Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017 1 How-to Manufacture a Composite Clipboard (Pre-Preg) *Before starting, please read entire manual *Changes can be made in order for this manual to work for you 9” x 12.5” Advanced Composite Clipboard Objectives Demonstrate proper ply cutting and cutting Demonstrate proper use of composite materials, tools, and equipment Successfully manufacture a composite clipboard using the manufacturing plan Assemble the 9” x 12.5” Advanced Composite Clipboard Assignment: Students must understand and demonstrate the proper procedures for manufacturing an advanced composite clipboard. These procedures include ply cutting and kitting, tool preparation, pre-staging the work area, pre-preg lamination, temporary and permanent vacuum bagging, trimming the part, and the final assembly. Students must demonstrate these procedures successfully and completely. Follow these procedures and manufacturing plan. Planning Keep the area that you are going to be working in clean. (It is recommended to work in a clean room.) Know the materials that you are going to be working with and located the Material Safety Data Sheet if necessary. Always wear your PPE (Personal Protective Equipment) when working with any resin systems or resin impregnated products. (Resin contact with skin can cause irritation) Pre-preg materials should be stored in a freezer in a sealed bag to prevent moisture contamination but needs to be at room temperature for lay-up. Pre- prepped kits can be thawed in 10 minutes and big rolls may take up to 6 hours. (It is recommended to thaw materials before the project is started.) Tool Prep Obtain a tool of your choice. This tool may be an aluminum or steel caulplate. The tool must be at least 16 inches wide x 24 inches long x 1/8 inch thick. Once you have obtained your tool, use a Scotch Brite® Pad and M.E.K. or Acetone to clean any debris from a previous lay-up or for general cleaning.

Upload: others

Post on 11-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

1

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

*Before starting, please read entire manual *Changes can be made in order for this manual to work for you

9” x 12.5” Advanced Composite Clipboard

Objectives

Demonstrate proper ply cutting and cutting

Demonstrate proper use of composite materials, tools, and equipment

Successfully manufacture a composite clipboard using the manufacturing plan

Assemble the 9” x 12.5” Advanced Composite Clipboard

Assignment:

Students must understand and demonstrate the proper procedures for manufacturing

an advanced composite clipboard. These procedures include ply cutting and kitting,

tool preparation, pre-staging the work area, pre-preg lamination, temporary and

permanent vacuum bagging, trimming the part, and the final assembly. Students must

demonstrate these procedures successfully and completely. Follow these procedures

and manufacturing plan.

Planning

Keep the area that you are going to be working in clean. (It is recommended to

work in a clean room.)

Know the materials that you are going to be working with and located the

Material Safety Data Sheet if necessary.

Always wear your PPE (Personal Protective Equipment) when working with

any resin systems or resin impregnated products. (Resin contact with skin can

cause irritation)

Pre-preg materials should be stored in a freezer in a sealed bag to prevent

moisture contamination but needs to be at room temperature for lay-up. Pre-

prepped kits can be thawed in 10 minutes and big rolls may take up to 6 hours.

(It is recommended to thaw materials before the project is started.)

Tool Prep

Obtain a tool of your choice. This tool may be an aluminum or steel caulplate.

The tool must be at least 16 inches wide x 24 inches long x 1/8 inch thick.

Once you have obtained your tool, use a Scotch Brite® Pad and M.E.K. or

Acetone to clean any debris from a previous lay-up or for general cleaning.

Page 2: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

2

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

(Depending on the amount of debris on the tool you may need to use a disk

sander to remove the debris.)

Use a Class A Wiper and M.E.K. or Acetone to clean the dust and debris off the

caulplate once it has been scrubbed with a Scotch Brite® Pad. Always put the

cleaning solvent on the wiper first and not the caulplate.

Tape around the perimeter of your tool with masking tape. This area is where

your sealant tape will be applied.

Applying Frekote®

Use a Class A Wiper to apply 3 layers of Frekote® Mold Release. Always put

the Frekote® on the wiper first alternating directions when applying. (Top

to bottom, left to right, top to bottom. Avoid wiping over the same area that

was applied until the area has evaporated.)

Allow 5-10 minutes between each coat for solvent evaporation.

The dry time and coat number should be tracked.

Pre-Staging Work Area

Remove the masking tape from the perimeter of your caulplate. You should be

able to see a haze on the caulplate where the mold release was applied.

Apply the vacuum bagging sealant tape around the perimeter of your tool. (Area

where the masking tape was applied.) When encountering corners with the

sealant tape, simply tear the backing of the sealant tape and work it around the

corners. Once you have reached the other end lift the backing up at least the

width of the sealant tape and apply. The sealant tape should be over lapping

each other and the backing paper should be left on.

