  • 7/30/2019 9203 CSM Monthly Report Template

    1/2

    DeepStar Phase IXMonthly Progress Report

    CTR 9203 Delivery Date: 12/31/2009 Budget $600,000

    In the DATE field below, indicate the month the report covers, not the month the report

    is prepared. For example, if you are preparing a report for November 2008 on December7, 2008, you would select November 2008 below. Please submit your monthly report viaemail to the Project Manager with a copy to the Champion by the 7 th day of the monthfollowing the report. The report file name should be saved as:Month_CTR#_Company Name (i.e., Nov_9203_CSM).

    9203 A Hydrate Plugging Model for High Water CutsThe scope of this work is significantly extended from that covered in previous effortsfrom CTR 8203. The initial CSMHyK-OLGA program considered only the case wherethe aqueous phase is dispersed in the hydrocarbon liquid phase. Hydrate blockage assuch was predicted by the viscosification of the hydrocarbon liquid phase.

    In Phase IX, the goal is to build upon the lessons learned from the construction of theCSMHyK-OLGA model/program and to extend the model/program to high water cutsystems (CSMHyK-freewater-OLGA).

    To accomplish these goals, the contractor will perform five tasks:

    Task 1: Based upon experiments, develop a conceptual picture of the hydrate formationmechanism for high water cuts, including free water scenarios.

    Task 2: Measure particle/aggregate sizes and hydrate growth - key parameters topredict hydrate plugging via a high pressure cell/particle size analysis (FBRM/PVM)experiments.

    Task 3: Measure the effect of plugging variables on flow via viscosity and jammingmechanisms for high water cut systems.

    Task 4: Develop the CSMHyK-freewater-OLGA (CSM Hydrate Kinetics incorporatingFree Water for use with OLGA) model for high water cut systems.

    Task 5: Test the model in CSMHyK-freewater-OLGA against flowloop data and fielddata (e.g. Tommeliten-Gamma, XOM flowloop).

    Champion(s) Email Phone

    Jeff Creek - CVX [email protected] 713-754-7347

    Project Manager Email Phone

    Jim Chitwood - CVX [email protected] 713-754-4513Contractor Email Phone

    Carolyn Koh - CSM [email protected] 303-273-3237

    Select appropriate reporting year and month below by double clickingthe check box and then by selecting the default value checked.

    2008 2009 2010

    mailto:[email protected]:[email protected]
  • 7/30/2019 9203 CSM Monthly Report Template

    2/2

    DeepStar Phase IXMonthly Progress Report

    JanuaryFebruaryMarch

    AprilMayJune

    JulyAugustSeptember

    OctoberNovemberDecember

    Activity & Summary Accomplishments:

    Activities Planned Next Period:Corrective Action:

    Amount Expended:

    Percent Complete: