#3131094 Water & Waste Page 1 of 34
9. DEPARTMENTAL VIEW WATER AND WASTE (COMMERCIAL BUSINESS UNIT) Mission: To deliver quality and reliable water, wastewater and waste services that meet the needs of our community Officer Responsible: General Manager Water & Waste Staffing Level (FTE) 313.22
BRANCH: GENERAL MANAGEMENT AND ADMINISTRATION SUPPORT Mission: To provide general management, leadership and guidance to the Water & Waste Department Officer Responsible: General Manager Water & Waste Staffing Level (FTE) 5
Financial Summary 11/12 Budget
Revenue 160,049,287
Expenses 152,408,008
Financial Summary 11/12 Budget
Revenue 215,627
Expenses 24,907,784
#3131094 Water & Waste Page 2 of 34
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Performance review of managers work
Review of work performed by each branch and the effectiveness of each branch manager; Provision of guidance and support to improve outputs; Includes the review of Departmental performance in the following areas: • Budget management; • Operating initiative management; • Capital works management; • Workplace Health and Safety
performance; • Customer management.
Departmental Managers 6.7 1a. Departmental Budget performance 1b. Departmental Capital Budget - % spent 1c. Timeliness of Departmental operating initiative completions 1d. Departmental Safety Performance
2. Ensure leadership development is an ongoing priority within the Department.
Encourage and promote leadership development across the department
Departmental staff 6.4 2. Leadership
3. Oversee implementation of Departmental aspects of the Connecting Project.
Provision of effective support to enable all Departmental staff to meet the performance expectation of their customers
Departmental staff 6.7 3. Connecting Project
4. Oversee implementation of Departmental aspects of the Employee Opinion Survey.
Facilitate processes that engage and empower staff to make improvements to their work areas and the organisation
Departmental Staff 6.4 4. Employee Opinion Survey
#3131094 Water & Waste Page 3 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency Expenditure for the Department in the range of 0% to 5% under budget
1a. Departmental Budget performance
Provision of services within resourcing allowed
Revenue for the Department no more than 1% under budget
Oracle Financials Monthly
1b. Departmental Capital Budget - % spent
Track progressive spending of capital budget to ensure expenditure is on track
90% of budget spent by year end
Oracle financials Monthly
1c. Timeliness of Departmental operating initiative completions
All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update
Monthly
Lost Time Injury Frequency Rate – improving relative to the Department's 3 year average
1d. Departmental Safety Performance
Safety performance of the Department as measured by the Lost Time Injury Frequency Rate and the Lost Time Injury Duration Rate.
Lost Time Injury Duration Rate – improving relative to the Department's 3 year average
WH&S Statistics – Monthly WH&S report
Monthly
2. Leadership Determine at first review 3. Connecting Project Determine at first review 4. Employee opinion survey Determine at first review
#3131094 Water & Waste Page 4 of 34
BRANCH: BUSINESS SERVICES Mission: To provide high quality services (including analysis) in an efficient and effective manner Officer Responsible: Manager Business Services Staffing Level (FTE) 40
BUSINESS SERVICES – MANAGEMENT AND ADMINISTRATION SUPPORT
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
1. Management of Branch performance including;
- Customer Relations - Water Billing - Financial Management - Laboratory Services - Plumbing - Trade Waste - Business Systems Analysis
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W – Business Services
6.2 1a. Branch operating Performance within Operating Budget 1b. Timeliness of Branch operating initiative completion 1c. Branch Safety Performance
Financial Summary 11/12 Budget
Revenue 4,686,804
Expenses 6,485,176
#3131094 Water & Waste Page 5 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1a. Branch operating budget Provision of services within available resourcing allowed
Expenditure for the Department in the range of 0% to 5% under budget
Oracle Financials Monthly
1b. Operating Initiative completion
All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update Monthly
1c. Branch Safety Performance
Safety performance of the Department as measured by the Lost Time Injury Frequency Rate and the Lost Time Injury Duration Rate.
