610 10th Ed Datasheets (SI)

Download 610 10th Ed Datasheets (SI)

Post on 10-Nov-2014

120 views

Category:

Documents

3 download

Embed Size (px)

DESCRIPTION

API 610 datasheet

TRANSCRIPT

<p>PAGE</p> <p>1</p> <p>OF</p> <p>CENTRIFUGAL PUMP API 610 10TH EDITION / ISO 13709 PROCESS DATA SHEET SI UNITS1 APPLICABLE TO: 2 FOR 3 SITE 4 NOTES: INFORMATION BELOW TO BE COMPLETED: 5 6 7 PUMP 8 MOTOR 9 GEAR 10 TURBINE 11 APPLICABLE OVERLAY STANDARD(S): 12 13 FLOW, NORMAL 14 OTHER 15 15 SUCTION PRESSURE MAX./RATED 16 DISCHARGE PRESSURE 17 DIFFERENTIAL PRESSURE 18 DIFF. HEAD (m)NPSHA</p> <p>JOB NO. REQ. / SPEC. NO. PURCH. ORDER NO.INQUIRY NO.</p> <p>ITEM NO.(S)</p> <p>/DATE BY</p> <p>PROPOSALS</p> <p>PURCHASE</p> <p>AS BUILT UNIT SERVICE BY PURCHASER DATA SHEETS BY MANUFACTURER BY MANUFACTURER OR PURCHASER REVISIONS ITEM NO. ATTACHED NO. DATE BY</p> <p>ITEM NO.</p> <p>ATTACHED</p> <p>ITEM NO.</p> <p>ATTACHED</p> <p>1 2 3 4 5LIQUID (5.1.3) (m3/h) LIQUID TYPE OR NAME HAZARDOUS FLAMMABLE (5.1.5) OPERATING CONDITIONS (5.1.3) (m3/h) RATED</p> <p>/</p> <p>(MPa) (MPa) (MPa) (m) PUMPING TEMP (C) VAPOUR PRESS. (MPa) RELATIVE DENSITY (SG): VISCOSITY (mPas) SPECIFIC HEAT, Cp</p> <p>MIN.</p> <p>NORMAL</p> <p>MAX.</p> <p>19 PROCESS VARIATIONS (5.1.4) 20 STARTING CONDITIONS (5.1.4) 21 SERVICE: 22 23 24 24 LOCATION: (5.1.30) 25 26 27 28 INDOOR HEATED OUTDOOR UNHEATED CONT. INTERMITTENT (STARTS/DAY) SITE DATA (5.1.3) PARALLEL OPERATION REQ'D (5.1.13)</p> <p>(kJ/kgK) (mg/kg) (mol fraction)W ET (5.12.1.12c)</p> <p>CHLORIDE CONCENTRATION (6.5.2.4) H2S CONCENTRATION CORROSIVE / EROSIVE AGENT MATERIALS (5.12.1.1) ANNEX H CLASS (5.12.1.1) MIN DESIGN METAL TEMP (5.12.4.1) REDUCED-HARDNESS MATERIALS REQ'D. (5.12.1.12) BARREL/CASE CASE/IMPELLER WEAR RINGS IMPELLER</p> <p>(5.12.1.9)</p> <p>ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) CL GR DIV TROPICALIZATION REQ'D.</p> <p>(C)</p> <p>WINTERIZATION REQ'D</p> <p>29 SITE DATA (5.1.30) 30 31 ALTITUDE (m) BAROMETER / (MPa) (C)</p> <p>SHAFT DIFFUSERSPERFORMANCE:</p> <p>RANGE OF AMBIENT TEMPS: MIN./MAX.</p> <p>32</p> <p>RELATIVE HUMIDITY:</p> <p>MIN. / MAX. DUST</p> <p>/ FUMES</p> <p>(%) PROPOSAL CURVE NO. IMPELLER DIA. RATED IMPELLER TYPERATED POW ER</p> <p>33 UNUSUAL CONDITIONS: (5.1.30) 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 54 BEARINGS (TYPE/NUMBER): 55 56 57 58 59 60 RADIAL THRUST VERTICAL THRUST CAPACITY UP (N) DOWN / / FRAME HORIZONTAL VERTICAL / MANUFACTURER (kW) INDUCTION MOTOR OTHER</p> <p>r/min MAX. MIN. (mm)</p> <p>(kW ) EFFICIENCY</p> <p>(%) (m3/h)</p> <p>DRIVER TYPESTEAM TURBINE</p> <p>MINIMUM CONTINUOUS FLOW:</p> <p>GEAR</p> <p>THERMAL PREFERRED OPER. REGION ALLOWABLE OPER. REGION</p> <p>(m3/h)</p> <p>STABLE TO TO</p> <p>OTHERMOTOR