6dpsoh (urvlrq d 6hglphqwdwlrq &rqwuro 3odq mineral and land...¿qdo judgh lv uhdfkhg 7kh sdyhg...

56
7

Upload: others

Post on 19-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7

Page 2: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw
Page 3: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7

Attached is a sample erosion and sedimentation control plan based on one

This sample plan was developed in detail for instructive purposes. The

should select the most practical and effective practices to control erosion and

formation should be included to facilitate review by erosion control personnel. Construction details should be precise and clear for use by an experience

1. brief narrative

3. maintenance plan

6. site development plan

7.1

Page 4: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.2

Page 5: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.3

SAMPLE

EROSION AND SEDIMENTATION CONTROL PLAN

ABC INDUSTRIES, INC.

DEAL, N.C.

SEPTEMBER 1988

TABLE OF CONTENTS

PageNarrative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.4

Construction Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.8

Maintenance Plan. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.9

Vicinity Map. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.9

Site Topographic Map. . . . . . . . . . . . . . . . . . . . . . . . . Exhibit 1

Site Development Plan . . . . . . . . . . . . . . . . . . . . . . . . Exhibit 2

Site Erosion and Sedimentation Control Plan . . . . . . . . . . . . . Exhibit 3

. . . . . . . . . . 7.11

Vegetation Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.30

Supporting Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . 7.33

Financial Responsibility/Ownership Form . . . . . . . . . . . . . . . . . . 7.51

Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.53

Page 6: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.4

NARRATIVE

Project Description

with associated paved roads and parking area. Another building will be added in the

Road (see Vicinity Map).

Site Description

Adjacent Property

Land use in the vicinity is commercial/industrial. The land immediately to the

are undeveloped and heavily wooded, primarily in volunteer pine. Hocutt Creek, the

perennial stream. Sediment control measures will be taken to prevent damage to Hocutt

construction area.

Soils

The soil in the project area is mapped as Creedmore sandy loam in B and C slope

classes. Creedmoor soils are considered moderately well to somewhat poorly drained

in the subsoil.

events. No groundwater problem is expected. The tight clay in the subsoil will make

Page 7: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.5

Planned Erosion and Sedimentation Control Practices

1.

NOTE: The undisturbed areas to the east and north

could have been diverted, but this was not proposed because it would have

required clearing to the property line to build the diversion and the required

supporting calculations.

2. Temporary Gravel Construction Entrance/E

3.

A temporary block and gravel drop inlet protection device will be installed at

NOTE: The presence

4.

NOTE:

to break up this long, potentially erosive slope should the grading operation

be temporarily discontinued. A temporary diversion will be constructed along

supporting calculations.

5.

Page 8: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.6

7.

will be located on the higher cut areas, and the access road and open landscaped

placed in layers not to exceed 9 inches in depth and compacted. (NOTE: Fills

sedimentation control plan.)

8.

road ditch and channel number 3 to protect the road ditch. Approximately 2

9.

10.

Permanent sod drop inlet protection will replace the temporary block and gravel

Page 9: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.7

structure when the contributing drainage area has been permanently seeded and

11.

Buildings A and B to collect and convey site water to the project’s sediment

calculations.

channel to prevent channel siltation.

12.

calculations.

13.

14.

15.

The 3:1 cut slopes will be lightly roughened by disking just prior to vegetating,

reached.

it will be controlled by sprinkling.

Page 10: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.8

CONSTRUCTION SCHEDULE

1. Obtain plan approval and other applicable permits.

construction.

5. Install storm drain with block and gravel inlet protection at construction

entrance/exit.

7. Construct temporary diversions above proposed building sites. Install level

spreader and sediment trap and vegetate disturbed areas.

10. Rough grade site, stockpile topsoil, construct channels, install culverts and

11. Finish the slopes around buildings as soon as rough grading is complete. Leave

vegetate, landscape, and mulch.

15. Install riprap outlet channel and extend riprap to pipe outlet under entrance

road.

vegetation on the disturbed areas.

Page 11: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.9

MAINTENANCE PLAN

once every week. Any needed repairs will be made immediately to maintain all

practices as designed.

sediment pool no longer drains properly.

Gravel will be cleaned or replaced when the sediment pool no longer drains

properly.

maintain a barrier.

vegetative cover.

Page 12: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.10

Page 13: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.11

Page 14: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.12

Page 15: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.13

Page 16: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.14

Page 17: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.15

Page 18: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.16

Page 19: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.17

Page 20: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.18

Page 21: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.19

Page 22: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.20

Page 23: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.21

Page 24: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.22

Page 25: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.23

Page 26: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.24

Page 27: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.25

Page 28: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.26

Page 29: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.27

Page 30: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.28

Page 31: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.29

Page 32: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.30

VEGETATIVE PLAN

Seedbed Preparation (SP)

seedings)

roots, large clods and other debris to remain on the slope.

the slope.

3) Spread lime evenly over slopes at rates recommended by soil tests.

contour.

3) Loosen the subgrade immediately prior to spreading topsoil by disking or

1) Remove rocks and debris.

tiller.

