a history of major hanford facilities

94
PNL-6964 HEDR UC-707 A History of Major Hanford Facilities and Processes Involving Radioactive Material M. Y. Ballinger R. B. Hall March 1991 Prepared for the Technical Steering Panel d& %F Battelle

Upload: trinhcong

Post on 14-Feb-2017

222 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: A history of major Hanford facilities

PNL-6964 HEDR UC-707

A History of Major Hanford Facilities and Processes Involving Radioactive Material

M. Y. Ballinger R. B. Hall

March 1991

Prepared for the Technical Steering Panel

d& %F Battelle

Page 2: A history of major Hanford facilities

DISCLAIMER

This report was prepared under the direction of the HANFORD ENVIRON- MENTAL DOSE RECONSTRUCTION PROJECT Technical Steering Panel by Battelle Memorial Institute's Pacific Northwest Laboratories operating the Pacific Northwest Laboratory for the U.S. Department of Energy (DOE). While funding for the work was provided by DOE, the work is not under DOE direction or control. The views and opinions of the authors expressed in this document do not necessarily reflect those of the United States Government or any agency thereof. Reference herein to any specific commercial product, process or service by t d e name, trademark, manufacturer or otherwise does not necessarily constitute or imply its endorsement, recommendation or favoring by the U.S. Government or any agency thereof, nor by Battelle Memorial Institute.

Printed in the United States of America

Available to DOE and DOE contractors from the Office of Scientific m d Technical Information, P.O. Box 62, Oak Ridge, TN 37831;

prices available from (61 5) 576-8401. FTS 626-8401.

Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161.

Page 3: A history of major Hanford facilities

PNL-6964 HEDR UC-707

A HISTORY OF MAJOR HANFORD FACILITIES AND PROCESSES INVOLVING RADIOACTIVE MATERIAL

Hanford Environmental Dose Reconstruct ion P ro jec t

M. Y. B a l l i n g e r R. B. H a l l

March 1991

Prepared f o r t he Technical Steer ing Panel

P a c i f i c Northwest Laboratory Rich1 and, Washington 99352

Page 4: A history of major Hanford facilities

A HISTORY OF MAJOR HANFORD FACILITIES AND PROCESSES INVOLVING RADIOACTIVE MATERIAL

March 1991

This document has been reviewed and approved by the Technical Steering Panel.

muLQ1 144) Date

Hanford Environmental Dose Reconstruction Project

Page 5: A history of major Hanford facilities

ABSTRACT

The Hanford Environmental Dose Reconstruction (HEDR) Project was estab- lished in 1987 to estimate radiation doses that people could have received

- from nuclear operations at the Hanford Site since 1944. Hanford Site opera- tions began in 1944 to produce plutonium for nuclear weapons. This effort included fabricating fuel elements, irradiating the fuel in nuclear reactors,

L - and separating the resulting plutonium from uranium and fission byproducts.

w

To build a foundation for the first step in estimating radiation doses-- estimating the amount and type of radioactive materials released to the envi ronment--HEDR staff at the Pacific Northwest Laboratory compi 1 ed and sum- marized historical information that describes the processes and facil i ties in which radioactive material was generated or used at the Hanford Site. This document categorizes nuclear operations under six processes: fuel fabrication, reactor operations, fuel separations, plutonium finishing, research and development , and tank farms and waste recovery. Hi stori cal emission controls and effluent monitoring are discussed for each process.

The time period under study ranges from the startup of nuclear opera- tions in 1944 to the present; this report emphasizes the earlier years from 1944 to the mid-1960s. Timetables are provided for each operation to iden- tify operational periods and major changes that may have affected the release of radionuclides to the environment.

Because Hanford Site operations used the first 1 arge-scal e nuclear faci 1 it ies of their kind, process devel opment and effl uent control measures evolved as knowledge about the processes improved. Over the years, facil i - ties were added or modified to improve processes, accelerate production, and better control emissions to the environment. Changes in each of these areas influenced the quantity and types of radioactive contaminants released to the environment. Separate HEDR documents contain estimates of the quantities of these radioactive contaminants.

