MINUTES OF THE 9th
S.L.C. MEETING HELD ON 20/02/2016 AT 11.30 AM. IN THE CONFERENCE HALL
OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P
The list of the Members who attended the meeting is appended.
Agen
da
Item
Brief Description of the Issue Decision of the Committee
1 Confirmation of the Minutes of the previous Meeting
held on 04/07/2015
SLC confirmed the minutes of the previous
meeting held on 04/07/2015
2 Follow up action on the minutes of the previous Meeting
held on 04/07/2015.
Noted.
3
IIPP 2005-10& IIPP 2010-15 schemes – Sanction
of reimbursement of stamp duty, reimbursement
of land cost purchased in IEs/IDAs,
reimbursement of power cost and sanction of
reimbursement of sales tax - Regarding.
****
The Verification / Scrutiny Committee
meetings held on 05/01/2016, 07/01/2016,
12/01/2016 22/01/2016 & 12/02/2016 has verified /
Scrutinized (08) claim application of reimbursement
of Sales Tax and (51) claim applications of
reimbursement of power cost as per the Guidelines
under respective schemes and recommended for
sanction/rejection of eligible Incentives /
Concessions to the units. The Minutes of
Verification / Scrutiny Committee of Sales Tax and
Power cost are appended as Annexures – I
ABSTRACT
S No
General Incentives No of units Amount(in Rupees )
1 Sales Tax 8 25,63,09,291/-
2 Power Cost 51 65,62,55,885/-
GRAND TOTAL 59 91,25,65,176/-
Or Say : Rs.91.20 Cr
The Verification / Scrutiny Committee of
Investment Subsidy and Sales Tax have recommended
for sanction / rejection of eligible Incentives/concessions
to the units as mentioned below.
SANCTION OF REIMBURSEMENT OF SALES TAX.
S
N
o
Appri
sal
Numb
er &
Date
of
SVC
meeti
ng
Date
of
receip
t of
claim
Name of
the unit
Nat
ure
of
Sch
eme
Decision
SLC has examined the recommendations of the
Verification / Scrutiny Committee and decided
to sanction eligible incentives / concessions to
the industrial units as mentioned below under
various schemes:
ABSTRACT
S No
General
Incentives
No of
units
Amount(in
Rupees )
1 Sales Tax 8 25,60,96,313/-
2 Power Cost 48 58,80,30,102/-
GRAND TOTAL 56 84,41,26,415/-
Or Say :
Rs.84.41 Cr
DETAILS
1. Reimbursment of Sales Tax Sanctioned
reimbursement of sales tax to (08) units
under IIPP and the list is appended as in
Annexure – I. In respect of Sl. No. 7, M/s
Adani Wilmar Limited, the Revised Rs.
1,74,18,039/- (Rupees One Crore Seventy
Four Lakhs Eighteen Thousand and Thirty
Nine only) was sanctioned towards sales
tax reimbursement.
2. Reimbursment of Power Cost sanctioned
to (48) units under IIPP and the list is
appended as Annexure – II. In respect of
Sl. No. 21 M/S. Usha Spincoat Pvt Ltd, Sl.
No 22 M/s. Shri Govindaraja Textiles and
Sl. No 50 M/s. Idupulapadu Cotton Mils
Pvt Ltd, SLC deferred the cases to next
meeting.
:: 2 ::
1
10
05/01/
2016
19/05/
2015
M/s
Teamec
Chlorates
Limited,
Industrial
Growth
Centre,
Gundlapall
i Village,
Maddipadu
Mandal,
Prakasham
District
IIPP
201
0-15
Rs.17,37,975/- (Rupees Seventeen Lakhs
Thirty Seven Thousand Nine Hundred and
Seventy Five only) towards sales tax
reimbursement for the year 2014-15, subject
to submission of the shortfall
information/documents i.e. 1. Valid CFO
issued by APPCB., 2. Factories Department
approval. 3. To obtain Civil Engineer
Certificate for record. 4. Assistant
Commissioner of Commercial Taxes
Department opined that audited balance sheet
shall be obtained along with upto date
assessment orders from the unit for
scrutinizing the components form-A.
2
12
12/02/
2016
15/06/
2015
M/s
A.S.Jute
products
Pvt Ltd.,
(Expansion
)
Nerallavala
sa Village,
Padmanaba
m Mandal,
Visakhapat
nam
IIPP
201
0-15
Rs.3,70,976/- (Rupees Three Lakhs Thirty
Seven Thousand Three Hundred and Twenty
only) towards sales tax reimbursement for
year 2014-15 i subject to submission of the
shortfall information/documents. i.e. 1.
Confirmation on Turnover particulars
furnished by the unit holder 2. Board
Resolution authorising the person to sign the
documents .3. Sale Deed 4. Land
Conversion permission 5. Civil Engineer
Certificate 6. Charted Accountant certificate
indicating share holding of Directors 7.
Status of original unit
3
20
12/02/
2015
27/06/
2015
M/s.
Godrej
Agrovet
Limited
Unit-2
(Expansion
-1)
IIPP
201
0-15
SVC verified the claim application in detailed
and found that GM, DIC recommended zero
value proposals towards reimbursement of
sales tax for the year of 2013-14 under IIPP
2010-15.
4
21
12/02/
2015
27/06/
2015
M/s.
Godrej
Agrovet
Limited
Unit-2
(Expansion
-1)
IIPP
201
0-15
Rs.1,20,50,150/- (Rupees One Crore Twenty
Lakhs Fifty Thousand One Hundred and Fifty
only) towards sales tax reimbursement for
year 2014-15 subject to submission of the
shortfall information/documents i.e. 1.
Confirmation of GM, DIC on the production
particulars for the last 3 years prior to date of
the commencement production of the
expansion project.)
5
37
12/02/
2016
27/07/
2015
M/s
K.P.Polyle
fin Sacks
Private
Limited,
Sy.No.913,
Epuru-
1A(V),
Doruvulap
alem (P),
Muthukur(
M), SPSR
Nellore
District
IIPP
200
5-10
Rs.15,34,990/- (Rupees Fifteen Lakhs Thirty
Four Thousand Nine Hundred and Ninety
only) towards Sales Tax reimbursement for
the year 2014-15 , subject to submission of the
shortfall information/documents i.e. 1.
Building plan approval from Town & Country
Planning Department & Factories
Department.2. Valid CFO from APPCB for
woven sacks is furnished and CFO for
additional line of activities like Tarpulin and
fabric .3. CA certificate indicating the % of
share holding of directors 4. Board resolution
authorizing the person to sign the claim. 5.
Land Conversion approval 6. Statement of
accounts in case of aided unit.7. List of plant
& machinery duly certified by GM, DIC and
Financial Institution as per operational
guidelines.8. As per the claim application, the
line of activity is HDPE and PP Woven
Sacks.9. As per Form – A Certificate
indicating additional products: a) Woven
Sacks - existing activity (Nos) b) Fabric –
Additional Activity.( Kgs) c) Tarpaulin –
Additional Activity. (Nos) d) The production
capacity indicated in IEM is in 4500 M.Ts.
and capacity is in Numbers in Form – A
certified by Commercial Tax Department and
hence could not be correlated. GM,DIC to
furnish the products indicated in Form A in
terms of Kgs.
3. SLC decided to release incentive amount to
the unit after the apportioned amount in
respect of tax paid in the State Telangana
as per the Section 56(1) (2) of the A.P.
Reorganisation Act 2014 is received.
4. SLC have taken a view of the member
representing State Bank of Hyderabad and
decided to furnish the information of
claims sanctioned duly indicating the name
of the Financial Institution.
5. SLC opined that the agenda shall be
circulated well before 2 days of convening
the State Level Committee so as to enable
the members to go through the contents
carefully while taking decisions.
6. SLC also taken a view of member
representing the AP Spinning Mills
Association and decided to allocate the
time from 3.00 PM to 5.00 PM on every
Monday exclusively for the spinning mills
to reconcile the shortfall information so as
to expedite the sanctions and clear the
issues pertaining to Textile Sector.
:: 3 ::
6
38
12/01/
2016
27/07/
2015
M/S
Gemini
Edibles
And Fats
India Pvt.
Ltd., S.No.
1607/2,
Indl.Park,
Pantapale
m (V),
Muthukur
(M), SPSR
Nellore
District
IIPP
200
5-10
Rs.12,78,86,725/- (Rupees Twelve Crores
Seventy Eight Lakhs Eighty Six Thousand
Seven Hundred and Twenty Five only)
towards Sales Tax reimbursement for the year
2014-15. subject to submission of the
shortfall information/documents i.e. 1.
Boiler certificate 2. List of Plant &
Machinery duly certified by GM, DIC and
Financial Institution as per operational
guidelines. 3. CA certificate indicating the
share holding of directors. 4. An amount of
Rs.17,28,90,730/- was paid in residual Andhra
Pradesh certified by CT Department Nellore,
AP and an amount of Rs 8,28,82,720/-
certified by CT Department, Hyderabad.
Further, SVC opined that only eligible sales
tax reimbursement against the tax paid in
residual A.P. shall be paid by A.P.
Government as per procedure laid down in
A.P.State Reorganisation Act. Hence SVC
recommended for sanction of
Rs.8,64,45,365/- against the tax paid in
residual Andhra Pradesh. (50% of Rs.
17,28,90,730/). In respect of an eligible
amount of Rs. 4,14,41,360/- (50% of
8,28,82,720/-) signed by CT Department,
Hyderabad towards sales tax
reimbursement, the release of funds shall
be shared by the State of A.P and
Telangana as per the outcome of the
Government decision.
7
42
12/02/
2016
10/08/
2015
M/s Adani
Wilmar
Limited,
Sy.No.
269, 270,
284, 287,
Thammava
ram (V),
Suryaraope
ta
Panchayat,
Kakinada
Rural
Mandal,
East
Godavari
District
IIPP
200
5-10
Rs.1,76,31,017/- (Rupees One Crore Seventy
Six Lakhs Thirty One Thousand and
Seventeen only) towards Sales Tax
reimbursement for the year 2012-13 & 2013-
14 , subject submission of the shortfall
information/documents i.e 1. DTCP approval
with approved plan. 2. Valid CFO from
APPCB 3. Power load is not indicated at the
time of filing claim application 4. Valid Boiler
certificate 5. Machinery statement not
certified as per guidelines. 6. Bank sanction is
in favour of old unit
8
50
12/02/
2016
14/08/
2015
M/S
Krishnapat
nam Oils
And Fats
Pvt. Ltd.,
Sy.No. 292
And 317,
Pantapale
m (V),
Epur BIT-I
Village,
Muthukuru
Mandal,
Spsr
Nellore
District
IIPP
200
5-10
Rs.9,51,27,458/- (Rupees Nine Crores Fifty
One Lakhs Twenty Seven Thousand Four
Hundred and Fifty Eight only) towards Sales
Tax reimbursement for the year 2014-15
under IIPP 2005-10, subject to submission of
the shortfall information/documents i.e 1.
Confirmation on production particulars for the
year 2014-15 by CT Department and GM,
DIC as the production particulars are not
given in Form-A. 2. Board resolution
authorizing the person to sign the claim
application .3. CA certificate indicating the
share holding 4. Power release certificate 5.
DTCP approval 6. Inward date on claim
application filed in DIC 7. Land conversion
approval 8. Valid CFO from APPCB.
II.REIMBURSEMENT OF POWER COST:
S
N
o
Appri
sal
Numb
er &
Date
of
SVC
meeti
ng
Date
of
receip
t of
claim
Name of
the unit
Nat
ure
of
Sch
eme
Decision
1
1
12/02/
2016
28/11/
2014
M/s Eisai
Pharma
and
Technolog
y &
Manufactu
ring
IIPP
200
5-10
Rs.1,38,27,240/- (Rupees One Crore Thirty
Eight Lakhs Twenty Seven Thousand Two
Hundred and Forty only) towards power
cost reimbursement for 1st & 2nd quarter of
2014-15 Subject to submission of the
shortfall information/documents i.e Civil
:: 4 ::
Private
Ltd.,
Parawada
Visakhapat
nam
Engineer Certificate for all civil works.
2
4
12/02/
2016
24/01/
2015
M/s Eisai
Pharma
and
Technolog
y &
Manufactu
ring
Private
Ltd.,
Parawada
Visakhapat
nam
IIPP
200
5-10
Rs.56,85,860/- (Rupees Fifty Six Lakhs
Eighty Five Thousand Eight Hundred and
Sixty only) towards power cost
reimbursement for 3rd quarter of 2014-15
under Industrial Investment Promotion
Policy 2005-2010, subject to submission of
the shortfall information/documents i.e.
Civil Engineer Certificate for all civil
works.)
3
11
22/01/
2016
15/06/
2015
M/s A.S.
Jute
products
Pvt Ltd.
(Expansiop
n)
,Nerallaval
asa
Village,
Padmanaba
m Mandal,
Visakhapat
nam
IIPP
201
0-15
Rs.3,37,320/- (Rupees Three Lakhs Thirty
Seven Thousand Three Hundred and
Twenty only) towards power cost
reimbursement for 1st half and 2nd half year
of 2014-15 in respect of expansion project,
subject to submission of the shortfall
information/documents i.e 1. Board
Resolution authorising the person to sign
the documents.2. Sale Deed., 3. Land
Conversion permission. 4. Civil Engineer
Certificate.5. Chartered Accountant
Certificate certifying the year-wise power
consumption detaileds for the last 3 years.
6. Charted Accountant certificate
indicating share holding of Directors.7.
GM DIC shall to consult the DE
(operations) APEPDCL and verify the
additional load in the power release
certificate with respect additional
machinery installation . 8. Status of
original unit .
4
16
22/01/
2015
27/06/
2015
M/s.
Godrej
agrovet
Limited
Unit-2
(Expansion
-1), West
Godavari
District
IIPP
201
0-15
SVC verified the claim and found the
following shortfall information. 1. The
approval issued by the Town and Country
planning Department is in the name of M/s
Godrej Oil Palm Ltd.,2. Power is released
on 13.04.2012 for 500 KVA under HT Cat-
II commercial category.3. As per the
scheme of amalgamation, Godrej Oil Palm
Ltd., is amalgamated with Godrej Agro vet
Limited on 16.03.2012 but the date of
commencement of commercial production
after amalgamation is declared on
15.06.2013. 4. Power consumption of the
unit is less than the base consumption and
hence recommended zero value proposals
for 1st half year 2013-14. 5. Valid Gram
Panchayat approval 6..Land Conversion
permission. 13. List of Plant & Machinery
duly certified by the GM, DIC and
Financial Institution as per guidelines in the
prescribed format in original. 7. Factories
Department approval. 8. GM, DIC has
his remarks on existing unit ie M/s Godrej
Oil Palm Ltd., and unit not achieving the
Base power consumption units in respect of
expansion project.
SVC opined that the GM, DIC
recommended zero value proposals, the
above shortfall information shall be
obtained from the GM,DIC in order to
upkeep the file for processing the future
claims.
5
17
22/01/
2015
27/06/
2015
M/s.
Godrej
agrovet
Limited
Unit-2
(Expansion
-1), West
Godavari
District
IIPP
201
0-15
SVC verified the claim application in
detailed and found that GM, DIC
recommended zero value proposals towards
reimbursement of power cost for 2nd half
year of 2013-14 under IIPP 2010-15.
:: 5 ::
6
18
22/01/
2015
27/06/
2015
M/s.
Godrej
agrovet
Limited
Unit-2
(Expansion
-1), West
Godavari
District
IIPP
201
0-15
SVC verified the claim application in
detailed and found that GM, DIC
recommended zero value proposals towards
reimbursement of power cost for 1st half
year of 2014-15 under IIPP 2010-15.
7
19
22/01/
2015
27/06/
2015
M/s.
Godrej
agrovet
Limited
Unit-2
(Expansion
-1), West
Godavari
District
IIPP
201
0-15
SVC verified the claim application in
detailed and found that GM, DIC
recommended zero value proposals towards
reimbursement of power cost for 2nd half
year of 2014-15 under IIPP 2010-15.
8
22
22/01/
2016
03/07/
2015
M/s NSL
Textiles
Limited,
APIIC
Industrial
Park,
Pulivendul
a, YSR
District
IIPP
200
5-10
Rs.1,43,41,895/- (Rupees one crore forty
three lakhs forty one thousand eight
hundred ninty five only) towards power cost
reimbursement for 4th quarter of 2014-15,
subject to submission of the shortfall
information/documents i.e 1. Reasons for
increase in power load with respect initial
filing of claim application.2. Power 2000
KVA released on 11.03.2010 and 1000
KVA released on 07.07.2010 and the same
is not reflected in Part B self declaration.
3. Approval of change of name of the
unit.4. Bank Term Loan Sanction letter
5. Board resolution 6. DTCP approval .
9
23
12/02/
2016
06/07/
2015
M/s Eisai
Pharma and
Technology
&
Manufacturin
g Private
Ltd.,
Parawada
Visakhapatna
m
IIPP
200
5-10
Rs.1,35,50,960/- (Rupees One Crore Thirty
Five Lakhs Fifty Thousand Nine Hundred
and Sixty only) towards power cost
reimbursement for 4th quarter of 2014-15
and 1st quarter of 2015-16 subject to
submission of the shortfall
information/documents i.e Civil Engineer
Certificate for all civil works.)
1
0
24
12/01/
2016
08/07/
2015
M/s JSW
Cement
Limited,
Sy.No.206,
Bilakalgud
ur (V),
Gadivenm
ula (M),
Kurnool
District
IIPP
201
0-15
Rs.4,42,04,960/- (Rupees Four Crores Forty
Two Lakhs Four Thousand Nine Hundred
and Sixty only) towards power cost
reimbursement for 1st half year of 2014-15,
Subject to submission of the shortfall
information/documents 1. Certification of
incorporation of the company , 2. Board
Resolution authorising the person to sign
the claim application is 3. Approved plans
for expansion issued by T & C P
Department .4. Land conversion approval
5. Civil Engineer Certificate for all civil
works .6. Valid CFO / Acknowledgement
from APPCB 7. Statement of Machinery
duly certified by the Financial Institution
and General Manager, DIC as per
guidelines 8. Land Sale Deed / Lease
Deed 9. Statement of Accounts in
original or attested copy .10. Approval and
approved plans from the Factories
Department 11. Power release certificate.
:: 6 ::
1
1
25
12/02/
2016
08/07/
2015
M/s South
India
Krishna
Oil and
Fats Pvt.