Lost Time Injury Frequency Rate – improving relative to the Department's 3 year average
WH&S Statistics – Monthly WH&S report Monthly
1d. Operating Initiative completion
All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update Monthly
BUSINESS SERVICES – WATER BILLING
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
1. Water Consumption Accounts
Water usage notices and settlement data to customers, provided in a timely and effective manner
Water consumers 4.2
Water Usage – Notice turnaround time from read to issue date.
#3131094 Water & Waste Page 6 of 34
2. Water Usage Settlement Accounts
Final reads provided in the settlement process associated with property transfers
Solicitors and persons undertaking conveyancing works
4.2
Water Settlements - turnaround time from request to issue.
3. Water Usage Summaries Introduction of water usage summaries for all properties External customers 4.2
Issuing of water usage summaries
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Water Usage Notice - time
from read to bill issue date Time from read to bill issue date Within 14 days of reading
date Authority Monthly
2. Water Settlements - turnaround time from request to issue
Turnaround time from request to issue 5 days for $35.60 fee 24 hours for $57.80 fee
Document Management System
Monthly
3. Issuing of Water Usage Summaries
Comparative water usage data provided to all property owners in the Cairns region
Every four (4) months Authority Every four (4) months
BUSINESS SERVICES – FINANCIAL MANAGEMENT
Operating Initiatives Relevant linkage(s) Completion Date 1. Full Cost Pricing Model for Waste Services 6.3, 6.7 December 2011 2. Customer Service Obligations Model 6.3, 6.7 December 2011 3. Review of the Corporate Overhead Model for Water and Waste 6.2, 6.7 September 2011 4. Undertake Financial Analysis of Tender and Project Evaluations 6.2, 6.7 September 2011
#3131094 Water & Waste Page 7 of 34
BUSINESS SERVICES - LABORATORY SERVICES Operating Initiatives Relevant linkage(s) Completion Date 1. Implementation of Laboratory Information Management System (LIMS) 1.5, 4.1, 6.3, 6.4, 6.7 December 2011 2. Develop and implement Analytical Methods for Cryptosporidium and Giardia Testing 4.1, 4.4 June 2012 3. Develop and implement Analytical Methods for Legionella Testing 4.1, 4.4 January 2012 4. Development of Service Level Agreement between Laboratory Services and Waste and
Environmental Services 6.2, 6.3 January 2012
5. Implementation of Stormwater Monitoring Program 1.6 March 2012
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
Tests on: - Waters for Drinking
Purposes - Waters (non-drinking) - Solid matrices - Other tests
- Tests undertaken for client purposes include water for drinking, wastewaters, pools, creeks, lakes, sludge and soils and other tests.
Water & Waste Operations, City Works and Services, External Clients
4.1 1a. Test turn-around time 1b. Quality of test results
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1a. Test turn-around time Completion rates for analyses and reporting 85 % within 5 working
days Laboratory Information Management System
Quarterly
1b. Quality of test results Statistical function which allows the quality of the results to be determined.
