvisitorsis:

50%fromSouthWhidbeyIslandwith16,230people,growingat0.95%/year 20%fromtherestofWhidbeyIslandwith49,680people,growingat0.75%/year 30%fromvisitorsofftheClintonferrywith670,632people,growingat0.43%/year

Whilethesegrowthratesdonotseemlarge,theexistingpopulationsarestilllargeenoughtogetsignificantgrowth.

What are the User Characteristics? 

TohelpdeterminethetypesofeventsandactivitiestobeheldontheFairgroundsandhowtoaimthepromotionofthoseevents,bothintermsofthetypeofmediatouse,aswellasthecontentofthemedia,thefollowingdemographicswerereviewed.

AstudywasdoneforthePortofSouthWhidbeybyBSTAssociatesin2013usingthedataintheU.S.2010Census(thegeographicareaofthePortofSouthWhidbeyisapproximatelythesameastheSouthWhidbeySchoolDistrictandtheZIPcodesofClinton,Freeland,andLangley).Amongtheirfindingsare:

ThemedianageisolderinthePort’sareaat52.7years,comparedto43.2inIslandCounty,and37.1inWashingtonState.

Figure 4: Median Age  

TheeducationalattainmentisgreaterinthePort’sarea,with76%havingsomecollege,vs.71%inIslandCounty,and66%inWashington.

Figure 5: Educational attainment ThemeanincomeisgreaterinthePort’sareaat$78,506peryear,comparedto$71,283inIslandCounty,and$76,504inWashington.

Figure 6: Mean Income

                                                            3 Source: Washington State Ferries 2013 Origin‐Destination Travel Survey, dated August 2014 

$76,504

$71,283 

$78,506 

$65,000

$70,000

$75,000

$80,000

WashingtonState

Island County Port of SouthWhidbey

66%71%

76%

60%

65%

70%

75%

80%

WashingtonState

Island County Port of SouthWhidbey

Page 19: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 10 of 90 

Port of South Whidbey 

What Do Users Like To Do? 

Insurveysdoneduringthe2015ChoochokamandWhidbeyAreaFair,peoplewereaskedwhatkindofeventswilldrawthemtotheFairgroundsoutsideoftheFair.Atotalof1307voteswerecastwiththeresultsshowninTable4andFigure7.

Table 4: Interest in Events  Figure 7: Event Interest 

Event  Votes  Percent 

Music Concert  211  16% Garage & Yard Sale  130  10% Wine & Cheese   128  10% Gardening Show  124  9% Antiques Show  113  9% Holiday Bazaar  105  8% Auto Show  100  8% Dog  Show  92  7% Major Art Exhibit  82  6% Bicycle & Cycling   78  6% Guns and Ammo   77  6% Gourmet Dinner  67  5% 

  1307   

 

   

Music Concert

Garage Sale

Wine & Cheese

Gardening Show

Antiques Show

Holiday Bazaar

Page 20: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 11 of 90 

Port of South Whidbey 

Fairgrounds Business Plan 

Thesuccessofthebusinessplandependsonthreetasks:

Hireacapablestaff.Evenwiththebestplan,ifthestaffisnotuptomakingithappen,itwon’twork.Sothistask,whichhastobethefirstone,isreallythemostimportantone.

Bringinnewbusiness,whichiscriticaltotheabilityoftheFairgroundstobecomefinanciallyindependent.This,ofcourse,insomecases,isdependentonrenovatingtheFairgroundstoattractthenewbusiness.

RaiseessentialcapitaltofundtherenovationsoftheFairgroundsanditsbuildings,whichisnecessarytoattractnewbusinessesandtoreducemaintenancecosts.

Hire a Capable Staff 

Toaccomplishtheworkandbringinthenewopportunitieswillrequireunique,highlyskilledindividualstocarryitoutandexceptionalcooperationamonganumberoforganizations.TheStateofWashington,IslandCounty,theCityofLangley,thePortofSouthWhidbey,andtheIslandCountyFairAssociationmustworktogetherandintheclosestpossibleharmonytorealizethiscommonvision.ThepersonmanagingtheFairgroundsmusthaveoutstandingskillstofacilitatebringingtheseorganizationstogetherwhilefocusingonaccomplishingthetasksneededtofulfillthevision.Hiring,motivating,andretainingthebestpossiblemanagementandstaffwillalsoresultin:

Providingexcellentcustomerservice Maintainingthebuildingsandgroundssotheylookandfunctiontheverybestpossible Handlingfinancestoprudentlymaximizerevenueandminimizeexpenses.

Bring in New Business 

TheFairgroundshasnumerousnewandexistingFairgroundsbusinessopportunitieswitheconomicpotential,includingthefollowing:

RentalofRV/Campgroundsites Majorneweventsincludingfestivals,expositions,conferences,andshows Communityswapmeets,garagesales,andyardsalescombinedwithfoodandbeverage

sales Smallereventssuchasweddings,receptions,auctions,andparties Rentalofbothkitchentimeandavailablebuildingspace Revenueopportunitiesfrom4‐H,equestrianactivities,andtheFair

TherearefourpossiblepathsoverthenexttenyearsthatcanbefollowedbytheFairgroundstorealizetheseopportunities,onlythreeofwhichaccomplishthevisiontovaryingdegrees.TheseareshowninTable5:

Page 21: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 12 of 90 

Port of South Whidbey 

Table 5: Vision Paths 

As Is  Conservative  Middle  Aggressive Make few changes to the Fairgrounds; handle only urgent needs 

Slowly implement changes, putting off major changes until later years 

Implement changes more rapidly, spreading work out over seven years 

Quickly implement changes completing planned changes by year five 

Focus on the Fair and 4‐H and do not significantly add other revenue streams 

Bring in the easiest revenue items first, putting off events requiring more extensive changes 

As changes are made, bring in new revenue activity on a more even basis. 

Bring in new revenue at a rapid pace as changes are made 

Continue the current trend of increasing losses 

Begin to turn around the Fairgrounds’ losses,  but don’t achieve positive income until the seventh year  

Turn around the Fairgrounds’ losses so that positive income is achieved in the sixth year 

Turn around the losses so that positive income is achieved in the fourth year 

Require  very little capital investment 

Require little capital investment at first, but growing over the ten years 

Require a relatively constant level of capital investment over seven years 

Require all capital investment in the first five years 

Require increasing funding from outside the Fairgrounds 

Slowly decrease outside funding  

Rapidly decrease outside funding, ending in year five 

Require outside funding only in the first‐three years. 

Allthreepathsthatleadtofulfillingthisvisionmust:

ImplementtheMarketingPlandescribedearlier UsetheMarketingPlantogainthesupportofthecommunityandbringinnewevents,

activities,andrentalsthatcanbereasonablycarriedoutontheFairgroundstoimproveitsrevenue

MakethechangesneededtotheFairgroundsbuildingsandgroundstoattracttheincomeenvisioned,asdescribednextintheFairgroundsRenovationPlan

Prioritizethechangesaccordingtotheurgencyofthechangeandtheexpectedimpactonrevenue.

Raisethefundsneededtobothmaketheneededchanges,aswellascovertheintermediatelosseswhiletheFairgroundsisbroughtuptoself‐sustainability.

Raise Essential Capital 

SincetheFairgroundsdoesnotandwillnotforseveralyearsmakeenoughmoneytosupportitself,letalonerefurbishandrenovateitsbuildingsandgrounds,themoneytodothatmustberaisedasoneofthefirstessentialtasks.ThereareanumberofsourcesincludingStateandFederalgrantsandloans,ofwhichtheFairgroundsqualifiesforanumber(seeAppendixDforalistofpossiblegrantsandloans),Countyfunds,Porttax

Page 22: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 13 of 90 

Port of South Whidbey 

money,variousdebtinstrumentsthroughthePort,andfunddevelopmentincludingdonations,privategrants,capitalprojects,buildingsponsors,specialevents,andendowments.Anumberofthesesourcesneedtobeworkedtogethertoseewhichoneswillbesuccessfulandbringinmoneyassoonaspossible.Also,severaljoint‐sourcesmaybeneededtocoverlargerprojects.Slightlymitigatingthisneedistheplantouseavolunteerworkforceonasmanyprojectsaspossible.SeethediscussionofthisinFairgroundsRenovationPlannext.

Fairgrounds Renovation Plan 

TheFairgrounds,overthelastseveraldecades,hasnotmadeorreceivedenoughmoneytoproperlymaintainandbringthebuildingsandgroundsuptodate.Also,thenecessaryeffortandmoneyhasnotbeenexpendedtobringinnon‐Fairusersandeventsthatwillhelpthefinancialsituation,andthedeteriorationofthegroundshasnotsupportedthat.ManyofthebuildingswerebuiltforaspecialpurposeduringtheFairandhaveverylimiteduseandincomeabilitytherestoftheyear.Manyofthebuildingswerebuiltinexpensively,causingthemtohaveashorterlifecycleandanumberareendingtheirlifespan.

Thesmallsizeofthegroundshasputseriouslimitationsontheavailableparking,andthusthesizeofevents.Likewise,thesizeandconditionoftheRVParkhasdiminishedthelevelofincomeitcansupport.

Finally,theLangleyandSouthWhidbeycommunityhasnotseenthediamond‐in‐the‐roughthatistheFairgroundsandtakenownershipinit.

ToovercomethissituationandupgradetheFairgroundstowhereitwillaccomplishthevisionwillrequireaccomplishingmanyofthefollowingtasksinapproximatelytheordergiven:

PreparelandscapingandarchitecturalplanstocreateacohesivevisionforwhatwillbeimplementedfortheentireFairgroundsoverthetermofthisplan.

Cleanupandbeautifythegroundswithlandscapingandpainting,includingtrimmingorremovingthetreesthatoverhangthepropertyandbuildingsonthewestside.

ConductastudyonbringingsolarpowertotheFairgrounds. ImprovetheFairgroundssignagetopromotethefeaturesandeventsonthegrounds. Repairandrevitalizesomeofthebuildingsandinfrastructure,aimingtoaccommodate

multipleuseswherefeasible. Handlestormwaterrunoffanddrainage,andbluffstabilization. Upgradebothkitchenswithadditionalrefrigerationandotherequipmentincluding

dishwashers,slicers,andmixers. Addinsulationandheattoseveralbuildings. Addrestroomswithshowersandyear‐aroundwaterhookupstotheCampgrounds.

Page 23: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 14 of 90 

Port of South Whidbey 

Improveandaddtothecampgrounds50Amppower,water,andsewerhookupsandmoresites.

Improveandaddparking. Addotherrestroomsasneededfortheincreasedattendanceatevents. Replacebuildingsthatareendingtheirusefullifewithmultipurposebuildingsthatnot

onlyhandlethepreviousfunctionsbutotherfunctionsthatwillbringinrevenue. Addaroofoverthearenaandbleachers,andimprovethearenafooting,thegroundthat

makesupthearenafloor. Upgradethefacilitiestoaccommodatecommunityemergencysituations.

Thisworkwillbeaccomplishedthroughacombinationofacommunityvolunteerworkforceprogram(similartoHeartsandHammers),sponsorships,contributions,andprivate,County,State,andFederalgrantandloansprograms,andotherfundraisingsources.

TheproposedchangestotheFairgroundslistedabovewillbeimplementedoveraperiodoftimeoffivetotenyearsdependingontheavailabilityoffundingandthetimetodothework.AnoverviewofthreepossiblesetsoftasksandimplementingschedulesisshowninTable6.

Thetasksidentifiedineachtimeperiodaredividedbetweenthosethatareknownandthoseyettobedetermined.Theknowntasksareonesthatmustbedoneeitherurgently,forsafetyorlegalreasons,orbecauseofthepotentialforaddedrevenue.Thereareothertaskswhichhavebeenvaguelyidentified,whichwillbemorepreciselydescribedandprioritizedinthearchitecturalandlandscapingplansyettobedone.TheseothertasksareidentifiedinTable6as“Generalrenovation#1through#4.”

NotethatwhileTable6andthefinancialprojectionsandestimatesshowsometomanytasksstartingoffalmostimmediatelyin“Year1,”theymayactuallystartinyear2orlaterduetothetimeitmaytaketohirethemanager,acquirefunding,contractforthearchitecturalandlandscapingplans,andcompletethoseplans.Thisdelayisverypossibleandshouldnotchangetheendresultoftheplanbyyear10.

Tasks Needed to Renovate the Fairgrounds 

ThetasksthatarelistedaboverepresentabroadrangeofitemsthatmaybedonetorenovatetheFairgrounds.Someofthethoughtandreasoningofwhythesespecifictasksarerecommendedisdescribedinthefollowingparagraphs.

Prepare Landscaping and Architectural Plans  

Asstatedearlierandshownasoneofthefirsttasksineachoftheplanvariantsabove,procuringlandscapingandarchitecturalplansisaveryimportantfirststeptocarryingoutthisplan.Theplansmakesurethatthereisacommontheme,tiedintotherenovationof

Page 24: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 15 of 90 

Port of South Whidbey 

Table 6. Possible Implementation Task Scenarios 

Year  Conservative  Middle  Aggressive Year 1  Get architectural and 

landscaping plans. Begin cleanup and beautify; Improve signage; General renovation #1; Heat Burrier‐west; 

Get architectural and landscaping plans. Begin cleanup and beautify; Improve signage;  Upgrade kitchens; General renovation #1; Heat Burrier‐west;  Handle storm water and bluffs;  

Get architectural and landscaping plans. Begin cleanup and beautify; Improve signage;  Upgrade kitchens;  General renovation #1; Heat Burrier‐west; Handle storm water and bluffs; Renovate Pole dining room; Renovate and remodel Coffman; 

Year 2  Upgrade kitchens; Handle storm water and bluffs;  Renovate Pole dining room; Renovate and remodel Coffman; 

Renovate Pole dining room; General renovation #2; Renovate and remodel Coffman; Add restrooms to Campgrounds; Improve RV layout and hookups; Heat all of Pole; 

General renovation #2; Add restrooms to Campgrounds; Improve RV layout and hookups; Heat all of Pole;  Renovate restrooms; Heat Malone; Add parking; 

Year 3  General renovation #2; Add restrooms to Campgrounds; Improve RV layout and hookups; Renovate restrooms; 

Renovate restrooms;  Heat Malone; Add Solar power; Add parking; General renovation #3; 

Add Solar power;  General renovation #3; Replace Turner and Burrier; Cover arena & replace footing; Replace Horse 1, 2, and 3; 

Year 5  Add Solar power; General renovation #3; 

Replace Turner and Burrier;  Replace Cattle and Grandstand; General renovation #4; 

Year 7  Replace Cattle and Grandstand; 

Replace Cattle and Grandstand; General renovation #4; 

 

Year 10  General renovation #4;     

thebuildingsandthelandscapingtoenhancethebeautyofthewholefairgroundsandgiveitacohesivefeel.Also,theplanswillincludewaystomakefair‐onlybuildingssuitableforalternativeusestoenablethemtoaddrevenueoutsideoftheFair.

Architecturalplansmustuseaspecializedarchitectwhoisfamiliarwithworkingwithhistoricbuildingstomakesurerenovationsaretocodeandfollowthehistoricalternationsrequirements.Thearchitectneedstomakethebuildingsattractive,safe,secure,andfresh,

Page 25: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 16 of 90 

Port of South Whidbey 

suggestingwaystomakethemostoutofwhatisalreadytherewhilerecognizingwhensomethinghastobereplacedorremodeled.

Cleanup and Beautify the Grounds 

LandscapingandadditionalpaintingofthefacilitiesareamongthemostobviousandleastexpensivewaystomaketheFairgroundsmoreattractiveandinvitingforpeopletoattendevents.Withthelandscapingandarchitecturalplansinhand,landscapingcanbegin.Thiswillcreateafeelingofchangeandrejuvenation.Landscapingcanalsohelptocreateabrandbyfollowingathemethroughouttheelementsofthefairgroundsandbuildings,suchas“thevillagebythesea”withanauticaltheme(alsotoreflectthePort)orWhidbeyIslandNativeAmericanswithPacificNWtotempolesatselectedsitesandnativeartonbuildings.Landscapingcanprovidemanysmallerprojectsthatcanbedonebyvolunteers(see“UsingaVolunteerWorkForce”laterinthisdocument)andcanaddtosustainabilitywithraingardensandplantstoreducewaterrun‐off.ItcanraiseawarenessoftheFair’sdedicationtotheenvironmentandbeauty.Itcanhelpstabilizethegroundswithattractivewallsandplantersincriticalplaces.ThisworkwillalsoincludetrimmingorremovingthetreesthatoverhangthepropertyandbuildingsonthewestsideoftheFairgrounds.

Study Using Solar Power 

TheFairgroundscurrentlyspendsover$10,000ayearonelectricityanditispossiblethatthiscouldbeallbuteliminatedbyinvestingapproximately$100,000inasolarpowerinstallation.Anotherlocalinstitutionhasdonealmostexactlythat.Todetermineifthisisfeasibleandcanmakeagoodreturn,astudyneedstobeconductedatacostofapproximately$3,000.Therearegrantsavailabletodothisstudy,aswellasgrantsandloansforthepurchaseandinstallationofasolarpowerarray(seeAppendixD).Also,itispossibleforaninvestmentgrouptopayforthestudyandthepurchaseandinstallationofthesolararray.InthiscasetheFairgroundswouldgetalmostfreepowerandtheinvestorswouldgetthetaxcreditsandtheincomefromsellingsurpluspower.ThisisthesetupwiththesolararraysattheGreenbankFarm.OneobstaclethatneedstobestudiedisthatalmostalltheroofsontheFairgroundsareorientedeast‐westandthemostefficientpowergenerationisonsouthfacingroofs.ItmaybethattheMidwayfoodbooths,whichhavesouth‐facingroofscouldbeusedforthispurposeiftheyaresturdyenough.

Upgrade Fairgrounds Signage 

ThecurrentFairgroundssignagepromotestheFairbuthasnoroomfororabilitytopromoteothereventsorfeaturesonthegrounds.Thisisimportantfortheeventsandfeaturestogetthepublicinterestedinthemandtoattracttheeventsinthefirstplace.Newsignagethataccomplishestheseobjectivesisnotexpensiveandisanimportantpartofanadvertisingprogram.

Page 26: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 17 of 90 

Port of South Whidbey 

Repair, Revitalize, and Replace Buildings 

Repairing,revitalizing,andreplacingbuildingsandinfrastructure,aimingtoaccommodatemultipleuseswhenfeasible,butwithanoverallaimofmakingthebuildingsmoreusableandincome‐producingyeararound.AppendixAdescribeseachofthebuildingsandtheworkthatneedstobedonewitheachtogivethemgreateruseandtoprolongtheirlife.Someofthereasoningbehindtheworkrecommendedinthisplanthatisspreadoverafivetotenyearperiodisasfollows:

Remodel,insulate,andheatthePolebuildingdiningroomtoimproveitsattractivenessandyear‐aroundusebringingdinners,meetings,conferences,andpossiblyanongoingeatinganddrinkingestablishment.

InsulateandheatthewestsideoftheBurriertokeepandupgradethecurrenttenant. RemodelandrenovatetheCoffmanbuildingmainroomandbathroomstoimproveits

attractivenessandusefulnessforexhibits,presentations,andmeetings. Upgradeandremodelbathrooms“A”and“B”toimprovetheirattractivenessand

usefulnessandremoveamajornegativeontheFairgrounds. Renovate,insulate,andheatthePolemainauditoriumandstagetoimproveitsyear‐

aroundusefulnessforconcerts,dances,auctions,andshows. RenovateandheattheMelonebuildingforyear‐arounduseforquiltingdisplaysand

exhibits. RemoveandreplacetheTurnerandBurrierbuildingswithanewsinglebuildingsthat

canbeusedduringtheFairfortheexistingcommercial,cooking,baking,andartexhibits,andforeventsandexpostherestoftheyear.