Page 6: A history of major Hanford facilities

FOREWORD

The appendix t o t h i s document i s a record o f TSP comments and B a t t e l l e ' s

responses; the TSP has reviewed and approved Batte77e1s responses t o i t s - comments. The comment numbers appear i n the l e f t margin next t o the para-

graph i n which the corresponding comment was addressed. Changed t e x t i s

- - shown i n i t a l i c s . I n add i t i on t o TSP comments, some changes were made t o

cor rec t e r r o r s o r f o r f u r t h e r c l a r i f i c a t i o n .

Page 7: A history of major Hanford facilities

CONTENTS

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . FOREWORD

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ABSTRACT

1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 FUEL FABRICATION . . . . . . . . . . . . . . . . . . . . . . .

2.1 PROCESS DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1.1 AS uminum-Cl ad Fuel

2.1.2 Z i r c o n i um-Cl ad Fuel . . . . . . . . . . . . . . . 2.2 FACILITY DESCRIPTION . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . 2.2.1 A1 umi num-Cl ad Fuel

2.2.2 Zirconium-Cl ad Fuel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3 TIMETABLE

. . . . . . . . . . . . . . . . . . . . . . . . 2.4 EFFLUENTS

3.0 REACTOR OPERATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 PILE REACTIONS AND SUPPORT SYSTEMS

3.2 FACILITY DESCRIPTION . . . . . . . . . . . . . . . . . . 3.2.1 P i l e Design . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . 3.2.2 P i l e c o n t r o l s

3.2.3 Coo l ing Water System . . . . . . . . . . . . . . . 3.2.4 Hel iumSystem . . . . . . . . . . . . . . . . . .

3.3 REACTOR DIFFERENCES . . . . . . . . . . . . . . . . . . . 3.4 FUELSTORAGE . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . 3.5 TIMETABLE

