A Guide to ConstructionCost Sources

Commissioned by:Ontario Construction Secretariat

Authored by:Prism Economics and Analysis

and the Department of Civil Engineering,University of Toronto

March 2001

Page 2: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

A Guide to Cost Sources

As the industrial, commercial and institutional (ICI)marketplace becomes increasingly global, the competition tohost new facilities also becomes more intense. Decisions byowners on where to build are often based upon a conceptualestimate, with construction costs being part of that estimate.Other factors include (but are not limited to) projected returnson investment, location-specific tax relief, energy availability,and operating costs.

It is important to put construction costs in context. For a newindustrial facility, construction cost comprises both the cost ofconstructing a building and the cost of equipping the facility.The following chart from Richardson Engineering Services,Inc. illustrates the cost breakdown for a Toronto area project.Other Canadian locations would have a similar cost structure.

Figure from Richardson Engineering ServicesAs can be seen, for a typical processing plant, building andsite work accounts for only 20% of the total costs including

installation of processing equipment. Labour costs account for21% of the total construction cost (9% in building and siteconstruction, and 12% in processing installation.

For determining the cost of construction in the preliminarystages of project development, several cost indexes arecommercially available. These differ in their intended use andtheir reliability. One index may depict the cost of constructionin a certain city or area as very competitive globally, whileanother may indicate that the same location is uncompetitive.This report discusses the assumptions behind constructioncost indexes available in the ICI industry and compares theresulting indication of cost competitiveness using Toronto asthe baseline.

NormalizationNormalization answers the question: what is the base (i.e.100) for an index. Cost indexes can be normalized on time orlocation. Often, indexes are normalized to a baseline value of100 assigned to a specific year and location. For example, anindex might take as its baseline 100 as the cost of building a20 storey office building in Toronto in 1992. Locations may bedefined as cities, telephone area codes, provinces/states, orcountries, depending on the level of detail and the intendeduse of the index. The assumptions and methodology behindeach index is unique, therefore the values are not transferable.

Input, Output, and Hybrid IndexesThere are several facets of cost indexes that may affect theirapplicability. First, it is important to know the philosophy

100% ConstructionCost

20% Buildings& Site

80% ProcessSystem

55% FieldMaterial

45%Labour

75%EngineeringEquipment

10% FieldMaterial

15%Labour

Page 3: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

behind the index. Generally, they are characterized as input,output, or hybrid indexes 1.

Input indexes are compiled from a shopping cart of commonmaterials, equipment, and trade labour hours. They representthe inputs to the construction process and reflect the marketprices for these items. For example, an input index may bebased upon the cost of 100 m3 of concrete, 50 hours each fora carpenter, mason, plumber, electrician, and an ironworker,and 200 hours each for a backhoe and a mobile crane. Localcosts for the items in the shopping cart are determined forevery location covered by the index, and summed. They arethen normalized to the baseline to produce the index.

Input indexes do not contain any assumptions or adjustmentsrelated the local labour productivity although some effort mayhave been expended to generally proportion the quantities oflabour and materials. It is important to note that the quantitiesare constant in every location. This means that some aspectsof the construction process are not captured, such as labourskill levels or practices and local building code requirements.

While the use of input indexes is limited, they are the simplestto produce and contain the least error. Local hard costs arecollected from collective agreements and materialdistributors/retailers. Importantly, these indexes are not biasedby assumptions or estimates of local conditions. This indexmay be useful for construction companies that move their owncrews between projects and only need to know the differencesin the cost of materials.

Output indexes attempt to measure the total cost ofconstruction of a completed structure in each location. This is

1 Mohammadian, R., and Seymour, S., 1994, Construction PriceIndex Methodology, 1994 CSCE Annual Conference, Winnipeg, MB,Canada

achieved in one of two ways. First, actual tender prices forprojects are collected. Because every project will havedifferent parameters, the costs must be adjusted to account forthe different project characteristics. Although these indexesmore closely represent real costs, it is extremely difficult tocollect this information and to adjustment the costs in areasonable way to reflect the effects of the different projectparameters. For example, the cost of constructing a high risebuilding will be affected by the footprint size and shape, thebuilding height, the interior finishes, the presence ofunderground parking, and ground conditions.

The second procedure is to estimate the cost of constructing aspecific building. The various characteristics of the building areoutlined and estimates are solicited from practitioners in eachlocation. While this method produces indexes that reflectlocation conditions including labour skill, availability, andproductivity, it requires significant cost estimating resources.Extreme care must be taken to ensure that the assumptionsmade in the specifications are acceptable across all locations.This method introduces uncertainty and possibly biasesbecause the estimated costs are dependent upon thepractitioners. When tenders are submitted for a project, everybid that is submitted has a different price. The index costdeveloped by the estimator may affect the perceivedcompetitiveness of that location by the users of that index.

Hybrid indexes exploit the ease of input index developmentand the reliability of output indexes. Instead of providingindexes based on the total cost of a project, hybrid indexesfocus on the installed costs of smaller building elements, suchas foundation walls, insulation or roof membranes. Buildingelements are usually organized using MasterFormat. Often,labour cost, material cost, and total cost including overheadsare provided.

Page 4: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

It is important to understand the basis of these indexes. Ifcosts are provided for each location, then they may containproductivity differences. If the cost is ascertained for a singlelocation and then applied across locations using a locationindex, the assumptions behind the location index must also beconsidered. Often assumptions are based on labour hourlycosts and material costs, with a standard productivity rate andoverhead rate applied, making them more similar to an inputindex than an output index.

Compilation MethodA second facet of the cost index relates to how the costinformation collected over several projects or locations iscompiled into a single index. Several schemes have beendeveloped including using simple averages, medians, modes,inverse averages, and product roots. Each method results in adifferent index value even if the same data are used. In mostcases, the mean (the mathematical average) or the mode (themost likely value) is used based on a sample of 3 costestimates. For example, consider three costs collected as$1.25, $1.30, and $1.75. The mean would result in a cost of$1.43 whereas the mode may be interpreted as $1.30.Because small sample sizes are usually used, somesubjective judgement must be used to ensure the results arereasonable. Occasionally, a confidence level is used as thevalue. Assuming a normal distribution was fit to these data andan 85% confidence value was desired, this would result in acost of $1.72. It is obvious that the method significantly affectsthe resulting reported cost, and they are all correct based ontheir interpretation.

Method CostMean $1.43Most Likely $1.3085% Confidence $1.72

ValidationFinally, the reliability of the data is always in question. Themethod used to collect the cost data is very important toensure the data are representative of the political andeconomic conditions. Data collection may be done by phonewith associated firms (engineers, quantity surveyors, and/orcontractors) providing information, by survey of publishedlabour, material, and equipment costs, or by review ofcompleted project files. Where associated firms are providingthe information, it is important that they all understand theassumptions that must remain constant for all locations, and tonot allow personal or local biases affect the reliability of theprocess.

Page 5: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Research Objective

The primary objective of this research was to:

• Develop a reference guide that presents the keycharacteristics of each construction cost source separatelyand allows convenient comparisons of results.

This was achieved by collecting the cost sources, interviewinganalysis and publishers, documenting results and preparingthe guide. Additional analysis was performed showing how theindexes compared over time, and by location.

How to Use this Guide

This Guide is organized in the following manner. Section 2contains a summary of the cost sources and a comparison ofthe costs over time and location. Section 3 contains detailedinformation for each cost source outlining the assumptions,strengths and weaknesses of each source. In addition, astandardized format specific to each index was preparedoutlining their characteristics related to labour, material andequipment indexes, assemblies and structures indexes, andlocation indexes.

The cost sources included in this guide are:• Boeckh Commercial, Institutional, Light Industrial

Building Cost Guide• Dodge unit Cost Guide• Engineering News Record• Hanscomb’ Yardsticks• Hanscomb-Means International Construction Cost

Index• Helyar Construction Cost Guide• KPMG International Cost Comparison Analysis• RSMeans Building Construction Cost Data• Richardson Construction Cost Trend Reporter• Richardson International Cost Index• Saylor Current Construction Costs• Statistics Canada Construction Price Statistics

Page 6: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Summary of Cost Sources

Cost Type

CostSource

Labour(Input)

Materials(Input)

Equip’t(Input)

Assemblies/Structures(Output)

LocationIndexes

TimeSeries

Boeckh ü Input üDodge ü ü ü InputENR ü ü ü InputHanscomb ü ü Input & OutputHelyar ü Output üKPMG ü OutputRichardson ü ü OutputRSMeans ü ü ü ü Input üSaylor ü ü ü Input üStatisticsCanada

ü ü ü ü ü

Page 7: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Comparison of Time Series

Statistics Canada and Helyar Indices (1981=100)Toronto: Commercial

100

125

150

175

200

1981 1983 1985 1987 1989 1991 1993 1995 1997

Helyar Statistics Canada

Figure 1: Statistics Canada vs. Helyar

Statistics Canada and Saylor Indices (1990=100)Statistics Canada: 7 City Average

Saylor: Sub-Contractor and Materials & Labour Indices

90100110120130140

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999

Saylor: Sub-Contractors Saylor: Materials & Labour

Statistics Canada

Figure 2: Statistics Canada vs. Saylor

Some of the indexes can be expressed as time series that areapproximately comparable to the time series published byStatistics Canada. No inference should be made from thesecomparisons that one index is more reliable than another. Thereliability of an index is determined by its suitability to the useto which it is applied and by the validity of the assumptionswith respect to that use. In all cases, the comparisons arerates of change from a base year.

Statistics Canada / Helyar ( Figure 1) Figure 1 compares changes from 1981 in the cost ofconstructing a commercial-use building, as measured byStatistics Canada and Helyar & Associates. From 1981 to1989, the Helyar Index and the Statistics Canada Index closelytrack one another. The indexes differ on whether constructioncosts peaked in 1989 or 1990. In the 1990,s the indexesdiverge significantly. Statistics Canada reports a moderatedecline in construction costs – approximately 6% from 1990 to1992. Helyar & Associates, however, report a much sharperdecline in costs – approximately 22% from 1989 to 1992.Thereafter, both indexes track a comparable 1½% annual rateof inflation form 1992 to 1999. While there are strongsimilarities in the trends reported by the two indexes, it issignificant that they differ on both the turning point of theconstruction cycle and the extent of cost reductions during theperiod of contraction from 1991 to 1993.

Statistics Canada / Saylor (Figure 2)The Statistics Canada and the Saylor indexes exhibitapproximately similar patterns. During the contraction of 1990-1992, Statistics Canada reports a reduction in constructioncosts. This is consistent with the Helyar index and also withexpectations. The Saylor indexes, however, show virtually nodecline in costs during the recession.

Page 8: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada and Boechk Indices (1990=100)Statistics Canada: Toronto Non-Residential

Boechk: Unweighted All-Components Average for Ontario

90

100

110

120

130

140

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000

Boechk Ontario Average Statistics Canada-Toronto Non-Residential

Figure 3: Statistics Canada vs. Boechk

Statistics Canada and R.S. Means Indices (1990=100)Statistics Canada: 7-City AverageR.S. Means: Historical Cost Index

90

100

110

120

130

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999

Means Index Statistics Canada

Figure 4: Statiscis Canada vs. RSMeans

Over the decade, Statistics Canada estimates constructioncost increases of 10% compared to 25% and 27% in theSaylor indexes. The Saylor indexes consistently estimateinflation at significantly higher rates that Statistics Canada.

Statistics Canada / Boechk (Figure 3)As in the Saylor comparison, the Boechk Index divergessharply from the cost pattern reported by Statistics Canada forthe recession years (1991-1993). During this period, StatisticsCanada reported a cost reduction for Toronto Non-Residentialconstruction of approximately 5%. Boechk, however reports acost increase of 15%. This degree of cost increase is uniqueamong the indexes for the period in question and is alsocounter-intuitive. For the period 1993 to 1999, the Boechk andStatistics Canada indexes closely track one another. Boechkreports cost inflation of approximately 17% compared to 14.5%for Statistics Canada. In 2000, Statistics Canada identified asharp increase in costs – 6.5%. This is consistent with industryexperience. Boechk, however, reports inflation in 2000 of only1.6%. The indexes appear to track one another during periodof moderate expansion, but to diverge during the downturnand at acceleration points in the construction cycle.

Statistics Canada / R.S. Means (Figure 4)As with the Boechk index, the Means index reports costincreases during the contraction years 1991-1992. Thiscontrasts with Statistics Canada and Helyar. For the period1993-1999, the R.S. Means index and the Statistics Canada 7-City Average track one another closely. Means reports costinflation of 15.6% during this period, while Statistics Canadaestimates the 6-year inflation at 13.7%.