Removeandreplacehorsebarns1,2,and3withoneortwonewbarnsthatprovidebetterandmoreusablestalls,removedeterioratingbuildings,and,withmovablestalls,providemulti‐usecapability.

RemoveandreplacetheCattlebuildingandtheGrandstandsandreplacethemwithoneortwonewbuildingsthatcanbeusedforcattleandalpacas,andpossiblyotheranimals,duringtheFair,andcanthen,withremovablepens,beusedforevents,andstoragetherestoftheyear.

Handle Storm Water and Bluffs 

ForseveraldecadesstormwatermitigationandbluffstabilizationhasbeenrecognizedasamajorproblemwiththeFairgrounds.Duringheavyrainsthearenafloodsandwatercanenterandevenfloodbuildings,asseenwiththefloodinginCoffmanandwaterrunningthroughTurnerlastfall.AlsothebluffstotheeastoftheCoffmanbuildingandtheSheepbarnandthosetothewestoftheHorse,Cattle,andGoatbarnsareunstableandcouldcollapse.In1996theCountyhiredprofessionalengineerstostudythesituationanddesignaplantohandletheproblems.Theplanwascompleted,buttheworkwasn’tcarriedout.TheplanonlyhandledstormwaterinthesouthernhalfoftheFairgrounds.Aplanneedsto

Page 27: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 18 of 90 

Port of South Whidbey 

bedevelopedandimplementedtohandletheentireFairgroundstobothprotectitandmakeitusableyear‐aroundwithoutdamage.

Upgrade Both Kitchens 

AsurveycarriedoutbyGoosefootindicatedasignificantneedforcommercialkitchensonSouthWhidbey.TheFairgroundshastwosuchkitchens,andaspeoplehavebecomeawareoftheminrecentmonths,theyhaveincreasinglybeenused.Togetthefullestuseofthem,additionalrefrigeration,drystorage,andotherequipmentincludingdishwashers,slicers,andmixersneedtobeadded.

Improve the RV Park / Campgrounds and Add Restrooms 

TheRVParkandCampgroundsrepresentsamajorincomesourcefortheFairgroundsduetoitsclosenesstoLangleyandthewaterfront,butitscurrentuseislimitedbythelackofanearbyrestroom,itsunattractiveness,anditslackoffull‐featuredhookups.Tocorrectthesedeficitsandgetthefullestpossibleuse,thisplanrecommendsthatafullrestroomwithshowersbeaddedtotheCampgroundsarea,thatsomelandscapingbeaddedtomakeitmoreattractive,andthatfull50‐amphookupswithwaterandsewerbeadded.Also,inthelongrun,notinthisplan,thatmorelandbeacquiredforadditionalsites.

Improve and Add Parking 

AmajorlimitingfactorofFairgroundssuccessisthelackofparking!ThebasicfunctionoftheFairgroundsistobringpeopletoitseventsandactivities.Ifparkingisdifficultornotavailable,peoplewillbelesslikelytoattend.BecauseoftheFairgroundslimitedarea(12.8acres)andheavycurrentuseofthatarea,thereisverylimitedspaceforparking.DuringtheFairahundredormorecarsparkalongCamanoAvenue,SandyPointRoad,andEdgecliffRoad.Thisisnotconsideredaviableparkingalternativebecauseitisdangerous,andthelocalcitizensstronglydislikeit.

CurrentandpotentialpossibleparkingareasandtheirnumberofspacesareshownonFigure8andlistednext(usingapproximately80carsperacretoleaveroomforaccessroadsandoddshapes)(seeAppendixCformoreonthepotentialareas).

a. Current Possible Parking Areas:  Spaces 

1. Official,designatedparkingspacesontheFairgrounds(roughly) 402. UnofficialparkingspaceshereandthereontheFairgrounds(veryroughly) 603. RVPark/Campgrounds(morevaluableasanRVPark).85acre 704. Fiddle‐Faddlelawn,veryapproximately.3acre 305. Carnivalarea,veryapproximately.4acre 406. NobleCreekParkandRidelot(perIslandTransit) 64

Subtotalcurrentpossibleareas 304

   

Page 28: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 19 of 90 

Port of South Whidbey 

 

Figure 8: Fairgrounds Current and Potential Parking Areas 

   

Page 29: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 20 of 90 

Port of South Whidbey 

b. Potential Parking Areas:  Spaces 

7. MiddleSchoolplayfield2.2acres(perLanderman‐Moore) 1608. AylottpropertycornerofCamanoandEdgecliff.5acre 409. NoblepropertycornerofCamanoandSandyPoint22acres(use5) 400

10. IzettpropertynorthofFairgroundsroad5.1acres(use2) 16011. AndersonpropertysouthofFairgroundsroad22.6acres(use10) 800

Subtotalpotentialpossibleareas 1560

Totalpossibleareas 1864

Thereareofcourseanumberofstumblingblockstousingthesespaces.Thefirstiswhatelseisgoingonintheareasthatwouldtakeupparkingspaces.Othersinclude

TheRVParkshouldstayanRVParkintermsofmostvaluableuseofthatspace. TheFiddle‐FaddlelawnandCarnivalareamayneedtobeusedforotherpurposesand

shouldbelandscapedtoimprovetheFairgroundsambiance. TheParkandRidelotispublicandmaynotbefullyavailable. TheSchoolDistricthasnotbeenveryopentotheFairgroundsusingtheirsiteoutsideof

theFairwhentheHighSchoolathleticprogramgetstherevenue. TheCamanoAvenueandEdgecliffDrivesoutheastcornerpropertyisnotcurrentlyon

themarketandmaynotbeappropriatelyzoned. TheNobelpropertyisnotcurrentlyonthemarketandmaybeveryexpensive.Italso

maybemorevaluableasanewcampground/RVPark. TheIzettandAndersonpropertiesarenotcurrentlyonthemarket,maynotbe

appropriatelyzoned,andrequirewalkingupahilltogetto.

ThismeansthatcurrentlytheonlyprobableparkingspacesaretheofficialandunofficialspacesontheontheFairgroundsplustheParkandRidelot(assumingnooneelseisparkingthere)providing164spaces.Atthestandardaverageof2.3peoplepercar,youcanbringlessthan400peopletotheFairgrounds,whichisnotaverylargeevent.

Althoughthisplandoesnotrecommendaspecificsolutiontotheparkingproblem,thereareidentifiedfundsintheEstimatedCapitalInvestmentslaterinthisdocumentandtherearethreepossiblesolutionstothis,eachofwhichneedtoberesearchedand,ifapplicable,prioritizedintotheplan.Theseare:

UseexistingoutlyinglotsandprovidebusservicefromsuchlotstotheFairgrounds.SuchlotswouldincludetheCommunity(CMA)andMethodistchurchlots,allschoollots,andlocalparkandridelots.ThiscouldbedoneinconjunctionwithIslandTransitandapotentialPortsponsoredbusroutesbringingpeoplefromClinton(andthereforeMukilteo)andFreeland,andevenCoupevilleandOakHarbor.Atalaterdate,wellinto

Page 30: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 21 of 90 

Port of South Whidbey 

theten‐yearplan,theFairgroundsorthePortcouldconsidergettingandrunningtheirownbusorbuses.

Buylandforparkingpurposes.OneobviouspossibilityistoengagetheSchoolDistrictintalkstobuysomeoftheirlandnexttotheFairgrounds,identifiedas“#7”inFigure9.OtherpossibilitiesarethesoutheastcornerofCamanoandEdgecliff(“#8”),thesoutheastcornerofCamanoandSandyPoint(“9”),thepropertyjustabovethesouthendoftheFairgroundstothenorthofFairgroundsroad(“10”),andthepropertyjustsouthofFairgroundsroad(“11”).AppendixChasmoredetailontheseproperties.

BuildaparkinggarageataconvenientlocationtoeitherwalkorbuspeopletotheFairgrounds.Thisisquiteexpensiveandisnotcoveredinthisplan.Nevertheless,becauseitisanefficientuseofland,itshouldbeconsidered,possiblyinconjunctionwithothers,suchastheCounty,Langley,andIslandTransit.Also,partoftheparkinggaragecouldbeusedforlongertermparkingandstoringboatsandRVsandotherlargeobjects,generatingrevenue.Also,itcouldbeusedforoverflowparkingforotherLangleyandSouthWhidbeyevents.Onepotentialsiteforaparkinggarageisatthesouthern‐mostendoftheFairgrounds,probablywiththerequirementofpurchasingmorelandandre‐contouringit.

Add a Roof to the Arena and Improve the Footing 

Thecurrentarenaisprimarilyusedby4‐HandWhidbeyWesternGamesAssociationduringgoodweather.Toincreaseusagewithotherequestrians,suchasdressage,andnon‐equestrians,suchasmotorsports,andotheruses,suchasoutdoorconcerts,severalimprovementsmustbemadetothearena.Theseinclude:

Replacingthefootings(thegroundonthefloorofthearena)tomakeitmoreusablebyawidervarietyofusers;

MovingthebleacherssothesmalloneonthewestsideofthearenaismovedtothesouthoftheHopebuilding,andthebleachersontheeastsideismovedtothewestsidetothenorthoftheHopebuilding;

Improvingthelightingandsoundsystemssothereisbetternight‐timelightingandthesoundsystemsoundisbetterdirectedtojustthearena;

Erectingaroofoverthearenaandbleacherstoallowuseduringinclementweather.

Provide Shelter and Care in Emergencies. 

TheFairgroundshaslotsofbuildings.Iftheyareheated,andpossiblyageneratorisadded,theycouldbeusedasshelterduringanemergency.Theplanhassuchapossibilityinmind,butthegeneratorwouldhavetocomeoutofthe“GeneralBuildingsandGrounds”lineitems.

Page 31: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 22 of 90 

Port of South Whidbey 

Using a Volunteer Work Force 

DuringseveralpublicforumsandfocusgroupsontheFairgrounds,theideaofhavingaHearts‐and‐Hammers‐likevolunteerworkdayonceortwiceayearwasdiscussedwithcommunitymemberswhoexpressedquiteabitofsupport.ThisPlanrecommendsorganizingandgettingstartedwiththistypeofvolunteerworkforcealmostimmediatelyandplanforaworkdayinthefirstyear.Thenameforthisgroup,aswellasthenamefortheFairgroundsitselfwillbediscussedduringpublicforumsandpeoplewillbeencouragedtosuggestnames.Apotentialnameforthevolunteergroupis“FairgroundsVision.”Thefirstgrouptorecruitforthiseffortwillbebuildersandcontractorsofallskills.GregGilleshasalreadysaidhewouldbeapartofthis.Thisgroupwouldbeusedtoplantheworktobedone(adheringtotheoverallarchitecturalplans),estimatewhatmaterialsareneeded,andwherethematerialscanbeprocured.

Asecondoffshootofthevolunteerworkforcewillbegardenersworkingtotheoveralllandscapeplan,whowillincludeMasterGardenersandgardenclubs,aswellasprofessionallandscapers.

Itshouldbenotedthatboth4‐HandtheFairAssociationalreadyhavevolunteerworkdaysseveraltimesayear.ThePlan’svolunteerworkforcewillnottakeoverorreplacethisvaluableeffort,butratheraddtoit,generallywithvolunteersnototherwiseassociatedwiththeFairgrounds.

   

Page 32: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 23 of 90 

Port of South Whidbey 

FAIRGROUNDS FINANCIAL PROJECTIONS 

TheFairgroundsfinancialprojectionsarebasedupontheassumptionthattheFairgroundswillundergosignificantenhancementswithmajorcapitalinvestments.Withthisinvestment,theprojectionsofrevenueandexpensearemadebeginningwiththe2015actualsandprojectingoutoverthenexttenyearsinthreeversions:Conservative,Middle‐of‐the‐Road,andAggressive.Inallcases,a“reasonableperson”approachhasbeenusedtonotexaggeratethefuturerevenueandexpense.Theneareryears,years1,2,and3arelikelymoreaccuratethanyears7and10.Years4,6,8,and9havebeenskippedsimplyforbrevity.

Thefirstyear,2016,isanessentialtimeforlayingthefoundationandrefiningthevisionofwhattheFairgroundswillbecomeinthefollowingyears.Suchthingsashiringacapablemanager,creatingawebsite,layingoutamarketingandadvertisingprogram,developingafundraisingplan,andpreparingthedetailarchitecturalandlandscapingplansforworkthatwillbecarriedoutinthenextnineyears,iscrucialforthesuccessoftheoverallplan.

Inthefollowingpages,theFairgroundscapitalinvestment,revenue,andexpensearelaidout,firstasawrittenexplanationandthennumerically.Therearemanyassumptionsinthesenumbers,highonthelististhatthereisnotanimpactfromeitherapositiveornegativeeconomy.Othersarethatthereisn’tamajorcatastrophelikeanearthquakeorfire,fundsareavailablewhentheyareneeded,capableandgoodpeopleareavailablewhenneeded,andthatthedemandforwhattheFairgroundsoffersremainsconstant.Ofcourse,noneoftheseassumptionswillholdabsolutelytrueoverthetenyears

Capital Investment 

TobringtheFairgroundsbacktoitsfullpotentialandmaximumearningpowerwillrequireasignificantcapitalinvestment.Therearethreepossiblecapitalprojectimplementationscenarioswithdifferentsetsoftasksandtiming,asshowninTable7.Theestimatedcostofthetasksareveryrough,atbestaneducatedguess,andneedtobefurtherconfirmed.Also,thereisgreatleewayastowhatisdonewhenandifitisdoneatall,dependingontheavailabilityoffundingandhowtheprojectsareplannedandprioritized.

Forthisplan,thefollowingroughestimatesofpossiblecapitalinvestmentswillbeusedineachofthescenarios.4Therearefour“Generalbuildings…”entriesinthelistofcapitalinvestments.ThesearemeanttocoveramyriadofprojectssuchassprucinguptheMidway,handlingemergencypreparedness,andmanyotherconsiderations.

 

                                                            4 Some of the estimates are from the 2014 Landermann‐Moore Strategic Plan. 

Page 33: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 24 of 90 

Port of South Whidbey 

Possible Proposed Capital Investment Estimates 

1. PreparelandscapingandarchitecturalplansforacohesiveFairgroundsvision: $50,0002. CleanupandbeautifytheFairgroundswithlandscapingandpainting: $20,0003. ImprovetheFairgroundssignagetopromotethegroundsandevents: $10,0004. Addwalk‐inrefrigerationandwire‐cagedrystoragetoeachkitchen,total: $30,0005. Generalbuildingsandgroundsrenovationandimprovement#1: $50,0006. Addinsulation,drywall,heatingandnewdoorstothewestsideofBurrier: $20,0007. Updatetheplanandcarryoutthestormwaterrunoffandbluffstabilization: $100,0008. Addinsulation,heating,andremodelthePolediningroom: $50,0009. Generalbuildingsandgroundsrenovationandimprovement#2: $50,00010. RenovateandremodeltheCoffman/4‐Hmainroom,restrooms,andannex: $50,00011. Buildanewrestroomfacilitywithshowerstothecampgrounds: $100,00012. Re‐layouttheRVParkandadd50‐AMPRVhookupswithWaterandsewer: $75,00013. Insulate,heat,replacedoors,andrenovatethestageofthePolebuilding: $120,00014. Upgradeandrenovaterestrooms“A”and“B”: $50,00015. ReplacefiberglasswindowsanddoorsandheattheMalonebuilding: $75,00016. AddsolarpowertotheFairgrounds $100,00017. Purchaseanapproximatelytwoacrepropertytopark160cars: $600,00018. Generalbuildingsandgroundsrenovationandimprovement#3: $50,00019. RemoveandreplacetheTurnerandBurrierbuildingswithasinglebuilding:$1,500,00020. RemoveandreplaceHorsebarns1,2,and3withnewmulti‐purposestalls: $750,00021. Generalbuildingsandgroundsrenovationandimprovement#4: $50,00022. Remove&replaceCattleandGrandstandswithamulti‐purposebuilding: $1,000,00023. Placeapavilionroofoverthearena,replacethefooting,lights,andsound: $1,000,000

Thetotalof$5,900,000canbespreadovertenyearsinthreescenariosasshownTable7.

Page 34: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 25 of 90 

Port of South Whidbey 

Table 7: Estimated Capital Investment Scenarios 

 

   

Year

1 1 Plans 50,000$       1 Plans 50,000$       1 Plans 50,000$      

2 Clean & beautify 20,000$       2 Clean & beautify 20,000$       2 Clean & beautify 20,000$      

3 Signage 10,000$       3 Signage 10,000$       3 Signage 10,000$      

5 General #1 50,000$       4 Upgrade kitchens 30,000$       4 Upgrade kitchens 30,000$      

6 Heat Burrier 20,000$       5 General #1 50,000$       5 General #1 50,000$      

6 Heat Burrier 20,000$       6 Heat Burrier 20,000$      

7 Storm water 100,000$     7 Storm water 100,000$    

8 Pole dining room 50,000$      

10 Coffman 50,000$      

Total 150,000$     Total 280,000$     Total 380,000$    

2 4 Upgrade kitchens 30,000$       8 Pole dining room 50,000$       9 General #2 50,000$      

7 Storm water 100,000$     9 General #2 50,000$       11 RV restroom 100,000$    

8 Pole dining room 50,000$       10 Coffman 50,000$       12 RV layout, Powe 75,000$      

10 Coffman 50,000$       11 RV restroom 100,000$     13 Heat all Pole 120,000$    

12 RV layout, Power 75,000$       14 Restrooms 50,000$      

13 Heat all Pole 120,000$     15 Heat Melone 75,000$      

17 Parking 600,000$    

Total 230,000$     Total 445,000$     Total 1,070,000$ 

3 9 General #2 50,000$       14 Restrooms 50,000$       16 Add solar 100,000$    

11 RV restroom 100,000$     15 Heat Melone 75,000$       18 General #3 50,000$      

12 RV layout, Powe 75,000$       16 Add solar 100,000$     19 Turner & Burrier 1,500,000$ 

14 Restrooms 50,000$       17 Parking 600,000$     20 Horse 1, 2, 3 750,000$    

18 General #3 50,000$      

Total 275,000$     Total 875,000$     Total 2,400,000$ 

5 16 Add solar 100,000$     19 Turner & Burrier 1,500,000$  21 Cattle, Grandsta 1,000,000$ 

18 General #3 50,000$       22 General #4 50,000$      

23 Cover the Arena 1,000,000$ 

Total 150,000$     Total 1,500,000$  Total 2,050,000$ 

7 21 Cattle, Grandsta 1,000,000$  21 Cattle, Grandstan 1,000,000$ 

22 General #4 50,000$      

Total 1,000,000$  Total 1,050,000$  Total ‐$            

10 22 General #4 50,000$      

Total 50,000$       Total ‐$             Total ‐$            

Ten Year Total 1,855,000$  Ten Year Total 4,150,000$  Ten Year Total 5,900,000$ 

Conservative Middle  Aggressive

Page 35: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 26 of 90 

Port of South Whidbey 

Fairgrounds Revenue 

Manyevents,activitiesandrentalsarepossibleontheFairgroundsforpurposesofbringinginrevenue.Theprimarysetoftheseitems,calledeconomicpotentials,arediscussednext.Apossiblerevenuestreamforeachunderthethreepossiblescenariosisshownwitheachitem.Thegrowthintherevenuestreamsisaresultofmanyfactors,somegeneraltotheFairgroundsitselfsuchasbeautificationandanewwebsite,whileothersarespecifictospecificfacilitiessuchasheatingthePolediningroomandupgradingtheRVPark.Thesefactorsareidentifiedinthefollowingdiscussionandtakenintoaccountintherevenuestreams.

