1
All depths are KB Drilled April-July 2008 Deviation in open hole: 10.4 to 13.1 deg from 6395 to 9035’ 17.2 to 20.0 deg from 9434 to 9950’ from surface to 4,391’ in 17 1/2” hole Burst: 5,380 psi Capacity: 6.2199 gals/ft from 4,189’ to 6,462’ in a 12 1/4” hole Burst: 7,930 Capacity: 2.9721 gals/ft 30” csg to 130’ in a 36” hole 20” csg to 1108’ in a 26” hole 13 3/8” 72lb L-80 csg 9-5/8” 53.5lb L-80 csg 8-1/2” open-hole from 6,462 to 10,060’ (TD) The Future of Geothermal Energy Notice of Public Outreach Meeting Thursday, August 12th – 6 - 8pm AltaRock will describe the project plans and hold an open forum to discuss questions and concerns from all interested parties. AltaRock will provide refreshments. We look forward to meeting you there. Sunriver Nature Center and Observatory 57245 River Road (off of Circle 3) • Sunriver, OR AltaRock Energy and Davenport Newberry Contact AltaRock: Kimberly Van Hall [email protected] (415) 331-0130 Learn More: www.newberrygeothermal.com www.altarockenergy.com www.facebook.com/newberryegs The Future of Geothermal Energy Notice of Public Outreach Meeting Thursday, August 12th – 6 - 8pm AltaRock will describe the project plans and hold an open forum to discuss questions and concerns from all interested parties. AltaRock will provide refreshments. We look forward to meeting you there. Sunriver Nature Center and Observatory 57245 River Road (off of Circle 3) • Sunriver, OR AltaRock Energy and Davenport Newberry Contact AltaRock: Kimberly Van Hall [email protected] (415) 331-0130 Learn More: www.newberrygeothermal.com www.altarockenergy.com www.facebook.com/newberryegs Goals of the Demonstration • Demonstrate current technology and advances in EGS – Stimulate at least 3 fracture zones – Demonstrate diverter technology for multiple zone stimulation – Demonstrate single-well test methods to assess productivity after stimulation • Drill two production wells into newly created EGS reservoir • Produce economic quantities of fluid per production well • Establish circulation through three-well system • Develop conceptual model of complete EGS system • American Reinvestment and Recovery Act • Department of Energy, Energy Efficiency and Renewable Energy, Geothermal Technologies Program • AltaRock awarded $21.45m as part of total budget of $43.81m • In association with: Davenport Newberry, EGI, USGS, Temple University, TexasA&M, LBNL • Demonstrate EGS at Newberry for future application across the United States • 10 miles northeast of La Pine, Oregon • 23 miles south of Bend, Oregon • Deschutes National Forest • Northwest flank of Newberry Volcano, Deschutes Co, OR • Federal geothermal leases outside western boundary of monument • Community Outreach • Geoscience review and lab studies • Baseline Monitoring • Permitting • Stimulation Plan • DOE Stage-Gate Review Regional • Low historic seismicity – no measurable events since 1980 within 10 km of demonstration • Existing stations at Bend, Pine Mountain, Fort Rock, and SE flank of Newberry • Installed additional stations at River Meadows and La Pine Local • Coupled with regional array to provide baseline data and initial indication of Phase II array performance • High density station array of short period seismometers to measure smaller, local events • Final array will consist of up to 10 borehole installations and 7 surface stations Preparation for Stimulation • Injection Well Stimulation • Drill andTest Production Wells • Conduct CirculationTest • Develop conceptual model of fully developed EGS wellfield and power plant • Supply project reports to Department of Energy • Issue peer-reviewed publications • Post demonstration data to National Geothermal Database Phase I - Pre-Stimulation 2010-2011 A Demonstration of EGS Technology Project Location - Central Oregon, USA Existing Well 55-29, completed in 2008, will be stimulated. After stimulation, two additional wells will be directionally drilled from the same pad to intersect the newly created EGS reservoir. Well 55-29 Profile and Direction Drilling Monitoring Seismicity Phase II - Injection Well Stimulation / Summer-Fall 2011 Drill and Test Production Wells / Fall 2011-Fall 2012 The on-site waters well will provide fluid for stimulation. A single-well test will be conducted to evaluate stimulation results. Field activities will culminate in a 30-60 day three-well circulation test. Stimulation and Well Flow Testing Planned Microseismic Array Stations Estimated Water Usage Phase III - Conceptual Modeling 2013 Stimulation of First Interval Pre-Stimulation Stimulation of Second Interval After Diverter Application Stimulation of Three Intervals Complete Drill Two Production Wells into EGS Reservoir Milestones Award Notification – November 1, 2009 • DOE Limited Release of Funds – May 3, 2010 • Filed Notice of Intent – June 8, 2010 • Initiated EA – September 16, 2010 • Completed Seismic Risk Assessment – November 24, 2010 Complete EA – April 29, 2011 • Complete DOE Stage-Gate Review – June 17, 2011 • Initiate Phase II Stimulation Activities – June 20, 2011 • Project may use between 73 and 142 million gallons (223-435 ac-ft) of groundwater • Estimate incorporates many variables that will be validated by demonstration • Water produced from on-site groundwater wells • All consumption balanced by purchase of Deschutes River Conservancy mitigation credits Water remains in reservoir or is evaporated during flow tests Multi-Well Flow Test The Marketing Department - www.tmd-usa.com Atmospheric Separator and Weir Box Water Well Lights Lights Sump Off site water source 55-29 55A-29 55B-29 Water Supply Pumps Circulation Pumps Water Tanks Atmospheric Separator and Weir Box CAT Diesel Generator Lights Lights Trailers Storage Containers Water Truck Trucks Cars Water Well Atmospheric Separator and Weir Box Lights Batch Mixer Sump Water Tanks Water Supply Pumps Off site water source Stimulation Pumps (Frac trucks) 55-29 Generator Lights Lights Trailers Containers Water Truck Trucks Cars