Page 9: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Comparison of Location Series

Location indexes are an important source of information tocompare regional construction costs. Table 1 shows locationindexes from eight publications for 12 cities, 4 of which are inCanada. Figure 5 shows the same information in graphicalformat. These cities were chosen to provide a reasonablegeographic sampling as well as to represent major industrialcentres. They have all been normalized so that Toronto=100.To fairly compare costs, an adjustment for the Canadian dollarhas been made using the exchange rate of C$1.48 = US$1.00.The rightmost column shows the arithmetic average of thelocation indexes for each city from the publications. Theaverage for each publication is shown under the index list. Thebottom row of the table shows whether the location indexcould be considered an input index or an output index (asdefined in the introduction). To facilitate trend analysis, thelowest index value for each location is marked with a singleunderline, and the highest value marked with a doubleunderline.

The values vary widely. Only two of the indexes are fromCanadian firms, namely Helyar and Hanscomb. Thesepublications do not provide indexes for US cities. Boeckh isbased out of Germany, but has offices in Canada and US thatgather information for their publication. KPMG is internationaland, like Boeckh, has offices in both Canada and US. Theother indexes are published by US firms. Only Richardson isspecific to industrial process plant construction while theothers are general building construction.

For this analysis, there was some difficulty getting indexes forall of the cities. In some cases, an index for a particular citywas not available, so an available index for another city wasused. For example, Richardson provides city indexes in theirInternational Cost manual, but only publishes indexes forstates in their Process Plant publication. For this reason, theUS cities are represented by their index for the state. Similarsubstitutions were made for the KPMG data. San Diego wasused for Los Angeles, Columbus for Cincinnati, Dallas-FortWorth for Houston, Saginaw for Detroit, and Newark for NewYork. These substitutions were deemed reasonable at thetime.

Of the eight location indexes compared, only three, KPMG,Helyar and Hanscomb, are output indexes. RSMeans explicitlystates that productivity is not considered in their locationindexes. Saylor, Dodge, and Richardson each mention once intheir literature that productivity is considered but do notindicate how. Richardson provides a productivity factor in theirInternational Cost Guide, but it is the same for each Canadiancity. Saylor uses the same productivity rate in the calculationsof union installed costs and open shop installed costs, andassume that the same crew configuration is used in eachlocation. It is therefore unlikely that they differentiateproductivity rates in their location indexes. Dodge statedduring their interview that constant productivity rates wereused.

Because all the publications provide indexes for the chosenCanadian cities, this discussion will first look at them. Then,

Page 10: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

the US cities will be included, which will require omitting Helyarand Hanscomb from the discussion.

Comparing Canadian Cities OnlyAll of the input indexes show Toronto as the most expensiveCanadian city. Only one output index, Hanscomb, shows thesame trend although the difference between them cannot beconsidered significant. All three output indexes indicate thatToronto and Montreal are approximately the same. BothKPMG and Helyar indicate Vancouver and Calgary are moreexpensive than Toronto, although KPMG is much higher. Infact, KPMG has the highest index for each Canadian city.

Figure 5: Location Cost Indexes

Comparing All CitiesThis discussion does not include Hanscomb and Helyar asthey do not provide indexes for the US cities, leaving KPMGas the only output index in the comparison.

KPMG, an output index, publishes the highest value for 7 ofthe cities and is the highest index on average. Richardson, aninput index, is the lowest. Because of the small sample ofoutput indexes (only 1), we cannot conclude that labourproductivity varies significantly between these cities, and it hasa dramatic effect on costs. It has yet to be determined if and towhat degree productivity may differ.

Although there an exchange rate of Can$1.48= US$1.00 hasbeen applied, two US cities have indexes significantly lower(approximately 15%) than Toronto. These are Atlanta andHouston from Dodge and Richardson publications. RSMeans,however, published indexes for these two cities approximately15% higher than Toronto. There does not appear to be anyconsistency in the indexes across publications, even thosethat are of the input type.

To understand the sensitivity of the US location factors to theexchange rate used, the rate was varied until the averageindex for each of the US cities was equal to 100. This occurredwhen $1.00 US = Can $:

Houston $1.41Atlanta $1.38

Cincinnati $1.26Chicago $1.14

Los Angeles $1.11Detroit $1.08Boston $1.06

New York $0.92

ConclusionUsing location indexes appears to be a gamble, and the resultwill vary significantly depending on the index used. There is noobvious consistency between the publications, even those ofthe same type. This is very concerning as major decisions maybe based upon this information.

75

100

125

150

175

200

Tor

onto

Mon

trea

l

Cal

gary

Va

nco

uve

r

Hou

ston

Atla

nta

Cin

cinn

ati

Chi

cago

Los

Ang

eles

Det

roit

Bos

ton

Ne

w Y

ork

Richardson Dodge Boeckh Saylor

RS Means KPMG Hanscomb Helyar

Page 11: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Table 1: Normalized Location Indexes

City Richardson Dodge Boeckh Saylor RS Means KPMG Hanscomb Helyar Average

Toronto 100 100 100 100 100 100 100 100 100Montreal 96 91 89 89 92 100 98 98 94.1Calgary 97 81 82 87 87 140 96 106 97.0

Vancouver 99 94 92 94 96 124 95 106 100.0Houston 83 86 107 132 118 104 105.0Atlanta 85 88 100 123 117 128 106.9

Cincinnati 96 101 115 132 122 140 117.6Chicago 102 119 149 132 146 129.5

Los Angeles 110 115 141 148 144 140 133.2Detroit 97 120 134 135 139 200 137.4Boston 103 123 144 135 154 176 139.3

New York 132 155 180 153 176 172 161.4Average 100.1 106.1 119.4 121.7 124.3 138.5 97.2 102.5

Type of Index Input Input Input Input Input Output Output OutputSingle Underline: lowest index value per cityDouble Underline: highest index value per city

Page 12: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General Information

Publisher: Boeckh, A Division of Thomson Canada Limited100 Sheppard Ave. EastSuite 460, Toronto, ON M2N 6N5

Tel: (800) 661-3619Fax: N/AWebsite: http://www.boeckh.com

Years in circulation: 66 years

Type of index: This guide provides unit costs for various building types with adjustments for building parameters andcharacteristics. Location multipliers for construction costs at various locations are provided to transfer unitcosts to other locations.

Intended use by: This publication provides insurance adjusters with estimates of the cost of replacing a building. It does notattempt to measure the market value of the building. The information may be used by owners for preliminaryconstruction cost comparisons, but is not detailed enough to be of use to contractors. Of interest are thelocation multipliers that compare costs in different locations.

Canadian CityCoverage:

940 locations, 53 of which are Canadian cities:BC: Kamloops, Prince George, Vancouver, VictoriaAB: Calgary, Edmonton, LethbridgeSK: Prince Albert, Regina, SaskatoonMB: Brandon, WinnipegON: Barrie, Hamilton, Kingston, Kitchener, London, Ottawa, Owen Sound, Peterborough, St.

Catharines, Sarnia, Sault Ste. Marie, Sudbury, Thunder Bay, Timmins, Toronto, WindsorQC: Chicoutimi, Granby, Hull, Joliette, Montreal, Noranda, Quebec, Rimouski, St. Hyacinthe, St.

Jerome, Sherbrooke, Sorel, Trois RivieresNB: Bathurst, Fredericton, Moncton, Saint JohnNS: Bridgewater, Halifax, Sydney, Truro, Yarmouth

Page 13: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General InformationPE: CharlottetownNF: Corner Brook, St. John’s

Other Publications: • Residential Building Cost Guide• Mobile-Manufactured Housing Cost Guide• High-Valued Dwelling Cost Guide• Agricultural Building Cost Guide• Apartment and Condominium Personal property Cost Guide

Description: The Boeckh Cost Guide consists to two major sections: the baseline square foot building costs, and thelocation multipliers. The baseline for costs is Milwaukee WI in 1995. It was chosen because of its historicallystable economy and its typical profile of national economic characteristics.

Baseline Square Foot Building CostsBoeckh uses an inductive cost estimating method in which they collect elemental costs and combine them instages to eventually represent a whole building.

Boeckh provides square foot building costs in Milwaukee, WI for 120 different building models falling into 10model types

• Lodging• Offices• Mercantile• Restaurant/Recreation• Professional Services• Public Building• Services• Industrial• Processes• Basements/Miscellaneous

Page 14: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General InformationDepending on its superstructure construction type

• Frame• Masonry• Pre-Engineered Metal• Steel Frame• Protected Steel Frame• Reinforced Concrete Frame

Adjustment factors are available to account for other characteristics, such as:• Exterior wall material• Heating and cooling system type• Miscellaneous (elevators, fire systems)• Construction quality (economy, average, superior)• Building area to perimeter ratio

The following constants have been added to the total cost:• 20% to account for combined overhead and profit of the general contractor and subcontractors• 7% for architect and engineering fees• 5% for contingencies

The following have not been included:• Local impact fees: these are taxes imposed by municipalities for new construction, but should not apply

to reconstruction projects• Fast track construction: it is assumed that standard design-construct practices are used. Boeckh

recommends adding 10-15% for fast track projects• Demolition, site work (clearing, paving, landscaping)

Location MultipliersOnce the base cost of the building is determined, it may be adjusted to a specific location and year using thelocation multipliers. Boeckh provides location multipliers for over 880 locations, categorized by US state and

Page 15: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General Informationzip codes and Canadian provinces and cities. For each location, nine multipliers are provided:

Frame, Masonry, JointedMasonry

Pre-Engineered Metal, Non-Combustible

Steel, Protected Steel, MasonryNon-Combustible, Modified Fire

Resistive

Reinforced ConcreteFrame, Fire Resistive

Building Items andSite Improvements

Group I Group II Group I Group II Group I Group II Group I Group II All

Where Group I are structures with occupancy related to Services, Industrial, Processes, and Basements,and Group II are Lodging, Offices, Mercantile, Restaurant/Recreation, Professional Services, and PublicBuildings.

The location multipliers are calculated based on 115 elemental costs consisting of 19 building trade labourrates, 89 material prices, and 7 other applicable costs.

Labour rates for 19 construction trades consisting of prevailing wages (union or open shop depending on thelocation and property type) plus fringe benefits are gathered from the locations. Wages include the basewage (journeyman) including vacation and holidays. Fringe benefits include health and welfare, pensionfunds, industry advancement funds, and apprentice training. In addition, workers’ compensation programs,contractor’s/builder’s liability insurance, social security and unemployment compensation are determined.Data sources include building trade councils, general contractor organizations, local unions and contractorsby writing or telephone interviews.

Material prices are collected from local suppliers. The costs of these items include local taxes, freightcharges, and contractor discounts. National-supply centres distribute certain materials, and their cost isassumed constant.

For each building model, elemental costs as a percentage of the total baseline cost in Milwaukee arecalculated. The Boeckh example shows these proportions for the costs of a tree house:• 40% Carpenter labour• 25% 2x4 lumber

Page 16: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General Information• 20% Plywood• 10% Asphalt shingles• 5% Paint

The local cost of each labour-hour and material unit is then weighted according to the model, summed, andnormalized to the Milwaukee 1995 cost to calculate the location multiplier.

Of the over 880 location multipliers provided, only 201 are calculated independently. The remainder aremodified from a similar, neighbouring zip code using a predetermined “hook-up” factor which relates theneighbouring locations to the central location by a factor, say, 0.96 or 1.03. Periodically, the hook-up factorsare reviewed for accuracy.

The base building is assumed to be in a cold climate and a seismic zone 0. Additional factors are provided toaccount for special site conditions that are important in the subject location but not captured in thelabour/material-based location multipliers.

Multipliers for Canadian locations represent Canadian dollars.

Assumptions: 1. An allowance is included in the base costs for normal general contractor and subcontractor overheadand profit (O & H) combined and is equal to 20 percent.

2. An allowance is included in the base costs for Architectural fees and is equal to 7 percent.

3. An allowance is included in the base costs for contingencies and is equal to 5 percent.

4. The base cost assumes a seismic zone 0 and a cold climate region.

Page 17: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Boeckh Commercial, Institutional, Light Industrial Building Cost Guide

General Information

Strengths: 1. Cover a large number of Canadian cities (53 cities).

2. No exchange rate is applied for the Canadian locations, which gives flexibility to apply a current oranticipated exchange rate.

3. Provides location and time multipliers.

4. The Boeckh publication recognizes three national building codes and the cost differentials due to buildingcode requirements are taken into consideration.

5. The following factors are reflected in the multipliers:• Engineering and architectural costs• Building code requirements such as seismic design requirements• Climate and weather conditions

Weaknesses: 1. Markup for general contractors and subcontractors, architectural costs, and contingencies are reflectedas a constant percentage for all locations.

