MINUTES OF THE 9 th S.L.C. MEETING HELD ON 20/02/2016 AT 11.30 AM. IN THE CONFERENCE HALL OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P The list of the Members who attended the meeting is appended. Agen da Item Brief Description of the Issue Decision of the Committee 1 Confirmation of the Minutes of the previous Meeting held on 04/07/2015 SLC confirmed the minutes of the previous meeting held on 04/07/2015 2 Follow up action on the minutes of the previous Meeting held on 04/07/2015. Noted. 3 IIPP 2005-10& IIPP 2010-15 schemes – Sanction of reimbursement of stamp duty, reimbursement of land cost purchased in IEs/IDAs, reimbursement of power cost and sanction of reimbursement of sales tax - Regarding. **** The Verification / Scrutiny Committee meetings held on 05/01/2016, 07/01/2016, 12/01/2016 22/01/2016 & 12/02/2016 has verified / Scrutinized (08) claim application of reimbursement of Sales Tax and (51) claim applications of reimbursement of power cost as per the Guidelines under respective schemes and recommended for sanction/rejection of eligible Incentives / Concessions to the units. The Minutes of Verification / Scrutiny Committee of Sales Tax and Power cost are appended as Annexures – I ABSTRACT S No General Incentives No of units Amount(in Rupees ) 1 Sales Tax 8 25,63,09,291/- 2 Power Cost 51 65,62,55,885/- GRAND TOTAL 59 91,25,65,176/- Or Say : Rs.91.20 Cr The Verification / Scrutiny Committee of Investment Subsidy and Sales Tax have recommended for sanction / rejection of eligible Incentives/concessions to the units as mentioned below. SANCTION OF REIMBURSEMENT OF SALES TAX. S N o Appri sal Numb er & Date of SVC meeti ng Date of receip t of claim Name of the unit Nat ure of Sch eme Decision SLC has examined the recommendations of the Verification / Scrutiny Committee and decided to sanction eligible incentives / concessions to the industrial units as mentioned below under various schemes: ABSTRACT S No General Incentives No of units Amount(in Rupees ) 1 Sales Tax 8 25,60,96,313/- 2 Power Cost 48 58,80,30,102/- GRAND TOTAL 56 84,41,26,415/- Or Say : Rs.84.41 Cr DETAILS 1. Reimbursment of Sales Tax Sanctioned reimbursement of sales tax to (08) units under IIPP and the list is appended as in Annexure – I. In respect of Sl. No. 7, M/s Adani Wilmar Limited, the Revised Rs. 1,74,18,039/- (Rupees One Crore Seventy Four Lakhs Eighteen Thousand and Thirty Nine only) was sanctioned towards sales tax reimbursement. 2. Reimbursment of Power Cost sanctioned to (48) units under IIPP and the list is appended as Annexure – II. In respect of Sl. No. 21 M/S. Usha Spincoat Pvt Ltd, Sl. No 22 M/s. Shri Govindaraja Textiles and Sl. No 50 M/s. Idupulapadu Cotton Mils Pvt Ltd, SLC deferred the cases to next meeting.

Upload: lekiet

Post on 14-Apr-2018

237 views

Category:

Documents


3 download

TRANSCRIPT

MINUTES OF THE 9th

S.L.C. MEETING HELD ON 20/02/2016 AT 11.30 AM. IN THE CONFERENCE HALL

OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P

The list of the Members who attended the meeting is appended.

Agen

da

Item

Brief Description of the Issue Decision of the Committee

1 Confirmation of the Minutes of the previous Meeting

held on 04/07/2015

SLC confirmed the minutes of the previous

meeting held on 04/07/2015

2 Follow up action on the minutes of the previous Meeting

held on 04/07/2015.

Noted.

3

IIPP 2005-10& IIPP 2010-15 schemes – Sanction

of reimbursement of stamp duty, reimbursement

of land cost purchased in IEs/IDAs,

reimbursement of power cost and sanction of

reimbursement of sales tax - Regarding.

****

The Verification / Scrutiny Committee

meetings held on 05/01/2016, 07/01/2016,

12/01/2016 22/01/2016 & 12/02/2016 has verified /

Scrutinized (08) claim application of reimbursement

of Sales Tax and (51) claim applications of

reimbursement of power cost as per the Guidelines

under respective schemes and recommended for

sanction/rejection of eligible Incentives /

Concessions to the units. The Minutes of

Verification / Scrutiny Committee of Sales Tax and

Power cost are appended as Annexures – I

ABSTRACT

S No

General Incentives No of units Amount(in Rupees )

1 Sales Tax 8 25,63,09,291/-

2 Power Cost 51 65,62,55,885/-

GRAND TOTAL 59 91,25,65,176/-

Or Say : Rs.91.20 Cr

The Verification / Scrutiny Committee of

Investment Subsidy and Sales Tax have recommended

for sanction / rejection of eligible Incentives/concessions

to the units as mentioned below.

SANCTION OF REIMBURSEMENT OF SALES TAX.

S

N

o

Appri

sal

Numb

er &

Date

of

SVC

meeti

ng

Date

of

receip

t of

claim

Name of

the unit

Nat

ure

of

Sch

eme

Decision

SLC has examined the recommendations of the

Verification / Scrutiny Committee and decided

to sanction eligible incentives / concessions to

the industrial units as mentioned below under

various schemes:

ABSTRACT

S No

General

Incentives

No of

units

Amount(in

Rupees )

1 Sales Tax 8 25,60,96,313/-

2 Power Cost 48 58,80,30,102/-

GRAND TOTAL 56 84,41,26,415/-

Or Say :

Rs.84.41 Cr

DETAILS

1. Reimbursment of Sales Tax Sanctioned

reimbursement of sales tax to (08) units

under IIPP and the list is appended as in

Annexure – I. In respect of Sl. No. 7, M/s

Adani Wilmar Limited, the Revised Rs.

1,74,18,039/- (Rupees One Crore Seventy

Four Lakhs Eighteen Thousand and Thirty

Nine only) was sanctioned towards sales

tax reimbursement.

2. Reimbursment of Power Cost sanctioned

to (48) units under IIPP and the list is

appended as Annexure – II. In respect of

Sl. No. 21 M/S. Usha Spincoat Pvt Ltd, Sl.

No 22 M/s. Shri Govindaraja Textiles and

Sl. No 50 M/s. Idupulapadu Cotton Mils

Pvt Ltd, SLC deferred the cases to next

meeting.

:: 2 ::

1

10

05/01/

2016

19/05/

2015

M/s

Teamec

Chlorates

Limited,

Industrial

Growth

Centre,

Gundlapall

i Village,

Maddipadu

Mandal,

Prakasham

District

IIPP

201

0-15

Rs.17,37,975/- (Rupees Seventeen Lakhs

Thirty Seven Thousand Nine Hundred and

Seventy Five only) towards sales tax

reimbursement for the year 2014-15, subject

to submission of the shortfall

information/documents i.e. 1. Valid CFO

issued by APPCB., 2. Factories Department

approval. 3. To obtain Civil Engineer

Certificate for record. 4. Assistant

Commissioner of Commercial Taxes

Department opined that audited balance sheet

shall be obtained along with upto date

assessment orders from the unit for

scrutinizing the components form-A.

2

12

12/02/

2016

15/06/

2015

M/s

A.S.Jute

products

Pvt Ltd.,

(Expansion

)

Nerallavala

sa Village,

Padmanaba

m Mandal,

Visakhapat

nam

IIPP

201

0-15

Rs.3,70,976/- (Rupees Three Lakhs Thirty

Seven Thousand Three Hundred and Twenty

only) towards sales tax reimbursement for

year 2014-15 i subject to submission of the

shortfall information/documents. i.e. 1.

Confirmation on Turnover particulars

furnished by the unit holder 2. Board

Resolution authorising the person to sign the

documents .3. Sale Deed 4. Land

Conversion permission 5. Civil Engineer

Certificate 6. Charted Accountant certificate

indicating share holding of Directors 7.

Status of original unit

3

20

12/02/

2015

27/06/

2015

M/s.

Godrej

Agrovet

Limited

Unit-2

(Expansion

-1)

IIPP

201

0-15

SVC verified the claim application in detailed

and found that GM, DIC recommended zero

value proposals towards reimbursement of

sales tax for the year of 2013-14 under IIPP

2010-15.

4

21

12/02/

2015

27/06/

2015

M/s.

Godrej

Agrovet

Limited

Unit-2

(Expansion

-1)

IIPP

201

0-15

Rs.1,20,50,150/- (Rupees One Crore Twenty

Lakhs Fifty Thousand One Hundred and Fifty

only) towards sales tax reimbursement for

year 2014-15 subject to submission of the

shortfall information/documents i.e. 1.

Confirmation of GM, DIC on the production

particulars for the last 3 years prior to date of

the commencement production of the

expansion project.)

5

37

12/02/

2016

27/07/

2015

M/s

K.P.Polyle

fin Sacks

Private

Limited,

Sy.No.913,

Epuru-

1A(V),

Doruvulap

alem (P),

Muthukur(

M), SPSR

Nellore

District

IIPP

200

5-10

Rs.15,34,990/- (Rupees Fifteen Lakhs Thirty

Four Thousand Nine Hundred and Ninety

only) towards Sales Tax reimbursement for

the year 2014-15 , subject to submission of the

shortfall information/documents i.e. 1.

Building plan approval from Town & Country

Planning Department & Factories

Department.2. Valid CFO from APPCB for

woven sacks is furnished and CFO for

additional line of activities like Tarpulin and

fabric .3. CA certificate indicating the % of

share holding of directors 4. Board resolution

authorizing the person to sign the claim. 5.

Land Conversion approval 6. Statement of

accounts in case of aided unit.7. List of plant

& machinery duly certified by GM, DIC and

Financial Institution as per operational

guidelines.8. As per the claim application, the

line of activity is HDPE and PP Woven

Sacks.9. As per Form – A Certificate

indicating additional products: a) Woven

Sacks - existing activity (Nos) b) Fabric –

Additional Activity.( Kgs) c) Tarpaulin –

Additional Activity. (Nos) d) The production

capacity indicated in IEM is in 4500 M.Ts.

and capacity is in Numbers in Form – A

certified by Commercial Tax Department and

hence could not be correlated. GM,DIC to

furnish the products indicated in Form A in

terms of Kgs.

3. SLC decided to release incentive amount to

the unit after the apportioned amount in

respect of tax paid in the State Telangana

as per the Section 56(1) (2) of the A.P.

Reorganisation Act 2014 is received.

4. SLC have taken a view of the member

representing State Bank of Hyderabad and

decided to furnish the information of

claims sanctioned duly indicating the name

of the Financial Institution.

5. SLC opined that the agenda shall be

circulated well before 2 days of convening

the State Level Committee so as to enable

the members to go through the contents

carefully while taking decisions.

6. SLC also taken a view of member

representing the AP Spinning Mills

Association and decided to allocate the

time from 3.00 PM to 5.00 PM on every

Monday exclusively for the spinning mills

to reconcile the shortfall information so as

to expedite the sanctions and clear the

issues pertaining to Textile Sector.

:: 3 ::

6

38

12/01/

2016

27/07/

2015

M/S

Gemini

Edibles

And Fats

India Pvt.

Ltd., S.No.

1607/2,

Indl.Park,

Pantapale

m (V),

Muthukur

(M), SPSR

Nellore

District

IIPP

200

5-10

Rs.12,78,86,725/- (Rupees Twelve Crores

Seventy Eight Lakhs Eighty Six Thousand

Seven Hundred and Twenty Five only)

towards Sales Tax reimbursement for the year

2014-15. subject to submission of the

shortfall information/documents i.e. 1.

Boiler certificate 2. List of Plant &

Machinery duly certified by GM, DIC and

Financial Institution as per operational

guidelines. 3. CA certificate indicating the

share holding of directors. 4. An amount of

Rs.17,28,90,730/- was paid in residual Andhra

Pradesh certified by CT Department Nellore,

AP and an amount of Rs 8,28,82,720/-

certified by CT Department, Hyderabad.

Further, SVC opined that only eligible sales

tax reimbursement against the tax paid in

residual A.P. shall be paid by A.P.

Government as per procedure laid down in

A.P.State Reorganisation Act. Hence SVC

recommended for sanction of

Rs.8,64,45,365/- against the tax paid in

residual Andhra Pradesh. (50% of Rs.

17,28,90,730/). In respect of an eligible

amount of Rs. 4,14,41,360/- (50% of

8,28,82,720/-) signed by CT Department,

Hyderabad towards sales tax

reimbursement, the release of funds shall

be shared by the State of A.P and

Telangana as per the outcome of the

Government decision.

7

42

12/02/

2016

10/08/

2015

M/s Adani

Wilmar

Limited,

Sy.No.

269, 270,

284, 287,

Thammava

ram (V),

Suryaraope

ta

Panchayat,

Kakinada

Rural

Mandal,

East

Godavari

District

IIPP

200

5-10

Rs.1,76,31,017/- (Rupees One Crore Seventy

Six Lakhs Thirty One Thousand and

Seventeen only) towards Sales Tax

reimbursement for the year 2012-13 & 2013-

14 , subject submission of the shortfall

information/documents i.e 1. DTCP approval

with approved plan. 2. Valid CFO from

APPCB 3. Power load is not indicated at the

time of filing claim application 4. Valid Boiler

certificate 5. Machinery statement not

certified as per guidelines. 6. Bank sanction is

in favour of old unit

8

50

12/02/

2016

14/08/

2015

M/S

Krishnapat

nam Oils

And Fats

Pvt. Ltd.,

Sy.No. 292

And 317,

Pantapale

m (V),

Epur BIT-I

Village,

Muthukuru

Mandal,

Spsr

Nellore

District

IIPP

200

5-10

Rs.9,51,27,458/- (Rupees Nine Crores Fifty

One Lakhs Twenty Seven Thousand Four

Hundred and Fifty Eight only) towards Sales

Tax reimbursement for the year 2014-15

under IIPP 2005-10, subject to submission of

the shortfall information/documents i.e 1.

Confirmation on production particulars for the

year 2014-15 by CT Department and GM,

DIC as the production particulars are not

given in Form-A. 2. Board resolution

authorizing the person to sign the claim

application .3. CA certificate indicating the

share holding 4. Power release certificate 5.

DTCP approval 6. Inward date on claim

application filed in DIC 7. Land conversion

approval 8. Valid CFO from APPCB.

II.REIMBURSEMENT OF POWER COST:

S

N

o

Appri

sal

Numb

er &

Date

of

SVC

meeti

ng

Date

of

receip

t of

claim

Name of

the unit

Nat

ure

of

Sch

eme

Decision

1

1

12/02/

2016

28/11/

2014

M/s Eisai

Pharma

and

Technolog

y &

Manufactu

ring

IIPP

200

5-10

Rs.1,38,27,240/- (Rupees One Crore Thirty

Eight Lakhs Twenty Seven Thousand Two

Hundred and Forty only) towards power

cost reimbursement for 1st & 2nd quarter of

2014-15 Subject to submission of the

shortfall information/documents i.e Civil

:: 4 ::

Private

Ltd.,

Parawada

Visakhapat

nam

Engineer Certificate for all civil works.

2

4

12/02/

2016

24/01/

2015

M/s Eisai

Pharma

and

Technolog

y &

Manufactu

ring

Private

Ltd.,

Parawada

Visakhapat

nam

IIPP

200

5-10

Rs.56,85,860/- (Rupees Fifty Six Lakhs

Eighty Five Thousand Eight Hundred and

Sixty only) towards power cost

reimbursement for 3rd quarter of 2014-15

under Industrial Investment Promotion

Policy 2005-2010, subject to submission of

the shortfall information/documents i.e.

Civil Engineer Certificate for all civil

works.)

3

11

22/01/

2016

15/06/

2015

M/s A.S.

Jute

products

Pvt Ltd.

(Expansiop

n)

,Nerallaval

asa

Village,

Padmanaba

m Mandal,

Visakhapat

nam

IIPP

201

0-15

Rs.3,37,320/- (Rupees Three Lakhs Thirty

Seven Thousand Three Hundred and

Twenty only) towards power cost

reimbursement for 1st half and 2nd half year

of 2014-15 in respect of expansion project,

subject to submission of the shortfall

information/documents i.e 1. Board

Resolution authorising the person to sign

the documents.2. Sale Deed., 3. Land

Conversion permission. 4. Civil Engineer

Certificate.5. Chartered Accountant

Certificate certifying the year-wise power

consumption detaileds for the last 3 years.

6. Charted Accountant certificate

indicating share holding of Directors.7.

GM DIC shall to consult the DE

(operations) APEPDCL and verify the

additional load in the power release

certificate with respect additional

machinery installation . 8. Status of

original unit .

4

16

22/01/

2015

27/06/

2015

M/s.

Godrej

agrovet

Limited

Unit-2

(Expansion

-1), West

Godavari

District

IIPP

201

0-15

SVC verified the claim and found the

following shortfall information. 1. The

approval issued by the Town and Country

planning Department is in the name of M/s

Godrej Oil Palm Ltd.,2. Power is released

on 13.04.2012 for 500 KVA under HT Cat-

II commercial category.3. As per the

scheme of amalgamation, Godrej Oil Palm

Ltd., is amalgamated with Godrej Agro vet

Limited on 16.03.2012 but the date of

commencement of commercial production

after amalgamation is declared on

15.06.2013. 4. Power consumption of the

unit is less than the base consumption and

hence recommended zero value proposals

for 1st half year 2013-14. 5. Valid Gram

Panchayat approval 6..Land Conversion

permission. 13. List of Plant & Machinery

duly certified by the GM, DIC and

Financial Institution as per guidelines in the

prescribed format in original. 7. Factories

Department approval. 8. GM, DIC has

his remarks on existing unit ie M/s Godrej

Oil Palm Ltd., and unit not achieving the

Base power consumption units in respect of

expansion project.

SVC opined that the GM, DIC

recommended zero value proposals, the

above shortfall information shall be

obtained from the GM,DIC in order to

upkeep the file for processing the future

claims.

5

17

22/01/

2015

27/06/

2015

M/s.

Godrej

agrovet

Limited

Unit-2

(Expansion

-1), West

Godavari

District

IIPP

201

0-15

SVC verified the claim application in

detailed and found that GM, DIC

recommended zero value proposals towards

reimbursement of power cost for 2nd half

year of 2013-14 under IIPP 2010-15.

:: 5 ::

6

18

22/01/

2015

27/06/

2015

M/s.

Godrej

agrovet

Limited

Unit-2

(Expansion

-1), West

Godavari

District

IIPP

201

0-15

SVC verified the claim application in

detailed and found that GM, DIC

recommended zero value proposals towards

reimbursement of power cost for 1st half

year of 2014-15 under IIPP 2010-15.

7

19

22/01/

2015

27/06/

2015

M/s.