RV Park and Campgrounds 

TheCampgroundsandRVParkareexpectedtobea,ifnotthe,majorrevenuesourceontheFairgrounds.ThisispredicatedonthenearnesstoLangleyandthewaterfront,andtheplannedimprovementsoverthenextfivetotenyears.DuringtheFair,MarilynandEliseGabeleinlayoutthecampgroundstoget70RVsandtrailersplus10ormoretentsinthelot.LarryKwarsickputtogetheraverycomfortablelayoutof30RVsplussometents(seeFigure9).

Figure 9: Kwarsick 30 Vehicle RV Park Plan 

 

Page 36: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 27 of 90 

Port of South Whidbey 

ToimprovetheuseoftheRVPark/Campgrounds,thisplaninallofthescenariosenvisionsthesomeorallfollowingmodificationsthatwillbemadeatvarioustimesdependingonthescenariofollowed:

BeautifytheRVPark/Campgroundstomakethemmoreattractiveandinviting. AddanewsetofbathroomsandshowersintheRVPark/Campgrounds Upgradethegroundsandadd30new50amphookupswithwaterandsewerage

Additionally,whilenotincludedinthisplan,considerationshouldbegiventobuyingadditionalpropertyandaddingmoreRVsitesandhookups.

TheusageoftheCampgroundswillvaryovertheyearwithverylittleifanyusageoverthefourwintermonthsofNovemberthroughFebruary,buildingtoveryheavyusageinthesummermonthsofJulyandAugust.Also,overtheten‐yearspanofthisplan,usagewillgrowandfeescanbeincreasedasthecampgroundsareimprovedandtherelatedmarketingprogramhasitseffects.Table8providesaprojectionofCampgroundsuseandincomeoverthetenyearsinthreescenarios.“Days”arethenumberofdaysintheperiodthatthecampgroundisoccupiedand“No.”istheaveragenumberofsitesoccupied,so,forexample,intheMarch‐Aprilperiod,thathas61days,40dayshaveanaverageof6sitesoccupiedat$25each,orarevenueof6x40x25or$6,000.Thisassumesthatanewwebsiteandadvertisingprogramareworkingtopromotethecampgroundsandtakereservations,andthatthecleanupandbeautificationisdoneearlyinthefirstyear.Also,itisassumedthattheFairtakesallRVParkrevenuefortendaysayear.

Figure10showshowthegrowthfollowstheimprovementsbeingmadetotheRVPark/Campground.

0%

5%

10%

15%

20%

25%

30%

35%

40%

Year 1 Year 2 Year 3 Year 5 Year7 Year 10

Figure 10: RV Park / Campground Growth

Conservative Middle Aggressive

Page 37: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 28 of 90 

Port of South Whidbey 

Table 8: RV Park/Campgrounds Revenue stream 

   

Enhan

cements

Bathroom & Upgrad

e

Period

DaysNo. 

Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

Jan ‐Fe

300

25$   

‐$        

025

$   

‐$        

127

$   

810

$        

329

$   

2,610

$    

532

$   

4,800

$      

735

$   

7,350

$      

Mar‐Apr 

406

25$   

6,000

$    

725

$   

7,000

$    

927

$   

9,720

$    

1129

$   

12,760

$  

1332

$   

16,640

$    

1535

$   

21,000

$    

May‐Jun

508

25$   

10,000

$ 9

25$   

11,250

$  

1027

$   

13,500

$  

1329

$   

18,850

$  

1532

$   

24,000

$    

1735

$   

29,750

$    

July‐Aug

5015

25$   

18,750

$ 16

25$   

20,000

$  

1727

$   

22,950

$  

2029

$   

29,000

$  

2232

$   

35,200

$    

2435

$   

42,000

$    

Sep‐O

ct40

625

$   

6,000

$    

725

$   

7,000

$    

827

$   

8,640

$    

1029

$   

11,600

$  

1232

$   

15,360

$    

1435

$   

19,600

$    

Nov‐Dec

300

25$   

‐$        

025

$   

‐$        

127

$   

810

$        

329

$   

2,610

$    

532

$   

4,800

$      

735

$   

7,350

$      

Fair

10‐

$        

‐$        

‐$        

‐$        

‐$           

‐$           

Total

40,750

$ 45,250

$  

56,430

$  

77,430

$  

100,800

$  

127,050

$  

% Growth

11%

25%

37%

30%

26%

Enhan

cements

Bathroom & Upgrad

e

Period

DaysNo. 

Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

Jan ‐Fe

300

25$   

‐$        

125

$   

750

$        

227

$   

1,620

$    

429

$   

3,480

$    

632

$   

5,760

$      

835

$   

8,400

$      

Mar‐Apr 

406

25$   

6,000

$    

825

$   

8,000

$    

1027

$   

10,800

$  

1229

$   

13,920

$  

1432

$   

17,920

$    

1635

$   

22,400

$    

May‐Jun

508

25$   

10,000

$ 10

25$   

12,500

$  

1227

$   

16,200

$  

1429

$   

20,300

$  

1632

$   

25,600

$    

1835

$   

31,500

$    

July‐Aug

5015

25$   

18,750

$ 17

25$   

21,250

$  

1927

$   

25,650

$  

2229

$   

31,900

$  

2432

$   

38,400

$    

2635

$   

45,500

$    

Sep‐O

ct40

625

$   

6,000

$    

825

$   

8,000

$    

1027

$   

10,800

$  

1229

$   

13,920

$  

1432

$   

17,920

$    

1635

$   

22,400

$    

Nov‐Dec

300

25$   

‐$        

125

$   

750

$        

327

$   

2,430

$    

529

$   

4,350

$    

632

$   

5,760

$      

835

$   

8,400

$      

Fair

10‐

$        

‐$        

‐$        

‐$        

‐$           

‐$           

Total

40,750

$ 51,250

$  

67,500

$  

87,870

$  

111,360

$  

138,600

$  

% Growth

26%

32%

30%

27%

24%

Enhan

cements

Bathroom & Upgrad

e

Period

DaysNo. 

Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

No. Rate

Total

Jan ‐Fe

300

25$   

‐$        

125

$   

750

$        

327

$   

2,430

$    

529

$   

4,350

$    

632

$   

5,760

$      

835

$   

8,400

$      

Mar‐Apr 

406

25$   

6,000

$    

825

$   

8,000

$    

1027

$   

10,800

$  

1229

$   

13,920

$  

1532

$   

19,200

$    

1735

$   

23,800

$    

May‐Jun

508

25$   

10,000

$ 11

25$   

13,750

$  

1327

$   

17,550

$  

1529

$   

21,750

$  

1732

$   

27,200

$    

1935

$   

33,250

$    

July‐Aug

5015

25$   

18,750

$ 18

25$   

22,500

$  

2027

$   

27,000

$  

2329

$   

33,350

$  

2532

$   

40,000

$    

2735

$   

47,250

$    

Sep‐O

ct40

625

$   

6,000

$    

825

$   

8,000

$    

1027

$   

10,800

$  

1229

$   

13,920

$  

1432

$   

17,920

$    

1635

$   

22,400

$    

Nov‐Dec

300

25$   

‐$        

125

$   

750

$        

327

$   

2,430

$    

529

$   

4,350

$    

732

$   

6,720

$      

935

$   

9,450

$      

Fair

10‐

$        

‐$        

‐$        

‐$        

‐$           

‐$           

Total

40,750

$ 53,750

$  

71,010

$  

91,640

$  

116,800

$  

144,550

$  

% Growth

32%

32%

29%

27%

24%

RV Park/Cam

pgrounds Reve

nue ‐ Aggressive

Beau

tification

Year 1

Year 2

Year 3

Yea

r 5

Year7

Yea

r 10

RV Park/Cam

pgrounds Reve

nue ‐ Conservative

Beau

tification

Year 1

Year 2

Year 3

Yea

r 5

Year7

Yea

r 10

RV Park/Cam

pgrounds Reve

nue ‐ M

iddle of the Road

Year 1

Year 2

Year 3

Yea

r 5

Year7

Yea

r 10

Beau

tification

Page 38: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 29 of 90 

Port of South Whidbey 

Major Art Event 

SouthWhidbeyandtheCityofLangleyhavealargeartistpopulationandasubstantialinterestinthearts.ThismakesanartexhibitontheFairgroundsanatural.Tothis,localwine,beer,andgourmetfoodwillbeaddedtomakealargescaleeventthatwillbemonetizedbychargingapercentageofthefoodandwine,andspacerentalfortheartexhibits.TheFairgroundsenhancementsthateffectartexhibitsarelistednextproducingtherevenueshowninTable9.

Generalbeautification,cleanup,andpainting Newwebsiteandadvertisingprogram ImprovedSignage Insulationandheatingvariousbuilding Generalrenovations Addedparking ReplacingTurnerandBurrier ReplacingCattleandGrandstand

Table 9: Major Art Event Revenue 

Major Swap Meet / Garage Sale 

Swapmeets/GarageSalesareamajorwaymanyfairgroundsbringinincome.Againfoodandbeverageswillbeaddedandtheeventmonetizedbychargingapercentageofthefoodandwine,andapercentageofswapmeet/garagesales.Thiswillstartwithoneoftheseeventsinthefirstyearandgrowtomultipleonesinfutureyears.TheFairgroundsenhancementsthateffectswapmeetsandgaragesalesarelistednextproducingtherevenueshowninTable10.

Generalbeautification,cleanup,andpainting Newwebsiteandadvertisingprogram ImprovedSignage Insulationandheatingvariousbuilding Generalrenovations Addedparking ReplacingTurnerandBurrier ReplacingCattleandGrandstand

Art Event Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,500$     2,000$     3,000$     6,000$     10,000$     20,000$     

Middle 2,000$     3,000$     6,000$     12,000$   25,000$     50,000$     

Aggressive 3,000$     9,000$     15,000$   30,000$   60,000$     90,000$     

Page 39: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 30 of 90 

Port of South Whidbey 

Table 10: Swap Meets and Garage Sales Revenue 

Major Music Concerts and Festivals 

Musicconcertsarethemostdesiredfairgroundsactivity,asshownearlier,whichattherighttimeofyearcanbeindoorsoroutdoors.TheFairgroundsenhancementsthateffectmusicconcertsarelistednextproducingtherevenueshowninTable11.

Generalbeautification,cleanup,andpainting Newwebsiteandadvertisingprogram ImprovedSignage Insulationandheatingvariousbuilding Generalrenovations Addedparking EnhancingandcoveringtheArena

Table 11: Major Music Concerts and Festivals Revenue 

Weddings 

AttractiveandsuccessfulweddingscanbeheldontheFairgrounds,seeFigure11.Theremustbesomepromotionatbridalfairs,onawebsite,andotheravenues,sotheusewillstartoffslowlyandgrowoverthetenyearsastheimprovementsintheFairgroundsarerealized.TheFairgroundsmodificationsthatimpactthisarelistednextproducingtherevenueshowninTable12.

Generalbeautification,cleanup,andpainting Newwebsiteandadvertisingprogram ImprovedSignage InsulationandheatingthePolebuilding Generalrenovations Addedparking

Garage Sale Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 2,000$     4,000$     6,000$     10,000$   20,000$     50,000$     

Middle 5,000$     8,000$     15,000$   30,000$   50,000$     75,000$     

Aggressive 7,500$     12,000$   20,000$   50,000$   75,000$     100,000$   

Music Concert Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 4,000$     6,000$     8,000$     12,000$   18,000$     30,000$     

Middle 5,000$     7,000$     10,000$   15,000$   25,000$     50,000$     

Aggressive 7,000$     12,000$   18,000$   30,000$   50,000$     75,000$     

Page 40: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 31 of 90 

Port of South Whidbey 

Table 12: Weddings 

Figure 11: September 2015 Fairgrounds Wedding 

Smaller One‐Building Events 

Smallevents,suchasreceptions,meetings,lectures,conferences,andseminars,aswellascomputergamedaysandtournamentscanbeaccommodatedtoalimitedextenttodayinCoffmanyear‐around,andinPoleduringwarmermonths.WiththeheatingofPoleandthenMalone,moreeventscanbeheld,andasmulti‐purposebuildingsreplaceotherbuildingsinlateryears,thisusewillexpand.Thiswillstartwithacoupleeventsthefirstyearandgrowinlateryears,asshowninTable13.ThesameFairgroundsmodificationslistedforWeddingspositivelyimpactsmallevents.

Weddings Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,200$     2,400$     3,600$     6,000$     8,400$       12,000$     

Middle 2,400$     4,800$     7,200$     9,600$     12,000$     18,000$     

Aggressive 3,600$     7,200$     12,000$   14,400$   20,000$     28,000$     

Page 41: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 32 of 90 

Port of South Whidbey 

Table 13: Receptions and Smaller Events Revenue 

Full Fairgrounds Events 

FullFairgroundsevents,suchRagnar(alargecyclingevent)willonlyoccasionallyhappen,butRagnariscurrentlyscheduledfor2016andshouldcontinue.Thiswillbringin$1,500thefirstyearandwillexpandinbothnumberandtypesofeventsandrevenuepereventoverthetenyears,asshowninTable14.TheseeventswillalsobringinrevenuefromtheCampgroundsandmiscellaneoussourcesandwillprovidesomepromotiontotheFairgroundsingeneral.

Table 14: Full Fairgrounds Events Revenue 

Building Rental 

Full‐timebuildingrentalontheFairgroundsiscurrentlydifficultduetotheneedtomoveoutduringthefair,thelackofheat,andtheneedtodobusinessaroundFairparaphernalia.Thecurrentrentershaveacombinedrentofapproximately$1,800amonthorapproximately$20,000forelevenmonthsthatwillbeusedforthefirstyear.AsheatisaddedtoBurrierwestandrentaluseincreasesforbothsidesofBurrier,revenuewillincrease.Asotherbuildingsareheated,remodeled,orreplaced,newusesandrevenuewillemerge.Finally,thereisthepossibilityofrentingspacefor12monthstotenantswhocanbepartoftheFairasexhibitors.Asaresultthebuildingrentalwillgrowmodestly,asshowninTable15.

Table 15: Building Rental Revenue 

Smaller Events Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,500$     2,500$     4,000$     6,000$     9,000$       12,000$     

Middle 2,000$     3,000$     5,000$     7,500$     10,000$     15,000$     

Aggressive 3,000$     5,000$     7,000$     10,000$   15,000$     20,000$     

Full Fairgrounds Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,500$     2,000$     2,500$     3,500$     5,000$       7,000$       

Middle 1,500$     2,500$     3,000$     5,000$     7,000$       9,000$       

Aggressive 2,000$     3,000$     4,500$     7,500$     10,000$     15,000$     

Building Rent Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 20,000$   22,000$   25,000$   30,000$   32,000$     35,000$     

Middle 20,000$   25,000$   30,000$   32,000$   35,000$     40,000$     

Aggressive 22,000$   27,000$   32,000$   35,000$   40,000$     45,000$     

Page 42: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 33 of 90 

Port of South Whidbey 

Kitchen Rental 

Thetwocommercialkitchenscurrentlyeachrentfor$15forthefirsthour,$10perhourthereafter,or$95perday.Itisexpectedthattogethertheycanbeusedabout10daysamonthduringthefirstyearduring11months,or110daysayearat$95perdayor$10,450ayear.Withtheadditionofwalk‐inrefrigeration,drystorage,andequipmentsuchasdishwashers,slicersandmixers,thiswillgrowwithadditionaldaysandreasonablerateincreasesovertheplanyears,asshowninTable16.Figure12showaThanksgivingdinnerputonbyacatererinthePolekitchenanddiningroom.

Table 16: Kitchen Rental Days per Year and Revenue 

Figure 12: Thanksgiving Dinner in the Pole Kitchen and Dining Room (Source: Melene Thompson) 

 

Boat and RV Storage 

ThecurrentboatandRVstorageisanagreementwithGregHeimfor$3.00perlinearfootstored.InthepastboatstoragehasgrownbeginninginOctober($500),toNovemberthroughFebruary($1,100each),andMarch,April,andMay($900,$600,and$300respectively)foratotal$6,700.Thiswillremainrelativelyconstantuntiladditionalfacilitiesbecomeavailableinfutureyearsplusaslightinflationintherate,asshowninTable17.Themajorfactorsimpactingthiswillbe:

Kitchens Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Cons days/year 110        132           165           198           220             275             

Conservative 10,450$   13,200$   16,500$   23,760$   27,500$     37,125$     

Middle days/year 121        143           187           231           297             385             

Middle 11,495$   14,300$   18,700$   27,720$   37,125$     51,975$     

Aggressive days/yea 132        165           198           275           385             495             

Aggressive 12,540$   16,500$   19,800$   33,000$   48,125$     66,825$     

Page 43: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 34 of 90 

Port of South Whidbey 

Collapsiblepensinseveralofthebarns ReplacementofCattleandtheGrandstand ReplacementoftheHorsebarns

Table 17: Boat and RV Storage Revenue 

4‐H Programs 

4‐HprogramsareconsideredacommunityphilanthropythatispartoftheFairgroundslegacyandtheyarenotexpectedtocovertheirexpenses.Theyhaveonemajorannualevent,elevenhorseevents,andseveralmeetings.Itisassumedthattheywillbechargedamodest$5formeetingsintheHopebuildingwiththeappropriateschedulingandwillingnesstoworkaroundpayingevents.Theywillbechargedforelevenusesofthearenaat$65peruse,forsixusesofthetractorat$50,and$150fortheirmajorevent.Thiswillbringinapproximately$1,200peryearin2016andgrowverymodestlyoverthenextnineyears,asshowninTable18.

Table 18: 4‐H Program Revenue 

Equestrian Events 

Non‐4‐Hequestrianeventsarecompetitionsandexhibitionsputonforyouthandadultsoutsideof4‐HbyorganizationssuchasWWGA(WhidbeyWesternGamesAssociation).Currentlythereareseveneventdaysayearthatbringin$150each,andoneevent(O‐Mok‐See)thatbringsin$300.Inaddition80stallnightsarerentedat$10apiece.Thistotals$2,150ayearandwillgrowmodestly.Withthereplacementofthehorsebarns,thecoveringofthearenaandbleachers,andanimprovedfootingputinthearena,thisshouldincreaseusageinthelateryears,asshowninTable19.OthermodificationstotheFairgroundsthatwillhelppromoteequestrianeventsare

Stormwaterhandlingandbeautificationofthegrounds Addedparking

Storage Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 6,700$     7,000$     7,500$     9,000$     12,000$     15,000$     

Middle 6,700$     7,000$     7,500$     12,000$   15,000$     20,000$     

Aggressive 6,700$     7,000$     7,500$     19,000$   24,000$     29,000$     

4‐H Events Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,200$     1,200$     1,300$     1,500$     1,800$       2,200$       

Middle 1,200$     1,300$     1,500$     1,800$     2,200$       2,200$       

Aggressive 1,300$     1,500$     1,800$     2,200$     2,200$       2,400$       

Page 44: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 35 of 90 

Port of South Whidbey 

RVPark/Campgroundsupgraded

Table 19: Equestrian Revenue 

Annual Fair 

TheannualWhidbeyAreaFairoverthelastfiveyears(2010‐2014)hascontributedonaverageover$60,000peryeartothemaintenanceoftheFairgrounds.Thisamounthasbeendecliningoverthatperiodfromover$100,000toaround$50,000.ItisreasonabletoexpectthattheFaircancontributeatleast$45,000in2016andthat,veryconservatively,thiswillgrowby$5,000to$10,000peryearwithreasonablemanagementandimprovementsintheFairgrounds,asshowninTable20.

Table 20: Annual Fair Revenue 

Miscellaneous Income 

MiscellaneousincomecomesfromRVdumpfees,smallrentals,andothersources.Itiscurrentlyabout$1,000ayear.Thiswillgrowverymodestlyoverthenexttenyears,asshowninTable21.