2. The following factors are not reflected in the location multipliers:• Work regulation• Access and transportation (site conditions)• Market competitiveness condition and local discounting practices

3. The following costs are not reflected in the location multipliers:• Land and related costs such as land surveys• Managerial and supervision costs

Page 18: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Boeckh Commerical, Institutional, Light Industrial

Location Factor Published

GeneralComments Time-location multipliers are published for each state and province over 10 years. Eight building structure types are detailed plys an overall building and site improvement multiplier. The multipliers take into account labour rates, material prices and other applicable costs such as taxes and insurance. Boeckh states that they apply a productivity adjustment.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 19: A Guide to Construction Cost Sources - O'Grady

Boeckh Commerical, Institutional, Light Industrial

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 1

Data Collection Method

Update Frequency annual

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 20: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Boeckh Commerical, Institutional, Light Industrial

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 21: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Boeckh Commerical, Institutional, Light Industrial

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 22: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Dodge Unit Cost Guide

General Information

Publisher: Marshall & Swift911 Wilshire Blvd.Los Angeles, CA 90017-3409

Tel:Fax:Website:

(213) 683-9000(213) 683-9010http://www.marshallswift.com

Years in circulation: • 12 years by Marshall & Swift (1988-present)• 16 years by McGraw-Hill (1972-1988)• Dodge cost indexes have been created since 1932

Type of index: The Dodge Unit Cost guide provides:• Elemental costs: detailed costs categorized by CSI Masterformat• Equipment Data: daily, weekly and monthly rental rates• Local Multipliers: Multipliers are provided for over 1000 locations in US and Canada

Intended use by: These indexes are intended to assist contractors in developing bids and drop prices.

Canadian CityCoverage:

Over 1000 locations of which 86 are Canadian:BC: Cranbrook, Kamloops, Kelowna, Nanaimo, Nelson, Penticton, Port Alberni, Prince George, Prince

Rupert, Trail, Vancouver, VictoriaAB: Calgary, Edmonton, Lethbridge, Medicine Hat, Red DeerSK: Moose Jaw, North Battleford, Prince Albert, Regina, SaskatoonMB: Brandon, Thompson, WinnipegON: Barrie, Belleville, Brampton, Brantford, Brockville, Cambridge, Guelph, Hamilton, Kingston,

Kitchener, Lancaster, Lindsay, London, Niagara Falls, North Bay, Orillia, Oshawa, Ottawa, OwenSound, Peterborough, Sarnia, Sault St. Marie, St. Catharines, Sudbury, Thunder Bay, Timmins,Toronto, Trenton, Waterloo, Windsor

Page 23: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Dodge Unit Cost Guide

General InformationQC: Chicoutimi, Drummondville, Hull, Jonquiere, Laval, Montreal, Quebec City, Rimouski, Rouyn,

Sept. Iles, Sherbrooke, Trios-Rivieres, Val d'OrNB: Bathurst, Edmundston, Fredericton, Moncton, St. JohnNS: Cape Breton, Dartmouth, Halifax, New Glasgow, Sydney, TruroPE: CharlottetownNF: Corner Brook, Gander, St. JohnsNT: YellowknifeYT: Whitehorse

Other Publications: • Repair and Remodel Cost Guide• Residential Cost Handbook• Commercial Cost Handbook• Electrical Cost Guide

Description: The Dodge Unit Cost Guide contains construction costs organized by the CSI MasterFormat divisions.Hourly labour rates are gathered for the different trades in each city. Material and equipment costs aredetermined by contacting building product manufacturers, dealers, supply houses, distributors, andcontractors.

All the costs found in the Dodge Unit Cost Guide are U.S. national averages. The local multipliers are usedto adjust the national average to the different locations.

Material prices and wage rates are collected locally. Usually there are 3 sources for each location. Ajudgement is made on the information to exclude the outliers. An average is taken from the remaining data torepresent each location.

Markups (OH & P) are included and they vary by the CSI divisions and by trade.

There are location multipliers for each division of the CSI Master-Format, and there is also an overallmultiplier, which represents a weighted average of materials and labour. The weights of the overall localmultiplier are the same for all the locations and over time.

Page 24: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Dodge Unit Cost Guide

General Information

Marshall & Swift monitors the areas specified in the publication for the required costs and rates on aquarterly basis. The guide is published annually. The local multipliers are provided quarterly.

All taxes (PST and GST for the Canadian cities) are included.

The range of error believed in the estimates of the location multipliers is ± (5 – 10)%.

For the Canadian cities, the prices and rates are collected in local currency (No exchange rates are applied).

Assumptions: 1. Crew compositions are assumed constant over all locations. These crews are believed by the Dodgeestimators to be typical crew compositions. The crew compositions are found in the crew data section.

2. All the productivity rates estimated for the crews and used in the calculations are derived from nationalaverages. These productivity rates are considered constant for all locations.

3. Labour wage rates are Union wage rates.

Strengths: 1. Covers a large number of Canadian cities (86 cities).

2. There is an option of applying a location multiplier from a category specific to a certain component, orusing the overall multiplier and apply it to an entire project.

3. No exchange rates are applied for the Canadian locations, which gives the flexibility to apply a desiredexchange rate when comparing projects between the U.S. and Canada.

4. Estimated markups are added to the total costs. These are not a constant value or percentage for alllocations; they vary by trade and CSI divisions.

Page 25: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Dodge Unit Cost Guide

General Information

Weaknesses: 1. Only Union wage rates are used.

2. Crew compositions are constant in all locations.

3. Productivity is assumed constant for all locations, therefore, no differential productivity is reflected in thelocation multipliers.

4. The location multipliers do not reflect the following factors:• Unique local requirements• Regional variations due to specific building codes• Climate and weather conditions• Seismic design requirements• Design styles and conventions• Market competitiveness condition, and local discounting practices• Access and transportation (site conditions)

5. The following are not reflected in the costs:• Engineering and architectural costs• Land related costs• Land surveys• Permit fees and taxes• Payroll costs such as social security and payroll insurance• Managerial and supervision costs

6. Markups do not reflect local competitive conditions.

Page 26: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Dodge Unit Cost Guide

Location Factor Published

GeneralComments The Local Multipliers are calculated for each of the 16 CSI Masterformat divisions plus an overall multiplier.

Local Multipliers are based solely on prevailing wages and material costs within each of the regions.

Multipliers are relatively detailed with several ZIP codes distinguished for each US state. Canadian Local Multipliers are organized by province and city.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 27: A Guide to Construction Cost Sources - O'Grady

Dodge Unit Cost Guide

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements

Number Of Trades Tracked Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 3

Data Collection Method Phone interviews and data collection

Update Frequency semi annually

Notes Elemental costs provided for over 20,000 line items. They are based on labour and materials only (equipment costs not included). Overhead and profits are provided. Markups do not reflect local competitiveness across locations but vary by CSI Masterformat divisions and by trade. Elemental costs are based on single components. Their sum for an entire structure would likely exceed total costs because savings between elemental installations are not considered.

Crew composition is based on the typical crew assumed by the Dodge estimators and is constant for all the locations.

Costs are calculated as the average from 3 or more sources with outliers removed if necessary.

The crew productivity rates are derived from the national averages, and are asumed the same for all the locations.

Very few revisions on productivity from year to year.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 28: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Dodge Unit Cost Guide

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements

Number Of Trades Tracked 20

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources

Data Collection Method

Update Frequency

Notes Dodge does not specifically provide a labour index, but tracks labour costs in their crew component of the elemental and assembly costs.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 29: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Dodge Unit Cost Guide

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked

Same Materials Across Location

Number Of Sources

Data Collection Method

Update Frequency

Notes Dodge does not specifically provide a materials index, but tracks material costs in the elemental and assembly costs.

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 200

Same Equipment Across Locations

Number Of Sources 3

Data Collection Method phone survey

Update Frequency

Notes Equipment rental rates are given on a daily, weekly, and monthly basis.

For each type of equipment, several configurations are provided. For example, Air Compressor rates are lised for 15 different capacities for diesel-fueled, and 2 capacities for gas-fueled.

It is expected that the Local Multipliers would be sufficient to convert these national average rental costs to individual locations.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 30: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Engineering News Record Building Cost Index and Construction Cost Index

General Information

Publisher: Engineering News-RecordMcGraw-Hill Co.,Two Penn Plaza,New York, New York 10121-2298

Tel: (212)-904-3418Website: http://www.enr.com

Years in circulation: • Both indexes base-dated to 1913• Construction Cost Index commenced in 1920’s• Building Cost Index commenced in 1930’s

Type of index: Composite of four input costs: labour (skilled/unskilled), cement, lumber and steel.

Intended use by: Contractors and developers - to estimate approximate changes in constructions over time in locations, not tocompare across locations.

Canadian CityCoverage:

Toronto and Montreal

Other Publications: The ENR’s cost indexes are proprietary. The ENR’s 20-city average (US only) is published weekly. City-specific data (including Toronto and Montreal) are published in the Dec. 1st issue.

Page 31: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Engineering News Record Building Cost Index and Construction Cost Index

General Information

Description: The ENR publishes two indexes. Both indexes are based on a similar methodology.

Construction Cost Index:The CCI is a composite index based on specified quantities as follows:

cement - 1,128 tones of bulk portland cement priced locally

lumber - 1,088 board-ft of 2 x 4 lumber priced locally

steel - 25 cwt of fabricated structural steel at the 20-city average

Labour for the Construction Cost Index is assumed to be 200 hours of common labour (i.e., unskilledlabour). Labour is priced at the 20-city average.

Building Cost Index:The BCI uses the same material inputs and costs but alters the labour input to 68.38 hours of skilledlabour. Skilled labour is the average wage paid to three trades – bricklayers, carpenters andstructural ironworkers. The 20-city average is used.

Both indexes are based-dated to 1913. There have been no changes in the technical specifications(quantities and types of labour, quantities and types of materials).

Wage costs in both indexes are the published union wage rate for the package, i.e., inclusive of non-statutory benefits. Statutory payments are not included.

As noted, prices for lumber and cement a local. The steel price is a national average. The national averageis not weighted.

Because the technical specifications of the indexes have not changed, the current relative weight of thecomponents is a function of changes in prices and wages since 1913. Because labour costs, in the long run,tend to outstrip commodity prices, both indexes have a secular bias to be over weighted to the labour

Page 32: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Engineering News Record Building Cost Index and Construction Cost Index

General Informationcomponent. The current weights are approximately at follows:

CCI BCILabour 78% 61%Cement 1% 27%Lumber 10% 7%Steel 11% 2%

These weights are excessively skewed to the labour input. In general, the labour share of the labour-plus-materials component of construction ranges from 30% in civil projects to 40% in ICI projects and 60% inrepair projects.

Changes in the timing of the index components affect the month-to-month variations. Steel prices and wagerates tend to change once per year. Cement prices change once or twice per year. By contrast, lumberprices can change monthly. Hence, the month-to-month variations in the indexes are largely determined bylumber prices, except in those months when wages or the prices of steel and cement change. There mayalso be lags in the incorporation into the index of changes. Consequently a moving average is more reliableas an indicator of underlying inflation trends than a point-over-point comparison.

ENR does not recommend use of the indexes to derive cost comparisons across locations. The indexes areintended to show changes in costs over time at a location or over time for the 20-city average. ENR is moreconfident in the 20-city average than in individual city estimates. Typically only one source is used perlocation. ENR endeavors to use the same source over time.

It is common for the ENR index to be referenced in construction contracts that provide for inflationadjustments. It is also common for the ENR index to be used to estimate the current cost of replicating astructure built in the past.

Canadian data are estimated in C$ and are not converted. Consequently any attempt to derive a comparisonbetween Toronto and Montreal and the 20-city US average would be invalid, as the exchange rate factorwould not be taken into account.

Page 33: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Engineering News Record Building Cost Index and Construction Cost Index

General Information

Assumptions: 1. Steel, Portland cement and 2 x 4 lumber are representative building materials.

2. An unweighted average of bricklayers, carpenters and structural ironworkers is representative of skilledlabour. (Note that this excludes the mechanical trades).

Strengths: 1. There are comparatively few components in the index. This makes maintenance comparativelyinexpensive. The methodology and the calculation of the index are published and are transparent.

2. There are no proprietary productivity assumptions.

Weaknesses: 1. The index measures input costs for labour and materials. The index does not measure in-lace costs.The latter take into account contractors’ mark-ups.

2. The index does not take into account the impact of equipment costs.

3. The labour component is over weighted and incorporates a secular bias to be increasingly overweighted.

4. The three materials selected to proxy the materials component of construction do not reflect the costs ofmechanical systems or changes in finish materials (e.g., the shift from plaster to drywall).

