a prime logistics and industrial development … · - , statistics by region, report month december...
TRANSCRIPT
URBAN LOCATION WITH NATIONAL REACH
baytree-hannover.com
A PRIME LOGISTICS AND INDUSTRIAL DEVELOPMENT OPPORTUNITY
UP TO 29,000 SQ M
Am Brinker Hafen
Max-Müller Straße
Hackethalstraße
THE LOGISTICS ADVANTAGE
HIGHLY FLEXIBLE DESIGN SUITABLE FOR A BROAD RANGE OF USES, LAYOUTS AND REQUIREMENTS
URBAN LOGISTICS Large scale, multi-user urban distribution building up to 29,000 sq m.
LABOUR POOL Access to large, skilled local labour pool with 72,000 in Hannover.
STRATEGIC LOCATION Fast access onto J-44 on the East-West Motorway and A352/A44.
ESTABLISHED INDUSTRIAL AREA Home to leading brands and occupiers using the location benefits for distribution.
MULTIMODAL CONNECTIONS Range of flexible connections by air, sea, land and rail available nearby.
Benefits from having direct connections to four German motorways. Major centres of business are within a day’s drive.
Hannover’s international airport provides rapid airfreight and 24-hour operations without weight limits offering competitive advantages.
Hannover’s inland waterway ports are connected via the Mittellandcanal to Europe’s waterway network.
Hannover Nordhafen Inland Canal Port Container terminal Hannover (CTH) – 0.25km, 2-minute drive.
Central hub in Germany’s / Europe’s vital train connections running both east-west (linking the Rhine-Ruhr industrial area and Berlin) and north-south (linking Hannover and Munich). Easy access to public transport including S-Bahn, U-Bahn and the bus network.
HannoverInternational Airport
A352
Nordhafen
522
Vahrenwalder Str
Industrieweg Kugelfangtrift
Wiesenauer Str
Hackethalstraße
Wohlenberg Str
Max-Müller Str
A2
44
Central Hannover
Industrieweg
Am Brinker Hafen
Hackethalstraße
Max-Müller Straße
Wohlenbergstraße
Vahrenwalderstraße
J44 A2
Nordhafen
J42 A2
URBAN LOCATION
HANNOVER’S INTERNATIONAL AIRPORT
PROVIDES RAPID AIRFREIGHT AND 24-HOUR OPERATIONS WITHOUT WEIGHT LIMITS
HANNOVER
Frankfurt
Hamburg
7
Berlin
Munich
Stuttgart
Düsseldorf
2
1
27
23
7
21
1
20
1914
24
39
14
29
Bremen
33
7
9
10
13
11
12
13Leipzig Airport
9
71
72
70
73
745
5
4
Bielefeld
244
49
Dortmund
43
3
45
3
48
1
1
Cologne
61
40
3
31
8
Nuremberg
93
6
6
581
7
65
96
95
9981
58
92
993
3
1
Dresden
RUHR Industrial Area
Nordhafen Inland Canal Port Lehtre Mega Hub
Hannover IntAirport
Bremerhaven
Ruhrgebiet
AN EXPERIENCED AND SKILLED LABOUR POOL
REGIONAL LOGISTICS AREA
• Thanks to its highly-differentiated range of businesses and occupiers, the Hannover region demonstrates a broad spectrum of logistics functions with high quality requirements.
• Over the last 10 years, more than 50% of all commercial property transactions in Hannover were driven by logistics usage.
• Hannover has developed a regional logistics area concept. This concept has the objective of developing market relevant locations integrated within area planning zones to satisfy the logistics industry’s demands.
• Land at key regional sites is reserved for logistics development and important infrastructure projects are being initiated and supported. 1.3Bn invested in logistics real estate and development since 2013.
