a community of communities · 2020. 7. 22. · a community of communities 320 esplanade sydney,...

74
A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:[email protected] JULY 22, 2020 ADDENDUM #6 RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Donna M. Murphy Donna M. Murphy, Procurement Officer

Upload: others

Post on 16-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 22, 2020

ADDENDUM #6

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Donna M. Murphy Donna M. Murphy, Procurement Officer

Page 2: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY
Page 3: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 21, 2020

ADDENDUM #5

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Robina Dunn Robina Dunn, Procurement Officer

Page 4: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY
Page 5: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 20, 2020

ADDENDUM #4

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Donna M. Murphy Donna M. Murphy, Procurement Officer

Page 6: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 4 PAGE 1Sydney, Nova Scotia July 20, 2020

1. INTENT .1 This addendum forms an integral part of the Bid Documents covering allaspects of this Project and is to be read in conjunction therewith. Shouldpoints arise which are at variance, this Addendum shall take precedence.

.2 The purpose of this Addendum is to add to, clarify and/or to amend the BidDocuments.

.3 The Addendum comprises 1 pages of text (including this page).

2. ARCHITECTURAL SPECIFICATIONS

Reference Specification Section 07 41 00 - PREFORMED METAL STANDING SEAM ROOFING

1. Revise paragraph 2.3.3 to read as follows; Finish shall be Factory applied, Kynar 500 Fluorocarboncoating or , WeatherXL coating system by Valspar, utilizing silicone modified polyester resin.

Reference Specification Section 076200 - SHEET METAL FLASHING & TRIM

1. Revise paragraph 2.1.1 to read as follows; Pre-finished galvanized steel in 24 gaugethickness. Colour and finish to match sloped metal roofing.

*** END OF ADDENDUM ***

Page 7: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 20, 2020

ADDENDUM #3

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Robina Dunn Robina Dunn, Procurement Officer

Page 8: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 3 PAGE 1Sydney, Nova Scotia July 20, 2020

1. INTENT .1 This addendum forms an integral part of the Bid Documents covering allaspects of this Project and is to be read in conjunction therewith. Shouldpoints arise which are at variance, this Addendum shall take precedence.

.2 The purpose of this Addendum is to add to, clarify and/or to amend the BidDocuments.

.3 The Addendum comprises 11 pages of text (including this page).

2. Reference DRAWING 205 DETAILS & SECTIONS

1. Add the details shown on Figure No. SK-1 to this drawing to show the connection of the bondbeams in the masonry wall to the concrete walls of the elevator shaft.

3. Reference DRAWING 601 DRAINAGE PLANS LEVEL 1 & 2

1. Revise vehicle bay trench drain catch basin dimensions from 24”x24” to 6”x20”.2. Relocated CW-2 clothes washer is a Milnor model # 30022T5X c/w wall-mounted Knight On-

Premise laundry chemical dispenser pump rack. Install in accordance with manufacturer’sinstructions.

3. Reference sanitary vent lines serving SH-1, LAV-2 and WC-2 in 109-W/C and LAV-2 in 108-W/C:Vent shall increase to 2” diameter before connecting to vent from LAV-2 in 108-W/C.

4. Reference DRAWING 602 PLUMBING PLANS LEVEL 1 & 2

1. Remove fire extinguisher from room # 206 – Mechanical.2. Relocated CW-2 clothes washer is a Milnor model # 30022T5X c/w wall-mounted Knight On-

Premise laundry chemical dispenser pump rack. Install in accordance with manufacturer’sinstructions.

3. Reference domestic hot and cold water lines serving SH-1 and WC-2 in 109-W/C: DCW shall be1-1/4”, DHW shall be ½” in diameter.

4. Reference domestic hot and cold water lines serving SH-1, WC-2 and LAV-2 in 108-W/C: DCWshall be 1-1/4” and DHW shall be ½” in diameter.

5. All wash bay domestic water and compressed air service outlets shall be 42” AFF.

5. Reference DRAWING 605 PLUMBING SCHEDULES

1. Reference Plumbing Fixture Schedule:.1 Revise LAV-2 as follows: Fixture: Franke V1619/5/3 self-rimming drop-in vanity basinwith faucet ledge, 18ga. 304SS, mirror finished rim, satin finish bowl, undercoated. 3 faucetholes, 4” centerset..2 Revise JS-1 as follows: Add integral check valves to faucet..3 Revise SH-1 as follows: Trap: 3” P-trap..4 Revise CW-2 as follows: Other: Provided c/w relocated laundry detergent dosing pumprack..5 Revise kitchen sink (KS) designations in schedule to KS-1, KS-2 and KS-3, in that order.

Page 9: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 3 PAGE 2Sydney, Nova Scotia July 20, 2020

.6 Revise KS-3, single compartment SS sink: Fixture: Kindred QSL2020/8/3.

6. Reference DRAWING 701 HVAC PLANS LEVEL 1 & LEVEL 2

1. Add following general note: “install outdoor air temperature sensor and humidity sensor insheltered location away from direct sunlight and wind.”

7. Reference DRAWING 702 HVAC PARTIAL PLANS & DETAILS SHEET 1

1. Add detail 21, shown on MSK-01 attached to this addendum.

8. Reference DRAWING 704- HVAC CONTROLS AND SCHEMATICS1. Reference VAV control schematic: add analog output signal, VAV box %.

9. Reference DRAWING 803 POWER PLAN1. Delete shunt trip on kitchen range breaker (111-17,19) and in lieu provide a contactor (c/w240/120V control transformer) and E-stop "maintained contact" mushroom style illuminated push-button (to be located near the kitchen exit door on the latch side). "PUSH TO POWER OFF STOVE, PULLTO RESET". System to interrupt the range circuit (111-17,19) to ensure the stove is not left energizedwhen the area is quickly vacated during fire calls. Provide lamicoid nameplate identification near the E-stop button and at stove clearly identifying the remote stop function. Push button to be equal to EatonCat. No. 10250T563LED06-71X .

ARCHITECTURAL SPECIFICATIONS

Reference Specification Section 04 21 50 – THIN BRICK FORMLINER SYSTEM

1. Revise paragraph 2.1.1 to read as follows; Acceptable Formliner Manufacturer: InnovativeBrick Systems, Arrow Construction or pre-approved equivalent.

2. Revise paragraph 2.1.2 to read as follows; Endicott Clay Products Co., Shaw Slender Brick orpre-approved equivalent.

MECHANICAL SPECIFICATIONS

Reference Specification Section 21 12 00 – FIRE SUPPRESSION STANDPIPES AND HOSE ASSEMBLIES:1. Revise paragraph 3.02.6 as follows: “.6 Hydrostatically pressure test new training standpipe to

the requirements of NFPA 14.”

Reference Specification Section 22 05 00 – COMMON WORK RESULTS FOR PLUMBING:1. Add Section 2.01. NAMED MANUFACTUERS/MODELS as follows: “.1 All equipment submitted

for approval must comply with the requirements listed on the specifications and drawings.Inclusion as an acceptable manufacturer does not relieve contractor, vendor and manufacturer ofrequirements to comply with the specifications and drawings.”

2. Revise paragraph 3.04.2 as follows: “.2 Control wiring 50V or less and power wiring over 50Vrequired for control devices is the responsibility of the EMCS contractor except as otherwise noted.Wiring standards shall be in accordance with requirements of Div. 25 and Div. 26.”

Page 10: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 3 PAGE 3Sydney, Nova Scotia July 20, 2020

Reference Specification Section 22 05 15 – PLUMBING SPECIALTIES AND ACCESSORIES:1. Revise paragraph 2.13.2 as follows: “.2 Minimum flow capacity: 35 usgpm.”2. Revise paragraph 2.14.1.1 as follows: “.1 Trench: HDPE or polymer concrete trench bodies,

nominal 6” wide, 4” throat.”3. Revise paragraph 2.14.1.4 as follows: “.1 Zurn Perma-trench, ACO KlassikDrain or equivalent.”4. Revise paragraph 2.17.6 as follows: “System connection: as indicated on schedule.”5. Add paragraph 3.03.2 as follows: “.2 Provide isolation ball valve for wall hydrant at hydrant.

Provide wall access doors for all concealed non-freeze wall hydrant isolation valves and integralhydrant valves.”

Reference Specification Section 22 11 16 – DOMESTIC WATER PIPING:1. Revise paragraph 2.01.1.2 as follows: “.2 PEX piping to CSA B137.5, for concealed piping

NPS3/4 and under. PEX shall not be used for exposed piping.”2. Revise paragraph 2.01.2.2 as follows: “.2 PEX piping to CSA B137.5, in long lengths and with no

buried joints.”3. Revise paragraph 2.03.7 as follows: “.7 NPS 2 and smaller:

.1 Wrought copper to ANSI/ASME B16.22 or cast copper to ANSI/ASME B16.18, solderedor press-fit..2 PEX fittings to CSA B137.5.”

4. Revise paragraph 2.03.8 as follows: “.7 NPS 2½ and larger:.1 Roll grooved copper fittings to ASTM B88 and CSA B242. Victaulic no-sweat or equal.”

Add attached Specification Section 22 16 00 – BREATHING AIR SYSTEMS. (see attached)

Reference Specification Section 22 42 16 – COMMERCIAL LAVATORIES AND SINKS:1. Reference paragraph 2.02.7: Mop sink shall be 10” in height.2. Reference paragraph 2.02.8: All stainless steel kitchen counter-top sinks shall be 8” depth.

Reference Specification Section 23 05 00 – COMMON WORK RESULTS FOR MECHANICAL:1. Add Section 2.02. NAMED MANUFACTUERS/MODELS as follows: “.1 All equipment submitted

for approval must comply with the requirements listed on the specifications and drawings.Inclusion as an acceptable manufacturer does not relieve contractor, vendor and manufacturer ofrequirements to comply with the specifications and drawings.”

2. Add paragraph 3.02.1.1 as follows: “.1 In lieu of vacuuming ductwork after installation, allfabricated ductwork sections that are clean may have their openings sealed by 6 mil plastic untiltime of installation. After installation, all ductwork openings must be again sealed with 6 milplastic. All equipment must be vacuumed prior to being put into service.”

3. Revise paragraph 3.04.2 as follows: “.2 Control wiring 50V or less and power wiring over 50Vrequired for control devices is the responsibility of the EMCS contractor except as otherwise noted.Wiring standards shall be in accordance with requirements of Div. 25 and Div. 26.”

Reference Specification Section 23 05 29 – HANGERS AND SUPPORTS FOR HVAC PIPING:1. Revise paragraph 3.03.5 as follows: “.1 Flexible joint, roll groove pipe: in accordance with table

below for steel or copper as appropriate but not less than one hangar at joints. Table listings forstraight runs without concentrated loads and where full linear movement is not required.”

Page 11: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 3 PAGE 4Sydney, Nova Scotia July 20, 2020

Reference Specification Section 23 07 19 – HVAC PIPING INSULATION:1. Reference paragraph 3.06.6: Insulate plumbing vent piping and breathing air intake piping

running in attic to the requirements listed in table for rainwater leaders (RWL) and rainwaterpiping (RWP).

Reference Specification Section 23 34 00 – HVAC FANS:1. Add Section 2.05 DRYER BOOSTER FANS as follows:

“.1 Dryer booster fan:.1 Inline type, direct drive..2 Steel housing and wheel, baked enamel finish for housing..3 Direct drive EC motor, single point electrical connection w/ plug..4 Airflow in accordance with clothes dryer manufacturer’s requirements..5 Provide pressure switch for automatic activation of booster fan..6 Provide upstream lint filter for booster fans..7 Provide remote-mounted speed controller in laundry room for airflow

adjustment.”2. Add Section 2.06 ACCEPTABLE EQUIPMENT as follows:

“.1 Acceptable equipment:.1 Greenheck..2 Twin City Fan..3 Cook..4 PennBarry.”

Reference Specification Section 23 74 00 – PACKAGED OUTDOOR HVAC EQUIPMENT:1. Add Section 2.09 ACCEPTABLE EQUIPMENT as follows:

“.1 Acceptable Equipment:.1 Basis of design: Carrier 50TCQ series..2 York Equivalent..3 Trane Equivalent.”

Reference Specification Section 23 82 16.14 – ELECTRIC RESISTANCE AIR COILS:1. Revise paragraph 2.01.5.1 as follows: “.1 Panel – factory-mounted NEMA 1 enclosure for dry

indoor applications, NEMA 3R or NEMA 4 enclosure for attic installation. Enclosure complete withterminal blocks for single-point power connections and connection of wiring to thermostat, airflowproving switch and/or external controls.”

Reference Specification Section 25 05 01 – EMCS: GENERAL REQUIREMENTS:1. Add paragraph 2.03.4 as follows: “.4 All wiring and devices in attic shall be rated for use in

high humidity environments and to a minimum temperature of 0°F.”2. Add Paragraph 2.05.2 as follows: “.2 Owner’s existing central Building Management

System is a Trane Tracer ES system.”

Reference Specification Section 25 30 01 – EMCS: BUILDING CONTROLLERS:1. Revise paragraph 2.03.3.1 as follows: “.1 Microprocessor based controller with integral flow

transducer including software routines to execute PID algorithms, calculate airflow for integral flow

Page 12: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 3 PAGE 5Sydney, Nova Scotia July 20, 2020

transducer, and measure temperatures as per required inputs shown in control schematic.Sequence of operations as per drawings.”

2. Add paragraph 2.03.3.5 as follows: “.5 VAV controllers in unheated attic shall be rated foroperation in high humidity conditions and to a minimum temperature of 0°F.”

Reference Specification Section 25 30 02 – EMCS: FIELD CONTROL DEVICES:1. Revise paragraph 2.01.7 as follows: “.7 Outdoor and attic installation: use weatherproof

construction, NEMA 4 enclosures.”2. Add paragraph 2.01.10 as follows: “.10 Vehicle bay installations shall be rated for wash bay

service.”

ELECTRICAL SPECIFICATIONS

Reference Specification Section 28 31 00.02 MULTIPLEX FIRE ALARM1. Fire alarm system to be single stage and voice communication is not required

*** END OF ADDENDUM ***

Page 13: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

ASK-1

···

PROJECT NO.

DATE

TITLE FIGURE NO.