Godrej

agrovet

Limited

Unit-2

(Expansion

-1), West

Godavari

District

IIPP

201

0-15

SVC verified the claim application in

detailed and found that GM, DIC

recommended zero value proposals towards

reimbursement of power cost for 2nd half

year of 2014-15 under IIPP 2010-15.

8

22

22/01/

2016

03/07/

2015

M/s NSL

Textiles

Limited,

APIIC

Industrial

Park,

Pulivendul

a, YSR

District

IIPP

200

5-10

Rs.1,43,41,895/- (Rupees one crore forty

three lakhs forty one thousand eight

hundred ninty five only) towards power cost

reimbursement for 4th quarter of 2014-15,

subject to submission of the shortfall

information/documents i.e 1. Reasons for

increase in power load with respect initial

filing of claim application.2. Power 2000

KVA released on 11.03.2010 and 1000

KVA released on 07.07.2010 and the same

is not reflected in Part B self declaration.

3. Approval of change of name of the

unit.4. Bank Term Loan Sanction letter

5. Board resolution 6. DTCP approval .

9

23

12/02/

2016

06/07/

2015

M/s Eisai

Pharma and

Technology

&

Manufacturin

g Private

Ltd.,

Parawada

Visakhapatna

m

IIPP

200

5-10

Rs.1,35,50,960/- (Rupees One Crore Thirty

Five Lakhs Fifty Thousand Nine Hundred

and Sixty only) towards power cost

reimbursement for 4th quarter of 2014-15

and 1st quarter of 2015-16 subject to

submission of the shortfall

information/documents i.e Civil Engineer

Certificate for all civil works.)

1

0

24

12/01/

2016

08/07/

2015

M/s JSW

Cement

Limited,

Sy.No.206,

Bilakalgud

ur (V),

Gadivenm

ula (M),

Kurnool

District

IIPP

201

0-15

Rs.4,42,04,960/- (Rupees Four Crores Forty

Two Lakhs Four Thousand Nine Hundred

and Sixty only) towards power cost

reimbursement for 1st half year of 2014-15,

Subject to submission of the shortfall

information/documents 1. Certification of

incorporation of the company , 2. Board

Resolution authorising the person to sign

the claim application is 3. Approved plans

for expansion issued by T & C P

Department .4. Land conversion approval

5. Civil Engineer Certificate for all civil

works .6. Valid CFO / Acknowledgement

from APPCB 7. Statement of Machinery

duly certified by the Financial Institution

and General Manager, DIC as per

guidelines 8. Land Sale Deed / Lease

Deed 9. Statement of Accounts in

original or attested copy .10. Approval and

approved plans from the Factories

Department 11. Power release certificate.

:: 6 ::

1

1

25

12/02/

2016

08/07/

2015

M/s South

India

Krishna

Oil and

Fats Pvt.

Ltd.,

Sy.No.

275, 279,

280 & 281,

Epuru Bit-

IB,

Pantapale

m

Muthukur

(V&M),

SPSR

Nellore

District

IIPP

200

5-10

Rs.23,78,800/- (Rupees Twenty Thred

Lakhs Seventy Eight Thousand and Eight

Hundred only) towards power cost

reimbursement for 3rd quarter of 2014-15,

subject submission of the shortfall

information/documents i.e 1. Approved

plans by T & C P Department 2. Boiler

Certificate 3. Land conversion approval

4. GM, DIC has certified the activity in

claim Refined Oil and not in his covering

letter.5. Person signing the claim has not

indicated name of the person to verify the

Board Resoution Authorization 6.

Building plan approval from Factories

Department 7. Statement of Accounts

duly certified by GM, DIC 8. List of plant

& machinery duly certified by GM, DIC &

Financial institution as per operational

guidelines. 9. Reasons for power load

increased from 1000 KVA to 2500

KVA.10. Original DCP 27/09/2011

clarify.11. Additional power was given on

07/12/2013 as per Form-B.12. Power Bill

for January 2015.

1

2

27

12/01/

2016

10/07/

2015

M/s JSW

Cement

Limited,

Sy.No.206,

Bilakalgud

ur (V),

Gadivenm

ula (M),

Kurnool

District

IIPP

201

0-15

Rs.5,55,52,245/- (Rupees Five Crores Fifty

Five Lakhs Fifty Two Thousand Two

Hundred and Forty Five only) towards

power cost reimbursement for 2nd half year

of 2014-15 (subject to submission of the

shortfall information/documents i.e 1.

Certification of incorporation of the

company 2. Board Resolution authorising

the person to sign the claim application is

3. Approved plans for expansion issued

by T & C P Department .4. Land

conversion approval 5. Civil Engineer

Certificate for all civil works 6. Valid

CFO / Acknowledgement from APPCB 7.

Statement of Machinery duly certified by

the Financial Institution and General

Manager, DIC as per guidelines 8. Land

Sale Deed / Lease Deed 9. Statement of

Accounts in original or attested copy .10.

Approval and approved plans from the

Factories Department.

1

3

29

12/01/

2016

M/S Loyal

Textile

Mills Ltd.,

Industrial

Park,

Menakur

(V),

Naiduper(

M)

IIPP

201

0-15

Rs.2,90,89,130/- (Rupees Two Crores

Ninety Lakhs Eighty Nine Thousand One

Hundred and Thirty only) towards power

cost reimbursement for 1st and 2nd half year

of 2014-15, subject to submission of the

shortfall information/documents i.e. 1.

There is a variation in line of activity

recommended by GM, DIC with respect to

IEM Part B obtained. 2. Certificate of

incorporation 3. Board resolution

authorizing the person to sign the

documents. 4. Approved plan of Gram

Panchayat and Factories Department.5.

Valid CFO from APPCB .6. Attested Bank

term loan sanction letter 7. List of Plant &

Machinery Statement not attested and not

certified in the prescribed format 8.

Statement of accounts not attested 9. Civil

Engineer certificate is furnished without

attestation.10. Project report.11. CA

certificate indicating share holding of

Directors. 12. The reasons for release of

power after DCP.

:: 7 ::

1

4

30

12/01/

2016

M/S

Gemini

Edibles

And Fats

India Pvt.

Ltd., S.No.

1607/2,

Indl.Park,

Pantapale

m (V),

Muthukur

(M), SPSR

Nellore

Ditrict

IIPP

200

5-10

Rs.34,68,950/- (Rupees Thirty Four Lakhs

Sixty Eight Thousand Nine Hundred and

Fifty only) towards power cost

reimbursement for 3rd quarters of 2014-15

subject to submission of the shortfall

information/documents i.e 1. SVC opined

that as the Meeseva receipt No. for 4th

quarter of 2014-15 is not filed in covering

letter, clarification from GM,DIC.2. Date is

not recorded in claim application physically

filed for 4th quarter 2014-15. 3. Valid CFO

from APPCB 4. Valid Boiler certificate 5.

List of Plant & Machinery duly certified by

GM, DIC and Financial Institution as per

operational guidelines. 6. CA certificate

indicating the share holding particulars.

1

5

31

12/01/

2016

27/07/

2015

M/S.Sudar

shanam

Spinning

Mills Ltd,

R.S No:

52&53,

Tirumalagi

ri (V),

Jaggaipet

(M),

Krishna

Dist

IIPP

200

5-10

Rs.73,32,760/- (Rupees Seventy Three

Lakhs Thirty Two Thousand Seven

Hundred and Sixty only) towards power

cost reimbursement for 3rd and 4th quarter

of 2014-15, subject to submission of the

shortfall information/documents i.e 1.

Clarification with regard to capacity of the

plant in terms of kgs as the capacity is

mentioned in terms of ROTORS in IEM

Part B. 2. Reasons for increase in power

load in the present claim with respect to

power load as on DCP ie from 1077 KVA

to 1672 KVA.3. Land conversion

permission,Civil Engineer certificate and

project report. 4. Board resolution

authorizing the person to sign the claim

applications for 3rd and 4th quarter of 2014-

15. 5. Valid CFO from APPCB.6. CA

Certificate indicating share holding

particulars.

1

6

32

12/01/

2016

27/07/

2015

M/S.Sri

Vishnu

Shankaar

Mills Ltd,

Gopinenip

alem (V),

Vatsavai

(M),

Krishna

Dist

IIPP

200

5-10

Rs.88,66,700/- (Rupees Eighty Eight Lakhs

Sixty Six Thousand and Seven Hundred

only) towards power cost reimbursement for

3rd and 4th quarter of 2014-15, subject to

submission of the shortfall

information/documents i.e 1. Valid CFO

from APPCB 2. List of Plant & Machinery

duly certified by GM, DIC and Financial

Institution as per operational guidelines.3.

Project report 4. Land conversion

permission 5. CA certificate indicating the

% of share holding of directors 6. Reasons

for increase in power load from 900 KVA

to 1150 KVA and clarification on connected

load in HP/KW.7. Attested copy of

Statement of accounts.8. Board resolution

authorizing the person to sign the claim

application.

1

7

33

12/01/

2016

27/07/

2015

M/s.Rajapala

yam Mills

Ltd,

Gopinenipal

em (V),

Vatsavai

(M), Krishna

Dist

IIPP

200

5-10

Rs.90,38,170/- (Rupees Ninety Lakhs

Thirty Eight Thousand One Hundred and

Seventy only) towards power cost

reimbursement for 3rd and 4th quarter of

2014-15, subject to submission of the

shortfall information/documents i.e 1. Valid

CFO from APPCB.2. List of Plant &

Machinery duly certified by GM, DIC and

Financial Institution as per operational

guidelines.3. Land conversion permission 4.

CA certificate indicating the % of share

holding of directors 5. Board resolution

authorizing the person to sign the claim

application.

1

8

34

12/01/

2016

27/07/

2015

M/S.Sri

Harini

Textiles

Limited,

R.S No:

47,48, &

49

Tirumalagi

ri (V),

Jaggaipet

(M),

Krishna

Dist

IIPP

200

5-10

Rs.72,63,640/- (Rupees Seventy Two Lakhs

Sixty Three Thousand Six Hundred and

Forty only) towards power cost

reimbursement for 3rd and 4th quarter of

2014-15, subject to submission of the

shortfall information/documents i.e 1. Line

of activity is not mentioned by GM,DIC

while recommending the claim proposal.2.

Valid CFO from APPCB duly attested.3.

Project report 4. Land conversion

permission 5. CA certificate indicating the

% of share holding of directors 6. Board

resolution authorizing the person to sign the

claim.7. Reasons for increase in power load

:: 8 ::

from 1077 KW to 1624.83 KW at the time

of submission of claim.

1

9

35

12/02/

2016

27/07/

2015

M/s.Sandh

ya

Spinning

Mill Ltd.,

Krishna

District

IIPP

200

5-10

Rs.89,57,050/- (Rupees Eighty Nine Lakhs

Fifty Seven Thousand and Fifty only)

towards power cost reimbursement for 3rd

and 4th quarter of 2014-15, subject to

submission of the shortfall

information/documents i.e 1. Clarification

with regard to capacity of the plant in terms

of Kgs as the capacity is mentioned in terms

of ROTORS in IEM part-B. 2. Valid CFO

from APPCB.3. List of plant & machinery

duly certified by GM, DIC & Financial

Institution as per operational guidelines.4.

Land conversion permission 5. CA

certificate indicating the % of share holding

of directors 6. Board resolution authorizing

the person to sign the claim. 7. Reasons for

increase in power load from 900 KVA to

1150 KVA at the time of submission of

claim.

2

0

36

12/02/

2016

27/07/

2015

M/s

K.P.Polyle

fin Sacks

Private

Limited,

Sy.No.913,

Epuru-

1A(V),

Doruvulap

alem(P),

Muthukur(

M), SPSR

Nellore

District

IIPP

201

0-15

Rs.18,73,270/- (Rupees Eighteen Lakhs

Seventy Three Thousand Two Hundred and

Seventy only) towards power cost

reimbursement for 2nd half year of 2014-15

subject to submission of the shortfall

information/documents i.e 1. Building plan

approval from Town & Country Planning

Department & Factories Department.2.

Valid CFO from APPCB duly attested.3.

Form-B self declaration duly indicating the

power load. 4. CA certificate indicating the

% of share holding of directors 5. Board

resolution authorizing the person to sign the

claim.

2

1

39

12/01/

2016

30/07/

2015

M/S. Usha

Spincoat

Pvt Ltd, Rs

No: 341,

Chikkavara

m,

Gannavara

m (M),

Krishna

Dist

IIPP

200

5-10

Rs.73,07,824/- (Rupees Seventy Three

Lakhs Seven Thousand Eight Hundred and

Twenty Four only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall

information/documents i.e 1. Valid CFO

from APPCB. 2. Reasons for increase in

power from 1200 KVA to 1860 KVA and

clarification on connected load in HP/KW

3. CA certificate indicating share holding

particulars 4. Board resolution authorizing

the person to sign the claim. 5. Approved

plan of DTCP 6. Land Conversion

permission Further, SVC opined that the

Government permission for condonation

of delay in filing claim application and

making the unit eligible for availing the

incentives under IIPP 2005-2010 vide

Government memo No.

4850/IP/INF/A1/2014-15 Dated

16.12.2014 shall be circulated to the

Chairman SLC.

2

2

40

12/02/

2016

02/08/

2015

M/s. Shri

Govindaraj

a Textiles

Ltd., 708,

Peddarang

apuram

(V),

Pulivendal

a (M),

Kadapa

Dist

IIPP

200

5-10

Rs.6,03,60,918/-(Rupees six crors three

lakhs sixty thousand nine hundred and

eighteen only) towards power cost

reiombursment for the period 1st quater of

2015-16 and defereence amount in pervious

period from Jan - 2014 to March -2015

subject to submission of the shortfall

information/documents i.e 1. Reasons for

increase power load in KVA from 2500 to

10500 KVA and clarification on connected

load in HP/KW.2. Valid CFO from APPCB.

3. CA certificate indicating share holding

particulars. 4. DTCP approved plan 5. Form

B Self Declaration is not properly filled in

6. Board resolution authorizing the person

to sign the claim application . 7. Proof of

receipt of claim in hard copy by GM,DIC is

not available on the application 8. Factories

Department plan not attested 9. Land

conversion approval 10. Bank sanction

letter is not attested

241

12/01/06/08/

M/S Sri

Anantha

Lakshmi

IIPP

200

Rs.64,65,576/- (Rupees Sixty Four Lakhs

Sixty Five Thousand Five Hundred and

Seventy Six only) towards power cost

:: 9 ::

3 2016 2015 Spinning

Mills (P)

Ltd, (Exp-

1) 59/1,

Boyapalem

(V),

Edlapadu

(M),

Guntur

Dist

5-10 reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall

information/documents i.e 1. Sale deed 2.

Valid CFO 3. Bank sanction letter 4. GM

DIC has not informed increase in capacity

of the unit 5. CA certificate indicating share

holding particulars. 6. Land conversion

approval 7. Factories Department plan

furnished without attestation 8. T and CP

Department plan .

2

4

44

12/02/

2016

11/08/

2015

M/s Sree

Rayalasee

ma

Alkalies

And Allied

Chemicals

Ltd.,

Gondiparla

(V),

Kurnool

IIPP

200

5-10

Rs.9,19,34,290/- (Rupees Nine Crores

Nineteen Lakhs thirty Four Thousand Two

Hundred and Ninety only) towards power

cost reimbursement for 1st quarter of 2015-

16, subject to submission of the shortfall

information/documents i.e 1. IEM part B 2.

Land sale deed 3. Company incorporation 4.

Board resolution authorizing the person to

sign the claim application. 5. Factories

Department approval in full shape 6. Valid

Boiler certificate 7. Machinery list as per

guidelines. 8. CE certificate 9. Project

report 10. Land conversion 11. CA

certificate for share holding 12. Gram

panchayat approval furnished not attested

13. CFO duly attested by GM, DIC. 14.

Power release certificate duly attested by

GM, DIC.15. C.A. Certificate for payment

proof for the period for 1st quarter of 2015-

16

2

5 45

12/01/

2016

M/S.Mulpu

ri Foods &

Feeds Pvt

Ltd., Rs

No:

23&30,

Morsapudi

(V),

Nuzivid

(M),

Krishna

Dist

IIPP

201

0-15

Rs.10,36,810/- (Rupees Ten Lakhs Thirty

Six Thousand Eight Hundred and Ten only)

towards power cost reimbursement for 2nd

half year of 2014-15 , subject to submission

of the shortfall information/documents i.e

1. Reasons for increase of power from 1100

KVA to 2190 KVA 2. Valid CFO 3. CA

certificate for share holding 4. DTCP

approved plan 5. Board resolution

authorizing the person to sign the claim. 6.

Civil Engineer certificate 7. Project report

8. Factories approval and approved plan.9.

Clarification with regard to additional

machinery from GM,DIC.

2

6

46

12/01/

2016

13/08/

2015

M/S.Vanta

ge

Spinners,

Rs No: 50,

Gollapalli ,

Nusivid

(M0,

Krishna

Dist

IIPP

200

5-10

Rs.1,67,82,980/- (Rupees One Crore Sixty

Seven Lakhs Eighty Two Thousand Nine

Hundred and Eighty only) towards power

cost reimbursement for 1st quarter of 2015-

16, subject to submission of the shortfall

information/documents i.e 1. Board

resolution authorizing the person to sign the

claim application.2. Factories Department

approval 3. Valid CFO 4. Machinery

statement duly certified as per guidelines 5.

Project report 6. CA certificate indicating

share holding 7. Bank sanction letter 8.

Statement of accounts 9. Gram Panchayat,

DTCP approvals and approved plans 10.

Land conversion 11. Civil Engineer

certificate 12. Power release document with

attestation

2

7

47

12/01/

2016

13/08/

2015

M/s

AMARAV

ATHI

TEXTIEL

S (P) LTD

(4th

EXPANSI

ON),

MARTUR

(V) & (M),

PRAKAS

AM DIST

IIPP

201

0-15

Rs.3,06,91,800/- (Rupees Three Crores Six

Lakhs Ninety One Thousand and Eight

Hundred only) towards power cost

reimbursement for 1st half year of 2015-16,

subject to submission of the shortfall

information/documents i.e 1. Land sale

deed 2. Board resolution authorizing the

person to sign the claim application. 3.

DTCP approved plan 4. Power release

certificate 5. Meeseva receipt for 2nd

quarter of 2015-16 6. Valid CFO from

APPCB 7. List of Plant & Machinery duly

certified by the GM, DIC and Financial

Institution as per guidelines in the

prescribed format in original. 8.