>95% of analysis batches with acceptable quality
Laboratory Information Management System
Quarterly
#3131094 Water & Waste Page 8 of 34
BUSINESS SERVICES – CUSTOMER RELATIONS Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
1. Customer Relationship Management
Develop processes and systems to enhance customer management External Customers 6.5 Customer
Management
2. Sewer Plan Requests Provision of Sewer Main / As Constructed plans (per lot & plan)
Plumbers, Developers, Internal Operations 4.1 Sewer Plan request
turnaround time
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1. Customer Management Improve turnaround times for customer management
No more than 5 working days turnaround time CRM Monthly
2. Sewer Plan Request turnaround time Number of days from receipt of request to
issue of plan Issued within 2 working days Authority Monthly
#3131094 Water & Waste Page 9 of 34
BUSINESS SERVICES - PLUMBING
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
1. Plumbing Compliance Applications
Compliance assessments of plumbing applications and permit certificate works with the mandatory requirements of the Acts, Regulations and By-Laws
Plumbers, Developers, Internal Operations
4.1 Plumbing applications turnaround time
2. Plumbing Inspections Inspections and tests of water, plumbing and drainage works during constructions for compliance with the relevant regulations
Plumbers, Developers, Internal Operations
4.1 Plumbing inspections undertaken
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Plumbing application
turnaround time Number of plumbing applications received and assessed within statutory compliance requirements
Assessment within twenty days
Authority Monthly
2. Plumbing inspections undertaken
Number of plumbing inspections undertaken for the period, as per construction requirements
Monitor number Inspection Folders (Outlook)
Monthly
#3131094 Water & Waste Page 10 of 34
BUSINESS SERVICES – TRADE WASTE
Operating Initiatives Relevant linkage(s) Completion Date 1. Establish a reporting methodology for Breaches & Non Compliance Inspections 6.2 June 2012
Outputs Title Description Customer(s) Corporate
Objectives/Notes Result Measures
1. Trade waste Inspections Trade waste inspections undertaken for compliance with the relevant regulations and Trade Waste policy
Trade Waste Generators 1.5, 4.1
1a. Trade waste inspections undertaken
2. Trade Waste Investigations
Trade Waste investigations undertaken to identify illegal discharges into wastewater treatment plants and sewer systems
Trade Waste Generators 1.5, 4.1
1a. Trade waste inspections undertaken
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Number of Trade Waste
inspections undertaken Number of trade waste inspections undertaken for the period
All inspections undertaken on anniversary date of application
Inspection Folders (Outlook and Authority)
Monthly
2. Number of sewer investigations undertaken
Number of sewer investigations undertaken for the period
Inspections undertaken as requested
Inspection Folders (Outlook)
Monthly
#3131094 Water & Waste Page 11 of 34
BRANCH: OPERATIONS Mission: To operate and maintain reliable Water and Wastewater treatment facilities and reticulation networks. Officer Responsible: Operations Manager Staffing Level (FTE) 185
Outputs / services Title Description Customer(s) Corporate
Objective/Note Result Measures
Performance Management for: • Water Treatment • Water Reticulation • Wastewater Treatment • Wastewater Reticulation
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager Monthly Report Completeness
Financial Summary 11/12 Budget
Revenue 116,337,493
Expenses 83,067,339
#3131094 Water & Waste Page 12 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency Monthly Report Completeness Assess reports to check that they include
cumulative data on “Activity” performance vs output
100% complete MMS Monthly
#3131094 Water & Waste Page 13 of 34
OPERATIONS – WATER SERVICES - RETICULATION Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Potable Water - Reticulation
Connections to the Regional water supply system; supply of potable water to a quality equal to or better than the Australian Drinking Water Guidelines; water supply systems include: • Minor Rural Supply Systems • Distribution Network
Public 4.6; 4.1 Monthly
2. Infrastructure Maintenance - Reticulation
Maintenance of water infrastructure to service demands; principle assets are: • Rural Intakes • Numerous Pump Stations • Distribution Network • Reservoirs
Public, CRC 4.4 Monthly
3. Asset Information Supply of Asset information on underground assets for the purpose of locating utilities
Public, CRC, General Customers 4.4
Monthly % Completion
Rate based on availability and reliability of requested information.