PROJECT

1-

PLAN3/8" = 1'-0"

ASK-1

SECTION1" = 1'-0"

52BL
Line
52BL
Line
Page 14: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

SCALE: NTS-

21 GYPSUM BOARD CEILINGCEILING HATCH -

PIANO HINGE

SEAL TO FRAME ASREQUIRED TO

MAINTAIN CONTINUITYOF VAPOUR BARRIER

GYPSUM BOARDCEILING

METAL ENCLOSURE TOKEEP OUT BLOWN-IN

INSULATION, USE HEM ATTOP TO ENSURE NO SHARP

EDGES

BLOCKING ASREQUIRED

BLOWN-ININSULATION

INSULATED ROOFACCESS HATCH, 2"RIGID INSULATION

SELF-CLOSINGSPRING ANDBRACKET

HATCH FRAME

SLAM LATCH

HATCH RELEASE

REVISIONS

DRAWING NUMBER:

DRAWING NAME:

PROJECT NAME:

DESCRIPTION REV NO. DATE

MSK-1

ATTIC HATCHDETAIL

AM

CBRFS SYDNEYFIRE STATION 1

CHECKED BY:

AMDRAWN BY:

AS NOTEDSCALE:

16-JUL-2020DATE:

ANSI ASHEET SIZE:

702REF DWG:

0 20-JUL-2020ISSUED FOR ADDENUM

Page 15: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 22 16 00 Sydney Fire Station No. 1 BREATHING AIR SYSTEMS Page 1 of 4 Sydney, Nova Scotia June 2020

1 GENERAL

1.01 SUMMARY

.1 Section Includes: .1 Materials and installation for piping, fittings, equipment used in breathing air

systems.

1.02 REFERENCE STANDARDS

.1 American Society of Mechanical Engineers (ASME) .1 ASME Boiler and Pressure Vessel Code Section VIII Pressure Vessels.

.1 BPVC-VIII B - 2017, BPVC Section VIII - Rules for Construction of Pressure Vessels Division 1.

.2 Compressed Gas Association (CGA) .1 CGA G-7.1-2018, Commodity Specification for Air

.3 CSA Group (CSA) .1 CSA B51-03, Boiler, Pressure Vessel, and Pressure Piping Code.

.4 Health Canada/Workplace Hazardous Materials Information System (WHMIS) .1 Safety Data Sheets (SDS).

1.03 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submittals in accordance with Section 01 33 00 - Submittal Procedures.

.2 Product Data: .1 Submit manufacturer's printed product literature, specifications and datasheet for

piping, fittings and equipment. .2 Submit WHMIS SDS in accordance with Section 02 81 00 - Hazardous Materials.

Indicate VOC's for adhesive and solvents during application and curing.

.3 Shop Drawings: .1 Submit shop drawings to indicate project layout including layout, dimensions and

extent of piping system. .1 Test Reports: submit certified test reports from approved independent

testing laboratories indicating compliance with specifications for specified performance characteristics and physical properties.

.2 Certificates: submit certificates signed by manufacturer certifying that materials comply with specified performance characteristics and physical properties.

.3 Instructions: submit manufacturer's installation instructions.

.4 Closeout Submittals: submit maintenance and engineering data for incorporation into manual specified in Section 01 78 00 - Closeout

Page 16: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 22 16 00 Sydney Fire Station No. 1 BREATHING AIR SYSTEMS Page 2 of 4 Sydney, Nova Scotia June 2020

Submittals.

1.04 QUALITY ASSURANCE

.1 Health and Safety: .1 Do construction occupational health and safety in accordance with Section

01 35 29.06 - Health and Safety Requirements.

1.05 DELIVERY, STORAGE AND HANDLING

.1 Waste Management and Disposal: .1 Separate waste materials for reuse and recycling in accordance with Section

01 74 19 - Waste Management and Disposal. .2 Remove from site and dispose of packaging materials at appropriate recycling

facilities. .3 Collect and separate for disposal paper plastic polystyrene corrugated cardboard

packaging material in appropriate on-site bins for recycling in accordance with Waste Management Plan (WMP).

.4 Separate for reuse and recycling and place in designated containers Steel, Metal and Plastic waste in accordance with Waste Management Plan (WMP).

.5 Handle and dispose of hazardous materials in accordance with CEPA, TDGA, Regional and Municipal regulations.

.6 Divert unused metal materials from landfill to metal recycling facility.

2 PRODUCTS

2.01 FLEXIBLE HOSE

.1 Piping: nylon with aramid fiber reinforcement and polyurethane cover.

.2 Fittings and couplings: .1 As recommended by tubing manufacturer.

.3 Maximum operating pressure: 6000 psi constant pressure @ 75°F; minimum burst pressure safety factor of 4.

.4 Acceptable material: .1 ¼” ID: Parker Parflex 526BA-4 – Grade E breathing air hose.

2.02 BREATHING AIR INTAKE HOSE

.1 Piping: PVC to CSA B137.5 and to requirements of Section 23 13 16.16 – Sanitary Waste and Vent Piping – Plastic.

2.03 AIR COMPRESSOR, AIR CYLINDERS, FILL STATION

.1 Existing, provided by owner, installed by this contractor.

Page 17: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 22 16 00 Sydney Fire Station No. 1 BREATHING AIR SYSTEMS Page 3 of 4 Sydney, Nova Scotia June 2020

.1 Air compressor: Jordair AIR KAT6 1214-3E.

.2 Fill station: Jordair J-FFS-DF3 c/w remote cylinder fill wand and wall-mounted isolation valve.

.3 Air cylinders: 4 x 88.9 kg air cylinders c/w tubing pigtails, isolation valves, regulators and pressure gauges. Provide Unistrut rack and cylinder clamps in accordance with system manufacturer’s requirements and as required to secure breathing air cylinders.

3 EXECUTION

3.01 MANUFACTURER'S INSTRUCTIONS

.1 Compliance: comply with manufacturer's written recommendations or specifications, including product technical bulletins, handling, storage and installation instructions, and datasheet.

3.02 BREATHING AIR COMPRESSOR

.1 Install on vibration isolators on housekeeping pad as indicated and in accordance with manufacturer’s recommendations.

3.03 BREATHING AIR CYLINDERS

.1 Install on unistrut rack with cylinder clamps in accordance with system manufacturer’s requirements and as required to secure breathing air cylinders.

3.04 BREATHING AIR CYLINDER FILL STATION

.1 Install in wash bay with removable cover.

.2 Mount relocated manual cylinder fill wand isolation valve on wall adjacent to fill station.

3.05 BREATHING AIR COMPRESSOR INTAKE PIPING

.1 Thoroughly clean the inside of the breathing air compressor intake piping. Connect to relocated breathing air compressor intake filter.

3.06 BREATHING AIR TUBING

.1 Install in accordance with manufacturer’s instructions.

.2 Connect to existing relocated breathing air system components. Re-use existing tubing, fittings and valves as possible.

3.07 FIELD QUALITY CONTROL

.1 Site Tests/Inspection: .1 Testing: pressure test for 4 hours minimum, to 1-1/2 times the maximum

Page 18: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 22 16 00 Sydney Fire Station No. 1 BREATHING AIR SYSTEMS Page 4 of 4 Sydney, Nova Scotia June 2020

allowable pressure, with outlets closed and with compressor, fill station and cylinders isolated from system. Pressure drop not to exceed 10 psi.

.2 Obtain reports within 3 days of review and submit immediately to Consultant.

3.08 CLEANING

.1 Refer to Section 23 08 16 - Cleaning and Start-Up of HVAC Piping Systems.

.2 Cleaning: blow out piping to clean interior thoroughly of foreign matter.

.3 Check entire installation is approved by authority having jurisdiction.

.4 Perform cleaning operations in accordance with manufacturer's recommendations.

.5 Upon completion and verification of performance of installation, remove surplus materials, excess materials, rubbish, tools and equipment.

END OF SECTION

Page 19: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 17, 2020

ADDENDUM #2

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Robina Dunn Robina Dunn, Procurement Officer

Page 20: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 1Sydney, Nova Scotia July 17, 2020

1. INTENT .1 This addendum forms an integral part of the Bid Documents covering allaspects of this Project and is to be read in conjunction therewith. Shouldpoints arise which are at variance, this Addendum shall take precedence.

.2 The purpose of this Addendum is to add to, clarify and/or to amend the BidDocuments.

.3 The Addendum comprises 8 pages of text (including this page).

2. Reference DRAWING 101 SITE PLAN

1. The four traffic signals on George Street and the two traffic signals on Bentinck Street,complete with the specified aluminum pole structures and concrete sono tube foundations,are included in the scope of work of this contract. Also included is all of the buried conduit tosupply power to the traffic signals, except for the buried conduit that crosses under GeorgeStreet, as specified in Item 10 of this Addendum, on page 2.

3. Reference DRAWING 604 PLUMBING CONTROLS AND SCHEMATICS

1. Revise Detail 17 – DOMESTIC WATER ENTRANCE as follows: Water meter shall be provided byCBRM, coordinate pipe size, straight pipe lengths and installation requirements with CBRM andwater meter manufacturer’s requirements.

4. Reference DRAWING 701 HVAC PLANS LEVEL 1 & LEVEL 2:1. Add following general note to Lv.2 HVAC Plan: “Provide removable insulated access panels w/

weather seal and frames in gypsum board ceiling for access to VAV box controls and electric reheatcoil controls, bypass damper actuator and balancing dampers. Include sheet metal box with opentop above panel. Supply and installation of panels and frames by Div. 23. Coordinate with VAV boxand reheat coil locations and roof truss locations. Access to VAV boxes and reheat coils shall bebelow VAV and reheat coil control panel.”

5. Reference DRAWING 702 HVAC PARTIAL PLANS & DETAILS SHEET 1:1. Revise Detail 1 – ROOFTOP AHU and Detail 11 – STAND-MOUNTED AHU as follows: Remove

reference to acoustic duct liner; sound attenuation will be by duct silencers indicated on drawing#701.

6. Reference DRAWING 703- HVAC PARTIAL PLANS & DETAILS SHEET 2

1. Add balancing dampers to O/A and E/A ducts for ERV-1 located in 206 – MECH RM.

7. Reference DRAWING 704- HVAC CONTROLS AND SCHEMATICS:1. Revise ERV Control Schematic as follows: O/A and E/A dampers shall be 120V, powered and

controlled from ERV control panel. Wiring by Div. 25.

Page 21: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 2Sydney, Nova Scotia July 17, 2020

2. Revise Tower Exhaust Fan Control Schematic as follows: Remove reference to fan starter,replace with back box w/ control transformers by Div. 26. O/A and E/A dampers shall be normallyclosed, powered from back box.

8. Reference DRAWING 705- HVAC SCHEDULES SHEET 1:

1. Revise ERV schedule as follows: Remove requirement for factory-mounted non-fuseddisconnect switch.”

9. Reference DRAWING 800 ELECTRICAL LEGEND & LUMINAIRE SCHEDULE1. Provide another traffic signal connection at the traffic light system on Bentick Street (refer to civilDrawing No. 101 for locations of the two traffic signals located on Bentinck Street). Provide2#12AWG + #12B and duct as detailed in E/801.2. Only the lights/controls specified on the plans are to be included in the base tender Lump Sum Price,the contractor has the option to submit an alternate lighting package with an itemized breakdown(with associated cost savings) in his bid. The Owner reserves the right to accept or decline thealternate lighting package.

10. Reference DRAWING 801 ELECTRICAL SITE PLAN AND SECTIONS1. Include the supply and installation of all buried conduit for the Traffic Lights, except for thefollowing, which will be completed by others during the Upgrading and Repaving of George StreetProject:

1. The buried conduit to be installed under George Street to the Traffic Signals on theEast side of George Street as per Detail E/801 is not in this contract, and will beinstalled by others. All other buried conduit for the traffic signals are included in thiscontract, including the buried conduit running north/south on each side of GeorgeStreet, and the buried conduit to the two traffic signals on Bentinck Street.

11. Reference DRAWING 803 POWER PLAN1. Traffic light push-button for TIM600 controller to be located near Eye wash station in Vehicle Bay.Coordinate exact location with fire chief prior to rough in.2. Delete shunt trip on kitchen range breaker (111-17,19) and in lieu provide a contactor (c/w240/120V control transformer) and E-stop "maintained contact" mushroom style illuminated push-button (to be located near the kitchen exit door on the latch side). "PUSH TO POWER OFF STOVE, PULLTO RESET". System to interrupt the range circuit (111-17,19) to ensure the stove is not left energizedwhen the area is quickly vacated during fire calls. Provide lamicoid nameplate identification near the E-stop button and at stove clearly identifying the remote stop function.

12. Reference DRAWING 808 MECHANICAL HOOKUPS PLAN - UPPER FLOOR1. ERV-1 (as shown on the plan, but missing from the mechanical schedule) is to be circuited from a20A-1P breaker CCT 121-36 as indicated on Drawing 812 (coordinate exact requirement withmechanical contractor)

13. Reference DRAWING 811 LIGHTING SEQUENCE OF OPERATIONS1. Where the lighting controls sequence of operations varies for normal working hours (i.e. Foyer,Stairwells, Hall, etc.), the controllers are to be networked, programmable (and easily modifiable) by theoccupant via software application or button control.

Page 22: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 3Sydney, Nova Scotia July 17, 2020

FORM OF TENDER1. Replace Schedule A on page 11 of the Form of Tender with the new page 11 attached.2. Replace Schedule B on page 12 of the Form of Tender with the new page 12 attached3. Schedule B is to be filled in and included with the tender submission, but it is not included in

the Total Tendered Price in Schedule A.4. Schedule C breakdown of the Lump Sum Price is not required to be submitted with the Tender

submission before the Tender Closing date and time, however, Schedule C must be submittedby email to the Consultant within 24 hours of the tender closing to the email address below:[email protected]

INFORMATION FOR TENDERERS1. Add the following sentence on page 7, item 26- COMMISSIONING, AND START-UP

PROCEDURES: “The contract is expected to be awarded on or before August 3, 2020. All work,start-up and commissioning is to be completed no later than March 31, 2021.”

DIVISION 1 SPECIFICATIONS

Reference Specification Section 01 52 00 – CONSTRUCTION FACILITIES:1. Replace 1.13.5 with - “Construction Sign and notices for safety and instruction shall be in

English and the graphic symbols shall conform to CSA3-Z321.2. Add sentence 1.13.7 as follows: “Construction Sign to be 4’ x 8’ in size. Graphics for sign to be

provided to the Contractor by the Consultant in digital format.

DIVISION 3 SPECIFICATIONS

Reference Specification Section 03 41 00 – TILT-UP CONCRETE WALL PANELS1. Revise Item 1.4.1.1 to read as follows:

Site Cast Tilt-up Concrete Panels or Precast Concrete Panels fabricated in a Precast Plant will beaccepted for this project. Where Precast Concrete panels are proposed; the design,fabrication, and erection of the precast concrete wall panels shall conform to CSA-A23.4. Theprecast concrete panels shall also meet the requirements of the Contract Documents for thisproject, including Specification Section 03 41 00.