Page 34: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Engineering News Record Building Cost Index and Construction Cost Index

Location Factor Published

GeneralComments Location indexes are based solely on input values. The index is based on cost of 1,128 tonnes of bulk portland cement, 1,088 board-ft of lumber, 25 cwt of structural steel and either 200 hours of common labour (CCI) or 68.38 hours of the average of three skilled trades (BCI)

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 35: A Guide to Construction Cost Sources - O'Grady

Engineering News Record Building Cost Index and Construction Cost Index

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 36: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Engineering News Record Building Cost Index and Construction Cost Index

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective Agreement

Number Of Trades Tracked 4

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 1

Data Collection Method Same source consistently

Update Frequency US: Monthly; Canada: Annual

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 37: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Engineering News Record Building Cost Index and Construction Cost Index

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 200

Same Materials Across Location

Number Of Sources

Data Collection Method Survey

Update Frequency Weekly

Notes Each week, different material categories are published. For example, various types of pipe one week, then all wood items the next.

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 38: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb’s Yardsticks for Costing

General Information

Publisher: Produced by Hanscomb Limited, and published by R.S. Means Co., Inc.40 Holly Street, Suite 900Toronto ON, M4S 3C3

Tel: (416) 487-3811Fax: (416) 487-5043Website: http://www.hanscomb.com

Years in circulation: 5 years

Type of index: This publication provides installed-in-place costs for 8 Canadian cities for comparing construction costsbetween these locations.

Intended use by: Intended to be used as a costing tool by estimators for design work in the early stages of a project. It is notdesigned as a bidding tool.

Canadian CityCoverage:

This is a Canadian publication with 8 locations covered:• BC: Vancouver• AB: Calgary• MB: Winnipeg• ON: Ottawa, Toronto• QC: Montreal• NS: Halifax• NF: St. Johns

Other Publications: N/A

Page 39: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb’s Yardsticks for Costing

General Information

Description: The publication has four main sections:

1. Current market prices.The Current market prices section contains prices organized according to the CSI MasterFormat

Divisions. Prices in this section include all materials, labour to install, transportation, equipment costs, andsite overheads and profit for work done by subcontractors. Provincial taxes (PST) are included in Ottawa,Toronto, Winnipeg and Vancouver’s rates. Goods and Services Tax (GST), Harmonized Sales Tax (HST)and Quebec Sales Tax (QST) are not included.

2. Composite unit rates.This section contains composite rates classified according to the Canadian Institute of Quantity

Surveyors (CIQS) breakdown. The costs are built up from the current market prices. This section is to beused in preparing preliminary estimates or for comparative purposes.

3. Gross building costs.The gross building costs section contains a general guide to overall cost of 35 building types. Average

costs are shown for each building element with its proportion to the total cost. High and low prices are alsopresented per square foot or square meter.

4. Labour rates.The labour rates section contains rates from 23 different trades. The rate for each trade includes the

base rate, vacation & statutory holidays, health & welfare and pension, industry and union funds. All therates listed in this section are union rates.

All sections present prices and rates for the 8 Canadian cities listed above, except for the gross buildingcosts section, which shows the prices as national averages. The data required to produce this publication isdivided by a number of persons in each of the 8 cities. Each person will make telephone interviews withindustry contacts and contractors to get reasonable estimates of installed prices. Market experience andjudgement is then used to determine the most appropriate prices. The prices collected are put-in-placeprices. Hanscomb takes particular care with the Toronto cost estimates, because it represents almost half of

Page 40: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb’s Yardsticks for Costing

General Informationtheir market. They also use Toronto as a benchmark to assess cost estimates obtained from other cities.

Hanscomb used to produce a cost index (Cost Trends). This exercise was abandoned approximately fiveyears ago. Hanscomb cited three reasons:

1. The index was costly to maintain especially, in obtaining the correct and accurate prices, andcalculating the weighting of the components of the index.

2. There is a liability associated with the incorrect usage or application by the industry.3. Hanscomb believes that Statistics Canada does the same job in tracking changes in the construction

industry costs. Statistics Canada also has the advantage of being a published source, whichenhances its creditability when, relied on for litigation purposes.

Assumptions: 1. All contractors are unionized contractors.

Strengths: 1. This publication provides unit rates and costs for the different locations without the need to use a locationfactor or multiplier thus eliminating any inaccuracy involved in using such factor.

2. The costs and rates in this publication reflect the following factors if compared between the differentlocations:• Building code requirements• Local market conditions• Differential labour productivity• Supervision and management costs

Weaknesses: 1. All costs are unionized cost. No reflection for the non-unionized costs.

2. Not all the trades are covered in the labour rates section.

Page 41: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb’s Yardsticks for Costing

General Information3. Not all the labour rates are available in the labour rates section. About 20% of the labour rates are not

available.

4. In case of the gross building costs:• Prices are national and must be adjusted to local conditions• Costs for site work are not included because of the wide variation regardless of gross floor area

5. The costs and rates in this publication does not reflect the following factors if compared between thedifferent locations:• Climate and weather conditions• Access and transportation• Soil conditions• Market competitiveness condition and local discounting practices• Engineering and architectural costs• Insurance and bond costs• Land surveys• Permit fees

Page 42: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Hanscomb's Yardsticks for Costing

Location Factor Published

GeneralComments All costs presented for the 8 Canadian cities. Installed and complete costs provided.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 43: A Guide to Construction Cost Sources - O'Grady

Hanscomb's Yardsticks for Costing

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source contractors

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 3

Data Collection Method phone interviews

Update Frequency annual

Notes Metric and Imperial Current Market Prices:Includes:-material, labour, overhead, profit and PST-does not include GST, QST, or HST

Metric and Imperial Composite Unit Rates:-represent average rates for average conditions-are built up from the current market prices

Gross Building Costs-35 building types listed-per square metre and per square feet costs-national average costs and must be translated to individual locations-low, average, and high prices given-low and high represent 25%ile and 75%ile respectively-site work costs not included

Ontario Construction Secretariat: A Guide to Cost Sources

Page 44: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Hanscomb's Yardsticks for Costing

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source collective agreements

Number Of Trades Tracked 24

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 1

Data Collection Method data collection

Update Frequency annual

Notes Total wage rate given for 24 trades in 8 cities. Rates include (all cities except Montreal): -base rate -vacation and statutory holidays -health, welfare, pension -industry, union fundsMontreal includes: -base rate -vacation, sttautory holidays -finge benefits -CCQ, AECQ, other funds

Ontario Construction Secretariat: A Guide to Cost Sources

Page 45: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Hanscomb's Yardsticks for Costing

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 46: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb-Means International Construction Cost Index (Parity Index)

General Information

Publisher: Hanscomb1175 Peachtree St, NESuite 1650,Atlanta, Georgia 30309-9998

Tel: (404) 881-0533Fax: (404) 881-1341Website: http://www.hanscombusa.com

Years in circulation: Approximately 10 years

Type of index: Survey of in-place construction cost ranges to a prime contractor for industrial projects, showing approximatechanges in costs over time and approximate differences in costs across locations. The baseline is Chicago,IL. Exchange rates are applied at the market rate current at the time of publishing.

Intended use by: Early stage planners of industrial projects who are working within +/- 25% estimation ranges.

Canadian CityCoverage:

29 locations of which only one is Canadian: Toronto

Other Publications: The Parity Index is published in the Hanscomb·Means Report, which is available in PDF format from thecompany’s website.

Description: The Parity Index compares costs to a prime contractor for in-place construction of a standard industrialbuilding across 29 cities in all regions of the world. The standard industrial building is a single storey, owner-built and owner-occupied manufacturing facility with a large office component.

The standard industrial building comprises approximately 26 component specifications covering all majortrades.

Page 47: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb-Means International Construction Cost Index (Parity Index)

General Information

Technical specifications are held constant across locations and over time. The following table summarizesthe technical specifications:

Cost Model ParametersSingle-Storey Manufacturing Facility, Owner-Built, Owner-Occupied

Statistics: Office Manufacturing TotalGross Floor Area 4,400 m2 4,400 m2 4,400 m2

Floor – Roof Height 4.90 m 8.55 m n/aVolume 26,560 m2 81,225 m2 102,785 m2

Perimeter n/a n/a 555Exterior Wall Area 750 m2 2,425 m2 3,175 m2

Specifications: Office ManufacturingFoundations Spread footing Spread footing

Structure Girders GirdersBay Size 6 m x 6 m 12 m x 18 mRoof Adhered single-ply EPDM Adhered single-ply EPDM

Exterior Wall Metal siding Metal sidingFenestration Aluminum w/ insulated glass None

Finishes Standard MinimalMechanical Heated, vented & AC Heated, ventedElectrical Recessed fluorescent light fixtures Metal halide high bay light fixtures; copper bus duct

Because the parity index estimates in-place costs for each of the 26 components, the index does notseparate trade contractors’ costs for labour, machinery, materials, overhead or profit. An estimate isfactored into the index for a general contractor’s mark-up over costs. Using in-place costs implicitly takesaccount of differences in productivity across locations and over time as well as differences in market

Page 48: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb-Means International Construction Cost Index (Parity Index)

General Informationconditions.

Costs for components are estimated as a range. Typically the mid-point of the range is selected, unless thelocal pricing source assigns a greater probability to one end of the distribution. Allowances for tradecontractors’ overhead costs and profits are included in the in-place cost estimates. The index is marketfocused. Consequently, the index makes no distinction between union and non-union trade contractors.

In-place cost estimates exclude:• Development costs• Recoverables (GST, VAT)• Engineering and architectural fees• Site work costs (roads, parking, landscaping, and utilities)• The impact of specifically local factors (e.g., building codes, piling requirements, seismic

requirements)• Local differences in preferred materials• Regulatory requirements (or lack thereof)

The index is revised quarterly. Location surveys are undertaken semi-annually. Typically, the index relies ononly one source per city. All costs are expressed relative to Chicago costs, which are the base for the index.

The Hanscomb-Means International Construction Cost Index is published in two formats. The first is in localcurrency. This removes the influence of exchange rates and allows a user to employ whatever exchange ispreferred. This is the parity index. The second format uses the most recent month-end exchange rate,which is applied to the parity index. This is the international construction cost index in which all costs arebased on US$ at most recent exchange rates.

Hanscomb does not regard a 3% difference across locations as significant. A difference of 5% would reflectcost differences that are real, but may not be significant or enduring. However, a cost difference of 10% ormore is judged to be significant.

Page 49: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb-Means International Construction Cost Index (Parity Index)

General InformationHanscomb considers the index more reliable as a comparison of costs at a specific location over time thanacross locations. In part, this arises from differences in local factors that affect construction costs, but whichare excluded from the parity index (e.g., piling, seismic requirements or finish standards).

Assumptions: 1. It is assumed that the standard industrial building, per the specifications in the 26 components, isconstructed without modification in all locations.

2. It is assumed that the standard industrial building is constructed on the outskirts of an urban area.Transportation factors that might affect costs in another type of location are excluded, therefore, byassumption.

Strengths: 1. The Hanscomb-Means International Construction Cost Index is a purchasing power parity index.Consequently the index isolates the impact of exchange rates from the effect of local inflation (ordeflation) factors.

2. The Hanscomb-Means International Construction Cost Index is the only international cost comparisonthat isolates narrowly defined construction costs. Other international comparisons incorporate landcosts, site costs and other costs. Typically other international indice also present their estimates as asquare-metre (or square-foot) costs that are derived from comparisons of dissimilar buildings. Bycontrast, the Hanscomb-Means International Construction Cost Index uses an unchanging, standardbuilding as the basis for its estimates.

Page 50: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Hanscomb-Means International Construction Cost Index (Parity Index)

General Information

Weaknesses: 1. The Hanscomb-Means International Construction Cost Index does not take into account specifically localfactors that can have a significant impact on final construction costs. These factors include:

• Foundation requirements for piling

• Seismic requirements for modification to structural design

• Specific local building code requirements pertaining to use of materials and design requirements

• Site work requirements• Regulatory requirements, especially environmental requirements

• Local differences in preferred materials

2. As an output index that tracks the cost of in place construction, the Hanscomb-Means InternationalConstruction Cost Index does not isolate the relative roles of changes in the prices of materials, the costof labour, charges for equipment use or changes in contractors’ overheads and profit margins.

3. The Hanscomb-Means International Construction Cost Index maintains fixed specifications for thestandard building over time. Consequently the index does not reflect changes in building design thatoccur over time.

Page 51: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Hanscomb-Means International Construction Cost Index

Location Factor Published

GeneralComments It measures to some extent differences in market and bidding conditions. Relative productivity is captured

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 52: A Guide to Construction Cost Sources - O'Grady

Hanscomb-Means International Construction Cost Index

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 0

Data Collection Method Personal interviews

Update Frequency semi-annually

Notes The index makes no distinction between union and non-union labour.