Table 21: Miscellaneous Revenue 

   

Equestrians Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 2,150$     2,500$     2,750$     3,500$     5,000$       7,500$       

Middle 2,500$     3,000$     5,000$     10,000$   15,000$     20,000$     

Aggressive 2,750$     3,500$     7,500$     12,000$   20,000$     30,000$     

Fair Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 45,000$   50,000$   55,000$   65,000$   75,000$     85,000$     

Middle 50,000$   55,000$   60,000$   70,000$   80,000$     90,000$     

Aggressive 55,000$   65,000$   75,000$   95,000$   115,000$  135,000$   

Other Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

Conservative 1,000$     1,100$     1,200$     1,500$     2,000$       4,000$       

Middle 1,100$     1,200$     1,500$     2,000$     4,000$       6,000$       

Aggressive 1,200$     1,500$     2,000$     4,000$     6,000$       8,000$       

Page 45: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 36 of 90 

Port of South Whidbey 

Fairgrounds Expense 

Fairgroundsexpensecoversthemanagementandday‐to‐daymaintenanceoftheFairgroundsoutsideoftheFair.ItassumesthatmajormodificationsandenhancementstotheFairgroundsarebeingmadethroughaseparatecapitalbudget.Forsomeoftheamounts,thePort’s2016FairgroundsdraftpreliminarybudgetfigureswereusedasastartingpointwithanannualgrowthtoaccommodatethegrowthinFairgroundsuseandrevenue.Therearethreegroupingsofexpense:payroll,utilities,andother.

Payroll Expense 

PayrollexpensecoversaFairgroundsmanager,amaintenancemanager,part‐timeandfull‐time supportpersonnel underbothof thesemanagers, and their taxes andbenefits. Thenumberofsupportpersonnelandwhentheyareaddedvariesineachoftheplanscenarios.

TheFairgroundsmanagerhasnotonlythejobofpreformingtheday‐to‐daymanagement,butalsotheverylargejobofmarketingtheFairgroundsandorganizingandmanagingtheevents,activitiesandrentalsthatwillusetheFairgrounds,andraisingfundstoenhanceit.Thispersonhastohaveuniqueskillsandbeabletohandleabroadrangeofsituations.Togetthisperson,afairlyattractivesalarywillbeneeded.Intheaccompanyingfinancialplan,astartingsalaryof$60,000wasusedwithsmallgrowthoverthetenyears.

TheFairgroundsmanagerwillbeginworkingalone,maybewithanintern,buttofullydoherorhisjob,sheorhewillneedsupport,primarilytodothemanyday‐to‐dayfunctionsontheFairgrounds, as well as some of the social media work and working with events. It isenvisionedthatapart‐timepersonwillbehiredatfirstandgrowintoafulltimeposition.Thesalaryforthispersonisprojectedtobe$30,000onafulltimebasis.Additionalsupportpersonnelwillbeaddedovertime.

ThemaintenancemanagerwillalsoneedawiderangeofskillstohandlethemanyfunctionsontheFairgrounds.Itisplannedthatheorshewillstartat$40,000,whichwillgrowovertheyears.Thispersonwillneedsupportpersonnel,whichinitiallywillbeapart‐timepersongrowingtofulltime,andthentoadditionalpeopleoverthetenyears.

Payrolltaxesandbenefitsarefiguredtobe23%ofsalariesgrowingto24%inthethirdandfifthyears,and25%intheseventhandtenthyears.

Utilities Expense 

Utilitiesexpensecoverselectricity,propane,waterandsewer,refuse,andtelephoneandInternet.ThePort’s2016budgetisusedasthefirstyearandgivenagrowthfactortoaccommodatethegrowinguseoftheFairgrounds.Analternativesolarenergysourceandinvestmentwillbeexploredtoseehowitwouldaffectthetotalannualpowerbillofover$10,000ayearincludingtheFair.Thesenumbersassumethatsolarpowerisinstalledand

Page 46: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 37 of 90 

Port of South Whidbey 

significantlylowerstheelectricalbill.Thereisalocalinstancewherea$10,000electricbillhasbeenallbutwipedoutbyusingsolarpower.

Marketing Expense 

MarketingandpromotioniscriticalforthegrowthoftheFairgrounds.Thefirstyeartherewillbeanewwebsitebuiltthatalsohandlescampgroundsreservations.Socialnetworkingwillbesetupandmanned,initiallybythecreator,buteventuallybytheadministrativesupportstaff.Thisisexpectedtocost$10,000thefirstyear.InadditiontherewillbeseveralbrochuresmadefortheFairgroundsingeneralandspecificallyfortheCampgrounds,thekitchens,andforweddings.Twobridalfairswillbeattendedtobeginthepromotionofthevenueforweddings,andpaymentswillbemadetoplacethebrochuresontheFerriesandelsewhere.

Printadvertisingwillbepreparedfornewspapersandforseveralmagazinesandpaymentsmadetoplacethem.ThisadvertisingwillbefortheFairgroundsingeneralandforeventsthattheFairgroundsissponsoring.Thisneedstobeahighquality,andmaintainedwellinordertogrowtheFairgroundsasdescribedintheplan.

Thecostoftheadvertisingandbridalfairsisexpectedtobe$10,000,foratotalmarketingbudgetof$20,000.Updatesandrevisionstothewebsite,socialmediapages,brochures,andadvertisingwillmaintainandgrowthisexpenseovertime

Tax Expense 

AssumingthatTaxesareafunctionofrevenue,theywillincreaseintheplanwiththeincreasingrevenue,maintainingthe7.55%ratiotototalrevenue.Itisexpectedthataboutathirdofthisexpensewillbecollectedwiththerevenueandreducetheexpense,producing$7,221inexpenseinthefirstyearandincreasingwiththeincreaseinrevenue.

Other Expense 

Otherexpensecoverspurchasedmaintenanceandrepairs,materialsandsupplies,andother.ThePort’s2016budgetisusedasthefirstyear.AllcategoriesweregrowntoaccommodatethegrowinguseoftheFairgrounds.

ThethreepossiblerevenueandexpenseprojectionsareshowninTables22,23,and24,andFigures13,14,and15.

Page 47: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 38 of 90 

Port of South Whidbey 

 

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

RV Park / Campgrounds  40,750$         45,250$         56,430$         77,430$         100,800$      127,050$     

Major art event 1,500$           2,000$           3,000$           6,000$           10,000$         20,000$        

Major swap meet/garage sale 2,000$           4,000$           6,000$           10,000$         20,000$         50,000$        

Music Concerts 4,000$           6,000$           8,000$           12,000$         18,000$         30,000$        

Weddings 1,200$           2,400$           3,600$           6,000$           8,400$           12,000$        

Smaller one‐building events (receptions,  1,500$           2,500$           4,000$           6,000$           9,000$           12,000$        

Full Fairgrounds events (Ragnar) 1,500$           2,000$           2,500$           3,500$           5,000$           7,000$          

Building rental   20,000$         22,000$         25,000$         30,000$         32,000$         35,000$        

Kitchen rental 10,450$         13,200$         16,500$         23,760$         27,500$         37,125$        

Boat/RV Storage 6,700$           7,000$           7,500$           9,000$           12,000$         15,000$        

4‐H activities 1,200$           1,200$           1,300$           1,500$           1,800$           2,200$          

Equestrian events 2,150$           2,500$           2,750$           3,500$           5,000$           7,500$          

Annual Fair 45,000$         50,000$         55,000$         65,000$         75,000$         85,000$        

Miscellaneous Income 1,000$           1,100$           1,200$           1,500$           2,000$           4,000$          

     Total Revenue 138,950$      161,150$      192,780$      255,190$      326,500$      443,875$     

                             % Growth 16% 20% 32% 28% 36%

Expense

Administrative salaries 60,000$         60,500$         61,000$         62,000$         65,000$         68,000$        

Administrative support salaries ‐$               10,000$         15,000$         20,000$         25,000$         30,000$        

Maintenance salaries 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maintenance support salaries 10,000$         15,000$         20,000$         25,000$         30,000$         35,000$        

P/R Taxes and Benefits @ 23%, 24%, 25% 25,300$         28,957$         32,832$         35,568$         40,400$         43,750$        

    Total Payroll 135,300$      154,857$      169,632$      183,768$      202,000$      218,750$     

Electricity 8,000$           8,400$           9,240$           5,082$           2,846$           1,636$          

Propane 3,000$           3,150$           3,465$           3,812$           4,269$           4,909$          

Water & Sewer 4,000$           4,200$           4,620$           5,082$           5,692$           6,546$          

Refuse 5,000$           5,250$           5,775$           6,353$           7,115$           8,182$          

Telephone & Internet 3,000$           3,150$           3,465$           3,812$           4,269$           4,909$          

   Total Utilities 23,000$         24,150$         26,565$         24,140$         24,190$         26,182$        

Maintenance & Repair 12,000$         12,600$         13,860$         15,246$         17,076$         19,637$        

Materials and Supplies 10,000$         10,500$         11,550$         12,705$         14,230$         16,364$        

Marketing and Promotion 20,000$         21,000$         23,100$         25,410$         28,459$         32,728$        

Taxes 7,029$           8,152$           9,752$           12,909$         16,516$         22,453$        

Travel & Misc. Other 2,000$           2,100$           2,310$           2,541$           2,846$           3,273$          

   Total Other 51,029$         54,352$         60,572$         68,811$         79,126$         94,455$        

Total Expense 209,329$      233,359$      256,769$      276,718$      305,317$      339,388$     

                             % Growth 11% 10% 8% 10% 11%

(Loss) or Surplus (70,379)$       (72,209)$       (63,989)$       (21,528)$       21,183$         104,487$     

Cum (Loss) or Surplus (70,379)$       (142,588)$     (206,576)$     (228,105)$     (206,921)$     (102,434)$    

Table 22:                                                      Island County Fairgrounds

Financial Projection ‐‐ Conservative

Page 48: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 39 of 90 

Port of South Whidbey 

 

 

   

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Total Revenue 138,950$      161,150$      192,780$      255,190$      326,500$      443,875$     

Total Expense 209,329$      233,359$      256,769$      276,718$      305,317$      339,388$     

(Loss) or Surplus (70,379)$       (72,209)$       (63,989)$       (21,528)$       21,183$         104,487$     

Figure 13:                 Fairgrounds Financial Projection ‐‐ Conservative

 $(100,000)

 $‐

 $100,000

 $200,000

 $300,000

 $400,000

 $500,000

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Financial Projection ‐‐ Conservative

Total Revenue Total Expense (Loss) or Surplus

Page 49: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 40 of 90 

Port of South Whidbey 

 

   

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

RV Park / Campgrounds  40,750$         51,250$         67,500$         87,870$         111,360$      138,600$     

Major art event 2,000$           3,000$           6,000$           12,000$         25,000$         50,000$        

Major swap meet/garage sale 5,000$           8,000$           15,000$         30,000$         50,000$         75,000$        

Music food and drink festival (choochokam 5,000$           7,000$           10,000$         15,000$         25,000$         50,000$        

Weddings 2,400$           4,800$           7,200$           9,600$           12,000$         18,000$        

Smaller one‐building events (receptions,  2,000$           3,000$           5,000$           7,500$           10,000$         15,000$        

Full Fairgrounds events (Ragnar) 1,500$           2,500$           3,000$           5,000$           7,000$           9,000$          

Building rental   20,000$         25,000$         30,000$         32,000$         35,000$         40,000$        

Kitchen rental 11,495$         14,300$         18,700$         27,720$         37,125$         51,975$        

Boat/RV Storage 6,700$           7,000$           7,500$           12,000$         15,000$         20,000$        

4‐H activities 1,200$           1,300$           1,500$           1,800$           2,200$           2,400$          

Equestrian events 2,500$           3,000$           5,000$           10,000$         15,000$         20,000$         Annual Fair 50,000$         55,000$         60,000$         70,000$         80,000$         90,000$        

Miscellaneous Income 1,100$           1,200$           1,500$           2,000$           4,000$           6,000$          

     Total Revenue 151,645$      186,350$      237,900$      322,490$      428,685$      585,975$     

                             % Growth 23% 28% 36% 33% 37%

Expense

Administrative salaries 60,000$         60,500$         61,000$         62,000$         65,000$         68,000$        

Administrative support salaries 5,000$           15,000$         20,000$         30,000$         45,000$         60,000$        

Maintenance salaries 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maintenance support salaries 10,000$         20,000$         30,000$         45,000$         60,000$         75,000$        

P/R Taxes and Benefits @ 23%+A117 26,450$         31,257$         36,432$         42,768$         52,900$         61,250$        

    Total Payroll 141,450$      167,157$      188,232$      220,968$      264,500$      306,250$     

Electricity 8,400$           9,240$           5,082$           2,846$           1,636$           1,964$          

Propane 3,150$           3,465$           3,812$           4,269$           4,909$           5,891$          

Water & Sewer 4,200$           4,620$           5,082$           5,692$           6,546$           7,855$          

Refuse 5,250$           5,775$           6,353$           7,115$           8,182$           9,818$          

Telephone & Internet 3,150$           3,465$           3,812$           4,269$           4,909$           5,891$          

   Total Utilities 24,150$         26,565$         24,140$         24,190$         26,182$         31,419$        

Maintenance & Repair 12,600$         13,860$         15,246$         17,076$         19,637$         23,564$        

Materials and Supplies 10,500$         11,550$         12,705$         14,230$         16,364$         19,637$        

Marketing and Promotion 21,000$         23,100$         25,410$         28,459$         32,728$         39,274$        

Taxes 13,756$         9,427$           12,034$         16,313$         21,685$         26,022$        

Travel & Misc. Other 2,100$           2,310$           2,541$           2,846$           3,273$           3,764$          

   Total Other 59,956$         60,247$         67,936$         78,923$         93,687$         112,261$     

Total Expense 225,556$      253,969$      280,308$      324,082$      384,369$      449,929$     

                             % Growth 13% 10% 16% 19% 17%

(Loss) or Surplus (54,180)$       (67,619)$       (42,408)$       (1,592)$         44,316$         136,046$     

Cum (Loss) or Surplus (54,180)$       (121,799)$     (164,206)$     (165,798)$     (121,482)$     14,563$        

Table 23:                                                    Island County Fairgrounds

Financial Projection ‐‐ Middle

Page 50: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 41 of 90 

Port of South Whidbey 

 

 

   

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Total Revenue 151,645$      186,350$      237,900$      322,490$      428,685$      585,975$     

Total Expense 225,556$      253,969$      280,308$      324,082$      384,369$      449,929$     

(Loss) or Surplus (54,180)$       (67,619)$       (42,408)$       (1,592)$         44,316$         136,046$     

Figure 14:                          Financial Projection ‐‐ Middle

 $(200,000)

 $(100,000)

 $‐

 $100,000

 $200,000

 $300,000

 $400,000

 $500,000

 $600,000

 $700,000

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Financial Projection ‐‐ Middle

Total Revenue Total Expense (Loss) or Surplus

Page 51: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 42 of 90 

Port of South Whidbey 

 

   

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Revenue 2016 2017 2018 2020 2022 2025

RV Park / Campgrounds  40,750$         53,750$         71,010$         91,640$         116,800$      144,550$     

Major art event 3,000$           9,000$           15,000$         30,000$         60,000$         90,000$        

Major swap meet/garage sale 7,500$           12,000$         20,000$         50,000$         75,000$         100,000$     

Music food and drink festival (choochokam 7,000$           12,000$         18,000$         30,000$         50,000$         75,000$        

Weddings 3,600$           7,200$           12,000$         14,400$         20,000$         28,000$        

Smaller one‐building events (receptions,  3,000$           5,000$           7,000$           10,000$         15,000$         20,000$        

Full Fairgrounds events (Ragnar) 2,000$           3,000$           4,500$           7,500$           10,000$         15,000$        

Building rental   22,000$         27,000$         32,000$         35,000$         40,000$         45,000$        

Kitchen rental 12,540$         16,500$         19,800$         33,000$         48,125$         66,825$        

Boat/RV Storage 6,700$           7,000$           7,500$           19,000$         24,000$         29,000$        

4‐H activities 1,300$           1,500$           1,800$           2,200$           2,400$           2,600$          

Equestrian events 2,750$           3,500$           7,500$           12,000$         20,000$         30,000$         Annual Fair 55,000$         65,000$         75,000$         95,000$         115,000$      135,000$     

Miscellaneous Income 1,200$           1,500$           2,000$           4,000$           6,000$           8,000$          

     Total Revenue 168,340$      223,950$      293,110$      433,740$      602,325$      788,975$     

                             % Growth 33% 31% 48% 39% 31%

Expense

Administrative salaries 60,000$         61,000$         62,000$         63,000$         67,000$         71,000$        

Administrative support salaries 10,000$         20,000$         30,000$         50,000$         70,000$         90,000$        

Maintenance salaries 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maintenance support salaries 15,000$         30,000$         45,000$         60,000$         90,000$         120,000$     

P/R Taxes and Benefits @ 23%, 24%, 25% 28,750$         36,336$         42,672$         53,550$         67,150$         80,750$        

    Total Payroll 153,750$      187,736$      220,472$      267,750$      335,750$      403,750$     

Electricity 8,400$           9,240$           5,082$           2,846$           1,636$           1,964$          

Propane 3,465$           3,812$           4,269$           4,909$           5,891$           7,069$          

Water & Sewer 4,620$           5,082$           5,692$           6,546$           7,855$           9,426$          

Refuse 5,775$           6,353$           7,115$           8,182$           9,818$           11,782$        

Telephone & Internet 3,465$           3,812$           4,269$           4,909$           5,891$           7,069$          

   Total Utilities 25,725$         28,298$         26,426$         27,392$         31,092$         37,310$        

Maintenance & Repair 13,860$         15,246$         16,771$         18,783$         21,601$         25,921$        

Materials and Supplies 11,550$         12,705$         13,976$         15,653$         18,000$         21,601$        

Marketing and Promotion 23,100$         25,410$         27,951$         31,305$         36,001$         43,201$        

Taxes 11,954$         11,329$         14,827$         21,941$         30,469$         36,562$        

Travel & Misc. Other 2,310$           2,310$           2,541$           2,846$           3,273$           3,764$          

   Total Other 62,774$         67,000$         76,065$         90,527$         109,343$      131,048$     

Total Expense 242,249$      283,033$      322,963$      385,669$      476,185$      572,108$     

                             % Growth 17% 14% 19% 23% 20%

(Loss) or Surplus (73,909)$       (59,083)$       (29,853)$       48,071$         126,140$      216,867$     

Cum (Loss) or Surplus (73,909)$       (132,992)$     (162,845)$     (114,775)$     11,365$         228,232$     

Financial Projection ‐‐ Aggressive

Table 24:                                                 Island County Fairgrounds

Page 52: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 43 of 90 

Port of South Whidbey 

 

 

   

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Total Revenue 168,340$      223,950$      293,110$      433,740$      602,325$      788,975$     

Total Expense 242,249$      283,033$      322,963$      385,669$      476,185$      572,108$     

(Loss) or Surplus (73,909)$       (59,083)$       (29,853)$       48,071$         126,140$      216,867$     

Figure 15:                        Financial Projection ‐‐ Aggressive

 $(200,000)

 $(100,000)

 $‐

 $100,000

 $200,000

 $300,000

 $400,000

 $500,000

 $600,000

 $700,000

 $800,000

 $900,000

Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Financial Projection ‐‐ Aggressive

Total Revenue Total Expense (Loss) or Surplus

Page 53: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 44 of 90 

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

This Page Intentionally Left Blank 

   

Page 54: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 45 of 90 

Port of South Whidbey 

APPENDICES 

A.  Fairgrounds Buildings 

B.  CERB Requirements 

C.  Relevant Property Information 

D.  Sources of Possible Grants and Loans 

   

Page 55: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan  Page 46 of 90 

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

This Page Intentionally Left Blank 

 

Page 56: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 47 of 90 

Port of South Whidbey 

APPENDIX A—FAIRGROUNDS BUILDINGS 

ThebuildingandinfrastructureontheFairgrounds(seetheGoogleEarthimageinFigure16andthelistofbuildingsandareasinTable25)areinsomecasesapproaching80yearsoldandhavebeenlargelyneglectedforsometime.Forthemtoprovidethemaximumsupportfortheiruse,anumberofrenovations,andinsomecaseseventualreplacementneedstotakeplace.Eachofthebuildingsandareasaredescribedonthefollowingpages:

Table 25: List of Fairgrounds Buildings and Areas  Structures Size LengthandWidth1. GustSkarbergPoleBuilding 12,000sf. 80x1502. TurnerBuilding 5,000sf. 50x1003. BurrierBuilding 4,800sf. 50x964. MaloneBuilding 6,720sf. 60x1125. GoatBarn 6,720sf. 60x1126. CattleBarn 3,190sf. 55x587. Grandstand/AlpacaBarn 3,000sf. 8. HorseBarnNo.1 4,200sf. 50x849. HorseBarnNo.2 3,400sf. 40x8510. HorseBarnNo.3 3,200sf. 40x8011. HopeBuilding(TwoStory) 2,140sf. 34x6312. Coffman4‐HBuilding 3,440sf. 40x8613. DogArenaandShelter 4,320sf. 60x7214. AntiqueBarn 4,320sf. 60x7215. Swine/CatBarn 1,800sf. 30x6016 Rabbit/PoultryBarn 2,345sf. 35x6717. SheepBarn 3,456sf. 60x11218. Cavy/GuineaPigBarn 288sf. 24x1219. KenShort‐FiddleFaddleFarm 1,330sf. 35x3820. MidwayFood&BeverageBooths 2,784sf. 12x23221. Midway(EvaMaeGabelein)Stage 760sf. 20x3822. Restroom‘A’ 560sf. 20x2823. Restroom‘B’(TwoStory) 450sf. 24. Restroom‘C’(HorseRestroom) 432sf. 18x24 TotalBuildings 84,987sf.