Page 33: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.31

Seeding Methods (SM)

2

1) Broadcast seed at the recommended rate with a cyclone seeder, drop

spreader, or cultipacker seeder.

2) Rake seed into the soil and lightly pack to establish good contact.

Mulch (MU)

2 grain straw, cover

2

2 (4,000 lb/acre) grain straw and tack with 0.1 gal/yd2

2).

Install excelsior mat in the channel, extend up the channel banks to the

2 grain straw and anchor with 0.1

gal/yd2 2) asphalt.

Maintenance (MA)

desired.

2

2). Mow regularly to

2

Page 34: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.32

TABLE 1:

VEGETATIVE PLAN1

Area

No.2

Description

Season3

Seeding Mixture

Seedbed

Prepara-

tion

Seeding

Method

Mulch

Mainte-

nance

Notes

Permanent

Temporary

lb/ac

lb/ac

1Steep

slopes

maintenance

Spring

or

Bahiagrass

25

Rye grain

40

Permanent mixture also

areas (4).

Overseed

winter plantings

complete.

Summer

German millet40

Winter

Rye grain

120

2maintenance

Spring

Rye grain

120

increase rate to 250

lb/ac.

Temp. seeding

Summer

German millet40

Fall

Winter

Rye grain

120

3Grassed

channels

with side

slopes 3:1

Spring

Rye grain

40

Summer

German millet

10

4maintenance

areas

Spring

or

Fall

Bahiagrass

25

Rye grain

40

For temporary seeding

5 below.

temporary diversions.

Summer

Bermudagrass

15

German millet

10

Winter

Rye grain

120

5Areas

requiring

less than 1

year

Spring

Rye grain

120

Treat temporary

maintenance, permanent

(area 4)

Include topsoil

stockpiles here

Summer

German millet40

Fall &

Winter

Rye grain

120

1 2Area numbers are designated on map.

3

Page 35: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.33

SUPPORTING CALCULATIONS

RUNOFF CALCULATIONSMethod: Peak Discharge Method SCS Technical Release No. 55, Urban Hydrology

NOTE: Other acceptable methods such as Rational Method may also be used.

Calculate peak runoff rate for site during development--Design point outlet at northwest property corner.

1) Site location: South Granville County

construction area at outlet in N.W. corner

land.

1. Weighted curve number (CN) (Table 8.03b)

Land Use Percent CN ProductNewly graded 93 58.13

good cover 37.5 70

100.0 84.38

Weighted CN = 84.38, use 85.

4. Calculate Peak Discharge Rate

be made.

Q2,24

Q10,24

Page 36: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.34

(Exhibit 4).

(Table 8.03d):

Q2,24

Q10,24

and open land.

10,24

TotalQ10,24

Page 37: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.35

SEDIMENT BASIN DESIGN

10,24.

10,24

2. Determine basin volume:

3 3.

2) 3)338339340341342343

320054009000

1140013300

0.51.52.53.54.55.5

8005,10012,300

32,10044,450

3

requirement.

Qmin

NOTE

operation.

Qpipe

Determine riser requirement. From Figure 8.07b, riser: 21 in. diameter

riser = 17

riser > Q

pipe

Page 38: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.36

5. Emergency Spillway Design

a) Capacity Qe

= Q10,24 p

Qe

NOTE

Hp

c) Antiseep collars

2 3 = 1078 lb 4

Use concrete 1 3 or approx. 1/2 yd3 = 1140 lbs.

1

7. Dewatering the basin:

9. Embankment design:

grading to 344.5 at abutments.

slopes.

Page 39: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.37

GRASS LINED CHANNELSProcedure given in Appendices 8.05 used in design.

1. Channel #1

in dimensions, grade, and appearance the upper reach will not be designed

Area = 1.9 acre

Q10,24

For design purpose Q10,24

c) Proposed vegetation: Tall Fescued) Soil: Creedmore (easily erodible)e) Permissible velocity: (V

p

Vp

2

Z = 3A = bd + Zd2

2+1An iterative solution using Figure 8.05c to relate hydraulic radius depth

velocities.

Page 40: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.38

2) n Comments

0.8 4.32 0.54 0.043 3.25 14.0V<V

p 10, too

small, try deeper channel

0.9 5.13 0.59 0.042 3.53 18.1 V<Vp 10

2) Vt

n Comments

1.5 11.25 0.90 3.0 0.08 2.5

reduce trial V 2.0 0.11 1.8

0.12 18.4 Q>Q10

construction. This reduces the contributing drainage area when evaluating

Area = 1.4 acre

Vp

Q2,24

2,24

2,24

Using Manning’s equation:

b 2) Comments3 0.40 5.53 0.304 8.00 Q > Q

2

V >Vp, needs

protection

2

3)

2

d = 1.45 (Table 8.05g)

Page 41: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.39

b 2) 2) Comments3 2.88 0.42 10.3 0.75 T<T

d Q>Q

2

where Td =

allowableshear stress

Channel Summary:

Temporary liner: straw with net

2. Channel #3

construction because diversion may be removed when construction is complete.