Markup is included for subcontractors only.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 53: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Hanscomb-Means International Construction Cost Index

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 54: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Hanscomb-Means International Construction Cost Index

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 55: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Helyar Construction Cost Guide

General Information

Publisher: Helyar & Associates212 King St WestToronto, ONM5H 1K5

Tel: 416-204-1100Fax: 416-204-1200Website: www.helyar.com

Years in circulation: Over 20 years

Type of index: The Construction Cost Guide publishes an annual range estimate of in-place construction costs, expressedas cost per sq. ft., for 34 building types across 8 Canadian cities. Index trends in Toronto are published for:

• Commercial building costs• Institutional costs• Industrial, apartment, and housing building costs• Consumer price index

Index of Canadian Centres given for 44 locations

Intended use by: Early stage project planners, conceptual estimates

Canadian CityCoverage:

• BC: Vancouver• AB: Calgary, Edmonton• ON: Ottawa / Hull, Toronto• QC: Montreal• NS: Halifax

Other Publications: N/A

Page 56: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Helyar Construction Cost Guide

General Information

Description: The Helyar Construction Cost Guide estimates the in place cost of constructing 34 building types in Toronto,Montreal, Vancouver, Edmonton, Calgary, Ottawa/Hull and Halifax. Construction costs are expressed ascost per sq. ft. Cost estimates are developed by Helyar and Assoc., based on their current experience asproject managers and cost estimators.

The guiding formula may be summarized as follows:

Output Cost = Labour Cost + Materials Cost + Allowance for Contractors’ Overheads + Opportunity Cost

where variables are defined and estimated as follows:

1. Labour Cost:• Quantity estimated by Helyar for building type• Wage cost derived from Statistics Canada and/or current collective agreements

2. Materials Cost:• Quantity estimated by Helyar for building type• Prices derived from Statistics Canada and/or current information from managing projects

3. Contractors’ Overheads• Based on current information from managing projects

4. Opportunity Cost:• Based on current information from managing projects• In tight labour market conditions, will reflect over-rate charges for labour

The most unstable component of output cost is opportunity cost. In depressed market conditions, the need tocover overheads drives opportunity cost close to zero. By contrast, in a buoyant market, capacity utilizationapproaches 100%. In these conditions, the inelasticity of supply allows significant increases in mark-up.Consequently, the output price of construction is more unstable than the price of labour and materials.

Page 57: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Helyar Construction Cost Guide

General InformationThe Helyar Construction Cost Guide excludes land costs, financing costs, legal costs, architectural andengineering costs and permit costs. Site costs are estimated separately.

The following table lists the building types tracked by the Helyar Construction Cost Guide:Office Buildings (70% above grade / 30% below grade):

o under 5 storieso 5-10 storieso 10-20 storieso 20-30 storieso over 30 stories

Stores:o strip plazao enclosed mallo anchor / department storeo supermarketo discount store

Schools:o elementaryo high schoolo technical / vocational school

Nursing Homes

Hospitalso chronic care / long-term careo acute treatment / acute care

Hotels:o budgeto 4-star, full-serviceo luxury

Parking Garages:o free standing (above grade)o underground

Residential Condominiums / Apartments:o basic qualityo medium qualityo high quality

Townhouses:o row (medium quality)o stack (medium quality)o walk-up timber frame (medium quality)o walk-up timber frame (high quality)

Houses:o speculative (basic quality)o speculative (medium quality)o speculative (high quality)

Light Engineering Factories and Warehouses:o 10-20 k sq. fto 20-50 k sq. ft.o 50-150 sq. ft.

Page 58: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Helyar Construction Cost Guide

General Information

Component specifications for building types (e.g., partitions, fenestration, mechanical requirements) arebased on project management experience. Completed estimates are compared to current and recentprojects managed by the firm. All estimates are strongly judgment based.

Cost estimates are expressed as a range that is approximately +/- 10% from the mean. Costs reflect, tosome degree, local factors that entail design-related costs.

Helyar does not distinguish between union and non-union labour in its estimate of costs.

An Index of Canadian Centres provides estimated relative cost differences (Toronto = 100) for 44 differentlocations. This is a judgement based composite of construction costs based on approximately 200 projectsthat the company typically will have under current or recent management.

Assumptions: 1. It is assumed that the same structure is constructed without modification in all locations.

2. Transportation factors that might affect costs beyond the norm are excluded, e.g., the higher costs thatare typically associated with construction in a city core as opposed to the outskirts of an urban centre.

Strengths: 1. The Helyar Construction Cost Guide takes account of opportunity cost and is strongly sensitive to thecompanies’ perception of local conditions as they bear on opportunity cost.

2. The Helyar Construction Cost Guide covers a wide range of structures that are broadly representative ofthe construction market. As such, the Guide is useful to early stage planners estimating budgetrequirements and assessing the relative costs of build to specification vs. lease.

3. The Helyar Construction Cost Guide compares costs of constructing a total structure in place, i.e.,inclusive of “opportunity costs”.

Page 59: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Helyar Construction Cost Guide

General Information

Weaknesses: 1. The Helyar Construction Cost Guide is strongly judgement based. The Guide can be taken as indicativeof general trends but should not be used for precise comparisons across locations. In particular, therange which is typically +/-10% from the mean should discourage strong reliance on the Guide as acomparison of construction costs across locations.

2. The Index of Canadian Centres does not reflect differences in the composition of construction activityacross sectors and building types. The index should not be relied upon for anything more than anapproximate gauging of relative construction costs. For most construction projects, there are a significantnumber of project-specific or contractor-specific factors that affect final cost. Often, these will outweighthe location differences suggested by the Index.

3. The specifications for building types are adjusted over time, as appropriate to current constructionpractices. Consequently, for some buildings, comparisons over time are comparisons of structures thathave themselves changed.

Page 60: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Helyar Construction Cost Guide

Location Factor Published

GeneralComments Unit costs (per sq. ft.) for the various building types are given for each city. These costs are in the form of ranges.

Index provided for additional cities: 25 in Ontario, 4 in Quebec, 3 in Maritimes, 4 in Prairies, 5 in BC, and 3 in Territories.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 61: A Guide to Construction Cost Sources - O'Grady

Helyar Construction Cost Guide

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources

Data Collection Method Collective Agreement, Statistics Canada

Update Frequency annual

Notes Data derived from Helyar projects and Statistics Canada. Components are not published. Cost ranges give user information of variance due to project characteristics.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 62: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Helyar Construction Cost Guide

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 63: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Helyar Construction Cost Guide

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked

Same Materials Across Location

Number Of Sources

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 64: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Information

Publisher: KPMG777 Dunsmuir StVancouver, B.C.,V7Y 1K3

Tel:Fax:Website:

(604)-691-3410(604)-691-3340http://www.kpmg.ca

Years in circulation: Since 1994

Type of index: Survey of in-place costs (including land and construction) and operating costs (including labour, electricity,financing costs and taxes) for nine industries (electronics, food processing, medical devices, metalfabrication, pharmaceuticals, plastics, telecommunications equipment, packaged software, and advancedsoftware). Costs provided for at least three cities in each of the G-7 and other major economies.

Intended use by: Early stage planners of industrial projects with an international scope in terms of location. Policy plannerswishing to assess the impact of tax policy and labour costs on overall competitiveness.

Canadian CityCoverage:

64 cities, 25 of which are CanadianBC: Kamloops, Kelowna, VancouverAB: Calgary, EdmontonSK: Regina, SaskatoonMB: Brandon, WinnipegON: Hamilton, Kingston, Kitchener, London, Mississauga, Ottawa, Sarnia, Toronto, WindsorQC: Montreal, Quebec, SherbrookeNB: MonctonNS: HalifaxPE: CharlottetownNF: St. John’s

Page 65: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Information

Other Publications: Published in an International Edition and a G-7 edition. A detailed Results Book is also published.

Description: The KPMG international cost comparison estimates the cost of constructing and operating nine differenttypes of manufacturing operations in 64 cities. City coverage includes 25 Canadian cities, 21 American citiesand 15 European cities and 3 Japanese cities.

Construction costs are the costs to the owner-operator. Construction costs include both land costs andcompleted building costs. Implicitly these costs include the general contractor’s mark-up. The costs ofequipment are standard across locations. Land and building specifications are common across locations.

Operating costs are divided into divided into location-sensitive costs and costs which are not locationsensitive. Location-sensitive operating costs include:

• Labour• Utilities (both power and telecomm)• Transportation (based on an analysis of likely shipping patterns)• Interest (based on standard debt/equity ratios by industry)• depreciation2

• Taxes (including incentives that are firmly embedded in law and are not subject to negotiation ordiscretion)

Operating costs are not sensitive to location are raw material inputs.

Labour costs reflect direct wages and salaries, prevailing employee benefit costs, payroll taxes and otherstatutory contributions. Labour requirements are estimated for each industry in terms of 36 generic jobdescriptions. This allows for variation across industries in the nature of labour requirements. Labourrequirements in each industry are assumed standard across locations.

Operating costs are estimated over a 10-year horizon and reflect a scale-up of operations. Using common

2Although depreciation costs are expressed as a standard percentage of fixed capital, depreciation costs are considered location-sensitivebecause their actual amount is a function, in part, of the cost of initial construction, which is location sensitive.

Page 66: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Informationrevenue estimates for each location, the study estimates both before tax and after-tax return on investedcapital. For each industry, it is assumed that an operation will have at least 90 employees and annualrevenues greater than US$ 10 million.

The eight industries covered by the cost comparison vary in their capital intensiveness, labour intensivenessand the nature of the labour they require. The eight industries are:

• Electronics• Medical devices• Pharmaceuticals• Packaged software• Advanced software• Food processing• Metal fabrication• Plastics• Telecommunications equipment

The building characteristics for a manufacturing industry are:• Build-to-suit• 10% finished office space• All mechanical systems (HVAC) installed throughout• 50,000 – 100,000 sq. ft., depending on industry• 26-30 ft clear span ceiling height, depending on industry• Loading-level dock• Standard 500 lb./sq. ft. floor loading

For a service industry, it is assumed that space is leased. Building characteristics are:• Class A• Suburban location

Building costs are expressed as finished cost per square foot to the owner-occupier. Building costs include

Page 67: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Informationall “soft costs” such as construction financing, design and development charges. Land is priced at cost peracre to buy a lot of 5-10 acres. Site must be suitable to manufacturing, located in a light-to-medium industrialpark in a suburban area, fully serviced with good highway access. Colliers International gathers building andland costs for KPMG.

Construction costs are estimated without reference to union or non-union construction based on prevailingmarket conditions.

Cost are expressed in US dollars using current exchange rate. A separate analysis is done to illustrate theappreciation in the exchange that would be required to eliminate competitive advantage.

Cities are ranked in terms of their initial investment costs for land and building and their annual operatingcosts. Ranking is expressed as an index in which the base (100) is the average of the eight US cities. Cityrankings are shown for each industry and also for the 8-industry average. A separately published ResultsBook provides details on rate of return on invested capital by location showing detailed balance sheet andincome statements.

Both operating and initial investment specifications can change over time. Consequently the index should beused as a current cost comparison rather than for an analysis over time.

Key current findings are:1. 40-45% of total costs are location sensitive,2. Canadian cities enjoy a significant competitive advantage in all industries,3. Canada’s competitive advantage would be eliminated by an appreciation of the exchange rate of

approximately 18% from C$1.00 = US$0.67.4. Construction costs are lowest in Canada.

Page 68: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Information

Assumptions: 1. Location specific factors in construction (e.g., piling and seismic requirements) are not explicitly identifiedin the specifications, but may be incorporated into cost estimates.

2. Interest costs are based on local market conditions. Some companies will source capital internally in amarket other than where they locate a facility.

3. Operating cost components are standardized based on industry averages.

4. Transportation costs are standardized based on assumed shipping patterns for raw materials and endproduct.

5. Explicit productivity assumptions are factored into operating costs. For construction, productivity isimplicit.

Strengths: 1. The KPMG international cost comparison takes into account all major factors affecting a locationdecision.

2. By separating and detailing both initial investment costs (land and building) and operating costs, theKPMG international cost comparison allows an analysis of how sensitive the comparisons are to changesin either components of operating costs or initial investment costs.

3. The KPMG international cost comparison allows analysis of comparative advantage by industry type.

4. The KPMG international cost comparison identifies the impact of land costs.

Weaknesses: 1. Important industries (from an Ontario perspective) are not reflected in the KPMG international costcomparison. These include chemical processing and aeronautics. Auto assembly is also typically on ascale of operation that exceeds the specifications of the KPMG model.

Page 69: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

KPMG, INTERNATIONAL COST COMPARISON ANALYSIS: The Competitive Alternative

General Information2. The KPMG international cost comparison does not allow an analysis of the impact of union vs. non-

labour on construction costs.