OtherAreas Size Function

25. LoggingShowArea 26. HorseArena(150x220) 33,000sf. EquestrianShowsandTraining27. RecreationVehiclePark(0.85acres) 37,000sf. RVParkingandDumpStation28. CarnivalArea 20,000sf. Rides,Games,Food&Beverages

TotalOtherAreas 92,250sf.

 

Page 57: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 48 of 90 

Port of South Whidbey 

Figure16:theIslandCountyFairgroundsfromGoogleEarth(5/2/2015)

 

Page 58: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 49 of 90 

Port of South Whidbey 

1. Gust Skarberg Pole Building 

TheGustSkarbergPolebuilding,thecenterpieceoftheFairgroundsanditsoldeststructure,wasbuiltbytheWPAin1935‐36.ItisaWashingtonStateHeritageBarnandacityofLangleyHistoricbuilding.ThebuildinghasGableandMonitorroofshapes,Snap‐Locmetalroofcovering,woodenboardandhalfpolesiding,andaconcretefoundation.Itisframedwithroundlogs(poles)andhasariverstonefireplace.

Thebuildingconsistsof:

Alargecentralopenauditoriumorballroomwithastageanddressingrooms,butonlytemporaryseating.

Asmallseparatetheaterbehindthemainstage,theBlackBoxTheater,withraised‐rafterseating;

Administrativeofficesandstoragerooms; Alargecertifiedcommercialkitchenanddiningareawithastorageroom,andabathroom; Sixsmallroomsonthewestside,andtwolargeboothsacrossthefront.

Ithassignificantpotentialforeventuseincludingweddings,receptions,auctions,dinners,plays,conventions,displays,andmeetings.TofullyutilizethepotentialofthePoleBuildingthefollowingrenovationandrestorationneedstobehandled:

Add,repair,orreplacethefollowingsafetyitems:allstairrailingsforADAcompliance,fireexitintheBlackBoxTheater,emergencylighting,firealarmsystem,panicbarsondoors.

Repairrotineavesandatthegroundlevelofthepolesiding. Addweatherstrippingandplugholesinthewallsandceilingtowalljoint. Addinsulationandheatingtothediningarea Remodeldiningareatomakeitmoreattractive Replacetableandchairs Addawalk‐inrefrigerator,drystorage,andotherequipmenttothecommercialkitchen Addinsulationandheatingandremodelboththemainauditoriumandstagetomakethem

moreattractive AddAVequipmentforsoundandvideoprojection

Theinformationforthisappendixcomesfromthesesources: IslandCountyFairgrounds,PropertyHistory,2012byHarrisonGoodall BuildingAssessments,2015byJimLux IslandCountyFairgrounds,DueDiligenceReport,2015byMeleneThompson NotesfromRobertLowey,2015

Page 59: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 50 of 90 

Port of South Whidbey 

 

 

 

Source: Harrison Goodall 

   

Page 60: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 51 of 90 

Port of South Whidbey 

2. Turner Building 

TheTurnerorCommercialbuildingisaWashingtonStateHeritageBarnbuiltinthe1940sor50s.Turnerisalargeclerestorytypebarnwithoutloftandwithdriveindoorsateachend.IthaswoodenstallseparatorsdownbothwallsandalargecentralcorridorwithtemporarybutheavysolidstallseparatorsusedforcommercialboothsduringtheFair.Asaresult,ithaslimiteduseduringtherestoftheyear.

IthasaMonitorroofshape,aSnap‐Locstandingseammetalroof

covering,Board&battensiding,andaconcretefloorandfoundation.Duringrainstormsithaswaterrunningdownthemiddleofthefloor.

Toprovidebetterusability:

Replacethelargeslidingdoorsoneitherend. AddFrenchdrainsinfrontoftherearmaindoortopreventwaterenteringthebuilding Replaceallofthecentralcorridorstallpartitionsandsomeoftheside‐wallstallpartitionswith

polesanddrapestobemoreusableforstorage

3. Burrier Building 

TheBurrierbuildingisaWashingtonStateHeritageBarnbuiltinthe1940sor50s.Itisdividedintotwointernalareas:

Theeastside,onceaschoolhouse,hasadropceiling,raisedwoodenflooring,andisinsulatedandheated.

Thewestsidehasopenrafters,concretefloor,andisunheated.

IthasaGableroofshape,aSnap‐Locmetalroofing,board&battensiding,andconcretefloorfoundation.

Toprovidebetterusability:

Insulate,drywall,heat,andreplacethedoorsonthewestside Removetheoldfurnaceroomandreplacetherottenwall,floor,andceilingintheeastside.

Page 61: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 52 of 90 

Port of South Whidbey 

4. Malone Building 

TheMalonebuildingisaWashingtonStateHeritageBarnbuiltinthe1950s.Itisalarge,uninsulated,unheatedbuildingingoodconditionwithhighceilingsandaspaciouscharacter.ConstructionispoletypewithaZolatonepainted,crackedconcretefloor,newerredsteelstandingseamroofing,andinteriorplasticfacedroofinginsulation.

Northandsouthgablewallendshavebeenenclosedwithtranslucentroofingpanelswithfourfansthatdon’tpreventhightemperatures.

Maloneoffersgoodmulti‐usepotential,buthasbeenlimitedtoboatstorage.Maloneisgenerallyunderutilizedandoffershighpotentialforhostingevents.Toprovidebetterusability:

Replacethefiberglasspanelswithinsulatedglass,addheating,andrepairfloorcracks. AddFrenchdrainsinfromofdoorstopreventmudandwaterfromseepingthroughdoors.

5. Goat Barn 

TheGoatbarnisaWashingtonStateHeritageBarnbuiltinthe1950s.Itmaybethesecondmostimportantbuildingintermsofhistoricalcharacter.Goatisalofted,clerestorybuildingprovidingstrongcountryfairambience.Ithasalongopenshedalongtheeastsideandasmallclosedshedonthewest.Insidethebarnisaloftandbuilt‐inpens.Theroofislow,restrictingstorage.

IthasaMonitorroofshape,Snap‐Locmetalroofing,board&battensidingandaconcretefoundation.Toprovidebetterusability:

Cleanouttheloftandinstallnewandimprovedlighting. Replacethepermanentpenswithcollapsible,removableones. Replacetheroofandsupportonthelongeastsideshed.

Page 62: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 53 of 90 

Port of South Whidbey 

6. Cattle Barn 

TheCattlebarnisaWashingtonStateHeritageBarnbuiltinthe1950s.Itisopenonthreesideswithnodoors.Itisalargerectangularstructuredividedintothreepartsbysupportingpostsandfencingwhichcreatesacenterpathforpeoplewithtwosideareastocontaincattle.

CattlehasaGable(maybewanna‐be)roofshape,agalvanizedcorrugatedmetalroofcoveringandadifferenttypeofmetalonanotherpartoftheroof(bothofwhichneedreplacing),plywood

siding,andaconcretefoundation,butdirtfloor.

Thisbuildingislightlyusedwithonlyafewcattleduringthefairandisalmosttotallyunusedoutsideofthefair.ThisplanenvisionsreplacingCattleandtheGrandstandwithoneortwonewbuildings.

7. Grandstand / Alpaca Barn 

TheGrandstand/Alpacabarnisapoleandcantileveredrafterstructure.Itsoriginaluseasseatingforeventstoitseasthasbeencompromisedbylocationofchildren’scarnivalridesthatnowoccupytheentireareabetweenitandtheFiddleFaddlebarn.Interiorpostssupportingseatingandroofraftersdividegroundlevelunder‐coverspaceintoenclosedeaststorageunits(underthebleachers),acentralaisle,andanimalstallsinthewesternthird.

Thestallsarecurrentlylightlyusedtohousethe4Halpacacontingent,andthe bleachers are only used for a few hours each year. ThisplanenvisionsreplacingCattleandtheGrandstandwithoneortwonewbuildings.

Page 63: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 54 of 90 

Port of South Whidbey 

8. Horse Barn 1 

Allthreehorsebarnswerebuiltinthe1950s.Allareopenunprotectedstructureswithoutdoors.Theyareallpolebuildingsandaredirectlyacrossfromandsupportequineactivitiesinthearena.

HorseBarn1is of sound construction andhassingleanddoublestallsalongtheeastandwestwallswithacentralcorridor.IthasaGableroofshape,a rustedcorrugatedmetalroofingnearing the end of its lifespan,horizontalplanksiding,andaconcretefoundation.

Inaddition,allthreehorsebuildings,plusallotheranimalbuildingstothenorthofthehorsebarns(Grandstand,Cattle,andGoat),areborderedbyuncontrolled(some80’)aldertreesonthebankbeyondthepropertyline.Thealdershavegrownupandoutandnowoverhangallsixstructuresmakingtheircontroloneofthemostpressingsafetyissuesonthefairgrounds.

Thisplanenvisionsallthreehorsebarnsbeingreplacedwithoneortwonewonesthataremoreflexibleandcanpossiblybeusedforotherpurposes.

9. Horse Barn 2 

HorseBarn2hassingleanddoublestallsalongtheeastandwestwallswithacentralcorridor.Ithasaloftthatisusedforstorage.

HorseBarn2hasaMonitorroofshape,agalvanizedcorrugatedmetalroofingingoodcondition,boardandbattensiding,andaconcretefoundation.ItisinFaircondition

ThepostsofHorseBarn2(and3)arepressuretreated4x4’s,notthe6x6’sofHorseBarn1,andsoaremorepronetoweaknessduetodeterioration.BothHorse

Barn2and3outerpostseitherrestonorareanchoredintwoparallelconcretefootingsthatsupporttheouterwalls.Innerpostsare,possibly,justburiedinsoil.

RoofwaterneedstobebetterhandledwithguttersanddownspoutsgoingintoFrenchdrainsalongthefrontofeachbuilding.

Page 64: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 55 of 90 

Port of South Whidbey 

10. Horse Barn 3 

HorseBarn3hassingleanddoublestallsalongtheeastandwestwallswithacentralcorridor.IthasaGableroofshape,a rustedcorrugatedmetalroofingnearing the end of its lifespan,T‐111siding,andaconcretefoundation.

HorseBarn3,thenewestandleastwellbuilt,hasasubstandardroofdesignwithsmall2x4raftersspanningmuchmoredistancethantheyshould,aswellaspoorkneebracessupportingtherafters.Inadditiontheroofpeakflashingwastoonarrowandwaterhasleakedintothe

plywoodroofinganditisnowrotten.ThusthelifespanofHorseBarn3isdependentonajudgmentwhetherreplacingtheroofonamarginalpoststructureislessprudentthanreplacingthebuildingentirely.

11. Hope Building 

TheHopebuildingwasbuiltin1998withadonationfromtheBoeingCompanyfortheHopeTherapeuticRidingprogram.ItisusedbytheHopeprogram,4‐H,andotherequestrianprogramsfortrainingandvariousevents,races,andexhibitions.

Hopeisatwo‐storybuildingwithaGablemetalroof,T‐111siding,andaconcretefoundation.Itisinsulatedandheated.Ithasatackroom,a

classroom,anoffice,asmallkitchenwithaconcessionwindow,abathroom,alargermeetingroom,andanannouncer’sboothoverlookingthearena.Itisfrequentlyusedandisingoodcondition.Thereisnoknownneedformaintenanceorupgrade.

Page 65: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 56 of 90 

Port of South Whidbey 

12. Coffman 4‐H Building 

TheCoffman4‐Hbuildinghasaconcretefloorandfoundation,studwalls,redstandingseamsteelroof,hotairpropanefurnacewitha500galtank,men’sandwomen’srestroomswithasingleshowereach,acertifiedcommercialkitcheninexcellentcondition;anadjacentstorageareaforkitchenrentermaterials,aspaciousmeetingroomfor75to100peopleifitsthreeexitsareapproved,andacontiguousadditionforstorage.FlooringisZolatonetype(speckled)paintedconcrete.

Coffmanliabilitiesareacrackedconcretefloor,lacklusterexternalandinternalpaintcolors,rudimentarybathrooms,pooruseofthewestadditionasastoragelocation,androttingnorthwalloftheaddition.Suggestedimprovementsinclude:

Addwalk‐inrefrigerationandotherequipmentsuchasslicersandmixerstothekitchen. Redecorate,repaint,andthematicallydevelopthebuildinginteriordécortomakeitvisually

interestingandappealingconsistentwiththefairand4H;improveadaptabilityoftheroomfordifferentuses;andcontrolnoiselevelssothatconversationalnoiseofcrowdsdoesnotinhibitsmallgroupconversation.

Update,freshen,paint,andotherwiseimprovetherestrooms. Fillfloorcracksandrepaintfloorincludingtheunpaintedrestroomsandcorridorfloors. Installlarge,shallow,enclosed4Hdisplay/trophycaseoninteriorwalltotheleftofmainentry,

andpopulatethecasewithtrophies,photos,andotherinformationalmaterialtoconnecthistoricalandongoing4HpresenceandvitalitytoCoffman.

Re‐paintexteriorcolortomorevibrantcolorconsistentwithagriculturaltheme. Repairnorthwalloftheadditionandmakethespace(perhapspartially)availableandmore

commerciallyappealingasacontiguousspacetoCoffman’sinterior.

Page 66: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 57 of 90 

Port of South Whidbey 

13. Dog Arena and Shelter 

TheDogarenaisafencedgrassyareawithasetoffivebleacherrowsundercoverofaredmetalsheathedopensidedroofonthewestandashelterwithadoublerowofsmallshowingstallsseparatedbyacentralcorridorcoveredbyasinglepitched,shedstylemetalroof.Thedogstallbuildingisapartiallywalledpoleconstructionwithaconcretefloorandelectricity.ItliestothesouthofCoffmanandtothenorthoftheRayGabeleinAntiquebuilding.The4Hdogcontingentisveryactiveanditsjudgingandshowingactivitiesduringfairarewell

attended.Stallsaredecoratedandentrantsareidentified.Eachstallisoccupiedbyadogcage,anelevatedplatform,andonedog,usuallywithitsownerwhoistheretoanswerquestions.

14. Ray Gabelein, Sr. Antique Barn 

TheRayGabelein,Sr.AntiqueBarnisanewerbuildingwithtallwalls,talldrive‐indoorsnorthandsouth,andawalkindoorattheNWandSEcorners.Sidingisverticalplankwithspacesbetweenplanksandnobattensmakingitairandmoisturepermeable.Theupperfewfeetofendwallsaretranslucentplasticpanelsfornaturalinteriorlighting.Theroofiswhitemoderncorrugatedsteelwithacondensationbarrier.Itisgutteredwithdownspouts.(Drainintegrityanddrainendsareunconfirmed.Theremaining

rooflifespanisintermsofdecades.

Thebarnhasformanyyearsbeenbothstorage(betweenfairs)andadisplayarea(duringfairs)forantiquefarmandothertoolsandequipment.Alsoduringthewinteroneormoreboatsarestoredthere.Averysignificantamountofworkandexpensewouldhavetobedonetousethebuildingforanythingotherthanstorage.

Thebuildingshouldberepaintedinthenext2‐4years.Alsotheslidingmaindoorsbothneedrepairatthebottomguidesandtoprollers.Securityofdoorsshouldbeimprovedastheftsofcontentshavetakenplace.

Page 67: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 58 of 90 

Port of South Whidbey 

15. Rabbit and Poultry Barn 

TheRabbitandPoultrybarnisasmall,older,clerestorystylebuildingsimilartoGoat.ItwasoriginallypartofGoat,butwassawedinhalfandmoved.IthascentralNorthandSouthdrive‐indoors.Ithasacenteraisleandtwo12’sideaisleswithmovableanimalcagesduringthefair.Anadditionalshedroofhasbeenaddedtothewestsidewithshedraftersandsmallstalls.Leaksatthejunctureoftheshedroofandmainroofhavecausedsomerotintheoriginalmainroof.Exteriorshedstallfloorsare

concreteextendingontoarough3’widesidewalk.Thegeneralconditionofthefoundationandwallstructureissound;plankouterwallsareweatheredwithsplitsthroughout,andheavilyweatheredatbottoms.TheroofissamevintageasotherredmetalSnapLocroofingonotherbuildings.

Immediateneedsincludereplacingthewaterspigotonnorthendwithasubsurfacefrostfreefaucet.Assessshedrooftomainroofforsolutiontowaterleakage.Thesouthsidewaspaintedthisyear;remainderneedspainttoprotectsiding.

16. Bob Martens Swine and Cat Barn 

TheSwineandCatbarnisdividedlengthwiseroughlyintothirds,withthenorththirdhousingcatsandthesouthtwothirdshousingswine.Thebuildinghasaconcretefloordividedintosmallpenswithsteelpostsintheconcrete,connectedbyfencingwhichlimitsthebuildingtoonlyfairtimeanimaloccupation.Non‐fair,multi‐usepotentialwouldrequireremovalofallfenceposts,storageofsame,andmodificationstothepostholesandpoststopermitre‐assembly.

Page 68: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 59 of 90 

Port of South Whidbey 

17. Sheep Barn 

TheSheepbarnhaspoleconstructionthatisgenerallygoodconditionexceptforone,andpossiblymore,eastsidepostthatisdeterioratedsub‐surfaceduetodisconnectionofthegutterdownspout.Thereisaseconddownspoutthatisalsodisconnected.Thespacebehind(east)Sheepwallisperhaps6’fromthebluffedgeandtheareaiscompletelyfilledwithblackberryvines,preventingworkonthedownspouts.