Q10,24

c) Proposed vegetative cover: Tall Fescued) Soil: Creedmore (easily erodible)

By the same method as channel #1:

Description 2) Q (cps) Commentscut (D) 3.0 1.2 7.42 0.748 2.7 21.1 Q > Q

10, V < V

p

uncut (B) 3.0 1.7 13.77 1.00 1.0 13.8 Q > Q10

h) Evaluate Temporary Liner Requirements:

channel will be protected by a temporary diversion, the drainage area

2,24 = 3.7

A 2) Comments0.32 1.27 0.25 Q>Q

2, V>V

p, needs

protection

liner.

i. Calculate shear stress in channel at depth associated with Q2,24.

2

net will

Page 42: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.40

Channel #3 Summary:

Temporary liner: straw with net

3. Channel #2

Area = 0.8 acres

Q10,24

Because diversion will protect entire channel during construction, overland

2,24

Q10,24

c) Proposed vegetative cover = Tall Fescued) Soil: Creedmore (easily erodible)

Description d 2) Commentscut (D) 2.0 1.0 5.00 14.5 2.90 Q > Q

10, V < V

p

uncut (B) 2.0 1.4 0.80 8.19 0.94 Q > Q10

h) Evaluate temporary liner requirements: Not necessary, negligible Q2

Channel #2 Summary:

Temporary liner: none required.

establishment. However, since all other channels need temporary liner (mulch

4. Channel #4

Area = 0.75 acre

Q10,24

d) Soil: Creedmore (easily erodible)

Page 43: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.41

By same method as channel #1:

Description 2) R Q (cps) Commentscut (D) 2.0 1.00 5.00 1.95 9.75 Q>Q

10, V

p

uncut (B) 2.0 1.7 12.1 0.95 7.3 Q>Q10

h) Evaluate temporary liner requirements:

Q2,24

2) Comments0.35 1.07 0.25 3.10 3.32 Q>Q

2, V>V

p, needs

protection

2,24 conditions.

2

seeding, and will be consistent with channels #1 and #3.

Temporary liner: straw with net

1NOTEother channels even though design only requires a 2.0’ bottom width.

RIPRAP CHANNELS

Area = 3.74 acres

Q10,24

Channels Q10,24

214

10,24

Page 44: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.42

c) Proposed liner: riprap

d

Channel dimensions:

2) n S1.2 10.1 0.044 77.3

e) Determine riprap requirements

3)

Since Td

50, = 12 in. From Table 8.05g T

d

2) 2) Comment8 1.2 12.48 0.93 72.3 4.5 Q>Q

10, T<T

d

Since the side slopes are steeper than 3:1, the d50 must be adjusted:

0.78.

50 =

2 = 0.74.

Adjustment:d50 = d

50 1 2

max = 1.5 x d

50

below1.5 x d

max

Outlet Stability Evaluation:

Page 45: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.43

CULVERT DESIGNS

Q25

Slope (So

Culvert type: RCP Groove end headwall

n = 0.012

n = 0.07 Channel slope (S

o

Tailwater (TW25

2) Culvert #1 – under road to parking lot

Q25

Slope (So

Culvert type: RCP Groove end headwall

n = 0.012 Tailwater (TW

25

culvert.

Page 46: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.44

3) Culvert #3 – under entrance road

Q25

Slope (So

Culvert type: RCP Groove end headwall

n = 0.012 Tailwater (TW

25

culvert.

1NOTE

Page 47: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.45

Page 48: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.46

Page 49: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.47

Page 50: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.48

RIPRAP OUTLET PROTECTION

QDesign

Pipe diameter = 15 inches

d50

dmax = 1.5 x d

50

max = 9 inches = Use 1.0’

culvert #2)

QDesign

Pipe diameter = 30 inches

d50

dmax = 1.5 x d

max = 9 inches

max

QDesign

Pipe diameter = 24 inches

basin. Use Class B erosion control stone or D.O.T. class 2 riprap. (Same as riprap channel)

NOTEmovement.

SEDIMENT TRAP

Page 51: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.49

c) Trap capacity:

3 3

allows the pool to drain.

3

d) Embankment:

abutments

e) Stone outlet section:

Side slopes: 2:1 and 21 inches thick

50 = 9 inches, d

max

TEMPORARY DIVERSIONS

Diversion #1

Drainage area: 1.8 acresLand use: woodsSoil hydrology group: CQ10,24

2

QA

QA>Q

10,24 selected cross section is ok

Diversion #2

Drainage area: 1.2 acresLand use: woodsSoil hydrologic group: CQ10,24

Page 52: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.50

Use same minimum cross section as diversion #1.

2

QA

QA>Q

10,24 selected cross section is ok

Page 53: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.51

Page 54: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.52

Page 55: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw

7.53

Page 56: 6DPSOH (URVLRQ D 6HGLPHQWDWLRQ &RQWURO 3ODQ Mineral and Land...¿qdo judgh lv uhdfkhg 7kh sdyhg urdg orfdwhg rq wkh ¿oo zloo eh vorshg wr wkh vrxwk dqg zloo ixqfwlrq dv d shupdqhqw