OF THE 398,000 PEOPLE THAT WORK IN HANNOVER, 72,000 ARE DIRECTLY EMPLOYED IN EITHER LOGISTICS OR LOGISTICS RELATED BUSINESSES
HANNOVER AREA ECONOMIC FACTS
€3.798Average Monthly
Wage (Gross)
Employed
Employees
Unemployment Rate
HANNOVER
414,900
389,400
7.4%
HAMBURG
1,203,300
1,086,000
7.1%
GERMANY
43,057,000
38,721,000
6.1%
LABOUR SUPPLY
>6 HOURS
>4.5 HOURS
>3 HOURS
>1.5 HOURS
A2 (Anschlussstelle 44)
A352 (via B522)
A7 (via A352)
KM
1.5
4.6
17.8
MINUTES
4
7
14
ROADS - DRIVE TIMES
Binnenhafen Nordhafen
Central Hannover
Hannover Int. Airport
Lehrte MegaHub
Ostwestfalen Lippe Region
Hamburg
Bremerhaven
Ruhrgebiet
Leipzig Airport
Berlin
Frankfurt Airport
KM
4.2
6.4
7.4
21.7
96.4
147
177
225
246
285
365
MINUTES
9
15
11
23
55
1hr 29min
1hr 38min
2hr 12min
2hr 23min
3hr 19min
3hr 38min
LOCATIONS - DRIVE TIMES
NATIONAL REACH
7.4%Unemployment
Rate
414,900Employed
1.5% Economic Growth
in 2016 (Lower Saxony)
Sources- Employment Calculus Series 2, Volume 1 (2015), Statistical Offices of the Federation and the Länder - www.arbeitsagentur.de, Statistics by Region, Report Month December 2015
Sources: - Employment Calculus Series 2, Volume 1 (2015), Statistical Offices of the Federation and the Länder- www.arbeitsagentur.de, Statistics by Region, Report Month December 2015- NordLB
Hac
keth
alst
raße
Max-Müller Straße
Am Brinker Hafen
Warehouse
Mezzanine
Offices
Total area
Car parking
HGV Parking
25,920 sq m
2,780 sq m
300 sq m*
29,000 sq m
140
10
OPTION 1
STANDARD WAREHOUSE LAYOUT
Hac
keth
alst
raßeVA
N P
AR
KIN
G S
PAC
ES
HGV PARKING SPACES
114 CAR PARKING SPACES
14,250 SQ M
Max-Müller Straße
Am Brinker Hafen
Warehouse
Offices
Total area
Car parking
HGV / Van Parking
14,250 sq m
400 sq m*
14,650 sq m
114
20 / 60
OPTION 2
REGIONAL DISTRIBUTION CENTRE / LAST MILE LOGISTICS HUB
LEGENDE
~25.965 m2
~8.051 m2
~48.775 m2
26 ST
3 ST
~5.665 m2
~5.265 m2
~2.952 m2
C:\USERS\PETRA\APPDATA\LOCAL\TEMP\SPIRIT2016\2&28905&0&9234426&225.JPG
GRÜNFLÄCHE
LAGERFLÄCHE (BGF)
GRUNDSTÜCKSFLÄCHE
PKW-STELLPLÄTZE
EBENERDIGE TORE
DOCKTORE MIT
LKW-RANGIERFLÄCHE
LKW-STANDFLÄCHE(BETON)
(ASPHALT)
ÜBERLADEBRÜCKE
GRZ 0,82
15 ST LKW-STELLPLATZ
(PFLASTER)
TRH/WC (BGF)
~170 m2 SPRINKLER
~111 m2
PKW-STELLPLATZ184 ST
FEUERWEHRUMFAHRT~596 m2
LAGER (BGF)
BÜRO-/SOZIALBEREICH (BGF)~2.930 m2
EG
MEZZANIN
MEZZANIN
35 M
17 M
10 D
OC
K LE
VEL
LER
S8
DO
CK
LEV
ELLE
RS
8 D
OC
K LE
VEL
LER
S
6 C
AR
PA
RKI
NG
S
PAC
ES
10 H
GV
PA
RKI
NG
SPA
CES
140 CAR PARKING SPACES
25,920 SQ M
VAN
PA
RKI
NG
SPA
CES
HG
V P
AR
KIN
G S
PAC
ES
VAN
PA
RKI
NG
SPA
CES
* Flexible office space designs available from 300 - 4,000 sq m * Flexible office space designs available from 300 - 4,000 sq m
HIGHLY FLEXIBLE DESIGN
WHO WE ARE Baytree is a pan-European logistics and industrial development company focusing on the UK, German and French markets.