#3131094 Water & Waste Page 14 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Water Supply Quality –
Urban & Rural 100% Compliance (cumulative annual target)
NATA Certified Lab Results Monthly
a. eColi 100% 0 per 100mL Water Quality Testing Monthly b. Turbidity 95% < 5 NTU Water Quality Testing Monthly c. pH 98% within 6.0 – 8.5 Water Quality Testing Monthly d. Colour 98% < 15 colour units Water Quality Testing Monthly
e. Drinking Water Quality Complaints per 1000 Connections / Year
< 10 per 1000 connections (cumulative annual target)
Computerised Maintenance Management System (CMMS), CRM
Monthly
f. Drinking Water Quality Incidents / Year < 15 per year CMMS, CRM Annually
2. Continuity of Service Measures 100% compliance with Customer Charter Operational Data Monthly
a. Mains Breaks per 100km / Year 17.9 CMMS, CRM Monthly
b. Restoration of Services within 5 hours for unplanned interruptions
95% CMMS, CRM Monthly
c. Number of Customers affected by unplanned interruptions per annum
TBA CMMS, CRM Monthly
d. Maximum water pressure at boundary (Class 1 buildings)
500 KPA Demand Management Monthly
e. Minimum water pressure expectation at boundary
220 KPA Customer Service Standards As Requested
#3131094 Water & Waste Page 15 of 34
OPERATIONS – WASTEWATER SERVICES - RETICULATION
Mission: To minimise the operational costs of sewerage service delivery while maintaining agreed service standards Officer Responsible: Wastewater Services Coordinator Staffing Level (FTE) 42
Operating Initiatives Relevant linkage(s) Completion Date
1. Develop a ten (10) year cycle for Inflow/ Infiltration Inspections Corporate Plan 10.2.1 June 2016
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Treated Wastewater Connection to Regional Sewer System; Production of a high quality final effluent
Regulatory Agencies, Public
1.5
Regulatory compliance as defined in License #5010000159.
2. Infrastructure Maintenance
Maintenance of wastewater infrastructure to service demands; Principal assets to be maintained include: • Freshwater discharge points (2) • Pumping Stations (240) • Sewerage mains (1,750,km)
Public 4.4 Service response measures.
3. Sewer Overflow or Blockage Responses
Response time to notified sewer blockages or overflows Public 1.5 Service response
measures.
4. Complaint Responses Response time to complaints received relating to the sewer network or treatment plants
Public 1.1; 1.2; 1.3 Service response measures.
#3131094 Water & Waste Page 16 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Regulatory Compliance
a. Odour Complaints Number of Odour complaints recorded per 1000 connections
<3 per 1000 connections MMS Monthly
b. Number of Overflows Number of Overflows recorded per 100Km of main
<15 per 100Km MMS Monthly
2. Service Response a. Service Response Priority 1 events when service restored
within 5 hours >95% MMS Monthly
b. Service Response Priority 1 events when service restored within 1 hour
>95% MMS Monthly
c. Sewer Blockages
Number of blockages recorded per 100Km of main
<10 per 100Km MMS Monthly
#3131094 Water & Waste Page 17 of 34
OPERATIONS – TREATMENT
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Potable Water - Treatment
Connections to the Regional water supply system; supply of potable water to a quality equal to or better than the Australian Drinking Water Guidelines; water supply systems include: • Freshwater Supply System • Behana Creek Supply System • Mossman & Port Douglas Supply System• Daintree Supply System • Whyanbeel Supply System
Public 4.1 Monthly
2. Treated Wastewater Connection to Regional Sewer System; Production of a high quality final effluent 1.5
#3131094 Water & Waste Page 18 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting Frequency 1. Freshwater Treatment
Plant efficiency Utilise 100% of water through plant
Water Production Reports Monthly
2. Mossman Treatment Plant efficiency Utilise 100% of water
through plant Water Production Reports Monthly
3. Daintree Treatment Plant efficiency Utilise 100% of water
through plant Water Production Reports Monthly
4. Whyanbeel Treatment Plant efficiency Utilise 100% of water
through plant Water Production Reports Monthly
5. Compliance with Extraction Licence requirements
100% Compliance Operational data Monthly
6. Treated Wastewater Connection to Regional Sewer System; Production of a high quality final effluent
Regulatory Agencies (EPA), Public
Regulatory compliance as defined in License #5010000159.
Monthly
7. Infrastructure Maintenance
Maintenance of wastewater infrastructure to service demands; Principal assets to be maintained include:
- Major Treatment Plants (8) - Estuarine discharge points (6) - Freshwater Treatment Plant - Mossman Treatment Plant - Daintree Treatment Plant - Whyanbeel Treatment Plant
Public Continuity of Service. Monthly
#3131094 Water & Waste Page 19 of 34
ENGINEERING AND MAINTENANCE Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measure
1. Reliability and Availability assets Ensure reliable operation of Assets Operations 4.4 Reliability and
Availability Rates
2. Review of assets
Review of assets to current Australian Standards; Condition monitoring and assessment of water, wastewater and waste assets.