ARCHITECTURAL SPECIFICATIONS

Reference Specification Section 074213 - METAL WALL PANELS

1. Revise paragraph 2.1.1 to read as follows; Acceptable Products to be ALPOLIC composite metalpanels, Larson Composite Panels by Alucoil or pre-approved equivalent.

Reference Specification Section 075323 - EPDM ROOFING

1. Revise paragraph 2.3.1 to read as follows; Roofing and Flashing Membrane: BLACK curedsynthetic single-ply membrane composed of ethylene propylene diene terpolymer (EPDM)90 mil. RubberGard Non-Reinforced EPDM Membrane by Firestone, Carlie or pre approvedequivalent

Page 23: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 4Sydney, Nova Scotia July 17, 2020

Reference Specification Section 095199 - ACOUSTIC CEILINGS

1. Add paragraph 2.1.11 to read as follows; Equivalent CGC Inc. products are acceptable.

Reference Specification Section 096519 - RESILIENT FLOORING

1. Revise paragraph 2.1.1 to read as follows; Luxury Vinyl Tile (LVT): Wood-look, vinyl-plankflooring; 184mm x 1219mm x 2.5mm overall thickness with 0.5 mm Wearlayer. Beveled edge,Woodgrain Smooth Textured Embossing Look. 10 Years Commercial Warranty. Product to beCreation 55 by Gerflor Flooring Group or pre-approved equivalent. Colour to be selected fromManufacturers standard range. Allow for selection of three colours to be applied in a basicpattern including a border and field in larger rooms.

2. Add paragraph 2.1.7 to read as follows; VCT-1: 305 x 305 x 3mm Azrock TEXTILE – ResilientVinyl Composition Tile Flooring by Johnsonite or approved equivalent. Colour to be selectedfrom Manufacturers standard range. For use in service rooms as indicated on the Drawing 301.

Reference Specification Section 097051 - RESINOUS COATING SYSTEMS

1. Revise paragraph 1.1.2 to read as follows; To supply and install a Resinous coating system c/wcontrol joint sealant, Integral Cove Base and related accessories.

2. Revise paragraph 2.1.1 to read as follows; Stonshield SLT, a 100% solids, 3mm thicknessresinous quartz doubled broadcast system Manufactured by STONHARD Inc, comprised oftwo-component penetrating primer, two-component free flowing epoxy formulation,Stonshield coloured quartz aggregate, two-component clear epoxy sealer with two-componentUV, stain and chemical resistant topcoat. 4" Integral Cove Base with 1" radius.

3. Add paragraph 2.1.5 to read as follows; An equivalent System by Laticrete is acceptable.

4. Revise Section 3.2 APPLICATION to read as follows;

1. Standard Primer is mixed then applied to the floor with a squeegee and nap roller.StonshieldAggregate is broadcast into the wet primer using a special Stonhard Spraycaster. Allow 8hours to cure, then sweep off excess aggregate.

2. Stonshield Undercoat is mixed then applied with a squeegee, then rolled with a mediumnap roller. The undercoat is applied with a steel squeegee.

3. Stonshield Aggregate is broadcast into the freshly rolled undercoat using a special StonhardSpraycaster to ensure even distribution of the aggregate. Allow at least 8 hours to cure.

4. Scrape and sweep the floor to remove all loose aggregate particles, then vacuum.

5. Stonkote CE4 sealer is mixed then applied. For a standard texture, the sealer is appliedusing a rubber squeegee and then rolled using a medium nap roller. For a medium texture, the

Page 24: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 5Sydney, Nova Scotia July 17, 2020

sealer is applied using a rigid rubber squeegee and then rolled using a saturated, medium naproller.

6. Topcoat of Stonseal SK6, a two-component high gloss polyurethane/polyurea UV, chemicaland stain resistant clear sealer.

MECHANICAL SPECIFICATIONS

Reference Specification Section 21 12 00 – FIRE SUPPRESSION STANDPIPES AND HOSE ASSEMBLIES:1. Add paragraph 2.01.2 as follows: “.2 Standpipe is for training purposes only and is a dry type

standpipe with no permanent water connection.”

Reference Specification Section 22 15 00 – GENERAL SERVICE COMPRESSED AIR SYSTEMS:1. Revise paragraph 2.01.9 to read as follows: “.9 Acceptable material: Ingersoll Rand, Omega, or

approved equivalent.”

Reference Specification Section 23 05 48 – VIBRATION AND SEISMIC CONTROLS FOR HVAC:1. Add paragraph 1.02.4 as follows: “.4 National Building Code of Canada 2015.”2. Revise paragraph 1.03.2.1 to read as follows: “.4 Mechanical contractor shall provide a

complete seismic restraint design for the mechanical systems including equipment listed in thisSection including all applicable ducting, piping, specialties and equipment, stamped by aprofessional engineer registered or licensed in Province of Nova Scotia, Canada.”

3. Add paragraph 2.12.1.9 as follows: “.9 Seismic restraint design to comply with therequirements of the National Building Code of Canada 2015.”

4. Add paragraph 2.12.3.4 as follows: “.4 Curb-mounted rooftop equipment shall be mounted onseismically restrained vibration isolation bases that fit over the roof curb and under the isolatedequipment.”

5. Add paragraph 2.12.7 as follows:“.7 Site seismic design criteria:

.1 Site Class = C

.2 Sa(0.2) = 0.108.

.3 Fa = 1.0

.4 IE = 1.5 (Post-disaster).”

Reference Specification Section 23 35 16 – ENGINE EXHAUST SYSTEMS:1. Add paragraph 2.03.2 as follows: “.2 Provide blast gate dampers for balancing purposes in

vehicle exhaust system as indicated on drawings. Blast gate dampers shall be of galvanizedconstruction, rated for temperature and pressure of vehicle exhaust system.”

2. Revise paragraph 2.05.1 to read as follows: “.1 Standard of acceptance: NedermanMagnaTrack. Due to Owner’s operational requirements, no alternates will be permitted.”

Reference Specification Section 23 36 00 – AIR TERMINAL UNITS:1. Add paragraph 2.03.12 as follows: “.12 For Level 2 VAV boxes only: Control and electrical

connection shall be from bottom of unit, control panel shall be mounted to bottom of VAV box foraccess from below.”

Page 25: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 2 PAGE 6Sydney, Nova Scotia July 17, 2020

Reference Specification Section 23 74 00 – PACKAGED OUTDOOR HVAC EQUIPMENT:1. Add section 2.09 – ELECTRICAL as follows:

.1 Electrical: as indicated on drawing schedules.

.2 Unit to have single point electrical connection with factory-mounted non-fuseddisconnect..3 Provide w/ unpowered 115V, 15A convenience receptacle.”

Reference Specification Section 23 82 16.14 – ELECTRIC-RESISTANCE AIR COILS:1. Add paragraph 2.01.5.4 as follows: “.4 For Level 2 reheat coils only: Control panel shall be

configured for bottom access.”

Reference Specification Section 23 83 00.13 – RADIANT HEATERS – ELECTRIC INFRARED:2. Add paragraph 2.02.3 as follows: “.3 Provide NEMA 4X enclosure with terminal blocks and

control relay for on/off control by Building Automation System.”

Reference Specification Section 25 05 01 – EMCS: GENERAL REQUIREMENTS:1. Add Section 2.05 - ACCEPTABLE EQUIPMENT to read as follows: “.1 Building Automation

System shall be Trane Tracer SC+ with Synchrony user interface. No substitutions shall bepermitted.

*** END OF ADDENDUM ***

Page 26: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services PART ISydney Fire Station No. 1 June 2020Sydney, Nova Scotia FORM OF TENDER Page 11 of 15

CAPE BRETON REGIONAL MUNICIPALITYSYDNEY FIRE STATION No. 1SCHEDULE OF PRICES

SCHEDULE A(TO BE COMPLETED BY ALL TENDERS)

Refer to Division 1, Section 01010, Measurement and Payment for the Basis of Payment and Details ofwork:

ITEMNO. DESCRIPTION AMOUNT

1. Complete construction of the Sydney Fire Station No. 1 Facilityincluding the complete supply of materials and labour asspecified herein and shown on the Drawings. $

2. Contingency Allowance*$50,000.00

3. HST$

TOTAL TENDERED PRICE **$

Estimated Cost of Materials and Equipment$

Estimated Cost of Labour and all other items$

Contingency Allowance $50,000.00

HST$

TOTAL TENDERED PRICE **$

* The Tenderer agrees that no part of the Contingency Allowance covered by Item 2 in theSchedule of Prices shall be expended without the written direction of the Consultant, and any partnot so expended shall be deducted in whole from the Total Tendered Price.

** These two totals must be identical.

Page 27: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services PART ISydney Fire Station No. 1 June 2020Sydney, Nova Scotia FORM OF TENDER Page 12 of 15

CAPE BRETON REGIONAL MUNICIPALITYSYDNEY FIRE STATION No. 1SCHEDULE OF ADDITIONAL UNIT PRICES

SCHEDULE B- PROVISIONAL ITEMS(TO BE COMPLETED BY ALL TENDERERS AT THE TIME OF TENDER.)

ITEMNO. DESCRIPTION UNIT

PROVISIONALQUANTITY

UNITPRICE AMOUNT

1. Additional excavation, (Common) &disposal

m3 500

2. Additional excavation, (Rock) &disposal

m3 100

3. Backfill of additional excavationwith Pit Run Slag Material

Tonne 1000

4. Backfill of additional excavationwith Pit Run Sand & GravelMaterial

Tonne 500

5. Type I Fill Tonne 250

6. Type 2 Fill Tonne 250

7.

8.

9.

10.

11.

12.

13.

14.

TOTAL PROVISIONAL SUM* $ .

* The Tenderer agrees that no part of the Provisional Sum in Schedule B shall be expended without thewritten direction of the Consultant.

Page 28: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

A Community of Communities

320 Esplanade

Sydney, Nova Scotia B1P 7B9

Tel: 902-563-5015 Fax: 902-539-9964

email:[email protected]

JULY 13, 2020

ADDENDUM #1

RE: CBRM_T21-2020 SYDNEY CENTRAL FIRE STATION #1, PITT STREET, SYDNEY, NS

To Whom It May Concern: With reference to the above noted tender, please see the attached documents. If you have any questions, please contact our office at [email protected] Sincerely, Donna M. Murphy Donna M. Murphy, Procurement Officer

Page 29: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 1 PAGE 1Sydney, Nova Scotia July 13, 2020

1. INTENT .1 This addendum forms an integral part of the Bid Documents covering allaspects of this Project and is to be read in conjunction therewith. Shouldpoints arise which are at variance, this Addendum shall take precedence.

.2 The purpose of this Addendum is to add to, clarify and/or to amend the BidDocuments.

.3 The Addendum comprises 46 pages of text (including this page).

2. Reference DRAWING 100 EXISTING SITE & REMOVALS PLAN

1. Revise the note stating “Existing Trees to be removed and reinstated on site”. To read “ExistingTrees to be removed and disposed of offsite.”

3. Reference DRAWING 302 BUILDING ELEVATIONS, DRAWING 304 TYPICALSECTION DETAILS AND DRAWING 305 ENLARGED SECTION DETAILS

1. Note that the gable ends of the Vehicle Bays (Grid A & G) are to be Tilt-up Concrete Panels asshown in Detail 3/304.

2. Reference Detail 5/305; 45 degree angled Panel Joints are not acceptable. All Panel Joints are tobe perpendicular to the panels and are to be a minimum of the overall panel thickness awayfrom the outside corners.

4. Reference DRAWING 501 UPPER FLOOR & ROOF FRAMING PLAN

1. For the roof framing plan at the Fire Truck Bays, there will be no gable end trusses, as the tilt-upconcrete wall panels will extend up to meet the sloped roof as shown in Detail 3/304.

5. Reference DRAWING 800 ELECTRICAL LEGEND & LUMINAIRE SCHEDULE

.1 Revise type 4 luminaire to Teron Lighting Cat. No. EE-L30.0-ZE1000-120V-PRF-TB-35K or equivalent. Type 4 to be surface mounted.

.2 Revise type 10 luminaire to WAC Lighting Cat. No. DC-WD06-70W-N-840-S-BK.Type 10 to be mounted 8’5” A.F.F. (to be confirmed with architect prior to rough in)

.3 Note: Alternates must be pre-approved prior to tender close.

6. Reference DRAWING 803 POWER PLANS

.1 Add a duplex receptacle mounted 60" a.f.f. in Fitness Room 205 on center of 'Fire Gallery'wall, circuit from 121-8.

7. Reference DRAWING 804 LIGHTING PLANS

.1 2 (of 4) type 11 lights shown on main floor layout at front canopy to be located at upper roof

Page 30: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 1 PAGE 2Sydney, Nova Scotia July 13, 2020

soffit.

.2 All exterior downlights (type 11) to have black trims.

.3 Delete Type 4 lights in conference room 218 (type 5 to remain)

(Note: type 4’s to be installed in Foyer 101 & Lobby 201 only)

8. Reference DRAWING 807 MECHANICAL HOOKUPS PLAN- MAIN FLOOR

.1 EF-2, associated disconnect, and branch circuit wiring shall be relocated fromSouthwest wall of Vehicle bay #2 to Southeast wall of vehicle bay #2.

.2 ERV-2, associated disconnect, and branch circuit wiring shall be relocated further Weston South wall of Vehicle bay #2.

.3 BA-1, associated disconnect and branch circuit wiring shall be relocated from East wallof Pack/Comp/Water room 103 to West wall of pack/comp/water room 103.

.4 P-1, branch circuit wiring, and receptacle shall be relocated from North wall ofPack/Comp/Water 103 to East wall of Pack/Comp/Water Room 103.

.5 Hose Dryer (HD), associated disconnect, and branch circuit wiring shall be relocatedfurther West on Vehicle Bay #2 South wall.

.6 EF-4 and EF-6, add 120V reverse acting thermostat to be supplied installed and wiredby electrical contractor. Add supply, install, and wire branch circuit wiring and suitablebackbox for Controls Contractor supplied and installed control transformer for dampers,use spare 15A-1P Breaker in Panel 111.

.7 EF-5, add 120V reverse acting thermostat to be supplied, installed, and wired byelectrical contractor.

.8 Detail 1/807, change “reverse acting thermostat supplied by others, installed and wiredby electrical contractor” to read “reverse acting thermostat supplied, installed, and wiredby electrical contractor.”