3. The KPMG international cost comparison does not allow a separation of construction costs from softcosts.

Page 70: A Guide to Construction Cost Sources - O'Grady

Location Indexes

KPMG, International COST COMPARISON ANALYSIS: The Competitive Alternative

Location Factor Published

GeneralComments Along with the location index, they rank each location according to cost.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 71: A Guide to Construction Cost Sources - O'Grady

KPMG, International COST COMPARISON ANALYSIS: The Competitive Alternative

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 1

Data Collection Method Colliers-McKay Offices

Update Frequency Annual

Notes The KPMG Index compares costs to build and operate specific types of structures. All costs are included. Construction cost is cost to owner-operator, inclusive of all mark-ups.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 72: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

KPMG, International COST COMPARISON ANALYSIS: The Competitive Alternative

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 73: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

KPMG, International COST COMPARISON ANALYSIS: The Competitive Alternative

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 74: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

The Richardson Construction Cost Trend Reporter

General Information

Publisher: Richardson Engineering Services, Inc.1742 S. Fraser DrivePO Box 9103Mesa, AZ 85214-9103 USA

Tel:Fax:Website:

(480) 497-2062(480) 497-5529http://www.resi.net

Years in circulation: Approximately 30 years

Type of index: The Richardson Construction Trend Reporter is primarily a labour cost resource. The Richardson Labor CostIndex covers 16 trades for each location. The Richardson Composite Crew index has 16 crews for eachlocation. The Construction Cost Index is a compilation of 17 industry indexes including Bureau of theCensus, ENR, Turner Construction, over time, and 63 material prices from one location. The baseline is afictional average location called Richardson, USA. Canadian values are in Canadian dollars.

Intended use by: These indexes are for estimators and contractors.

Canadian CityCoverage:

120 locations, 7 of which are Canadian:BC: VancouverAB: Calgary, EdmontonMB: WinnipegON: Toronto, WindsorQC: Montreal

Other Publications: • Process Plant Construction Cost Estimating Standards• General Construction Cost Estimating Standards• International Cost Factors Location Manual

Page 75: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

The Richardson Construction Cost Trend Reporter

General Information

Description: The Richardson Construction Cost Trend Reporter consists of 3 sections:

1. Richardson Labour Cost Index:• 120 U.S. cities and 7 Canadian cities• 16 trades• Union and open shop (Davis-Bacon) hourly labour rates• Union fringe benefits include all the benefits such as health and welfare, pensions, vacations• Davis-Bacon fringe benefits• Richardson labour index for each of the Union wage rates and the Davis-Bacon rates normalized

2. Richardson Composite Crew Rates:• 120 U.S. cities and 7 Canadian cities• 18 composite crews• Union and open shop (Davis-Bacon) hourly manhour rates plus RES index• Crew consists of 10 journey level tradespeople (no apprentices):

• 1 foreperson• 7 journeypersons• 2 labourers• 1 equipment (depending on the trade)

• Hourly rate reflects a mix of trades and their contribution to one hour• Adjustment to hourly rate should be made if crew composition or skill level changes

3. Construction Cost Trends: (trends over time)• Construction Cost Indexes normalized so that 1992=100• Combines several publicly available indexes including ENR, Boeckh, Bureau of Reclamation, Turner

Construction Company, and Bureau of Census• Indexes of Producer Prices of Materials Used in Construction for 63 materials and material groupings

over time• Interest rates

Page 76: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

The Richardson Construction Cost Trend Reporter

General Information• Contract Construction Employment provides number of employees on payrolls by type of contractor• New US Nonresidential Construction Put in Place gives annual construction values by building type

The Davis-Bacon wage rates and fringe benefits are determined by the United States Department of Labour(for the U.S. cities only) to be the prevailing rate for a particular craft or labour classification in a given area.The Davis-Bacon rates constitute the minimum wages and fringe benefits payable on federal and federallyassisted buildings construction projects.

For the Canadian cities, the rates are in local currency so there are no exchange rates applied.

The target level of confidence for all the Richardson values is 85% (i.e. that the user can be 85% confidentthat the actual cost will be the published value or less). In other words, Richardson does not use averages(50% confidence) to provide a level of confidence in the published data.

It is important to note that this publication is for the comparison of labour rates only. Differences inproductivity and installed costs are not reflected. There is no mention how the differences in labour ratescorrelate to productivity, safety, or labour stability in that region.

Assumptions: 1. There is sufficient local labour availability that a crew of average quality can be dispatched.

2. The Richardson standard crews consist only of skilled labour (no apprentices).

3. The management is sufficiently skilled in planning to avoid shortages of materials and equipment.

4. The Richardson crew composition is the same for all the locations.

Page 77: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

The Richardson Construction Cost Trend Reporter

General Information

Strengths: 1. The data in this report provides a mean of comparing individual labour and crew wage rates and therelated fringe benefits for a large number of cities.

2. Cost index trends from other publications are compiled here. The indexes are presumed to reflect anaverage US location, but would vary from source to source. The compilation does provide a goodoverview of index ranges.

Weaknesses: 1. This report compares union and open shop labour and crew costs for various cities. It is important toremember that only labour costs are reflected and not productivity or installed prices.

2. The same crew composition is assumed for all the locations. Estimators must make allowances forthe impact on productivity of diverging from the standard crews, e.g., including apprentices, usinglabour of less quality owing to tight labour market conditions, absenteeism and over-manning andvarying the size or composition of the crew.

3. The differential productivity between the locations is not reflected in the RES index.

4. The management system is assumed to be sufficiently skilled, but the costs of a managementsystem are not reflected in the total wage rates.

Page 78: A Guide to Construction Cost Sources - O'Grady

Location Indexes

The Richardson Construction Cost Trend Reporter

Location Factor Published

GeneralComments Richardson Labour Cost Index: labour wage rates for both union and Davis-Bacon labour organized by city and trade.

Richardson Composite Crew Index: wage rates for both union and Davis-Bacon labour orbanized by city and trade crews.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 79: A Guide to Construction Cost Sources - O'Grady

The Richardson Construction Cost Trend Reporter

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 1

Data Collection Method Data collection from industry index publications

Update Frequency annually

Notes These are not Output cost indexes of other index publishers are compiled and normalized using 1992 = 100. Assumptions are dependent on the index source.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 80: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

The Richardson Construction Cost Trend Reporter

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements, Davis-Bacon wa

Number Of Trades Tracked 16

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 1

Data Collection Method Data collection

Update Frequency annually

Notes The wage rates are provided for individual labour and composite crews. They consist of:For union wage rates -local union no. -basic hourly rate -H & W Pens. -Fringes -Total hourly rate -Index -Union wage rate expiry dateFor Davis-Bacon wage rates -Basic hourly rate -Fringes -Total hourly rate -Index

Canadian locations are union rates only.

Worker's compensation is not included in the wage rate because it is highly dependent on experience and can vary widely.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 81: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

The Richardson Construction Cost Trend Reporter

It is assumed that the crews are efficient and can complete the required work with an efficient production rate. It is assumed that all the composite crew members consist of journey trades (no apprentices).

Adjustments should be made to account for any changes in the crews from the standard crews.

Standard crew consists of 1 foreman, 7 journey trades, 2 labourers, and 1 operator. Standard crew is the same in every location.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 82: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

The Richardson Construction Cost Trend Reporter

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 63

Same Materials Across Location

Number Of Sources 1

Data Collection Method Data collection

Update Frequency monthly

Notes Indices of Producer Prices of Materials Used in Construction: data for 63 materials or material groups from the US Department of Labor, Bureau of Labour. Indexes normalized with 1982-100.

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 83: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Richardson International Cost Factors Location Manual

General Information

Publisher: Richardson Engineering Services, Inc.1742 S. Fraser DrivePO Box 9103Mesa, AZ 85214-9103 USA

Tel: (480) 497-2062Fax: (480) 497-5529Website: http://www.resi.net

Years in circulation: Approximately 30 years

Type of index: The Richardson International Cost Factors Location Manual provides indexes that compare the costchanges over international locations with an average, fictional location called Richardson, USA as a baseindex.

Intended use by: Richardson’s Construction Locations Factors are formulas used to adjust U.S. based estimates for processplant industry construction to each country. They attempt to meet the needs of owners, contractors, andconsultants by providing economic, political, and regulatory information about each location as well as costs.

Canadian CityCoverage:

21 locations of which 5 are Canadian:BC: VancouverAB: CalgaryMB: WinnipegON: Toronto, WindsorQC: Montreal

Other Publications: • Process Plant Construction Cost Estimating Standards• General Construction Cost Estimating Standards• The Richardson Construction Cost Trend Reporter

Page 84: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Richardson International Cost Factors Location Manual

General Information

Description: This manual contains cost multipliers for major cities in 21 countries: Argentina, Australia, Brazil, Canada,China, France, Germany, India, Indonesia, Ireland, Japan, Kuwait, Singapore, South Africa, Spain, U.A.E.,Mexico, Poland, Saudi Arabia, United Kingdom, Venezuela. The base for comparison between locations isRichardson USA, a fictitious town having average US characteristics and costs.

A fixed process plant design consisting of both a building and of a plant structure is used for the analysis.The total cost of the plant is based on the weighted sum of the cost of materials (local and imported), plantequipment (local and imported), and the local labour rates. A Labour Productivity Factor is determined foreach city, and is incorporated in the final location factor to account for differences in productivity. Overheadsand markups are incorporated.

General FactorsBLDNG = % Building Cost of Total Process Project PCEE = % Process Engineered Equipment CostBLABOUR = % Building Labour Cost PCFM = % Process Field Material CostBLDNGFM = % Building Field Material Cost EEL = % Engineered Equipment LocalPROC SYS = % Process Plant Cost of Total Process Project EEI = % Engineered Equipment ImportedPLABOUR = % Process Labour Cost FML = % Field Material Local

FMI = % Field Material ImportedIndex Formulas

LI = Labour IndexIMI = Import Material IndexLIM = Local Material Index

LI = 1.00 x Local Rates / Base Rates x Labour Productivity FactorIMI = 1.00 + Duty + Freight + VAT + OtherLIM = Local Prices / Base Prices

Location Factor FormulasLLF = Labour Location FactorEELF= Engineering Equipment Location FactorFMLF = Field Material Location FactorLF = Location FactorLLF = BLDNG x %BLABOUR + (PROC SYS x % PLABOUR) x LIEELF= (PROC SYS x %PCFM x %FMI x IMI) + (%PROC SYS x PCEE x EEL% x LIM)FMLF = (%PROC SYS x %PCFM x % %FMI x IMI) + (%PROC SYS x %PCFM x FML% x LMI) +

Page 85: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Richardson International Cost Factors Location Manual

General Information

(%BLDNG x %BLDNGFM x %FMI x IMI) + (%BLDNG x %BLDNGFM x %FML% x LMI)LF = LLF + EELF + FMLF

Richardson tries to provide a target level of confidence for all the Richardson publications of 85%.

The costs and rates are collected from owners (from the owner perspective) unlike other sources that collectthe data from suppliers and contractors. All costs are converted to US dollars, with the exchange rate usedfor the conversion listed at the bottom of the appropriate page.

Below are some samples of the Richardson International Cost Factors.

City, CountryLabour Productivity

Factor Location FactorSidney, Australia 1.6 1.24Guangzhuo, China 3.0 1.01Bombay, India 3.0 1.00Mexico City, Mexico 1.7 1.00Rio de Janeiro, Brazil 1.9 1.10Calgary, Canada 1.2 1.00Toronto, Canada 1.2 1.03

Additional information for each country is provided including:• General Information• People and ethnic divisions• History• Government and political conditions• Foreign business – legal organization of businesses, foreign ownership, patents• Taxation• Regulatory agencies• Trade regulations• Environmental issues• Employment – unemployment rates, major unions, labour relations, worker rights

Page 86: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Richardson International Cost Factors Location Manual

General Information

• Economy – currency exchange• Crew Rates

Unfortunately, this information appears to be at least 6 years outdated. This could cause significantmisinterpretations if someone is viewing the information for the first time.

Assumptions: 1. A fixed percentage (10%) is added to the delivered prices to account for the general contractor markup.The estimators must vary this percentage according to the local conditions.

2. Open shop conditions are assumed.

3. The Labour Productivity Factor reflects typical labour saving construction tools and equipment used inthe host country.

Strengths 1. The Richardson International Cost Factors Location Manual provides means of comparing constructioncosts among international locations.

2. Relative productivity between locations is reflected through the Labour Productivity Factors.

3. Some design requirements (e.g., piling, seismic requirements, …etc) are taken into account in thelocation factors.

4. The following factors are included in the Location factors:• Availability of skilled labour• Climatic conditions• Shipping costs for unavailable materials from various ports in the U.S.• Environmental issues• Import duties

Page 87: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Richardson International Cost Factors Location Manual

General Information

Weaknesses 1. Although Richardson provides significant information about each country, it tends to be outdated. Forexample, the economic and political information on Canada appears to be at least 6 years old.

2. It is very risky to represent all the market conditions for a specific country by one factor. It could be betterto apply a range.

3. An exchange rate is used in the calculations of the location factors, so the estimator must make anyappropriate adjustments.

4. Local purchase requirements might affect the cost of materials.

5. Cost differences might arise from local regulations within the same country.

6. The markup percentage is assumed constant for all locations.

7. There is no differentiation between Union and Non-union labour in this index. All the costs are based onopen shop conditions.

Page 88: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Richardson International Cost Factors Location Manual

Location Factor Published

GeneralComments differences in codes, requirements, conditions, and productivity are captured. Also differences in the designs are taken into consideration. Captures differences in code requirements, weather and limatic conditions, local requirement.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 89: A Guide to Construction Cost Sources - O'Grady

Richardson International Cost Factors Location Manual

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 100

Data Collection Method survey

Update Frequency annually

Notes It is assumed that all the composite crew members consist of skilled labour (no apprentices). It is also assumed that there are sufficient local skilled labour and efficient management system to do the job.

For subs, a 10% mark-up is added. The estimator must adjust this percentage in the light of the local conditions.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 90: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Richardson International Cost Factors Location Manual

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source

Number Of Trades Tracked 0

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 91: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Richardson International Cost Factors Location Manual

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 92: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Information

Publisher: R.S. Means Company, Inc.A Construction Market Data Group CompanyConstruction Plaza, 63 Smiths LaneKingston, MA 0264-0800

Tel:Fax:Website:

(800) 448-8182(781) 585-8868www.rsmeans.com

Years in circulation: 60 years

Type of index: The Means Building Construction Cost Data provides local multipliers that represent relative constructionfactors for material costs, installation costs as well as the weighted average for total in-place costs for eachCSI MasterFormat Division. These multipliers can be used for comparing costs between cities as well asacross time for the same city. Installation and Materials indexes are published.

Intended use by: This publication is intended to assist estimators and contractors to estimate their jobs in the early planningstages of a project.

Canadian CityCoverage:

930 locations of which 62 are Canadian:BC: Kamloops, Prince George, Vancouver, VictoriaAB: Calgary, Edmonton, Fort McMurray, Lethbridge, Lloydminster, Medicine Hat, Red DeerSK: Moose Jaw, Prince Albert, Regina, SaskatoonMB: Brandon, Protage la Prairie, WinnipegON: Barrie, Brantford, Cornwall, Hamilton, Kingston, Kitchener, London, North Bay, Oshawa, Ottawa,

Owen Sound, Peterborough, Sarnia, St. Catharines, Sudbury, Thunder Bay, Toronto, WindsorQC: Cap-de-la-Madeleine, Charlesbourg, Chicoutimi, Gatineau, Laval, Montreal, Quebec, Sherbrooke,

Trois RivieresNB: Bathurst, Dalhousie, Fredericton, Moncton, Newcastle, Saint JohnNS: Dartmouth, Halifax, New Glasgow, Sydney, Yarmouth

Page 93: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General InformationPE: Charlottetown, SummersideNF: Corner Brook, St. John'sYT: WhitehorseNT: Yellowknife

Other Publications: • Assemblies Cost Data• Building Construction Cost Data• Concrete & Masonry Cost Data• Construction Cost Indexes• Contractor's Pricing Guide: Framing & Rough

Carpentry, and Residential Detailed Costs, andResidential Square Foot Costs

• Electrical Change Order Cost Data• Environmental Remediation Cost Data

• Heavy Construction Cost Data• Interior Cost Data• Labor Rates for the Construction Industry• Mechanical Cost Data• Open Shop Building Construction Cost Data• Plumbing Cost Data• Repair & Remodeling Cost Data• Site Work & Landscape Cost Data• Square Foot Cost Data

Description: The Means Building Construction Cost Data contains average construction cost indexes for 305 U.S. andCanadian cities. The cities listed represent geographical areas with the densest population centers. All costsfound in this publication represent U.S. national averages and are given in U.S. dollars. The nationalaverage is the average construction costs for the 30 major cities in U.S. (Also known as the 30 CityAverage). Means city cost indexes are used to adjust the national average costs to a particular location. Thecity cost indexes for Canada can be used to adjust the U.S. national averages to local costs in Canadiandollars.

The Means Building Construction Cost Data is updated on annual basis, while the city cost indexes areupdated and published on a quarterly basis.

The city cost indexes use the national average costs as basis for comparison between locations. The MeansConstruction Cost Indexes publication also contains historical city cost indexes which use January 1, 1993as a base line for comparing costs across time.

The city cost indexes can be used for the following applications:• Compare costs from city to city

Page 94: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Information• Compare a specific city’s construction costs with the national average• Update and adjust construction cost data based on a national average

The city cost indexes are updated quarterly. Thus, this will be particularly useful in updating a “bottom line”estimate that has been “on the shelf” for a couple of quarters.

The Historical city indexes can be used for the following applications:• Estimating and comparing costs in the same city for different years• Estimating and comparing costs in different cities for the same year• Estimating and comparing costs

To create the city cost indexes, R.S. Means researched the building types most often constructed in theUnited States and Canada. Nine different types of buildings were combined to create a composite model.These nine building types were chosen to form a composite model, because there is no one type buildingthat can completely represent the building construction industry. The following structures were chosen tomake up the composite model:

• Factory, 1 story• Office, 2-4 story• Store, retail• Town hall, 2-3 story• High school, 2-3 story• Hospital, 4-8 story• Garage, parking• Apartment, 1-3 story• Hotel/Motel, 2-3 story

The exact material, labour and equipment quantities are based on detailed analysis of these nine buildingtypes, then each quantity is weighted in proportion to expected usage. The material prices, hourly labourrates and equipment rental rates are combined to form this composite building that represents as closely aspossible the actual usage of materials, labour and equipment used in the North American buildingconstruction industry.

Page 95: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Information

There are approximately three sources for the cost data in each city. An average of the sources is used torepresent each location index. The range of error believed in the estimates of the city cost indexes is ± 5%.

The components of the index for the composite model consists of:• Specific quantities of 66 commonly used construction materials.• Specific labour hours for 21 building construction trades• Specific days of equipment rentals for 6 types of construction equipment (normally used to install the 66

material items by the 21 building trades).

The cost data in this publication is represented in two ways: Bare cost and Total cost including O&P(Overhead and Profit). For each item of the CSI MasterFormat divisions, the following costs are represented.

Material bare costsMaterial costs are collected by contacting manufacturers, dealers, distributors, and contractors in each city.Material costs don’t include sales taxes.

Labour bare costsLabour wage rates are determined from labour union agreements where available. When labour union wagerates are not available in a certain city, the associated general contractors are contacted and an average forthe wage rates is considered. Labour rates reflect productivity based on actual normal conditions. Thesefigures include time spent during a normal workday on tasks other than actual installation, such as materialreceiving and handling, mobilization at site, site movement, and cleanup. The labour costs represent the in-place costs for installing the required materials.

Equipment bare costsEquipment costs are collected from contractors, suppliers, dealers, manufacturers, and distributors.Equipment costs include rental and operating costs under normal use. The operating costs include parts and

Page 96: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Informationlabour for routine servicing such as repair and replacement of pumps, filters, …etc. Normal operatingexpendables such as fuel, lubricants, tires, …etc are included. Extraordinary operating expendables withhighly variable wear patterns such as diamond bits and blades are excluded.

Total costThe total cost is the sum of the Bare costs of material, labour and equipment.Total cost = Material bare cost + Labour bare cost + Equipment bare costs

Total cost including O&PTotal cost including O&P = (Material bare cost x 10%)+ (Labour bare cost x 10%) + (Equipment bare costs x 10%)

General conditions, when applicable, should also be added to the Total cost including O&P. The costs forthe general conditions are listed in division 1. General conditions for the subcontractors may range from 0%to 10% of the Total cost including O&P. For the general contractors, costs for the general conditions mayrange from 5% to 15% of the Total cost including O&P, with a figure of 10% as the most typical allowance.

For the Canadian cities, the prices are collected in the local currency (No exchange rate is applied).

Assumptions: 1. The labour productivity rates assumed are considered as the standard or typical productivity rates. Theserates are constant for all the cities.

2. Productivity rates are developed over an extended period so as not to be influenced by abnormalvariations and reflects a typical average.

3. Overhead and profit for the subcontractor is assumed to be 10% of the total labour, material, andequipment bare costs.

Page 97: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Information

Strengths: 1. Covers a large number of Canadian cities (57 cities)

2. There is an option of applying an index from a category specific to a certain component, or using overallindex and apply it to the whole project.

3. No exchange rate is applied for the Canadian cities, which gives the flexibility to apply a desiredexchange rate when comparing projects between the U.S. and Canada.

Weaknesses: 1. Productivity is assumed to be constant for all locations. Therefore, no differential productivity is reflectedin the city cost indexes.

2. The city cost indexes does not reflect the following factors:• Unique local requirements• Regional variations due to specific building

codes• Climate and weather conditions• Seismic design requirements• Design styles and conventions

• Competitive conditions• Automation• Restrictive union practices• Managerial efficiency• Access and transportation• Soil conditions

3. The following costs are not reflected in the city cost indexes:• Engineering and architectural costs• Land and related costs• Land surveys• Permit fees• Taxes

Page 98: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

RSMeans Building Construction Cost Data

General Information• Safety costs• Managerial and supervision costs

4. Overhead and profit is assumed constant for all locations, which does not reflect the local market foreach city. Additional adjustments will be required to reflect local market conditions.

Page 99: A Guide to Construction Cost Sources - O'Grady

Location Indexes

RSMeans Building Construction Cost Data

Location Factor Published

GeneralComments RSMeans clearly states that productivity is not measured between locations.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 100: A Guide to Construction Cost Sources - O'Grady

RSMeans Building Construction Cost Data

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements

Number Of Trades Tracked 21 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 3

Data Collection Method Mailed surveys

Update Frequency quarterly

Notes Average productivity rates, same in all locations. Union wage rates are used from as many locations as possible, because it is easier to collect. If open shop is more dominant, Davis-Bacon rates are used or open-shop contractors are contacted to determined the going rates. There are almost 15,000 sources (data suppliers). They try to maintain at least 3 suppliers per location per cost item. Judgement is required to deal with the outlier data instead of just taking the average.

Installation costs include labour wage rates and equipment rental costs. Markups are national averages and vary by trade.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 101: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

RSMeans Building Construction Cost Data

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements

Number Of Trades Tracked 21

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 3

Data Collection Method Mailed surveys

Update Frequency quarterly

Notes Union wage rates are used from as many locations as possible, because it is easier to collect. If open shop is more dominant, Davis-Bacon rates are used or open-shop contractors are contacted to determined the rates.

There are almost 15,000 sources (data suppliers). They try to maintain at least 3 suppliers per location per cost item. Judgement is required to deal with the outlier data instead of just taking the average.

Installation costs include labour wage rates and equipment rental costs.

For open-shop contractors, the average of the wages collected is used excluding outliers.

Markups are national averages and vary by trade.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 102: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

RSMeans Building Construction Cost Data

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 66

Same Materials Across Location

Number Of Sources 3

Data Collection Method Mailed surveys

Update Frequency quarterly

Notes Expert judgement is used to remove outlier data instead of just taking the average.

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 103: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Saylor Current Construction Costs

General Information

Publisher: Saylor Publications, Inc.9420 Topanga Canyon Blvd.Suite 203Chatsworth, CA 91311

Tel:

Fax:Website:

(818) 718-5966(800) 642-3352(818) 718-8024www.saylor.com

Years in circulation: 38 years

Type of index: The Saylor Current Construction Costs provides costs for Union and Open Shop trades, 23 materials, 21subcontractor specialties, and a Major Cities Cost Relationship Index for 125 cities. Costs are based on SanFrancisco, CA.

Intended use by: These indexes are for estimators working for contractors and consulting engineers.