Clarification with regard to power load of

6700 KVA as on 26.11.2009 and increasing

to 10000 KVA as on 11.11.2011. 9. The

date on claim application pertaining to 1st

half year claim of 2015-16 for power cost

reimbursement is not recorded for verifying

:: 10 ::

the date of filing. 10. Company

incorporation 11. Factories plan 12. Land

conversion 13. Project report 14. CA

certificate indicating share holding

2

8

48

12/02/

2016

13/08/

2015

M/S

Bhavya

Cements

Ltd,

Tangeda

(V),

Dachepalli

(M),

Guntur

Dist.

IIPP

200

5-10

Rs.4,31,42,550/- (Rupees Four Crores

Thirty One Lakhs Forty Two Thousand

Five Hundred and Fifty only) towards

power cost reimbursement for 1st quarter of

2015-16 subject to submission of the

shortfall information/documents i.e 1. Valid

CFO from APPCB 2. Sale deed 3. T & CP

approval 4. Civil Engineer certificate 5.

Board resolution authorizing the person to

sign the claim application .6. Land

conversion 7. State Bank of Indore letter

with attestation. 8. CA certificate indicating

share holding 9. Pipeline Certificate under

IIPP 2005-2010.

2

9

49

12/01/

2016

14/08/

2015

M/S

Idupulapad

u Cotton

Mils Pvt

Ltd ,

Jonnatali

(V),

Martur

(M),

Prakasam

Dist.

IIPP

200

5-10

Rs.3,09,61,270/- (Rupees Three Crores

Nine Lakhs Sixty One Thousand Two

Hundred and Seventy only) towards power

cost reimbursement for 1st quarter of 2015-

16, subject to submission of the shortfall

information/documents i.e 1. CA Certificate

2. Power release certificate 3. Machinery

statement not certified as per guidelines 4.

Board resolution authorizing the person to

sign the claim application . 5. No inward

date on 1st quarter of 2015-16 claim. GM,

DIC to furnish his report on filing of claims

with DIC as per the stipulated time frame.

6. Bank sanction letter 7. Approved plans of

DTCP, Factories and Gram panchayat 8.

Reasons for increase of power from 1510

KVA to 5600 KVA 9. Valid CFO from

APPCB 10. Statement of accounts not

furnished 11. Approved project report.

3

0

51

12/02/

2016

17/08/

2015

M/S.Ravali

Spinners

Pvt Ltd.

(Expansion

),

Khandavali

, Peravali

(M), West

Godavari

Dist

IIPP

200

5-10

Rs.32,89,450/- (Rupees Thirty Two Lakhs

Eighty Nine Thousand Four Hundred and

Fifty only) towards power cost

reimbursement for 1st quarter of 2015-16 ,

subject to submission of the shortfall

information/documents i.e 1. Certificate of

incorporation Rs.32,89,450/- Certificate of

incorporation 2. Board resolution

authorizing the person to sign the claim

application .3. Valid CFO from APPCB 4.

Statement of Accounts 5. Project report 6.

CA certificate indicating the share holding

7. IEM part B issued by SIA/DIPP 8. Sale

deed 9. Land conversion 10. Machinery

statement not certified as per guidelines 11.

Civil Engineer Certificate 12. Separate

C.A. Certificate on power consumption

units for the previous three years prior to

expansion. 13. Variation in power load

reported in form B Self Declaration, power

bill and also power load as on DCP.

Clarification on power load at the time of

release in terms of KW/HP.14. DTCP and

Factories Department plans are not

attested.15. Gram Panchayat approval

3

1

52

12/01/

2016

17/08/

2015

M/S. Spads

Textiles

Limited,

Sy No:

86/1,

Ravikampa

du (V),

Jaggaipet(

M),

Krishna

Dist

IIPP

200

5-10

Rs.37,01,808/- (Rupees Thirty Seven

Lakhs One Thousand Eight Hundred and

Eight only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall

information/documents i.e 1. Project report

2. Land sale deed 3. Factories Department

approval 4. Bank Term loan sanction letter

5. Valid CFO from APPCB 6. Reasons for

increase in power load from 1000 KVA to

1350 KVA 7. DTCP approval with

attestation. 8. Board resolution authorizing

the person to sign the claim. 9. CA share

holding report with attestation 10. Land

conversion approval 11. Gram Panchayat

approved plan.

:: 11 ::

3

2

53

12/02/

2016

17/08/

2015

M/S.Ravali

Spinners

Pvt Ltd.

(Existing),

Khandavali

, Peravali

(M), West

Godavari

Dist

IIPP

200

5-10

SVC verified the claim application in

detailed and recommended for rejection for

sanction of reimbursement of power cost for

the period of 4th quarter of 2014-15 under

IIPP 2005-10, since the incentives availing

period of 8 years completed by the end of

3rd quarter of 2014-15 from the date of

commencement of production of the unit.

3

3

54

22/01/

2016

18/08/

2015

M/s Mohan

Spintex

India

Limited

(Expansion

)

R.S.No.29/

2,

Vattigudip

adu

Village,

Agiripalli

Mandal,

Krishna

District

IIPP

200

5-10

Rs.84,06,980/- (Rupees Eighty Four Lakhs

Six Thousand Nine Hundred and Eighty

only) towards power cost reimbursement for

1st quarter of 2015-16, subject to submission

of the shortfall information/documents 1.

Land sale deed or lease deed 2. Bank

sanction letter 3. Project report 4. Town

and Country Planning Approval 5.

Statement of Accounts in original 6.

Machinery statement duly certified by the

Financial Institution as per guidelines. 7.

The status of original unit and there is no

correlation of IEM of original unit and

expansion project. 8. Claim application is

not completely filled in leaving column

meant for filling in the capacity of original

unit, as blank. 9. GM DIC to clarify the

line of activity in the claim application with

respect to IEM part B since there is a

variation. 10. Gram Panchayat approved

plans 11. Town and Country Planning

plans .12. CFO furnished is unattested. 13.

Land conversion approval .

3

4

55

22/01/

2016

18/08/

2015

M/s Mohan

Spintex

India

Limited

(Unit II)

Remalle,

Bapulapad

u Mandal,

Krishna

District

IIPP

200

5-10

Rs.3,17,29,280/- (Rupees Three Crores

Seventeen Lakhs Twenty Nine Thousand

Two Hundred and Eighty only) towards

power cost reimbursement for 1st quarter of

2015-16, subject to submission of the

shortfall information/documents i.e 1.

Land sale deed or lease deed 2. Reasons

in increase of KVA from 4000 to 5000

KVA and clarification on connected load.

3. Town and Country Planning

Department approval 4. Board resolution

authorizing the person to sign the

documents . 5. Land conversion certificate

6. CA certificate indicating share holding

of Directors . 7. Gram Panchayat

approved plans. 8. Attested copy of CFO

issued by APPCB.

3

5

56

12/01/

2016

18/08/

2015

M/S

Deccan

Fine

Chemicals

(India) Pvt

Ltd,

Nagaram

(P)

Payakarao

pet (M),

Visakhapat

nam Dist

IIPP

200

5-10

Rs.2,25,76,374/- (Rupees Two Crores

Twenty Five Lakhs Seventy Six Thousand

Three Hundred and Seventy Four only)

towards power cost reimbursement for 1st

quarter of 2015-16, subject to submission

of the shortfall information/documents i.e

1. IEM Part B 2. Company incorporation

certificate 3. T & CP dept approval 4. Land

conversion approval 5. Approved project

report 6. Valid CFO issued by APPCB 7.

Factories Department approved plan 8.

Bank term loan sanction letter 9. CA share

holding report not attested 10. Land sale

deed. 11. Machinery statement duly

certified by Bank.

3

6

57

12/02/

2016

18/08/

2015

M/S

Vasudha

Pharma

Chem

Limtied

Unit -III

Plot No:

23&24,

Jnpc,

Parawada

(V),

Visakhapat

nam Dist

IIPP

201

0-15

Rs.54,93,890/- (Rupees Fifty Four Lakhs

Ninety Three Thousand Eight Hundred and

Ninety only) towards power cost

reimbursement for 2nd half year of 2012-13

and 1st and 2nd half year of 2013-14 and 1st

half year 2014-15, subject to submission of

the shortfall information/documents i.e 1.

Board resolution authorizing the person to

sign the claim application. 2. IEM Part B 3.

Line of activity in IEM Part B is different

from GM,DIC report in his covering letter

4. CFO with attestation. 5. Valid boiler

certificate 6. Statement of Accounts 7. List

of Plant & Machinery as per operational

guidelines.

:: 12 ::

3

7

58

22/02/

2016

20/08/

2015

M/s Silica

Ceramica

Private

Limited,

D.No.97,

Narayanap

uram,

Unguturu

Mandal,

West

Godavari

District

IIPP

200

5-10

Rs.63,49,765/- (Rupees Sixty Three Lakhs

Forty Nine Thousand Seven Hundred and

Sixty Five only) towards power cost

reimbursement for 1st quarter of 2015-16 ,

subject to submission of the shortfall

information/documents i.e 1. Land sale deed

or Lease deed. 2. Company incorporation.3.

Project report 4. Valid CFO issued by

APPCB. 5. CA Certificate indicating share

holding of directors6. Machinery statement

not signed but signed in a separate sheet. 7.

Factories Department plan. 8. Land

conversion certificate 9. Board resolution

authorizing the person to sign the

documents.10. Banker term loan sanctioned

letter with attestation.11. Statement of

accounts with attestation.

3

8

59

12/02/

2016

24/08/

2015

M/s

Chowdary

Spinners

Limited,

Undrajavar

am

Mandal,

West

Godavari

IIPP

201

0-15

Rs.43,91,499/- (Rupees Forty Three Lakhs

Ninety One Thousand Four Hundred and

Ninety Nine only) towards power cost

reimbursement for 1st quarter of 2015-16 ,

subject to submission of the shortfall

information/documents i.e . 1. Valid CFO

issued by APPCB 2. Land sale deed or lease

deed 3. Project report 4. C.A.Certificate

indicating share holding of directors 5.

Factories Department, Gram Panchayat and

T & CP Department approved Plan 6. Board

resolution authorizing the person to sign the

claim application.7. IEM Part B 8. APSFC

term loan Sanctioned letter 9. Date of

commencement of commercial production

is not indicated in IEM Part – B.

3

9

60

22/02/

2016

25/08/

2015

M/s PVR

Spinning

and

Weaving

Limited,

Kondayapa

lem Road,

Tetali,

Tanuku

Mandal,

West

Godavari

IIPP

200

5-10

Rs.39,42,768/- (Rupees Thirty Nine Lakhs

Forty Two Thousand Seven Hundred and

Sixty Eight only) towards power cost

reimbursement for 1st quarter of 2015-16 ,

subject submission of the shortfall

information/documents i.e .1. Land sale

deed or lease deed.2. Reasons in increase of

KVA from 600 to 2401 KVA and clarify on

connected load. 3. Bank term loan sanction

letter. 4. Project report. 5. Company

incorporation. 6. Board resolution

authorizing the person to sign.7. Gram

Panchayat approval. 8. Town and Country

planning /UDA approval 9. Factories

department approval. 10. Valid CFO from

APPCB.11. CA certificate for share

holding. 12. Llist of plant & machinery duly

certified by GM, DIC & Financial

Institution as per guidelines.

4

0

61

22/02/

2016

25/08/

2015

M/S

Lohiya

Edible Oils

Pvt

Ltd.,(Unit

II)

(existing)

Plot No.25

IDA,

Vakalapudi

, Kakinada

Rural East

Godavari

pertaining

to 4th

quarter of

2014-15

IIPP

200

5-10

Rs.17,89,675/- (Rupees Seventeen Lakhs

Eighty Nine Thousand Six Hundred and

Seventy Five only) towards power cost

reimbursement for 4th quarter of 2014-15 ,

subject to submission of the shortfall

information/documents i.e 1. Board

resolution authorizing the person to sign the

claim application . 2. Land sale deed. 3.

Gram Panchayat, Factories Department and

DTCP approval 4. Land conversion 5. CFO

issued from APPCB 6. Bank term loan

sanction letter 7. Project report 8.

C.A.Certificate indicating share holding of

directors 9. C.A.Certificate for increase in

investment for expansion project 10. There

is a variation in power load in present claim

with respect to original claim filed. ( 450

HP original claim, 1680 HP in present

claim) 11. Power release certificate for

1680HP 12. Statement of accounts duly

certified by financial institution 13. List of

Plant & Machinery duly certified by

financial institution and as per operational

guidelines.14. Valid Boiler certificate.

:: 13 ::

4

1

62

22/02/

2016

25/08/

2015

M/S

Lohiya

Edible Oils

Pvt Ltd,

(Expansion

) Plot

No.25

IDA,

Vakalapudi

, Kakinada

Rural East

Godavari

pertaining

to 2nd half

year of

2014-15

IIPP

201

0-15

Rs.24,49,050/- (Rupees Twenty Four Lakhs

Forty Nine Thousand and Fifty only)

towards power cost reimbursement for 2nd

half year of 2014-15 , subject to submission

of the shortfall information/documents i.e.

1.Board resolution authorizing the person

to sign the claim application . 2.Land Sale

deed, 3.Certificate of incorporation, 4.CA

Certificate for share holding pattern,

5.Gram Panchayat, Factories Department

and DTCP approval, 6.Land conversion,

7.Valid CFO issued by APPCB, 8.Bank

term loan sanctioned letter Project report,

9.C.E.Certificate, 10.Power release

certificate, 11.There is a variation in DCP in

claim application filed for expansion, 12.

DCP is 01.07.2012 as per IEM Part B and

GM DIC reported DCP as 07.03.2010 in

claim application and Form B self

declaration, which is correct, 13.Statement

of Accounts furnished pertains to 2009

which is certified by Union Bank India and

is not relevant for expansion, 14.Expansion

project is financed by APSFC as per

machinery statement, 15.Form B self

declaration furnished for expansion is not

relevant, 17.CA has not certified the

investment criteria in respect of expansion

project, 18.As per power release certificate

in (original) unit II the power load is 450

HP released on 26.12.2004, 19.As per

Factories Department approval is reported

increased from 331 HP to 3117 HP,

20.Power release certificate for verification

in respect of expansion project.

4

2

64

22/01/

2016

28/08/

2015

M/s

Bhavanam

Spinning

Mills Pvt

Ltd.,

(Expansion

Unit)

Bhimineni

varipalem

Village,Me

dikonduru

Mandal,

Guntur

District

IIPP

200

5-10

Rs.30,73,815/- (Rupees Thirty Lakhs

Seventy Three Thousand Eight Hundred

and Fifteen only) towards power cost

reimbursement for 1st quarter of 2015-16

submission of the shortfall

information/documents, subject to

submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery in view of increase in power

load. 2. Land documents. 3. Valid CFO

from APPCB. 4. Approved Project report.

5. T& CP Department approved 6. Bank

sanction letter. 7. C A certificate

indicating share holding of directors. 8.

Board resolution authorizing the person to

sign the claim application. 9. Land

conversion document. 10. There is increase

in power load from 1550KVA to 3200KVA.

4

3

65

22/01/

2016

28/08/

2015

M/s

Guntur

Spinning

Mills

Private

Ltd.,

Obulavarip

alme

Village,

Guntur

IIPP

200

5-10

Rs.15,82,920/- (Rupees Fifteen Lakhs

Eighty Two Thousand Nine Hundred and

Twenty only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery in view of increase in power

load.2. Land sale deed.3. Valid CFO

from APPCB 4. Approved project

report.6. Signature of authorized person

not attested in board resolution /

authorization and not indicated the name of

person in the claim application.7. T&CP

Dept and Factories Dept Plans.8. Bank

Sanctioned letter 9. Banker has not

attested as machinery as per guidelines.10.

Valid CFO from APPCB.11. There is

increase in power load from 600KVA to

2240KVA.12. CA certificate for share

holding.

:: 14 ::

4

4

66

22/01/

2016

28/08/

2015

M/s Sri

Venkata

Lakshmi

Narasimha

Spinning

Mills

Private

Ltd.,D.No.

176/4,

GBC

Road,

Chebrolu

Village &

Mandal,

Guntur

District

IIPP

200

5-10

Rs.49,43,366/- (Rupees Forty Nine Lakhs

Forty Three Thousand Three Hundred and

Sixty Six only) towards power cost

reimbursement for 3rd quarter of 2014-15,

subject to submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery in view of increase in power

load.2. Land conversion certificate 3.

Valid CFO from APPCB are .4. Approved

Project report . 5. There is a mismatch of

person sinning the person claim are valid

board resolution has .6. Approved plans of

T & CP , Factories, Gram Panchayat are

.7. Land conversion 8. CA certificate

indication share holding of directors is also

.9. Bank sanction letter .

4

5

67

22/01/

2016

28/08/

2015

M/s.

Vasundhar

a Cotton

Mills Pvt

Ltd.,

Boyapalem

Village,

Vankayala

padu,

Edlapadu,

Sattenapall

i, Guntur

District

IIPP

200

5-10

Rs.36,32,840/- (Rupees Thirty Six Lakhs

Thirty Two Thousand Eight Hundred and

Forty only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery in view of increase in power

load.2. Land conversion certificate.3.

Land Sale Deed.4. Valid CFO from

APPCB5. Project report 6. Bank

Sanction Letter 7. IEM part B issued by

SIA/DIPP declaring DCP 8. GM, DIC has

not confirmed DCP in his recommendation

and certified the DCP in claim 10. Plan of

Gram Panchayat and Factories Department

11. There is increased in power load 12. CA

certificate indicating share holding

particulars.

4

6

68

22/01/

2016

28/08/

2015

M/s. Sree

Veerabrahmen

dra Swamy

Spinning Mills

Pvt Ltd.,

Guntur

IIPP

200

5-10

Rs.43,91,846/- (Rupees Forty Three Lakhs

Ninety One Thousand Eight Hundred and

Forty Six only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject to furnishing of submission of the

shortfall information/documents.i.e 1.

Confirmation on installation of additional

machinery due to increase in power load

from 600 KVA to 1050 KVA 2. Land sale

deed 3. Land conversion 4. Valid CFO

from APP CB 5. CA certificate indicating

share holding of Director 6. DT&CP,

Panchayat, Factories department plans 7.

Valid Board Resolution authorizing the

person to sign on claim application as the

one furnished is mismatched8. Attested

copy of T&CP approval 9. Bank Sanction

Letter is not attested 10. Form B self

declaration contents are not correct with

respect to power bill / claim application.

4

7

69

22/01/

2016

28/08/

2015

M/s. Sri

Lakshmi

Godavari

Spinning

Mills Pvt

Ltd.

Sy.No.113,

Chebrole

Village and

Mandal,

Guntur

District

IIPP

200

5-10

Rs.58,54,604/- (Rupees Fifty Eight Lakhs

Fifty Four Thousand Six Hundred and Four

only) towards power cost reimbursement for

1st quarter of 2015-16, subject to

submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery due to increase in power load

from 650 KVA to 4950 KVA.2. Board

resolution 3. Factories Department

approval and plan 4. Land conversion

certificate 5. Valid CFO from APPCB 6.