Baytree was launched by AXA Investment Managers - Real Assets (“AXA IM - Real Assets”), Europe’s largest real estate portfolio and asset manager, with €65bn of assets under management. AXA Investment Managers is part of the AXA Group, a global leader in financial protection and wealth management.
Baytree is focused on delivering high quality logistics and industrial buildings that meet the changing property needs of our customers.
THE BAYTREE PHILOSOPHY
As a responsible business delivering built solutions for our customers, we understand that profit, environmental regeneration, and a thriving society are interlinked.
We work with respect for our customers, partners, investors and stakeholders.
Baytree values each customer as unique and our way of working intentionally builds long term relationships and delivers enhanced long-term value.
Baytree’s design principles are founded on delivering buildings within environments which are attractive to occupiers as a consequence of their unique flexibility for a variety of different uses, facilitating the creation of high quality employment opportunities for local people.
Baytree delivers buildings in industry leading timescales which are environmentally responsible and which save our customers money on operating and maintenance costs.
WHY BAYTREE?
• Specialist industrial and distribution developer
• Team with a proven track record in delivering build-to-suit projects for many of the world’s leading retailers, 3PL’s, manufacturers and automotive companies
• The Baytree Team has experience in successfully delivering over 5m sq m of logistics space across Europe
• A full-service logistics industrial developer with institutional financial backing
• Committed to sustainable environmental and social responsibility
• Committed to providing solutions which enhance our customers’ business productivity while respecting the wellbeing of people and community
• A promise of exemplary customer service throughout the project lifecycle, founded on collaboration and transparency
YOUR DEVELOPMENT PARTNER
ENVIRONMENTAL VALUE Less environmental impact
INNOVATIVE DESIGN Environmental value Less environmental impact
ADDED VALUE FOR CUSTOMERS Meeting customer needs
SOCIAL VALUE More positive changes and measurable benefits
INDICATIVE BUILD SCHEDULE
Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018
SUSTAINABILITY
• BREEAM certified
• Landscaped and planted green areas
• The specification integrates environmental measures with the following objectives:
- Reduction of CO2 emissions
- Reduction of electricity, gas and water consumption
- Use of recycled and recyclable materials
- Reduction of pollution linked in the construction phase
- Wellbeing of employees
- Improvement of existing site biodiversity
OUR BUILDINGS
• Up to 15m to haunch
• Concrete columns and timber rafters
• Floor slab to TR 34 FM2 flatness with AR2 abrasion resistance
• 60kN racking leg load on 200mm plate
• Dock leveller loading 6 tonne dynamic / 9 tonne static
• Dock doors 2.5m wide x 3.0m high
• Level access doors 3.8m wide x 4.4m high
• ESFR sprinklers
• Battery area ready for customers fit out
• 35m yard area
• Possibility to divide the building
THE OFFICES
• The office area includes reception, offices and social rooms
• Ceramic tile floor coverings to reception areas, social rooms and ground floor offices
• 8 person passenger lift
• Suspended ceiling with mineral tiles on metal framework
• Heating and cooling via reverse cycle heat pumps
• Shower facilities included
Jun 2018 Jul 2018 Aug 2018 Sept 2018 Oct 2018 Nov 2017
Permitting ConstructionDemolition
Nov 2018 Dec 2018
AIR
‘WHO estimates that 12.7% of deaths globally could be prevented by improving air quality’
WATER
‘Being dehydrated by just 2% has been shown to impair cognitive performance’
NOURISHMENT