Canadian CityCoverage:

120 locations of which 5 are Canadian:BC: VancouverAB: CalgaryMB: WinnipegON: TorontoQC: Montreal

Other Publications: Residential Construction CostsRemodeling/Repair Construction CostsCommercial Square Foot Building CostsResidential Square Foot Building Costs

Page 104: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Saylor Current Construction Costs

General Information

Description: The Current Construction Costs publication contains six main sections:1. Wage Rate Recap

• Includes wage rates for 31 trades• Union and open shop• Includes benefits, supervision, overhead and profit

2. Material/Labour and Subcontractor Time Indexes• Started in 1967 (Index = 100)• 4 construction types (concrete, steel, wood frame, and combination) information for 5 previous

years3. Material Time Indexes

• Unit costs for 23 construction materials• Assumes minimum quantity

4. Major Cities Cost Relationship Index• 125 U.S. and Canadian cities• Uses San Francisco, California as the base city• Indexes are computed from the analysis of both wage rates only (no material or equipment costs

are included in the analysis or computation of indexes)5. Construction Costs

• Organized according to 16 CSI MasterFormat divisions• Costs of the elemental items are broken down by material cost and labour (union and open shop)

installation cost• Material cost includes equipment, equipment rental, material and factory fabrication, plus profit

and overhead• Installation is defined as field installation and erection with applied subcontractor’s overhead,

profit, payroll taxes and insurance6. Assembly Costs

• Arranged by 11 CSI MasterFormat divisions• Each assembly derived from construction cost section• Complete building cost determined by adding the applicable assemblies

Page 105: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Saylor Current Construction Costs

General InformationMaterial prices and rates are gathered from suppliers’ catalogues.

Markup percentages vary by trade and differ between Union and Open shop where markup percentages forthe Open shop trades are higher than those of the Union trades.

The supervisory labour costs vary by trade and differ between Union and Open Shop. For the Open shop,the supervisory costs are slightly higher as a percent of the labour cost.

For the Canadian Cities Relationship Indexes, costs are quoted in local currency (No exchange rates areapplied).

Assumptions: 1. The same crew composition and productivity is assumed for the Union and Open shop. Only the wagerates differ.

2. Crew composition and productivity are assumed constant over all locations.

Strengths:1. This publication differentiates between the Union and the Open shop, and provides separate installation

costs.

2. No exchange rates are applied for the Canadian locations, which gives the flexibility to apply anappropriate exchange rate when comparing projects between the U.S. and Canada.

3. The Major Cities Cost Relationship Index reflect the following factors:• Managerial and supervision costs.

Weaknesses:1. The location indexes are derived from labour only i.e. they assume material costs are constant across all

locations. Although the publication mentions that productivity is considered, it was stated during theinterview that productivity is not considered.

Page 106: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Saylor Current Construction Costs

General Information

2. The Major Cities Cost Relationship Index does not reflect the following factors:• Unique local requirements• Regional variations due to specific building codes• Climate and weather conditions• Seismic design requirements• Design styles and conventions

3. The same crew composition is assumed for both Union and Open Shop crews. This does not reflect all ofthe differences between them.

Page 107: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Saylor Current Construction Costs

Location Factor Published

GeneralComments Major Cities Cost Relationship Index: No account is taken for the productivity differences between locations. Only direct labour wage rates (hourly rates) are collected from the different locations and used to calculate the index.

There is an attempt to maintain at least two sources for each location. The most probable value is used instead of the average if there are outliers.

Commercial Square Foot Building Costs:Square foot costs are provided for 65 building types with 5 exterior finishes over each of 4 earthquake zones. These costs include GC overhead and profit, and architectural fees. This section is an excerpt of the Commercial Square Foot Building Costs publication.

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 108: A Guide to Construction Cost Sources - O'Grady

Saylor Current Construction Costs

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements, Labour brokers

Number Of Trades Tracked 31 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 1

Data Collection Method Personal interviews

Update Frequency annual

Notes Elemental and Assembly costs are detailed and categorized by CSI Masterformat. Costs are provided for:-elemental or assembly measurement unit-material cost-union installation cost-total union cost (material + installation)-open shop installation cost-total open shop cost (material + installation)

Installation costs between union and open shop are proportional to differences in wage rates and not to productivity differences.

Markup is added to the unit rates as a percentage which is determined from finished projects. Markup percentages for open-shop contractors are higher than those for union contractors.

Commercial Square Foot Building Costs:Square foot building costs for 65 building types, each with 5 exterior finish/frame type combinations. Costs are presented for 4 earthquate zones, as shown on included map of US. These costs are used to evaluate cost trade-offs for different designs and materials.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 109: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Saylor Current Construction Costs

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective agreements, Labour brokers

Number Of Trades Tracked 31

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 2

Data Collection Method Phone calls and data collection

Update Frequency annual

Notes Union Wage Rate Recap and Open Shop Wage Rate Recap consist of: -base wage -total fringe (union only) -payroll taxes -supervision -workers comp. -overhead & profit -total

All information is based on San Francisco

Supervisory Factor: A percentage is assumed for the supervisory costs (0.96-1.72 %). Supervisory costs are in general higher for open shop labour when calculated as a percent of the base wage, but is generally lower in hourly costs.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 110: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Saylor Current Construction Costs

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 23

Same Materials Across Location

Number Of Sources 2

Data Collection Method Phone interviews

Update Frequency annual

Notes Material costs are based on San Francisco prices and are tracked over time.

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 111: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General Information

Publisher: Statistics Canada - Prices Division13-D2, Jean Talon BuildingOttawa K1A 0T6

Tel: 613-951-3390Website: www.statcan.ca

Years in circulation: Current ICI buildings index since 1981. There are predecessor indexes.

Type of index: See below

Intended use by: These indexes should be used only to compare changes in costs across regions and types of construction,not differences in absolute costs. They were developed for:1. Price deflators for estimating the real value of construction output for the National Accounts2. Industry use

Canadian City Index Type of Pricing Pricing Frequency Coverage

Coverage: Construction Inputs:• Materials (various)• Wages• Financial• Machinery

• Selling Prices• Union Rates• BoC Rate• Selling Prices

• Monthly• Monthly• Monthly• Quarterly

• National• 22 Cities• National• National

Construction Outputs:Residential:

• New Housing• Apartment

• Model• Model

• Monthly• Quarterly

• 20 Cities• 7 Cities

Non-Residential• Office• Warehouse• Shopping Centre• School

• Model• Model• Model• Model

• Quarterly• Quarterly• Quarterly• Quarterly

• 7 Cities (Halifax, Montreal, Ottawa, Toronto, Calgary,• 7 Cities Edmonton, Vancouver)• 7 Cities• 7 Cities

Page 112: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General Information• Factory • Model • Quarterly • 7 Cities

Trades• Fabricated Structural Steel• Pre-cast Concrete

• Model• Model

• Quarterly• Semi-Annual

• 3 regions• 3 regions

Engineering:• Highways• Utilities

o Electrico Telecom

• Purchase Prices

• Modified Input• Purchase Prices

• Annual

• Annual• Annual

• 9 provinces (excl PE)

• National• National

Other Publications: Various. See Statistics Canada catalogue.

Description: Statistics Canada publishes three types of construction price indexes.

Input Prices: monitor changes in the cost of labour, machinery and building materials. Labour costs areunion rates, both straight wage and inclusive of benefits. The selected rate is typically the ICI rate for eachtrade.

• Model Prices for Construction Outputs: estimate the cost of various model structures by pricingthe in-place contractor’s price for various components. This procedure is used forestimating changes in construction costs in apartment buildings and ICI buildings.

• Bid Price for Construction Outputs: estimate the cost for certain types of engineered constructionbased on unit bid prices. This procedure is used for certain types of engineeringconstruction (e.g., highways).

Input Prices:Input prices are based on regular surveys of suppliers. Wage costs are prevailing union wages (direct wagesand benefits). Wage costs do not include statutory contributions to EI, WCB, CPP, EHT, etc.

Page 113: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General InformationModel Prices for ICI Buildings:

Statistics Canada estimates costs for six model buildings:

Apartment Building• 7 stories with penthouse used for mechanical systems – 53 units – 4,900 m2

• 2-level basement parking• brick face / aluminum siding and stucco

Office Building• 10 stories - 16,500 m2

• basement parking• brick veneer and glazed aluminum curtain wall

Warehouse• 1 storey, concrete slab-on-grade - 3,809 m2

Shopping Centre• L-shaped suburban mall• concrete slab-on-grade - 1,895 m2

Light Factory• 1 storey – 7,910 m2

Secondary School• 3 stories – 20,000 m2

• basement parking• brick veneer and glazed aluminum curtain wall

Approximately 200 components are priced for each model. These components represent approximately 60%of total costs. Component prices are in-place costs, inclusive of contractors’ overhead and profit margin.

Page 114: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General Information

Components are divided into four major trade divisions – architectural, structural, mechanical and electrical –plus the general contractor’s overhead and profit.

Excluded from component costs are:• Capitalized services – legal, engineering and architectural• Financing cost• GST• Land costs• Landscaping

The same structure is used across locations. Local differences in codes (if applicable) or seismicrequirements are not taken into account.

Multiple prices are elicited from quantity surveyors, consultants and contractors. For the model apartmentbuilding, for example, in Toronto, 45 different sources are used. For mechanical and electrical trades, themain sources of price information are suppliers of construction materials and equipment to these trades.Overhead, productivity and profit information is derived through discussions with trade associations andunions. Many sources are applicable to more than one type of structure. For ICI structures, in Toronto,approximately 110 sources are surveyed

Models are revised every 10-15 years. If codes change, the specifications will be revised for the relevantcomponents. The office, light factor and school are based on 1991 specifications. The warehouse andshopping centre are based on 1981 specifications.

The union/non-union composition of the survey panel depends on the amount of construction generallyperformed by each type of contractor.

The indexes cannot be used to compare absolute cost levels across locations. The indexes can be used tocompare changes in costs across locations and across building types.

Page 115: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General Information

Bid Prices – EngineeringBid prices are drawn from actual bids registered with provincial and municipal governments and with utilities.Bid prices are typically expressed in terms of price per standard unit of output.

Assumptions: 1. Changes in construction technology proceed slowly and do not jeopardize a model-based index thatis updated every 10-15 years.

2. The composition of ICI construction does not change sufficiently to make the models selectedunrepresentative.

Strengths: 1. The model ICI building cost estimates are published quarterly.

2. The length of time of the survey and the consistency of the methodology allow time series analysisand a comparison of the different behaviour of input and output prices over the course of theeconomic cycle.

Weaknesses: 1. For each of the segments of the ICI sector, comparatively few model structures are employed. In theinstitutional segment of ICI, the representative structure is a secondary school. This underestimatesthe impact of changes in mechanical construction costs in structures, such as hospitals, that aresignificantly more mechanical-intensive.

2. The indexes should only be used to compare changes in construction costs across cities. Theindexes cannot be used to compare absolute construction costs.

3. The ICI indexes may over-estimate on-site construction costs by not taking sufficient account of thetrend to use pre-fabricated components that require only installation labour.

Page 116: A Guide to Construction Cost Sources - O'Grady

A Guide to Cost Sources

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

General Information

4. The indexes do not reflect the diversity in architectural specification (especially in regard to buildingenvelope)

Page 117: A Guide to Construction Cost Sources - O'Grady

Location Indexes

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

Location Factor Published

GeneralComments

Soft Costs Included

Design Modified to Local Conditions

Same Weighting Of Index Components Over Locations

Ontario Construction Secretariat: A Guide to Cost Sources

Page 118: A Guide to Construction Cost Sources - O'Grady

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

Elements, Assemblies, and Buildings

Elemental Installations

Assembly Installations

Complete Structures

Individual Location Costs

Costs Specific To One Location

National Average Costs

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective Agreement or Survey

Number Of Trades Tracked 20 Supplementary Benefits

Constant Productivity Rates

Same Crew Composition

Supervisory Factor

Markup FactorNumber Of Sources 100

Data Collection Method Interviews

Update Frequency Monthly

Notes

Ontario Construction Secretariat: A Guide to Cost Sources

Page 119: A Guide to Construction Cost Sources - O'Grady

Labour Cost Indexes

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

Labour Costs Tracked

Costs for Individual Locations

Costs Specific To One Location

Costs are National Averages

Union Wage Rates

Open Shop Wage Rates

Wage Rate Source Collective Agreement

Number Of Trades Tracked 20

Same Crew Composition

Supplementary Benefits Included

Constant Productivity Rates

Supervisory Factor Included

Markup Factor

Number Of Sources 100

Data Collection Method Interview

Update Frequency Quarterly

Notes Labour costs are tracked for all trades.Number of sources varies by location. In Toronto over 100 sources.

Ontario Construction Secretariat: A Guide to Cost Sources

Page 120: A Guide to Construction Cost Sources - O'Grady

Materials and Equipment

Statistics Canada Construction Price Statistics (Cat. No. 62-007-XPB)

Materials Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Materials Tracked 0

Same Materials Across Location

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Equipment Tracked

Individual Location Costs

Costs Specific To One Location

National Average Costs

Number Of Equipment Tracked 0

Same Equipment Across Locations

Number Of Sources 0

Data Collection Method

Update Frequency

Notes

Ontario Construction Secretariat: A Guide to Cost Sources