DRIVER (6.1.1 / 6.1.4)</p> <p>(m3/h) (m3/h) (m) (kW) (m) (5.1.10) (5.1.11) (dBA) (5.1.16) (dBA) (5.1.16) (dBA) (5.1.16)</p> <p>MAX. HEAD @ RATED IMPELLER MAX. POWER @ RATED IMPELLER (r/min) NPSHR AT RATED FLOWMAX. SUCTION SPECIFIC SPEED:</p> <p>ENCLOSURE SERVICE FACTOR /</p> <p>MAX. SOUND PRESS. LEVEL REQ'D EST. MAX. SOUND PRESS. LEVEL EST. MAX. SOUND POWER LEVELUTIL ITY CONDITIONS (5.1.3)</p> <p>VOLTS/PHASE/HERTZ TYPE</p> <p>MINIMUM STARTING VOLTAGE (6.1.5) INSULATION FULL LOAD AMPS LOCKED ROTOR AMPS STARTING METHOD LUBE STEAMDRIVERS HEATING MAX. PRESS.</p> <p>TEMP. RISE</p> <p>ELECTRICITYDRIVERS HEATING SYSTEM VOLTAGE DIP</p> <p>VOLTAGE</p> <p>PHASE</p> <p>HERTZ</p> <p>80%MAX. TEMP.</p> <p>OTHER</p> <p>(6.1.5)</p> <p>MIN. PRESS.</p> <p>MIN. TEMP.</p> <p>COOLING WATER: (5.1.19) SUPPLY TEMP. (N) NORM. PRESS. MIN. RET. PRESS. CHLORIDE CONCENTRATION:</p> <p>SOURCE (C) (MPa) (MPa) MAX. RETURN TEMP. DESIGN PRESS. MAX. ALLOW. D.P. (C) (MPa) (MPa) (mg/kg)</p> <p>PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63REMARK S</p> <p>2</p> <p>OF</p> <p>PAGE</p> <p>3</p> <p>OF</p> <p>CENTRIFUGAL PUMP DATA SHEET API 610 10TH EDITION / ISO 13709 SINGLE STAGE OVERHUNG (TYPE OH) SI UNITS1CONSTRUCTION</p> <p>JOB NO. REQ. / SPEC. NO. PURCH. ORDER NO.INQUIRY NO.</p> <p>ITEM NO.(S)</p> <p>/DATE BY</p> <p>SURFACE PREPARATION AND PAINT</p> <p>2 ROTATION: (VIEWED FROM COUPLING END) 3 PUMP TYPE: (4.1) 4 OH2 OH3 OH6 OTHER</p> <p>CW</p> <p>CCW</p> <p>MANUFACTURER'S STANDARD SPECIFICATION NO. PUMP: PRIMER</p> <p>OTHER (SEE BELOW)</p> <p>5 CASING MOUNTING: 6 7 8 CASING TYPE: 9 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER</p> <p>CENTERLINE</p> <p>IN-LINE</p> <p>OTHER</p> <p>FINISH COAT BASEPLATE: (6.3.17) PRIMER FINISH COAT DETAILS OF LIFTING DEVICES(6.3.20) SHIPMENT: (7.4.1) DOMESTIC EXPORT EXPORT BOXING REQUIRED</p> <p>10 CASE PRESSURE RATING: 11 12 13 14 15 16 17 18 SUCTION 19 DISCHARGE 20 21 22 23 24 25 26 27 28 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) CYLINDRICAL THREADS REQUIRED (5.4.3.3) DRAIN VENT WARM-UP PRESSURE CASING AUX. CONNECTIONS: (5.4.3) NO. SIZE (DN) TYPE OH6 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) MAX. ALLOWABLE WORKING PRESSURE @ (C) (MPa) (MPa)</p> <p>OUTDOOR STORAGE MORE THAN 6 MONTHS SPARE ROTOR ASSEMBLY PACKAGED FOR: HORIZONTAL STORAGE FAC'G POSITION TYPE OF SHIPPING PREPARATIONHEATING AND COOLING</p> <p>HYDROTEST PRESSURE NOZZLE CONNECTIONS: (5.4.2) SIZE FLANGE RATING</p> <p>VERTICAL STORAGE</p> <p>HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D. COOLING WATER (C.W.) PIPING PLAN (6.5.3.1)C.W. PIPING:</p> <p>PIPE</p> <p>TUBING;</p> <p>FITTINGS</p> <p>C.W. PIPING MATERIALS: S. STEEL C. STEELGALVANIZED</p> <p>COOLING WATER REQUIREMENTS: BEARING HOUSING HEAT EXCHANGER TOTAL COOLING WATER HEAT MEDIUM: HEATING PIPING: MODEL STEAM TUBING OTHER PIPE (m3/h) (m3/h) (m3/h)</p> <p>29 ROTOR: 30 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) 31 COUPLINGS:(6.2.2) 32 33 34 35 36 37 38 39 40 41 MANUFACTURER RATING (kW per 100 r/min) SPACER LENGTH (mm) SERVICE FACT.