Approved project report 7. Authorised

person are not sign on claim8. Approved

T&CP 9. CA certificate for share holding

of Directors of the company 10. Bank

sanction letter 11. Project report 12. Sale

deed with attestation

4

8

70

22/01/

2016

28/08/

2015

M/s

Bhavanam

Spinning

Mills Pvt

Ltd.,(2nd

Expansion

Unit)

Bhimineni

IIPP

200

5-10

Rs.81,75,134/- (Rupees Eighty One Lakhs

Seventy Five Thousand One Hundred and

Thirty Four only) towards power cost

reimbursement for 1st quarter quarter of

2015-16, subject to submission of the

shortfall information/documents i.e

1. Confirmation on installation of

additional machinery due to increase in

:: 15 ::

varipalem

Village,Me

dikonduru

Mandal,

Guntur

District

power load from 2300 KVA to 3200 KVA

2. DT&CP plan approval for expansion

3. Company incorporation 4. Land

Conversion certification 5. Valid CFO

from APPCB 6. Bank sanctioned letter

7. Land sale deed 8. Board resolution

authorizing person to sign claim 9.

Approvged plan of Gram Panchayat,

Factories & T&CP 10. Statement of account

with attestation by GM, DIC11. CA

certificate of power computation sheets for

last three years with attestation.

4

9

71

22/01/

2016

28/08/

2015

M/s Sri

Venkata

Siva

Parvathi

Spinning

Mills Pvt

Ltd.,

(Expansion

)

IIPP

200

5-10

Rs.9,64,472/- (Rupees Nine Lakhs Sixty

Four Thousand Four Hundred and Seventy

Two only) towards power cost

reimbursement for 4th quarter of 2014-15,

subject to submission of the shortfall

information/documents i.e 1.

Confirmation from General Manager, DIC,

Guntur on installation of additional

machinery due to increase in power load

2. Land conversion certificate 3. Valid

CFO from APPCB 4. Approved project

report 5. Gram Panchayat, Factories

Department and T&CP approved plans 6.

There is increase in power load with

respect to present claim7. CA certificate

indicating share holding of directors

5

0

74

12/02/

2016

28/08/

2015

M/s.

Idupulapad

u Cotton

Mils Pvt

Ltd (Exp-

5),

Ganapavar

am (V),

Nadendla

(M),

Guntur

Dist

IIPP

200

5-10

Rs.5,57,041/- (Rupees Five Lakhs Fifty

Seven Thousand and Forty One only)

towards power cost reimbursement for the

year 2014-15 after deducting the sanctioned

excess amount in previous period duly

placing before SLC as separate Agenda,

subject to submission of the shortfall

information/documents i.e 1.

Confirmation on installation of additional

machinery due to increase in power load

from 7100 KVA to 8000 KVA 2. Land

Conversion certification 3. Valid CFO

from APPCB 4. Land sale deed 5.

Board resolution authorizing person to sign

claim 6. Approved plan of Gram

Panchayat, Factories & T&CP for

expansion.

5

1

75

12/02/

2016

28/08/

2015

M/s

Viswateja

Spinning

Mills Ltd

(Exp-2) D

No: 219,

Boyapalem

(V),

Edlapadu

(M),

Guntur

IIPP

200

5-10

Rs.1,45,06,340/- (Rupees One Crore Forty

Five Lakhs Six Thousand Three Hundred

and Forty only) towards power cost

reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall

information/documents. i.e 1.

Confirmation on installation of additional

machinery due to increase in power load

from 3000 KVA to 4100 KVA 2.

Company incorporation 3. Land

Conversion certification 4. Valid CFO

from APPCB 5. Bank term loan

sanctioned letter 6. Land sale deed 7.

Board resolution authorizing person to sign

claim 8. Approvged plan of Gram

Panchayat, Factories & T&CP

4 STATUS NOTE ON RELEASE OF SANCTIONED

INCENTIVE / CONCESSIONS OF TO THE

INDUSTRIEAL UNITS UNDER IIPP 2005-10 &

IIPP 2010-15

General Budget:

Government have allocated budget of Rs.129,64 lakhs

for the year 2015-16 towards General Incentives Nature of Incentive Sanctioned as

on date

04.07.2015

Releases made Pending for

releases

No.

of

cas

es

Amou

nt Rs

in Cr

No. of

cases

Amo

unt in

Cr

No

Amou

nt

Rs.in

Cr

Investment subsidy 113 16.12 0 0 113 16.12

100% Reimbursement of Stamp Duty 43 0.92 0 0 43 0.92

Noted.

:: 16 ::

100% Reimbursement of Mortgage

Duty 2 0.037 0 0 2 0.037

25% Reimbursement of Land Cost 14 0.59 0 0 14 0.59

Quality certification 2 0.011

2 0.011

Land Conversion charges 11

0.014

7 0 0 11

0.014

7

Reimbursement of Sales tax 126

124.9

8 0 0 126

124.9

8

TOTAL 311

142.6

73 0 0 311

142.6

7

Reimbursement of Power Cost (General) The details of sanctioned cases pending for releases is as

follows.

Nature of Incentive

Sanctioned as

on date

04.07.2015

Releases made Pending for

releases

No

. of

cas

es

Amou

nt Rs

in Cr

No. of

cases

Amou

nt in

Cr

No

Amou

nt

Rs.in

Cr

Power cost reimbursement 12

44

242.3

9 0 0

12

44

242.3

9

Reimbursement of Pavala Vaddi (General) The details of sanctioned cases pending for releases is as

follows

Nature of Incentive

Sanctioned as

on date

04.07.2015

Releases made Pending for

releases

No

. of

cas

es

Amou

nt Rs

in Cr

No.

of

cases

Amou

nt in

Cr

No

Amou

nt

Rs.in

Cr

Interest subsidy 58

4 39.75 0 0

58

4 39.75

Total

424.8

1

5 STATUS REPORT ON THE PROPOSALS SENT

TO THE GOVERNMENT AS ON:12/02/2016 S

l

.

N

o

Date

of

SLC

Meeti

ng

SLC Decision Statues of the issue

1

.

27/04/

12

IIPP 2005-10 - Reimbursement of Power cost -

Application of M/s. Sri Durga Kanakeswari Ice

Plant, S.No. 176/3B, Lankalapalem, Parawada,

Visakhapatnam District - Regarding.

The General Manager, DIC,

Visakhapatnam has recommended the

Reimbursement of Power cost claim application of

M/s Sri Durga Kanakeswari Ice Plant, S.No. 176/3B,

Lankalapalem, Parawada, Visakhapatnam for

sanction of Power cost for 4th quarter of 2008-09, 1st

to 4th quarters of 2009-10 & 1st & 2nd quarter of

2010-11 under IIPP 2005-10 scheme.

In this connection it is to submit that,

the unit holder has procuring power from M/s

Anakapalli Rural Electricity Cooperative Society

Ltd., Kasimkota. As per the guidelines para 5.3.5

under IIPP 2005-10 scheme is as follows:

“The power cost reimbursement shall

be applicable to the industries, which are utilizing

power from DISCOM only and power consumption

should be in the name of the unit.”

The decision of SLC is as follows:

“SLC examined the issue in detailed and decided to

recommend to Govt., for considering the units

availing power from Rural Electricity Cooperative

Society Ltd, for availing the reimbursement of power

cost under IIPP 2005-2010 and also under IIPP 2010-

15, as the RECS are being fed by DISCOMs”.

Accordingly, the proposals were recommended to the

Government vide letter No. 20/02/12/0053 DT:

15/05/2012. The issue was placed in SIPC

meeting held on 03/01/2013 and SPIB held on

26/04/2013. The SIPB approved the proposal to

provide power subsidy incentive those industries

drawing power from Rural Electricity Supply (RES).

A proposal has been

submitted to Government

vide single file no:

15/01/2013/11296 dt:

30/06/2013. Government

orders are awaited. In

response to the

Government memo, it was

requested vide

30/1/14/1288/1288/UP

Dated 17.12.2014, to issue

appropriate orders, as the

budget required n the

instant case falls under the

regular budget under IIPP

2005-2010 and 2010-15.

Further Government was

amending the guidelines 1)

G.O.Ms No: 328, Inds &

Comm (IP) Departmetn

Dt: 13/12/2005 ,

2) G.O Ms No: 42, Inds &

Comm (IP)Department

Dt: 05/05/2011 to make

eligible Industries which

are utilizing power from

Rural Electric Supply Co-

Operative Societies and

other similar sources for

Reimbursement of Power

cost under IIPP 2010-15

vide 1) G.O.Ms No: 2

Inds & Comm (P&I)

Dept dt: 01/01/2016,

2) G.O.Ms No: 2 Inds &

Comm (P&I) Dept dt:

01/01/2016,

Noted.

:: 17 ::

2

.

27/04/

12

IIPP 2005-10 - Reimbursement of Power cost -

Application of M/s Sri Satya Surya Industries,

Boduvalasa (V),Sabbavaram (M), Visakhapatnam

District - Regarding.

The General Manager, DIC,

Visakhapatnam has recommended the

Reimbursement of Power cost claim application of

M/s Sri Satya Surya Industries, Boduvalasa

(V),Sabbavaram (M), Visakhapatnam for sanction of

Power cost for 1st quarter of 2010-11 onwards under

IIPP 2005-10 scheme.

In this connection it is to submit that,

the SLC in its 78th SLC meeting held on 23/09/2009

has sanctioned reimbursement of Power cost of Rs.

3,700/- for the 3rd quarter of 2008-09. So far an

amount of Rs. 22,010/- has been sanctioned towards

reimbursement of Power cost to the unit. The

reimbursement of power claim application are

pending for sanction. Further, the unit holder has

procuring power from M/s Anakapalli Rural

Electricity Cooperative Society Ltd., Kasimkota. As

per the guidelines para 5.3.5 under IIPP 2005-10

scheme is as follows:

“The power cost reimbursement shall be applicable

to the industries, which are utlizing power from

DISCOM only and power consumption should be in

the name of the unit”.

The decision of SLC is as follows:

“The Committee examined the issue in detailed and

decided to recommend to Govt., for considering the

units availing power from Rural Electricity

Cooperative Society Ltd, for availing the

reimbursement of power cost under IIPP 2005-2010

and also under IIPP 2010-15, as the RECS are fed by

the concerned DISCOMs”.

Accordingly, the proposals were recommended to the

Government vide letter No. 20/02/12/6053,

dated:15/05/2012.

The issue was placed in SIPC meeting held on

03/01/2013 and SPIB held on 26/04/2013. The SIPB

approved the proposal to provide power subsidy

incentive those industries drawing power from Rural

Electricity Supply (RES)

A proposal has been

submitted to Government

vide single file no:

15/01/2013/11296 dt:

30/06/2013. Government

orders are awaited

Further Government was

amending the guidelines 1)

G.O.Ms No: 328, Inds &

Comm (IP) Departmetn

Dt: 13/12/2005 ,

2) G.O Ms No: 42, Inds &

Comm (IP)Department

Dt: 05/05/2011 to make

eligible Industries which

are utilizing power from

Rural Electric Supply Co-

Operative Societies and

other similar sources for

Reimbursement of Power

cost under IIPP 2010-15

vide 1) G.O.Ms No: 2

Inds & Comm (P&I)

Dept dt: 01/01/2016,

2) G.O.Ms No: 2 Inds &

Comm (P&I) Dept dt:

01/01/2016,

3 01/03/

13

IIPP 2005-10 – M/s. Visaka Industries Limited – RS

No. 385,386, jujjuru, Veerullapadu (M), Krishna

District – Sanction of reimbursement of power cost –

regarding.

The SLC has examined the issue on the following

points:

G.O. Ms. No.108, Industries & Commerce (IP)

Department, dt.20/05/1996 pertains to Target – 2000

Scheme – New Industrial Policy 1995 and policy

period is from 15.11.1995 to 31.03.2000, in which

line of activity “Mangalore Tiles / Asbestos

Products” is listed at Sl. No.49 in the ineligible

industrial activities.

In this regard vide G.O. Ms. No.196, Industries &

Commerce (IP) Department, dt.11.06.1998 an

amendment was issued that words “Asbestos

Products” occurring against item 49 in the list of

ineligible industries annexed to G.O. Ms. No.108,

Industries & Commerce (IP) Department,

dt.20/05/1996 shall be deleted”.

While issuing the G.O. Ms. No.178, Industries &

Commerce (IP) Department, dt. 21-06-2005, the

Government has not taken the order issued for

amendment to the G.O. Ms. No.108, Industries &

Commerce (IP) Department, dt.20/05/1996. They

have taken only ineligible list annexure with the

G.O.Ms.9 Industries & Commerce (IP) Department,

dt. 05-01-2001.

M/s. Visaka Industries Limited – RS No. 385,386,

jujjuru, Veerullapadu (M), Krishna District were also

processed for sanction of incentives under IIPP

2005-2010 and sanctioned in various SLCs an

amount of Rs.30,18,270/- and also an amount of

Rs.13,05,190/- were released pertaining to

reimbursement of power cost.

In view of the above circumstances, the SLC has

decided to recommend the issue to the Government

for making eligible for the line of activity of

“Asbestos Products” and issue amendment

accordingly to the G.O. Ms. No.178, Industries &

Commerce (IP) Department, dt. 21/06/2005, since

the same line of activity are eligible under IIPP

2010-15 schemes.

Accordingly, the proposals were recommended to the

Government vide letter No. 10/3/2007/0568,

dt.21/03/2013.

Government Orders are

awaited.

4

.

27/02/

15

INDUSTRIAL INVESTMENT PROMOTION

POLICY 2005-2010 – M/s Greentech Industries

(India) Pvt Ltd. SPSR Nellore District – request of

the unit for sanction of incentives to cover under

IIPP 2005-2010 as per MOU.

The State Level Committee examined the issue in

detail and based on the report given by the Joint

Director Sri VRVR Naik on supporting facts which

Government issued orders

for Condonation of Delay

for making eligible for

availing the incentives

under Industrial Promotion

Policy 2005-10 vide

G.O.Ms No: 497 Inds &

Comm (P&I) Dept, Dt:

:: 18 ::

are submitted by the unit regarding their claim, SLC

opined that in the light of the evidence of such

certificate, concerned Joint Director may submit his

report to Secretary (Industries) with clear

calculations indicating the impact on financial

implications likely to arise by considering the claim

of the unit to cover under the Industrial Industrial

Investment Promotion Policy 2005-10, examining

the similar cases.

Accordingly, the proposals were recommended

to the Government vide letter No. Lr. No.

20/1/14/14556/14556/ID, dated 13/03/2015.

16/11/2015

5

.

20/05/

15

IIPP 2010-15 – Sanction of Investment Subsidy –

M/s. MNR Complex Sy.No.189/2 , Nandyal Road,

Banaganapalli post and mandal, Kurnool District –

sanctioned by DIPC – release of incentives –

regarding

The SLC discussed the issue in detail and

decided to send the proposal of extending incentives

to differently able persons, to Government for the

issue of appropriate orders on the operational

guidelines in respect of G.O.Ms.No.188 Industries

and Commerce (IP) Department dated 20.12.2013.

Accordingly, the proposals were

recommended to the Government vide letter No. Lr.

No. 30/1/15/0288, dated 18/06/2015.

Government Orders are

awaited.

6

.

20/05/

15

IIPP 2005-2010 and 2010-15- claim applications

revised for reimbursement of sales tax – clarification

– regarding.

The SLC discussed the issue in detail and

decided to seek clarification from the Government

regarding the reimbursement of sales tax paid by the

unit in the united state of Andhra Pradesh when the

physical location of the unit is in residual Andhra

Pradesh. In view of the above Sales Tax

reimbursement is sanctioned to all such units subject

to outcome of Government orders.

Accordingly, the proposals were recommended

to the Government vide letter No. Lr. No.

30/1/14/0288/0288/ID, dated 23/05/2015

Government Orders are

awaited.

6

IIPP 2005-2010 – M/s Eisai Pharmatechnology &

Manufacturing Private Limited – change of name to M/s

Eisai Pharmaceuticals India Pvt Ltd., Visakhapatnam –

requested – regarding.

M/s Eisai Pharmatechnology and manufacturing

Pvt Ltd., SEZ, Parawada, Visakhapatnam is a Mega

Project promoted by M/s Eisai Co Ltd., Tokyo, Japan,

established with an investment of Rs. 280 Cr and

commenced commercial production on 28.06.2010 in the

line of activity “ Pharmaceutical Manufacturing and

Research Development Services”. Further M/s Eisai

Pharmatechnology and manufacturing Pvt Ltd., SEZ,

Parawada, Visakhapatnam is a 100% subsidiary of M/s

Eisai Co Ltd., Tokyo, Japan.

General Manager, District Industries Centre,

Visakhapatnam forwarded the claim application for

sanction of power cost reimbursement pertaining to 4th

quarter 2013-14 treating the claim as belated claim, since

the claim application was filed on 24.10.2014 manually

in the office of the General Manager, District Industries

Centre, Visakhapatnam which is beyond 6 months from

the end of quarter making the claim ineligible for

availing power cost reimbursement as per Para No. 5.3.1

of operational guidelines issued under IIPP 2005-2010.

“Para No.5.3.1 read as “ All Eligible

industrial units shall submit their claims

in the prescribed application form given

at annexure-IV for reimbursement of

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 19 ::

power cost on quarterly basis within six

months from the date of completion of

such quarter along with the documents

mentioned in the Application to the

General Manager, District Industries

Centre concerned.”

The captioned unit represented that they have

submitted the claim application for 4th quarter of 2013-14

in Meeseva centre for uploading the claim application on

08.10.2014 but could not uploaded due to HUDHUD

Cyclone affecting the Meeseva services in

Visakhapatnam. The claim application was uploaded on

23.10.2014 in meeseva portal and hence the unit

requested the Government to condone the delay in filing

the claim application.

Subsequently Government have considered the

proposal of the unit vide Govt. Memo No.

5316/P&I/A1/2015 Dated 17.11.2015 duly condoning

the delay in submission of above claim and directed the

Director of Industries to process the claim application of

4th quarter of 2013-14 in relaxation of the rules as an

exceptional case subject to satisfaction of the other

applicable provisions and furnish the action taken report

at an early date.

Accordingly General Manager, District

Industries Centre Visakhapatnam was directed to inspect

the unit and send his proposals as per the procedure in

vogue. GM,DIC recommended the claim application of

4th quarter of 2013-14 for sanction of reimbursement of

power cost.

Further, General Manager District Industries Centre,

Visakhapatnam recommended the proposal of change of

name of the unit from M/s Eisai Pharmatechnology and

manufacturing Pvt Ltd to M/s Eisai Pharmaceuticals

India Pvt Ltd., for placing in State Level Committee

enclosing the following documents.