. . . . . . . . . . . . . . . . . . . . . . . . 3.6 EFFLUENTS

4.0 FUEL SEPARATIONS . . . . . . . . . . . . . . . . . . . . . . .

Page 8: A history of major Hanford facilities

. . . . . . . . . . . . . . . . . . . 4.1 PROCESSDESCRIPTIONS

. . . . . . . . . . . . 4.1.1 Bismuth Phosphate Process

. . . . . . . . . . . . . . . . . . 4.1.2 REDOX Process

. . . . . . . . . . . . . . . . . . 4.1.3 PUREX Process

. . . . . . . . . . . . . . . . . . . 4.1.4 TBP Process

. . . . . . . . . . . . . . . . . . 4.2 FACILITY DESCRIPTIONS

. . . . . . . . . . . . . . . . . . 4.2.1 B and T P lan t s

. . . . . . . . . . . . 4.2.2 224 Concentrat ion B u i l d i n g

. . . . . . . . . . . . . . . . . . . 4.2.3 REDOX P l a n t

. . . . . . . . . . . . . . . . . . . 4.2.4 PUREX P l a n t

. . . . . . . . . . . . . . . . . . . . . 4.2.5 C P l a n t

. . . . . . . . . . . . . . . . . 4.2.6 U and UO3 P lan ts

. . . . . . . . . . . . . . . . . . . . . . . . 4.3 TIMETABLE

. . . . . . . . . . . . . . . . . . . . . . . . 4.4 EFFLUENTS

. . . . . . . . . . . . . . . . . . 4.4.1 Gaseous Waste

. . . . . . . . . . . . . . . . . . 4.4.2 Aqueous Waste

. . . . . . . . . . . . . . . . . . . . . 0 PLUTONIUM FINISHING

. . . . . . . . . . . . . . . . . . . 5.1 PROCESS DESCRIPTION

. . . . . . . . . . . . . . . . . . 5.2 FACILITY DESCRIPTION

5.3 TIMETABLE . . . . . . . . . . . . . . . . . . . . . . . . 5.3

5.4 EFFLUENTS . . . . . . . . . . . . . . . . . . . . . . . . 5.4

. . . . . . . . . . . . . . . . . . . 6.0 RESEARCH AND DEVELOPMENT 6.1

. . . . . . . . . . . . . . . . . . . . . . 6.1 325 BUILDING 6.2

. . . . . . . . . . . . . . . . . . . . . . 6.2 327BUILDING 6.3

6.3 308/309 BUILDINGS . . . . . . . . . . . . . . . . . . . . 6.3

. . . . . . . . . . . . . . . . . . . . . . 6.4 324 BUILDING 6.4

v i i i

Page 9: A history of major Hanford facilities

6.5 CRITICAL MASS LABORATORIES . . . . . . . . . . . . . . . 6.5

6.6 TRITIUM EXTRACTION FACILITIES . . . . . . . . . . . . . . 6.5

7.0 TANK FARMS AND WASTE RECOVERY . . . . . . . . . . . . . . . . 7.1

7 .1 TANKFARMS . . . . . . . . . . . . . . . . . . . . . . . 7.1

. . . . . . . . . . . . . . . . . . . . . 7.2 WASTE RECOVERY 7.3

8 .0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . 8 .1

9.0 GLOSSARY . . . . . . . . . . . . . . . . . . . . . . . . . . . 9.1

APPENDIX - SUMMARY OF TSP COMMENTS AND BATTELLE RESPONSES . . . . . A.1

Page 10: A history of major Hanford facilities

H a n f o r d S i t e . . . . . . . . . . . . . . . . . . . . . . . . . Operat ing Periods f o r ~ a i o r Hanford Fac i l i t i e s . . . . . . . . Zirconium-Clad Fuel Design . . . . . . . . . . . . . . . . . . Fuel Manufactur ing F a c i l i t i e s i n t he 300 Area . . . . . . . . Cross Sect ion o f a Uranium Column i n a P i l e . . . . . . . . .

. . . . . . . . . . . Reactor Shie lds and I n e r t Gas Atmosphere

Cross Sect ion o f Contro l Rod and Hole . . . . . . . . . . . . 100-D Area Water System . . . . . . . . . . . . . . . . . . . Flow Chart f o r Helium System . . . . . . . . . . . . . . . . . Locat ion o f Reactor Areas on the Hanford S i t e . . . . . . . .

. . . . . . . . . . . . Operat ing Periods f o r Hanford Reactors

. . . . . . . . . . . . . . . . . . A i r Flow Through C Reactor

. . . . . . . . . . . . . Reactor E f f l u e n t System Flow Diagram

. . . . . . . . . . . . . . . . Process Used i n B and T Plants

I somet r i c Diagram o f B and T Plant Canyon . . . . . . . . . . V e n t i l a t i o n Diagram o f Processing Area Canyon B u i l d i n g . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . REDOX P lan t Simp1 i f i ed Layout

. . . . . . . . . . . . . . . Top-Down View o f t h e PUREX Plant

. . . . . . . . . . . . . . . . Isomet r i c View o f PUREX P lant

. . . . . . . . . . . . . . . Uranium Recovery and UO3 Plants

. . . . . . . . . . . . . . Typ ica l Ground Disposal F a c i l i t i e s

Locat ion o f Plutonium F in i sh ing Operations . . . . . . . . . . Typ ica l High-Level Waste Storage F a c i l i t y . . . . . . . . . .

Page 11: A history of major Hanford facilities

TABLES

3.1 Fuel and Target Element Failures in Hanford Reactors . . . . . 3.18

4.1 Functions of Cells f o r B andT Plants . . . . . . . . . . . . 4.10

4.2 Functions of Cells i n Concentration Building . . . . . . . . . 4.12

Page 12: A history of major Hanford facilities

1.0 INTRODUCTION

2. In 1943, the U.S. Army Corps of Engineers selected an area of about 600 square miles, in semi arid southeastern Washington State, for producing

_ pl utoni urn and other nuclear materi a1 s supporting weapons product ion f o r World War 11. This area, called the Hanford Site, was divided into three major operational areas supporting pl utonium production (Figure 1.1). These areas were the 100 Areas for reactor operations (shown in Figure 1.1 as 100-B, 100-C, etc.), the 200 Areas for fuel reprocessing, plutonium recovery, and waste management, and the 300 Area for fuel fabrication. Nine nuclear reactors for the production of plutonium were eventually constructed in the 100 Areas (Figure 1.2). Reactor operations began in 1944; the last produc- tion reactor was put in cold standby in 1987. Support facilities were con-

structed in the 200 and 300 Areas in the 1940s and 1950s; some of these facilities continue to operate. Hanford Site operations developed and changed as the defense needs of the United States and the understanding of nucl ear energy changed. Health physics and environmental monitoring acti vi - ties at the Hanford Site developed through the years as well, impacting the quantity and types of radioactive materi a1 s re1 eased to the envi ronment .