</p> <p>BEARINGS AND LUBRICATION</p> <p>BEARING (TYPE/NUMBER) (5.10.1): RADIAL THRUST LUBRICATION (5.11.3, 5.11.4): GREASE PURGE OIL MIST ASME B15.1 OIL PURE OIL MIST / /</p> <p>COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11) COUPLING PER ISO 14691 (6.2.4) COUPLING PER ISO 10441 (6.2.4) COUPLING PER API 671 (6.2.4)</p> <p>CONSTANT LEVEL OILER PREFERENCE (5.10.2.2): OIL VISC. ISO GRADE (6.2.14a)INSTRUMENTATION</p> <p>NON-SPARK COUPLING GUARD (6.2.14c) COUPLING GUARD STANDARD PER</p> <p>42 BASEPLATES: 43 44 45 API BASEPLATE NUMBER NON-GROUT CONSTRUCTION (6.3.13) OTHER (ANNEX D)</p> <p>ACCELEROMETER (6.4.2.1) PROVISION FOR MOUNTING ONLY (5.10.2.11) FLAT SURFACE REQ'D (5.10.2.12) TEMP. GAUGES (WITH THERMOWELLS) (8.1.3.6) PRESSURE GAUGE TYPE</p> <p>46 MECHANICAL SEAL: (5.8.1) 47 48 49 50 51 52 53 54 55 SEE ATTACHED ISO 21049/API 682 DATA SHEET</p> <p>REMARKS:</p> <p>MASSES (kg) PUMP BASEPLATE DRIVER TOTAL</p> <p>PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22OTHER PURCHASER REQUIREMENTS SPARE PARTS (TABLE 18)</p> <p>4</p> <p>OF</p> <p>QA INSPECTION AND TESTING (CONT.)</p> <p>START-UP</p> <p>NORMAL MAINTENANCE</p> <p>TEST HYDROSTATIC (7.3.2) PERFORMANCE (7.3.3) RETEST ON SEALLEAKAGE (7.3.3.2d)</p> <p>NON-WIT</p> <p>WIT</p> <p>OBSERVE</p> <p>COORDINATION MEETING REQUIRED (9.1.3) MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) MAX RELATIVE DENSITY MAX DIA. IMPELLERS AND/OR NO. OF STAGES OPERATION TO TRIP SPEED OH3 BEARING HS6 LIFTER (8.1.2.6) CONNECTION DESIGN APPROVAL (5.12.3.4) TORSIONAL ANALYSIS REQUIRED (5.9.2.1) TORSIONAL ANALYSIS REPORT (5.9.2.6) PROGRESS REPORTS (9.3.3) OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.1.1f)PIPING AND APPURTENANCES</p> <p>NPSH (7.3.4.2) TRUE PEAK VELOCITY DATA (7.3.3.4d) COMPLETE UNIT TEST (7.3.4.3) SOUND LEVEL TEST (7.3.4.4) CLEANLINESS PRIOR TO FINAL ASSEMBLY (7.2.2.2) NOZZLE LOAD TEST (6.3.6) CHECK FOR CO-PLANAR MOUNTING PAD SURFACES (6.3.3) MECHANICAL RUN UNTIL OIL TEMP. STABLE (7.3.4.7.1) 4 h MECHANICAL RUN AFTER OIL TEMP. STABLE (7.3.4.7.3) 4 h MECH. RUN TEST(7.3.4.7.2) BRG HSG RESONANCE TEST (7.3.4.6)</p> <p>MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) VENT DRAIN COOLING WATER</p> <p>MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) INSTALLATION LIST IN PROPOSAL (9.2.3L)</p> <p>23 CONNECTION BOLTING 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 PTFE COATING