.9 Add supply, install, and wire branch circuit wiring and suitable backbox in Vehicle Bay#2 for Controls Contractor supplied and installed control transformer for dampers. Usespare 15A-1P breaker in Panel 112.

.10 Add supply, install, and wire branch circuit wiring for four vehicle exhaust system railsin Vehicle Bays. Use spare 15A-1P breaker in Panel 112. Coordinate location withMechanical Contractor.

9. Reference DRAWING 808 MECHANICAL HOOKUPS PLAN- UPPER FLOOR

.1 VAV-8 and RH-8, relocate all associated electrical equipment from Chief’s office 222 toConference Room 218.

Page 31: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire ServicesSydney Fire Station No. 1 ADDENDUM NO. 1 PAGE 3Sydney, Nova Scotia July 13, 2020

COMMISSIONING SPECIFICATIONS

Add Specification Section 01 79 00.13 – DEMONSTRATION AND TRAINING FOR BUILDINGCOMMISSIONING (Attached)

Add Specification Section 01 91 13 – GENERAL COMMISSIONING REQUIREMENTS (Attached)

Add Specification Section 01 19 13.13 – COMMISSIONING PLAN OUTLINE (Attached)

Add Specification Section 01 19 13.16 – COMMISSIONING FORMS. (Attached)

Add Commissioning Plan – Preliminary (Attached)

ARCHITECTURAL SPECIFICATIONS

Reference Specification Section 07 42 13 - METAL WALL PANELS.

1. Delete paragraphs 1.1.2, 1.1.3 & 1.1.4.

Reference Specification Section 07 53 23 - EPDM ROOFING.

1. Revised paragraph 3.4.1 to read as follows; “Mechanical Attachment: Mechanically fasteninsulation & cover board in accordance with membrane manufacturer's instructions andrecommendations in order to achieve specified warranties.”

Add Specification Section 09 49 00 GLASS FIBRE REINFORCED CONCRETE (Attached)

Reference Specification Section 10 90 00 - MISCELLANEOUS SPECIALTIES.

1. Revised paragraph 2.1.1 to read as follows; “Acceptable Manufacturer: Lincora CanadaLockers, GSS Systems, Hadrian Emperor Lockers or pre-approved equivalent.”

2. Revised paragraph 2.6.1 to read as follows; Supply and Install two Letter Signs as shown onElevations. Letter to be Times Bold Font, 15” high x 1.25” Thick, Cast Aluminum - BlackAnodized Finish. Letters to be have threaded stud bosses for thread insertion c/w template.Acceptable Manufacturer: Gemini Letters or pre-approved equivalent.

ELECTRICAL SPECIFICATIONS.1 Delete Specification Section 28 23 00 VIDEO SURVEILLANCE

CCTV is not a project requirement.

CIVIL SPECIFICATIONS.1 Reference Specification Section 31 23 01 EXCAVATION FOR STRUCTURES; add

clause 3.6.3 as follows:

The tipping fee at the CBRM Landfill Site will be waived for the disposal of the surplusexcavated material.

*** END OF ADDENDUM (see attached specifications) ***

Page 32: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 79 00.13 Sydney Fire Station No. 1 DEMONSTRATION AND TRAINING FOR Page 1 of 3 Sydney, Nova Scotia BUILDING COMMISSIONING June 2020

1 GENERAL

1.01 SUMMARY

.1 Section Includes: .1 This Section specifies roles and responsibilities of Commissioning Training.

1.02 TRAINEES

.1 Trainees: personnel selected for operating and maintaining this facility. Includes Property/Facility Manager, building operators, maintenance staff, security staff, and technical specialists as required.

.2 Trainees will be available for training during later stages of construction for purposes of familiarization with systems.

1.03 INSTRUCTORS

.1 Contractor and certified factory-trained manufacturers' personnel: to provide instruction on the following: .1 Start-Up, operation, shut-down of equipment, components and systems. .2 Control features, reasons for, results of, implications on associated systems of,

adjustment of set points of control and safety devices. .3 Instructions on servicing, maintenance and adjustment of systems, equipment and

components.

1.04 TRAINING OBJECTIVES

.1 Training to be detailed and duration to ensure: .1 Safe, reliable, cost-effective, energy-efficient operation of systems in normal and

emergency modes under all conditions. .2 Effective on-going inspection, measurements of system performance. .3 Proper preventive maintenance, diagnosis and trouble-shooting. .4 Ability to update documentation. .5 Ability to operate equipment and systems under emergency conditions until

appropriate qualified assistance arrives.

.2 Provide training for all commissioned systems and equipment in accordance with Cx Plan.

1.05 TRAINING MATERIALS

.1 Instructors to be responsible for content and quality.

.2 Training materials to include: .1 "As-Built" Contract Documents.

Page 33: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 79 00.13 Sydney Fire Station No. 1 DEMONSTRATION AND TRAINING FOR Page 2 of 3 Sydney, Nova Scotia BUILDING COMMISSIONING June 2020

.2 Operating Manual.

.3 Maintenance Manual.

.3 PM, CxA and Facility/Property Manager will review training manuals and materials.

.4 Training materials to be in a format that permits future training procedures to same degree of detail.

.5 Supplement training materials: .1 Transparencies for overhead projectors. .2 Multimedia presentations. .3 Manufacturer's training videos. .4 Equipment models.

1.06 SCHEDULING

.1 Include in Commissioning Schedule time for training.

.2 Deliver training during regular working hours, training sessions to be minimum 3 hours in length and as required to fully train participants on the equipment and systems.

.3 Training to be completed prior to acceptance of facility.

1.07 RESPONSIBILITIES

.1 Be responsible for: .1 Implementation of training activities, .2 Coordination among instructors, .3 Quality of training, training materials,

.2 CxA will evaluate training and materials.

1.08 TRAINING CONTENT

.1 Training to include demonstrations by Instructors using the installed equipment and systems.

.2 Content includes: .1 Functional requirements. .2 System philosophy, limitations of systems and emergency procedures. .3 Review of system layout, equipment, components and controls. .4 Equipment and system start-up, operation, monitoring, servicing, maintenance

and shut-down procedures. .5 System operating sequences, including step-by-step directions for starting up,

shut-down, operation of valves, dampers, switches, adjustment of control settings and emergency procedures.

.6 Maintenance and servicing.

.7 Trouble-shooting diagnosis.

Page 34: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 79 00.13 Sydney Fire Station No. 1 DEMONSTRATION AND TRAINING FOR Page 3 of 3 Sydney, Nova Scotia BUILDING COMMISSIONING June 2020

.8 Review of O&M documentation.

.3 Provide specialized training as specified in relevant Technical Sections of the construction specifications.

1.09 VIDEO-BASED TRAINING

.1 Manufacturer's videotapes may be used as training tool in conjunction with live, in-person instruction by knowledgeable trainers/instructors.

.2 On-Site training videos: .1 Record training sessions for use during future training. .2 To be performed after systems are fully commissioned. .3 Organize into several short modules to permit incorporation of changes.

.3 Production methods to be high quality; use tripod to secure recording device, ensure that recording device is moved as required to allow for all necessary information to be recorded.

.4 Ensure that volume levels are sufficient, presenter to wear microphone if necessary for sufficient audio volume on recording.

1.10 ATTENDANCE

.1 Owner shall provide a list of personnel to be trained during each session.

.2 Instructors shall use the list of personnel to be trained to develop training attendance sheets, leaving blank spaces at the bottom for additional attendees to sign.

.3 Owner’s personnel shall sign the attendance sheet. Instructors shall note if attendees leave the session without signing the sheet.:

.4 Include attendance records as part of the training record and O&M information.

2 PRODUCTS

2.01 NOT USED

.1 Not Used.

3 EXECUTION

3.01 NOT USED

.1 Not Used.

END OF SECTION

Page 35: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 1 of 10 Sydney, Nova Scotia June 2020

1 GENERAL

1.01 SUMMARY

.1 Section Includes: .1 General requirements relating to commissioning of project's components and

systems.

.2 Acronyms: .1 BAS – Building Automation System .2 CC – Controls Contractor .3 CM – General Contractor’s Construction Manager .4 Cx – Commissioning. .5 CxA – Commissioning Authority .6 Cx Plan – Commissioning Plan .7 EC – Electrical Contractor .8 EMCS – Energy Monitoring and Control Systems. .9 FPT – Functional Performance Testing .10 GC – General Contractor .11 MC – Mechanical Contractor .12 O&M – Operation and Maintenance. .13 Subs – Subcontractors to General Contractor (EC, MC, CC, TAB, etc) .14 TAB - Testing, Adjusting and Balancing Contractor.

1.02 GENERAL

.1 Cx is a planned program of tests, procedures and checks carried out systematically on systems and integrated systems of the finished Project. Cx testing is performed after systems and integrated systems are completely installed, Contractor's pre-functional/start-up testing responsibilities have been completed and approved. General objectives: .1 Verify installed equipment, systems and integrated systems operate properly in

accordance with Contract Documents and design criteria and intent. .2 Ensure appropriate documentation is compiled into the O&M manuals. .3 Effectively train O&M staff.

.2 Cx is a process which begins at the start of construction. Cx testing includes prefunctional/startup testing and full-scale systems-based Functional Performance Testing (FPT). Cx and Cx testing may be used interchangeably.

.3 GC shall designate a Construction Manager (CM) as the primary point of contact between the CxA and the GC and Subs. CM shall be responsible for obtaining required Cx documentation from GC and Subs for the CxA as well as convey communications between CxA and GC/Subs.

.4 CM, through the GC, is responsible for performance of Cx requirements by EC, MC, CC,

Page 36: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 2 of 10 Sydney, Nova Scotia June 2020

TAB and other relevant Subs on this project.

.5 GC and Subs assist in Cx process, provides labour for and conducts equipment and systems testing, troubleshooting and making adjustments as required. .1 Systems to be operated at full capacity under various modes to determine if they

function correctly and consistently at peak efficiency. Systems to be interactively with each other as intended in accordance with Contract Documents and design criteria.

.2 During these checks, adjustments to be made to enhance performance to meet environmental or user requirements.

.6 Design Criteria: as per client's requirements or determined by designer. To meet Project functional and operational requirements.

1.03 COMMISSIONING OVERVIEW

.1 Section 01 91 13.13 - Commissioning Plan.

.2 For Cx team responsibilities refer to Section 01 91 13.13 - Commissioning Plan.

.3 Cx to be a line item of Contractor's cost breakdown.

.4 Cx activities supplement field quality and testing procedures described in relevant technical sections.

.5 Cx is conducted in concert with activities performed during each stage of project delivery. Cx identifies issues Construction and testing stages to ensure the built facility is constructed and proven to operate satisfactorily under weather, environmental and occupancy conditions to meet functional and operational requirements. Cx activities includes transfer of critical knowledge to facility operational personnel.

.6 Consultant will issue Interim Acceptance Certificate when: .1 Completed Cx documentation has been received, reviewed for suitability and

approved by Consultant and CxA. .2 Equipment, components and systems have been commissioned. .3 O&M training has been completed.

.7 General Cx process summary: .1 Submission of Cx documentation to CxA. .2 Completion of pre-functional testing on all equipment that comprise the systems

that are being commissioned, including controls system checkout and TAB. .3 Completion of functional performance testing (FPT) on all systems that are being

commissioned. .4 Submission of final Cx and O&M documentation to CxA. .5 Training of Owner’s personnel. .6 Deferred/seasonal testing during warranty period.

Page 37: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 3 of 10 Sydney, Nova Scotia June 2020 1.04 NON-CONFORMANCE TO PERFORMANCE VERIFICATION REQUIREMENTS

.1 Should equipment, system components, and associated controls be incorrectly installed or malfunction during Cx, correct deficiencies, re-verify equipment and components within the unfunctional system, including related systems as deemed required by CxA, to ensure effective performance.

.2 Costs for corrective work, additional tests, inspections, to determine acceptability and proper performance of such items to be borne by Contractor. Above costs to be in form of progress payment reductions or hold-back assessments.

1.05 PRE-TESTING REVIEW

.1 Before start of pre-functional testing: .1 Ensure installation of related components, equipment, sub-systems, systems is

complete. .2 Fully understand Cx requirements and procedures. .3 Have Cx documentation shelf-ready. .4 Understand completely design criteria and intent and special features. .5 Submit complete start-up documentation to CxA. .6 Have Cx schedules up-to-date. .7 Ensure systems have been cleaned thoroughly. .8 Ensure that control systems are complete. .9 Ensure that systems are ready for TAB procedures on systems. .10 Ensure "As-Built" system schematics are available.

.2 Inform Consultant in writing of discrepancies and deficiencies on finished works.

1.06 CONFLICTS

.1 Report conflicts between requirements of this section and other sections to A/E and CxA before start-up and obtain clarification.

.2 Failure to report conflict and obtain clarification will result in application of most stringent requirement.

1.07 ACTION AND INFORMATIONAL SUBMITTALS

.1 Submittals: in accordance with Section 01 33 00 - Submittal Procedures. .1 Submit no later than 3 weeks after award of Contract:

.1 Name of Contractor's Cx representative / CM.

.2 Draft Cx documentation.

.3 Preliminary Cx testing schedule. .2 Submit proposed Cx procedures to CxA where not specified and obtain written

approval at least 12 weeks prior to start of Cx testing. .3 Provide additional documentation relating to Cx process required by CxA.

Page 38: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 4 of 10 Sydney, Nova Scotia June 2020 1.08 COMMISSIONING DOCUMENTATION

.1 CxA to review and approve Cx documentation.

.2 CM to provide completed and approved Cx documentation to CxA.

1.09 COMMISSIONING SCHEDULE

.1 CM/GC to provide detailed Cx schedule as part of construction schedule.

.2 Provide adequate time for Cx activities prescribed in technical sections and commissioning sections including: .1 Approval of Cx reports. .2 Pre-functional testing. .3 TAB & controls checkout. .4 Functional Performance Testing (FPT) .5 Repairs, retesting, re-commissioning, re-verification. .6 Training.

1.10 COMMISSIONING MEETINGS

.1 CxA to convene and chair a commissioning kickoff meeting within 60 days of the beginning of construction with representatives of CxA, A/E, PM, GC and Subs. CxA shall take notes and distribute minutes. Issues at meeting to include: .1 Review duties and responsibilities of Contractor and subcontractors, addressing

delays and potential problems. .2 Review of Cx Plan, finalize project Cx contacts and lines of reporting. .3 Review initial Cx schedule.

.2 Convene Cx meetings as part of project meetings as required. CxA shall attend select job-site construction meetings. Purpose: to resolve issues, monitor progress, identify deficiencies, relating to Cx.