Cut and gather the required vacuum bagging materials.

o Nylon vacuum bagging film should extend at least 1 inch past the sealant

tape.

o The edge breather (breather cloth

strips) should be cut at least 1”-2”

wide and placed along the edge

inside perimeter of the sealant tape.

o The breather cloth must extend to

the inside perimeter of the sealant

over the edge breather.

o The solid parting film must be extend

at least ¾” onto the edge breather.

o Probes pads (breather cloth) should

be the size of a probe base, approximately 2 ½” x 2 ½”.

o The vacuum hose, probes, and gauge should be in arms reach.

☐ Nylon Vacuum Bagging Film

☐ Edge Breather

☐ Breather Cloth

☐ Solid Parting Film (Non-Perf)

☐ Probe Pads

☐ Vacuum Hose (1)

☐ Vacuum Probes (2)

☐ Vacuum Gauge (1)

Page 3: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

3

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

Create a ply table and sketch of the part being manufactured. (See ply table on

page 8.)

Your plies will need to be 13 inches long x 9.5 inches wide. Cut your plies using

a straight edge with a guard or angle aluminum and a utility knife. Mark each

ply with the ply number and ply orientation.

Put the plies in order with Ply 1 being on top and Ply 8 being on the bottom.

Verify that the plies and ply numbers match accordingly to the ply table. (Ply 1

will be on the tool side; ply 8 will be on the bag side.

Verify that your vacuum source is working properly.

Tips

Be sure to have all materials in order before you start the lay-up.

Have all bagging materials, vacuum hose, probes, gauge, and other supplies in arms reach.

Do a dry run to get a feel for how the lay-up will occur.

Lay-Up

Material must be thawed to room temperature prior to lay-up.

Verify that your tool is clean of debris and dust.

Locate Ply 1 (250° Graphite Plain Weave) and center it on the caulplate leaving

the top backing on to avoid contact with the material. Using your hand or a solid

sweep, remove the air bubbles starting from the middle to the outside. (The

material may not stay in place due to the mold release. A heat gun on low heat

may be used to help the material stay in place.)

Remove the top backing on Ply 1 and place Ply 2 (250° Fiberglass Style 7781)

on top. Follow the same procedure done when applying Ply 1 and remove the

air bubbles starting from the middle to the outside with your hand or a solid

sweep.

Remove the backings on Ply 2 and place Ply 3 on top.

Continue with the lay-up and follow the procedures for all the plies.

Once you have reached the final ply remove the backing. The part is not ready to

be permanently vacuum bag.

Tips

Remember to remove the backing from all plies before placing the next ply.

Keep track of the backing once they have been removed. This will help in verifying that all

the backings have been removed.

Page 4: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

4

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

Permanent Vacuum Bagging

Verify that the backing on the final is removed.

Place the solid parting film (non-perforated) on of the part and verify that it

extends onto the edge breather at least ¾” of an inch. Remove any wrinkles in

the parting film.

(Optional) – A pressure plate may be placed over the top of the solid parting film

for a smooth bag side surface.

Place the breather cloth over the solid parting film and verify that it reaches the

inside perimeter of the sealant tape.

Place probe pads on opposite corners of the caulplate on top of the breather.

(Make sure it is not touching the part.)

Place remove the probe bases from the probe tops and place the probe bases on

each of the probe pads.

Center the vacuum bag over the tool. Starting from the top, remove a small

section of the backing on the sealant tape from the middle. Do the same for the

bottom except this time you will need pull the bagging film tight and apply it to

the tape. This process will also need to be done on the left and right side.

Once the bagging film is applied to the centers of the sealant tape the corners

can now be applied. Remove the backing from one corner starting from the

center of the sealant tape to the corner. Pull the vacuum bag tight and apply it.

Do this for all four corner. The outcome should be a very tight vacuum bag with

no creases.

To apply the probe tops to the probe bases you will need to cut two slits in the

vacuum bag. These slits are located right at the hole of the probe base. (It is

recommend to make an X or cross the slits so the probe top can be connected

without force.

Once the probe top is in the slit it will need to be tightened with a quarter turn.

(Do not over tighten the probe top as it could stretch the vacuum bag and cause

a leak.)

Attach your vacuum hose and verify that you are pulling vacuum.

Attach a vacuum gauge.

Tips

Use a bagging sweep to sweep over the sealant tape and vacuum bag to ensure that there

are no leaks.

Make sure to always use a functional vacuum gauge. Any broken or worn vacuum gauges

may need give you the correct reading.

Page 5: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

5

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

Vacuum Bagging Leak Check

A minimum of 22”Hg is required.

At sea level you should be able to pull 29”Hg.

To perform a vacuum bagging leak check you will need to remove the vacuum

hose from the probe. You should not lose more than 2”Hg in five minutes.

If you are noticing that the vacuum is dropping fairly slow or rapidly apply the

vacuum hose and use the bagging sweep to sweep over the sealant tape and

vacuum bag to remove any creases or leaks.