Operations 4.4
% of assets for which condition assessments are current
3. Preventative maintenance Undertake preventative maintenance to reduce unplanned interruptions to asset performance
Operations 4.4 Level of unplanned maintenance
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Reliability and Availability
Rates Equipment availability at a parent asset level 98% of equipment available
Maintenance Management System Monthly
2. Review of assets Asset Information updated in Matman 100% Above ground assets MMS Annually
3. Preventative maintenance Completion rate of planned maintenance activities
<80% of all Preventative Maintenance work generated
MMS Monthly
#3131094 Water & Waste Page 20 of 34
BRANCH: INFRASTRUCTURE
MANAGEMENT AND ADMINISTRATION SUPPORT
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Management of Branch performance including;
- Project Delivery - Planning & Design - Asset Management - Administration Support
Report monthly the measurable outputs of the unit against Corporate and legislative requirements.
General Manager – CRW&W CRW&W - Operations
6.2 1a.Branch operating
performance within Operating Budget 1b. Timeliness of Branch operating initiative completion 1c. Branch Safety Performance
Mission: To effectively plan, manage and deliver the region’s Utility Infrastructure to meet the needs of the community to ensure a sustainable future
Officer Responsible: Staffing Level (FTE) 38
Financial Summary 11/12 Budget
Revenue 6,359,724
Expenses 5,498,071
#3131094 Water & Waste Page 21 of 34
2. Promote continuous improvement and skill development of staff
Apply continuous improvement principles to processes within Infrastructure branch. Training development plans agreed and implemented
Branch staff 6.4 Processes mapped and continuous improvement applied Training development plans completed
3. Capital Works Program Management
- Development of 10 Year Capital Works Program and Annual Capital Works Program
- Review and performance reporting of Annual Capital Works Programs
General Manager - CRW&W
6.2 Timeliness of the development and quarterly review of Annual Capital Works Program. Annual review of the 10 year Capital Works Program Completion of Annual Capital Works Program (Actual & Committals Expenditure)
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1a. Branch operating budget
Provision of services within resourcing allowed
Expenditure for the Department in the range of 0% to 5% under budget
Oracle Financials Monthly
1b. Operating Initiative All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update Monthly
1c. Branch Safety Performance
Safety performance of the Department as measured by the Lost Time Injury Frequency Rate and the Lost Time Injury Duration Rate.
Lost Time Injury Frequency Rate – improving relative to the Department's 3 year average
WH&S Statistics – Monthly WH&S report Monthly
#3131094 Water & Waste Page 22 of 34
Adoption of 10 Year and Annual Capital Works program by Corporate deadlines
Council Report Annual
Review (cost, time) of Annual Capital Works Program
Financial Reports and Branch reports Quarterly
3. Development and quarterly review of annual Capital Works Program
Delivery of adopted annual Capital Works Program within forecasted time and budget
80% completion of Annual Capital Works Program by end of financial year
Financial Reports and Branch reports Monthly
INFRASTRUCTURE – PROJECT DELIVERY
Operating Initiatives Relevant linkage(s) Completion Date
1. Construction of new reservoir at Bellenden Ker Corporate Goal 4 TMP Sub Plan 10 June 2012
2. Commence construction of Behana Creek Fluoride Treatment Plant Corporate Goal 4 TMP Sub Plan 10
June 2012
3. Implementation of Smart Metering in Port Douglas Corporate Goal 4 TMP Sub Plan 10 June 2012
#3131094 Water & Waste Page 23 of 34
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water, Wastewater and Waste Asset Project Delivery
- Project delivery and contract administration for Water, Wastewater and Waste assets
Operations (Water & Wastewater), Waste Services
4.1 Capital Projects delivered to the brief and delivered on time
2. Demand Management Implementation of Demand Management Initiatives
General Manager CRCW&W
4.2 Compliance and effectiveness of Demand Management Strategy Program