Thebuildingfloorisdirt,thesidewallsare7’highT111leavingvoidsboth

fromwalltoptoroofandwallbottomtoground.Endwallsarepresentexceptforanapproximate12’wideopendoorway.ThebuildinginteriorisdividedintosheeppensofTpostsbearinghogwireonplastictiesforfairactivity,andbyacentral~12’wideplypartitionhangingfromthetrusslowerchordandbearingelectricalconduitandalightswitch.TheImmediateneedsinclude:

Clearingtheblackberryvinesontheeastside Repairingthedownspoutconnectionsandassessingdrainagedispersion Repairinganyrottedpostbottoms Sprayingtheinsidetrusseswithableachsolutiontokillmossandmoldonrafters Paintingtheoutsidewallswithinnextcoupleofyears,andtheinteriorwallswithinacoupleof

yearsafterthat.Fortheexteriorpaintconsiderthedesirabilityofredvs.thecurrentgreen.

Paintingorreplacingtheroof,whichissoundbutcorroded.Paintingwithasteelroofingpainttoextendlifelookscheaper,butmayrequiresignificantlaborforpreparation,primingandpainting,andpossiblydamagingtheroof’swaterproofingabilitybywalkingonit.

TheSheepbarncouldbeusedforboatorotherstoragebetweenfairsbyremovalofTpostsandhogwirepensandenclosingthebuilding.Thecentralpartialpartitionisanimpedimentbutthereisaccessfrombothenddoors.Wallvoidstopandbottomwouldneedtobecovered,andenddooropeningswouldneeddoorsconstructedtoprovidecontentsecurityandpreventwind‐blowndebrisandmoisture.FairprepofpenscouldbedrivingTpostsinandreattachinghogwireeveryyear,orburyingshortpipesectionsforeasier,fasterinsertionofsmallerpipesaspenposts(capsinstalledduringmostofyear),thoughsemi‐permanentfloorspigotswouldimpedecleaning.Solutionstopenset‐up/take‐downmustreviewedforspeedandeaseofprocess.Dirtfloorlimitsabilitytocleanandpouringaconcretefloorwouldbeaniceimprovementthoughwouldnotaddsignificantlytodualpurposeuseandcomesatahighcost.Enddoorheight(8’7”north,8’1”south)isperhapsthebiggestlimitingfactorbutwouldpermitsmallboats,tenttrailers,andsmallertraveltrailers.

Page 69: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 60 of 90 

Port of South Whidbey 

18. Cavy / Guinea Pig Barn 

TheCavyorGuineaPigbarnisoneoftheolderstructuresontheFairgrounds.Itcontainssmallcagesforguineapigsandisonlyusedduringthefair.Itbadlyneedsanewrooftoreplaceitscedarshakes.

19. Ken Short Fiddle Faddle Barn 

TheKenShortFiddleFaddlebarnisanopenbarnstructureusedforchildren’sactivitiesandrecentlyforawedding.

Page 70: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 61 of 90 

Port of South Whidbey 

20. Midway Food and Beverage Booths 

ArowoffoodvendorboothslinesthenorthsideofthemidwaywitheastandwestboothsseparatedbytheraisedEvaMaeGabeleinMainStage.TherowsitsrightonthenorthernFairgroundspropertyline.TheFairparadeonSaturdayrunsfromdowntownLangleytotheFairgroundsandroutesthroughthemidway.Postparade,picnictablesaresetupinfrontofthebooths.

WhiletheVendorboothsarenotingenerallygoodcondition,theyremain

functional.Theyareofuninsulatedstudconstructionwithconcretefloorsandredstandingseamsteelroofingofthesamevintageasthemainbuildingrowacrossfromthem.Boothsareequippedwithhotandcoldwater,sinks,andtwooftheboothshavecookingapplianceswithventhoods.Generalexteriorconditionisgoodtofair,withinteriorfairtopoorandrelativelydirtyfromyearsofuse.Theventhoodsdonothavefiresuppression.Wateristurnedoffbeforefreezingweatherandthetwohotwaterheatersaredrained.Consideration of the replacement or rebuilding of the entire 

vendor line is less probable due to their condition than to the steady progression of food handling and 

food preparation health regulations, which are more and more limiting what can be done in the booths

21. Eva Mae Gabelein Midway Stage 

TheEvaMaeGabeleinstageislocatedamidtheMidwayFoodBooths.Itisanoutdoorsstageforperformancesmainlyduringthefair.Itstoresseatingbenchesintheoffseason

Page 71: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 62 of 90 

Port of South Whidbey 

22. Restrooms ‘A’ 

Eachofthethreerestroomsarerudimentarymen’sandwomen’srestroomswithoneortwoshowerstalls.Theyhaveaconcreteslabfloor,studdedwalls,T‐111sidingandared,standingseamsteelroofoflowpitch.Restrooms‘B’and‘C’areprimarilyusedonlyduringtheFair.

Restroom‘A’istheprimaryFairgroundsrestroomandisusedyeararound.

Allthreebathroomscouldbenefitfromupdatingthefacilitiesandpaintinginsideandout.

23. Restrooms ‘B’ 

Restroom‘B’isatwo‐storybuildingwithasmalloneroomapartmentonthesecondfloorwithitsownbathroomandasmallkitchen.TherestroomisnotusedmuchoutsideoftheFair

Theoutsideneedspaintingandthedeckonthesouthsidehassomerottenboardsinit.

Page 72: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 63 of 90 

Port of South Whidbey 

24. Restrooms ‘C’ 

Restroom‘C,’‘Horserestroom,’or‘4‐HrestroomislocatedbetweentheGrandstandandHorsebarn1.Itisusedduringequestrianactivities,aswellasduringtheFair

25. Logging Show area 

TheloggingshowareaoccupiesatriangleattheSEcornerofthearenaandcontainsanin‐groundpoolforlogrolling,asetofbleachersingoodcondition,groundareausedtostoreandmovelogsforvariousevents,andtwotallpolesforclimbingcontests.Tomyknowledgeitisusedonlyonceayearforadayortwoduringthefair.Theeventdrawsabout100fairattendeesandhasasmallbutmotivatedgroupofparticipantsincludingAlbertGabelein.Lowannualusageandtotalattendancewouldsuggestfindingmoreutilityforthis

areaduetoitsbleachers.Thewoodcovers,liftedoffbycraneforlogrolling,wouldappeartoofferaready‐madeadditionalstageareawithbleacherseating,butusewouldhavetobewellcoordinatedwithprotectiveloggersandorganizers.Thepresenceof3’ofwaterunderthestagemeansthatpossiblecollapse,intowater,wouldhavetobepreventedatallcosts,andthattheuseofelectricitywouldbeproblematic.Neverthelessthearea’sunder‐utilizationmakesitatargetforotherusesiftheprimaryusecanbemaintained.

Page 73: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix A—Buildings  Page 64 of 90 

Port of South Whidbey 

26. Horse Arena 

TheHorseArenaislocatedprettymuchinthecenterofthefairgrounds.Itisusedfor4‐Handotherequestrianshowsduringsevenoreightmonthsoftheyear.

Ithasevengreaterpotentialifitwerecovered,forbothequineandnon‐equineevents.Alsothefooting(thegroundonarenafloor)needstobereplacedforusebyothertypesofequestriansandformotorsports.Finally,boththelightingandthesoundsystemcouldbeupgraded.

27. RV Park and Campground 

TheRVParkandCampgroundisa.85acretriangularplotofgroundatthesoutherntipofthefairgrounds.Ithas3030‐amphookupswithawaterconnection,andthereisaseparatesepticdumpstation.

DuringtheFairMarilynandEliseGabeleinlayoutaFireDepartmentapprovedplanfor70smallerRVs.

LarryKwarsickhadaprofessionallayoutdonewith30sites,15ofwhicharepull‐throughsites.Healsodidresearchfor50‐amphookups.

InthisplantheRVParkandCampgroundsareenvisionedto:

Becleanedupandbeautified Installanewsetofrestroomswithshowers(promisedbytheCounty,butnotdone) GetimprovedRVhookupswith50amppower,water,andsewer

Page 74: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 65 of 90 

Port of South Whidbey 

Appendix B: CERB Planning Study Minimum Requirements  APlanningStudy,entitled“AVisionfortheIslandCountyFairgroundsandaPlantoAccomplishIt,”ofwhichthisappendixisapart,addresseseachoftheCERB’sminimumrequirementsasfollows: 

a. A product market analysis linked to economic development. ThePlanningStudyprovidesamarketanalysisthatislinkedtojobscreation,asprovidedinanswerto“o‐1”below.

 b. A market strategy containing action elements linked to timelines. 

ThePlanningStudyprovidesamarketstrategycontainingactionelementslinkedtotimelinesasshownonpages15and25.

 c. Identification of targeted industries. 

ThePlanningStudyonpages26‐35providesalistof“economicpotentials”thatarethetargeteventsandactivitiesthatwillprovideadditionalrevenue.

 d. Identification of the group responsible for implementing the marketing strategy. 

Describe the group’s capacity to complete the responsibility. ThePlanningStudyidentifiesthePortofSouthWhidbeyonpage4andamanagementandstaffingteamdescribedonpages11and36andaddressestheircapacitytocompletetheplan.

e. The site’s appropriateness by addressing, at minimum, appropriate zoning, affect to the state or local transportation system, environmental restrictions, cultural resource review, and the site’s overall adequacy to support the anticipated development upon project completion. TheIslandCountyFairgroundsiswithintheCityofLangleyandisgovernedbytheirzoning,specificallythefollowingchapters:

1. Chapter18.09identifieswhatispermittedwithintheP‐1(PublicUse)zoningthatisassignedtotheFairgrounds.

2. Chapter18.10providesaFairgroundsZoningOverlaythatestablishesarangeofpermittedusesandstandardsthatmightnototherwisebepermittedwithintheP‐1zoning.

3. Chapter18.33statesthattheCitysupportsandprotectsthepermittedandcustomaryFairgroundsrelatedactivitieseventhoughtheymaynotbecompatiblewithnearbyresidentialuses.

ThemajorityofwhatisproposedinthePlanningStudyfallswithinthecurrentLangleyzoning.Twopotentialareas,lightindustrialandbrewinganddistilling,arenotcovered,andthecityispreparingtoincludethoseinanupdateoftheircomprehensiveplan.

ThePlanningStudyenvisionsworkbeingdonetomitigatethestormwaterrunoffproblemsontheFairgrounds.SuchasolutionwillrequireworkingwithLangleytohandlethedischargewaterintwocreeks.

StateandlocaltransportationareanissuethatisdiscussedinthePlanningStudy.TheFairgroundsisonseveralmajorIslandTransitroutes,aswellasapotentialweekendbusservice,bothconnectingwiththeWashingtonStateFerryinClintonandanewparkinglotinMukilteo,allofwhichsupporttheactivitiesinthePlanningstudy.

Page 75: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 66 of 90 

Port of South Whidbey 

TherearenoknownenvironmentalrestrictionseffectingtheFairgroundsandtheproposedusesofitasdescribedinthePlanningStudy.

TheFairgrounds’almost80year‐oldhistoricbuildingsandlegacyofanover100year‐oldcountyfairaremajorculturalresourcesthatareembracedandpromotedbythePlanningStudy.

TheFairgroundssiteanditsmanyhistoricbuildingsprovidethefoundationformanyoftheactivitiesandeventsdescribedinthePlanningStudy.ThereisoneneedthatislackingintheFairgroundsandthatisforsufficientparking.ThisneedandseveralsolutionsforitarediscussedintheStudy.

 f. A location analysis of other adequately served vacant industrial land. 

TheplanningstudyisfocusedontheIslandCountyFairgroundsbecauseofitsalready‐existinginfrastructure.ThereispropertysurroundingtheWhidbeyAirparkinLangleythatiszonedforcommercialuses,howeveritlackstheinfrastructureofalready‐existingbuildingsandutilities,sothecapitalinvestmentwouldbeprohibitivelyexpensivetoincludepurchaseoftheproperty(ies)andconstructionofallnewbuildings.AppendixCdiscussestheadequacyofseveralpotentialpropertiesthatmightbeusedbytheFairgroundsforparkingandanexpandedRVpark.

g. Total funding for the public facilities improvements is secured or will be secured within a given time frame. ThePlanningStudyonpages12and13discusseshowfundingforpublicfacilitiescanbesecuredandthetimeframeexpectedandprovidesinAppendixDanumberofgrantandloanresources.

 

h. An analysis of how the project will assist local economic diversification efforts. ThePlanningStudydiscusseshowtheFairgroundscanbeamajorneweconomiccontributorandthereforeadiversificationofthelocaleconomy.

 i. Indicate the specific issues that will be addressed. 

ThespecificissuesthatwillenabletheFairgroundstobeaself‐sufficiententity,asdescribedinpages13‐21ofthePlanningStudy,include:1. Beautificationandrenovationofthegrounds2. Improvedsignage3. Insulateandheatseveralbuildings4. Upgradetwocommercialkitchens5. Handlestorm‐waterrunoffandstabilizetwobluffs6. Renovateandremodelseveralbuildings7. Addanewrestroomwithshowersinthecampgrounds8. ReplaceandupgradeRVhookups9. Addsolarpower10. Addparking11. Addanewcoverandreplacethefootingtothearena12. Replaceseveralbuildings

 

Page 76: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 67 of 90 

Port of South Whidbey 

j. List one or more economic outcomes that you expect from the proposed CERB project. ThemajoreconomicoutcomeexpectedinthePlanningStudyisthattheFairgroundswillbecomeapositiveeconomiccontributorinsteadofadrainandwillbeastrongcontributingfactorinthebroadereconomicgainsoftheCityofLangley,theSouthWhidbeyCommunity,andIslandCounty.

 

k. Describe the specific, quantifiable measures of the outcome(s) that will indicate success. Describe in measurable terms what you expect to be able to show as progress toward the outcome for each year before the whole outcome has been achieved. Thespecific,quantifiablemeasureoftheoutcomeofthePlanningStudyisthesurplusorlossfromtheoperationoftheFairgroundsasdescribedinpages26‐43oftheStudy.

 

l. Describe what data you will collect to determine whether the outcome is being achieved. TheprimarymeasuretodeterminetheoutcomeofimplementingthePlanningStudyisthesurplusorlossfromtheoperationoftheFairgrounds.AdditionallysalestaxrevenuefrombusinessesinLangley,WAwillbeusedtoprovideinformationonsalesamountsbefore,duringandaftertheproject.Subsidiarymeasureswouldbetheunitsandrevenuefromeachofrevenuesourcesaswellastheexpensesbycategories.Also,thespecificstepsintheplanthathavebeenaccomplished.

 m. Describe the data collection procedure including when data will be collected, from whom 

and by whom. Themanagingentity(e.g.thePortofSouthWhidbey)shouldhaveaccountingproceduresinplacesothatrevenuesandexpendituresaretrackedandattributedtospecificactivities,andprojectionsshouldbedevelopedandtrackedtoactuals.Asdescribedin“l,”theprimarymeasureisfinancialsurplusorlossfromoperations,whichshouldbetrackedatleastonamonthlybasis.Inaddition,economicdevelopmentdatawillbeanalyzedincludingdirectjobsretainedandcreated,indirectjobscreated,andrecordedsalestaxrevenuesascomparedtothoserecordedpriortothisproject’sexecution.

 n. The estimated median hourly wage of the jobs created when development occurs. 

Wageswillvarybythejobstobeperformedandwillexceedthemedianhourlywageinthelocalarea.

o. If the project is determined to be feasible, the following information must be provided within the final report: 

 

1. Total estimated jobs created (in FTEs). AttachedTables26through28showtheestimatedjobscreatedbyimplementingthePlanningStudy.TheseestimateswerearrivedatusingtheStateofWashingtonOfficeofFinancialManagement2007WashingtonStateInput‐OutputMultipliers.

2. Describe benefits offered to employees. Standardhealthandwelfarebenefitswillbeofferedemployeesatleastequaltothosemandatedbylaw.

3. Describe the median hourly wage of the new jobs in relation to the median hourly county wage. “Themedianhourlywage(adjustedforinflation)forjobsinIslandCountyin2013was$18.22comparedtothe$22.09statemedianwage.”(FromtheWashington

Page 77: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 68 of 90 

Port of South Whidbey 

StateEmploymentSecurityDepartment;BureauofLaborStatistics;BureauofEconomicAnalysis).AttheFairgrounds,wageswillvarybythejobstobeperformedandwillexceedthecounty’smedianwage,asdescribedonpage36ofthePlanningStudy.

4. The county three‐year unemployment rate in relation to the state rate. IslandCounty’sunemploymentratecomparedtotheState’sandtheNation’sisshowninthefollowingfigure:

 TheactualunemploymentratesintheCountyandStateinOctoberofeachyearare:

Unemployment Rate  2013  2014  2015 

Island County  7.4%  6.8%  5.5% 

Washington State  6.5%  5.8%  5.0% 

Source:WashingtonStateEmploymentSecurityDepartment;BureauofLaborStatistics;BureauofEconomicAnalysis

5. County population change in the last five years. TheCountypopulationhasgrownby2.7%inthelastfiveyears,growingfrom78,506in2010toanestimated80,600in2015

6. The estimated jobs created represent what percentage of the county’s labor force. ThepeakjobsexpectedtobecreatedinthePlanningStudyis113,whichis0.35%oftheCounty’s2014averagecivilianlaborforceof31,692

7. The estimated jobs created represent what percentage of the county’s unemployed workers. ThepeakjobsexpectedtobecreatedinthePlanningStudyis113,whichis5.1%oftheCounty’s2014averagepopulationactivelyseekingemploymentof2,193

8. Estimated new annual state and local revenue generated by the private business. ThesubjectofthePlanningStudy,theIslandCountyFairgrounds,isaquasi‐governmententityownedbyIslandCounty,theprojectedrevenueofwhichisdescribedonpages26through35.TheFairgroundsrentsspaceandfacilitiestoprivatebusinesses,thenumberandrevenueofwhichisexpectedtogrowovertheperiodofthestudy,butthestudydoesnotconsidertherevenuegeneratedbythosebusinesses.

9. Estimated private investment generated by project. ThePlanningStudydoesnotconsideranyprivateinvestmentontheFairgrounds.