1. Application for change of name of the company

in Form 1(A)

2. Copy of certificate of Incorporation for change of

name duly certified by Registrar of Companies,

Hyderabad

3. Copy of list of Directors

4. Copy of A.P.High Court order

5. Copy of Bombay High Court Orders

6. Copy of Memorandum & Articles of

Association.

The power cost reimbursement from 1st quarter of

2010-11 to 3rd

quarter of 2013-14 were already

sanctioned and released to the captioned unit.

:: 20 ::

The claim applications from 1st quarter of 2014-15 to

1st quarter of 2015-16 for sanction of power cost

reimbursement are scrutinised by SVC held on

12.02.2016 and it was decided to recommend for

sanction of incentives towards power cost reimbursement

subject to submission of shortfall document of Civil

Engineer Certificate for all civil works.

As per Para No. 11 of operational guidelines issued

vide G.O.Ms.No.328 Industries and Commerce (IP)

Department dated 13.12.2005 which read as

“11.0. INSTANCES OF CHANGE OF

CONSTITUTION/MANAGEMENT/

NAME OR STYLE OF INDUSTRIAL

UNIT: The Industrial units that availed

incentives/concessions should obtain the

No Objection Certificate from the

concerned financing institutions in

respect of aided units before seeking the

approval of Commissioner of Industries

for any change of the

constitution/Management/name & style of

the unit within the first six (6) years from

the date of commencement of Commercial

production.”

In view of the State Level Committee may take a

view with regard to processing the claim application for

the sanction of power cost reimbursement in respect of 4th

quarter of 2013-14 as per Government Memo and

according permission for change of name from M/s Eisai

Pharmatechnology and manufacturing Pvt Ltd to M/s

Eisai Pharmaceuticals India Pvt Ltd.

7 Incentives / Concessions Under IIPP 2005-10 & 2010-15

Schemes – reimbursement of power cost to M/s Spin Cot

Textiles Pvt Ltd., - revival of the unit – issue of

Government orders vide G.O.Ms.No.388 Industries &

Commerce (P&I) Department dated 28.08.2015 -

Release of sanctioned amount to the industrial unit

from the amount available in PD Account of

Commissioner of Industries.– regarding.

M/s Spin Cot Textiles Pvt Ltd.,19th Kilometer

NH 5 , Marripalem Village, Edlapadu Mandal, Guntur

District is a Private Limited Company established with

an investment of Rs. 59 Cr for the manufacture of Cotton

Yarn and commenced commercial production with effect

from 05.04.2007. The unit is a large scale Industry

having IEM Part B bearing No. 1763/IIM/PROD/2008

Dated 26.09.2008. The incentives of Rs.1,65,90,184/-

was released towards power cost reimbursement under

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 21 ::

Industrial Investment Promotion Policy (IIPP) 2005-2010

policy from the date of commencement of commercial

production ie from 05.04.2007 upto 4th quarter of 2010-

11.

Further release proceedings are issued as detailed

below towards power cost reimbursement

S.No. Consolidated Proceedings No &

Date

Period Amount

sanctioned in Rs

1 No.10/01/2014/8551/power cost

/FD Dated 18.12.2014.

1st quarter of 2011-12 to

1st quarter of 2013-14

2,67,89,467/-

2 No.10/01/2014/8551/power cost

/FD Dated 13.01.2015.

2nd quarter of 2013-14 to

3rd & 4th quarter of 2013-

14

2,03,79,940/-

Total 4,71,69,347/-

The General Manager, DIC, Guntur in his letter

dated 28-12-2014 informed that the unit is sick / closed

and he has not recommended for release of the above

sanctioned amount.

As per operational guidelines issued vide

G.O.Ms.No. 328 Industries and Commerce (IP)

Department dated 13.12.2005,

Para No. 4.11. Continuous Production:

Continuous production meanscontinuous working of

an industrial unit in the manufacture of approved

lines for a minimum period of six (6) years, without

any break-in-Production.

Para No. 21.10. In respect of APSFC

financed industrial units, subsidy amounts

sanctioned and released shall not be credited to the

A/c. of respective industrial units if they are sick,

closed or changes of management taken place or

sold away, etc.

Also wherever the General Manager, DICs

finds an industrial unit sick, closed, change of

management taken place etc. or for any other

reason not worthy or receiving subsidy fill

further examination, the Managing

Director, APSFC / Branch Manager,

APSFC shall not disburse the subsidy to such

units on written intimation given to them by

the General Managers DICs, or by Commissioner of

Industries. In case of above two situations,

the subsidy shall be disbursed only afterfurther

clearance given by the Additional Director

of Industries and Member-Secretary, SLC.

Further the unit holder vide his letter dated

06.02.2015 informed that due legal issue in NSEL

Mumbai, the financial institution have not disbursed the

working capital to the unit and unit was stopped due to

:: 22 ::

financial crisis and accordingly represented to

Government to release the sanctioned power cost

reimbursement for revival of the unit.

The request of M/s Spin Cot Textiles Pvt Ltd was

submitted to the Government vide letter no.

30/1/2009/0266 dated 7-2-2015. Government of Andhra

Pradesh issued orders vide G.O.Rt.No.388 Industries and

Commerce (P & I) Department Dated 28.08.2005

according permission for the release of an amount of

Rs.2,50,00,000 to M/s Spin cot Textiles Pvt Ltd., Guntur

District out of the total eligible subsidy of Rs.4.70 Crore

from out of the already released funds towards incentives

for Industrial promotion during the current financial year

2015-16 and available with the Department, so as to

revive the unit by the promoter in relaxation of existing

rules and subject to ratification by the State Level

Committee.

In pursuance of the orders in the G.O.Rt.No.388

Inds & Comm (P & I) Department dated 28.08.2015 and

as per the recommendation of General Manager, District

Industries Centre, Guntur District an amount of

Rs.2,49,96,220/- was released to the captioned unit

16.09.2015 and credited into the Joint Account

No.3488716164 of Central Bank of India, Gottipadu

operated by General Manager, District Industries Centre,

Guntur and Managing Director of M/s Spin Cot Textiles

Pvt Ltd towards the following.

S.

No

Released amount to be spent

on

Amount in Rs

1 For agreement with court

receiver

1,00,00,000

2 Part payment of arrears to

APSPDCL

40,00,000

3 For supply of Raw Material

(cotton) to Cotton

Corporation of India, Guntur

68,00,000

4 For repairs and maintenance of

M/c

41,97,000

Total 2,49,96,200

While releasing the amount of Rs.2,49,96,220/-

to GM, DIC, Guntur, the General Manager, DIC, Guntur

was directed to ensure that the funds released are not

misutilised and that the funds are to be used only for

revival / reopening of the unit. He should open a

separate bank account with joint signatory of the

Managing Director of M/s. Spincot Textiles Pvt Ltd for

release of funds so that the General Manager, DIC,

Guntur to oversee that the released funds can be utilized

only for revival / reopening of the unit. Further M/s.

Spincot Textiles Pvt Ltd should submit the utilization

:: 23 ::

certificate with relevant proof that the amount of Rs 2.50

crs released is spent for the revival of the unit within 15

days from the date of release or else proceedings under

AP RR Act 1864 will be initiated by the General

Manager, DIC, Guntur for the recovery of the above

amount along with interest as per the lending rate of

State Bank of India. The General Manager, DIC should

have constant supervision and extreme vigil over the

utilization of funds released to M/s. Spincot Textiles Pvt

Ltd, Guntur and report compliance to the Director of

Industries.

Subsequently, the General Manager, DIC,

Guntur in his letter dated 27-10-2015 informed that the

trial production of the unit started and the preparatory

section machinery were found working except one

carding machine and that he has given a cheque for Rs

1.00 crs in favour of court receiver, Mumbai High Court.

He also informed that he released Rs 1,00,15,747/- and

has balance Rs 50 lakhs available. He has requested

another Rs 1.00 crs for procurement of raw material

(cotton yarn) in addition to Rs 2.50 crores already

released to him. Accordingly an amount of Rs.1.00 Cr

out of pending power cost reimbursement Rs. 2.20 Cr

payable to the captioned unit was released on

05.11.2015 duly imposing the same conditions for the

revival of the unit.

Subsequently, the General Manager, DIC, Guntur

in his letter dated 22-1-2016, & 1-2-2016 informed that

the power bill of Rs 38,96,000 is to be paid by 5-2-2016

otherwise the power supply would be disconnected again.

He has requested whether to recommend for release of

balance Rs 1.20 crs or to utilize the amount of Rs 1.00 cr

kept aside for payment towards court receiver in the joint

account.

The General Manager, DIC, Guntur in his letter

dated 2-2-2016 informed the details of the utilization of

the Rs 3.50 crs released to him for revival of the unit.

S. No Released amount to be spent on Amount in Rs

1 Amount set aside for court payment 1,00,00,000

2 Power charges paid 58,44,300

3 Paid to Cotton Corporation of India, Guntur for

cotton

1,49,70,000

4 Repairs and maintenance of M/c 41,86,698

Total 3,50,00,998

In this connection it is submitted that the total

amount due for release to the units towards reimbursement

of the power charges is Rs 4,71,69,347/-. Till now, the

amount released for the purpose of the revival of the unit

is Rs 3,49,96,220. The balance amount is Rs.

1,21,73,127/-

:: 24 ::

The request of the General Manager, DIC,

Guntur for release the balance amount of Rs

1,21,73,127/- was examined by the Director’s Office and

noticed that the possibility of revival of the unit with the

balance amount appears to be bleak. Hence, the matter is

being examined on the working capital requirement of

the unit and for further course of action in the matter.

In view of the above, SLC may take a view to

ratify the release of funds of Rs 2,49,96,220 /- to the

captioned unit as per G.O.Rt.No.388 Inds & Comm (P &

I) Department dated 28.08.2015 and also further amount

of Rs 1.00 cr released to the unit as requested by the

General Manager, DIC, Guntur.

8 IIPP 2010-15 – Processing of claim application for

sanction of Reimbursement of Sales Tax in Annexure IX

– sanction as per Form A certified by Commercial Tax

Department - Tax refunds by the Commercial Tax

Department in certain cases – regarding.

The reimbursement of sales tax is being

sanctioned based on the amount tax paid by the industrial

unit and as certified by the Commercial Tax Department

in the form A prescribed with contents furnished

hereunder.

“ It is certified that all the facts and figures

furnished by the Enterprise is verified with the

records and found correct. The above

Enterprise/Industry has paid the sales tax amount of

Rs. ______ and also there is no due for the year - 201

- 201 .”

The sales tax reimbursement is being sanctioned

by the Department as per Para No.5.7.7 of operational

guidelines issued vide G.O.Ms.No.42 Industries and

Commerce (IP) Department Dated 05.05.2011 on the tax

paid by the unit during the year and as per certification

that there are no due for the year for which claim is

preferred.

“5.7.7 The enterprise/industry shall obtain the

details of the net commercial tax paid

during the year for which the claim is being

made duly certified by Commercial Tax

authorities in form prescribed at Form-A for

original/expansion / Diversification

Enterprise/Industry separately as the case

may be.”

Further, the Assistant Commissioner,

Commercial Taxes Department has raised the issue in

Scrutiny cum verification Committee held on 12.02.2016

that there are certain cases where there are instances of

refund of tax paid to the units after assessment. But

Scrutiny cum verification committee is processing claims

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 25 ::

based on Form A certified by Commercial Tax

Department indicating that the there is no due for the

year. Wherever it is observed that there are tax refunds

on the claims which were sanctioned, CT Department

shall provide such data so that the proportionate tax

reimbursement will be computed and deducted in next

claim. The decision of the Scrutiny cum verification

Committee held on 12.02.2016 is as follows.

“SVC discussed the issue and decided to place

before the SLC for taking a view.”

SLC may take a view

9 IIPP 2005-10 - Claim application of M/s. Shri

Govindaraja Textiles Ltd., 708, Peddarangapuram (V),

Pulivendala (M), Kadapa Dist for the sanction of

reimbursement of power cost under IIPP 2005-10 -

Regarding.

M/s. Shri Govindaraja Textiles Ltd. has

established the unit at 708, Peddarangapuram (V),

Pulivendala (M), Kadapa District for the line of activity

of “Cotton Yarn Spinning”, obtained IEM bearing

No.2145/SIA/IMO/2007 from the Government of India

and commenced commercial production

w.e.f.01/04/2008.

The unit has entered MoU with Government of

Andhra Pradesh on 16/11/2006. As per MoU, the

Government has offered the following incentives:

1. GoAP shall provide land measuring 100 acres to

the proposed textile unit at Peddarangapuram

(V), Pulivendala (M), Kadapa District, cost of

which shall be the actual cost of acquision as

mutually agreed between GoAP/APIIC and SGT.

2. GoAP shall provide necessary infrastructure

facilities such as roads, electricity,

communication facilities and water at the ‘door

step’ of the unit at the cost of the GoAP.

3. The unit shall be exepted from any statutory

power cuts to ensure uninterrupted production. A

special concession of Rupee One per unit unit on

the power tariff as prevailing on November, 1st

2006 shall be provided to the unit for a minimum

period of 5 years from the date of preferring the

claim for reimbursement of subsidy provided

such claims are preferred before 31st December

2010.

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 26 ::

4. GoAP shall supply water to the doorstep of the

unit and the tariff for such water shall be Rs.15/-

per kiloliter, for a minimum period of five years

from the date of commencement of commercial

operations, provided the unit commence

production before 31st December 2010.

5. GoAP shall provide an approach road linking to

the site of the unit.

6. GoAP shall provide the unit with an additional

tax reimbursement at the rate of 25% of VAT

paid during first five years to be done from 2nd

to

6th year, 50% of the VAT paid 6

th and 7

th years in

the 7th and 8

th year of commercial production

respectively.

7. GoAP shall provide incentive of Rs.5,000/- for

every person of the origin of AP trained and

employed by the unit, provided the employee

stays in the employment for a period of at least

one year.

8. GoAP shall declare the unit as Public Utility

Services and the women will be allowed to work

in all the three shifts in the units subject to taking

necessary safety and welfare measures.

9. GoAP shall reimburse 100% stamp duty and

transfer duty related to transaction of land

between the Government and the unit, as per the

IIPP 2005-10.

10. GoAP shall provide all other incentives as

applicable under the relevant IIPP 2005-10.

The Government has not issued G.O. for the

above MoU. Only basing on the above MoU, the claims

are processed for reimbursement of power cost duly

fixing @1/- per unit as per 2005-06 power tariff and

sanctioned duly following the pegged down as per IIPP

2005-10 for the claims received up to December, 2010.

From January, 2011, the claims are processed for

reimbursement of power cost duly fixing @0.75/- per

unit as per 2005-06 power tariff and sanctioned duly

following the pegged down as per IIPP 2005-10 upto

December, 2013. The pegged down eligibility from DCP

for various quarters are as detailed below:

For the year 2005-06 power tariff – Rs.3.35/- per

unit

As per IIPP 2005-10, base price at the time of

:: 27 ::

DCP – 3.35 – 0.75 = 2.60

Eligibility as per MoU – Rs.1/-

DCP of the unit – 01/04/2008.

Period

Actual

Power

tariff

Pegg

ed

down

price

as

per

polic

y

Eligibl

e tariff

Tariff

consid

ered

for

earlier

claims

as per

MoU

2008-09 3.00 2.60 0.40 0.65

2009-10 2.95 2.60 0.35 0.60

2010-11

(upto July,

2010)

2.95 2.60 0.35 0.60

August &

September,

2010

3.25 2.60 0.65 0.90

From October,

2010 to March,

2011

3.25 2.60 0.65 0.65

2011-12 3.25 2.60 0.65 0.65

2012-13 4.37 2.60 1.77 1.77

2013-14

(upto

December,

2013)

Not applied

0

January, 2014 5.30 2.60 2.70 1.00

February &

March, 2014 4.90 2.60 2.30

1.00

2014-15 4.90 2.60 2.30 1.00

2015-16 (1st

quarter) 5.15 2.60 2.55

2.55

From the above, it is clear that the Power Tariff

sanctioned is not either as per MoU or as per IIPP 2005-

10 for the period from April, 2008 to December, 2010.

However, Rs.1/- per unit was sanctioned for the period

from January, 2014 to March, 2015 is not as per IIPP

2005-10 under the provisions of G.O.Ms. No.42

Industries & Commerce (IP) Department,

dated:05/05/2011. MoU expires on 31/12/2010.

Further, Government of Andhra Pradesh

extended the eligibility period for spinning mills

commissioned during IIPP 2005-10 period by another 3

years making total eligibility period as 8 years vide

G.O.Ms. No.42 Industries & Commerce (IP) Department,

dated:05/05/2011 and the captioned unit is falling under

IIPP 2005-10.

Further it is observed that the claims from

January 2014 to March 2015 were processed and

:: 28 ::

sanctioned power cost reimbursement @Rs.1/- per unit

(upper sealing) without following the method of pegged

down by erroneously.

The captioned unit represented on 21/09/2015

that their claims are considered at the fixed power cost

Rs. 1/- per unit instead of Pegged down as per policy

applicable to their unit as per G.O.Ms.No. 42 Industries

& Commerce (IP) Department, dated:05/05/2011 from

the claims from January 2014 to March 2015.

The General Manager, District Industries

Centre, YSR Kadapa District has recommended the claim

application for sanction of reimbursement of power cost

for the period of 1st quarter of 2015-16. The same has

been placed before Scrutiny/Verification Committee

(SVC) meeting held on 12/02/2016 and the decision of

SVC is as follows:

“SVC scrutinised in detailed and observed that

the earlier claims from January 2014 to March

2015 were processed and sanctioned @Rs.1/- per

unit by erroneously instead of pegging down the

eligibility to the base price at prevailing power

rate. The same was verified with G.O.Ms. No.26

Industries & Commerce (Tex) Department,

Dated:12/01/2012 wherein the fixed cost

reimbursement of Rs.1/- per unit is only for new

unit commencing under IIPP 2010-15.

SVC verified the claim application in detailed

and recommended for sanction of

Rs.6,03,60,918/- (Rupees Six Crores Three Lakhs

Sixty Thousand Nine Hundred and Eighteen

only) towards power cost reimbursement for the

period of 1st quarter of 2015-16 and difference

amount in previous period from January 2014 to

March 2015 under IIPP 2005-10 duly placing

before SLC as a detailed Agenda Item, subject

to submission of the following shortfall

information.”

1. Reasons for increase power load in KVA from

2500 to 10500 KVA and clarification on connected

load in HP/KW.

2. Valid CFO from APPCB.

3. CA certificate indicating share holding

particulars.

4. DTCP approved plan

5. Form B Self Declaration is not properly filled

in

6. Board resolution authorizing the person to sign

the claim application .