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Capital Projects delivered
to the brief and delivered on time
Capital Projects are delivered within budget Capital Works expenditure within 80% of YTD forecasted budget
Capital budget report Monthly
Timeliness based on meeting initiative completion dates as per Demand Management Strategy
100% completed by date - Project Plans - Capital Works
Program
2. Compliance and effectiveness of Demand Management Strategy Program Effectiveness based on achieving
consumption and non-revenue water targets as per Demand Management Strategy
Target consumption and non-revenue water as per Demand Management Strategy
- Consumption Data - District Metering data - Production Data
Bi-Annual
#3131094 Water & Waste Page 24 of 34
INFRASTRUCTURE – PLANNING AND DESIGN
Operating Initiatives Relevant linkage(s) Completion Date 1. Approval of Recycle Water Management Plans for Marlin Coast, Northern and
Mossman WWTP recycle water schemes Corporate Goal 4 TMP Sub Plan 2 June 2012
2. Completion of Marlin Coast WWTP Recycle Water Treatment Plant Design Corporate Goal 4 TMP Sub Plan 2 June 2012
3. Completion of 20 year Dam Safety Review for the Copperlode Falls Dam Corporate Goal 4 TMP Sub Plan 2
December 2011
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Water, Wastewater and Waste Strategic Infrastructure Planning
Strategic and tactical planning for future infrastructure
Ratepayers 4.4 Infrastructure capacity
2. Development Application Assessment Advice
Advise of Cairns Regional Council Water & Waste requirements in accordance with SPA
Development Assessment
6.5 Timely and accurate advice on Development Applications
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency Water – Source, treatment and distribute to meet design standard. Eg. Safe yield, production capacity, water quality,
100% compliance Planning Reports and Demand monitoring, Operational Reports
Bi-annual 1. Infrastructure capacity satisfies customer service standards
Wastewater – Collection, transport, treatment system capacity exceeds peak design loads
100% compliance Planning Reports and Pump station performance, Operational Reports
Bi-annual
#3131094 Water & Waste Page 25 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency Timely delivery of planning reports to set program deadlines
Cover each wastewater catchment within five year cycle. Develop & utilise a hydraulic model of all of Cairns Regional Council water and wastewater reticulation network.
Internal and external planning reports – captured in DM5
Annual. As per Council endorsement of planning report
Timeliness based on date defined by Development Assessment & Statutory period defined by SPA
90% completed by date Register of Development projects
Quarterly 2. Timely and accurate advice on Development Applications
Accuracy based on number of returns from Development Assessment
Less than 10% Register of Development projects
Quarterly
INFRASTRUCTURE – ASSET MANAGEMENT Operating Initiatives Relevant linkage(s) Completion Date 1. Full implementation of Strategic Asset Management (SAM) module for
underground assets Corporate Goal 4/6 June 2012
2. Review/Develop effective maintenance schedules and KPIs Corporate Goal 4/6 June 2012
#3131094 Water & Waste Page 26 of 34
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Asset Management Plans (AMP) for Water & Waste Infrastructure
An Asset Management Strategy for Water & Waste Infrastructure, including Asset Management Plans (AMP) and the maintenance of asset data for all asset classes.
Operations, Planning & Design, Project Delivery, Business Services.
4.4
Asset Management Plans maintained for all asset classes
2. GIS Strategy for Water & Waste
On going maintenance and co-ordination of Geographic Information System (GIS) Strategy for supporting the operations of Water & Waste in delivering its service target.
Operations, Planning & Design, Project Delivery & Waste Services, Business Services
4.4
Endorsement and Implementation of Spatial Data Strategy
3. Capitalisation of Assets Asset information entered into asset registers with financial information Asset owners 4.4 Capitalisation of
assets
4. GIS Support for Water & Waste
GIS Technical Support Services to Water & Waste
Operations, Planning & Design, Project Delivery & Waste Services and Business Services.