Ltd.,
Sy.No.
275, 279,
280 & 281,
Epuru Bit-
IB,
Pantapale
m
Muthukur
(V&M),
SPSR
Nellore
District
IIPP
200
5-10
Rs.23,78,800/- (Rupees Twenty Thred
Lakhs Seventy Eight Thousand and Eight
Hundred only) towards power cost
reimbursement for 3rd quarter of 2014-15,
subject submission of the shortfall
information/documents i.e 1. Approved
plans by T & C P Department 2. Boiler
Certificate 3. Land conversion approval
4. GM, DIC has certified the activity in
claim Refined Oil and not in his covering
letter.5. Person signing the claim has not
indicated name of the person to verify the
Board Resoution Authorization 6.
Building plan approval from Factories
Department 7. Statement of Accounts
duly certified by GM, DIC 8. List of plant
& machinery duly certified by GM, DIC &
Financial institution as per operational
guidelines. 9. Reasons for power load
increased from 1000 KVA to 2500
KVA.10. Original DCP 27/09/2011
clarify.11. Additional power was given on
07/12/2013 as per Form-B.12. Power Bill
for January 2015.
1
2
27
12/01/
2016
10/07/
2015
M/s JSW
Cement
Limited,
Sy.No.206,
Bilakalgud
ur (V),
Gadivenm
ula (M),
Kurnool
District
IIPP
201
0-15
Rs.5,55,52,245/- (Rupees Five Crores Fifty
Five Lakhs Fifty Two Thousand Two
Hundred and Forty Five only) towards
power cost reimbursement for 2nd half year
of 2014-15 (subject to submission of the
shortfall information/documents i.e 1.
Certification of incorporation of the
company 2. Board Resolution authorising
the person to sign the claim application is
3. Approved plans for expansion issued
by T & C P Department .4. Land
conversion approval 5. Civil Engineer
Certificate for all civil works 6. Valid
CFO / Acknowledgement from APPCB 7.
Statement of Machinery duly certified by
the Financial Institution and General
Manager, DIC as per guidelines 8. Land
Sale Deed / Lease Deed 9. Statement of
Accounts in original or attested copy .10.
Approval and approved plans from the
Factories Department.
1
3
29
12/01/
2016
M/S Loyal
Textile
Mills Ltd.,
Industrial
Park,
Menakur
(V),
Naiduper(
M)
IIPP
201
0-15
Rs.2,90,89,130/- (Rupees Two Crores
Ninety Lakhs Eighty Nine Thousand One
Hundred and Thirty only) towards power
cost reimbursement for 1st and 2nd half year
of 2014-15, subject to submission of the
shortfall information/documents i.e. 1.
There is a variation in line of activity
recommended by GM, DIC with respect to
IEM Part B obtained. 2. Certificate of
incorporation 3. Board resolution
authorizing the person to sign the
documents. 4. Approved plan of Gram
Panchayat and Factories Department.5.
Valid CFO from APPCB .6. Attested Bank
term loan sanction letter 7. List of Plant &
Machinery Statement not attested and not
certified in the prescribed format 8.
Statement of accounts not attested 9. Civil
Engineer certificate is furnished without
attestation.10. Project report.11. CA
certificate indicating share holding of
Directors. 12. The reasons for release of
power after DCP.
:: 7 ::
1
4
30
12/01/
2016
M/S
Gemini
Edibles
And Fats
India Pvt.
Ltd., S.No.
1607/2,
Indl.Park,
Pantapale
m (V),
Muthukur
(M), SPSR
Nellore
Ditrict
IIPP
200
5-10
Rs.34,68,950/- (Rupees Thirty Four Lakhs
Sixty Eight Thousand Nine Hundred and
Fifty only) towards power cost
reimbursement for 3rd quarters of 2014-15
subject to submission of the shortfall
information/documents i.e 1. SVC opined
that as the Meeseva receipt No. for 4th
quarter of 2014-15 is not filed in covering
letter, clarification from GM,DIC.2. Date is
not recorded in claim application physically
filed for 4th quarter 2014-15. 3. Valid CFO
from APPCB 4. Valid Boiler certificate 5.
List of Plant & Machinery duly certified by
GM, DIC and Financial Institution as per
operational guidelines. 6. CA certificate
indicating the share holding particulars.
1
5
31
12/01/
2016
27/07/
2015
M/S.Sudar
shanam
Spinning
Mills Ltd,
R.S No:
52&53,
Tirumalagi
ri (V),
Jaggaipet
(M),
Krishna
Dist
IIPP
200
5-10
Rs.73,32,760/- (Rupees Seventy Three
Lakhs Thirty Two Thousand Seven
Hundred and Sixty only) towards power
cost reimbursement for 3rd and 4th quarter
of 2014-15, subject to submission of the
shortfall information/documents i.e 1.
Clarification with regard to capacity of the
plant in terms of kgs as the capacity is
mentioned in terms of ROTORS in IEM
Part B. 2. Reasons for increase in power
load in the present claim with respect to
power load as on DCP ie from 1077 KVA
to 1672 KVA.3. Land conversion
permission,Civil Engineer certificate and
project report. 4. Board resolution
authorizing the person to sign the claim
applications for 3rd and 4th quarter of 2014-
15. 5. Valid CFO from APPCB.6. CA
Certificate indicating share holding
particulars.
1
6
32
12/01/
2016
27/07/
2015
M/S.Sri
Vishnu
Shankaar
Mills Ltd,
Gopinenip
alem (V),
Vatsavai
(M),
Krishna
Dist
IIPP
200
5-10
Rs.88,66,700/- (Rupees Eighty Eight Lakhs
Sixty Six Thousand and Seven Hundred
only) towards power cost reimbursement for
3rd and 4th quarter of 2014-15, subject to
submission of the shortfall
information/documents i.e 1. Valid CFO
from APPCB 2. List of Plant & Machinery
duly certified by GM, DIC and Financial
Institution as per operational guidelines.3.
Project report 4. Land conversion
permission 5. CA certificate indicating the
% of share holding of directors 6. Reasons
for increase in power load from 900 KVA
to 1150 KVA and clarification on connected
load in HP/KW.7. Attested copy of
Statement of accounts.8. Board resolution
authorizing the person to sign the claim
application.
1
7
33
12/01/
2016
27/07/
2015
M/s.Rajapala
yam Mills
Ltd,
Gopinenipal
em (V),
Vatsavai
(M), Krishna
Dist
IIPP
200
5-10
Rs.90,38,170/- (Rupees Ninety Lakhs
Thirty Eight Thousand One Hundred and
Seventy only) towards power cost
reimbursement for 3rd and 4th quarter of
2014-15, subject to submission of the
shortfall information/documents i.e 1. Valid
CFO from APPCB.2. List of Plant &
Machinery duly certified by GM, DIC and
Financial Institution as per operational
guidelines.3. Land conversion permission 4.
CA certificate indicating the % of share
holding of directors 5. Board resolution
authorizing the person to sign the claim
application.
1
8
34
12/01/
2016
27/07/
2015
M/S.Sri
Harini
Textiles
Limited,
R.S No:
47,48, &
49
Tirumalagi
ri (V),
Jaggaipet
(M),
Krishna
Dist
IIPP
200
5-10
Rs.72,63,640/- (Rupees Seventy Two Lakhs
Sixty Three Thousand Six Hundred and
Forty only) towards power cost
reimbursement for 3rd and 4th quarter of
2014-15, subject to submission of the
shortfall information/documents i.e 1. Line
of activity is not mentioned by GM,DIC
while recommending the claim proposal.2.
Valid CFO from APPCB duly attested.3.
Project report 4. Land conversion
permission 5. CA certificate indicating the
% of share holding of directors 6. Board
resolution authorizing the person to sign the
claim.7. Reasons for increase in power load
:: 8 ::
from 1077 KW to 1624.83 KW at the time
of submission of claim.
1
9
35
12/02/
2016
27/07/
2015
M/s.Sandh
ya
Spinning
Mill Ltd.,
Krishna
District
IIPP
200
5-10
Rs.89,57,050/- (Rupees Eighty Nine Lakhs
Fifty Seven Thousand and Fifty only)
towards power cost reimbursement for 3rd
and 4th quarter of 2014-15, subject to
submission of the shortfall
information/documents i.e 1. Clarification
with regard to capacity of the plant in terms
of Kgs as the capacity is mentioned in terms
of ROTORS in IEM part-B. 2. Valid CFO
from APPCB.3. List of plant & machinery
duly certified by GM, DIC & Financial
Institution as per operational guidelines.4.
Land conversion permission 5. CA
certificate indicating the % of share holding
of directors 6. Board resolution authorizing
the person to sign the claim. 7. Reasons for
increase in power load from 900 KVA to
1150 KVA at the time of submission of
claim.
2
0
36
12/02/
2016
27/07/
2015
M/s
K.P.Polyle
fin Sacks
Private
Limited,
Sy.No.913,
Epuru-
1A(V),
Doruvulap
alem(P),
Muthukur(
M), SPSR
Nellore
District
IIPP
201
0-15
Rs.18,73,270/- (Rupees Eighteen Lakhs
Seventy Three Thousand Two Hundred and
Seventy only) towards power cost
reimbursement for 2nd half year of 2014-15
subject to submission of the shortfall
information/documents i.e 1. Building plan
approval from Town & Country Planning
Department & Factories Department.2.
Valid CFO from APPCB duly attested.3.
Form-B self declaration duly indicating the
power load. 4. CA certificate indicating the
% of share holding of directors 5. Board
resolution authorizing the person to sign the
claim.
2
1
39
12/01/
2016
30/07/
2015
M/S. Usha
Spincoat
Pvt Ltd, Rs
No: 341,
Chikkavara
m,
Gannavara
m (M),
Krishna
Dist
IIPP
200
5-10
Rs.73,07,824/- (Rupees Seventy Three
Lakhs Seven Thousand Eight Hundred and
Twenty Four only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall
information/documents i.e 1. Valid CFO
from APPCB. 2. Reasons for increase in
power from 1200 KVA to 1860 KVA and
clarification on connected load in HP/KW
3. CA certificate indicating share holding
particulars 4. Board resolution authorizing
the person to sign the claim. 5. Approved
plan of DTCP 6. Land Conversion
permission Further, SVC opined that the
Government permission for condonation
of delay in filing claim application and
making the unit eligible for availing the
incentives under IIPP 2005-2010 vide
Government memo No.
4850/IP/INF/A1/2014-15 Dated
16.12.2014 shall be circulated to the
Chairman SLC.
2
2
40
12/02/
2016
02/08/
2015
M/s. Shri
Govindaraj
a Textiles
Ltd., 708,
Peddarang
apuram
(V),
Pulivendal
a (M),
Kadapa
Dist
IIPP
200
5-10
Rs.6,03,60,918/-(Rupees six crors three
lakhs sixty thousand nine hundred and
eighteen only) towards power cost
reiombursment for the period 1st quater of
2015-16 and defereence amount in pervious
period from Jan - 2014 to March -2015
subject to submission of the shortfall
information/documents i.e 1. Reasons for
increase power load in KVA from 2500 to
10500 KVA and clarification on connected
load in HP/KW.2. Valid CFO from APPCB.
3. CA certificate indicating share holding
particulars. 4. DTCP approved plan 5. Form
B Self Declaration is not properly filled in
6. Board resolution authorizing the person
to sign the claim application . 7. Proof of
receipt of claim in hard copy by GM,DIC is
not available on the application 8. Factories
Department plan not attested 9. Land
conversion approval 10. Bank sanction
letter is not attested
241
12/01/06/08/
M/S Sri
Anantha
Lakshmi
IIPP
200
Rs.64,65,576/- (Rupees Sixty Four Lakhs
Sixty Five Thousand Five Hundred and
Seventy Six only) towards power cost
:: 9 ::
3 2016 2015 Spinning
Mills (P)
Ltd, (Exp-
1) 59/1,
Boyapalem
(V),
Edlapadu
(M),
Guntur
Dist
5-10 reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall
information/documents i.e 1. Sale deed 2.
Valid CFO 3. Bank sanction letter 4. GM
DIC has not informed increase in capacity
of the unit 5. CA certificate indicating share
holding particulars. 6. Land conversion
approval 7. Factories Department plan
furnished without attestation 8. T and CP
Department plan .
2
4
44
12/02/
2016
11/08/
2015
M/s Sree
Rayalasee
ma
Alkalies
And Allied
Chemicals
Ltd.,
Gondiparla
(V),
Kurnool
IIPP
200
5-10
Rs.9,19,34,290/- (Rupees Nine Crores
Nineteen Lakhs thirty Four Thousand Two
Hundred and Ninety only) towards power
cost reimbursement for 1st quarter of 2015-
16, subject to submission of the shortfall
information/documents i.e 1. IEM part B 2.
Land sale deed 3. Company incorporation 4.
Board resolution authorizing the person to
sign the claim application. 5. Factories
Department approval in full shape 6. Valid
Boiler certificate 7. Machinery list as per
guidelines. 8. CE certificate 9. Project
report 10. Land conversion 11. CA
certificate for share holding 12. Gram
panchayat approval furnished not attested
13. CFO duly attested by GM, DIC. 14.
Power release certificate duly attested by
GM, DIC.15. C.A. Certificate for payment
proof for the period for 1st quarter of 2015-
16
2
5 45
12/01/
2016
M/S.Mulpu
ri Foods &
Feeds Pvt
Ltd., Rs
No:
23&30,
Morsapudi
(V),
Nuzivid
(M),
Krishna
Dist
IIPP
201
0-15
Rs.10,36,810/- (Rupees Ten Lakhs Thirty
Six Thousand Eight Hundred and Ten only)
towards power cost reimbursement for 2nd
half year of 2014-15 , subject to submission
of the shortfall information/documents i.e
1. Reasons for increase of power from 1100
KVA to 2190 KVA 2. Valid CFO 3. CA
certificate for share holding 4. DTCP
approved plan 5. Board resolution
authorizing the person to sign the claim. 6.
Civil Engineer certificate 7. Project report
8. Factories approval and approved plan.9.
Clarification with regard to additional
machinery from GM,DIC.
2
6
46
12/01/
2016
13/08/
2015
M/S.Vanta
ge
Spinners,
Rs No: 50,
Gollapalli ,
Nusivid
(M0,
Krishna
Dist
IIPP
200
5-10
Rs.1,67,82,980/- (Rupees One Crore Sixty
Seven Lakhs Eighty Two Thousand Nine
Hundred and Eighty only) towards power
cost reimbursement for 1st quarter of 2015-
16, subject to submission of the shortfall
information/documents i.e 1. Board
resolution authorizing the person to sign the
claim application.2. Factories Department
approval 3. Valid CFO 4. Machinery
statement duly certified as per guidelines 5.
Project report 6. CA certificate indicating
share holding 7. Bank sanction letter 8.
Statement of accounts 9. Gram Panchayat,
DTCP approvals and approved plans 10.
Land conversion 11. Civil Engineer
certificate 12. Power release document with
attestation
2
7
47
12/01/
2016
13/08/
2015
M/s
AMARAV
ATHI
TEXTIEL
S (P) LTD
(4th
EXPANSI
ON),
MARTUR
(V) & (M),
PRAKAS
AM DIST
IIPP
201
0-15
Rs.3,06,91,800/- (Rupees Three Crores Six
Lakhs Ninety One Thousand and Eight
Hundred only) towards power cost
reimbursement for 1st half year of 2015-16,
subject to submission of the shortfall
information/documents i.e 1. Land sale
deed 2. Board resolution authorizing the
person to sign the claim application. 3.
DTCP approved plan 4. Power release
certificate 5. Meeseva receipt for 2nd
quarter of 2015-16 6. Valid CFO from
APPCB 7. List of Plant & Machinery duly
certified by the GM, DIC and Financial
Institution as per guidelines in the
prescribed format in original. 8.
Clarification with regard to power load of
6700 KVA as on 26.11.2009 and increasing
to 10000 KVA as on 11.11.2011. 9. The
date on claim application pertaining to 1st
half year claim of 2015-16 for power cost
reimbursement is not recorded for verifying
:: 10 ::
the date of filing. 10. Company
incorporation 11. Factories plan 12. Land
conversion 13. Project report 14. CA
certificate indicating share holding
2
8
48
12/02/
2016
13/08/
2015
M/S
Bhavya
Cements
Ltd,
Tangeda
(V),
Dachepalli
(M),
Guntur
Dist.
IIPP
200
5-10
Rs.4,31,42,550/- (Rupees Four Crores
Thirty One Lakhs Forty Two Thousand
Five Hundred and Fifty only) towards
power cost reimbursement for 1st quarter of
2015-16 subject to submission of the
shortfall information/documents i.e 1. Valid
CFO from APPCB 2. Sale deed 3. T & CP
approval 4. Civil Engineer certificate 5.
Board resolution authorizing the person to
sign the claim application .6. Land
conversion 7. State Bank of Indore letter
with attestation. 8. CA certificate indicating
share holding 9. Pipeline Certificate under
IIPP 2005-2010.
2
9
49
12/01/
2016
14/08/
2015
M/S
Idupulapad
u Cotton
Mils Pvt
Ltd ,
Jonnatali
(V),
Martur
(M),
Prakasam
Dist.
IIPP
200
5-10
Rs.3,09,61,270/- (Rupees Three Crores
Nine Lakhs Sixty One Thousand Two
Hundred and Seventy only) towards power
cost reimbursement for 1st quarter of 2015-
16, subject to submission of the shortfall
information/documents i.e 1. CA Certificate
2. Power release certificate 3. Machinery
statement not certified as per guidelines 4.
Board resolution authorizing the person to
sign the claim application . 5. No inward
date on 1st quarter of 2015-16 claim. GM,
DIC to furnish his report on filing of claims
with DIC as per the stipulated time frame.
6. Bank sanction letter 7. Approved plans of
DTCP, Factories and Gram panchayat 8.
Reasons for increase of power from 1510
KVA to 5600 KVA 9. Valid CFO from
APPCB 10. Statement of accounts not
furnished 11. Approved project report.
3
0
51
12/02/
2016
17/08/
2015
M/S.Ravali
Spinners
Pvt Ltd.