:: 29 ::

7. Proof of receipt of claim in hard copy by

GM,DIC is not available on the application

8. Factories Department plan not attested

9. Land conversion approval

10. Bank sanction letter is not attested

SLC may take a view.

10 IIPP 2005-10 Scheme - M/s. Usha Spincoat Pvt.

Limited, Chikkavaram, Gannavaram Mandal

Krishna District- Sanction of reimbursement of

Power Cost based Government Memo - Regarding.

M/s. Usha Spincoat Pvt. Limited,

Chikkavaram, Gannavaram Mandal Krishna District

has approached the Govt., to consider the unit under

IIPP-2005-10 by condoning the delay of 9 months

and 4 days for commencement of commercial

production. The request is placed in the SLC 96th

held on 01.03.2013 and request of the unit is

recommended to Govt., for consideration for

extending the incentives under IIPP-2005-10.

In this context, the Govt requested the

Commissioner of Industries to provide incentives

under IIPP-2005-10 to M/s. Usha Spincoat Pvt.

Limited, Chikkavaram, Gannavaram Mandal

Krishna District. Duly condoning the delay of 9

months and 4 days in commencement of commercial

production on 04.04.2011 vide Memo No. 4850/IP

& INF/A1/2014-5, Dated 16.12.2014 Industries &

Commerce (IP & INF) Department.

“5th

State Leve Committee held on

23.12.2014 discussed the issue on the orders issued

by Government, vide Memo No. 4850/IP &

INF/A1/2014-5, Dated 16.12.2014 Industries &

Commerce (IP & INF) Department and sanctioned

differential amount of Rs. 3,29,49,250/- towards

reimbursement of power cost pertaining to 11

quarters from April 2011 to September 2014 and

further decided to refer to the Government for taking

a decision in respect of 3rd

quarter of 2012-13, 1st

and 3rd

quarter of 2013-14 claims for sanction of

reimbursement of power cost which are filed under

IIPP 2010-15 policy and become belated due to

coverage of the unit under IIPP 2005-2010.”

Subsequently the claim application for the

sanction of power cost reimbursement of M/S.

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 30 ::

Usha Spincoat Pvt Ltd, Rs No: 341, Chikkavaram,

Gannavaram (M), Krishna Dist pertaining to 1st

quarter of 2015-16 under IIPP 2005-10 was placed

in the Scrutiny cum verification committee meeting

held on 12.01.2016 and decision of the SVC is as

follows.

“SVC opined that Government permission for

condonation of delay in filing claim

application and making the unit eligible for

availing the incentives under IIPP 2005-2010

vide Government Memo No. 4850/IP &

INF/A1/2014-5, Dated 16.12.2014 shall be

circulated to the State Level Committee for

perusal” 11 IIPP 2005-2010 – M/s Idupulapadu Cotton Mills Pvt

Ltd., Expansion 5 , Ganapavaram Village, Nadendla

mandal, Guntur District – sanction of power cost

reimbursement – revising the appraisal from January

2011 – regarding.

The General Manager, District Industries Centre,

Guntur District recommended the claim application for

the sanction of power cost reimbursement of M/s.

Idupulapadu Cotton Mils Pvt Ltd (Exp-5), Ganapavaram

(V), Nadendla (M), Guntur Dist pertaining to 4th quarter

of 2014-15 under IIPP 2005-10 and the same was

received in this office on 28.08.2015.

The claim for 4th quarter 2014-15 has been

placed before SVC meeting held on 12/02/2016 for

scrutinized and revised appraisal is prepared from the

year 2010-11 to 2014-15 and details are is as follows.

Year wise appraisal of power cost reimbursement

Year

SLC sanctioned

Amt

Amount as per

appraisal Eligible amount computed

2010-11 1252409 1252409 1252409

2011-12 4338506 4337637 4337637

2012-13 3882403 -7371788 0

2013-14 ---- -11648534 0

2014-15 ---- 4440305 4440305

Total 9473310 10030351

A

.

Amount actually sanctioned from 4th quarter of 2010-

11 to 3rd quarter 2012-13 by 102nd State Level

Committee

Rs.94,73,310

B

.

Eligible for the period from 4th quarter of 2010-11 to

2014-15 as per revised appraisal

Rs. 1,00,30,351

C

.

Eligible for the year 2014-15 (A-B) Rs. 5,57,041

The SVC is scrutinized the claim application of

the unit and decision of the SVC is as follows:

“SVC verified the claim application in detailed

and recommended for sanction of Rs.5,57,041/-

SLC deferred the issue to next meeting

requsting the members to go through the

contents of the agenda for taking a decision.

:: 31 ::

Sd,/- Kartikeya Misra,

Director of Industries &

Chairman, State Level Committee (SLC).

// ATTESTED //

DEPUTY DIRECTOR (II).

(Rupees Five Lakhs Fifty Seven Thousand and

Forty One only) towards power cost

reimbursement for the year 2014-15 after

deducting the sanctioned excess amount in

previous period under IIPP 2005-10 duly placing

before SLC as separate Agenda, subject to

submission of following shortfall information.

1. Confirmation on installation of

additional machinery due to increase in

power load from 7100 KVA to 8000 KVA

2. Land Conversion certification

3. Valid CFO from APPCB

4. Land sale deed

5. Board resolution authorizing person

to sign claim

6. Approved plan of Gram Panchayat,

Factories & T&CP for expansion”.

:: 32 ::

:: 33 ::

LIST OF MEMBERS ATTENDED THE 9th STATE LEVEL COMMITTEE MEETING HELD ON 20/02/2016

AT 11.30AM. IN THE CONFERENCE HALL OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P

SL.NO. MEMBERS NAME & DESIGNATION OF MEMBER /

__________________________________________________ REPRESENTAT___________________ _______

Sri/Smt:

1. Chairman, Kartikeya Misra, IAS.,

State Level Committee. Chairman, SLC / Director of Industries.

2. The Managing Director, T. Srinivas Chowdary,

APSFC, Hyderabad. Manager.

3. The Chairman, Y.Madhu Babu

AP Spinning Mill Assosiation AGM, NSL Group.

4. The Commissioner, M. Pampapathi ,

Commercial Taxes, AP, Hyderabad. Additional Commissioner

5. The Cheif Engineer (Commercial), G. Seetha Rama Murthy

APTRANSCO, Hyderabad. S.E., (Comml.)

6. The Commissioner & Inspector General K.Suseela

Regi & Stamps Dept, Hyderabad AIG, Stamps Dept

7. The Member Secretary, R Sreeramulu

APPCB, Hyd SEE, Hyderabad

8. The Commissioner K.Sankara Rao

Transport Dept, Assistant Secretary

9. The Commissioner T.K.Rama Mani

Land Administration Joint Commissioner.

10. The Chief Manager, Rajeshkar

SBI, SME Br, Hyderabad. Chief Manager

11. The Chief Manager Vijay Kumar

Syndicate Bank Assit General .Manager .

12. The Deputy General Manager M Y Reddy.

SME, Head Office, SBH, Hyderabad Chief Manager.

13. The President G.Shobha

DICCI, (AP), Hyderabad Member

14. The Commissioner G.Uma Devi

B.C Welfare, Hyderabad Deputy Director

15. The President K.Rama Devi

ALEAP, Hyderabad . President

16. The Additional Director B.Suresh Babu

Central Office, Hyderabad Additional Director

:: 34 ::

:: 35 ::

I. SANCTION OF REIMBURSEMENT OF SALES TAX. Annexure -1

S No Name of the unit

Nature

of

Scheme

Decision

1

M/s Teamec Chlorates

Limited, Industrial

Growth Centre,

Gundlapalli Village,

Maddipadu Mandal,

Prakasham District

IIPP

2010-15

Rs.17,37,975/- (Rupees Seventeen Lakhs Thirty Seven Thousand

Nine Hundred and Seventy Five only) towards sales tax

reimbursement for the year 2014-15, subject to submission of the

shortfall information/documents i.e. 1. Valid CFO issued by

APPCB., 2. Factories Department approval. 3. To obtain Civil

Engineer Certificate for record. 4. Assistant

Commissioner of Commercial Taxes Department opined that audited

balance sheet shall be obtained along with upto date assessment

orders from the unit for scrutinizing the components form-A.

2

M/s A.S.Jute products

Pvt Ltd., (Expansion)

Nerallavalasa Village,

Padmanabam Mandal,

Visakhapatnam

IIPP

2010-15

Rs.3,70,976/- (Rupees Three Lakhs Thirty Seven Thousand Three

Hundred and Twenty only) towards sales tax reimbursement for year

2014-15 i subject to submission of the shortfall

information/documents. i.e. 1. Confirmation on Turnover

particulars furnished by the unit holder 2. Board Resolution

authorising the person to sign the documents .3. Sale Deed 4.

Land Conversion permission 5. Civil Engineer Certificate 6.

Charted Accountant certificate indicating share holding of Directors

7. Status of original unit

3

M/s. Godrej Agrovet

Limited Unit-2

(Expansion-1), West

Godavari District

IIPP

2010-15

SVC verified the claim application in detailed and found that GM,

DIC recommended zero value proposals towards reimbursement of

sales tax for the year of 2013-14 under IIPP 2010-15.

4

M/s. Godrej Agrovet

Limited Unit-2

(Expansion-1), West

Godavari District

IIPP

2010-15

Rs.1,20,50,150/- (Rupees One Crore Twenty Lakhs Fifty Thousand

One Hundred and Fifty only) towards sales tax reimbursement for

year 2014-15 subject to submission of the shortfall

information/documents i.e. 1. Confirmation of GM, DIC on the

production particulars for the last 3 years prior to date of the

commencement production of the expansion project.)

5

M/s K.P.Polylefin Sacks

Private Limited,

Sy.No.913, Epuru-

1A(V), Doruvulapalem

(P), Muthukur(M),

SPSR Nellore District

IIPP

2005-10

Rs.15,34,990/- (Rupees Fifteen Lakhs Thirty Four Thousand Nine

Hundred and Ninety only) towards Sales Tax reimbursement for the

year 2014-15 , subject to submission of the shortfall

information/documents i.e. 1. Building plan approval from Town &

Country Planning Department & Factories Department.2. Valid CFO

from APPCB for woven sacks is furnished and CFO for additional

line of activities like Tarpulin and fabric .3. CA certificate indicating

the % of share holding of directors 4. Board resolution authorizing

the person to sign the claim. 5. Land Conversion approval 6.

Statement of accounts in case of aided unit.7. List of plant &

machinery duly certified by GM, DIC and Financial Institution as

per operational guidelines.8. As per the claim application, the line of

activity is HDPE and PP Woven Sacks.9. As per Form – A

Certificate indicating additional products: a) Woven Sacks -

existing activity (Nos) b) Fabric – Additional Activity.( Kgs) c)

Tarpaulin – Additional Activity. (Nos) d) The production capacity

indicated in IEM is in 4500 M.Ts. and capacity is in Numbers in

:: 36 ::

Form – A certified by Commercial Tax Department and hence could

not be correlated. GM,DIC to furnish the products indicated in Form

A in terms of Kgs.

6

M/S Gemini Edibles

And Fats India Pvt. Ltd.,

S.No. 1607/2, Indl.Park,

Pantapalem (V),

Muthukur (M), SPSR

Nellore District

IIPP

2005-10

Rs.12,78,86,725/- (Rupees Twelve Crores Seventy Eight Lakhs

Eighty Six Thousand Seven Hundred and Twenty Five only)

towards Sales Tax reimbursement for the year 2014-15. subject to

submission of the shortfall information/documents i.e. 1. Boiler

certificate 2. List of Plant & Machinery duly certified by GM,

DIC and Financial Institution as per operational guidelines. 3. CA

certificate indicating the share holding of directors. 4. An amount

of Rs.17,28,90,730/- was paid in residual Andhra Pradesh certified

by CT Department Nellore, AP and an amount of Rs 8,28,82,720/-

certified by CT Department, Hyderabad. Further, SVC opined

that only eligible sales tax reimbursement against the tax paid in

residual A.P. shall be paid by A.P. Government as per

procedure laid down in A.P.State Reorganisation Act. Hence

SVC recommended for sanction of Rs.8,64,45,365/- against the

tax paid in residual Andhra Pradesh. (50% of Rs.

17,28,90,730/). In respect of an eligible amount of Rs.

4,14,41,360/- (50% of 8,28,82,720/-) signed by CT Department,

Hyderabad towards sales tax reimbursement, the release of

funds shall be shared by the State of A.P and Telangana as per

the outcome of the Government decision.

7

M/s Adani Wilmar

Limited, Sy.No. 269,

270, 284, 287,

Thammavaram (V),

Suryaraopeta Panchayat,

Kakinada Rural Mandal,

East Godavari District

IIPP

2005-10

The revised amount of Rs. 1,74,18,039/- (Rupees One Crore

Seventy Four Lakhs Eighteen Thousand and Thirty Nine only)

towards Sales Tax reimbursement for the year 2012-13 & 2013-14 ,

subject submission of the shortfall information/documents i.e 1.

DTCP approval with approved plan. 2. Valid CFO from APPCB 3.

Power load is not indicated at the time of filing claim application 4.

Valid Boiler certificate 5. Machinery statement not certified as per

guidelines. 6. Bank sanction is in favour of old unit

8

M/S Krishnapatnam Oils

And Fats Pvt. Ltd.,

Sy.No. 292 And 317,

Pantapalem (V), Epur

BIT-I Village,

Muthukuru Mandal,

Spsr Nellore District

IIPP200

5-10

Rs.9,51,27,458/- (Rupees Nine Crores Fifty One Lakhs Twenty

Seven Thousand Four Hundred and Fifty Eight only) towards Sales

Tax reimbursement for the year 2014-15 under IIPP 2005-10,

subject to submission of the shortfall information/documents i.e 1.

Confirmation on production particulars for the year 2014-15 by CT

Department and GM, DIC as the production particulars are not given

in Form-A. 2. Board resolution authorizing the person to sign the

claim application .3. CA certificate indicating the share holding 4.

Power release certificate 5. DTCP approval 6. Inward date on claim

application filed in DIC 7. Land conversion approval 8. Valid CFO

from APPCB.

:: 37 ::

II.REIMBURSEMENT OF POWER COST: Annexure -II

S

No Name of the unit

Nature

of

Scheme

Decision

1

M/s Eisai Pharma and

Technology & Manufacturing

Private Ltd., Parawada

Visakhapatnam

IIPP

2005-10

Rs.1,38,27,240/- (Rupees One Crore Thirty Eight Lakhs

Twenty Seven Thousand Two Hundred and Forty only)

towards power cost reimbursement for 1st & 2

nd quarter of

2014-15 Subject to submission of the shortfall

information/documents i.e Civil Engineer Certificate for all

civil works.

2

M/s Eisai Pharma and

Technology & Manufacturing

Private Ltd., Parawada

Visakhapatnam

IIPP

2005-10

Rs.56,85,860/- (Rupees Fifty Six Lakhs Eighty Five

Thousand Eight Hundred and Sixty only) towards power

cost reimbursement for 3rd quarter of 2014-15 under

Industrial Investment Promotion Policy 2005-2010, subject to

submission of the shortfall information/documents i.e. Civil

Engineer Certificate for all civil works.)

3

M/s A.S. Jute products Pvt Ltd.

(Expansiopn) ,Nerallavalasa

Village, Padmanabam Mandal,

Visakhapatnam

IIPP

2010-15

Rs.3,37,320/- (Rupees Three Lakhs Thirty Seven Thousand

Three Hundred and Twenty only) towards power cost

reimbursement for 1st half and 2

nd half year of 2014-15 in

respect of expansion project, subject to submission of the

shortfall information/documents i.e 1. Board Resolution

authorising the person to sign the documents.2. Sale Deed.,

3. Land Conversion permission. 4. Civil Engineer

Certificate.5. Chartered Accountant Certificate certifying

the year-wise power consumption detaileds for the last 3

years. 6. Charted Accountant certificate indicating share

holding of Directors.7. GM DIC shall to consult the DE

(operations) APEPDCL and verify the additional load in the

power release certificate with respect additional machinery

installation . 8. Status of original unit .

4

M/s. Godrej agrovet Limited

Unit-2 (Expansion-1), West

Godavari District

IIPP

2010-15

SVC verified the claim and found the following shortfall

information. 1. The approval issued by the Town and

Country planning Department is in the name of M/s Godrej

Oil Palm Ltd.,2. Power is released on 13.04.2012 for 500

KVA under HT Cat-II commercial category.3. As per the

scheme of amalgamation, Godrej Oil Palm Ltd., is

amalgamated with Godrej Agro vet Limited on 16.03.2012

but the date of commencement of commercial production

after amalgamation is declared on 15.06.2013. 4. Power

consumption of the unit is less than the base consumption and

hence recommended zero value proposals for 1st half year

2013-14. 5. Valid Gram Panchayat approval 6..Land

Conversion permission. 13. List of Plant & Machinery duly

certified by the GM, DIC and Financial Institution as per

guidelines in the prescribed format in original. 7. Factories

Department approval. 8. GM, DIC has his remarks on

existing unit ie M/s Godrej Oil Palm Ltd., and unit not

achieving the Base power consumption units in respect of

expansion project.

:: 38 ::

SVC opined that the GM, DIC recommended zero value

proposals, the above shortfall information shall be obtained

from the GM,DIC in order to upkeep the file for processing

the future claims.

5

M/s. Godrej agrovet Limited

Unit-2 (Expansion-1), West

Godavari District

IIPP

2010-15

SVC verified the claim application in detailed and found that

GM, DIC recommended zero value proposals towards

reimbursement of power cost for 2nd

half year of 2013-14

under IIPP 2010-15.

6

M/s. Godrej agrovet Limited

Unit-2 (Expansion-1), West

Godavari District

IIPP

2010-15

SVC verified the claim application in detailed and found that

GM, DIC recommended zero value proposals towards

reimbursement of power cost for 1st half year of 2014-15

under IIPP 2010-15.

7

M/s. Godrej agrovet Limited

Unit-2 (Expansion-1), West

Godavari District

IIPP

2010-15

SVC verified the claim application in detailed and found that

GM, DIC recommended zero value proposals towards

reimbursement of power cost for 2nd

half year of 2014-15

under IIPP 2010-15.

8

M/s NSL Textiles Limited,

APIIC Industrial Park,

Pulivendula, YSR District

IIPP

2005-10

Rs.1,43,41,895/- (Rupees one crore forty three lakhs forty

one thousand eight hundred ninty five only) towards power

cost reimbursement for 4th quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Reasons for increase in power load with respect initial filing

of claim application.2. Power 2000 KVA released on

11.03.2010 and 1000 KVA released on 07.07.2010 and the

same is not reflected in Part B self declaration. 3. Approval

of change of name of the unit.4. Bank Term Loan Sanction

letter 5. Board resolution 6. DTCP approval .