4.4 GIS support provided to customer needs
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Asset Management Plans
maintained for all asset classes
Asset Management plans maintained in accordance with CRW&W Departmental Project Plan
Within 5 year cycle Asset Management Plan; Asset Management data
Annually
2. Endorsement & Implementation of Spatial Data Strategy
Timely delivery of Spatial Data Strategy 90% compliance Spatial Data Strategy Bi-annual
#3131094 Water & Waste Page 27 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 3. Capitalisation of Assets Value of Work In Progress due for
capitalisation 95% all projects capitalised within 7 working days of asset acquisition information being supplied
Work In progress report Oracle Project status
Quarterly
4. GIS support provided to customer needs
Timely and accurate response to requests or set program deadlines for technical support
95% of jobs requested completed within timeframe agreed with customer
IS Portal Quarterly
#3131094 Water & Waste Page 28 of 34
BRANCH: WASTE AND ENVIRONMENTAL MANAGEMENT Mission: To provide cost effective, efficient and sustainable Waste & Environmental Management Services Officer Responsible: Manager Waste & Environment Staffing Level (FTE) 36
Operating Initiatives Relevant linkage(s) Completion Date
1. Review and update Waste Management Strategy 2010-2015 Waste Management Strategy 2010-2015 June 2012
2. Develop a detailed waste business model Waste Management Strategy 2010-2015 June 2012
3. Undertake a review to establish the best value solution for organic waste treatment Waste Management Strategy 2010-2015 February 2012
4. Develop full cost recovery pricing model Waste Management Strategy 2010-2015 June 2012
5. Implement Waste Education & Communication Plan Waste Management Strategy 2010-2015 September 2012
6. Complete Options Analysis for Materials Recovery Facility Waste Management Strategy 2010-2015 September 2011
Financial Summary 11/12 Budget
Revenue 32,449,639
Expenses 32,449,638
#3131094 Water & Waste Page 29 of 34
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Management of Branch performance including:
Waste Services Unit; and Environmental
Management Unit
Report on the Branch’s performance measures at the frequency specified
Commercial and residential waste customers Departmental Branches
6.2 1a. Branch performing within operating budget 1b. Operating initiatives delivered by completion date 1c. Branch safety performance
2. Quality Management & Continuous Improvement
Ensure Quality Management & continuous improvement principles are applied to processes within the Waste & Environment Branch
Branch staff 6.4 Quality management & continuous improvement techniques applied and business processes mapped
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1a. Branch operating budget
Provision of services within resourcing allowed
Expenditure for the Department in the range of 0% to 5% under budget
Oracle Financials Monthly
1b. Operating Initiative completion
All operating initiatives identified in the Operational Plan are planned for completion in the financial year.
90% of initiatives completed by year end
Monthly report status update Monthly
1c. Branch Safety Safety performance of the Department as measured by the Lost Time Injury Frequency Rate and the Lost Time Injury Duration Rate.
Lost Time Injury Frequency Rate – improving relative to the Department's 3 year average.
WH&S Statistics – Monthly WH&S report Monthly
#3131094 Water & Waste Page 30 of 34
WASTE SERVICES – CONTRACT MANAGEMENT
Operating Initiatives Relevant linkage(s) Completion Date 1. Develop and implement a multi-unit dwelling waste and recycling plan and implement
planning conditions for new developments to include waste and recycling systems Waste Management Strategy 2010-2015 June 2012
2. Develop and implement an away from home waste and recycling trial Waste Management Strategy 2010-2015 June 2012
3. Develop and implement the Business Recycling plan to maximise the collection of recyclables
Waste Management Strategy 2010-2015 June 2012
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Waste & Recycling Collection Contract: 75292
Domestic, Council and Commercial waste & recyclables collection
Residents and ratepayers Council internal Branches Commercial businesses
1.4
Services delivered in accordance with the performance criteria specified in the Contract.
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1. Services delivered in accordance with performance criteria specified in the Contract.