(Expansion
),
Khandavali
, Peravali
(M), West
Godavari
Dist
IIPP
200
5-10
Rs.32,89,450/- (Rupees Thirty Two Lakhs
Eighty Nine Thousand Four Hundred and
Fifty only) towards power cost
reimbursement for 1st quarter of 2015-16 ,
subject to submission of the shortfall
information/documents i.e 1. Certificate of
incorporation Rs.32,89,450/- Certificate of
incorporation 2. Board resolution
authorizing the person to sign the claim
application .3. Valid CFO from APPCB 4.
Statement of Accounts 5. Project report 6.
CA certificate indicating the share holding
7. IEM part B issued by SIA/DIPP 8. Sale
deed 9. Land conversion 10. Machinery
statement not certified as per guidelines 11.
Civil Engineer Certificate 12. Separate
C.A. Certificate on power consumption
units for the previous three years prior to
expansion. 13. Variation in power load
reported in form B Self Declaration, power
bill and also power load as on DCP.
Clarification on power load at the time of
release in terms of KW/HP.14. DTCP and
Factories Department plans are not
attested.15. Gram Panchayat approval
3
1
52
12/01/
2016
17/08/
2015
M/S. Spads
Textiles
Limited,
Sy No:
86/1,
Ravikampa
du (V),
Jaggaipet(
M),
Krishna
Dist
IIPP
200
5-10
Rs.37,01,808/- (Rupees Thirty Seven
Lakhs One Thousand Eight Hundred and
Eight only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall
information/documents i.e 1. Project report
2. Land sale deed 3. Factories Department
approval 4. Bank Term loan sanction letter
5. Valid CFO from APPCB 6. Reasons for
increase in power load from 1000 KVA to
1350 KVA 7. DTCP approval with
attestation. 8. Board resolution authorizing
the person to sign the claim. 9. CA share
holding report with attestation 10. Land
conversion approval 11. Gram Panchayat
approved plan.
:: 11 ::
3
2
53
12/02/
2016
17/08/
2015
M/S.Ravali
Spinners
Pvt Ltd.
(Existing),
Khandavali
, Peravali
(M), West
Godavari
Dist
IIPP
200
5-10
SVC verified the claim application in
detailed and recommended for rejection for
sanction of reimbursement of power cost for
the period of 4th quarter of 2014-15 under
IIPP 2005-10, since the incentives availing
period of 8 years completed by the end of
3rd quarter of 2014-15 from the date of
commencement of production of the unit.
3
3
54
22/01/
2016
18/08/
2015
M/s Mohan
Spintex
India
Limited
(Expansion
)
R.S.No.29/
2,
Vattigudip
adu
Village,
Agiripalli
Mandal,
Krishna
District
IIPP
200
5-10
Rs.84,06,980/- (Rupees Eighty Four Lakhs
Six Thousand Nine Hundred and Eighty
only) towards power cost reimbursement for
1st quarter of 2015-16, subject to submission
of the shortfall information/documents 1.
Land sale deed or lease deed 2. Bank
sanction letter 3. Project report 4. Town
and Country Planning Approval 5.
Statement of Accounts in original 6.
Machinery statement duly certified by the
Financial Institution as per guidelines. 7.
The status of original unit and there is no
correlation of IEM of original unit and
expansion project. 8. Claim application is
not completely filled in leaving column
meant for filling in the capacity of original
unit, as blank. 9. GM DIC to clarify the
line of activity in the claim application with
respect to IEM part B since there is a
variation. 10. Gram Panchayat approved
plans 11. Town and Country Planning
plans .12. CFO furnished is unattested. 13.
Land conversion approval .
3
4
55
22/01/
2016
18/08/
2015
M/s Mohan
Spintex
India
Limited
(Unit II)
Remalle,
Bapulapad
u Mandal,
Krishna
District
IIPP
200
5-10
Rs.3,17,29,280/- (Rupees Three Crores
Seventeen Lakhs Twenty Nine Thousand
Two Hundred and Eighty only) towards
power cost reimbursement for 1st quarter of
2015-16, subject to submission of the
shortfall information/documents i.e 1.
Land sale deed or lease deed 2. Reasons
in increase of KVA from 4000 to 5000
KVA and clarification on connected load.
3. Town and Country Planning
Department approval 4. Board resolution
authorizing the person to sign the
documents . 5. Land conversion certificate
6. CA certificate indicating share holding
of Directors . 7. Gram Panchayat
approved plans. 8. Attested copy of CFO
issued by APPCB.
3
5
56
12/01/
2016
18/08/
2015
M/S
Deccan
Fine
Chemicals
(India) Pvt
Ltd,
Nagaram
(P)
Payakarao
pet (M),
Visakhapat
nam Dist
IIPP
200
5-10
Rs.2,25,76,374/- (Rupees Two Crores
Twenty Five Lakhs Seventy Six Thousand
Three Hundred and Seventy Four only)
towards power cost reimbursement for 1st
quarter of 2015-16, subject to submission
of the shortfall information/documents i.e
1. IEM Part B 2. Company incorporation
certificate 3. T & CP dept approval 4. Land
conversion approval 5. Approved project
report 6. Valid CFO issued by APPCB 7.
Factories Department approved plan 8.
Bank term loan sanction letter 9. CA share
holding report not attested 10. Land sale
deed. 11. Machinery statement duly
certified by Bank.
3
6
57
12/02/
2016
18/08/
2015
M/S
Vasudha
Pharma
Chem
Limtied
Unit -III
Plot No:
23&24,
Jnpc,
Parawada
(V),
Visakhapat
nam Dist
IIPP
201
0-15
Rs.54,93,890/- (Rupees Fifty Four Lakhs
Ninety Three Thousand Eight Hundred and
Ninety only) towards power cost
reimbursement for 2nd half year of 2012-13
and 1st and 2nd half year of 2013-14 and 1st
half year 2014-15, subject to submission of
the shortfall information/documents i.e 1.
Board resolution authorizing the person to
sign the claim application. 2. IEM Part B 3.
Line of activity in IEM Part B is different
from GM,DIC report in his covering letter
4. CFO with attestation. 5. Valid boiler
certificate 6. Statement of Accounts 7. List
of Plant & Machinery as per operational
guidelines.
:: 12 ::
3
7
58
22/02/
2016
20/08/
2015
M/s Silica
Ceramica
Private
Limited,
D.No.97,
Narayanap
uram,
Unguturu
Mandal,
West
Godavari
District
IIPP
200
5-10
Rs.63,49,765/- (Rupees Sixty Three Lakhs
Forty Nine Thousand Seven Hundred and
Sixty Five only) towards power cost
reimbursement for 1st quarter of 2015-16 ,
subject to submission of the shortfall
information/documents i.e 1. Land sale deed
or Lease deed. 2. Company incorporation.3.
Project report 4. Valid CFO issued by
APPCB. 5. CA Certificate indicating share
holding of directors6. Machinery statement
not signed but signed in a separate sheet. 7.
Factories Department plan. 8. Land
conversion certificate 9. Board resolution
authorizing the person to sign the
documents.10. Banker term loan sanctioned
letter with attestation.11. Statement of
accounts with attestation.
3
8
59
12/02/
2016
24/08/
2015
M/s
Chowdary
Spinners
Limited,
Undrajavar
am
Mandal,
West
Godavari
IIPP
201
0-15
Rs.43,91,499/- (Rupees Forty Three Lakhs
Ninety One Thousand Four Hundred and
Ninety Nine only) towards power cost
reimbursement for 1st quarter of 2015-16 ,
subject to submission of the shortfall
information/documents i.e . 1. Valid CFO
issued by APPCB 2. Land sale deed or lease
deed 3. Project report 4. C.A.Certificate
indicating share holding of directors 5.
Factories Department, Gram Panchayat and
T & CP Department approved Plan 6. Board
resolution authorizing the person to sign the
claim application.7. IEM Part B 8. APSFC
term loan Sanctioned letter 9. Date of
commencement of commercial production
is not indicated in IEM Part – B.
3
9
60
22/02/
2016
25/08/
2015
M/s PVR
Spinning
and
Weaving
Limited,
Kondayapa
lem Road,
Tetali,
Tanuku
Mandal,
West
Godavari
IIPP
200
5-10
Rs.39,42,768/- (Rupees Thirty Nine Lakhs
Forty Two Thousand Seven Hundred and
Sixty Eight only) towards power cost
reimbursement for 1st quarter of 2015-16 ,
subject submission of the shortfall
information/documents i.e .1. Land sale
deed or lease deed.2. Reasons in increase of
KVA from 600 to 2401 KVA and clarify on
connected load. 3. Bank term loan sanction
letter. 4. Project report. 5. Company
incorporation. 6. Board resolution
authorizing the person to sign.7. Gram
Panchayat approval. 8. Town and Country
planning /UDA approval 9. Factories
department approval. 10. Valid CFO from
APPCB.11. CA certificate for share
holding. 12. Llist of plant & machinery duly
certified by GM, DIC & Financial
Institution as per guidelines.
4
0
61
22/02/
2016
25/08/
2015
M/S
Lohiya
Edible Oils
Pvt
Ltd.,(Unit
II)
(existing)
Plot No.25
IDA,
Vakalapudi
, Kakinada
Rural East
Godavari
pertaining
to 4th
quarter of
2014-15
IIPP
200
5-10
Rs.17,89,675/- (Rupees Seventeen Lakhs
Eighty Nine Thousand Six Hundred and
Seventy Five only) towards power cost
reimbursement for 4th quarter of 2014-15 ,
subject to submission of the shortfall
information/documents i.e 1. Board
resolution authorizing the person to sign the
claim application . 2. Land sale deed. 3.
Gram Panchayat, Factories Department and
DTCP approval 4. Land conversion 5. CFO
issued from APPCB 6. Bank term loan
sanction letter 7. Project report 8.
C.A.Certificate indicating share holding of
directors 9. C.A.Certificate for increase in
investment for expansion project 10. There
is a variation in power load in present claim
with respect to original claim filed. ( 450
HP original claim, 1680 HP in present
claim) 11. Power release certificate for
1680HP 12. Statement of accounts duly
certified by financial institution 13. List of
Plant & Machinery duly certified by
financial institution and as per operational
guidelines.14. Valid Boiler certificate.
:: 13 ::
4
1
62
22/02/
2016
25/08/
2015
M/S
Lohiya
Edible Oils
Pvt Ltd,
(Expansion
) Plot
No.25
IDA,
Vakalapudi
, Kakinada
Rural East
Godavari
pertaining
to 2nd half
year of
2014-15
IIPP
201
0-15
Rs.24,49,050/- (Rupees Twenty Four Lakhs
Forty Nine Thousand and Fifty only)
towards power cost reimbursement for 2nd
half year of 2014-15 , subject to submission
of the shortfall information/documents i.e.
1.Board resolution authorizing the person
to sign the claim application . 2.Land Sale
deed, 3.Certificate of incorporation, 4.CA
Certificate for share holding pattern,
5.Gram Panchayat, Factories Department
and DTCP approval, 6.Land conversion,
7.Valid CFO issued by APPCB, 8.Bank
term loan sanctioned letter Project report,
9.C.E.Certificate, 10.Power release
certificate, 11.There is a variation in DCP in
claim application filed for expansion, 12.
DCP is 01.07.2012 as per IEM Part B and
GM DIC reported DCP as 07.03.2010 in
claim application and Form B self
declaration, which is correct, 13.Statement
of Accounts furnished pertains to 2009
which is certified by Union Bank India and
is not relevant for expansion, 14.Expansion
project is financed by APSFC as per
machinery statement, 15.Form B self
declaration furnished for expansion is not
relevant, 17.CA has not certified the
investment criteria in respect of expansion
project, 18.As per power release certificate
in (original) unit II the power load is 450
HP released on 26.12.2004, 19.As per
Factories Department approval is reported
increased from 331 HP to 3117 HP,
20.Power release certificate for verification
in respect of expansion project.
4
2
64
22/01/
2016
28/08/
2015
M/s
Bhavanam
Spinning
Mills Pvt
Ltd.,
(Expansion
Unit)
Bhimineni
varipalem
Village,Me
dikonduru
Mandal,
Guntur
District
IIPP
200
5-10
Rs.30,73,815/- (Rupees Thirty Lakhs
Seventy Three Thousand Eight Hundred
and Fifteen only) towards power cost
reimbursement for 1st quarter of 2015-16
submission of the shortfall
information/documents, subject to
submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery in view of increase in power
load. 2. Land documents. 3. Valid CFO
from APPCB. 4. Approved Project report.
5. T& CP Department approved 6. Bank
sanction letter. 7. C A certificate
indicating share holding of directors. 8.
Board resolution authorizing the person to
sign the claim application. 9. Land
conversion document. 10. There is increase
in power load from 1550KVA to 3200KVA.
4
3
65
22/01/
2016
28/08/
2015
M/s
Guntur
Spinning
Mills
Private
Ltd.,
Obulavarip
alme
Village,
Guntur
IIPP
200
5-10
Rs.15,82,920/- (Rupees Fifteen Lakhs
Eighty Two Thousand Nine Hundred and
Twenty only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery in view of increase in power
load.2. Land sale deed.3. Valid CFO
from APPCB 4. Approved project
report.6. Signature of authorized person
not attested in board resolution /
authorization and not indicated the name of
person in the claim application.7. T&CP
Dept and Factories Dept Plans.8. Bank
Sanctioned letter 9. Banker has not
attested as machinery as per guidelines.10.
Valid CFO from APPCB.11. There is
increase in power load from 600KVA to
2240KVA.12. CA certificate for share
holding.
:: 14 ::
4
4
66
22/01/
2016
28/08/
2015
M/s Sri
Venkata
Lakshmi
Narasimha
Spinning
Mills
Private
Ltd.,D.No.
176/4,
GBC
Road,
Chebrolu
Village &
Mandal,
Guntur
District
IIPP
200
5-10
Rs.49,43,366/- (Rupees Forty Nine Lakhs
Forty Three Thousand Three Hundred and
Sixty Six only) towards power cost
reimbursement for 3rd quarter of 2014-15,
subject to submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery in view of increase in power
load.2. Land conversion certificate 3.
Valid CFO from APPCB are .4. Approved
Project report . 5. There is a mismatch of
person sinning the person claim are valid
board resolution has .6. Approved plans of
T & CP , Factories, Gram Panchayat are
.7. Land conversion 8. CA certificate
indication share holding of directors is also
.9. Bank sanction letter .
4
5
67
22/01/
2016
28/08/
2015
M/s.
Vasundhar
a Cotton
Mills Pvt
Ltd.,
Boyapalem
Village,
Vankayala
padu,
Edlapadu,
Sattenapall
i, Guntur
District
IIPP
200
5-10
Rs.36,32,840/- (Rupees Thirty Six Lakhs
Thirty Two Thousand Eight Hundred and
Forty only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery in view of increase in power
load.2. Land conversion certificate.3.
Land Sale Deed.4. Valid CFO from
APPCB5. Project report 6. Bank
Sanction Letter 7. IEM part B issued by
SIA/DIPP declaring DCP 8. GM, DIC has
not confirmed DCP in his recommendation
and certified the DCP in claim 10. Plan of
Gram Panchayat and Factories Department
11. There is increased in power load 12. CA
certificate indicating share holding
particulars.
4
6
68
22/01/
2016
28/08/
2015
M/s. Sree
Veerabrahmen
dra Swamy
Spinning Mills
Pvt Ltd.,
Guntur
IIPP
200
5-10
Rs.43,91,846/- (Rupees Forty Three Lakhs
Ninety One Thousand Eight Hundred and
Forty Six only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject to furnishing of submission of the
shortfall information/documents.i.e 1.
Confirmation on installation of additional
machinery due to increase in power load
from 600 KVA to 1050 KVA 2. Land sale
deed 3. Land conversion 4. Valid CFO
from APP CB 5. CA certificate indicating
share holding of Director 6. DT&CP,
Panchayat, Factories department plans 7.
Valid Board Resolution authorizing the
person to sign on claim application as the
one furnished is mismatched8. Attested
copy of T&CP approval 9. Bank Sanction
Letter is not attested 10. Form B self
declaration contents are not correct with
respect to power bill / claim application.
4
7
69
22/01/
2016
28/08/
2015
M/s. Sri
Lakshmi
Godavari
Spinning
Mills Pvt
Ltd.
Sy.No.113,
Chebrole
Village and
Mandal,
Guntur
District
IIPP
200
5-10
Rs.58,54,604/- (Rupees Fifty Eight Lakhs
Fifty Four Thousand Six Hundred and Four
only) towards power cost reimbursement for
1st quarter of 2015-16, subject to
submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery due to increase in power load
from 650 KVA to 4950 KVA.2. Board
resolution 3. Factories Department
approval and plan 4. Land conversion
certificate 5. Valid CFO from APPCB 6.
Approved project report 7. Authorised
person are not sign on claim8. Approved
T&CP 9. CA certificate for share holding
of Directors of the company 10. Bank
sanction letter 11. Project report 12. Sale
deed with attestation
4
8
70
22/01/
2016
28/08/
2015
M/s
Bhavanam
Spinning
Mills Pvt
Ltd.,(2nd
Expansion
Unit)
Bhimineni
IIPP
200
5-10
Rs.81,75,134/- (Rupees Eighty One Lakhs
Seventy Five Thousand One Hundred and
Thirty Four only) towards power cost
reimbursement for 1st quarter quarter of
2015-16, subject to submission of the
shortfall information/documents i.e
1. Confirmation on installation of
additional machinery due to increase in
:: 15 ::
varipalem
Village,Me
dikonduru
Mandal,
Guntur
District
power load from 2300 KVA to 3200 KVA
2. DT&CP plan approval for expansion
3. Company incorporation 4. Land
Conversion certification 5. Valid CFO
from APPCB 6. Bank sanctioned letter
7. Land sale deed 8. Board resolution
authorizing person to sign claim 9.
Approvged plan of Gram Panchayat,
Factories & T&CP 10. Statement of account
with attestation by GM, DIC11. CA
certificate of power computation sheets for
last three years with attestation.
4
9
71
22/01/
2016
28/08/
2015
M/s Sri
Venkata
Siva
Parvathi
Spinning
Mills Pvt
Ltd.,
(Expansion
)
IIPP
200
5-10
Rs.9,64,472/- (Rupees Nine Lakhs Sixty
Four Thousand Four Hundred and Seventy
Two only) towards power cost
reimbursement for 4th quarter of 2014-15,
subject to submission of the shortfall
information/documents i.e 1.