.3 Continue Cx meetings on regular basis until commissioning deliverables have been addressed.

.4 CxA may convene additional dedicated Cx meetings with the GC, A/E and Subs as necessary. Meeting will be chaired by CxA, who will record and distribute minutes.

.5 Ensure GC, Subs and relevant manufacturer representatives are present at Cx kickoff meeting and subsequent Cx meetings and as required.

1.11 STARTING AND TESTING

.1 Contractor assumes liabilities and costs for inspections. Including disassembly and re-assembly after approval, starting, testing and adjusting, including supply of testing equipment.

Page 39: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 5 of 10 Sydney, Nova Scotia June 2020 1.12 WITNESSING OF STARTING AND TESTING

.1 Provide 21 days notice prior to commencement.

.2 CxA to witness start-up and testing using sampling strategies outlined in commissioning plan.

1.13 MANUFACTURER'S INVOLVEMENT

.1 Factory testing: manufacturer to: .1 Coordinate time and location of testing. .2 Provide testing documentation for approval by CxA. .3 Arrange for CxA to witness tests. .4 Obtain written approval of test results and documentation from CxA before

delivery to site.

.2 Subs to obtain manufacturers installation, start-up and operations instructions as part of A/E submittals and submit to A/E and CxA for review through Subs & CM. .1 Compare completed installation with manufacturer's published data, record any

discrepancies, and review with manufacturer. .2 Modify procedures detrimental to equipment performance and review same with

manufacturer before start-up.

.3 Integrity of warranties: .1 Subs shall use manufacturer's trained start-up personnel where specified

elsewhere in other divisions or required to maintain integrity of warranty. .2 Subs shall verify with manufacturer that testing as specified will not void

warranties.

.4 Qualifications of manufacturer's personnel: .1 Experienced in design, installation and operation of equipment and systems. .2 Ability to interpret test results accurately. .3 Report results in clear, concise, logical manner.

1.14 PROCEDURES

.1 Verify that equipment and systems are complete, clean, and operating in normal and safe manner prior to conducting start-up, testing and Cx.

.2 Conduct start-up and testing in following distinct phases: .1 Included in delivery and installation:

.1 Verification of conformity to specification and approved shop drawings.

.2 Visual inspection of quality of installation. .2 Start-up: follow accepted start-up procedures, fill out prefunctional/startup

checklists. .3 Functional Performance Testing (FPT): full-scale systems testing under direction

of CxA. .4 Post-substantial performance verification: to include fine-tuning as required by

Page 40: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 6 of 10 Sydney, Nova Scotia June 2020

CxA.

.3 Correct deficiencies and obtain approval from CxA after distinct phases have been completed and before commencing next phase.

.4 Document require tests on approved prefunctional checklist and FPT forms.

.5 Failure to follow accepted start-up procedures will result in re-evaluation of equipment by an independent testing agency selected by A/E. If results reveal that equipment start-up was not in accordance with requirements, and resulted in damage to equipment, implement following: .1 Minor equipment/systems: implement corrective measures approved by A/E. .2 Major equipment/systems: if evaluation report concludes that damage is minor,

implement corrective measures approved by A/E. .3 If evaluation report concludes that major damage has occurred, CxA and/or A/E

shall reject equipment. .1 Rejected equipment to be remove from site and replace with new. .2 Subject new equipment/systems to specified start-up procedures.

1.15 START-UP DOCUMENTATION

.1 Assemble manufacturer’s start-up documentation and submit to CxA for approval and incorporation into prefunctional checklists.

.2 CxA to supplement manufacturer’s start-up documentation as required.

.3 Start-up documentation to include: .1 Factory and on-site test certificates for specified equipment. .2 Pre-start-up inspection reports. .3 Signed installation/start-up check lists. .4 Start-up reports, .5 Step-by-step description of complete start-up procedures, to permit CxA to repeat

start-up at any time.

1.16 OPERATION AND MAINTENANCE OF EQUIPMENT AND SYSTEMS

.1 After start-up, operate and maintain equipment and systems as directed by equipment/system manufacturer.

.2 With assistance of manufacturer develop written maintenance program and submit to CxA and A/E for approval before implementation.

.3 Operate and maintain systems for length of time required for commissioning to be completed.

.4 After completion of commissioning, operate and maintain systems until issuance of certificate of interim acceptance.

Page 41: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 7 of 10 Sydney, Nova Scotia June 2020 1.17 TEST RESULTS

.1 If start-up and/or FPT produce unacceptable results, repair, replace or repeat specified starting and/or FPT procedures until acceptable results are achieved.

.2 Provide manpower and materials, assume costs for re-commissioning/testing.

1.18 START OF COMMISSIONING TESTING

.1 Notify Consultant at least 21 days prior to start of Cx testing.

.2 Start Cx testing after elements of building affecting start-up of systems have been completed.

1.19 INSTRUMENTS / EQUIPMENT

.1 Submit to CxA for review and approval: .1 Complete list of instruments proposed to be used. .2 Listed data including, serial number, current calibration certificate, calibration

date, calibration expiry date and calibration accuracy.

.2 Provide the following equipment as required: .1 2-way radios. .2 Ladders. .3 Equipment as required to complete work.

1.20 COMMISSIONING PERFORMANCE VERIFICATION

.1 Carry out Cx: .1 Under actual and/or accepted simulated operating conditions, over entire

operating range, in all modes including regular, emergency, setback, etc. .2 On independent systems and interacting systems.

.2 Cx procedures to be repeatable and reported results are to be verifiable.

.3 Follow equipment manufacturer's operating instructions.

.4 EMCS/BAS trending to be available as supporting documentation for performance verification.

1.21 WITNESSING COMMISSIONING

.1 CxA to witness activities and verify results.

1.22 AUTHORITIES HAVING JURISDICTION

.1 Where specified start-up, testing or commissioning procedures duplicate verification requirements of authority having jurisdiction, arrange for authority to witness procedures

Page 42: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 8 of 10 Sydney, Nova Scotia June 2020

so as to avoid duplication of tests and to facilitate expedient acceptance of facility.

.2 Obtain certificates of approval, acceptance and compliance with rules and regulation of authority having jurisdiction.

.3 Provide copies to CxA within 5 days of test and with Cx report.

1.23 EXTRAPOLATION OF RESULTS

.1 Where Cx of weather, occupancy, or seasonal-sensitive equipment or systems cannot be conducted under near-rated or near-design conditions, extrapolate part-load results to design conditions when approved by CxA in accordance with equipment manufacturer's instructions, using manufacturer's data, with manufacturer's assistance and using approved formulae.

1.24 EXTENT OF VERIFICATION

.1 Elsewhere: .1 Provide manpower and instrumentation to verify up to 30 % of reported results,

unless specified otherwise in other sections.

.2 Number and location to be at discretion of CxA.

.3 Conduct tests repeated during verification under same conditions as original tests, using same test equipment, instrumentation.

.4 Review and repeat commissioning of systems if inconsistencies found in more than 20% of reported results.

.5 Perform additional commissioning until results are acceptable to CxA.

1.25 REPEAT VERIFICATIONS

.1 Assume costs incurred by CxA for third and subsequent verifications where: .1 Verification of reported results fail to receive CxA approval. .2 Repetition of second verification again fails to receive approval. .3 CxA deems GC or Subs’ request for second verification was premature.

1.26 SUNDRY CHECKS AND ADJUSTMENTS

.1 Make adjustments and changes which become apparent as Cx proceeds.

.2 Perform static and operational checks as applicable and as required.

1.27 DEFICIENCIES, FAULTS, DEFECTS

.1 Correct deficiencies found during start-up and Cx to satisfaction of CxA.

.2 Report problems, faults or defects affecting Cx to CxA in writing. Stop Cx until problems

Page 43: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 9 of 10 Sydney, Nova Scotia June 2020

are rectified. Proceed with written approval from CxA.

1.28 COMPLETION OF COMMISSIONING

.1 Upon completion of Cx leave systems in normal operating mode.

.2 Except for warranty and seasonal verification activities specified in Cx specifications, complete Cx prior to issuance of Interim Certificate of Completion.

.3 Cx to be considered complete when contract Cx deliverables have been submitted and accepted by CxA and Owner.

1.29 ACTIVITIES UPON COMPLETION OF COMMISSIONING

.1 When changes are made to baseline components or system settings established during Cx process, provide updated Cx form for affected item.

1.30 TRAINING

.1 In accordance with Section 01 79 00.13 - Demonstration and Training for Building Commissioning.

1.31 MAINTENANCE MATERIALS, SPARE PARTS, SPECIAL TOOLS

.1 Supply, deliver, and document maintenance materials, spare parts, and special tools as specified in contract.

1.32 OCCUPANCY

.1 Cooperate fully with Owner and CxA during stages of acceptance and occupancy of facility.

1.33 INSTALLED INSTRUMENTATION

.1 Use instruments installed under Contract for TAB if: .1 Accuracy complies with these specifications. .2 Calibration certificates have been deposited with CxA.

.2 Calibrated EMCS sensors may be used to obtain performance data provided that sensor calibration has been completed and accepted.

1.34 PERFORMANCE VERIFICATION TOLERANCES

.1 Application tolerances: .1 Specified range of acceptable deviations of measured values from specified values

or specified design criteria. Except for special areas, to be within +/- [10]% of specified values.

.2 Instrument accuracy tolerances:

Page 44: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13 Sydney Fire Station No. 1 GENERAL COMMISSIONING REQUIREMENTS Page 10 of 10 Sydney, Nova Scotia June 2020

.1 To be of higher order of magnitude than equipment or system being tested.

.3 Measurement tolerances during verification: .1 Unless otherwise specified actual values to be within +/- 2 % of

recorded/measured values.

1.35 OWNER'S PERFORMANCE TESTING

.1 Additional performance testing of equipment or system by Owner, A/E or CxA will not relieve Contractor from compliance with specified start-up and testing procedures.

1.36 SEASONAL PERFORMANCE TESTING

.1 CxA will schedule 30 days of seasonal performance testing each during expected peak heating and cooling season load conditions during warranty period.

.2 Three weeks prior to start of seasonal commissioning, a meeting will be convened with the CxA, A/E, GC and CC to discuss specific processes and procedures for seasonal testing.

.3 Trend data from building automation systems during this period will be provided in Microsoft Excel format along with trend graphs showing system performance and response for review by CxA and A/E.

.4 During seasonal testing, controls contractor shall be available to make required adjustments and changes to the building controls as directed by CxA and A/E based upon initial recorded results.

.5 Controls contractor shall record all revised setpoints and sequence changes and submit to CxA.

.6 CxA shall update Commissioning Record with results of seasonal performance testing.

2 PRODUCTS

2.01 NOT USED

.1 Not Used.

3 EXECUTION

3.01 NOT USED

.1 Not Used.

END OF SECTION

Page 45: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.13 Sydney Fire Station No. 1 COMMISSIONING PLAN OUTLINE Page 1 of 5 Sydney, Nova Scotia June 2020

1 GENERAL

1.01 SUMMARY

.1 Section Includes: .1 Description of overall structure of Plan and roles and responsibilities of

commissioning team. .2 Preliminary Commissioning Plan (Cx Plan). Cx Plan is refined and revised during

construction. Preliminary plan is attached to this section.

1.02 GENERAL

.1 Provide a fully functional facility: .1 Systems, equipment and components meet user's functional requirements before

date of acceptance, and operate consistently at peak efficiencies and within specified energy budgets under normal loads.

.2 Facility user and O&M personnel have been fully trained in aspects of installed systems.

.3 Optimized life cycle costs.

.4 Complete documentation relating to installed equipment and systems.

.2 Term "Cx" in this section means "Commissioning".

.3 Use this Cx Plan as master planning document for Cx: .1 Outlines organization, scheduling, allocation of resources, documentation,

pertaining to implementation of Cx. .2 Communicates responsibilities of team members involved in Cx Scheduling,

documentation requirements, and verification procedures. .3 Sets out deliverables relating to O&M, process and administration of Cx. .4 Describes process of verification of how built works meet Owner design

requirements. .5 Produces a complete functional system prior to issuance of Certificate of

Occupancy. .6 Management tool that sets out scope, standards, roles and responsibilities,

expectations, deliverables, and provides: .1 Overview of Cx. .2 General description of elements that make up Cx Plan. .3 Process and methodology for successful Cx.

.4 Acronyms: .1 BAS – Building Automation System .2 CC – Controls Contractor .3 CM – General Contractor’s Construction Manager .4 Cx – Commissioning. .5 CxA – Commissioning Authority

Page 46: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.13 Sydney Fire Station No. 1 COMMISSIONING PLAN OUTLINE Page 2 of 5 Sydney, Nova Scotia June 2020

.6 Cx Plan – Commissioning Plan

.7 EC – Electrical Contractor

.8 EMCS – Energy Monitoring and Control Systems.

.9 FPT – Functional Performance Testing

.10 GC – General Contractor

.11 MC – Mechanical Contractor

.12 O&M – Operation and Maintenance.

.13 Subs – Subcontractors to General Contractor (EC, MC, CC, TAB, etc)

.14 TAB - Testing, Adjusting and Balancing Contractor.

.5 Commissioning terms used in this Section: .1 Bumping: short term start-up to prove ability to start and prove correct rotation. .2 Deferred Cx - Cx activities delayed for reasons beyond Contractor's control due to

lack of occupancy, weather conditions, need for heating/cooling loads.

1.03 REFINEMENT OF CX PLAN

.1 Cx Plan to be updated by CxA after commissioning kickoff meeting to take into account: .1 Approved shop drawings and product data. .2 Approved changes to contract. .3 Contractor's project schedule. .4 Cx schedule. .5 Contractor's, sub-contractor's, suppliers' requirements. .6 Project construction team's and Cx team's requirements.

.2 During construction phase, revise, refine and update Cx Plan to include: .1 Changes resulting from Client program modifications. .2 Approved design and construction changes.

.3 Revise, refine and update as required during construction phase. At each revision, indicate revision number and date.

.4 Include testing parameters at full range of operating conditions and check responses of equipment and systems.

1.04 COMPOSITION, ROLES AND RESPONSIBILITIES OF CX TEAM

.1 Refer to Cx Plan for roles and responsibilities for the following: .1 Commissioning Authority (CxA) .2 GC’s Construction Manager (CM) .3 Architect/Engineer (A/E) .4 Owner’s Project Manager (PM) .5 General Contractor (GC) .6 Subcontractors (Subs).