 

Page 78: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 69 of 90 

Port of South Whidbey 

 

Multipliers* Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Capital Projects 150,000$      230,000$      275,000$      150,000$      1,000,000$   50,000$        

Construction 10.89 1.6                  2.5                  3.0                  1.6                  10.9                0.5                 

Support Jobs 2.58 4.2                  6.5                  7.7                  4.2                  28.1                1.4                 

Total Jobs 5.8                  9.0                  10.7                5.8                  39.0                1.9                 

Fairgrounds Employees Admin Manag 60,000$         60,500$         61,000$         62,000$         65,000$         68,000$        

Admin Suppo ‐$               10,000$         15,000$         20,000$         25,000$         30,000$        

Maint Supervi 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maint Support 10,000$         15,000$         20,000$         25,000$         30,000$         35,000$        

Admin Manag 1.00                1.00                1.00                1.00                1.00                1.00               

Admin Support 0.33                0.50                0.67                0.83                1.00               

Maint Supervi 1.00                1.00                1.00                1.00                1.00                1.00               

Maint Support 0.33                0.50                0.67                0.83                1.00                1.16               

Total 2.33                2.83                3.17                3.50                3.83                4.16               

  less current (2.00)              (2.00)              (2.00)              (2.00)              (2.00)              (2.00)             

Support Jobs 1.39 0.46                1.15                1.63                2.09                2.54                3.00               

Total Jobs 0.79                1.98                2.80                3.59                4.37                5.16               

Events Revenue Major art even 1,500$           2,000$           3,000$           6,000$           10,000$         20,000$        

Major swap m 2,000$           4,000$           6,000$           10,000$         20,000$         50,000$        

Music food an 4,000$           6,000$           8,000$           12,000$         18,000$         30,000$        

Weddings 1,200$           2,400$           3,600$           6,000$           8,400$           12,000$        

Smaller one‐b 1,500$           2,500$           4,000$           6,000$           9,000$           12,000$        

Full Fairgroun 1,500$           2,000$           2,500$           3,500$           5,000$           7,000$          

     Total Event 11,700$         18,900$         27,100$         43,500$         70,400$         131,000$     

Event Jobs 20.48 0.2                  0.4                  0.6                  0.9                  1.4                  2.7                 

Support Jobs 1.64 0.4                  0.6                  0.9                  1.5                  2.4                  4.4                 

Total Jobs 0.6                  1.0                  1.5                  2.4                  3.8                  7.1                 

Service Revenue RV Park / Cam 40,750$         45,250$         56,430$         77,430$         100,800$      127,050$     

Building renta 20,000$         22,000$         25,000$         30,000$         32,000$         35,000$        

Kitchen renta 10,450$         13,200$         16,500$         23,760$         27,500$         37,125$        

Boat/RV Stora 6,700$           7,000$           7,500$           9,000$           12,000$         15,000$        

Equestrian ev 2,150$           2,500$           2,750$           3,500$           5,000$           7,500$          

     Total Event 80,050$         89,950$         108,180$      143,690$      177,300$      221,675$     

Service Jobs 27.72 2.2                  2.5                  3.0                  4.0                  4.9                  6.1                 

Support Jobs 1.39 3.1                  3.5                  4.2                  5.5                  6.8                  8.5                 

Total Jobs 5.3                  6.0                  7.2                  9.5                  11.7                14.7               

Total All Jobs 12.57             17.93             22.15             21.30             58.91             28.88            

* State of Washington Office of Financial Management, 2007 Washington State Input‐Out Multipliers

Table 26: Fairgrounds Plan Jobs Creation ‐‐ Conservative

Page 79: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 70 of 90 

Port of South Whidbey 

 

Multipliers* Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Capital Projects 280,000$      445,000$      875,000$      1,500,000$   1,050,000$   ‐$              

Construction 10.89 3.0                  4.8                  9.5                  16.3                11.4                ‐                 

Support Jobs 2.58 7.9                  12.5                24.6                42.1                29.5                ‐                 

Total Jobs 10.9                17.3                34.1                58.5                40.9                ‐                 

Fairgrounds Employees Admin Manag 60,000$         60,500$         61,000$         62,000$         65,000$         68,000$        

Admin Suppo 5,000$           15,000$         20,000$         30,000$         45,000$         60,000$        

Maint Supervi 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maint Support 10,000$         20,000$         30,000$         45,000$         60,000$         75,000$        

Admin Manag 1.00                1.00                1.00                1.00                1.00                1.00               

Admin Suppo 0.17                0.50                0.67                1.00                1.50                2.00               

Maint Supervi 1.00                1.00                1.00                1.00                1.00                1.00               

Maint Support 0.50                0.67                1.00                1.50                2.00                2.50               

Total 2.67                3.17                3.67                4.50                5.50                6.50               

  less current (2.00)              (2.00)              (2.00)              (2.00)              (2.00)              (2.00)             

Support Jobs 1.39 0.93                1.63                2.32                3.48                4.87                6.26               

Total Jobs 1.60                2.80                3.99                5.98                8.37                10.76            

Events Revenue Major art even 2,000$           3,000$           6,000$           12,000$         25,000$         50,000$        

Major swap m 5,000$           8,000$           15,000$         30,000$         50,000$         75,000$        

Music food an 5,000$           7,000$           10,000$         15,000$         25,000$         50,000$        

Weddings 2,400$           4,800$           7,200$           9,600$           12,000$         18,000$        

Smaller one‐b 2,000$           3,000$           5,000$           7,500$           10,000$         15,000$        

Full Fairgroun 1,500$           2,500$           3,000$           5,000$           7,000$           9,000$          

     Total Event 17,900$         28,300$         46,200$         79,100$         129,000$      217,000$     

Event Jobs 20.48 0.4                  0.6                  0.9                  1.6                  2.6                  4.4                 

Support Jobs 1.64 0.6                  1.0                  1.6                  2.7                  4.3                  7.3                 

Total Jobs 1.0                  1.5                  2.5                  4.3                  7.0                  11.7               

Service Revenue RV Park / Cam 40,750$         51,250$         67,500$         87,870$         111,360$      138,600$     

Building renta 20,000$         25,000$         30,000$         32,000$         35,000$         40,000$        

Kitchen renta 11,495$         14,300$         18,700$         27,720$         37,125$         51,975$        

Boat/RV Stora 6,700$           7,000$           7,500$           12,000$         15,000$         20,000$        

Equestrian ev 2,500$           3,000$           5,000$           10,000$         15,000$         20,000$        

     Total Event 81,445$         100,550$      128,700$      169,590$      213,485$      270,575$     

Service Jobs 27.72 2.3                  2.8                  3.6                  4.7                  5.9                  7.5                 

Support Jobs 1.39 3.1                  3.9                  5.0                  6.5                  8.2                  10.4               

Total Jobs 5.4                  6.7                  8.5                  11.2                14.1                17.9               

Total All Jobs 18.88             28.34             49.13             79.97             70.42             40.41            

* State of Washington Office of Financial Management, 2007 Washington State Input‐Out Multipliers

Table 27: Fairgrounds Plan Jobs Creation ‐‐Middle of the Road

Page 80: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 71 of 90 

Port of South Whidbey 

 

Multipliers* Year 1 Year 2 Year 3 Year 5 Year 7 Year 10

Capital projects 380,000$      1,070,000$   2,400,000$   2,050,000$   ‐$               ‐$              

Construction 10.89 4.1                  11.7                26.1                22.3                ‐                  ‐                 

Support Jobs 2.58 10.7                30.1                67.4                57.6                ‐                  ‐                 

Total Jobs 14.8                41.7                93.6                79.9                ‐                  ‐                 

Fairgrounds Employees Admin Manag 60,000$         61,000$         62,000$         63,000$         67,000$         71,000$        

Admin Suppo 10,000$         20,000$         30,000$         50,000$         70,000$         90,000$        

Maint Supervi 40,000$         40,400$         40,800$         41,200$         41,600$         42,000$        

Maint Support 15,000$         30,000$         45,000$         60,000$         90,000$         120,000$     

Admin Manag 1.00                1.00                1.00                1.00                1.00                1.00               

Admin Suppo 0.33                0.67                1.00                1.67                2.33                3.00               

Maint Supervi 1.00                1.00                1.00                1.00                1.00                1.00               

Maint Support 0.50                1.00                1.50                2.00                3.00                4.00               

Total 2.83                3.67                4.50                5.67                7.33                9.00               

  less current (2.00)              (2.00)              (2.00)              (2.00)              (2.00)              (2.00)             

Support Jobs 1.39 1.15                2.32                3.48                5.10                7.41                9.73               

Total Jobs 1.98                3.99                5.98                8.77                12.74             16.73            

Events Revenue Major art even 3,000$           9,000$           15,000$         30,000$         60,000$         90,000$        

Major swap m 7,500$           12,000$         20,000$         50,000$         75,000$         100,000$     

Music food an 7,000$           12,000$         18,000$         30,000$         50,000$         75,000$        

Weddings 3,600$           7,200$           12,000$         14,400$         20,000$         28,000$        

Smaller one‐b 3,000$           5,000$           7,000$           10,000$         15,000$         20,000$        

Full Fairgroun 2,000$           3,000$           4,500$           7,500$           10,000$         15,000$        

     Total Event 26,100$         48,200$         76,500$         141,900$      230,000$      328,000$     

Event Jobs 20.48 0.5                  1.0                  1.6                  2.9                  4.7                  6.7                 

Support Jobs 1.64 0.9                  1.6                  2.6                  4.8                  7.7                  11.0               

Total Jobs 1.4                  2.6                  4.1                  7.7                  12.4                17.7               

Service Revenue RV Park / Cam 40,750$         53,750$         71,010$         91,640$         116,800$      144,550$     

Building renta 22,000$         27,000$         32,000$         35,000$         40,000$         45,000$        

Kitchen renta 12,540$         16,500$         19,800$         33,000$         48,125$         66,825$        

Boat/RV Stora 6,700$           7,000$           7,500$           19,000$         24,000$         29,000$        

Equestrian ev 2,750$           3,500$           7,500$           12,000$         20,000$         30,000$        

     Total Event 84,740$         107,750$      137,810$      190,640$      248,925$      315,375$     

Service Jobs 27.72 2.3                  3.0                  3.8                  5.3                  6.9                  8.7                 

Support Jobs 1.39 3.3                  4.2                  5.3                  7.3                  9.6                  12.2               

Total Jobs 5.6                  7.1                  9.1                  12.6                16.5                20.9               

Total All Jobs 23.82             55.45             112.81           109.00           41.67             55.36            

* State of Washington Office of Financial Management, 2007 Washington State Input‐Out Multipliers

Table 28: Fairgrounds Plan Jobs Creation ‐‐ Aggressive

Page 81: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 28, 2016  Fairgrounds Vision and Plan—Appendix B—CERB  Page 72 of 90 

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

This Page Intentionally Left Blank 

 

Page 82: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix C—Property  Page 73 of 90  

Port of South Whidbey 

Appendix C: Relevant Property Information 

IntheattachedPlanningStudy,entitled“AVisionfortheIslandCountyFairgroundsandaPlantoAccomplishIt,”ofwhichthisappendixisapart,thediscussionofFairgroundsParkingonpages18‐21,fivepotentialpropertiesthatmightbeusedforadditionalparkingoutsideoftheFairgroundsarediscussed.Thisappendixprovidesadditionalinformation,gatheredfromtheIslandCountyAssessor’soffice,aboutthoseproperties.ThesepropertiesareshowninFigure17andarelistednext:

7. MiddleSchoolplayfield2.2acre(perLanderman‐Moore)Owner:SouthWhidbeySchoolDistrict#206Mailingaddress:5520MaxweltonRd,Langley,WA98260‐9520PropertyID:123743and123832GeographicID:R32903‐498‐4130andR32903‐531‐3830Size:5acresand12acres,17acrestotalAppraisedvalue:$3,513,454and$4,165,823,$7,679,277totalRecentsale:none

8. AylottpropertycornerofCamanoandEdgecliffOwner:MichaelV.andHelenS.Aylott,TrusteesMailingaddress:POBox1725,AransasPass,TX78335‐1725PropertyID:123814and123823GeographicID:R32903‐529‐4370andR32903‐529‐4470Size:0.4acresand0.0894acres,0.489acrestotalAppraisedvalue:$112,000and$19,384,$131,384totalRecentsale:1992$104,000and$10,500,$114,500

9. NoblepropertycornerofCamanoandSandyPointOwner:TheodoreE.NobleMailingaddress:POBox251,Langley,WA98260‐0251PropertyID:123360GeographicID:R32903‐324‐4731Size:22acresAppraisedvalue:$197,626Recentsale:none

Page 83: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix C—Property  Page 74 of 90  

Port of South Whidbey 

10. IzettpropertynorthofFairgroundsroadOwner:BradleyS.IzettMailingaddress:POBox641,Langley,WA98260‐0641PropertyID:123495GeographicID:R32903‐384‐3730Size:5.12acresAppraisedvalue:$370,689Recentsale:1991$152,500

11. AndersonpropertysouthofFairgroundsroadOwner:TamaraKnapp,PersonalRepresentativeforDorothyAndersonMailingaddress:501RoyStreet,Suite347,Seattle,WA98109PropertyID:123333GeographicID:R32903‐312‐3371Size:22.6acresAppraisedvalue:$186,336Recentsale:none

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 84: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix C—Property  Page 75 of 90  

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

Figure 17: Fairgrounds Current and Potential Parking Areas 

Page 85: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix C—Property  Page 76 of 90  

Port of South Whidbey 

 

 

 

 

 

 

 

 

 

 

 

This Page Intentionally Left Blank 

 

 

Page 86: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 77 of 90 

Port of South Whidbey 

Appendix D: SOURCES OF POSSIBLE GRANTS & LOANS TherearegrantsthatmaybeusedtoprovidefundingforFairgroundprojectsincludingconstructionandpreservationofbuildingsandbarns,acquisitionofland,renewableenergy,andstormwaterrunoff.Somegrantsareforstudiesorassessmentsoftheneedwhileothersareforactualwork,suchasconstructionorrenovation.Someofthemostlikelygrantsarelistedinthisappendix,whichincludesthewebsiteURLs,contactnames,andessentialinformationtogetstarted.Theinformationwasprimarilygatheredfromwebsites,soitmaybeincompleteandsometimesoutofdate,dependingonwhenthewebsitewasupdated.Togetthecurrentdata,includingeligibilityandapplicationduedates,onewillneedtocontacttheagencysupplyingthegrantorloan.

Hereisalistofthepossibleneedsandmatchinggrantors:

Building and Infrastructure Construction and Restoration: 

#1 CERB(ProspectiveDevelopmentConstructionProgram) #2 USDA(RuralBusinessDevelopmentGrants) #3 Dept.ofArchaeology&HistoricPreservation(HeritageBarnGrantProgram) #4 CapitalPeak(RuralInfrastructureOpportunityFund(RIO)) #5 USDA(CommunityFacilitiesDirectLoan&GrantProgram) #10 WAStateHistoricalSociety(HeritageCapitalProjectsFund) #11 The1772Foundation(GrantsforHistoricPropertiesRedevelopmentPrograms)

Solar /Renewable Energy  

#6 USDA(RuralEnergyforAmericaProgramEnergyAudit&RenewableEnergyDevelopmentAssistanceGrants)

#9 USDA(RuralEnergyforAmericaProgram(REAP)Grants)

Storm Water Runoff 

#1 CERB(ProspectiveDevelopmentConstructionProgram) #4 CapitalPeak(RuralInfrastructureOpportunityFund(RIO)) #7 Dept.ofEcology(StormWaterFinancialAssistance(SFAP) #8 IACC(Ecology:IntegratedWaterQualityFundingProgram) #13 USDA(Water&WasteDisposalLoan&GrantProgram)

New Website & Other 

#1 CERB(ProspectiveDevelopmentConstructionProgram) #4 CapitalPeak(RuralInfrastructureOpportunityFund(RIO)) #5 USDA(CommunityFacilitiesDirectLoan&GrantProgram) #12 WA.TrustforHistoricPreservation(ValerieSivinskiWAPreservesFund)

Acquisition of Land 

#1 CERB(ProspectiveDevelopmentConstructionProgram) #2 USDA(RuralBusinessDevelopmentGrants) #5 USDA(CommunityFacilitiesDirectLoan&GrantProgram)

Page 87: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 78 of 90 

Port of South Whidbey 

17: Fairgrounds PoNo.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

1CERB

(Community 

Eco

nomic 

Revitalization 

Boad

)

Building and 

infrastructure 

restoration

Prospective Deve

lopment 

Construction Program:

 For public infrastructure to enable 

future business development.

http://w

ww.commerce.wa.gov/com

mission

s/Com

mun

ityEcono

micRevit

alizationB

oard/Page

s/CERB‐

Traditiona

l‐Programs.aspx

Con

tact for Que

stions:

Janea Eddy

Program M

anager

janea.edd

[email protected]

360 725‐3151

Next date for Tier 1 is 

01/19/2016

(and every 2 m

onths, then 

decided

 2 m

onths later 

i.e. n

ext Tier 1 is 

3/14/2016)

Applying is do

ne in two 

tiers:

Tier 1 is to qualify an 

applicant an

d is hand

led 3 

days after an online

 

submittal.

http://w

ww.commerce.wa.g

ov/Documents/PD_Webinar

.pdf

Tier 2 includes a 

presentation to the board 

where a decision is made. 

The app

lication

 is 

submitted 6‐8 weeks before 

board m

eeting.

50% M

atching 

funds. Up to 

$2,000,000 per 

project loa

n with 

50% m

atching 

funds of total cost.

($300,000 only 

may be grant 

funds)

•Must have a fea

sibility study that 

shows that significant jobs or 

private investment will result, 

• Must demon

strate need. 

•Cannot be

 used for retail, 

gambling, displace jo

bs from one 

part of the state to another, or be 

outside the Island County 

jurisdiction.

Possible Uses: Acquisition, 

Con

struction, Repa

ir, 

Reconstruction, R

eplacement, 

Reh

abilitation, and

 includes 

improvement of: Sew

er, Storm

 

Water, Electricity, 

Telecommun

ications, Buildings or 

Structure, P

ort Facilities.

SOURCE

S OF POSSIBLE GRANTS & LOANS

Page 88: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 79 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

2USD

A Rural 

Deve

lopmen

t

This is 

administered by 

the state office.

Multi Use (e.g.): 

Land

 

Acquisition

Parking 

Construction

This lo

oks like a 

good possibility. 

The

 spe

cific 

prog

ram desired 

nee

ds to be 

define

d and the 

agen

cy 

contacted.

Rural B

usiness Deve

lopmen

Grants

Con

tact:

Rural B

usiness &

Coo

perative Programs

Tuana Jones, Director

(360

) 70

4‐770

7

tuan

a.jone

[email protected]

  Ran

dy Baird, A

sst. Director

(509

) 45

4‐574

3 ext 130

rand

[email protected]

www.rd.usda.gov/w

a

http://w

ww.rd.usda.go

v/programs‐

services/rural‐bu

sine

ss‐

develop

ment‐grants

Annu

ally, no

t sure of the 

date.

To get started

:

Applications are accepted 

throug

h USD

A Rural 

Developm

ent’s local or 

State offices once per year. 

Applican

ts check program

 

info to le

arn abo

ut local 

application timelines, 

concept pap

er 

requirements, and othe

details

No M

atching

 fun

ds 

required.

Grants range

 from 

$10,000 to 

$500,000

.

Smaller reque

sts 

are given

 priority.

App

lication

s are evaluated  o

n:

•Eviden

ce sho

wing jo

b creation to 

occur with local bu

sine

sses;

•Pe

rcen

t of non

federal fun

ding

 

committed to the project;

•Econo

mic nee

d in

 the

 area;

•Con

sisten

cy with local e

cono

mic 

developm

ent priorities;

•Experience of the gran

tee with 

similar efforts; 

The

se fund

s may be

 used for:

• Acquisition or developm

ent of 

land

, ea

semen

ts, o

r rights of way; 

construction, conversion, 

reno

vation

, of buildings, p

lants, 

machinery, e

quipmen

t, access 

streets and

 roa

ds, parking

 areas, 

utilities .

•Rural transpo

rtation im

provemen

(parking

 and

 access to the

 fair?)

• Commun

ity econ

omic 

developm

ent.

SOURCE

S OF POSS

IBLE GRANTS

 & LOANS

Page 89: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 80 of 90 

Port of South Whidbey 

Areas No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

3Departm

ent of 

Archae

ology

 & 

Historic 

Preservation

Preservation

 of 

Historic Barns

Heritage Barn Grant Program

These fund

s are used to "stabilize 

and preserve designated

 Heritage

 

Barns across the

 state."

http://w

ww.dah

p.wa.go

v/he

ritage

barn‐reg

ister

Contact: Chris Moore of the 

Washing

ton Trust for Historic 

Preservation

 at 20

6‐624

‐944

9, or via 

email a

t cm

oore@preservew

a.org

10/21/20

15

Postmarked no

 later than

 

4:30

. Th

e next grant period 

is proba

bly 20

17, b

ut 

depe

nden

t on

 the 

legislature

Con

tact Jennifer 

Morrtensen, 

Communications 

Coordinator

206 624

‐9449

jmortensen

@preservewa.or

g Mailing

 Addristoric 

Preservation

1204

 Minor Ave.

Seattle 98

101

$400

,000

 in total 

gran

t Avg. size of 

gran

t is $21,00

0.

This is grant 

reim

burse‐men

fund

s. 