Upload: others

Post on 04-Aug-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Demonstration of EGS Technology Project Location ...altarockenergy.com/projectupdates/Newberry_EGS_Poster.pdf · EGS Reservoir Milestones Award Notification – November 1, 2009

All depths are KBDrilled April-July 2008Deviation in open hole:10.4 to 13.1 deg from 6395 to 9035’17.2 to 20.0 deg from 9434 to 9950’

from surface to 4,391’ in 17 1/2” holeBurst: 5,380 psi

Capacity: 6.2199 gals/ft

from 4,189’ to 6,462’ in a 12 1/4” holeBurst: 7,930

Capacity: 2.9721 gals/ft

30” csg to 130’ in a 36” hole

20” csg to 1108’ in a 26” hole

13 3/8” 72lb L-80 csg

9-5/8” 53.5lb L-80 csg

8-1/2” open-hole from 6,462 to 10,060’ (TD)

The Future of Geothermal Energy

Notice of Public Outreach Meeting

Thursday, August 12th – 6 - 8pm

AltaRock will describe the project plans and hold an open forum to discuss questions and

concerns from all interested parties. AltaRock will provide refreshments.

We look forward to meeting you there.

Sunriver Nature Center and Observatory

57245 River Road (off of Circle 3) • Sunriver, OR

AltaRock Energy and Davenport Newberry

Contact AltaRock:

Kimberly Van Hall

[email protected]

(415) 331-0130

Learn More:

www.newberrygeothermal.com

www.altarockenergy.com

www.facebook.com/newberryegs

The Future of Geothermal Energy

Notice of Public Outreach Meeting

Thursday, August 12th – 6 - 8pm

AltaRock will describe the project plans and hold an open forum to discuss questions and

concerns from all interested parties. AltaRock will provide refreshments.

We look forward to meeting you there.

Sunriver Nature Center and Observatory

57245 River Road (off of Circle 3) • Sunriver, OR AltaRock Energy and Davenport Newberry

Contact AltaRock:

Kimberly Van Hall

kvanhall@

altarocken

ergy.com

(415) 331-0130

Learn More:

www.newberrygeothermal.com

www.altarockenergy.com

www.facebook.com/newberryegs

Goals of the Demonstration•DemonstratecurrenttechnologyandadvancesinEGS –Stimulateatleast3fracturezones –Demonstratedivertertechnologyformultiplezonestimulation –Demonstratesingle-welltestmethodstoassessproductivityafterstimulation•DrilltwoproductionwellsintonewlycreatedEGSreservoir•Produceeconomicquantitiesoffluidperproductionwell•Establishcirculationthroughthree-wellsystem•DevelopconceptualmodelofcompleteEGSsystem