9

M/s Eisai Pharma and

Technology & Manufacturing

Private Ltd., Parawada

Visakhapatnam

IIPP

2005-10

Rs.1,35,50,960/- (Rupees One Crore Thirty Five Lakhs Fifty

Thousand Nine Hundred and Sixty only) towards power cost

reimbursement for 4th quarter of 2014-15 and 1

st quarter of

2015-16 subject to submission of the shortfall

information/documents i.e Civil Engineer Certificate for all

civil works.)

10

M/s JSW Cement Limited,

Sy.No.206, Bilakalgudur (V),

Gadivenmula (M), Kurnool

District

IIPP

2010-15

Rs.4,42,04,960/- (Rupees Four Crores Forty Two Lakhs Four

Thousand Nine Hundred and Sixty only) towards power cost

reimbursement for 1st half year of 2014-15, Subject to

submission of the shortfall information/documents 1.

Certification of incorporation of the company , 2. Board

Resolution authorising the person to sign the claim

application is 3. Approved plans for expansion issued by T

& C P Department .4. Land conversion approval 5. Civil

Engineer Certificate for all civil works .6. Valid CFO /

Acknowledgement from APPCB 7. Statement of

Machinery duly certified by the Financial Institution and

General Manager, DIC as per guidelines 8. Land Sale Deed

/ Lease Deed 9. Statement of Accounts in original or

attested copy .10. Approval and approved plans from the

Factories Department 11. Power release certificate.

:: 39 ::

11

M/s South India Krishna Oil and

Fats Pvt. Ltd., Sy.No. 275, 279,

280 & 281, Epuru Bit-IB,

Pantapalem Muthukur (V&M),

SPSR Nellore District

IIPP

2005-10

Rs.23,78,800/- (Rupees Twenty Thred Lakhs Seventy Eight

Thousand and Eight Hundred only) towards power cost

reimbursement for 3rd

quarter of 2014-15, subject submission

of the shortfall information/documents i.e 1. Approved

plans by T & C P Department 2. Boiler Certificate 3.

Land conversion approval 4. GM, DIC has certified the

activity in claim Refined Oil and not in his covering

letter.5. Person signing the claim has not indicated name of

the person to verify the Board Resoution Authorization 6.

Building plan approval from Factories Department 7.

Statement of Accounts duly certified by GM, DIC 8. List of

plant & machinery duly certified by GM, DIC & Financial

institution as per operational guidelines. 9. Reasons for

power load increased from 1000 KVA to 2500 KVA.10.

Original DCP 27/09/2011 clarify.11. Additional power was

given on 07/12/2013 as per Form-B.12. Power Bill for

January 2015.

12

M/s JSW Cement Limited,

Sy.No.206, Bilakalgudur (V),

Gadivenmula (M), Kurnool

District

IIPP

2010-15

Rs.5,55,52,245/- (Rupees Five Crores Fifty Five Lakhs Fifty

Two Thousand Two Hundred and Forty Five only) towards

power cost reimbursement for 2nd

half year of 2014-15

(subject to submission of the shortfall

information/documents i.e 1. Certification of incorporation

of the company 2. Board Resolution authorising the person

to sign the claim application is 3. Approved plans for

expansion issued by T & C P Department .4. Land

conversion approval 5. Civil Engineer Certificate for all

civil works 6. Valid CFO / Acknowledgement from

APPCB 7. Statement of Machinery duly certified by the

Financial Institution and General Manager, DIC as per

guidelines 8. Land Sale Deed / Lease Deed 9. Statement

of Accounts in original or attested copy .10. Approval and

approved plans from the Factories Department.

13

M/S Loyal Textile Mills Ltd.,

Industrial Park, Menakur (V),

Naiduper(M)

IIPP

2010-15

Rs.2,90,89,130/- (Rupees Two Crores Ninety Lakhs Eighty

Nine Thousand One Hundred and Thirty only) towards power

cost reimbursement for 1st and 2

nd half year of 2014-15,

subject to submission of the shortfall information/documents

i.e. 1. There is a variation in line of activity recommended by

GM, DIC with respect to IEM Part B obtained. 2. Certificate

of incorporation 3. Board resolution authorizing the person to

sign the documents. 4. Approved plan of Gram Panchayat

and Factories Department.5. Valid CFO from APPCB .6.

Attested Bank term loan sanction letter 7. List of Plant &

Machinery Statement not attested and not certified in the

prescribed format 8. Statement of accounts not attested 9.

Civil Engineer certificate is furnished without attestation.10.

Project report.11. CA certificate indicating share holding of

Directors. 12. The reasons for release of power after DCP.

:: 40 ::

14

M/S Gemini Edibles And Fats

India Pvt. Ltd., S.No. 1607/2,

Indl.Park, Pantapalem (V),

Muthukur (M), SPSR Nellore

Ditrict

IIPP

2005-10

Rs.34,68,950/- (Rupees Thirty Four Lakhs Sixty Eight

Thousand Nine Hundred and Fifty only) towards power cost

reimbursement for 3rd

quarters of 2014-15 subject to

submission of the shortfall information/documents i.e 1.

SVC opined that as the Meeseva receipt No. for 4th quarter

of 2014-15 is not filed in covering letter, clarification from

GM,DIC.2. Date is not recorded in claim application

physically filed for 4th quarter 2014-15. 3. Valid CFO from

APPCB 4. Valid Boiler certificate 5. List of Plant &

Machinery duly certified by GM, DIC and Financial

Institution as per operational guidelines. 6. CA certificate

indicating the share holding particulars.

15

M/S.Sudarshanam Spinning

Mills Ltd, R.S No: 52&53,

Tirumalagiri (V), Jaggaipet (M),

Krishna Dist

IIPP

2005-10

Rs.73,32,760/- (Rupees Seventy Three Lakhs Thirty Two

Thousand Seven Hundred and Sixty only) towards power

cost reimbursement for 3rd

and 4th quarter of 2014-15,

subject to submission of the shortfall information/documents

i.e 1. Clarification with regard to capacity of the plant in

terms of kgs as the capacity is mentioned in terms of

ROTORS in IEM Part B. 2. Reasons for increase in power

load in the present claim with respect to power load as on

DCP ie from 1077 KVA to 1672 KVA.3. Land conversion

permission,Civil Engineer certificate and project report. 4.

Board resolution authorizing the person to sign the claim

applications for 3rd and 4th quarter of 2014-15. 5. Valid CFO

from APPCB.6. CA Certificate indicating share holding

particulars.

16

M/S.Sri Vishnu Shankaar Mills

Ltd, Gopinenipalem (V),

Vatsavai (M), Krishna Dist

IIPP

2005-10

Rs.88,66,700/- (Rupees Eighty Eight Lakhs Sixty Six

Thousand and Seven Hundred only) towards power cost

reimbursement for 3rd

and 4th quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Valid CFO from APPCB 2. List of Plant & Machinery duly

certified by GM, DIC and Financial Institution as per

operational guidelines.3. Project report 4. Land conversion

permission 5. CA certificate indicating the % of share

holding of directors 6. Reasons for increase in power load

from 900 KVA to 1150 KVA and clarification on connected

load in HP/KW.7. Attested copy of Statement of accounts.8.

Board resolution authorizing the person to sign the claim

application.

17

M/s.Rajapalayam Mills Ltd,

Gopinenipalem (V), Vatsavai

(M), Krishna Dist

IIPP

2005-10

Rs.90,38,170/- (Rupees Ninety Lakhs Thirty Eight Thousand

One Hundred and Seventy only) towards power cost

reimbursement for 3rd

and 4th quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Valid CFO from APPCB.2. List of Plant & Machinery duly

certified by GM, DIC and Financial Institution as per

operational guidelines.3. Land conversion permission 4. CA

certificate indicating the % of share holding of directors 5.

Board resolution authorizing the person to sign the claim

application.

:: 41 ::

18

M/S.Sri Harini Textiles Limited,

R.S No: 47,48, & 49

Tirumalagiri (V), Jaggaipet (M),

Krishna Dist

IIPP

2005-10

Rs.72,63,640/- (Rupees Seventy Two Lakhs Sixty Three

Thousand Six Hundred and Forty only) towards power cost

reimbursement for 3rd

and 4th quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1. Line

of activity is not mentioned by GM,DIC while

recommending the claim proposal.2. Valid CFO from

APPCB duly attested.3. Project report 4. Land conversion

permission 5. CA certificate indicating the % of share

holding of directors 6. Board resolution authorizing the

person to sign the claim.7. Reasons for increase in power

load from 1077 KW to 1624.83 KW at the time of

submission of claim.

19

M/S.Sandhya Spinning Mill

Ltd., Gopinenipalem (V),

Vatsavai (M), Krishna District

IIPP

2005-10

Rs.89,57,050/- (Rupees Eighty Nine Lakhs Fifty Seven

Thousand and Fifty only) towards power cost reimbursement

for 3rd

and 4th quarter of 2014-15, subject to submission of

the shortfall information/documents i.e 1. Clarification with

regard to capacity of the plant in terms of Kgs as the capacity

is mentioned in terms of ROTORS in IEM part-B. 2. Valid

CFO from APPCB.3. List of plant & machinery duly

certified by GM, DIC & Financial Institution as per

operational guidelines.4. Land conversion permission 5. CA

certificate indicating the % of share holding of directors 6.

Board resolution authorizing the person to sign the claim. 7.

Reasons for increase in power load from 900 KVA to 1150

KVA at the time of submission of claim.

20

M/s K.P.Polylefin Sacks Private

Limited, Sy.No.913, Epuru-

1A(V), Doruvulapalem(P),

Muthukur(M), SPSR Nellore

District

IIPP

2010-15

Rs.18,73,270/- (Rupees Eighteen Lakhs Seventy Three

Thousand Two Hundred and Seventy only) towards power

cost reimbursement for 2nd

half year of 2014-15 subject to

submission of the shortfall information/documents i.e 1.

Building plan approval from Town & Country Planning

Department & Factories Department.2. Valid CFO from

APPCB duly attested.3. Form-B self declaration duly

indicating the power load. 4. CA certificate indicating the %

of share holding of directors 5. Board resolution authorizing

the person to sign the claim.

21

M/S. Usha Spincoat Pvt Ltd, Rs

No: 341, Chikkavaram,

Gannavaram (M), Krishna Dist

IIPP

2005-10

Rs.73,07,824/- (Rupees Seventy Three Lakhs Seven

Thousand Eight Hundred and Twenty Four only) towards

power cost reimbursement for 1st quarter of 2015-16, subject

to submission of the shortfall information/documents i.e 1.

Valid CFO from APPCB. 2. Reasons for increase in power

from 1200 KVA to 1860 KVA and clarification on connected

load in HP/KW 3. CA certificate indicating share holding

particulars 4. Board resolution authorizing the person to sign

the claim. 5. Approved plan of DTCP 6. Land Conversion

permission Further, SVC opined that the Government

permission for condonation of delay in filing claim

application and making the unit eligible for availing the

incentives under IIPP 2005-2010 vide Government memo

No. 4850/IP/INF/A1/2014-15 Dated 16.12.2014 shall be

circulated to the Chairman SLC.

The SLC has deferred the case for the next meeting.

:: 42 ::

22

M/s. Shri Govindaraja Textiles

Ltd., 708, Peddarangapuram (V),

Pulivendala (M), YSR Kadapa

Dist

IIPP

2005-10

Rs.6,03,60,918/-(Rupees six crors three lakhs sixty thousand

nine hundred and eighteen only) towards power cost

reiombursment for the period 1st quater of 2015-16 and

defereence amount in pervious period from Jan - 2014 to

March -2015 subject to submission of the shortfall

information/documents i.e 1. Reasons for increase power

load in KVA from 2500 to 10500 KVA and clarification on

connected load in HP/KW.2. Valid CFO from APPCB. 3. CA

certificate indicating share holding particulars. 4. DTCP

approved plan 5. Form B Self Declaration is not properly

filled in 6. Board resolution authorizing the person to sign the

claim application . 7. Proof of receipt of claim in hard copy

by GM,DIC is not available on the application 8. Factories

Department plan not attested 9. Land conversion approval

10. Bank sanction letter is not attested

The SLC has deferred the case for the next meeting.

23

M/S Sri Anantha Lakshmi

Spinning Mills (P) Ltd, (Exp-1)

59/1, Boyapalem (V), Edlapadu

(M), Guntur Dist

IIPP

2005-10

Rs.64,65,576/- (Rupees Sixty Four Lakhs Sixty Five

Thousand Five Hundred and Seventy Six only) towards

power cost reimbursement for 1st quarter of 2015-16, subject

to submission of the shortfall information/documents i.e 1.

Sale deed 2. Valid CFO 3. Bank sanction letter 4. GM DIC

has not informed increase in capacity of the unit 5. CA

certificate indicating share holding particulars. 6. Land

conversion approval 7. Factories Department plan furnished

without attestation 8. T and CP Department plan .

24

M/s Sree Rayalaseema Alkalies

And Allied Chemicals Ltd.,

Gondiparla (V), Kurnool

IIPP

2005-10

Rs.9,19,34,290/- (Rupees Nine Crores Nineteen Lakhs thirty

Four Thousand Two Hundred and Ninety only) towards

power cost reimbursement for 1st quarter of 2015-16, subject

to submission of the shortfall information/documents i.e 1.

IEM part B 2. Land sale deed 3. Company incorporation 4.

Board resolution authorizing the person to sign the claim

application. 5. Factories Department approval in full shape 6.

Valid Boiler certificate 7. Machinery list as per guidelines. 8.

CE certificate 9. Project report 10. Land conversion 11. CA

certificate for share holding 12. Gram panchayat approval

furnished not attested 13. CFO duly attested by GM, DIC.

14. Power release certificate duly attested by GM, DIC.15.

C.A. Certificate for payment proof for the period for 1st

quarter of 2015-16

25

M/S.Mulpuri Foods & Feeds Pvt

Ltd., Rs No: 23&30, Morsapudi

(V), Nuzivid (M), Krishna Dist

IIPP

2010-15

Rs.10,36,810/- (Rupees Ten Lakhs Thirty Six Thousand

Eight Hundred and Ten only) towards power cost

reimbursement for 2nd

half year of 2014-15 , subject to

submission of the shortfall information/documents i.e 1.

Reasons for increase of power from 1100 KVA to 2190 KVA

2. Valid CFO 3. CA certificate for share holding 4. DTCP

approved plan 5. Board resolution authorizing the person to

sign the claim. 6. Civil Engineer certificate 7. Project report

8. Factories approval and approved plan.9. Clarification with

regard to additional machinery from GM,DIC.

:: 43 ::

26

M/S.Vantage Spinners (P) Ltd,

Rs No: 50, Gollapalli , Nusivid

(M0, Krishna Dist

IIPP

2005-10

Rs.1,67,82,980/- (Rupees One Crore Sixty Seven Lakhs

Eighty Two Thousand Nine Hundred and Eighty only)

towards power cost reimbursement for 1st quarter of 2015-

16, subject to submission of the shortfall

information/documents i.e 1. Board resolution authorizing the

person to sign the claim application.2. Factories Department

approval 3. Valid CFO 4. Machinery statement duly certified

as per guidelines 5. Project report 6. CA certificate indicating

share holding 7. Bank sanction letter 8. Statement of accounts

9. Gram Panchayat, DTCP approvals and approved plans 10.

Land conversion 11. Civil Engineer certificate 12. Power

release document with attestation

27

M/S Amaravathi Textiels (P) Ltd

(4th Expansion), Martur (V) &

(M), Prakasam Dist

IIPP

2010-15

Rs.3,06,91,800/- (Rupees Three Crores Six Lakhs Ninety

One Thousand and Eight Hundred only) towards power cost

reimbursement for 1st half year of 2015-16, subject to

submission of the shortfall information/documents i.e 1.

Land sale deed 2. Board resolution authorizing the person to

sign the claim application. 3. DTCP approved plan 4. Power

release certificate 5. Meeseva receipt for 2nd quarter of

2015-16 6. Valid CFO from APPCB 7. List of Plant &

Machinery duly certified by the GM, DIC and Financial

Institution as per guidelines in the prescribed format in

original. 8. Clarification with regard to power load of 6700

KVA as on 26.11.2009 and increasing to 10000 KVA as on

11.11.2011. 9. The date on claim application pertaining to 1st

half year claim of 2015-16 for power cost reimbursement is

not recorded for verifying the date of filing. 10. Company

incorporation 11. Factories plan 12. Land conversion 13.

Project report 14. CA certificate indicating share holding

28

M/S Bhavya Cements Ltd,

Tangeda (V), Dachepalli (M),

Guntur Dist.

IIPP

2005-10

Rs.4,31,42,550/- (Rupees Four Crores Thirty One Lakhs

Forty Two Thousand Five Hundred and Fifty only) towards

power cost reimbursement for 1st quarter of 2015-16 subject

to submission of the shortfall information/documents i.e 1.

Valid CFO from APPCB 2. Sale deed 3. T & CP approval 4.

Civil Engineer certificate 5. Board resolution authorizing the

person to sign the claim application .6. Land conversion 7.

State Bank of Indore letter with attestation. 8. CA certificate

indicating share holding 8

29

M/S Idupulapadu Cotton Mils

Pvt Ltd , Jonnatali (V), Martur

(M), Prakasam Dist.

IIPP

2005-10

Rs.3,09,61,270/- (Rupees Three Crores Nine Lakhs Sixty

One Thousand Two Hundred and Seventy only) towards

power cost reimbursement for 1st quarter of 2015-16, subject

to submission of the shortfall information/documents i.e 1.

CA Certificate 2. Power release certificate 3. Machinery

statement not certified as per guidelines 4. Board resolution

authorizing the person to sign the claim application . 5. No

inward date on 1st quarter of 2015-16 claim. GM, DIC to

furnish his report on filing of claims with DIC as per the

stipulated time frame. 6. Bank sanction letter 7. Approved

plans of DTCP, Factories and Gram panchayat 8. Reasons for

increase of power from 1510 KVA to 5600 KVA 9. Valid CFO from

APPCB 10. Statement of accounts not furnished 11. Approved project

report.

:: 44 ::

30

M/S.Ravali Spinners Pvt Ltd.

(Expansion), Khandavali,

Peravali (M), West Godavari

Dist

IIPP

2005-10

Rs.32,89,450/- (Rupees Thirty Two Lakhs Eighty Nine

Thousand Four Hundred and Fifty only) towards power cost

reimbursement for 1st quarter of 2015-16 , subject to

submission of the shortfall information/documents i.e 1.

Certificate of incorporation Rs.32,89,450/- Certificate of

incorporation 2. Board resolution authorizing the person to

sign the claim application .3. Valid CFO from APPCB 4.