Remove the vacuum hose again to see if there are any leaks left.

If there are no leaks your part is ready to be cured and can be placed in the oven

staging area.

Your part will need to be marked on the vacuum bag with your Name, Date,

Project, and Cure Profile.

Cure Profile-Oven Curing

All parts will have a cure profile specific to them.

The cure for this part will need to be cured at 250°F ±10°F for 90 minutes.

That doesn’t mean that you set your oven to 250°F and it will be fine. The ramp

up and ramp down of a part will affect the part integrity.

To find the ramp up rate we will need the Target Temperature (a°) - Ambient

Temperature (t°) = (e°) ÷ 3° = (r) minutes to ramp up to the target temperature.

Once you have reached your target temperature (250°F) you may start the cure

time or soak time.

Once your cure time has been complete you may start ramping down your

temperature. You will need to ramp down 3 degrees a minute. When you have

reached 130°F you may remove your part from the oven and debag your part.

Debagging

When debagging your part you will need to remove the vacuum probes. To

prevent misplacing or throwing away your probe bases cut the vacuum bagging

film around the vacuum probe and set the probes to the side.

Now cut around the inside perimeter of the sealant tape on the vacuum bag.

Remove the vacuum bag and peel back each layer one by one. (Breather cloth

and then solid parting film.

When removing the part from the caulplate be aware that there is resin flashing

on the edges of the part. This resin flashing is very sharp and can cause injury.

Example: Cure at 260°F±10° for 90 minutes.

260°-68°=192° ÷ 3° = 64 minutes to ramp up to 260°F

Page 6: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

6

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

(To avoid injury use masking tape and tape the edges or use sand paper and

start deburring the edge.)

Your part is now ready to be trimmed and sanded.

Trimming and Sanding

It is always good to have a final trim template for any composite part. You can

use a piece of wood, aluminum, and even a piece of paper.

When tracing out your part tape off the area that is going to be traced with

masking tape. (A color tex pencil can be used to avoid using masking tape.)

Trace the part out using a template (Size: 12.5 inches long x 9 inches wide).

You can now start trimming your part using a tile saw or band saw.

You will also need to mark and drill the holes for the rivets. You will need to use

a size 5/32 drill bit. When drilling the holes you will need to place a piece of

wood behind the part. This wood will help drilling a nice clean hole. Sometimes

when drilling without a support surface behind the part it can cause

delamination or fiber breakout.

Once you have trimmed your part you will need to sand the edges and round the

corners. Use a 220 grit sand paper when sanding your part. When sanding on

the edges do not sand against the fibers; sand with the fibers. (Sanding against

the fibers can cause the part to delaminate.)

You may come across a porous tool side surface. Meaning there are pin holes

between the weave. To fix that properly there two process you can do. You can

sand the surface until the pin holes are gone (do not sand into the fabric) or you

add a few layers of resin.

Sealing the Part

Before sealing your part you will need to do a real thorough cleaning. You do

not want to contaminate the resin. To clean the part after it has been sanded

take a Class A Wiper with a cleaning solvent (M.E.K. or Acetone) on it and wipe

the part down making sure that there is no dust or debris anywhere on the part.

(Always wear the proper PPE equipment.)

If you have encountered pin holes on the tool side surface you can fill those

holes with resin. (Also sealing the part) When filling those pin holes with resin

you can also achieve a very shiny tool side surface.

For this process you will need to use a resin system. Mix the resin and hardener

together thoroughly in a wax free cup for a minimum of two minutes. Apply the

resin to the part starting from the middle. Take a plastic applicator/sweep and

sweep the resin to the outside making sure that there are no air bubbles in the

resin. If there are air bubbles you can use a heat gun to remove the air bubbles.

The edges will also need to be sealed with the resin. Use a Class A Wiper or a

Page 7: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

7

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

clean cotton swab and wipe the edge of the part. The resin does not need to be

thick on the edge. Once you have removed the air bubbles you can let the resin

cycle through its cure. (This process may need to been a few times before all of

the air bubbles are gone. You may also buff the resin to achieve a glossy

surface.)

Another process of sealing your part is mixing a batch of resin (resin and

hardener in a wax free cup mixed for a minimum of two minutes) and applying

a very thin coat on the part. To do this you will need to cut small squares from a

clean Class A Wiper. Use a stir stick to apply a small amount of resin. Take one

of the squares that were cut and wipe the resin on the part. When doing this you

do not want any streaks. You will start to notice the color change on the part.

You will also want to seal the edges like this and change the square Class A

Wipers as you progress.

Once you have sealed your part it will need to be cured again. This will either

cure at room temperature or in the oven depending on the type of resin that you

are using.

Assembly

Now that your part has cured you can now assembly your part.