Confirmation from General Manager, DIC,
Guntur on installation of additional
machinery due to increase in power load
2. Land conversion certificate 3. Valid
CFO from APPCB 4. Approved project
report 5. Gram Panchayat, Factories
Department and T&CP approved plans 6.
There is increase in power load with
respect to present claim7. CA certificate
indicating share holding of directors
5
0
74
12/02/
2016
28/08/
2015
M/s.
Idupulapad
u Cotton
Mils Pvt
Ltd (Exp-
5),
Ganapavar
am (V),
Nadendla
(M),
Guntur
Dist
IIPP
200
5-10
Rs.5,57,041/- (Rupees Five Lakhs Fifty
Seven Thousand and Forty One only)
towards power cost reimbursement for the
year 2014-15 after deducting the sanctioned
excess amount in previous period duly
placing before SLC as separate Agenda,
subject to submission of the shortfall
information/documents i.e 1.
Confirmation on installation of additional
machinery due to increase in power load
from 7100 KVA to 8000 KVA 2. Land
Conversion certification 3. Valid CFO
from APPCB 4. Land sale deed 5.
Board resolution authorizing person to sign
claim 6. Approved plan of Gram
Panchayat, Factories & T&CP for
expansion.
5
1
75
12/02/
2016
28/08/
2015
M/s
Viswateja
Spinning
Mills Ltd
(Exp-2) D
No: 219,
Boyapalem
(V),
Edlapadu
(M),
Guntur
IIPP
200
5-10
Rs.1,45,06,340/- (Rupees One Crore Forty
Five Lakhs Six Thousand Three Hundred
and Forty only) towards power cost
reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall
information/documents. i.e 1.
Confirmation on installation of additional
machinery due to increase in power load
from 3000 KVA to 4100 KVA 2.
Company incorporation 3. Land
Conversion certification 4. Valid CFO
from APPCB 5. Bank term loan
sanctioned letter 6. Land sale deed 7.
Board resolution authorizing person to sign
claim 8. Approvged plan of Gram
Panchayat, Factories & T&CP
4 STATUS NOTE ON RELEASE OF SANCTIONED
INCENTIVE / CONCESSIONS OF TO THE
INDUSTRIEAL UNITS UNDER IIPP 2005-10 &
IIPP 2010-15
General Budget:
Government have allocated budget of Rs.129,64 lakhs
for the year 2015-16 towards General Incentives Nature of Incentive Sanctioned as
on date
04.07.2015
Releases made Pending for
releases
No.
of
cas
es
Amou
nt Rs
in Cr
No. of
cases
Amo
unt in
Cr
No
Amou
nt
Rs.in
Cr
Investment subsidy 113 16.12 0 0 113 16.12
100% Reimbursement of Stamp Duty 43 0.92 0 0 43 0.92
Noted.
:: 16 ::
100% Reimbursement of Mortgage
Duty 2 0.037 0 0 2 0.037
25% Reimbursement of Land Cost 14 0.59 0 0 14 0.59
Quality certification 2 0.011
2 0.011
Land Conversion charges 11
0.014
7 0 0 11
0.014
7
Reimbursement of Sales tax 126
124.9
8 0 0 126
124.9
8
TOTAL 311
142.6
73 0 0 311
142.6
7
Reimbursement of Power Cost (General) The details of sanctioned cases pending for releases is as
follows.
Nature of Incentive
Sanctioned as
on date
04.07.2015
Releases made Pending for
releases
No
. of
cas
es
Amou
nt Rs
in Cr
No. of
cases
Amou
nt in
Cr
No
Amou
nt
Rs.in
Cr
Power cost reimbursement 12
44
242.3
9 0 0
12
44
242.3
9
Reimbursement of Pavala Vaddi (General) The details of sanctioned cases pending for releases is as
follows
Nature of Incentive
Sanctioned as
on date
04.07.2015
Releases made Pending for
releases
No
. of
cas
es
Amou
nt Rs
in Cr
No.
of
cases
Amou
nt in
Cr
No
Amou
nt
Rs.in
Cr
Interest subsidy 58
4 39.75 0 0
58
4 39.75
Total
424.8
1
5 STATUS REPORT ON THE PROPOSALS SENT
TO THE GOVERNMENT AS ON:12/02/2016 S
l
.
N
o
Date
of
SLC
Meeti
ng
SLC Decision Statues of the issue
1
.
27/04/
12
IIPP 2005-10 - Reimbursement of Power cost -
Application of M/s. Sri Durga Kanakeswari Ice
Plant, S.No. 176/3B, Lankalapalem, Parawada,
Visakhapatnam District - Regarding.
The General Manager, DIC,
Visakhapatnam has recommended the
Reimbursement of Power cost claim application of
M/s Sri Durga Kanakeswari Ice Plant, S.No. 176/3B,
Lankalapalem, Parawada, Visakhapatnam for
sanction of Power cost for 4th quarter of 2008-09, 1st
to 4th quarters of 2009-10 & 1st & 2nd quarter of
2010-11 under IIPP 2005-10 scheme.
In this connection it is to submit that,
the unit holder has procuring power from M/s
Anakapalli Rural Electricity Cooperative Society
Ltd., Kasimkota. As per the guidelines para 5.3.5
under IIPP 2005-10 scheme is as follows:
“The power cost reimbursement shall
be applicable to the industries, which are utilizing
power from DISCOM only and power consumption
should be in the name of the unit.”
The decision of SLC is as follows:
“SLC examined the issue in detailed and decided to
recommend to Govt., for considering the units
availing power from Rural Electricity Cooperative
Society Ltd, for availing the reimbursement of power
cost under IIPP 2005-2010 and also under IIPP 2010-
15, as the RECS are being fed by DISCOMs”.
Accordingly, the proposals were recommended to the
Government vide letter No. 20/02/12/0053 DT:
15/05/2012. The issue was placed in SIPC
meeting held on 03/01/2013 and SPIB held on
26/04/2013. The SIPB approved the proposal to
provide power subsidy incentive those industries
drawing power from Rural Electricity Supply (RES).
A proposal has been
submitted to Government
vide single file no:
15/01/2013/11296 dt:
30/06/2013. Government
orders are awaited. In
response to the
Government memo, it was
requested vide
30/1/14/1288/1288/UP
Dated 17.12.2014, to issue
appropriate orders, as the
budget required n the
instant case falls under the
regular budget under IIPP
2005-2010 and 2010-15.
Further Government was
amending the guidelines 1)
G.O.Ms No: 328, Inds &
Comm (IP) Departmetn
Dt: 13/12/2005 ,
2) G.O Ms No: 42, Inds &
Comm (IP)Department
Dt: 05/05/2011 to make
eligible Industries which
are utilizing power from
Rural Electric Supply Co-
Operative Societies and
other similar sources for
Reimbursement of Power
cost under IIPP 2010-15
vide 1) G.O.Ms No: 2
Inds & Comm (P&I)
Dept dt: 01/01/2016,
2) G.O.Ms No: 2 Inds &
Comm (P&I) Dept dt:
01/01/2016,
Noted.
:: 17 ::
2
.
27/04/
12
IIPP 2005-10 - Reimbursement of Power cost -
Application of M/s Sri Satya Surya Industries,
Boduvalasa (V),Sabbavaram (M), Visakhapatnam
District - Regarding.
The General Manager, DIC,
Visakhapatnam has recommended the
Reimbursement of Power cost claim application of
M/s Sri Satya Surya Industries, Boduvalasa
(V),Sabbavaram (M), Visakhapatnam for sanction of
Power cost for 1st quarter of 2010-11 onwards under
IIPP 2005-10 scheme.
In this connection it is to submit that,
the SLC in its 78th SLC meeting held on 23/09/2009
has sanctioned reimbursement of Power cost of Rs.
3,700/- for the 3rd quarter of 2008-09. So far an
amount of Rs. 22,010/- has been sanctioned towards
reimbursement of Power cost to the unit. The
reimbursement of power claim application are
pending for sanction. Further, the unit holder has
procuring power from M/s Anakapalli Rural
Electricity Cooperative Society Ltd., Kasimkota. As
per the guidelines para 5.3.5 under IIPP 2005-10
scheme is as follows:
“The power cost reimbursement shall be applicable
to the industries, which are utlizing power from
DISCOM only and power consumption should be in
the name of the unit”.
The decision of SLC is as follows:
“The Committee examined the issue in detailed and
decided to recommend to Govt., for considering the
units availing power from Rural Electricity
Cooperative Society Ltd, for availing the
reimbursement of power cost under IIPP 2005-2010
and also under IIPP 2010-15, as the RECS are fed by
the concerned DISCOMs”.
Accordingly, the proposals were recommended to the
Government vide letter No. 20/02/12/6053,
dated:15/05/2012.
The issue was placed in SIPC meeting held on
03/01/2013 and SPIB held on 26/04/2013. The SIPB
approved the proposal to provide power subsidy
incentive those industries drawing power from Rural
Electricity Supply (RES)
A proposal has been
submitted to Government
vide single file no:
15/01/2013/11296 dt:
30/06/2013. Government
orders are awaited
Further Government was
amending the guidelines 1)
G.O.Ms No: 328, Inds &
Comm (IP) Departmetn
Dt: 13/12/2005 ,
2) G.O Ms No: 42, Inds &
Comm (IP)Department
Dt: 05/05/2011 to make
eligible Industries which
are utilizing power from
Rural Electric Supply Co-
Operative Societies and
other similar sources for
Reimbursement of Power
cost under IIPP 2010-15
vide 1) G.O.Ms No: 2
Inds & Comm (P&I)
Dept dt: 01/01/2016,
2) G.O.Ms No: 2 Inds &
Comm (P&I) Dept dt:
01/01/2016,
3 01/03/
13
IIPP 2005-10 – M/s. Visaka Industries Limited – RS
No. 385,386, jujjuru, Veerullapadu (M), Krishna
District – Sanction of reimbursement of power cost –
regarding.
The SLC has examined the issue on the following
points:
G.O. Ms. No.108, Industries & Commerce (IP)
Department, dt.20/05/1996 pertains to Target – 2000
Scheme – New Industrial Policy 1995 and policy
period is from 15.11.1995 to 31.03.2000, in which
line of activity “Mangalore Tiles / Asbestos
Products” is listed at Sl. No.49 in the ineligible
industrial activities.
In this regard vide G.O. Ms. No.196, Industries &
Commerce (IP) Department, dt.11.06.1998 an
amendment was issued that words “Asbestos
Products” occurring against item 49 in the list of
ineligible industries annexed to G.O. Ms. No.108,
Industries & Commerce (IP) Department,
dt.20/05/1996 shall be deleted”.
While issuing the G.O. Ms. No.178, Industries &
Commerce (IP) Department, dt. 21-06-2005, the
Government has not taken the order issued for
amendment to the G.O. Ms. No.108, Industries &
Commerce (IP) Department, dt.20/05/1996. They
have taken only ineligible list annexure with the
G.O.Ms.9 Industries & Commerce (IP) Department,
dt. 05-01-2001.
M/s. Visaka Industries Limited – RS No. 385,386,
jujjuru, Veerullapadu (M), Krishna District were also
processed for sanction of incentives under IIPP
2005-2010 and sanctioned in various SLCs an
amount of Rs.30,18,270/- and also an amount of
Rs.13,05,190/- were released pertaining to
reimbursement of power cost.
In view of the above circumstances, the SLC has
decided to recommend the issue to the Government
for making eligible for the line of activity of
“Asbestos Products” and issue amendment
accordingly to the G.O. Ms. No.178, Industries &
Commerce (IP) Department, dt. 21/06/2005, since
the same line of activity are eligible under IIPP
2010-15 schemes.
Accordingly, the proposals were recommended to the
Government vide letter No. 10/3/2007/0568,
dt.21/03/2013.
Government Orders are
awaited.
4
.
27/02/
15
INDUSTRIAL INVESTMENT PROMOTION
POLICY 2005-2010 – M/s Greentech Industries
(India) Pvt Ltd. SPSR Nellore District – request of
the unit for sanction of incentives to cover under
IIPP 2005-2010 as per MOU.
The State Level Committee examined the issue in
detail and based on the report given by the Joint
Director Sri VRVR Naik on supporting facts which
Government issued orders
for Condonation of Delay
for making eligible for
availing the incentives
under Industrial Promotion
Policy 2005-10 vide
G.O.Ms No: 497 Inds &
Comm (P&I) Dept, Dt:
:: 18 ::
are submitted by the unit regarding their claim, SLC
opined that in the light of the evidence of such
certificate, concerned Joint Director may submit his
report to Secretary (Industries) with clear
calculations indicating the impact on financial
implications likely to arise by considering the claim
of the unit to cover under the Industrial Industrial
Investment Promotion Policy 2005-10, examining
the similar cases.
Accordingly, the proposals were recommended
to the Government vide letter No. Lr. No.
20/1/14/14556/14556/ID, dated 13/03/2015.
16/11/2015
5
.
20/05/
15
IIPP 2010-15 – Sanction of Investment Subsidy –
M/s. MNR Complex Sy.No.189/2 , Nandyal Road,
Banaganapalli post and mandal, Kurnool District –
sanctioned by DIPC – release of incentives –
regarding
The SLC discussed the issue in detail and
decided to send the proposal of extending incentives
to differently able persons, to Government for the
issue of appropriate orders on the operational
guidelines in respect of G.O.Ms.No.188 Industries
and Commerce (IP) Department dated 20.12.2013.
Accordingly, the proposals were
recommended to the Government vide letter No. Lr.
No. 30/1/15/0288, dated 18/06/2015.
Government Orders are
awaited.
6
.
20/05/
15
IIPP 2005-2010 and 2010-15- claim applications
revised for reimbursement of sales tax – clarification
– regarding.
The SLC discussed the issue in detail and
decided to seek clarification from the Government
regarding the reimbursement of sales tax paid by the
unit in the united state of Andhra Pradesh when the
physical location of the unit is in residual Andhra
Pradesh. In view of the above Sales Tax
reimbursement is sanctioned to all such units subject
to outcome of Government orders.
Accordingly, the proposals were recommended
to the Government vide letter No. Lr. No.
30/1/14/0288/0288/ID, dated 23/05/2015
Government Orders are
awaited.
6
IIPP 2005-2010 – M/s Eisai Pharmatechnology &
Manufacturing Private Limited – change of name to M/s
Eisai Pharmaceuticals India Pvt Ltd., Visakhapatnam –
requested – regarding.
M/s Eisai Pharmatechnology and manufacturing
Pvt Ltd., SEZ, Parawada, Visakhapatnam is a Mega
Project promoted by M/s Eisai Co Ltd., Tokyo, Japan,
established with an investment of Rs. 280 Cr and
commenced commercial production on 28.06.2010 in the
line of activity “ Pharmaceutical Manufacturing and
Research Development Services”. Further M/s Eisai
Pharmatechnology and manufacturing Pvt Ltd., SEZ,
Parawada, Visakhapatnam is a 100% subsidiary of M/s
Eisai Co Ltd., Tokyo, Japan.
General Manager, District Industries Centre,
Visakhapatnam forwarded the claim application for
sanction of power cost reimbursement pertaining to 4th
quarter 2013-14 treating the claim as belated claim, since
the claim application was filed on 24.10.2014 manually
in the office of the General Manager, District Industries
Centre, Visakhapatnam which is beyond 6 months from
the end of quarter making the claim ineligible for
availing power cost reimbursement as per Para No. 5.3.1
of operational guidelines issued under IIPP 2005-2010.
“Para No.5.3.1 read as “ All Eligible
industrial units shall submit their claims
in the prescribed application form given
at annexure-IV for reimbursement of
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 19 ::
power cost on quarterly basis within six
months from the date of completion of
such quarter along with the documents
mentioned in the Application to the
General Manager, District Industries
Centre concerned.”
The captioned unit represented that they have
submitted the claim application for 4th quarter of 2013-14
in Meeseva centre for uploading the claim application on
08.10.2014 but could not uploaded due to HUDHUD
Cyclone affecting the Meeseva services in
Visakhapatnam. The claim application was uploaded on
23.10.2014 in meeseva portal and hence the unit
requested the Government to condone the delay in filing
the claim application.
Subsequently Government have considered the
proposal of the unit vide Govt. Memo No.
5316/P&I/A1/2015 Dated 17.11.2015 duly condoning
the delay in submission of above claim and directed the
Director of Industries to process the claim application of
4th quarter of 2013-14 in relaxation of the rules as an
exceptional case subject to satisfaction of the other
applicable provisions and furnish the action taken report
at an early date.
Accordingly General Manager, District
Industries Centre Visakhapatnam was directed to inspect
the unit and send his proposals as per the procedure in
vogue. GM,DIC recommended the claim application of
4th quarter of 2013-14 for sanction of reimbursement of
power cost.
Further, General Manager District Industries Centre,
Visakhapatnam recommended the proposal of change of
name of the unit from M/s Eisai Pharmatechnology and
manufacturing Pvt Ltd to M/s Eisai Pharmaceuticals
India Pvt Ltd., for placing in State Level Committee
enclosing the following documents.
1. Application for change of name of the company
in Form 1(A)
2. Copy of certificate of Incorporation for change of
name duly certified by Registrar of Companies,
Hyderabad
3. Copy of list of Directors
4. Copy of A.P.High Court order
5. Copy of Bombay High Court Orders
6. Copy of Memorandum & Articles of
Association.
The power cost reimbursement from 1st quarter of
2010-11 to 3rd
quarter of 2013-14 were already
sanctioned and released to the captioned unit.
:: 20 ::
The claim applications from 1st quarter of 2014-15 to
1st quarter of 2015-16 for sanction of power cost
reimbursement are scrutinised by SVC held on
12.02.2016 and it was decided to recommend for
sanction of incentives towards power cost reimbursement
subject to submission of shortfall document of Civil
Engineer Certificate for all civil works.
As per Para No. 11 of operational guidelines issued
vide G.O.Ms.No.328 Industries and Commerce (IP)
Department dated 13.12.2005 which read as
“11.0. INSTANCES OF CHANGE OF
CONSTITUTION/MANAGEMENT/
NAME OR STYLE OF INDUSTRIAL
UNIT: The Industrial units that availed
incentives/concessions should obtain the
No Objection Certificate from the
concerned financing institutions in
respect of aided units before seeking the
approval of Commissioner of Industries
for any change of the
constitution/Management/name & style of
the unit within the first six (6) years from
the date of commencement of Commercial
production.”