‘Fruit and vegetable intake is associated with increased productivity and job performance’
LIGHT
‘There is a relationship between proximity to windows and productivity’
COMFORT
‘Maintaining optimal thermal comfort can maximise productivity and decrease errors’
MIND
‘Environmental characteristics such as noise, indoor air quality and light can have direct impacts on mental health’
CASOLINE MF WITH GYPROC PLASTERBOARD
(British Gypsum or equivalent with recessed edge trim)
REINDEER MOSS WALL
CASOLINE MF WITH GYPROC PLASTERBOARD(British Gypsum or equivalent with recessed edge trim)
REINDEER MOSS WALL
WOODEN DOORS by Integrated Doorsets
WOODEN DOORS
by Integrated Doorsets
PRIMARY ENTRANCE BARRIER MATTING TO LOBBY
(Topguard Matting - Gradus/Forbo)
SECONDARY ENTRANCE BARRIER MATTING TO LOBBY
(Topguard Matting - Gradus/Forbo)
COFFEE / TEA STATION
DESSO AIRMASTER CARPET
(Green & Grey)
OAK RECESSED SKIRTING
(British Gypsum or
Equilvalent trim)
ROCKFON BLANKA with concealed grid edge profile (1200mmx600mm or 1800mmx600mm)
FEATURE WALL GRAPHIC TO STAIRWAY
DERAKO GRILL SYSTEM(American White Oak)
DERAKO GRILL SYSTEM (American White Oak)
OFFICES RECEPTION AREA
OPTIONAL WELL CERTIFICATION ILLUSTRATIVE ONLY
WOODEN HANDRAILS
(American White Oak
with LED strip lighting)
DESIGN WITH THE WELLBEING OF STAFF IN MIND
SIGNATURE TREE
NEW ARCHITECTURAL PROFILED PANEL
BUILDING EXTERIOR
‘ENERGY’ BAND
LANDSCAPE FEATURES
‘GREEN’ FEATURE PANELS
LANDSCAPE WALL
INSECT HOTEL
FIRE TRACK AS RUNNING TRACK
EXTERNAL GYMPHOTOVOLTAIC BICYCLE SHELTER
‘ACTIVE’ CANOPY
BUILDING EXTERIOR INDICATIVE ‘KIT OF PARTS’
ILLUSTRATIVE ONLY
ELECTRIC CAR CHARGING
EXTERNAL SEATING AREA
POSITION YOUR BUSINESS IN HANNOVER
The Agents for themselves and for the vendors or lessors of the property whose agents they give notice that, (i) these particulars are given without responsibility of The Agents or the vendors or lessors as a general outline only, for the guidance of prospective purchasers or tenants, and do not constitute the whole or any part of an offer or contract; (ii) The Agents cannot guarantee the accuracy of any description, dimension, references to condition, necessary permissions for use and occupation and other details contained therein and any prospective purchasers or tenants should not rely on them as statements or representations or fact but must satisfy themselves by inspection or otherwise as to the accuracy of each of them; (iii) no employee of The Agents has any authority to make or give any representation or enter into any contract whatsoever in relation to the property; (iv) VAT may be payable on the purchase price and / or rent, all figures are exclusive of VAT, intending purchasers or lessees must satisfy themselves as to the applicable VAT position, if necessary by taking appropriate professional advice; (v) The Agents will not be liable, in negligence or otherwise for any loss arising from the use of these particulars. October 2017.
baytree-hannover.com
Max Müller-Straße
Wohlenbergstraße
Industrieweg
Vahronw
alder Straße
Hackethalstraße
BUSINESS PARKHANNOVER NORD
Heinrich-Heine-Straße
Sonnenw
eg
An der Autobahn
Reinhold-Schleese-Straße
Am Brinker Hafen
Berliner P
latz
J44A2
B522
Nordhafen
Wilhelm-Busch-Straße
Friedrich-Ebert-Straße
Freiligraths-Straße
BOTHFELD
BOTHFELD-VAHRENHEIDE
VAHRENHEIDE
VAHRENWALD-LIST
A2
HANNOVER
IndustriewegKugelfangtrift
J44
HANNOVER-NORDSTADT
HERRENHAUSEN
A352
HANNOVERAIRPORT Reuterdamm
Flughafen Str
B6
J46
J44
J44
Kirchhorst
er Str
J3
A37
A7
J45
Heinrich-Konecke Str
Am Ortfelde
A7
Hannoversche Str
Podbielski Str
A37
Buchholzer Str
Ferdinand-
Wallbrecht Str
Mecklenheide Str
Vah
renw
ader
Str
Bremer Damm Celler Str
Godshorner Str Bothfelder Str
Langenforhterr Str
Karl-Wiechert-A
llee
Flugha fen Str
Vinn
ho rste
r Str
Sascha Petersmann Head of Germany
Baytree Deutschland GmbHIm MediaPark 8a50670 KölnT: +49 (0) 6221 985 62 92 M: +49 (0) 151 211 22 211