The Hanford Environmental Dose Reconstruct i on (HEDR) Project was estab- lished to estimate the radiological dose impact Hanford operations may have made on the local and regional population. This impact is estimated by examining operations involving radioactive materials that were conducted at the Hanford Site from the startup of the first reactor in 1944 to the present. The probable quantities of emissions from each facility to the air, water, and ground can be identified from measurements taken by monitoring groups or can be calculated by computing the amount of radionuclides present

- in each facility's process and applying release factors to the result. Radiation doses can be estimated from these emissions by accounting for

t specific radionuclide transport conditions and population demography.

. - 2 Pacific Northwest Laboratory (PNL) is conducting the HEDR Project under

the direction of an independent Technical Steering Panel, which is composed of experts in various fields required by the study. The techn ica l members o f

Page 13: A history of major Hanford facilities

5 10 Kilometers - - 0 1 2 3 4 5 Miles

FIGURE 1.1. Hanford S i t e

Page 14: A history of major Hanford facilities
Page 15: A history of major Hanford facilities
Page 16: A history of major Hanford facilities
Page 17: A history of major Hanford facilities
Page 18: A history of major Hanford facilities
Page 19: A history of major Hanford facilities
Page 20: A history of major Hanford facilities
Page 21: A history of major Hanford facilities
Page 22: A history of major Hanford facilities
Page 23: A history of major Hanford facilities
Page 24: A history of major Hanford facilities
Page 25: A history of major Hanford facilities
Page 26: A history of major Hanford facilities
Page 27: A history of major Hanford facilities
Page 28: A history of major Hanford facilities
Page 29: A history of major Hanford facilities
Page 30: A history of major Hanford facilities
Page 31: A history of major Hanford facilities
Page 32: A history of major Hanford facilities
Page 33: A history of major Hanford facilities
Page 34: A history of major Hanford facilities
Page 35: A history of major Hanford facilities
Page 36: A history of major Hanford facilities
Page 37: A history of major Hanford facilities
Page 38: A history of major Hanford facilities
Page 39: A history of major Hanford facilities
Page 40: A history of major Hanford facilities
Page 41: A history of major Hanford facilities
Page 42: A history of major Hanford facilities
Page 43: A history of major Hanford facilities
Page 44: A history of major Hanford facilities
Page 45: A history of major Hanford facilities
Page 46: A history of major Hanford facilities
Page 47: A history of major Hanford facilities
Page 48: A history of major Hanford facilities
Page 49: A history of major Hanford facilities
Page 50: A history of major Hanford facilities
Page 51: A history of major Hanford facilities
Page 52: A history of major Hanford facilities
Page 53: A history of major Hanford facilities
Page 54: A history of major Hanford facilities
Page 55: A history of major Hanford facilities
Page 56: A history of major Hanford facilities
Page 57: A history of major Hanford facilities
Page 58: A history of major Hanford facilities
Page 59: A history of major Hanford facilities
Page 60: A history of major Hanford facilities
Page 61: A history of major Hanford facilities
Page 62: A history of major Hanford facilities
Page 63: A history of major Hanford facilities
Page 64: A history of major Hanford facilities
Page 65: A history of major Hanford facilities
Page 66: A history of major Hanford facilities
Page 67: A history of major Hanford facilities
Page 68: A history of major Hanford facilities
Page 69: A history of major Hanford facilities
Page 70: A history of major Hanford facilities
Page 71: A history of major Hanford facilities
Page 72: A history of major Hanford facilities
Page 73: A history of major Hanford facilities
Page 74: A history of major Hanford facilities
Page 75: A history of major Hanford facilities
Page 76: A history of major Hanford facilities
Page 77: A history of major Hanford facilities
Page 78: A history of major Hanford facilities
Page 79: A history of major Hanford facilities
Page 80: A history of major Hanford facilities
Page 81: A history of major Hanford facilities
Page 82: A history of major Hanford facilities
Page 83: A history of major Hanford facilities
Page 84: A history of major Hanford facilities
Page 85: A history of major Hanford facilities
Page 86: A history of major Hanford facilities
Page 87: A history of major Hanford facilities
Page 88: A history of major Hanford facilities
Page 89: A history of major Hanford facilities
Page 90: A history of major Hanford facilities
Page 91: A history of major Hanford facilities
Page 92: A history of major Hanford facilities
Page 93: A history of major Hanford facilities
Page 94: A history of major Hanford facilities