•AmericanReinvestmentandRecoveryAct•DepartmentofEnergy,EnergyEfficiencyandRenewableEnergy,GeothermalTechnologiesProgram

•AltaRockawarded$21.45maspartoftotalbudgetof$43.81m

•Inassociationwith:DavenportNewberry,EGI,USGS,TempleUniversity,TexasA&M,LBNL

•DemonstrateEGSatNewberryforfutureapplicationacrosstheUnitedStates

•10milesnortheastofLaPine,Oregon•23milessouthofBend,Oregon•DeschutesNationalForest•NorthwestflankofNewberryVolcano,DeschutesCo,OR

•Federalgeothermalleasesoutsidewesternboundaryofmonument

•CommunityOutreach

•Geosciencereviewandlabstudies

•BaselineMonitoring

•Permitting

•StimulationPlan

•DOEStage-GateReview

Regional•Lowhistoricseismicity–nomeasurableeventssince1980within10kmofdemonstration

•ExistingstationsatBend,PineMountain,FortRock,andSEflankofNewberry

•InstalledadditionalstationsatRiverMeadowsandLaPine

Local•CoupledwithregionalarraytoprovidebaselinedataandinitialindicationofPhaseIIarrayperformance

•Highdensitystationarrayofshortperiodseismometers tomeasuresmaller,localevents•Finalarraywillconsistofupto10boreholeinstallationsand7surfacestations

PreparationforStimulation•InjectionWellStimulation•DrillandTestProductionWells•ConductCirculationTest•DevelopconceptualmodeloffullydevelopedEGSwellfieldandpowerplant•SupplyprojectreportstoDepartmentofEnergy•Issuepeer-reviewedpublications•PostdemonstrationdatatoNationalGeothermalDatabase

Phase I - Pre-Stimulation 2010-2011

A Demonstration of EGS Technology Project Location - Central Oregon, USA

ExistingWell55-29,completedin2008,willbestimulated.Afterstimulation,twoadditionalwellswillbedirectionallydrilledfromthesamepadtointersectthenewlycreatedEGSreservoir.

Well 55-29 Profile and Direction DrillingMonitoring Seismicity

Phase II - Injection Well Stimulation / Summer-Fall 2011Drill and Test Production Wells / Fall 2011-Fall 2012

Theon-sitewaterswellwillprovidefluidforstimulation.Asingle-welltestwillbeconductedtoevaluatestimulationresults.Fieldactivitieswillculminateina30-60daythree-wellcirculationtest.

Stimulation and Well Flow Testing

Planned Microseismic Array Stations Estimated Water Usage

Phase III - Conceptual Modeling 2013

StimulationofFirstIntervalPre-Stimulation StimulationofSecondIntervalAfterDiverterApplication

StimulationofThreeIntervalsComplete

DrillTwoProductionWellsintoEGSReservoir

MilestonesAwardNotification–November1,2009•DOELimitedReleaseofFunds–May3,2010•FiledNoticeofIntent–June8,2010•InitiatedEA–September16,2010•CompletedSeismicRiskAssessment–November24,2010

CompleteEA–April29,2011•CompleteDOEStage-GateReview–June17,2011•InitiatePhaseIIStimulationActivities–June20,2011

•Projectmayusebetween73and142milliongallons(223-435ac-ft)ofgroundwater•Estimateincorporatesmanyvariablesthatwillbevalidatedbydemonstration•Waterproducedfromon-sitegroundwaterwells•AllconsumptionbalancedbypurchaseofDeschutesRiverConservancymitigationcredits

Waterremainsinreservoirorisevaporatedduringflowtests

Multi-WellFlowTest

TheMarketingDepartment-www.tmd-usa.com

Atmospheric Separator and

Weir Box

Water Well

LightsLights

Sump

O� site water source

55-29

55A-29

55B-29

Water Supply Pumps

CirculationPumps

Water Tanks

Atmospheric Separator and

Weir Box

CAT Diesel Generator

LightsLightsO�ce Trailers

Storage Containers

Water Truck

Trucks

Cars

Water Well

Atmospheric Separator and

Weir Box

Lights

Batch Mixer

Sump

Water Tanks

Water Supply Pumps

O� site water source

Stimulation Pumps

(Frac trucks)

55-29

CAT Diesel Generator

LightsLightsO�ce Trailers

Storage Containers

Water Truck

Trucks

Cars