1.05 CX PARTICIPANTS

.1 Employ the following Cx participants to verify performance of equipment and systems:

Page 47: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.13 Sydney Fire Station No. 1 COMMISSIONING PLAN OUTLINE Page 3 of 5 Sydney, Nova Scotia June 2020

.1 Installation contractor/subcontractor: .1 All commissioned equipment and systems except as noted.

.2 Equipment manufacturer: equipment specified to be installed and started by manufacturer.

.3 Specialist subcontractor: equipment and systems supplied and installed by specialist subcontractor such as emergency power, communications, security and life safety systems.

.4 Ensure that Cx participant: .1 Could complete work within scheduled time frame. .2 Available for emergency and troubleshooting service during first year of

occupancy by user for adjustments and modifications outside responsibility of O&M personnel, including but not limited to: .1 Modify ventilation rates to meet changes in off-gassing. .2 Changes to heating or cooling loads beyond scope of EMCS. .3 Changes to EMCS control strategies beyond level of training provided to

O&M personnel. .4 Redistribution of electrical services. .5 Modifications of fire alarm systems. .6 Modifications to voice communications systems.

.5 Provide names of participants to CxA 3 months prior to starting date of Cx testing for review and approval.

1.06 EXTENT OF CX

.1 Commission mechanical systems and associated equipment: .1 Plumbing systems:

.1 Domestic CWS and HWS incl proper operation of plumbing fixtures.

.2 DHW heaters and DHW circ pumps.

.3 Automatic trap primers.

.4 Elevator sump pumps.

.5 Mixing valves, emergency eyewash/shower, backflow preventers.

.6 Compressed air system. .2 HVAC and exhaust systems:

.1 HVAC systems.

.2 General exhaust systems in equipment rooms.

.3 Vehicle exhaust system.

.4 Gas detection and emergency gas exhaust system.

.5 Overhead electric infrared heaters. .3 EMCS.

.2 Commission electrical systems and equipment: .1 Low voltage below 750 V:

.1 Low voltage equipment.

Page 48: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.13 Sydney Fire Station No. 1 COMMISSIONING PLAN OUTLINE Page 4 of 5 Sydney, Nova Scotia June 2020

.2 Low voltage distribution systems.

.3 Voice communications systems.

.4 Public Address System .2 Emergency power generation systems:

.1 Generators.

.2 Transfer switchgear and controllers. .3 Lighting systems:

.1 Lighting equipment.

.2 Distribution & control systems.

.3 Emergency lighting systems, including battery packs.

.4 Fire exit emergency signage.

.5 Traffic signals .4 Fire alarm systems, equipment:

.1 Annunciators.

.2 Control panels.

.3 Fire alarm battery banks.

1.07 DELIVERABLES RELATING TO O&M PERSPECTIVES

.1 General requirements: .1 Compile English documentation. .2 Documentation to be computer-compatible format ready for inputting for data

management.

.2 Provide deliverables: .1 Warranties. .2 Project record documentation. .3 Inventory of spare parts, special tools and maintenance materials. .4 Maintenance Management System (MMS) identification system used. .5 WHMIS information. .6 WHMIS Safety Data Sheets (SDS). .7 Electrical Panel inventory containing detailed inventory of electrical circuitry for

each panel board. Duplicate of inventory inside each panel.

1.08 DELIVERABLES RELATING TO THE CX PROCESS

.1 General: .1 Start-up, testing and Cx requirements, conditions for acceptance and

specifications form part of relevant technical sections of these specifications.

.2 Definitions: .1 Cx as used in this section includes:

.1 Cx of components, equipment, systems, subsystems, and integrated systems.

.2 Factory inspections and performance verification tests.

.3 Deliverables: provide:

Page 49: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.13 Sydney Fire Station No. 1 COMMISSIONING PLAN OUTLINE Page 5 of 5 Sydney, Nova Scotia June 2020

.1 Cx testing schedule.

.2 Startup, pre-Cx activities and documentation for systems, and equipment.

.3 Completed prefunctional/startup checklists

.4 Completed Functional Performance Tests (FPT) forms.

.5 O&M data

.6 Training Plans.

.7 Cx Reports.

.8 Prescribed activities during warranty period.

.4 CxA to witness and approve tests and reports of results.

.5 Refer to Cx Plan for additional information.

1.09 COMMISSIONING PLAN

.1 Refer to attached preliminary Commissioning Plan:

1.10 TRAINING

.1 Refer to Section 01 79 00.13 - Demonstration and Training for Building Commissioning.

1.11 FINAL SETTINGS

.1 Upon completion of Cx testing to satisfaction of CxA, lock control devices in their final positions, indelibly mark settings marked and include in Cx Reports.

.2 Repeat for final settings after end of each seasonal testing session during peak heating and cooling seasons.

2 PRODUCTS

2.01 NOT USED

.1 Not Used.

3 EXECUTION

3.01 NOT USED

.1 Not Used.

END OF SECTION

Page 50: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.16 Sydney Fire Station No. 1 COMMISSIONING FORMS Page 1 of 2 Sydney, Nova Scotia June 2020

1 GENERAL

1.01 SUMMARY

.1 Section Includes: .1 Requirements for commissioning forms to be completed for equipment, system

and integrated system.

1.02 PRE-FUNCTIONAL/START-UP CHECK LISTS

.1 As part of shop drawing submittals, include the following data: .1 Product manufacturer's installation instructions and recommended pre-start

checks. .2 Special procedures as specified in relevant technical sections. .3 Items considered good installation and engineering industry practices deemed

appropriate for proper and efficient operation.

.2 Equipment manufacturer's installation/start-up check lists are acceptable for use. As deemed necessary by CxA supplemental additional data lists will be required for specific project conditions.

.3 Use check lists for equipment installation. Document check list verifying checks have been made, indicate deficiencies and corrective action taken.

.4 Installer to sign check lists upon completion, certifying stated checks and inspections have been performed. Return completed check lists to Consultant. Check lists will be required during Commissioning and will be included in Commissioning Record at completion of project.

.5 Check lists will be stringently used for equipment pre-start and start-up procedures.

1.03 FUNCTIONAL PERFORMANCE TEST (FPT) FORMS

.1 A/E and CxA will develop and provide to CM required project-specific FPT forms in electronic format for distribution to Subs after commissioning kickoff meeting.

.2 FPT forms to be used for checks, running dynamic tests and adjustments carried out on equipment and systems to ensure correct operation, efficiently and function independently and interactively with other systems as intended with project requirements during full-scale systems testing.

.3 Strategy for Use: .1 CxA & A/E provides CM project-specific Commissioning forms for distribution

to Subs .2 During FPT, Subs to conduct tests to verify operation in specified normal and

emergency modes and under specified load conditions under direction of CxA and

Page 51: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

Cape Breton Regional Fire Services Section 01 91 13.16 Sydney Fire Station No. 1 COMMISSIONING FORMS Page 2 of 2 Sydney, Nova Scotia June 2020

in accordance with procedures outlined in FPT forms. .3 Record analytical and substantiating data. .4 Verify reported results. .5 Form to bear signatures of recording technician, testing personnel and reviewed

and signed off by CxA. .6 Submit immediately after tests are performed. .7 Reported results in true measured SI or IP unit values as appropriate. .8 Provide CxA with originals of completed forms. .9 Maintain copy on site during Cx testing period. .10 Forms to be both hard copy and electronic format, included in Commissioning

Record.

1.04 LANGUAGE

.1 To suit the language profile of the awarded contract.

2 PRODUCTS

2.01 NOT USED

.1 Not Used.

3 EXECUTION

3.01 NOT USED

.1 Not Used.

END OF SECTION

Page 52: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

1 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

Sydney No.1 Fire Station Commissioning Plan -

Preliminary

Table of Contents 1. Commissioning Program Overview ............................................................................................................................ 2

1.1 Goals and Objectives ......................................................................................................................................... 2

1.2 Abbreviations and Definitions ............................................................................................................................ 2

1.3 Building Information .......................................................................................................................................... 3

1.4 Systems to be Commissioned ............................................................................................................................ 3

2. Commissioning Team Members, Roles and Responsibilities ....................................................................................... 4

2.1 Commissioning Team ......................................................................................................................................... 4

2.2 Roles and Responsibilities .................................................................................................................................. 5

2.2.1 General ...................................................................................................................................................... 5

2.2.2 Roles and Responsibilities .......................................................................................................................... 6

2.3 Communication Protocol, Coordination, Meetings, Management and Submittals .............................................. 8

2.3.1 Commissioning Kickoff Meeting ................................................................................................................. 8

2.3.2 Coordination of Commissioning During Construction ................................................................................. 9

2.3.3 Initial Submittals and Documentation ........................................................................................................ 9

2.3.4 Communication Protocols ......................................................................................................................... 9

3. Commissioning Tasks ............................................................................................................................................... 10

3.1 Overview of Commissioning Tasks ................................................................................................................... 10

3.2 Description of Commissioning Tasks ................................................................................................................ 10

3.2.1 Pre-functional Checklists, Tests and Startup ............................................................................................. 10

3.2.2 Development of Functional Test and Verification Procedures ................................................................... 13

3.2.3 Execution of Functional Testing Procedures ............................................................................................. 15

3.2.4 O&M Manuals and Warranties ................................................................................................................. 16

3.2.5 Training and Orientation of Owner Personnel .......................................................................................... 17

3.2.6 Cx Summary Report ................................................................................................................................. 18

3.2.7 Warranty Period Activities ........................................................................................................................... 18

4. Commissioning Schedule ......................................................................................................................................... 19

4.1 Scheduling of Commissioning Activities ........................................................................................................... 19

Page 53: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

2 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

1. Commissioning Program Overview

1.1 Goals and Objectives Commissioning (Cx) is a systematic process of ensuring that all the building’s systems are installed and calibrated and perform interactively according to the design intent and the owner’s requirements and operational needs. This process enhances the overall project delivery and outcome.

Commissioning during the construction phase of this project is intended to achieve the following specific objectives:

• Ensure that applicable equipment and systems are installed properly and receive adequate operational checkout by installing contractors.

• Verify and document proper performance of equipment and systems through normal and other likely operational modes necessary to meet design intent.

• Ensure that O&M documentation provided to Owner is complete.

• Ensure that the Owner’s operating personnel are adequately trained.

Refer to the following specification sections for commissioning and testing requirements:

• Section 01 91 13 – General Commissioning Requirements. • Section 01 91 13.13 – Commissioning Plan • Section 01 91 13.16 – Commissioning Forms • Any applicable testing requirements in Divs. 21-28

1.2 Abbreviations and Definitions The following are common abbreviations used in this document. A/E Architect and design

engineers FPT Functional Performance Test

CxA Commissioning Authority GC General Contractor CC Controls Contractor

Cx Commissioning MC Mechanical Contractor Cx Plan Commissioning Plan

Document PFC Pre-functional Checklist

CM General Contractor’s Construction Manager

PM Owner’s Project Manager/Rep

Subs Trade Subcontractors to GC EC Electrical Contractor TAB Test and Balance Contractor

USER Facility User/Occupant

Page 54: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

3 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

1.3 Building Information Project Name: Sydney No.1 Fire Station

Location: Sydney, NS

Building Type (office, court, etc.): Fire Station

Square Footage: Approx. 12000 sq.ft # of storeys: 2

Owner: Cape Breton Regional Municipality

Tenants: Sydney No.1 Fire Department Service

Const. Start: Summer 2020

1.4 Systems to be Commissioned The following checked systems will be commissioned in this project: HVAC

Systems (including all integral equipment controls)

_X_ Variable Speed Drives _X_ Ductwork _X_ Energy Recovery Ventilators (ERVs) _X_ Packaged Heat Pump Air Handling Units (AHU’s) _X_ VAV Boxes / Terminal Units _X_ Exhaust Fans _X_ Electric Unit Heaters _X_ Electric Infrared Heaters _X_ Gas Detection and Emergency Gas Exhaust _X_ Vehicle Fume Exhaust System _X_ Testing, Adjusting and Balancing (TAB) work _X_ Building Automation System (controlled devices, control loops, control sequences, schedules & overrides, system integration, operator workstation graphics)

Electrical Systems

_X_ Scheduled lighting controls _X_ Daylighting/dimming controls _X_ Electrical Power System _X_ Security System _X_ Emergency power systems _X_ Emergency Lighting _X_ Interior/Exterior Lighting _X_ Phase loading when mech system close to fully loaded.

Page 55: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

4 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

Life Safety Systems

_X_ Fire alarm system

Plumbing

_X_ Elevator Sump Pumps _X_ Domestic Hot Water System incl DHW Heaters & recirc pumps _X_ Plumbing Fixtures, Mixing Valves, Backflow Preventers, Emergency Eyewash/Shower _X_ Trap primers _X_ General Service Compressed Air System _X_ Breathing Air Cascade System

Communication & Security Systems: (Coordinated w/ Owner’s Security Provider)

_X_ Security systems (CCTV, card control, door position switches, etc) _X_ Testing and certification _X_ Traffic signals

2. Commissioning Team Members, Roles and Responsibilities

2.1 Commissioning Team The members of the commissioning team consist of the CxA, PM, CM/GC, A/E, MC, EC, TAB representative, CC, any other installing subcontractors or suppliers of equipment, and CBRM staff involved with operations and maintenance.

Team Member

Co. & Contact Names

Voice, office, cell, fax, email, address

Owner

Project Manager

CAPE BRETON REGIONAL MUNICIPALITY

Property Manager

General Contractor

Construction Manager

Site Superintendent

Commissioning Mgr.

Page 56: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

5 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

Commissioning Authority

TRIMAC ENGINEERING

Andrew MacNeil, P.Eng.

Architect AWMG Architecture Wayne MacGibbon, NSAA

Mechanical Designer/Eng.

TRIMAC ENGINEERING

Andrew MacNeil, P.Eng.

Electrical Designer/Eng. DILLON, O’NEILL, SCRIVEN

JP Savoie, P.Eng., RCDD

Tenant Representative

Mechanical Contractor

Site Supervisor

Electrical Contractor

Site Supervisor

TAB Contractor

Controls Contractor Project Manager Project Engineer

2.2 Roles and Responsibilities

2.2.1 General General descriptions of the commissioning roles are as follows:

CxA: Coordinates the Cx process, develops and updates Cx Plan. Writes or approves tests, oversees and documents performance tests. Develops Commissioning Report.

CM: Facilitates the Cx process on behalf of the GC. Coordinates between GC and CxA and is main point of contact between CxA and GC. Approves test plans and signs-off on performance. Performs construction observation, approves O&M manuals prior to sending to rest of Cx team.

GC: Facilitates the Cx process, ensures that Subs perform their

Page 57: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

6 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

responsibilities and integrates Cx into the construction process and schedule

Subs: Provide manufacturer’s equipment startup checklists, demonstrate proper system performance, perform testing

A/E: Incorporates commissioning requirements in construction documents. Performs construction observation, approves O&M manuals and assists in resolving problems

PM: Owner’s project manager/representative, facilitates and supports the Cx process. Direct’s Owner’s personnel in performing owner’s integrated building systems commissioning.

Mfr.: The equipment manufacturers and vendors provide documentation to facilitate the commissioning work and perform contracted startup

2.2.2 Roles and Responsibilities Detailed roles and responsibilities for this project’s commissioning tasks are indicated in the following table. Note that this is not an exhaustive list of construction tasks and only the tasks as they pertain to commissioning are listed.

Commissioning Tasks and Responsibilities Responsibility of Task

Commissioning Plan PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X Prepare and update

X Review and approve (incl

updates)

X Distribute to Subs

Commissioning References in A/E Design Documentation PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X Prepare and update Prefunctional Checklists, Testing & Startup PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X X X X X X Coordinate schedule

X

X

X

X Provide manufacturers’

installation and startup data

X

X

Prepare prefunctional checklists using provided manufacturer’s installation and startup data, supplemented by A/E as required

X

Review and approve checklists (incl updates)

Page 58: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

7 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

X

Distribute prefunctional checklists to Subs

X

X

X

X

X

X

X

Execute & document prefunctional tests

X

Witness prefunctional Tests (at prescribed sampling rates)

X

Verify prefunctional tests and startup are complete

TAB PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X X X X X Coordinate schedule

X

X

X Prepare and submit plan

X Review & approve plan

X

X

X Ensure TAB/CC plan

coordination

Controls Checkout PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X X X X X Coordinate schedule

X Prepare and submit plan

X X X Review plan

X

X

X Ensure TAB/CC plan

coordination Functional Testing PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X X X X X Coordinate schedule

X Develop functional test

procedures

X Develop Testing Plan

Overview X X X X Execute tests X Witness tests X Document test results

O&M Manuals & Warranties PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X

Include requirements in specifications

X Prepare submittals X X X Review submittals

X

Assemble approved submittals

X

X

Coordinate transfer to End User

Page 59: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

8 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

Owner Training PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X

Include requirements in specifications

X

X

Prepare training plan submittals

X X X X Review submittals X X X X Schedule Training

X X X Provide Training

X

X Coordinate Training Attendance

X

Verify training completion

X

Assemble training documents

X

Coordinate transfer to End User

Commissioning Report PM CM/GC CxA A/E MC EC CC TAB Subs Mfr USER

X Prepare report

X Coordinate transfer to

Owner

X Coordinate transfer to End

User

2.3 Communication Protocol, Coordination, Meetings, Management and Submittals

2.3.1 Commissioning Kickoff Meeting A commissioning kickoff meeting is planned and conducted by the CxA within 30 days of the beginning of construction. In attendance are the respective representatives of the GC, PM, A/E, EC, MC, CC and TAB. At the meeting the commissioning process is reviewed with management and reporting roles finalized. The Cx Plan is reviewed, process questions are addressed, work products list is discussed. Also covered are the general list of each party’s responsibilities, who is responsible to develop the startup plan for each piece of equipment, and the initial proposed commissioning schedule

Page 60: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

9 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

put forth by the GC with input from the Subs. The meeting provides the CxA additional information needed to update the Cx Plan including the initial commissioning schedule. The CxA takes notes from the meeting and distributes meeting minutes.

2.3.2 Coordination of Commissioning During Construction In general, the CxA coordinates the commissioning activities and reports to the PM. All members work together to fulfill their contracted responsibilities and meet the objectives of the Contract Documents. CxA attends selected job-site construction meetings in order to remain informed on construction progress and to update parties involved in commissioning. The CM/GC provide the CxA with information regarding substitutions, change orders and any other instructions which may affect commissioning equipment, systems or schedule. CxA may also review construction meeting minutes for the same purpose. As construction progresses, additional meetings between various parties relating to commissioning may be scheduled by the CxA through the CM on an as-needed basis.

2.3.3 Initial Submittals and Documentation The CxA provides all Subs responsible for commissioned equipment with commissioning documentation requirements for their respective equipment and systems through the CM. This data request typically coincides and complements the normal A/E submittal/shop drawing process. At a minimum, this request includes equipment installation requirements and start-up procedures, O&M data, performance data and control drawings. The CxA reviews and approves submissions relative to commissioning requirements and not for general contract compliance which is the A/E’s responsibility. Submittals to the CxA do not constitute compliance for submittals for the O&M manuals. CxA may request additional information or clarification from CM, Subs or A/E by submitting a written request to any of those parties.

2.3.4 Communication Protocols The following protocols will be used on this project.

Issue Protocol

For requests for information (RFI) or formal documentation requests:

The CxA goes through the A/E, PM or CM.

For minor or verbal information and clarifications:

The CxA goes direct to the informed party.

For notifying contractors of deficiencies: The CxA documents deficiencies through the CM, but may discuss deficiency issues with contractors prior to notifying the CM.

Page 61: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

10 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

For scheduling functional tests or training: The CxA may provide input for and do some minor coordination of training and testing, but does not do any scheduling.

For scheduling commissioning meetings: The CxA selects the date and schedules through the CM.

For making a request for significant changes:

The CxA has no authority to issue change orders.

For making small changes in specified The CxA may not make changes to specified sequences without

sequences of operations: approval from the A/E.

Subcontractors disagreeing with requests or interpretations by the CxA shall:

Try to resolve with the CxA first. Then work through CM/GC who will work with CxA and subcontractors to resolve the situation.

3. Commissioning Tasks

3.1 Overview of Commissioning Tasks The following tasks comprise the commissioning work:

1. Commissioning kickoff meeting 2. Prepare pre-functional checklists (PFC) with information from Subs, tests and startup,

witness select tests 3. Develop functional test and verification procedures 4. Functional performance testing (FPT) 5. Review O&M manuals and warranties 6. Verify training and orientation of Owner personnel 7. Compile commissioning record 8. Prepare final commissioning report

3.2 Description of Commissioning Tasks

3.2.1 Pre-functional Checklists, Tests and Startup Pre-functional checklists (PFC) are important to ensure that the equipment and systems are hooked up and operational and that functional performance testing may proceed without unnecessary delays. Each piece of equipment receives full pre-functional checkout by the Contractor. No sampling strategies are used. In general, the pre- functional testing for a given system must be successfully completed prior to formal functional performance testing of equipment or subsystems of the given system.

Pre-functional checklists are primarily static inspections and procedures to prepare the equipment or system for initial operation (e.g., oil levels OK, fan belt tension, labels affixed, gages in place, sensor calibration, etc.). However, some pre-functional checklist items entail simple testing of the function of a component, a piece of

Page 62: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

11 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

equipment or system (such as measuring the voltage imbalance on a three phase pump motor of a chiller system). The word pre-functional refers to before functional testing. Pre-functional checklists augment and are combined with the manufacturer’s start-up checklist.

The CxA witnesses a percentage of the pre-functional testing except for testing of larger or more critical pieces of equipment. Sampling strategies are listed below.

3.2.1.1 Start-up Plan / Pre-functional checklists The following procedures will be used for this project: (the Sub is responsible for the plan development):

1. The Sub obtains manufacturer installation, start-up and checkout data, including actual field checkout sheets used by the field technicians for each piece of equipment in each system to be commissioned.

2. The Sub copies all pages with important instructional data and procedures (not covered in manufacturer field checkout sheets) from the start-up and checkout manuals and adds a signature line in the column by each procedure.

3. The information is sent to CM for review. 4. The CM sends the reviewed manufacturer’s to the CxA for review. 5. The CxA reviews, adapts and enhances, if necessary, the pre-functional

checklists. CxA also adds a cover sheet to each pre-functional checklist. If more information is required the CxA will transmit these requests to the CM who will in turn distribute the requests to the Subs.

6. For systems that may not have adequate manufacturer start-up and checkout procedures, particularly for components being integrated with other equipment, the Sub should provide the added necessary detail and documenting format to the CxA for approval, prior to execution.

7. The CxA transmits the full Start-up Plan to the CM who in turn distributes it to the relevant Subs for their review and use.

3.2.1.2 Execution of Checklists and Startup Four weeks prior to startup, the Subs and vendors schedule startup and initial checkout with the CM and CxA. The startup and initial checkout are directed and executed by the Sub or vendor. The CxA observes, at minimum, the procedures for each piece of primary equipment, unless there are multiple units, when a sampling strategy is used. For components of equipment, (e.g., VAV indoor terminal units), the CxA observes a sampling of the pre-functional and start-up procedures. To document the process of startup and checkout, the site technician performing the

Page 63: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

12 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

line item task initials and dates each paragraph of procedures in the “Startup Plan” and checks off items on the pre-functional and manufacturer field checkout sheets, as they are completed. Only individuals having direct knowledge of a line item being completed shall check or initial the forms. The Subs and vendors execute the checklists and tests and submit a signed copy of the completed start-up and pre-functional tests and checklists to the CxA. The CxA may review pre-functional checklists in progress, as necessary. 3.2.1.3 Sampling Strategy for CxA Observation of Pre-functional Checkout and Startup The following table provides a tentative list of the equipment and how much of the pre- functional checkout and startup work will be witnessed by the commissioning authority.

Equipment or System Fraction To Be

Observed by CxA

AHU’s, ERV’s 50%

Pumps, VFD’s 25%

Exhaust Fans 25%

Specialty Exhaust Systems 25% or one of each type

Terminal units 10%

Building automation system Observe 4 hours of checkout and calibration

TAB work Observe 4 hours of TAB

Other misc. equipment As necessary

3.2.1.4 Deficiencies and Non-Conformance

The Subs clearly list any outstanding items of the initial start-up and pre-functional procedures that were not completed successfully at the bottom of the procedures form or on an attached sheet. The procedures form and deficiencies are provided to the CxA within two days of test completion. The CxA works with the Subs and vendors to correct and retest deficiencies or uncompleted items, involving the CM and others as necessary. The installing Subs or vendors correct all areas that are deficient or incomplete according to the checklists and tests. The CxA recommends approval of the startup and initial checkout of each system to the PM.

Page 64: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

13 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

3.2.1.5 Phased Commissioning

Because of project size, this project will not require startup and initial checkout to be executed in phases.

3.2.1.6 TAB The TAB contractor submits the outline of the TAB plan and approach to the CxA and the controls contractor eight weeks prior to starting the TAB. Included in the approach, is an explanation of the intended use of the building control system. The CxA reviews the plan and approach for understanding and coordination issues and may comment, but does not “approve.” The controls contractor reviews the feasibility of using the building control system for assistance in the TAB work. The TAB submits weekly written reports of discrepancies, contract interpretation requests and lists of completed tests to the CM and CxA. This facilitates quicker resolution of problems and will result in a more complete TAB before functional testing begins. TAB work will not begin until the control system has been pre-functionally tested and point-to-point checks performed and approved by the CxA. 3.2.1.7 Controls Checkout Plan The controls contractor develops and submits a written step-by-step plan to the CxA which describes the process they intend to follow in checking out the control system and the forms on which they will document the process. The controls contractor will also meet with the TAB contractor prior to the start of TAB and review the TAB plan to determine the capabilities of the control system for use in TAB. The controls contractor will provide the TAB with any necessary unique instruments for setting terminal unit boxes and instruct TAB in their use (handheld control system interface for use around the building during TAB, etc.). The controls contractor shall also provide a technician qualified to operate the controls to assist the TAB contractor in performing TAB. All CxA-required controls pre-functional checklists, calibrations, start-up and selected functional tests of the system shall be completed and approved by the CxA prior to TAB. The controls contractor shall execute the tests and trend logs assigned to them and remain on site for assistance for mechanical system functional tests as specified. 3.2.2 Development of Functional Test and Verification Procedures

3.2.2.1 Overview Functional performance testing (FPT) is the dynamic testing of systems (rather than just components) under full operation. Systems are tested under various modes, such as during low cooling or heating loads, high loads, component failures, unoccupied, varying outside air temperatures, fire alarm, power failure, etc. The systems are run

Page 65: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

14 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

through all of the control system’s sequences of operation and components are verified to be responding as the sequences state. The CxA and A/E develop the functional test procedures in a sequential written form, coordinates, oversees and documents the actual testing, which is performed by the installing contractor or vendor.

3.2.2.2 Scope of Testing A list of systems to be commissioned as part of this project are given in Section 1.4 of this commissioning plan.

3.2.2.3 Development Process Before test procedures are written, the CxA obtains all requested documentation and a current list of change orders affecting equipment or systems, including an updated points list, control sequences and set points. The CxA develops specific test procedures to verify proper operation of each piece of equipment and system, using the testing requirements in the specifications. The CxA obtains clarification, as needed, from contractors and the A/E regarding sequences and operation to develop these tests. Prior to execution, the CxA provides a copy of the primary equipment tests to the installing Sub (via the CM) who reviews the tests for feasibility, safety, warranty and equipment protection. Blank copies of the procedures are input into the O&M manuals for later use by Owner’s operations staff. Functional testing and verification may be achieved by manual testing (persons manipulate the equipment and observe performance) or by monitoring the performance and analyzing the results using the control system’s trend log capabilities or by stand- alone data loggers. The CxA follows the Specifications when given and uses judgment where needed to determine which method is most appropriate. According to the Specifications, not all pieces of identical equipment receive in-depth testing. The CxA reviews factory acceptance tests and determines what further testing may be required to comply with the Specifications and design intent. Redundancy is minimized. Life safety systems and specialty systems such as the fire alarm and security systems are systems for which the CxA does not write procedures or document execution. The CxA reviews and approves documentation format of these tests prior to execution, but does not develop the procedures or document their execution. Upon review of the applicable test procedures, the CxA, at their discretion, may require more in-depth testing or information from the Subs and Vendors. 3.2.2.4 Testing Schedule The CM develops the functional testing schedule with input from the CxA to provide the contractors with a better idea of where functional testing lies in the schedule, and a list of what issues are preventing the start of testing, which contractors are needed for each test and how much time might be expected from them. This is developed

Page 66: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

15 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

after most equipment has been started up and when functional testing dates are not too far off. The testing schedule overview is provided to the Contractors to assist in moving more efficiently to functional testing.