In view of the State Level Committee may take a
view with regard to processing the claim application for
the sanction of power cost reimbursement in respect of 4th
quarter of 2013-14 as per Government Memo and
according permission for change of name from M/s Eisai
Pharmatechnology and manufacturing Pvt Ltd to M/s
Eisai Pharmaceuticals India Pvt Ltd.
7 Incentives / Concessions Under IIPP 2005-10 & 2010-15
Schemes – reimbursement of power cost to M/s Spin Cot
Textiles Pvt Ltd., - revival of the unit – issue of
Government orders vide G.O.Ms.No.388 Industries &
Commerce (P&I) Department dated 28.08.2015 -
Release of sanctioned amount to the industrial unit
from the amount available in PD Account of
Commissioner of Industries.– regarding.
M/s Spin Cot Textiles Pvt Ltd.,19th Kilometer
NH 5 , Marripalem Village, Edlapadu Mandal, Guntur
District is a Private Limited Company established with
an investment of Rs. 59 Cr for the manufacture of Cotton
Yarn and commenced commercial production with effect
from 05.04.2007. The unit is a large scale Industry
having IEM Part B bearing No. 1763/IIM/PROD/2008
Dated 26.09.2008. The incentives of Rs.1,65,90,184/-
was released towards power cost reimbursement under
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 21 ::
Industrial Investment Promotion Policy (IIPP) 2005-2010
policy from the date of commencement of commercial
production ie from 05.04.2007 upto 4th quarter of 2010-
11.
Further release proceedings are issued as detailed
below towards power cost reimbursement
S.No. Consolidated Proceedings No &
Date
Period Amount
sanctioned in Rs
1 No.10/01/2014/8551/power cost
/FD Dated 18.12.2014.
1st quarter of 2011-12 to
1st quarter of 2013-14
2,67,89,467/-
2 No.10/01/2014/8551/power cost
/FD Dated 13.01.2015.
2nd quarter of 2013-14 to
3rd & 4th quarter of 2013-
14
2,03,79,940/-
Total 4,71,69,347/-
The General Manager, DIC, Guntur in his letter
dated 28-12-2014 informed that the unit is sick / closed
and he has not recommended for release of the above
sanctioned amount.
As per operational guidelines issued vide
G.O.Ms.No. 328 Industries and Commerce (IP)
Department dated 13.12.2005,
Para No. 4.11. Continuous Production:
Continuous production meanscontinuous working of
an industrial unit in the manufacture of approved
lines for a minimum period of six (6) years, without
any break-in-Production.
Para No. 21.10. In respect of APSFC
financed industrial units, subsidy amounts
sanctioned and released shall not be credited to the
A/c. of respective industrial units if they are sick,
closed or changes of management taken place or
sold away, etc.
Also wherever the General Manager, DICs
finds an industrial unit sick, closed, change of
management taken place etc. or for any other
reason not worthy or receiving subsidy fill
further examination, the Managing
Director, APSFC / Branch Manager,
APSFC shall not disburse the subsidy to such
units on written intimation given to them by
the General Managers DICs, or by Commissioner of
Industries. In case of above two situations,
the subsidy shall be disbursed only afterfurther
clearance given by the Additional Director
of Industries and Member-Secretary, SLC.
Further the unit holder vide his letter dated
06.02.2015 informed that due legal issue in NSEL
Mumbai, the financial institution have not disbursed the
working capital to the unit and unit was stopped due to
:: 22 ::
financial crisis and accordingly represented to
Government to release the sanctioned power cost
reimbursement for revival of the unit.
The request of M/s Spin Cot Textiles Pvt Ltd was
submitted to the Government vide letter no.
30/1/2009/0266 dated 7-2-2015. Government of Andhra
Pradesh issued orders vide G.O.Rt.No.388 Industries and
Commerce (P & I) Department Dated 28.08.2005
according permission for the release of an amount of
Rs.2,50,00,000 to M/s Spin cot Textiles Pvt Ltd., Guntur
District out of the total eligible subsidy of Rs.4.70 Crore
from out of the already released funds towards incentives
for Industrial promotion during the current financial year
2015-16 and available with the Department, so as to
revive the unit by the promoter in relaxation of existing
rules and subject to ratification by the State Level
Committee.
In pursuance of the orders in the G.O.Rt.No.388
Inds & Comm (P & I) Department dated 28.08.2015 and
as per the recommendation of General Manager, District
Industries Centre, Guntur District an amount of
Rs.2,49,96,220/- was released to the captioned unit
16.09.2015 and credited into the Joint Account
No.3488716164 of Central Bank of India, Gottipadu
operated by General Manager, District Industries Centre,
Guntur and Managing Director of M/s Spin Cot Textiles
Pvt Ltd towards the following.
S.
No
Released amount to be spent
on
Amount in Rs
1 For agreement with court
receiver
1,00,00,000
2 Part payment of arrears to
APSPDCL
40,00,000
3 For supply of Raw Material
(cotton) to Cotton
Corporation of India, Guntur
68,00,000
4 For repairs and maintenance of
M/c
41,97,000
Total 2,49,96,200
While releasing the amount of Rs.2,49,96,220/-
to GM, DIC, Guntur, the General Manager, DIC, Guntur
was directed to ensure that the funds released are not
misutilised and that the funds are to be used only for
revival / reopening of the unit. He should open a
separate bank account with joint signatory of the
Managing Director of M/s. Spincot Textiles Pvt Ltd for
release of funds so that the General Manager, DIC,
Guntur to oversee that the released funds can be utilized
only for revival / reopening of the unit. Further M/s.
Spincot Textiles Pvt Ltd should submit the utilization
:: 23 ::
certificate with relevant proof that the amount of Rs 2.50
crs released is spent for the revival of the unit within 15
days from the date of release or else proceedings under
AP RR Act 1864 will be initiated by the General
Manager, DIC, Guntur for the recovery of the above
amount along with interest as per the lending rate of
State Bank of India. The General Manager, DIC should
have constant supervision and extreme vigil over the
utilization of funds released to M/s. Spincot Textiles Pvt
Ltd, Guntur and report compliance to the Director of
Industries.
Subsequently, the General Manager, DIC,
Guntur in his letter dated 27-10-2015 informed that the
trial production of the unit started and the preparatory
section machinery were found working except one
carding machine and that he has given a cheque for Rs
1.00 crs in favour of court receiver, Mumbai High Court.
He also informed that he released Rs 1,00,15,747/- and
has balance Rs 50 lakhs available. He has requested
another Rs 1.00 crs for procurement of raw material
(cotton yarn) in addition to Rs 2.50 crores already
released to him. Accordingly an amount of Rs.1.00 Cr
out of pending power cost reimbursement Rs. 2.20 Cr
payable to the captioned unit was released on
05.11.2015 duly imposing the same conditions for the
revival of the unit.
Subsequently, the General Manager, DIC, Guntur
in his letter dated 22-1-2016, & 1-2-2016 informed that
the power bill of Rs 38,96,000 is to be paid by 5-2-2016
otherwise the power supply would be disconnected again.
He has requested whether to recommend for release of
balance Rs 1.20 crs or to utilize the amount of Rs 1.00 cr
kept aside for payment towards court receiver in the joint
account.
The General Manager, DIC, Guntur in his letter
dated 2-2-2016 informed the details of the utilization of
the Rs 3.50 crs released to him for revival of the unit.
S. No Released amount to be spent on Amount in Rs
1 Amount set aside for court payment 1,00,00,000
2 Power charges paid 58,44,300
3 Paid to Cotton Corporation of India, Guntur for
cotton
1,49,70,000
4 Repairs and maintenance of M/c 41,86,698
Total 3,50,00,998
In this connection it is submitted that the total
amount due for release to the units towards reimbursement
of the power charges is Rs 4,71,69,347/-. Till now, the
amount released for the purpose of the revival of the unit
is Rs 3,49,96,220. The balance amount is Rs.
1,21,73,127/-
:: 24 ::
The request of the General Manager, DIC,
Guntur for release the balance amount of Rs
1,21,73,127/- was examined by the Director’s Office and
noticed that the possibility of revival of the unit with the
balance amount appears to be bleak. Hence, the matter is
being examined on the working capital requirement of
the unit and for further course of action in the matter.
In view of the above, SLC may take a view to
ratify the release of funds of Rs 2,49,96,220 /- to the
captioned unit as per G.O.Rt.No.388 Inds & Comm (P &
I) Department dated 28.08.2015 and also further amount
of Rs 1.00 cr released to the unit as requested by the
General Manager, DIC, Guntur.
8 IIPP 2010-15 – Processing of claim application for
sanction of Reimbursement of Sales Tax in Annexure IX
– sanction as per Form A certified by Commercial Tax
Department - Tax refunds by the Commercial Tax
Department in certain cases – regarding.
The reimbursement of sales tax is being
sanctioned based on the amount tax paid by the industrial
unit and as certified by the Commercial Tax Department
in the form A prescribed with contents furnished
hereunder.
“ It is certified that all the facts and figures
furnished by the Enterprise is verified with the
records and found correct. The above
Enterprise/Industry has paid the sales tax amount of
Rs. ______ and also there is no due for the year - 201
- 201 .”
The sales tax reimbursement is being sanctioned
by the Department as per Para No.5.7.7 of operational
guidelines issued vide G.O.Ms.No.42 Industries and
Commerce (IP) Department Dated 05.05.2011 on the tax
paid by the unit during the year and as per certification
that there are no due for the year for which claim is
preferred.
“5.7.7 The enterprise/industry shall obtain the
details of the net commercial tax paid
during the year for which the claim is being
made duly certified by Commercial Tax
authorities in form prescribed at Form-A for
original/expansion / Diversification
Enterprise/Industry separately as the case
may be.”
Further, the Assistant Commissioner,
Commercial Taxes Department has raised the issue in
Scrutiny cum verification Committee held on 12.02.2016
that there are certain cases where there are instances of
refund of tax paid to the units after assessment. But
Scrutiny cum verification committee is processing claims
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 25 ::
based on Form A certified by Commercial Tax
Department indicating that the there is no due for the
year. Wherever it is observed that there are tax refunds
on the claims which were sanctioned, CT Department
shall provide such data so that the proportionate tax
reimbursement will be computed and deducted in next
claim. The decision of the Scrutiny cum verification
Committee held on 12.02.2016 is as follows.
“SVC discussed the issue and decided to place
before the SLC for taking a view.”
SLC may take a view
9 IIPP 2005-10 - Claim application of M/s. Shri
Govindaraja Textiles Ltd., 708, Peddarangapuram (V),
Pulivendala (M), Kadapa Dist for the sanction of
reimbursement of power cost under IIPP 2005-10 -
Regarding.
M/s. Shri Govindaraja Textiles Ltd. has
established the unit at 708, Peddarangapuram (V),
Pulivendala (M), Kadapa District for the line of activity
of “Cotton Yarn Spinning”, obtained IEM bearing
No.2145/SIA/IMO/2007 from the Government of India
and commenced commercial production
w.e.f.01/04/2008.
The unit has entered MoU with Government of
Andhra Pradesh on 16/11/2006. As per MoU, the
Government has offered the following incentives:
1. GoAP shall provide land measuring 100 acres to
the proposed textile unit at Peddarangapuram
(V), Pulivendala (M), Kadapa District, cost of
which shall be the actual cost of acquision as
mutually agreed between GoAP/APIIC and SGT.
2. GoAP shall provide necessary infrastructure
facilities such as roads, electricity,
communication facilities and water at the ‘door
step’ of the unit at the cost of the GoAP.
3. The unit shall be exepted from any statutory
power cuts to ensure uninterrupted production. A
special concession of Rupee One per unit unit on
the power tariff as prevailing on November, 1st
2006 shall be provided to the unit for a minimum
period of 5 years from the date of preferring the
claim for reimbursement of subsidy provided
such claims are preferred before 31st December
2010.
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 26 ::
4. GoAP shall supply water to the doorstep of the
unit and the tariff for such water shall be Rs.15/-
per kiloliter, for a minimum period of five years
from the date of commencement of commercial
operations, provided the unit commence
production before 31st December 2010.
5. GoAP shall provide an approach road linking to
the site of the unit.
6. GoAP shall provide the unit with an additional
tax reimbursement at the rate of 25% of VAT
paid during first five years to be done from 2nd
to
6th year, 50% of the VAT paid 6
th and 7
th years in
the 7th and 8
th year of commercial production
respectively.
7. GoAP shall provide incentive of Rs.5,000/- for
every person of the origin of AP trained and
employed by the unit, provided the employee
stays in the employment for a period of at least
one year.
8. GoAP shall declare the unit as Public Utility
Services and the women will be allowed to work
in all the three shifts in the units subject to taking
necessary safety and welfare measures.
9. GoAP shall reimburse 100% stamp duty and
transfer duty related to transaction of land
between the Government and the unit, as per the
IIPP 2005-10.
10. GoAP shall provide all other incentives as
applicable under the relevant IIPP 2005-10.
The Government has not issued G.O. for the
above MoU. Only basing on the above MoU, the claims
are processed for reimbursement of power cost duly
fixing @1/- per unit as per 2005-06 power tariff and
sanctioned duly following the pegged down as per IIPP
2005-10 for the claims received up to December, 2010.
From January, 2011, the claims are processed for
reimbursement of power cost duly fixing @0.75/- per
unit as per 2005-06 power tariff and sanctioned duly
following the pegged down as per IIPP 2005-10 upto
December, 2013. The pegged down eligibility from DCP
for various quarters are as detailed below:
For the year 2005-06 power tariff – Rs.3.35/- per
unit
As per IIPP 2005-10, base price at the time of
:: 27 ::
DCP – 3.35 – 0.75 = 2.60
Eligibility as per MoU – Rs.1/-
DCP of the unit – 01/04/2008.
Period
Actual
Power
tariff
Pegg
ed
down
price
as
per
polic
y
Eligibl
e tariff
Tariff
consid
ered
for
earlier
claims
as per
MoU
2008-09 3.00 2.60 0.40 0.65
2009-10 2.95 2.60 0.35 0.60
2010-11
(upto July,
2010)
2.95 2.60 0.35 0.60
August &
September,
2010
3.25 2.60 0.65 0.90
From October,
2010 to March,
2011
3.25 2.60 0.65 0.65
2011-12 3.25 2.60 0.65 0.65
2012-13 4.37 2.60 1.77 1.77
2013-14
(upto
December,
2013)
Not applied
0
January, 2014 5.30 2.60 2.70 1.00
February &
March, 2014 4.90 2.60 2.30
1.00
2014-15 4.90 2.60 2.30 1.00
2015-16 (1st
quarter) 5.15 2.60 2.55
2.55
From the above, it is clear that the Power Tariff
sanctioned is not either as per MoU or as per IIPP 2005-
10 for the period from April, 2008 to December, 2010.
However, Rs.1/- per unit was sanctioned for the period
from January, 2014 to March, 2015 is not as per IIPP
2005-10 under the provisions of G.O.Ms. No.42
Industries & Commerce (IP) Department,
dated:05/05/2011. MoU expires on 31/12/2010.
Further, Government of Andhra Pradesh
extended the eligibility period for spinning mills
commissioned during IIPP 2005-10 period by another 3
years making total eligibility period as 8 years vide
G.O.Ms. No.42 Industries & Commerce (IP) Department,
dated:05/05/2011 and the captioned unit is falling under
IIPP 2005-10.
Further it is observed that the claims from
January 2014 to March 2015 were processed and
:: 28 ::
sanctioned power cost reimbursement @Rs.1/- per unit
(upper sealing) without following the method of pegged
down by erroneously.
The captioned unit represented on 21/09/2015
that their claims are considered at the fixed power cost
Rs. 1/- per unit instead of Pegged down as per policy
applicable to their unit as per G.O.Ms.No. 42 Industries
& Commerce (IP) Department, dated:05/05/2011 from
the claims from January 2014 to March 2015.
The General Manager, District Industries
Centre, YSR Kadapa District has recommended the claim
application for sanction of reimbursement of power cost
for the period of 1st quarter of 2015-16. The same has
been placed before Scrutiny/Verification Committee
(SVC) meeting held on 12/02/2016 and the decision of
SVC is as follows:
“SVC scrutinised in detailed and observed that
the earlier claims from January 2014 to March
2015 were processed and sanctioned @Rs.1/- per
unit by erroneously instead of pegging down the
eligibility to the base price at prevailing power
rate. The same was verified with G.O.Ms. No.26
Industries & Commerce (Tex) Department,
Dated:12/01/2012 wherein the fixed cost
reimbursement of Rs.1/- per unit is only for new
unit commencing under IIPP 2010-15.
SVC verified the claim application in detailed
and recommended for sanction of
Rs.6,03,60,918/- (Rupees Six Crores Three Lakhs
Sixty Thousand Nine Hundred and Eighteen
only) towards power cost reimbursement for the
period of 1st quarter of 2015-16 and difference
amount in previous period from January 2014 to
March 2015 under IIPP 2005-10 duly placing
before SLC as a detailed Agenda Item, subject
to submission of the following shortfall
information.”
1. Reasons for increase power load in KVA from
2500 to 10500 KVA and clarification on connected
load in HP/KW.
2. Valid CFO from APPCB.
3. CA certificate indicating share holding
particulars.
4. DTCP approved plan
5. Form B Self Declaration is not properly filled
in
6. Board resolution authorizing the person to sign
the claim application .
:: 29 ::
7. Proof of receipt of claim in hard copy by
GM,DIC is not available on the application
8. Factories Department plan not attested
9. Land conversion approval
10. Bank sanction letter is not attested
SLC may take a view.
10 IIPP 2005-10 Scheme - M/s. Usha Spincoat Pvt.
Limited, Chikkavaram, Gannavaram Mandal
Krishna District- Sanction of reimbursement of
Power Cost based Government Memo - Regarding.
M/s. Usha Spincoat Pvt. Limited,
Chikkavaram, Gannavaram Mandal Krishna District
has approached the Govt., to consider the unit under
IIPP-2005-10 by condoning the delay of 9 months
and 4 days for commencement of commercial
production. The request is placed in the SLC 96th
held on 01.03.2013 and request of the unit is
recommended to Govt., for consideration for
extending the incentives under IIPP-2005-10.
In this context, the Govt requested the
Commissioner of Industries to provide incentives
under IIPP-2005-10 to M/s. Usha Spincoat Pvt.