$ must be 

available before 

the grant is mad

e. 

Total p

roject 

cost=Grant 

requ

est+ Cash 

matching fund

s + 

In‐kind matching

 

fund

s.

Emph

asis placed on:

•Barns m

ust be

 listed

 in the

 

Heritage Barn Reg

ister. 

•Priority is given

 to working

 farm

 

barns.

•Historical significance of ba

rn

•Urgen

cy of repa

irs

•Provision

 for long

‐term 

preservation

.

•Fun

ds m

ust be

 availa

ble be

fore 

gran

t is given

, and

 must be

 

expe

nded

. This grant is 

reim

bursem

ent only. (Matching 

fund

s)

•Rea

diness to Proceed

 is a m

ajor 

factor in granting

 $. 

•Grant $ is only available for 

construction costs. (no

 new

 

building

s or add

itions to existing 

structures tha

t might ruin the 

historic essen

se of the building.)

•In‐kind

 work can

 be used as part 

of the

 available m

one

y, valued

 @ 

$15/hr.

SOURCE

S OF POSS

IBLE GRANTS & LOANS

Page 90: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 81 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

4Ca

pital Peak

 

(with CoBank)

New

 

construction, 

Upgrades or 

Expansions

Not sure how 

relevent this 

could be. It 

involves a lot of 

participa

tion by 

consultants.

Rural Infrastructure Opportunity 

Fund (RIO)

This fund

ing program is sponsored 

by a partnership of the USD

A and 

private investors, such as Capital 

Peak and

 CoBank, to finance Job‐

Creating

 Infrastructure Projects in 

Rural A

merica. 

Capital P

eak specializes in proven‐

demand projects across  energy, 

water/wastew

ater, 

agriculture/agribusiness, 

telecommunications/ broadban

d, 

and community facilities.

http://w

ww.capitol‐

peak.com/abo

utus/

http://w

ww.usda.gov/documen

ts/Ru

ral‐Infrastructure‐O

pportunity‐Fund‐

FAQ.pdf

First step is to submit a PDF 

for cconsideration for a 

project which can be 

downloade

d here:

http://www.cap

itol‐

peak.com/contact/

Then

, if approved, Capital 

Peak provides indepth 

consulting to evaluate, 

strategize, and obtain 

fund

ing from private 

investors. 

It is a "womb to tomb" type

 

of consulting.

Billions are 

available 

nationally. No 

online info on 

individual projects. 

But it reads as if 

large projects are 

han

dled.

Not m

uch info 

available on grants 

vs. loans.

The U.S. R

ural Infrastructure 

Opportunity Fund

 is a public/private 

partne

rship with the U.S. 

Government, Cap

itol Pe

ak, CoBank, 

and other Investors. Th

e Fund

 is 

design

ed to: 

* Bring

 new capital to rural 

infrastructure projects while 

creating a sustainable, integrated 

platform

  * Transform the setting dom

inated 

by lenders into one tha

t enab

les 

participation

 of the broadest 

universe of institutiona

l investors 

* Place a le

ading coope

rative 

bank/GSE with deep expertise in 

rural infrastructure lend

ing at the 

center of a public/private 

partne

rship 

Capitol P

eak Asset Man

agem

ent 

and the Fun

d was anno

unced in 

2014 at the White House Rural 

Opportunity Infrastructure 

Conference by To

m Vilsack, U

.S. 

Secretary of Agriculture and 

Chairman of the White House Rural 

SOURCE

S OF POSSIBLE GRANTS & LOANS

Page 91: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 82 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

5USDA

This is 

administered by 

the state.

Can be used to 

purchase, 

construct, 

and/or im

prove 

essential 

community 

facilities, 

purchase 

equipment and 

pay related 

project 

expenses (it 

specifically 

mentions 

fairgrounds as 

an example of 

an essential 

community 

facility)

Community Facilities Direct Loan & 

Grant Program

 Mario Villanueva, State Director

 1835 Blacklake Boulevard SW, Suite 

B  Olympia, WA  98512‐5715

 Voice: (360) 704‐7740

 Fax: (360) 704‐7742

http://w

ww.rd.usda.gov/programs‐

services/community‐facilities‐direct‐

loan‐grant‐program

www.rd.usda.gov/wa

Types of funding available:

•Low interest direct loans

•Grants

•A combination of the two 

above, as well as a loan 

guarantee program. These 

may be combined with 

commercial financing to 

finance one project if all 

eligibility and feasibility 

requirements are m

et.

Small commuinities (less 

than 5,500 people) and low‐

income ones are given 

priority.

•Contact your local 

office to discuss  

specific projects

•Applications for 

this program are 

accepted year 

round

•Program 

resources are 

available online 

(includes form

needed, guidance, 

certifications)

•Request a Data 

Universal Number 

System (DUNS) 

number if your 

organization 

doesn’t already 

have one.

•Register with the 

System for Award 

Management 

(SAM) if you aren’t 

already registered. 

•Applicants m

ust have legal 

authority to borrow m

oney, obtain 

security, repay loans, construct, 

operate, and m

aintain the proposed 

facilities

•Applicants m

ust be unable to 

finance the project from their own 

resources and/or through 

commercial credit at reasonable 

rates and term

s

•Facilities must serve rural area 

where they are/w

ill be located

•Project m

ust demonstrate 

substantial community support

•Environmental review m

ust be 

completed/acceptable

SOURCES OF POSSIBLE GRANTS & LOANS

Page 92: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 83 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

6USDA

This is 

administered by 

the state.

Renew

able 

Ene

rgy Study

Rural E

nergy

 for America Program 

Energy Audit & Ren

ewab

le Energy 

Dev

elopmen

t Assistance Grants

http://w

ww.rd.usda.go

v/programs‐

services/rural‐en

ergy‐am

erica‐

program

‐energy‐aud

it‐renew

able‐

ene

rgy‐developm

ent‐assistance

Ran

dy Baird, U

SDA Rural 

Developm

ent 

160

6 Perry St, D

Yakim

a, W

A 98902

509

 454‐57

43

[email protected]

 These grants are availab

le 

year round

. Form

s are 

availab

le online.

Max grant is 

$100,00

0. 

Rural Business & 

Coope

rative 

Prog

rams

Seems available for stud

y or 

research on

ly on renew

able ene

rgy 

development assistance.

This program helps in

crease 

American ene

rgy indep

end

ence by 

increa

sing the private sector supp

ly 

of renewable ene

rgy and

 

decreasing the dem

and for en

ergy 

throug

h energy efficiency 

improvements. 

Over time, these in

vestments can

 

also help lo

wer energy costs.

SOURCES OF POSSIBLE GRANTS & LOANS

Page 93: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 84 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

7Dep

artm

ent of 

Ecology

Stormwater 

Run

off

This is an "iffy" 

possibility. Ta

lk 

to the 

coordinator to 

find

 if the 

Fairgroun

ds 

qua

lifies.

Storm

 Water Finan

cial Assistance 

(SFA

P)

Plan

ning projects associated with 

publicly‐owne

d wastewater and

 

stormwater facilities.

 Jessica Sch

wing

 Storm

water Grants Program 

Coo

rdinator

 Email: je

ssica.schwing@

ecy.wa.gov 

 Pho

ne: 3

60‐407‐62

16

Annu

ally Augu

st throu

gh 

the second

 week of 

Octobe

r is whe

applications are accep

ted

25%

 Matching 

funds, o

r 15%

 for 

commun

ities 

meeting hardship 

criteria.

$5 Millio

n pe

commun

ity can be

 

availa

ble.

Cou

nties, cities, and

 Ports after the 

CY1

4/CFY16 funding

 cycle.c

Projects that address existing 

pollution

 problems and

 provide

 a 

high level of water qua

lity ben

efit

http://w

ww.ecy.wa.gov/water/storm

water/index.htm

l

http:/www.ecy.wa.gov/programs/ 

wq/funding

/fund

ing.htm

SOURCES

 OF POSS

IBLE GRANTS & LOANS

Page 94: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 85 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

8IACC ‐ 

Infrastructure 

Assistance 

Coordininating 

Council

Storm

water 

Runoff

Eco

logy, Integrated W

ater Quality 

Funding Program

Centennial Clean W

ater Fund

Plann

ing projects associated with 

publicly‐owne

d wastewater and 

storm

water facilities.

Contact David Dunn

360 407‐6503

[email protected]

Applications are due 

October 16, 201

5.

Facility project applican

ts 

will h

ave until N

ovembe

r 6 

to submit Ecology approval 

letters and SERP 

determ

ination le

tters.

Loan (SFY 2016 

interest rates) at 

either: 2% interest 

for 6‐20 yea

r term

or  1% interest for 

5 year term

.

Storm

water grant 

maximun award is 

$25

0,000, with a 

required 24% 

match.

Coun

ties, cities, towns, 

conservation districts, o

r other 

political subdivision, municipal or 

quasi‐m

unicipal corporations, and 

tribes

The integrated program also funds 

planning and im

plemen

tation of 

nonp

oint source pollution control 

activities.

Website is:

http://w

ww.in

frafund

ing.wa.gov/  

Info at:

http://w

ww.in

frafunding.wa.gov/do

wnloads/Fund

ing_Program_Summar

y%20

10‐08‐2015.pdf

Pre‐Construction 

Set‐aside 

(Distressed

 

Com

mun

ities)

50%

 forgivable 

principal loan and 

50%

 loan

SOURCES

 OF POSSIBLE GRANTS & LOANS

Page 95: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 86 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

9USDA

Provide

gua

rantee

loan fina

ncing 

and

 grant 

fund

ing to 

agricultural 

producers and

 

rural sm

all 

busine

sses to 

purcha

se or 

install 

rene

wable 

energy system

or m

ake en

ergy

 

efficien

cy 

improv

emen

ts.

Rural En

ergy for America Program 

(REA

P) Grants

Con

tact Randy Baird, 

USD

A Rural Developm

ent

509 45

4‐57

43

rand

y.ba

ird@

wa.usda

.gov

http://w

ww.rd.usda.gov/wa

•App

lican

ts m

ust provide

 at 

least 75

% of the project 

cost if app

lying for a grant 

only.

•App

lican

ts m

ust provide

 at 

least 25

% of the project 

cost if app

lying for loa

n, or 

loan

 and

 grant 

combina

tion

.

•Projects greater than

 

$200,000 requ

ire a 

technical repo

rt.

•Ene

rgy efficiency projects 

require an ene

rgy aud

it or 

assessment.

In 2014 the

 

amoun

ts were:

Renewab

le Grants‐

$2,500 to $500,000

Efficiency Grants ‐ 

$1,500 to $250,000

The m

axim

um 

grant is 25%

 of the 

project cost.

Availa

ble to:

Com

mercial, Local Government, 

Scho

ols, State Government, Tribal 

Government, Agricultural, 

Institutiona

l

•Businesses must be

 in an area 

other than

 a city or town with a 

popu

lation

 of greater than

 50,000

 

inha

bitants an

d the urban

ized area 

of tha

t city or town. C

heck elig

ible 

busine

ss add

resses.

•Agricultural produ

cers m

ay be in

 

rural o

r no

n‐rural a

reas.

Eligible Uses: 

For Solar Water 

Hea

t, Solar 

Space Hea

t, 

Solar Th

erm

al 

Electric, Solar 

Pho

tovo

ltaics, 

plus more

Website is:

http://w

ww.rd.usda

.gov/programs‐

services/rural‐ene

rgy‐america‐

program‐rene

wab

le‐ene

rgy‐systems ‐

ene

rgy‐efficiency/wa

App

lication

s are accepted 

year roun

d at ou

r local 

USD

A office.

The lo

an & grant 

combination 

stipulates that the 

grant portion

 

exceed $1,500 and

 

that the total g

rant 

plus loan

 be at 

least $5

,000

..

Some of the requ

irements are 

confusing.  Someone needs to talk 

to the

 con

tact to find

 out for sure if 

the Fairgroun

ds would be elig

ible. I 

think yes.

SOURCE

S OF POSSIBLE GRANTS

 & LOANS

Page 96: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 87 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

10

Wash. State 

Historical 

Society

Provides capital 

improvements 

to existing 

facilities, 

construction of 

new facilities, 

preservation of 

historic 

buildings, 

structures, and 

improvements 

at historic or 

archaeological 

sites.

Heritage Capital Projects Fu

nd

“The purpose of the HCPF is to 

support the capital needs of 

facilities and organizations that 

preserve and interpret the state's 

history and heritage, so that 

Washington’s  he

ritage in historical 

sites and artifacts can be read

ily 

accessible and provide lifelong 

learning opportunities to citizens.”

http://w

ww.washingtonh

istory.org/s

upport/heritage/capitalprojectsfun

d

/

Con

tact:

 Janet Rogeron

253

‐798‐5909 

[email protected]

The

Due

dat

e fo

r ap

plyi

ng is

gi

ven

as M

ay 1

5, 2

014

for

the

2015

-201

7 bi

enni

um.

Alth

ough

it is

too

late

to

appl

y no

w, i

t may

be

wor

thw

hile

to k

eep

it in

m

ind

for

the

next

ava

ilabl

e tim

e.

To

help

app

lican

ts, f

ree

HC

P O

utre

ach

Wor

ksho

ps

are

sche

dule

d to

gro

om

futu

re a

pplic

ants

for

fund

ing

durin

g th

e 20

17-2

019

bien

nium

.D

urin

g th

e th

ree-

hour

se

ssio

ns, J

anet

Rog

erso

n

prov

ides

an

over

view

abo

ut

the

HC

P p

rogr

am a

nd

proc

esse

s, to

pro

vide

st

rate

gies

to p

repa

re fo

r a

2016

app

licat

ion,

then

fa

cilit

ates

a r

ound

tabl

e di

scus

sion

.

$10 M

illion

 was 

alloted for the 

2015‐2017 

biennium  p

rogram.

The HCPF cost 

share ratio is 33% 

meaning that the 

state's share of the 

total grant project 

cost can be no 

more than 33%. 

The grantee's 

share m

ust be at 

least 67% throug

cash and

 in‐kind.

Eligible entities are  a

ny non

profit 

organ

ization, local go

vernment 

agency, tribal government, public 

development authority, or other 

entity as determ

ined by the society.

   HCPE grants have assisted 

hundreds of local heritage projects, 

resulting in the construction of new 

museums and interpretive centers, 

additions to heritage facilities, 

improvements to archives and 

museum collection storage, 

preservation and reuse of historic 

structures, restoration of historic 

ships, and rehab

ilitation of historic 

railroad equipment.

SOURCES OF POSSIBLE GRANTS

 & LOANS

Page 97: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 88 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

11

The 177

Foundation

This 

orga

nization 

has prim

arily 

been

 used for 

restoring 

historic 

buildings in

 the 

East. It no

w has 

one fun

d that is  

availab

le 

throug

hout the 

U.S.

Grants for Historic Properties 

Red

evelopmen

t Programs 

(Revo

lving Funds)

http://w

ww.177

2foun

dation.org/

Contact M

ary Anthony:

maryanthon

y@17

72foun

dation.org

App

lication

s are due on

 or 

before December the year 

before the

 fun

ds are mad

availab

le.

The

se grants are available 

to 501c3 organization

only. I have includ

ed them

 

because the

y might be 

used to restore the 

McC

leod

 Cabin an

d the

 

Brooks Hill H

ouse, for 

instance.

There doe

sn't 

seem

 to be a fixed 

amou

nt, b

ut som

of the

 examples 

have be betwee

$10,000

 and

 

$50,000

.

The Fou

ndation

 will consider 

requ

ests for the follow

ing:

Grants for fea

sibility studies for 

established

 preservation 

organizations which are considering 

starting historic properties 

rede

velopm

ent program

s

Grants to increase the capacity of 

existing historic prope

rties 

rede

velopm

ent program

s

The examples sho

w how old 

building

s ha

ve bee

n preserved

 with 

this fun

ding

.

SOURCES

 OF POSSIBLE GRANTS

 & LOANS

Page 98: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 89 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

12

Washing Trust 

for Historic 

Preservation

This could be 

used for sm

all 

urge

nt projects 

to sho

re up a 

build

ing or 

prod

uce a 

feasibility 

study

, for 

instance.

Valerie Sivinski Washington 

Preserves Fu

nd

http://preservew

a.org/w

ashington‐

preserves‐fund

.aspx

Que

stions to:

Cathy W

ickw

ire, Ope

ration

Mana

ger

206 624

‐9449

 

cwickw

ire@

preservew

a.org

The website do

es not give 

the curren

t year for 

app

lying, but it was in 

Octob

er last year.

To see

 overview of 

application process:

http://preservew

a.org/File

L

ibrary/file

/WA%20P

reserve

s/20

16%20

Washington%20

Preserves%20

Guidelin

es.pd

f

The

 maximum

 

award is fo $2,000.

The

 goa

l of the 

fund

 is to provide

 

small mea

ningful 

amoun

ts of mone

to promote historic 

preservation whe

re 

it really happ

ens: 

at the community 

level. Awards are  

in the name of 

Valerie Sivinski, a 

preservationist, 

kille

d in Octob

er 

200

0 while doing 

preservation‐

related work. 

This fund

 has be

en used for 

purcha

sing materials or services for 

brick or mortar projects to preserve 

a building, repa

iring rot in a 

theater, paying for architectural 

design

s for nee

ded repa

irs, and

 

produ

cing

 publications to promote 

the historic sign

ificance of the site.

Emph

asis on

:

•Urgent projects

•Contribu

tes to developm

ent of 

commun

ity preservation 

organ

izations

•Are listed in the Most En

dang

ered 

Historic Properties.

SOURCES

 OF POSS

IBLE GRANTS

 & LOANS

Page 99: A VISION FOR THE ISLAND COUNTY FAIRGROUNDS AND A PLAN …portofsouthwhidbey.com/wp-content/uploads/2017/10/... · will draw the community closer to the Fairgrounds and help with maintenance

January 12, 2016  Fairgrounds Vision and Plan—Appendix D—Grants  Page 90 of 90 

Port of South Whidbey 

 No.Grant So

urce 

& Use

Title/ Website /Contact

Applying

$ Amount

Requirements/Comments

13

USDA

Provides fun

ding

 

for clean and 

reliab

le drinking 

water systems, 

sanitary sewage 

disposal, 

sanitary solid 

waste dispo

sal, 

and storm

 

water 

collection, 

tran

smission

and

 disposal to 

hou

seholds and 

businesses in 

eligible rural 

areas

Water & W

aste Disposal Lo

an & 

Grant Program

http://w

ww.rd.usda.gov/programs‐

services/water‐waste‐disposal‐loan

grant‐program

 Mario Villanueva

, State Director

 1835 Blacklake Boulevard SW, Suite 

B

 Olympia, WA  98

512‐5715

 Voice: (360) 704‐7740

 Fax: (36

0) 704‐7742

To get started contact the 

local office and submit the 

application year found.

This is for long

‐term

 (up to 

40 years), lo

w‐interest 

fixed rate loa

ns.

If funds are available, 

grants m

ay be combined 

with a lo

an if ne

cessary to 

keep

 user costs reasonable.

No details are 

availa

ble on the

 

size or history of 

the loan/grant 

programs. I 

suspect they try to 

cover wha

t is 

needed

 to m

aintain 

water an

d waste 

disposal sites.

It is availab

le to m

ost state and 

local governmental entities, in rural 

areas and twon with few

er than 

10,000 people.

The funds m

ay also be used for:

•Legal a

nd engineering fees

•Land acquisition, w

ater and la

nd 

rights, perm

its and equipment

•Start‐up operations and 

maintenance

•Interest in

curred during 

construction

•Purchase of existing facilities to 

improve service or prevent loss of 

service

•Other costs determ

ined to be 

necessary for completion of the 

project

SOURCES OF POSSIBLE GRANTS