Use a clamp to hold the clip in place on the part. Make sure that the holes are

lined up.

Now you can rivet the clip onto the part.

Once you have finished your assembly your part is now finished and you have a

complete clipboard.

Page 8: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

8

Ho

w-to

Ma

nu

fac

ture

a C

om

po

site

Clip

bo

ard

(Pre

-Pre

g)

Pre-Preg Clipboard Ply Table

Ply # Material Orientation

1 250°F Graphite PW 0°/90°

2 250°F Fiberglass Style 7781 0°/90°

3 250°F Fiberglass Style 7781 0°/90°

4 250°F Fiberglass Style 7781 0°/90°

5 250°F Fiberglass Style 7781 0°/90°

6 250°F Fiberglass Style 7781 0°/90°

7 250°F Fiberglass Style 7781 0°/90°

8 250°F Graphite PW 0°/90°

*This ply chart is what we found useful, if needed you can alter or use

your own ply table to manufacture the clipboard.

Page 9: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Manufacturing Traveler

Name ________________ Date __________ Project ________________

Objective: ___________________________________________________________________

Tool Prep

Verified

Applying Frekote®

Coat Time Dry Time

1

2

3 Verified

Pre-Staging Work Area

Roll Serial #: ______________

Roll #: ______________

Material Type: _________________

Verified

Lay-UpResin System ____________________ Mix Ratio ________

Pot Life ________ Resin Weight ________

Cure Time ______________________ Hardener Weight _______

Mix Start Time _________ Total ______

Weight of Fabric _______ Mix Time _________ Verified

Vacuum Bagging Vacuum Bag Leak Check (Min. 22"Hg)

Vacuum Pressure ____

Vacuum Lost within 5 Minutes (no more than 2") ____

Verified

CuringCure Temperature ______ Hold cure temperature for ____ minutes

Cure Time ______ Ramp up rate 3° a minute for __ minutes. Ramp down rate _3° a minute.

Target Temp a° - Ambient Temp t° = e° ÷ 3° = r minutes to ramp up to a° Verified

Obtain a tool of your choice. Tool #/Description ______________________________________________________________

Once you have obtained your tool use a cleaning solvent and a Scotch Brite Pad to clean any debris.

Use a Class A Wiper to clean the leftover debris.

Tape around the perimeter of your tool with masking tape. This area is where your sealant tape will be applied.

Use a Class A Wiper to apply 3 layers of Frekote® mold release. Note: Move the wiper with a steady

motion alternating from top to bottom and left to right after each coat. Avoid wiping over the same area that was

applied until the solvent has evaporated.

Allow 5-10 minutes between each coat for solvent evaporation.

Cut and gather the required bagging materials. Nylon Vacuum Bagging Film

Non-Perf and Perf Parting Film

Nylon Peel Ply

Breather Cloth

Remove the blue masking tape and apply vacuum bagging sealant tape around perimeter.

Note: Do not remove backing on sealant tape until the final bag.

Create a ply table for the part being manufactured.

Cut and label plies according to ply chart with the ply number and orentation.

Obtain two vacuum probes, a vacuum gauge, and a vacuum hose.

Verify that your vacuum source is working properly.

Layout the required vacuum bagging materials in the order of operation.

Vacuum Probes, Guage, Hose

Locate the first ply on the tool.

Remove any debris from the plies.

If applicable remove the backing on one side of the material.

Continue to lay-up the part according to the ply table.

Verify each ply is laid-up.

Apply a 1" wide edge breather continuously around the perimeter of the part.

Apply perforated parting film onto part.

Apply non-perforated parting film over perorated parting film.

Apply nylon peel ply.

Apply breather cloth and probe pads.

Apply vacuum probes and nylon vacuum bag. Apply vacuum hose and vacuum pressure.

Note: Vacuum can be removed once part temperature drops below 135°F.

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017

Page 10: 9” x 12.5” Advanced Composite Clipboard...To apply the probe tops to the probe bases you will need to cut two slits in the vacuum bag. These slits are located right at the hole

Manufacturing Traveler

Cutting and DeburringTool/Equipment Used to Cut ______________________

Is the equipment working properly? __________

Verified

Assembly and Seal

Note: When applying the resin use a "Class A" Wiper and wipe the resin onto the part until there are no streaks.

Verified

Ply # Material Orentation Notes/Sketches Final Verification

Date

Verified

Deburr the edges of the part

Place masking tape over the area needed to be cut (Optional)

If applicable use a template to trace the part with a sharpie

Cut the part

Verify the part matches the template

If applicable accuire the parts necessary for assembly

Use a two part epoxy resin system to seal the part where the fibers are exposed

Cure the resin seal for the oppropriate cure time

Assemble the part correctly

Rev A1 Pacific Coast Composites | [email protected] | 1.888.535.1810 | www.pccomposites.com © 2017