Limited, Chikkavaram, Gannavaram Mandal
Krishna District. Duly condoning the delay of 9
months and 4 days in commencement of commercial
production on 04.04.2011 vide Memo No. 4850/IP
& INF/A1/2014-5, Dated 16.12.2014 Industries &
Commerce (IP & INF) Department.
“5th
State Leve Committee held on
23.12.2014 discussed the issue on the orders issued
by Government, vide Memo No. 4850/IP &
INF/A1/2014-5, Dated 16.12.2014 Industries &
Commerce (IP & INF) Department and sanctioned
differential amount of Rs. 3,29,49,250/- towards
reimbursement of power cost pertaining to 11
quarters from April 2011 to September 2014 and
further decided to refer to the Government for taking
a decision in respect of 3rd
quarter of 2012-13, 1st
and 3rd
quarter of 2013-14 claims for sanction of
reimbursement of power cost which are filed under
IIPP 2010-15 policy and become belated due to
coverage of the unit under IIPP 2005-2010.”
Subsequently the claim application for the
sanction of power cost reimbursement of M/S.
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 30 ::
Usha Spincoat Pvt Ltd, Rs No: 341, Chikkavaram,
Gannavaram (M), Krishna Dist pertaining to 1st
quarter of 2015-16 under IIPP 2005-10 was placed
in the Scrutiny cum verification committee meeting
held on 12.01.2016 and decision of the SVC is as
follows.
“SVC opined that Government permission for
condonation of delay in filing claim
application and making the unit eligible for
availing the incentives under IIPP 2005-2010
vide Government Memo No. 4850/IP &
INF/A1/2014-5, Dated 16.12.2014 shall be
circulated to the State Level Committee for
perusal” 11 IIPP 2005-2010 – M/s Idupulapadu Cotton Mills Pvt
Ltd., Expansion 5 , Ganapavaram Village, Nadendla
mandal, Guntur District – sanction of power cost
reimbursement – revising the appraisal from January
2011 – regarding.
The General Manager, District Industries Centre,
Guntur District recommended the claim application for
the sanction of power cost reimbursement of M/s.
Idupulapadu Cotton Mils Pvt Ltd (Exp-5), Ganapavaram
(V), Nadendla (M), Guntur Dist pertaining to 4th quarter
of 2014-15 under IIPP 2005-10 and the same was
received in this office on 28.08.2015.
The claim for 4th quarter 2014-15 has been
placed before SVC meeting held on 12/02/2016 for
scrutinized and revised appraisal is prepared from the
year 2010-11 to 2014-15 and details are is as follows.
Year wise appraisal of power cost reimbursement
Year
SLC sanctioned
Amt
Amount as per
appraisal Eligible amount computed
2010-11 1252409 1252409 1252409
2011-12 4338506 4337637 4337637
2012-13 3882403 -7371788 0
2013-14 ---- -11648534 0
2014-15 ---- 4440305 4440305
Total 9473310 10030351
A
.
Amount actually sanctioned from 4th quarter of 2010-
11 to 3rd quarter 2012-13 by 102nd State Level
Committee
Rs.94,73,310
B
.
Eligible for the period from 4th quarter of 2010-11 to
2014-15 as per revised appraisal
Rs. 1,00,30,351
C
.
Eligible for the year 2014-15 (A-B) Rs. 5,57,041
The SVC is scrutinized the claim application of
the unit and decision of the SVC is as follows:
“SVC verified the claim application in detailed
and recommended for sanction of Rs.5,57,041/-
SLC deferred the issue to next meeting
requsting the members to go through the
contents of the agenda for taking a decision.
:: 31 ::
Sd,/- Kartikeya Misra,
Director of Industries &
Chairman, State Level Committee (SLC).
// ATTESTED //
DEPUTY DIRECTOR (II).
(Rupees Five Lakhs Fifty Seven Thousand and
Forty One only) towards power cost
reimbursement for the year 2014-15 after
deducting the sanctioned excess amount in
previous period under IIPP 2005-10 duly placing
before SLC as separate Agenda, subject to
submission of following shortfall information.
1. Confirmation on installation of
additional machinery due to increase in
power load from 7100 KVA to 8000 KVA
2. Land Conversion certification
3. Valid CFO from APPCB
4. Land sale deed
5. Board resolution authorizing person
to sign claim
6. Approved plan of Gram Panchayat,
Factories & T&CP for expansion”.
:: 33 ::
LIST OF MEMBERS ATTENDED THE 9th STATE LEVEL COMMITTEE MEETING HELD ON 20/02/2016
AT 11.30AM. IN THE CONFERENCE HALL OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P
SL.NO. MEMBERS NAME & DESIGNATION OF MEMBER /
__________________________________________________ REPRESENTAT___________________ _______
Sri/Smt:
1. Chairman, Kartikeya Misra, IAS.,
State Level Committee. Chairman, SLC / Director of Industries.
2. The Managing Director, T. Srinivas Chowdary,
APSFC, Hyderabad. Manager.
3. The Chairman, Y.Madhu Babu
AP Spinning Mill Assosiation AGM, NSL Group.
4. The Commissioner, M. Pampapathi ,
Commercial Taxes, AP, Hyderabad. Additional Commissioner
5. The Cheif Engineer (Commercial), G. Seetha Rama Murthy
APTRANSCO, Hyderabad. S.E., (Comml.)
6. The Commissioner & Inspector General K.Suseela
Regi & Stamps Dept, Hyderabad AIG, Stamps Dept
7. The Member Secretary, R Sreeramulu
APPCB, Hyd SEE, Hyderabad
8. The Commissioner K.Sankara Rao
Transport Dept, Assistant Secretary
9. The Commissioner T.K.Rama Mani
Land Administration Joint Commissioner.
10. The Chief Manager, Rajeshkar
SBI, SME Br, Hyderabad. Chief Manager
11. The Chief Manager Vijay Kumar
Syndicate Bank Assit General .Manager .
12. The Deputy General Manager M Y Reddy.
SME, Head Office, SBH, Hyderabad Chief Manager.
13. The President G.Shobha
DICCI, (AP), Hyderabad Member
14. The Commissioner G.Uma Devi
B.C Welfare, Hyderabad Deputy Director
15. The President K.Rama Devi
ALEAP, Hyderabad . President
16. The Additional Director B.Suresh Babu
Central Office, Hyderabad Additional Director
:: 35 ::
I. SANCTION OF REIMBURSEMENT OF SALES TAX. Annexure -1
S No Name of the unit
Nature
of
Scheme
Decision
1
M/s Teamec Chlorates
Limited, Industrial
Growth Centre,
Gundlapalli Village,
Maddipadu Mandal,
Prakasham District
IIPP
2010-15
Rs.17,37,975/- (Rupees Seventeen Lakhs Thirty Seven Thousand
Nine Hundred and Seventy Five only) towards sales tax
reimbursement for the year 2014-15, subject to submission of the
shortfall information/documents i.e. 1. Valid CFO issued by
APPCB., 2. Factories Department approval. 3. To obtain Civil
Engineer Certificate for record. 4. Assistant
Commissioner of Commercial Taxes Department opined that audited
balance sheet shall be obtained along with upto date assessment
orders from the unit for scrutinizing the components form-A.
2
M/s A.S.Jute products
Pvt Ltd., (Expansion)
Nerallavalasa Village,
Padmanabam Mandal,
Visakhapatnam
IIPP
2010-15
Rs.3,70,976/- (Rupees Three Lakhs Thirty Seven Thousand Three
Hundred and Twenty only) towards sales tax reimbursement for year
2014-15 i subject to submission of the shortfall
information/documents. i.e. 1. Confirmation on Turnover
particulars furnished by the unit holder 2. Board Resolution
authorising the person to sign the documents .3. Sale Deed 4.
Land Conversion permission 5. Civil Engineer Certificate 6.
Charted Accountant certificate indicating share holding of Directors
7. Status of original unit
3
M/s. Godrej Agrovet
Limited Unit-2
(Expansion-1), West
Godavari District
IIPP
2010-15
SVC verified the claim application in detailed and found that GM,
DIC recommended zero value proposals towards reimbursement of
sales tax for the year of 2013-14 under IIPP 2010-15.
4
M/s. Godrej Agrovet
Limited Unit-2
(Expansion-1), West
Godavari District
IIPP
2010-15
Rs.1,20,50,150/- (Rupees One Crore Twenty Lakhs Fifty Thousand
One Hundred and Fifty only) towards sales tax reimbursement for
year 2014-15 subject to submission of the shortfall
information/documents i.e. 1. Confirmation of GM, DIC on the
production particulars for the last 3 years prior to date of the
commencement production of the expansion project.)
5
M/s K.P.Polylefin Sacks
Private Limited,
Sy.No.913, Epuru-
1A(V), Doruvulapalem
(P), Muthukur(M),
SPSR Nellore District
IIPP
2005-10
Rs.15,34,990/- (Rupees Fifteen Lakhs Thirty Four Thousand Nine
Hundred and Ninety only) towards Sales Tax reimbursement for the
year 2014-15 , subject to submission of the shortfall
information/documents i.e. 1. Building plan approval from Town &
Country Planning Department & Factories Department.2. Valid CFO
from APPCB for woven sacks is furnished and CFO for additional
line of activities like Tarpulin and fabric .3. CA certificate indicating
the % of share holding of directors 4. Board resolution authorizing
the person to sign the claim. 5. Land Conversion approval 6.
Statement of accounts in case of aided unit.7. List of plant &
machinery duly certified by GM, DIC and Financial Institution as
per operational guidelines.8. As per the claim application, the line of
activity is HDPE and PP Woven Sacks.9. As per Form – A
Certificate indicating additional products: a) Woven Sacks -
existing activity (Nos) b) Fabric – Additional Activity.( Kgs) c)
Tarpaulin – Additional Activity. (Nos) d) The production capacity
indicated in IEM is in 4500 M.Ts. and capacity is in Numbers in
:: 36 ::
Form – A certified by Commercial Tax Department and hence could
not be correlated. GM,DIC to furnish the products indicated in Form
A in terms of Kgs.
6
M/S Gemini Edibles
And Fats India Pvt. Ltd.,
S.No. 1607/2, Indl.Park,
Pantapalem (V),
Muthukur (M), SPSR
Nellore District
IIPP
2005-10
Rs.12,78,86,725/- (Rupees Twelve Crores Seventy Eight Lakhs
Eighty Six Thousand Seven Hundred and Twenty Five only)
towards Sales Tax reimbursement for the year 2014-15. subject to
submission of the shortfall information/documents i.e. 1. Boiler
certificate 2. List of Plant & Machinery duly certified by GM,
DIC and Financial Institution as per operational guidelines. 3. CA
certificate indicating the share holding of directors. 4. An amount
of Rs.17,28,90,730/- was paid in residual Andhra Pradesh certified
by CT Department Nellore, AP and an amount of Rs 8,28,82,720/-
certified by CT Department, Hyderabad. Further, SVC opined
that only eligible sales tax reimbursement against the tax paid in
residual A.P. shall be paid by A.P. Government as per
procedure laid down in A.P.State Reorganisation Act. Hence
SVC recommended for sanction of Rs.8,64,45,365/- against the
tax paid in residual Andhra Pradesh. (50% of Rs.
17,28,90,730/). In respect of an eligible amount of Rs.
4,14,41,360/- (50% of 8,28,82,720/-) signed by CT Department,
Hyderabad towards sales tax reimbursement, the release of
funds shall be shared by the State of A.P and Telangana as per
the outcome of the Government decision.
7
M/s Adani Wilmar
Limited, Sy.No. 269,
270, 284, 287,
Thammavaram (V),
Suryaraopeta Panchayat,
Kakinada Rural Mandal,
East Godavari District
IIPP
2005-10
The revised amount of Rs. 1,74,18,039/- (Rupees One Crore
Seventy Four Lakhs Eighteen Thousand and Thirty Nine only)
towards Sales Tax reimbursement for the year 2012-13 & 2013-14 ,
subject submission of the shortfall information/documents i.e 1.
DTCP approval with approved plan. 2. Valid CFO from APPCB 3.
Power load is not indicated at the time of filing claim application 4.
Valid Boiler certificate 5. Machinery statement not certified as per
guidelines. 6. Bank sanction is in favour of old unit
8
M/S Krishnapatnam Oils
And Fats Pvt. Ltd.,
Sy.No. 292 And 317,
Pantapalem (V), Epur
BIT-I Village,
Muthukuru Mandal,
Spsr Nellore District
IIPP200
5-10
Rs.9,51,27,458/- (Rupees Nine Crores Fifty One Lakhs Twenty
Seven Thousand Four Hundred and Fifty Eight only) towards Sales
Tax reimbursement for the year 2014-15 under IIPP 2005-10,
subject to submission of the shortfall information/documents i.e 1.
Confirmation on production particulars for the year 2014-15 by CT
Department and GM, DIC as the production particulars are not given
in Form-A. 2. Board resolution authorizing the person to sign the
claim application .3. CA certificate indicating the share holding 4.
Power release certificate 5. DTCP approval 6. Inward date on claim
application filed in DIC 7. Land conversion approval 8. Valid CFO
from APPCB.
:: 37 ::
II.REIMBURSEMENT OF POWER COST: Annexure -II
S
No Name of the unit
Nature
of
Scheme
Decision
1
M/s Eisai Pharma and
Technology & Manufacturing
Private Ltd., Parawada
Visakhapatnam
IIPP
2005-10
Rs.1,38,27,240/- (Rupees One Crore Thirty Eight Lakhs
Twenty Seven Thousand Two Hundred and Forty only)
towards power cost reimbursement for 1st & 2
nd quarter of
2014-15 Subject to submission of the shortfall
information/documents i.e Civil Engineer Certificate for all
civil works.
2
M/s Eisai Pharma and
Technology & Manufacturing
Private Ltd., Parawada
Visakhapatnam
IIPP
2005-10
Rs.56,85,860/- (Rupees Fifty Six Lakhs Eighty Five
Thousand Eight Hundred and Sixty only) towards power
cost reimbursement for 3rd quarter of 2014-15 under
Industrial Investment Promotion Policy 2005-2010, subject to
submission of the shortfall information/documents i.e. Civil
Engineer Certificate for all civil works.)
3
M/s A.S. Jute products Pvt Ltd.
(Expansiopn) ,Nerallavalasa
Village, Padmanabam Mandal,
Visakhapatnam
IIPP
2010-15
Rs.3,37,320/- (Rupees Three Lakhs Thirty Seven Thousand
Three Hundred and Twenty only) towards power cost
reimbursement for 1st half and 2
nd half year of 2014-15 in
respect of expansion project, subject to submission of the
shortfall information/documents i.e 1. Board Resolution
authorising the person to sign the documents.2. Sale Deed.,
3. Land Conversion permission. 4. Civil Engineer
Certificate.5. Chartered Accountant Certificate certifying
the year-wise power consumption detaileds for the last 3
years. 6. Charted Accountant certificate indicating share
holding of Directors.7. GM DIC shall to consult the DE
(operations) APEPDCL and verify the additional load in the
power release certificate with respect additional machinery
installation . 8. Status of original unit .
4
M/s. Godrej agrovet Limited
Unit-2 (Expansion-1), West
Godavari District
IIPP
2010-15
SVC verified the claim and found the following shortfall
information. 1. The approval issued by the Town and
Country planning Department is in the name of M/s Godrej
Oil Palm Ltd.,2. Power is released on 13.04.2012 for 500
KVA under HT Cat-II commercial category.3. As per the
scheme of amalgamation, Godrej Oil Palm Ltd., is
amalgamated with Godrej Agro vet Limited on 16.03.2012
but the date of commencement of commercial production
after amalgamation is declared on 15.06.2013. 4. Power
consumption of the unit is less than the base consumption and
hence recommended zero value proposals for 1st half year
2013-14. 5. Valid Gram Panchayat approval 6..Land
Conversion permission. 13. List of Plant & Machinery duly
certified by the GM, DIC and Financial Institution as per
guidelines in the prescribed format in original. 7. Factories
Department approval. 8. GM, DIC has his remarks on
existing unit ie M/s Godrej Oil Palm Ltd., and unit not
achieving the Base power consumption units in respect of
expansion project.
:: 38 ::
SVC opined that the GM, DIC recommended zero value
proposals, the above shortfall information shall be obtained
from the GM,DIC in order to upkeep the file for processing
the future claims.
5
M/s. Godrej agrovet Limited
Unit-2 (Expansion-1), West
Godavari District
IIPP
2010-15
SVC verified the claim application in detailed and found that
GM, DIC recommended zero value proposals towards
reimbursement of power cost for 2nd
half year of 2013-14
under IIPP 2010-15.
6
M/s. Godrej agrovet Limited
Unit-2 (Expansion-1), West
Godavari District
IIPP
2010-15
SVC verified the claim application in detailed and found that
GM, DIC recommended zero value proposals towards
reimbursement of power cost for 1st half year of 2014-15
under IIPP 2010-15.
7
M/s. Godrej agrovet Limited
Unit-2 (Expansion-1), West
Godavari District
IIPP
2010-15
SVC verified the claim application in detailed and found that
GM, DIC recommended zero value proposals towards
reimbursement of power cost for 2nd
half year of 2014-15
under IIPP 2010-15.
8
M/s NSL Textiles Limited,
APIIC Industrial Park,
Pulivendula, YSR District
IIPP
2005-10
Rs.1,43,41,895/- (Rupees one crore forty three lakhs forty
one thousand eight hundred ninty five only) towards power
cost reimbursement for 4th quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Reasons for increase in power load with respect initial filing
of claim application.2. Power 2000 KVA released on
11.03.2010 and 1000 KVA released on 07.07.2010 and the
same is not reflected in Part B self declaration. 3. Approval
of change of name of the unit.4. Bank Term Loan Sanction
letter 5. Board resolution 6. DTCP approval .
9
M/s Eisai Pharma and
Technology & Manufacturing
Private Ltd., Parawada
Visakhapatnam
IIPP
2005-10
Rs.1,35,50,960/- (Rupees One Crore Thirty Five Lakhs Fifty
Thousand Nine Hundred and Sixty only) towards power cost
reimbursement for 4th quarter of 2014-15 and 1
st quarter of
2015-16 subject to submission of the shortfall
information/documents i.e Civil Engineer Certificate for all
civil works.)
10
M/s JSW Cement Limited,
Sy.No.206, Bilakalgudur (V),
Gadivenmula (M), Kurnool
District
IIPP
2010-15
Rs.4,42,04,960/- (Rupees Four Crores Forty Two Lakhs Four
Thousand Nine Hundred and Sixty only) towards power cost
reimbursement for 1st half year of 2014-15, Subject to
submission of the shortfall information/documents 1.