3.2.3 Execution of Functional Testing Procedures

3.2.3.1 Overview and Process

The CM schedules functional performance tests (FPT) in coordination with the CxA and affected Subs. For any given system, prior to performing FPT, the CxA and CM waits until the pre- functional checklist has been submitted with the necessary signatures, confirming that the system is ready for functional testing. The CxA oversees, witnesses and documents the functional testing of all equipment and systems according to the Specifications and the Cx Plan. The Subs execute the tests. The control system is tested before it is used to verify performance of other components or systems. The air balancing and water balancing is completed and debugged before FPT of air-related or water-related equipment or systems. Testing proceeds from components to subsystems to systems and finally to interlocks and connections between systems. The CxA documents the results of the test. 3.2.3.2 Deficiencies and Retesting Corrections of minor deficiencies identified are made during the tests at the discretion

of the CxA. The CxA records the results of the test on the procedure or test form. Deficiencies or non-conformance issues are noted and reported to the CM. Subs correct deficiencies, notify the CxA and certify correction prior to re-testing. The CxA schedules retesting through the CM. Decisions regarding deficiencies and corrections are made at as low a level as possible, preferably between CxA and the CM & Sub. For areas in dispute, final authority resides with the Owner’s PM and A/E. The CxA recommends acceptance of each test to the PM. The PM gives final approval on each test. 3.2.3.3 Facility Staff Participation The Owner’s facilities operating staff are encouraged to attend and participate in the testing process. The CxA will notify the Owner/PM, who will then notify the facility staff when the commissioning events will occur.

3.2.3.4 Sampling Multiple identical pieces of non-life-safety or otherwise non-critical equipment may be functionally tested using a sampling strategy. The Specifications specify the sampling strategies that are used on this project.

Page 67: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

16 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

3.2.4 O&M Manuals and Warranties

3.2.4.1 Standard O&M Manuals The CxA reviews the O&M manuals, documentation and red line as-builts for systems that were commissioned to verify general compliance and completeness. The CxA recommends approval and acceptance of these sections of the O&M manuals to the PM. The CxA also reviews each equipment warranty and verifies that all requirements to keep the warranty valid are clearly stated. 3.2.4.2 Commissioning Record The CxA will compile, organize and index the following commissioning data into labeled, indexed and tabbed three-ring binders and deliver it with the Owner to be included with the O&M manuals. Correspondence, meeting minutes, progress reports, miscellaneous notes will not be included. List of required information shall be provided to CM by CxA for CM to obtain from subs. Information shall be provided to CxA by CM The formal of the manual is as follows: Binder 1:

Tab 1 Commissioning Summary Report (As specified in Section 3.2.6) Tab 2 Issues Log (log of commissioning findings and resolution)

Tab 3 Finalized Commissioning Plan Tab 4 Summary Training Record

Binder 2: Tab 5 System / Equipment # 1 (air handler AHU-3, etc.)

Finalized Sequence of Operation for System/Equipment #1 (provided by A/E)

Colored separator sheet Functional Test Record and any approvals (filled out test procedures). Include trend logs if applicable/available as part of testing (provided by CC).

Colored separator sheet

Pre-functional Checklist (filled out) Colored separator sheet

Training Record Tab 7 System / Equipment / Assembly # 2. repeat as per System 1 … Tab X Miscellaneous commissioning data relevant to commissioning record.

Page 68: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

17 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

3.2.5 Training and Orientation of Owner Personnel

3.2.5.1 Training plan The CxA shall assemble the training plan with information from the installing subs and manufacturer’s representatives stating the following:

• Level of training required on each system. • General outline of topics to be covered for each system along with

learning objective for each topic. • Location of training session (classroom, on-site). • Instructor’s qualifications. • List of training materials or aids, if required. • Training record requirements.

3.2.5.2 Systems requiring training The following training will be provided in this project:

HVAC system (all equipment) HVAC controls Domestic hot water system Electronic plumbing fixtures Plumbing systems incl. trap primers General service compressed air system EMCS interface Automatic Lighting controls Electrical system Emergency power system Voice Communications system Security system Fire alarm system Telecommunications and data systems Traffic signals

3.2.5.3 Owner’s Personnel Owner shall submit a list of personnel that will be attending each training session. These lists will be the basis of training attendance sheets developed by the instructors for each training session.

3.2.5.4 Training Session Documentation / Attendance Sheets Attendance sheets for Owner’s personnel being trained in each session will be provided for each session by instructors based on the attendance lists given by the Owner with room for additional attendees to add their names. Attendees shall sign the attendance sheet. Instructor shall note whether any attendees left without signing the attendance sheet. Attendees not on the list supplied by the Owner shall print and sign their names at the bottom of the sheet in the space provided.

Page 69: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

18 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

3.2.6 Cx Summary Report A final commissioning summary report by the CxA will be provided to the CM and PM. The report shall include an executive summary, list of participants and roles, brief building description, overview of commissioning and testing scope and a general description of testing and verification methods.

For each piece of commissioned equipment, the report will contain the disposition of the CxA regarding the adequacy of the equipment, documentation and training meeting the contract documents in the following areas: 1) Equipment meeting the equipment specifications, 2) Equipment installation, 3) Functional performance, 4) Equipment documentation, and 5) Operator training.

All outstanding non-compliance items shall be specifically listed. Recommendations for improvement to equipment or operations, future actions, commissioning process changes, etc. shall also be listed. Each non-compliance issue shall be referenced to the specific functional test, inspection, trend log, etc. where the deficiency is documented. The functional performance and efficiency section for each piece of equipment shall include a brief description of the verification method used (manual testing, BAS trend logs, data loggers, EMCS graphics etc.) and include observations and conclusions from the testing.

Appendices shall contain acquired sequence documentation, logs, meeting minutes, progress reports, deficiency lists, site visit reports, findings, unresolved issues, communications, etc. Pre-functional checklists and functional tests (along with blanks for the operators) and monitoring data and analysis will be provided in a separate labeled binder along with the commissioning plan, training record, test schedules, monitoring reports and trend logs.

3.2.7 Warranty Period Activities During the warranty period, seasonal testing and other deferred testing required is completed according to the Specifications. The CM coordinates this activity with input from the CxA. Tests are executed and deficiencies corrected by the appropriate Subs, witnessed by facilities staff and the CxA. Any final adjustments to the O&M manuals and as-builts due to the testing are made. Seasonal testing shall be scheduled by the CxA during the warranty period. CxA will designate a 30 day period during which trend data from the EMCS shall be used to evaluate the seasonal performance of the system. CC will provide trend data to the CxA

Page 70: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

JULY 2020

19 Preliminary Commissioning Plan – Sydney No.1 Fire Station TriMac Engineering Inc.

and A/E in Microsoft Excel format along with trend graphs from EMCS. During seasonal testing, CC will make changes as directed by A/E and CxA to the operating sequences and setpoints as required based on results of testing.

4. Commissioning Schedule

4.1 Scheduling of Commissioning Activities Commissioning activities shall be initially scheduled during commissioning kickoff meeting that takes place after start of construction by CM and subs with input from CxA. CM will update commissioning schedule as part of overall construction schedule as construction progresses with input from CxA.

Page 71: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

!

Cape Breton Regional Fire Services GLASS FIBRE REINFORCED CONCRETE Section 09 49 00 Sydney Fire Station No. 1 Sydney, Nova Scotia Page ! of ! 1 4 June 2020 !

1. GENERAL

1.1. SECTION INCLUDES 1. Furnish all materials, labour, equipment and services necessary for the supply and

installation of GFRC components as indicated on the drawings and contract documents, all in compliance with local codes and/or ordinances.

2. Work shall include supply of GFRC components, installation, patching, repairing and cleaning.

1.2. REFERENCES 1. ASTM International (ASTM):

1. ASTM D638 Standard Test Method for Tensile Properties of Plastics 2. ASTM E84 Standard Test Method for Surface Burning Characteristics of

Building Materials 3. ASTM C109/C109M Standard Test Method for Compressive Strength of

Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube Specimens) 4. ASTM C947 Standard Test Method for Flexural Properties of Thin-Section

Glass-Fiber-Reinforced Concrete (Using Simple Beam With Third-Point Loading)

5. ASTM D256 Standard Test Methods for Determining the Izod Pendulum Impact Resistance of Plastics

6. ASTM D696 Standard Test Method for Coefficient of Linear Thermal Expansion of Plastics Between −30°C and 30°C with a Vitreous Silica Dilatometer

7. ASTM C473 Standard Test Methods for Physical Testing of Gypsum Panel Products

8. ASTM C177 Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus

9. ASTM E136 Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750°C

10. ASTM G23 Standard Practice for Operating Light-Exposure Apparatus (Carbon-Arc Type) With and Without Water for Exposure of Nonmetallic Materials.

1.3. SUBMITTALS 1. Product Data: Submit manufacturer's data sheets on each product to be used, including:

1. Printed product data and installation guidelines for GFRC. 2. Manufacturer's installation instructions, showing required preparation and

installation procedures. 3. Storage and handling requirements and recommendations.

Page 72: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

!

Cape Breton Regional Fire Services GLASS FIBRE REINFORCED CONCRETE Section 09 49 00 Sydney Fire Station No. 1 Sydney, Nova Scotia Page ! of ! 2 4 June 2020 !

2. Shop Drawings: Submit shop drawings for approval showing plans, sections, details, joint treatment, reinforcing, fastening devices and the relation of the GFRC components to the surrounding construction.

1.4. QUALITY ASSURANCE 1. Manufacturer Qualifications: Minimum 5 years experience manufacturing similar

products. 2. Installer Qualifications: Experienced and competent in Stone Veneer installation. 3. Mock-Up: Provide a mock-up for evaluation of techniques and application workmanship.

The mock-up shall demonstrate the full range of specified design options and workmanship to be expected in completed work.

1.5. DELIVERY, STORAGE, AND HANDLING 1. Transport and handle units in a manner that avoids excessive stresses or damage. 2. Components displaying obvious damage must be rejected at site at time of delivery. 3. Store the components in a controlled environment, weather protected, on level surfaces,

with temporary supports as required. Do not stack or lean.

2. PRODUCTS

2.1. MANUFACTURERS 1. Glass Fibre Reinforced Concrete Molding and Trims to be supplied by Plasterform Inc,

Formglas Products Ltd. or pre-approved equivalent.

2.2. MATERIALS 1. GFRC components shall be asbestos free and prefabricated with portland cement,

polymers, aggregates, and reinforced with chopped strand fibres. 2. GFRC components shall be suitably reinforced with steel. 3. Fabrication will be as per approved shop drawings and will not include framing or

assembly. If multiple components are required to complete design criteria as per contract drawings, additional site work under related sections, installation or finishing may be required.

4. FINISH to be Smooth, paint grade to be painted under Section 09 91 99 Painting.

2.3. TOLERANCES (FABRICATION) 1. Dimensional - all directions +/- 1/8" 2. Thickness - skin +/-1/8" 3. Thickness - total unit 5/16” 4. Warpage or Bowing +/- 1/16”/foot 5. Site conditions and normal manufacturing variations may require additional site work to

maintain these tolerances.

Page 73: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

!

Cape Breton Regional Fire Services GLASS FIBRE REINFORCED CONCRETE Section 09 49 00 Sydney Fire Station No. 1 Sydney, Nova Scotia Page ! of ! 3 4 June 2020 !

2.4. PHYSICAL PROPERTIES 1. Shell Thickness ½" 2. Weight (depending on shape and reinforcement) 4 - 7 lbs/sq.ft 3. Density 130 - 140 lbs/cu.ft 4. Compressive Strength (ASTM C-109-92 Mod.) 9,810 psi. 5. Flexural Strength (ASTM C-947-89 Mod.) 2,562 psi. 6. Modulus of Elasticity - In Flexure (ASTM D638) 2.28 x 106 psi. 7. Tensile Strength (ASTM D-638) 940 psi. 8. Impact Strength (ASTM D-256-93a; Notched) 1.30 ft-lbs/in of notch 9. Coefficient of Linear Thermal Expansion (ASTM D-696) 0.60 x 10-5/°F 10. Humidified Deflection (ASTM C-473-95) No Measurable Value 11. Thermal Conductivity (ASTM C-177-85) 4.35 Btu-in/hr-sq.ft-°F 12. Fuel Contribution (ASTM E-136-98a) 0 13. Flame Spread (ASTM E-84-98) 0, Class A 14. Smoke Index (ASTM E-84-98) 0, Class A 15. Resistance to Weathering (ASTM G-23-93) Class 5, Negligible color alteration 16. Screw Withdrawal (standard lab procedure) 346 lbs 17. Fiber Content 5% - 6% by weight

3. EXECUTION

3.1. PRE-INSTALLATION RESPONSIBILITY 1. Field Measurements: Prior to manufacturing, the Installer will be responsible for

obtaining all field dimensions for inclusion on the Manufacturer’s shop drawings. 2. Coordination: The Installer will be responsible for the co-ordination of the installation

with related sections, within the tolerances specified in the respective articles. 3. Discrepancies: Prior to installation, the Installer shall check job site dimensions and

conditions. Any discrepancies between design and field dimensions shall be brought to the attention of the General Contractor and the Architect.

3.2. INSTALLATION 1. Components shall be lifted/handled with suitable devices. 2. Handle units with clean gloves. 3. Components shall be installed plum and true. Shim where necessary. 4. Pre-drill and countersink to 1/8" minimum below finished surface of unit if required. 5. Fasten components with stainless steel fasteners through embedded steel or face of GFRC

as indicated on shop drawings.

Page 74: A Community of Communities · 2020. 7. 22. · A Community of Communities 320 Esplanade Sydney, Nova Scotia B1P 7B9 Tel: 902-563-5015 Fax: 902-539-9964 email:purchase@cbrm.ns.ca JULY

!

Cape Breton Regional Fire Services GLASS FIBRE REINFORCED CONCRETE Section 09 49 00 Sydney Fire Station No. 1 Sydney, Nova Scotia Page ! of ! 4 4 June 2020 !

6. Use PL Premium construction adhesive where indicated on shop drawings. 7. Where components are suspended, use as a minimum 12 gauge galvanized steel wire and

the suspension points indicated on the shop drawings. 8. Allowable variation in material thickness at surface suspension points shall not exceed

+/- 1/4". 9. Framing, hangers, etc., as specified elsewhere. 10. Butt joints are to be caulked as specified under Sealants and Caulking.

3.3. PATCHING AND CONTROL JOINTS 1. Introduce control joints as required (35'-0" O.C.) under related section of the

Specification. 2. Patch any damage to match component texture, using mix and sealer provided by

manufacturer or Installer.

3.4. CLEANING 1. Cleaning: As recommended by manufacturer. 2. Clean soiled GFRC units with mild detergent and clean water using a soft cloth. Rinse

thoroughly with clean water.

END OF SECTION