Compliance or non compliance with the performance criteria specified in the Contract.
100% compliance with the performance criteria specified in the contract.
Contract Performance Management Committee minutes Reports from the Contractor as specified in the Contract.
Quarterly
#3131094 Water & Waste Page 31 of 34
WASTE SERVICES – WASTE TRANSFER STATION OPERATIONS Operating Initiatives Relevant linkage(s) Completion Date 1. Develop and implement new operational model and communications plan for Buy Back
Shop to maximise patronage and resource recovered from satellite transfer stations Waste Management Strategy 2010-2015
Ongoing – November 2011
2. Implement operational recommendations from Master Plan Waste Management Strategy 2010-2015 June 2012
3. Develop Master Plan for Transfer Stations and Landfills Waste Management Strategy 2010-2015
August 2011
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Efficient and effective waste & recycling transfer stations operation
Identification of opportunities to increase resource recovery at transfer stations
Residents and ratepayers Council internal branches Commercial businesses
1.4 4.4 6.2
Waste diversion rates
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1. Waste diversion Amount of material recovered for reuse or recycling
Establish baseline and increase by 5% annually
Waste statistics data Quarterly
#3131094 Water & Waste Page 32 of 34
WASTE SERVICES – LANDFILL OPERATIONS
Operating Initiatives Relevant linkage(s) Completion Date 1. Investigate the feasibility for conversion of Killaloe landfill operation from
a contractor to Council run facility Waste Management Strategy 2010-2015 December 2011
2. Investigate options for Construction and Demolition waste recycling at Killaloe landfill
Waste Management Strategy 2010-2015 April 2012
3. Investigate the feasibility for conversion of Newell Beach Landfill to a Transfer Station
Waste Management Strategy 2010-2015 September 2011
4. Complete major capital works project for earthworks at Killaloe Landfill Waste Management Strategy 2010-2015 December 2011
5. Implement Post Closure Maintenance Plan for Portsmith Landfill Waste Management Strategy 2010-2015 December 2011
WASTE SERVICES – MATERIALS RECOVERY FACILITY (MRF) Operating Initiatives Relevant linkage(s) Completion Date 1. Integrate maintenance schedules with operations manual in accordance with asset
management requirements Waste Management Strategy 2010-2015
Ongoing – September 2011
2. Develop markets for resale of crushed glass Waste Management Strategy 2010-2015 Ongoing – March 2012
Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Effective and efficient operation of the MRF
Identification of opportunities to increase resource recovery at the MRF
Residents and ratepayers
1.4 4.4
Waste diversion
#3131094 Water & Waste Page 33 of 34
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency
1. Waste diversion Amount of material recovered for reuse or recycling
75% of feedstock processed and sold
MRF weighbridge data Quarterly
#3131094 Water & Waste Page 34 of 34
ENVIRONMENTAL MANAGEMENT Outputs Title Description Customer(s) Corporate
Objective/Notes Result Measures
1. Environmental Management System
Implementation of the Water & Waste Department’s Environmental Management System
General Manager – Water & Waste Water & Waste Branch Managers Residents and ratepayers
1.1 1.3 1.5 1.7 1.8 1.9
Quarterly review of the implementation of the Environmental Management System
2. Water & Waste Environmental Licence Compliance Reports
Environmental Licence compliance reports to the Department of Environmental Resources Management
Operations Staff, Infrastructure Staff, Waste Services, Business Services
4.1 Compliance with environmental licences.
Performance Measurement Result Measures (Title) Result Measure (Description) Result Targets Source of Data Reporting
Frequency 1. Review of the
implementation of the Environmental Management System
Review and evaluate the Environmental Management System suitability, adequacy and effectiveness
Quarterly review of the Environmental Management system by the Water & Waste Management Team
Minutes from the management review meetings
Quarterly
2. Compliance with Environmental Licences Enforcement action taken by DERM Nil enforcement action taken
by DERM
Water and Waste Opportunities for Improvement Register
Monthly