Certification of incorporation of the company , 2. Board
Resolution authorising the person to sign the claim
application is 3. Approved plans for expansion issued by T
& C P Department .4. Land conversion approval 5. Civil
Engineer Certificate for all civil works .6. Valid CFO /
Acknowledgement from APPCB 7. Statement of
Machinery duly certified by the Financial Institution and
General Manager, DIC as per guidelines 8. Land Sale Deed
/ Lease Deed 9. Statement of Accounts in original or
attested copy .10. Approval and approved plans from the
Factories Department 11. Power release certificate.
:: 39 ::
11
M/s South India Krishna Oil and
Fats Pvt. Ltd., Sy.No. 275, 279,
280 & 281, Epuru Bit-IB,
Pantapalem Muthukur (V&M),
SPSR Nellore District
IIPP
2005-10
Rs.23,78,800/- (Rupees Twenty Thred Lakhs Seventy Eight
Thousand and Eight Hundred only) towards power cost
reimbursement for 3rd
quarter of 2014-15, subject submission
of the shortfall information/documents i.e 1. Approved
plans by T & C P Department 2. Boiler Certificate 3.
Land conversion approval 4. GM, DIC has certified the
activity in claim Refined Oil and not in his covering
letter.5. Person signing the claim has not indicated name of
the person to verify the Board Resoution Authorization 6.
Building plan approval from Factories Department 7.
Statement of Accounts duly certified by GM, DIC 8. List of
plant & machinery duly certified by GM, DIC & Financial
institution as per operational guidelines. 9. Reasons for
power load increased from 1000 KVA to 2500 KVA.10.
Original DCP 27/09/2011 clarify.11. Additional power was
given on 07/12/2013 as per Form-B.12. Power Bill for
January 2015.
12
M/s JSW Cement Limited,
Sy.No.206, Bilakalgudur (V),
Gadivenmula (M), Kurnool
District
IIPP
2010-15
Rs.5,55,52,245/- (Rupees Five Crores Fifty Five Lakhs Fifty
Two Thousand Two Hundred and Forty Five only) towards
power cost reimbursement for 2nd
half year of 2014-15
(subject to submission of the shortfall
information/documents i.e 1. Certification of incorporation
of the company 2. Board Resolution authorising the person
to sign the claim application is 3. Approved plans for
expansion issued by T & C P Department .4. Land
conversion approval 5. Civil Engineer Certificate for all
civil works 6. Valid CFO / Acknowledgement from
APPCB 7. Statement of Machinery duly certified by the
Financial Institution and General Manager, DIC as per
guidelines 8. Land Sale Deed / Lease Deed 9. Statement
of Accounts in original or attested copy .10. Approval and
approved plans from the Factories Department.
13
M/S Loyal Textile Mills Ltd.,
Industrial Park, Menakur (V),
Naiduper(M)
IIPP
2010-15
Rs.2,90,89,130/- (Rupees Two Crores Ninety Lakhs Eighty
Nine Thousand One Hundred and Thirty only) towards power
cost reimbursement for 1st and 2
nd half year of 2014-15,
subject to submission of the shortfall information/documents
i.e. 1. There is a variation in line of activity recommended by
GM, DIC with respect to IEM Part B obtained. 2. Certificate
of incorporation 3. Board resolution authorizing the person to
sign the documents. 4. Approved plan of Gram Panchayat
and Factories Department.5. Valid CFO from APPCB .6.
Attested Bank term loan sanction letter 7. List of Plant &
Machinery Statement not attested and not certified in the
prescribed format 8. Statement of accounts not attested 9.
Civil Engineer certificate is furnished without attestation.10.
Project report.11. CA certificate indicating share holding of
Directors. 12. The reasons for release of power after DCP.
:: 40 ::
14
M/S Gemini Edibles And Fats
India Pvt. Ltd., S.No. 1607/2,
Indl.Park, Pantapalem (V),
Muthukur (M), SPSR Nellore
Ditrict
IIPP
2005-10
Rs.34,68,950/- (Rupees Thirty Four Lakhs Sixty Eight
Thousand Nine Hundred and Fifty only) towards power cost
reimbursement for 3rd
quarters of 2014-15 subject to
submission of the shortfall information/documents i.e 1.
SVC opined that as the Meeseva receipt No. for 4th quarter
of 2014-15 is not filed in covering letter, clarification from
GM,DIC.2. Date is not recorded in claim application
physically filed for 4th quarter 2014-15. 3. Valid CFO from
APPCB 4. Valid Boiler certificate 5. List of Plant &
Machinery duly certified by GM, DIC and Financial
Institution as per operational guidelines. 6. CA certificate
indicating the share holding particulars.
15
M/S.Sudarshanam Spinning
Mills Ltd, R.S No: 52&53,
Tirumalagiri (V), Jaggaipet (M),
Krishna Dist
IIPP
2005-10
Rs.73,32,760/- (Rupees Seventy Three Lakhs Thirty Two
Thousand Seven Hundred and Sixty only) towards power
cost reimbursement for 3rd
and 4th quarter of 2014-15,
subject to submission of the shortfall information/documents
i.e 1. Clarification with regard to capacity of the plant in
terms of kgs as the capacity is mentioned in terms of
ROTORS in IEM Part B. 2. Reasons for increase in power
load in the present claim with respect to power load as on
DCP ie from 1077 KVA to 1672 KVA.3. Land conversion
permission,Civil Engineer certificate and project report. 4.
Board resolution authorizing the person to sign the claim
applications for 3rd and 4th quarter of 2014-15. 5. Valid CFO
from APPCB.6. CA Certificate indicating share holding
particulars.
16
M/S.Sri Vishnu Shankaar Mills
Ltd, Gopinenipalem (V),
Vatsavai (M), Krishna Dist
IIPP
2005-10
Rs.88,66,700/- (Rupees Eighty Eight Lakhs Sixty Six
Thousand and Seven Hundred only) towards power cost
reimbursement for 3rd
and 4th quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Valid CFO from APPCB 2. List of Plant & Machinery duly
certified by GM, DIC and Financial Institution as per
operational guidelines.3. Project report 4. Land conversion
permission 5. CA certificate indicating the % of share
holding of directors 6. Reasons for increase in power load
from 900 KVA to 1150 KVA and clarification on connected
load in HP/KW.7. Attested copy of Statement of accounts.8.
Board resolution authorizing the person to sign the claim
application.
17
M/s.Rajapalayam Mills Ltd,
Gopinenipalem (V), Vatsavai
(M), Krishna Dist
IIPP
2005-10
Rs.90,38,170/- (Rupees Ninety Lakhs Thirty Eight Thousand
One Hundred and Seventy only) towards power cost
reimbursement for 3rd
and 4th quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Valid CFO from APPCB.2. List of Plant & Machinery duly
certified by GM, DIC and Financial Institution as per
operational guidelines.3. Land conversion permission 4. CA
certificate indicating the % of share holding of directors 5.
Board resolution authorizing the person to sign the claim
application.
:: 41 ::
18
M/S.Sri Harini Textiles Limited,
R.S No: 47,48, & 49
Tirumalagiri (V), Jaggaipet (M),
Krishna Dist
IIPP
2005-10
Rs.72,63,640/- (Rupees Seventy Two Lakhs Sixty Three
Thousand Six Hundred and Forty only) towards power cost
reimbursement for 3rd
and 4th quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1. Line
of activity is not mentioned by GM,DIC while
recommending the claim proposal.2. Valid CFO from
APPCB duly attested.3. Project report 4. Land conversion
permission 5. CA certificate indicating the % of share
holding of directors 6. Board resolution authorizing the
person to sign the claim.7. Reasons for increase in power
load from 1077 KW to 1624.83 KW at the time of
submission of claim.
19
M/S.Sandhya Spinning Mill
Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna District
IIPP
2005-10
Rs.89,57,050/- (Rupees Eighty Nine Lakhs Fifty Seven
Thousand and Fifty only) towards power cost reimbursement
for 3rd
and 4th quarter of 2014-15, subject to submission of
the shortfall information/documents i.e 1. Clarification with
regard to capacity of the plant in terms of Kgs as the capacity
is mentioned in terms of ROTORS in IEM part-B. 2. Valid
CFO from APPCB.3. List of plant & machinery duly
certified by GM, DIC & Financial Institution as per
operational guidelines.4. Land conversion permission 5. CA
certificate indicating the % of share holding of directors 6.
Board resolution authorizing the person to sign the claim. 7.
Reasons for increase in power load from 900 KVA to 1150
KVA at the time of submission of claim.
20
M/s K.P.Polylefin Sacks Private
Limited, Sy.No.913, Epuru-
1A(V), Doruvulapalem(P),
Muthukur(M), SPSR Nellore
District
IIPP
2010-15
Rs.18,73,270/- (Rupees Eighteen Lakhs Seventy Three
Thousand Two Hundred and Seventy only) towards power
cost reimbursement for 2nd
half year of 2014-15 subject to
submission of the shortfall information/documents i.e 1.
Building plan approval from Town & Country Planning
Department & Factories Department.2. Valid CFO from
APPCB duly attested.3. Form-B self declaration duly
indicating the power load. 4. CA certificate indicating the %
of share holding of directors 5. Board resolution authorizing
the person to sign the claim.
21
M/S. Usha Spincoat Pvt Ltd, Rs
No: 341, Chikkavaram,
Gannavaram (M), Krishna Dist
IIPP
2005-10
Rs.73,07,824/- (Rupees Seventy Three Lakhs Seven
Thousand Eight Hundred and Twenty Four only) towards
power cost reimbursement for 1st quarter of 2015-16, subject
to submission of the shortfall information/documents i.e 1.
Valid CFO from APPCB. 2. Reasons for increase in power
from 1200 KVA to 1860 KVA and clarification on connected
load in HP/KW 3. CA certificate indicating share holding
particulars 4. Board resolution authorizing the person to sign
the claim. 5. Approved plan of DTCP 6. Land Conversion
permission Further, SVC opined that the Government
permission for condonation of delay in filing claim
application and making the unit eligible for availing the
incentives under IIPP 2005-2010 vide Government memo
No. 4850/IP/INF/A1/2014-15 Dated 16.12.2014 shall be
circulated to the Chairman SLC.
The SLC has deferred the case for the next meeting.
:: 42 ::
22
M/s. Shri Govindaraja Textiles
Ltd., 708, Peddarangapuram (V),
Pulivendala (M), YSR Kadapa
Dist
IIPP
2005-10
Rs.6,03,60,918/-(Rupees six crors three lakhs sixty thousand
nine hundred and eighteen only) towards power cost
reiombursment for the period 1st quater of 2015-16 and
defereence amount in pervious period from Jan - 2014 to
March -2015 subject to submission of the shortfall
information/documents i.e 1. Reasons for increase power
load in KVA from 2500 to 10500 KVA and clarification on
connected load in HP/KW.2. Valid CFO from APPCB. 3. CA
certificate indicating share holding particulars. 4. DTCP
approved plan 5. Form B Self Declaration is not properly
filled in 6. Board resolution authorizing the person to sign the
claim application . 7. Proof of receipt of claim in hard copy
by GM,DIC is not available on the application 8. Factories
Department plan not attested 9. Land conversion approval
10. Bank sanction letter is not attested
The SLC has deferred the case for the next meeting.
23
M/S Sri Anantha Lakshmi
Spinning Mills (P) Ltd, (Exp-1)
59/1, Boyapalem (V), Edlapadu
(M), Guntur Dist
IIPP
2005-10
Rs.64,65,576/- (Rupees Sixty Four Lakhs Sixty Five
Thousand Five Hundred and Seventy Six only) towards
power cost reimbursement for 1st quarter of 2015-16, subject
to submission of the shortfall information/documents i.e 1.
Sale deed 2. Valid CFO 3. Bank sanction letter 4. GM DIC
has not informed increase in capacity of the unit 5. CA
certificate indicating share holding particulars. 6. Land
conversion approval 7. Factories Department plan furnished
without attestation 8. T and CP Department plan .
24
M/s Sree Rayalaseema Alkalies
And Allied Chemicals Ltd.,
Gondiparla (V), Kurnool
IIPP
2005-10
Rs.9,19,34,290/- (Rupees Nine Crores Nineteen Lakhs thirty
Four Thousand Two Hundred and Ninety only) towards
power cost reimbursement for 1st quarter of 2015-16, subject
to submission of the shortfall information/documents i.e 1.
IEM part B 2. Land sale deed 3. Company incorporation 4.
Board resolution authorizing the person to sign the claim
application. 5. Factories Department approval in full shape 6.
Valid Boiler certificate 7. Machinery list as per guidelines. 8.
CE certificate 9. Project report 10. Land conversion 11. CA
certificate for share holding 12. Gram panchayat approval
furnished not attested 13. CFO duly attested by GM, DIC.
14. Power release certificate duly attested by GM, DIC.15.
C.A. Certificate for payment proof for the period for 1st
quarter of 2015-16
25
M/S.Mulpuri Foods & Feeds Pvt
Ltd., Rs No: 23&30, Morsapudi
(V), Nuzivid (M), Krishna Dist
IIPP
2010-15
Rs.10,36,810/- (Rupees Ten Lakhs Thirty Six Thousand
Eight Hundred and Ten only) towards power cost
reimbursement for 2nd
half year of 2014-15 , subject to
submission of the shortfall information/documents i.e 1.
Reasons for increase of power from 1100 KVA to 2190 KVA
2. Valid CFO 3. CA certificate for share holding 4. DTCP
approved plan 5. Board resolution authorizing the person to
sign the claim. 6. Civil Engineer certificate 7. Project report
8. Factories approval and approved plan.9. Clarification with
regard to additional machinery from GM,DIC.
:: 43 ::
26
M/S.Vantage Spinners (P) Ltd,
Rs No: 50, Gollapalli , Nusivid
(M0, Krishna Dist
IIPP
2005-10
Rs.1,67,82,980/- (Rupees One Crore Sixty Seven Lakhs
Eighty Two Thousand Nine Hundred and Eighty only)
towards power cost reimbursement for 1st quarter of 2015-
16, subject to submission of the shortfall
information/documents i.e 1. Board resolution authorizing the
person to sign the claim application.2. Factories Department
approval 3. Valid CFO 4. Machinery statement duly certified
as per guidelines 5. Project report 6. CA certificate indicating
share holding 7. Bank sanction letter 8. Statement of accounts
9. Gram Panchayat, DTCP approvals and approved plans 10.
Land conversion 11. Civil Engineer certificate 12. Power
release document with attestation
27
M/S Amaravathi Textiels (P) Ltd
(4th Expansion), Martur (V) &
(M), Prakasam Dist
IIPP
2010-15
Rs.3,06,91,800/- (Rupees Three Crores Six Lakhs Ninety
One Thousand and Eight Hundred only) towards power cost
reimbursement for 1st half year of 2015-16, subject to
submission of the shortfall information/documents i.e 1.
Land sale deed 2. Board resolution authorizing the person to
sign the claim application. 3. DTCP approved plan 4. Power
release certificate 5. Meeseva receipt for 2nd quarter of
2015-16 6. Valid CFO from APPCB 7. List of Plant &
Machinery duly certified by the GM, DIC and Financial
Institution as per guidelines in the prescribed format in
original. 8. Clarification with regard to power load of 6700
KVA as on 26.11.2009 and increasing to 10000 KVA as on
11.11.2011. 9. The date on claim application pertaining to 1st
half year claim of 2015-16 for power cost reimbursement is
not recorded for verifying the date of filing. 10. Company
incorporation 11. Factories plan 12. Land conversion 13.
Project report 14. CA certificate indicating share holding
28
M/S Bhavya Cements Ltd,
Tangeda (V), Dachepalli (M),
Guntur Dist.
IIPP
2005-10
Rs.4,31,42,550/- (Rupees Four Crores Thirty One Lakhs
Forty Two Thousand Five Hundred and Fifty only) towards
power cost reimbursement for 1st quarter of 2015-16 subject
to submission of the shortfall information/documents i.e 1.
Valid CFO from APPCB 2. Sale deed 3. T & CP approval 4.
Civil Engineer certificate 5. Board resolution authorizing the
person to sign the claim application .6. Land conversion 7.
State Bank of Indore letter with attestation. 8. CA certificate
indicating share holding 8
29
M/S Idupulapadu Cotton Mils
Pvt Ltd , Jonnatali (V), Martur
(M), Prakasam Dist.
IIPP
2005-10
Rs.3,09,61,270/- (Rupees Three Crores Nine Lakhs Sixty
One Thousand Two Hundred and Seventy only) towards
power cost reimbursement for 1st quarter of 2015-16, subject
to submission of the shortfall information/documents i.e 1.
CA Certificate 2. Power release certificate 3. Machinery
statement not certified as per guidelines 4. Board resolution
authorizing the person to sign the claim application . 5. No
inward date on 1st quarter of 2015-16 claim. GM, DIC to
furnish his report on filing of claims with DIC as per the
stipulated time frame. 6. Bank sanction letter 7. Approved
plans of DTCP, Factories and Gram panchayat 8. Reasons for
increase of power from 1510 KVA to 5600 KVA 9. Valid CFO from
APPCB 10. Statement of accounts not furnished 11. Approved project
report.
:: 44 ::
30
M/S.Ravali Spinners Pvt Ltd.
(Expansion), Khandavali,
Peravali (M), West Godavari
Dist
IIPP
2005-10
Rs.32,89,450/- (Rupees Thirty Two Lakhs Eighty Nine
Thousand Four Hundred and Fifty only) towards power cost
reimbursement for 1st quarter of 2015-16 , subject to
submission of the shortfall information/documents i.e 1.
Certificate of incorporation Rs.32,89,450/- Certificate of
incorporation 2. Board resolution authorizing the person to
sign the claim application .3. Valid CFO from APPCB 4.
Statement of Accounts 5. Project report 6. CA certificate
indicating the share holding 7. IEM part B issued by
SIA/DIPP 8. Sale deed 9. Land conversion 10. Machinery
statement not certified as per guidelines 11. Civil Engineer
Certificate 12. Separate C.A. Certificate on power
consumption units for the previous three years prior to
expansion. 13. Variation in power load reported in form B
Self Declaration, power bill and also power load as on DCP.