Statement of Accounts 5. Project report 6. CA certificate

indicating the share holding 7. IEM part B issued by

SIA/DIPP 8. Sale deed 9. Land conversion 10. Machinery

statement not certified as per guidelines 11. Civil Engineer

Certificate 12. Separate C.A. Certificate on power

consumption units for the previous three years prior to

expansion. 13. Variation in power load reported in form B

Self Declaration, power bill and also power load as on DCP.

Clarification on power load at the time of release in terms of

KW/HP.14. DTCP and Factories Department plans are not

attested.15. Gram Panchayat approval

31

M/S. Spads Textiles Limited, Sy

No: 86/1, Ravikampadu (V),

Jaggaipet(M), Krishna Dist

IIPP

2005-10

Rs.37,01,808/- (Rupees Thirty Seven Lakhs One Thousand

Eight Hundred and Eight only) towards power cost

reimbursement for 1st quarter of 2015-16, subject to

submission of the shortfall information/documents i.e 1.

Project report 2. Land sale deed 3. Factories Department

approval 4. Bank Term loan sanction letter 5. Valid CFO

from APPCB 6. Reasons for increase in power load from

1000 KVA to 1350 KVA 7. DTCP approval with attestation.

8. Board resolution authorizing the person to sign the claim.

9. CA share holding report with attestation 10. Land

conversion approval 11. Gram Panchayat approved plan.

32

M/S.Ravali Spinners Pvt Ltd.

(Existing), Khandavali, Peravali

(M), West Godavari Dist

IIPP

2005-10

SVC verified the claim application in detailed and

recommended for rejection for sanction of reimbursement of

power cost for the period of 4th quarter of 2014-15 under IIPP

2005-10, since the incentives availing period of 8 years

completed by the end of 3rd

quarter of 2014-15 from the date

of commencement of production of the unit.

33

M/s Mohan Spintex India

Limited (Expansion)

R.S.No.29/2, Vattigudipadu

Village, Agiripalli Mandal,

Krishna District

IIPP

2005-10

Rs.84,06,980/- (Rupees Eighty Four Lakhs Six Thousand

Nine Hundred and Eighty only) towards power cost

reimbursement for 1st quarter of 2015-16, subject to

submission of the shortfall information/documents 1. Land

sale deed or lease deed 2. Bank sanction letter 3. Project

report 4. Town and Country Planning Approval 5.

Statement of Accounts in original 6. Machinery statement

duly certified by the Financial Institution as per guidelines.

7. The status of original unit and there is no correlation of

IEM of original unit and expansion project. 8. Claim

application is not completely filled in leaving column meant for

filling in the capacity of original unit, as blank. 9. GM DIC to

clarify the line of activity in the claim application with respect to

IEM part B since there is a variation. 10. Gram Panchayat approved

plans 11. Town and Country Planning plans .12. CFO furnished is

unattested. 13. Land conversion approval .

:: 45 ::

34

M/s Mohan Spintex India

Limited (Unit II) Remalle,

Bapulapadu Mandal, Krishna

District

IIPP

2005-10

Rs.3,17,29,280/- (Rupees Three Crores Seventeen Lakhs

Twenty Nine Thousand Two Hundred and Eighty only)

towards power cost reimbursement for 1st quarter of 2015-16,

subject to submission of the shortfall information/documents

i.e 1. Land sale deed or lease deed 2. Reasons in increase

of KVA from 4000 to 5000 KVA and clarification on

connected load. 3. Town and Country Planning Department

approval 4. Board resolution authorizing the person to

sign the documents . 5. Land conversion certificate 6. CA

certificate indicating share holding of Directors . 7. Gram

Panchayat approved plans. 8. Attested copy of CFO issued

by APPCB.

35

M/S Deccan Fine Chemicals

(India) Pvt Ltd, Nagaram (P)

Payakaraopet (M),

Visakhapatnam Dist

IIPP

2005-10

Rs.2,25,76,374/- (Rupees Two Crores Twenty Five Lakhs

Seventy Six Thousand Three Hundred and Seventy Four

only) towards power cost reimbursement for 1st quarter of

2015-16, subject to submission of the shortfall

information/documents i.e 1. IEM Part B 2. Company

incorporation certificate 3. T & CP dept approval 4. Land

conversion approval 5. Approved project report 6. Valid CFO

issued by APPCB 7. Factories Department approved plan 8.

Bank term loan sanction letter 9. CA share holding report not

attested 10. Land sale deed. 11. Machinery statement duly

certified by Bank.

36

M/S Vasudha Pharma Chem

Limtied Unit –III, Plot No:

23&24, Jnpc, Parawada (V),

Visakhapatnam Dist

IIPP

2010-15

Rs.54,93,890/- (Rupees Fifty Four Lakhs Ninety Three

Thousand Eight Hundred and Ninety only) towards power

cost reimbursement for 2nd

half year of 2012-13 and 1st and

2nd

half year of 2013-14 and 1st half year 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Board resolution authorizing the person to sign the claim

application. 2. IEM Part B 3. Line of activity in IEM Part B is

different from GM,DIC report in his covering letter 4. CFO

with attestation. 5. Valid boiler certificate 6. Statement of

Accounts 7. List of Plant & Machinery as per operational

guidelines.

37

M/s Silica Ceramica Private

Limited, D.No.97,

Narayanapuram, Unguturu

Mandal, West Godavari District

IIPP

2005-10

Rs.63,49,765/- (Rupees Sixty Three Lakhs Forty Nine

Thousand Seven Hundred and Sixty Five only) towards

power cost reimbursement for 1st quarter of 2015-16 , subject

to submission of the shortfall information/documents i.e 1.

Land sale deed or Lease deed. 2. Company incorporation.3.

Project report 4. Valid CFO issued by APPCB. 5. CA

Certificate indicating share holding of directors6. Machinery

statement not signed but signed in a separate sheet. 7.

Factories Department plan. 8. Land conversion certificate 9.

Board resolution authorizing the person to sign the

documents.10. Banker term loan sanctioned letter with

attestation.11. Statement of accounts with attestation.

:: 46 ::

38

M/s Chowdary Spinners

Limited, Undrajavaram Mandal,

West Godavari

IIPP

2010-15

Rs.43,91,499/- (Rupees Forty Three Lakhs Ninety One

Thousand Four Hundred and Ninety Nine only) towards

power cost reimbursement for 1st quarter of 2015-16 , subject

to submission of the shortfall information/documents i.e . 1.

Valid CFO issued by APPCB 2. Land sale deed or lease deed

3. Project report 4. C.A.Certificate indicating share holding

of directors 5. Factories Department, Gram Panchayat and T

& CP Department approved Plan 6. Board resolution

authorizing the person to sign the claim application.7. IEM

Part B 8. APSFC term loan Sanctioned letter 9. Date of

commencement of commercial production is not indicated in

IEM Part – B.

39

M/s PVR Spinning and Weaving

Limited, Kondayapalem Road,

Tetali, Tanuku Mandal, West

Godavari

IIPP

2005-10

Rs.39,42,768/- (Rupees Thirty Nine Lakhs Forty Two

Thousand Seven Hundred and Sixty Eight only) towards

power cost reimbursement for 1st quarter of 2015-16 , subject

submission of the shortfall information/documents i.e .1.

Land sale deed or lease deed.2. Reasons in increase of KVA

from 600 to 2401 KVA and clarify on connected load. 3.

Bank term loan sanction letter. 4. Project report. 5. Company

incorporation. 6. Board resolution authorizing the person to

sign.7. Gram Panchayat approval. 8. Town and Country

planning /UDA approval 9. Factories department approval.

10. Valid CFO from APPCB.11. CA certificate for share

holding. 12. Llist of plant & machinery duly certified by GM,

DIC & Financial Institution as per guidelines.

40

M/S Lohiya Edible Oils Pvt

Ltd.,(Unit II) (existing) Plot

No.25 IDA, Vakalapudi,

Kakinada Rural East Godavari

pertaining to 4th quarter of 2014-

15

IIPP

2005-10

Rs.17,89,675/- (Rupees Seventeen Lakhs Eighty Nine

Thousand Six Hundred and Seventy Five only) towards

power cost reimbursement for 4th quarter of 2014-15 , subject

to submission of the shortfall information/documents i.e 1.

Board resolution authorizing the person to sign the claim

application . 2. Land sale deed. 3. Gram Panchayat, Factories

Department and DTCP approval 4. Land conversion 5. CFO

issued from APPCB 6. Bank term loan sanction letter 7.

Project report 8. C.A.Certificate indicating share holding of

directors 9. C.A.Certificate for increase in investment for

expansion project 10. There is a variation in power load in

present claim with respect to original claim filed. ( 450 HP

original claim, 1680 HP in present claim) 11. Power release

certificate for 1680HP 12. Statement of accounts duly

certified by financial institution 13. List of Plant &

Machinery duly certified by financial institution and as per

operational guidelines.14. Valid Boiler certificate.

:: 47 ::

41

M/S Lohiya Edible Oils Pvt Ltd,

(Expansion ) Plot No.25 IDA,

Vakalapudi, Kakinada Rural

East Godavari pertaining to 2nd

half year of 2014-15

IIPP

2010-15

Rs.24,49,050/- (Rupees Twenty Four Lakhs Forty Nine

Thousand and Fifty only) towards power cost reimbursement

for 2nd half year of 2014-15 , subject to submission of the

shortfall information/documents i.e. 1.Board resolution

authorizing the person to sign the claim application . 2.Land

Sale deed, 3.Certificate of incorporation, 4.CA Certificate for

share holding pattern, 5.Gram Panchayat, Factories

Department and DTCP approval, 6.Land conversion, 7.Valid

CFO issued by APPCB, 8.Bank term loan sanctioned letter

Project report, 9.C.E.Certificate, 10.Power release certificate,

11.There is a variation in DCP in claim application filed for

expansion, 12. DCP is 01.07.2012 as per IEM Part B and GM

DIC reported DCP as 07.03.2010 in claim application and

Form B self declaration, which is correct, 13.Statement of

Accounts furnished pertains to 2009 which is certified by

Union Bank India and is not relevant for expansion,

14.Expansion project is financed by APSFC as per machinery

statement, 15.Form B self declaration furnished for

expansion is not relevant, 17.CA has not certified the

investment criteria in respect of expansion project, 18.As per

power release certificate in (original) unit II the power load is

450 HP released on 26.12.2004, 19.As per Factories

Department approval is reported increased from 331 HP to

3117 HP, 20.Power release certificate for verification in

respect of expansion project.

42

M/s Bhavanam Spinning Mills

Pvt Ltd., (Expansion Unit)

Bhiminenivaripalem

Village,Medikonduru Mandal,

Guntur District

IIPP

2005-10

Rs.30,73,815/- (Rupees Thirty Lakhs Seventy Three

Thousand Eight Hundred and Fifteen only) towards power

cost reimbursement for 1st quarter of 2015-16 submission of

the shortfall information/documents, subject to submission

of the shortfall information/documents i.e 1. Confirmation

on installation of additional machinery in view of increase in

power load. 2. Land documents. 3. Valid CFO from

APPCB. 4. Approved Project report. 5. T& CP

Department approved 6. Bank sanction letter. 7. C A

certificate indicating share holding of directors. 8. Board

resolution authorizing the person to sign the claim

application. 9. Land conversion document. 10. There is

increase in power load from 1550KVA to 3200KVA.

43

M/s Guntur Spinning Mills

Private Ltd., Obulavaripalme

Village, Guntur

IIPP

2005-10

Rs.15,82,920/- (Rupees Fifteen Lakhs Eighty Two Thousand

Nine Hundred and Twenty only) towards power cost

reimbursement for 1st quarter of 2015-16, subject submission

of the shortfall information/documents i.e 1. Confirmation

on installation of additional machinery in view of increase in

power load.2. Land sale deed.3. Valid CFO from APPCB

4. Approved project report.6. Signature of authorized

person not attested in board resolution / authorization and not

indicated the name of person in the claim application.7.

T&CP Dept and Factories Dept Plans.8. Bank Sanctioned

letter 9. Banker has not attested as machinery as per

guidelines.10. Valid CFO from APPCB.11. There is increase

in power load from 600KVA to 2240KVA.12. CA certificate

for share holding.

:: 48 ::

44

M/s Sri Venkata Lakshmi

Narasimha Spinning Mills

Private Ltd.,D.No.176/4, GBC

Road, Chebrolu Village &

Mandal, Guntur District

IIPP

2005-10

Rs.49,43,366/- (Rupees Forty Nine Lakhs Forty Three

Thousand Three Hundred and Sixty Six only) towards power

cost reimbursement for 3rd

quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Confirmation on installation of additional machinery in view

of increase in power load.2. Land conversion certificate

3. Valid CFO from APPCB are .4. Approved Project

report . 5. There is a mismatch of person sinning the person

claim are valid board resolution has .6. Approved plans of

T & CP , Factories, Gram Panchayat are .7. Land

conversion 8. CA certificate indication share holding of

directors is also .9. Bank sanction letter .

45

M/s. Vasundhara Cotton Mills

Pvt Ltd., Boyapalem Village,

Vankayalapadu, Edlapadu,

Sattenapalli, Guntur District

IIPP

2005-10

Rs.36,32,840/- (Rupees Thirty Six Lakhs Thirty Two

Thousand Eight Hundred and Forty only) towards power cost

reimbursement for 1st quarter of 2015-16, subject to

submission of the shortfall information/documents i.e 1.

Confirmation on installation of additional machinery in view

of increase in power load.2. Land conversion

certificate.3. Land Sale Deed.4. Valid CFO from

APPCB5. Project report 6. Bank Sanction Letter 7. IEM

part B issued by SIA/DIPP declaring DCP 8. GM, DIC has

not confirmed DCP in his recommendation and certified the

DCP in claim 10. Plan of Gram Panchayat and Factories

Department 11. There is increased in power load 12. CA

certificate indicating share holding particulars.

46

M/s. Sree Veerabrahmendra

Swamy Spinning Mills Pvt Ltd.,

Guntur

IIPP

2005-10

Rs.43,91,846/- (Rupees Forty Three Lakhs Ninety One

Thousand Eight Hundred and Forty Six only) towards power

cost reimbursement for 1st quarter of 2015-16, subject to

furnishing of submission of the shortfall

information/documents.i.e 1. Confirmation on installation

of additional machinery due to increase in power load from

600 KVA to 1050 KVA 2. Land sale deed 3. Land

conversion 4. Valid CFO from APP CB 5. CA certificate

indicating share holding of Director 6. DT&CP, Panchayat,

Factories department plans 7. Valid Board Resolution

authorizing the person to sign on claim application as the one

furnished is mismatched8. Attested copy of T&CP approval

9. Bank Sanction Letter is not attested 10. Form B self

declaration contents are not correct with respect to power bill

/ claim application.

47

M/s. Sri Lakshmi Godavari

Spinning Mills Pvt Ltd.

Sy.No.113, Chebrole Village and

Mandal, Guntur District

IIPP

2005-10

Rs.58,54,604/- (Rupees Fifty Eight Lakhs Fifty Four

Thousand Six Hundred and Four only) towards power cost

reimbursement for 1st quarter of 2015-16, subject to

submission of the shortfall information/documents i.e 1.

Confirmation on installation of additional machinery due to

increase in power load from 650 KVA to 4950 KVA.2.

Board resolution 3. Factories Department approval and plan

4. Land conversion certificate 5. Valid CFO from APPCB

6. Approved project report 7. Authorised person are not

sign on claim8. Approved T&CP 9. CA certificate for

share holding of Directors of the company 10. Bank sanction

letter 11. Project report 12. Sale deed with attestation.

:: 49 ::

48

M/s Bhavanam Spinning Mills

Pvt Ltd.,(2nd

Expansion Unit)

Bhiminenivaripalem

Village,Medikonduru Mandal,

Guntur District

IIPP

2005-10

Rs.81,75,134/- (Rupees Eighty One Lakhs Seventy Five

Thousand One Hundred and Thirty Four only) towards power

cost reimbursement for 1st quarter quarter of 2015-16,

subject to submission of the shortfall information/documents

i.e 1. Confirmation on installation of

additional machinery due to increase in power load from

2300 KVA to 3200 KVA 2. DT&CP plan approval for

expansion 3. Company incorporation 4. Land Conversion

certification 5. Valid CFO from APPCB 6. Bank

sanctioned letter 7. Land sale deed 8. Board resolution

authorizing person to sign claim 9. Approvged plan of

Gram Panchayat, Factories & T&CP 10. Statement of

account with attestation by GM, DIC11. CA certificate of

power computation sheets for last three years with attestation.

49

M/s Sri Venkata Siva Parvathi

Spinning Mills Pvt Ltd.,

(Expansion)

IIPP

2005-10

Rs.9,64,472/- (Rupees Nine Lakhs Sixty Four Thousand Four

Hundred and Seventy Two only) towards power cost

reimbursement for 4th quarter of 2014-15, subject to

submission of the shortfall information/documents i.e 1.

Confirmation from General Manager, DIC, Guntur on

installation of additional machinery due to increase in power

load 2. Land conversion certificate 3. Valid CFO from

APPCB 4. Approved project report 5. Gram Panchayat,

Factories Department and T&CP approved plans 6. There is

increase in power load with respect to present claim7. CA

certificate indicating share holding of directors

50

M/s. Idupulapadu Cotton Mils

Pvt Ltd (Exp-5), Ganapavaram

(V), Nadendla (M), Guntur Dist

IIPP

2005-10

Rs.5,57,041/- (Rupees Five Lakhs Fifty Seven Thousand and

Forty One only) towards power cost reimbursement for the

year 2014-15 after deducting the sanctioned excess amount in

previous period duly placing before SLC as separate

Agenda, subject to submission of the shortfall

information/documents i.e 1. Confirmation on installation

of additional machinery due to increase in power load from

7100 KVA to 8000 KVA 2. Land Conversion certification

3. Valid CFO from APPCB 4. Land sale deed 5. Board

resolution authorizing person to sign claim 6. Approved

plan of Gram Panchayat, Factories & T&CP for expansion.

The SLC has deferred the case for the next meeting.

51

M/s Viswateja Spinning Mills

Ltd (Exp-2) D No: 219,

Boyapalem (V), Edlapadu (M),

Guntur

IIPP

2005-10

Rs.1,45,06,340/- (Rupees One Crore Forty Five Lakhs Six

Thousand Three Hundred and Forty only) towards power cost

reimbursement for 1st quarter of 2015-16, subject to submission

of the shortfall information/documents. i.e 1. Confirmation on

installation of additional machinery due to increase in power load

from 3000 KVA to 4100 KVA 2. Company incorporation 3.

Land Conversion certification 4. Valid CFO from APPCB 5.

Bank term loan sanctioned letter 6. Land sale deed 7. Board

resolution authorizing person to sign claim 8. Approvged plan of

Gram Panchayat, Factories & T&CP