Clarification on power load at the time of release in terms of
KW/HP.14. DTCP and Factories Department plans are not
attested.15. Gram Panchayat approval
31
M/S. Spads Textiles Limited, Sy
No: 86/1, Ravikampadu (V),
Jaggaipet(M), Krishna Dist
IIPP
2005-10
Rs.37,01,808/- (Rupees Thirty Seven Lakhs One Thousand
Eight Hundred and Eight only) towards power cost
reimbursement for 1st quarter of 2015-16, subject to
submission of the shortfall information/documents i.e 1.
Project report 2. Land sale deed 3. Factories Department
approval 4. Bank Term loan sanction letter 5. Valid CFO
from APPCB 6. Reasons for increase in power load from
1000 KVA to 1350 KVA 7. DTCP approval with attestation.
8. Board resolution authorizing the person to sign the claim.
9. CA share holding report with attestation 10. Land
conversion approval 11. Gram Panchayat approved plan.
32
M/S.Ravali Spinners Pvt Ltd.
(Existing), Khandavali, Peravali
(M), West Godavari Dist
IIPP
2005-10
SVC verified the claim application in detailed and
recommended for rejection for sanction of reimbursement of
power cost for the period of 4th quarter of 2014-15 under IIPP
2005-10, since the incentives availing period of 8 years
completed by the end of 3rd
quarter of 2014-15 from the date
of commencement of production of the unit.
33
M/s Mohan Spintex India
Limited (Expansion)
R.S.No.29/2, Vattigudipadu
Village, Agiripalli Mandal,
Krishna District
IIPP
2005-10
Rs.84,06,980/- (Rupees Eighty Four Lakhs Six Thousand
Nine Hundred and Eighty only) towards power cost
reimbursement for 1st quarter of 2015-16, subject to
submission of the shortfall information/documents 1. Land
sale deed or lease deed 2. Bank sanction letter 3. Project
report 4. Town and Country Planning Approval 5.
Statement of Accounts in original 6. Machinery statement
duly certified by the Financial Institution as per guidelines.
7. The status of original unit and there is no correlation of
IEM of original unit and expansion project. 8. Claim
application is not completely filled in leaving column meant for
filling in the capacity of original unit, as blank. 9. GM DIC to
clarify the line of activity in the claim application with respect to
IEM part B since there is a variation. 10. Gram Panchayat approved
plans 11. Town and Country Planning plans .12. CFO furnished is
unattested. 13. Land conversion approval .
:: 45 ::
34
M/s Mohan Spintex India
Limited (Unit II) Remalle,
Bapulapadu Mandal, Krishna
District
IIPP
2005-10
Rs.3,17,29,280/- (Rupees Three Crores Seventeen Lakhs
Twenty Nine Thousand Two Hundred and Eighty only)
towards power cost reimbursement for 1st quarter of 2015-16,
subject to submission of the shortfall information/documents
i.e 1. Land sale deed or lease deed 2. Reasons in increase
of KVA from 4000 to 5000 KVA and clarification on
connected load. 3. Town and Country Planning Department
approval 4. Board resolution authorizing the person to
sign the documents . 5. Land conversion certificate 6. CA
certificate indicating share holding of Directors . 7. Gram
Panchayat approved plans. 8. Attested copy of CFO issued
by APPCB.
35
M/S Deccan Fine Chemicals
(India) Pvt Ltd, Nagaram (P)
Payakaraopet (M),
Visakhapatnam Dist
IIPP
2005-10
Rs.2,25,76,374/- (Rupees Two Crores Twenty Five Lakhs
Seventy Six Thousand Three Hundred and Seventy Four
only) towards power cost reimbursement for 1st quarter of
2015-16, subject to submission of the shortfall
information/documents i.e 1. IEM Part B 2. Company
incorporation certificate 3. T & CP dept approval 4. Land
conversion approval 5. Approved project report 6. Valid CFO
issued by APPCB 7. Factories Department approved plan 8.
Bank term loan sanction letter 9. CA share holding report not
attested 10. Land sale deed. 11. Machinery statement duly
certified by Bank.
36
M/S Vasudha Pharma Chem
Limtied Unit –III, Plot No:
23&24, Jnpc, Parawada (V),
Visakhapatnam Dist
IIPP
2010-15
Rs.54,93,890/- (Rupees Fifty Four Lakhs Ninety Three
Thousand Eight Hundred and Ninety only) towards power
cost reimbursement for 2nd
half year of 2012-13 and 1st and
2nd
half year of 2013-14 and 1st half year 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Board resolution authorizing the person to sign the claim
application. 2. IEM Part B 3. Line of activity in IEM Part B is
different from GM,DIC report in his covering letter 4. CFO
with attestation. 5. Valid boiler certificate 6. Statement of
Accounts 7. List of Plant & Machinery as per operational
guidelines.
37
M/s Silica Ceramica Private
Limited, D.No.97,
Narayanapuram, Unguturu
Mandal, West Godavari District
IIPP
2005-10
Rs.63,49,765/- (Rupees Sixty Three Lakhs Forty Nine
Thousand Seven Hundred and Sixty Five only) towards
power cost reimbursement for 1st quarter of 2015-16 , subject
to submission of the shortfall information/documents i.e 1.
Land sale deed or Lease deed. 2. Company incorporation.3.
Project report 4. Valid CFO issued by APPCB. 5. CA
Certificate indicating share holding of directors6. Machinery
statement not signed but signed in a separate sheet. 7.
Factories Department plan. 8. Land conversion certificate 9.
Board resolution authorizing the person to sign the
documents.10. Banker term loan sanctioned letter with
attestation.11. Statement of accounts with attestation.
:: 46 ::
38
M/s Chowdary Spinners
Limited, Undrajavaram Mandal,
West Godavari
IIPP
2010-15
Rs.43,91,499/- (Rupees Forty Three Lakhs Ninety One
Thousand Four Hundred and Ninety Nine only) towards
power cost reimbursement for 1st quarter of 2015-16 , subject
to submission of the shortfall information/documents i.e . 1.
Valid CFO issued by APPCB 2. Land sale deed or lease deed
3. Project report 4. C.A.Certificate indicating share holding
of directors 5. Factories Department, Gram Panchayat and T
& CP Department approved Plan 6. Board resolution
authorizing the person to sign the claim application.7. IEM
Part B 8. APSFC term loan Sanctioned letter 9. Date of
commencement of commercial production is not indicated in
IEM Part – B.
39
M/s PVR Spinning and Weaving
Limited, Kondayapalem Road,
Tetali, Tanuku Mandal, West
Godavari
IIPP
2005-10
Rs.39,42,768/- (Rupees Thirty Nine Lakhs Forty Two
Thousand Seven Hundred and Sixty Eight only) towards
power cost reimbursement for 1st quarter of 2015-16 , subject
submission of the shortfall information/documents i.e .1.
Land sale deed or lease deed.2. Reasons in increase of KVA
from 600 to 2401 KVA and clarify on connected load. 3.
Bank term loan sanction letter. 4. Project report. 5. Company
incorporation. 6. Board resolution authorizing the person to
sign.7. Gram Panchayat approval. 8. Town and Country
planning /UDA approval 9. Factories department approval.
10. Valid CFO from APPCB.11. CA certificate for share
holding. 12. Llist of plant & machinery duly certified by GM,
DIC & Financial Institution as per guidelines.
40
M/S Lohiya Edible Oils Pvt
Ltd.,(Unit II) (existing) Plot
No.25 IDA, Vakalapudi,
Kakinada Rural East Godavari
pertaining to 4th quarter of 2014-
15
IIPP
2005-10
Rs.17,89,675/- (Rupees Seventeen Lakhs Eighty Nine
Thousand Six Hundred and Seventy Five only) towards
power cost reimbursement for 4th quarter of 2014-15 , subject
to submission of the shortfall information/documents i.e 1.
Board resolution authorizing the person to sign the claim
application . 2. Land sale deed. 3. Gram Panchayat, Factories
Department and DTCP approval 4. Land conversion 5. CFO
issued from APPCB 6. Bank term loan sanction letter 7.
Project report 8. C.A.Certificate indicating share holding of
directors 9. C.A.Certificate for increase in investment for
expansion project 10. There is a variation in power load in
present claim with respect to original claim filed. ( 450 HP
original claim, 1680 HP in present claim) 11. Power release
certificate for 1680HP 12. Statement of accounts duly
certified by financial institution 13. List of Plant &
Machinery duly certified by financial institution and as per
operational guidelines.14. Valid Boiler certificate.
:: 47 ::
41
M/S Lohiya Edible Oils Pvt Ltd,
(Expansion ) Plot No.25 IDA,
Vakalapudi, Kakinada Rural
East Godavari pertaining to 2nd
half year of 2014-15
IIPP
2010-15
Rs.24,49,050/- (Rupees Twenty Four Lakhs Forty Nine
Thousand and Fifty only) towards power cost reimbursement
for 2nd half year of 2014-15 , subject to submission of the
shortfall information/documents i.e. 1.Board resolution
authorizing the person to sign the claim application . 2.Land
Sale deed, 3.Certificate of incorporation, 4.CA Certificate for
share holding pattern, 5.Gram Panchayat, Factories
Department and DTCP approval, 6.Land conversion, 7.Valid
CFO issued by APPCB, 8.Bank term loan sanctioned letter
Project report, 9.C.E.Certificate, 10.Power release certificate,
11.There is a variation in DCP in claim application filed for
expansion, 12. DCP is 01.07.2012 as per IEM Part B and GM
DIC reported DCP as 07.03.2010 in claim application and
Form B self declaration, which is correct, 13.Statement of
Accounts furnished pertains to 2009 which is certified by
Union Bank India and is not relevant for expansion,
14.Expansion project is financed by APSFC as per machinery
statement, 15.Form B self declaration furnished for
expansion is not relevant, 17.CA has not certified the
investment criteria in respect of expansion project, 18.As per
power release certificate in (original) unit II the power load is
450 HP released on 26.12.2004, 19.As per Factories
Department approval is reported increased from 331 HP to
3117 HP, 20.Power release certificate for verification in
respect of expansion project.
42
M/s Bhavanam Spinning Mills
Pvt Ltd., (Expansion Unit)
Bhiminenivaripalem
Village,Medikonduru Mandal,
Guntur District
IIPP
2005-10
Rs.30,73,815/- (Rupees Thirty Lakhs Seventy Three
Thousand Eight Hundred and Fifteen only) towards power
cost reimbursement for 1st quarter of 2015-16 submission of
the shortfall information/documents, subject to submission
of the shortfall information/documents i.e 1. Confirmation
on installation of additional machinery in view of increase in
power load. 2. Land documents. 3. Valid CFO from
APPCB. 4. Approved Project report. 5. T& CP
Department approved 6. Bank sanction letter. 7. C A
certificate indicating share holding of directors. 8. Board
resolution authorizing the person to sign the claim
application. 9. Land conversion document. 10. There is
increase in power load from 1550KVA to 3200KVA.
43
M/s Guntur Spinning Mills
Private Ltd., Obulavaripalme
Village, Guntur
IIPP
2005-10
Rs.15,82,920/- (Rupees Fifteen Lakhs Eighty Two Thousand
Nine Hundred and Twenty only) towards power cost
reimbursement for 1st quarter of 2015-16, subject submission
of the shortfall information/documents i.e 1. Confirmation
on installation of additional machinery in view of increase in
power load.2. Land sale deed.3. Valid CFO from APPCB
4. Approved project report.6. Signature of authorized
person not attested in board resolution / authorization and not
indicated the name of person in the claim application.7.
T&CP Dept and Factories Dept Plans.8. Bank Sanctioned
letter 9. Banker has not attested as machinery as per
guidelines.10. Valid CFO from APPCB.11. There is increase
in power load from 600KVA to 2240KVA.12. CA certificate
for share holding.
:: 48 ::
44
M/s Sri Venkata Lakshmi
Narasimha Spinning Mills
Private Ltd.,D.No.176/4, GBC
Road, Chebrolu Village &
Mandal, Guntur District
IIPP
2005-10
Rs.49,43,366/- (Rupees Forty Nine Lakhs Forty Three
Thousand Three Hundred and Sixty Six only) towards power
cost reimbursement for 3rd
quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Confirmation on installation of additional machinery in view
of increase in power load.2. Land conversion certificate
3. Valid CFO from APPCB are .4. Approved Project
report . 5. There is a mismatch of person sinning the person
claim are valid board resolution has .6. Approved plans of
T & CP , Factories, Gram Panchayat are .7. Land
conversion 8. CA certificate indication share holding of
directors is also .9. Bank sanction letter .
45
M/s. Vasundhara Cotton Mills
Pvt Ltd., Boyapalem Village,
Vankayalapadu, Edlapadu,
Sattenapalli, Guntur District
IIPP
2005-10
Rs.36,32,840/- (Rupees Thirty Six Lakhs Thirty Two
Thousand Eight Hundred and Forty only) towards power cost
reimbursement for 1st quarter of 2015-16, subject to
submission of the shortfall information/documents i.e 1.
Confirmation on installation of additional machinery in view
of increase in power load.2. Land conversion
certificate.3. Land Sale Deed.4. Valid CFO from
APPCB5. Project report 6. Bank Sanction Letter 7. IEM
part B issued by SIA/DIPP declaring DCP 8. GM, DIC has
not confirmed DCP in his recommendation and certified the
DCP in claim 10. Plan of Gram Panchayat and Factories
Department 11. There is increased in power load 12. CA
certificate indicating share holding particulars.
46
M/s. Sree Veerabrahmendra
Swamy Spinning Mills Pvt Ltd.,
Guntur
IIPP
2005-10
Rs.43,91,846/- (Rupees Forty Three Lakhs Ninety One
Thousand Eight Hundred and Forty Six only) towards power
cost reimbursement for 1st quarter of 2015-16, subject to
furnishing of submission of the shortfall
information/documents.i.e 1. Confirmation on installation
of additional machinery due to increase in power load from
600 KVA to 1050 KVA 2. Land sale deed 3. Land
conversion 4. Valid CFO from APP CB 5. CA certificate
indicating share holding of Director 6. DT&CP, Panchayat,
Factories department plans 7. Valid Board Resolution
authorizing the person to sign on claim application as the one
furnished is mismatched8. Attested copy of T&CP approval
9. Bank Sanction Letter is not attested 10. Form B self
declaration contents are not correct with respect to power bill
/ claim application.
47
M/s. Sri Lakshmi Godavari
Spinning Mills Pvt Ltd.
Sy.No.113, Chebrole Village and
Mandal, Guntur District
IIPP
2005-10
Rs.58,54,604/- (Rupees Fifty Eight Lakhs Fifty Four
Thousand Six Hundred and Four only) towards power cost
reimbursement for 1st quarter of 2015-16, subject to
submission of the shortfall information/documents i.e 1.
Confirmation on installation of additional machinery due to
increase in power load from 650 KVA to 4950 KVA.2.
Board resolution 3. Factories Department approval and plan
4. Land conversion certificate 5. Valid CFO from APPCB
6. Approved project report 7. Authorised person are not
sign on claim8. Approved T&CP 9. CA certificate for
share holding of Directors of the company 10. Bank sanction
letter 11. Project report 12. Sale deed with attestation.
:: 49 ::
48
M/s Bhavanam Spinning Mills
Pvt Ltd.,(2nd
Expansion Unit)
Bhiminenivaripalem
Village,Medikonduru Mandal,
Guntur District
IIPP
2005-10
Rs.81,75,134/- (Rupees Eighty One Lakhs Seventy Five
Thousand One Hundred and Thirty Four only) towards power
cost reimbursement for 1st quarter quarter of 2015-16,
subject to submission of the shortfall information/documents
i.e 1. Confirmation on installation of
additional machinery due to increase in power load from
2300 KVA to 3200 KVA 2. DT&CP plan approval for
expansion 3. Company incorporation 4. Land Conversion
certification 5. Valid CFO from APPCB 6. Bank
sanctioned letter 7. Land sale deed 8. Board resolution
authorizing person to sign claim 9. Approvged plan of
Gram Panchayat, Factories & T&CP 10. Statement of
account with attestation by GM, DIC11. CA certificate of
power computation sheets for last three years with attestation.
49
M/s Sri Venkata Siva Parvathi
Spinning Mills Pvt Ltd.,
(Expansion)
IIPP
2005-10
Rs.9,64,472/- (Rupees Nine Lakhs Sixty Four Thousand Four
Hundred and Seventy Two only) towards power cost
reimbursement for 4th quarter of 2014-15, subject to
submission of the shortfall information/documents i.e 1.
Confirmation from General Manager, DIC, Guntur on
installation of additional machinery due to increase in power
load 2. Land conversion certificate 3. Valid CFO from
APPCB 4. Approved project report 5. Gram Panchayat,
Factories Department and T&CP approved plans 6. There is
increase in power load with respect to present claim7. CA
certificate indicating share holding of directors
50
M/s. Idupulapadu Cotton Mils
Pvt Ltd (Exp-5), Ganapavaram
(V), Nadendla (M), Guntur Dist
IIPP
2005-10
Rs.5,57,041/- (Rupees Five Lakhs Fifty Seven Thousand and
Forty One only) towards power cost reimbursement for the
year 2014-15 after deducting the sanctioned excess amount in
previous period duly placing before SLC as separate
Agenda, subject to submission of the shortfall
information/documents i.e 1. Confirmation on installation
of additional machinery due to increase in power load from
7100 KVA to 8000 KVA 2. Land Conversion certification
3. Valid CFO from APPCB 4. Land sale deed 5. Board
resolution authorizing person to sign claim 6. Approved
plan of Gram Panchayat, Factories & T&CP for expansion.
The SLC has deferred the case for the next meeting.
51
M/s Viswateja Spinning Mills
Ltd (Exp-2) D No: 219,
Boyapalem (V), Edlapadu (M),
Guntur
IIPP
2005-10
Rs.1,45,06,340/- (Rupees One Crore Forty Five Lakhs Six
Thousand Three Hundred and Forty only) towards power cost
reimbursement for 1st quarter of 2015-16, subject to submission
of the shortfall information/documents. i.e 1. Confirmation on
installation of additional machinery due to increase in power load
from 3000 KVA to 4100 KVA 2. Company incorporation 3.
Land Conversion certification 4. Valid CFO from APPCB 5.
Bank term loan sanctioned letter 6. Land sale deed 7. Board
resolution authorizing person to sign claim 8. Approvged plan of
Gram Panchayat, Factories & T&CP