PAINTED ASTM A 153 GALVANIZED SSQA INSPECTION AND TESTING</p> <p>AUXILIARY EQUIPMENT TEST (7.3.4.5) IMPACT TESTING (5.12.4.3) PER EN 13445 PER ASME VIII</p> <p>SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPROVAL TEST WITH SUBSTITUTE SEAL (7.3.3.2b) MATERIAL CERTIFICATION REQUIRED (5.12.1.8) CASING OTHER CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) MAG. PARTICLE RADIOGRAPHIC LIQUID PENETRANT ULTRASONIC IMPELLER SHAFT</p> <p>VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5) VENDOR SUBMIT TEST DATA WITHIN 24 h (7.3.3.3e) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3) SUBMIT INSPECTION CHECK LIST (7.1.6)</p> <p>INSPECTION REQUIRED FOR CASTINGS (7.2.1.3 / 5.12.1.5) MAG. PARTICLE RADIOGRAPHIC HARDNESS TEST REQUIRED: ADDITIONAL SUBSURFACE EXAMINATION FOR 7.2.1.3 FOR METHODREMARKS</p> <p>LIQUID PENETRANT ULTRASONIC (7.2.2.3)</p> <p>PAGE</p> <p>3</p> <p>OF</p> <p>CENTRIFUGAL PUMP DATA SHEET API 610 10TH EDITION / ISO 13709 BETWEEN BEARINGS (TYPE BB) SI UNITS1CONSTRUCTION CW CCW</p> <p>JOB NO. REQ. / SPEC. NO. PURCH. ORDER NO.INQUIRY NO.</p> <p>ITEM NO.(S)</p> <p>/DATE BYSURFACE PREPARATION AND PAINT</p> <p>2 ROTATION: (VIEWED FROM COUPLING END) 3 PUMP TYPE: (4.1) 4 BB1 BB2 BB3 BB5</p> <p>MANUFACTURER'S STANDARD SPECIFICATION NO. PUMP: PUMP SURFACE PREPARATION</p> <p>OTHER (SEE BELOW)</p> <p>5 CASING MOUNTING: 6 7 CENTERLINE FOOT NEAR CENTERLINE</p> <p>PRIMER FINISH COAT BASEPLATE: (6.3.17)</p> <p>8 CASING SPLIT: 9 AXIAL RADIAL</p> <p>BASEPLATE SURFACE PREPARATION PRIMER</p> <p>10 CASING TYPE: 11 12 SINGLE VOLUTE BETWEEN BEARINGS MULTIPLE VOLUTE BARREL DIFFUSER</p> <p>FINISH COAT DETAILS OF LIFTING DEVICES (6.3.20) SHIPMENT: (7.4.1)</p> <p>13 CASE PRESSURE RATING: 14 15 16 17 18 19 20 21 22 SUCTION 23 DISCHARGE 24 BALANCE DRUM 25 26 27 28 29 30 31 32 33 34 DRAIN VENT PRESS. GAUGE TEMP. GAUGE WARM-UP BALANCE / LEAK-OFF MACHINED AND STUDDED CONNECTIONS (5.4.3.8) CYLINDRICAL THREADS REQUIRED (5.4.3.3) PRESSURE CASING AUX. CONNECTIONS: (5.4.3) NO. SIZE (DN) TYPE MAX. ALLOWABLE WORKING PRESSURE @ (C) (MPa) (MPa)</p> <p>DOMESTIC</p> <p>EXPORT</p> <p>EXPORT BOXING REQUIRED</p> <p>OUTDOOR STORAGE MORE THAN 6 MONTHS SPARE ROTOR ASSEMBLY PACKAGED FOR: SHIPPING CONTAINER (8.2.8.3) TYPE OF SHIPPING PREPARATIONHEATING AND COOLING HEATING JACKET REQ'D. (5.8.9)</p> <p>HYDROTEST PRESSURE SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6) NOZZLE CONNECTIONS: (5.4.2) SIZE (DN) FLANGE RATING FACING</p> <p>VERTICAL STORAGE (8.2.8.2) N2 PURGE (8.2.8.4)COOLING REQ'D.</p> <p>POSITION</p> <p>COOLING WATER (C.W.) PIPING PLAN (6.5.3.1)C.W. PIPING:</p> <p>PIPE</p> <p>TUBING;</p> <p>FITTINGSGALVANIZED3 3</p> <p>C.W. PIPING MATERIALS: S. STEEL C. STEEL</p> <p>COOLING WATER REQUIREMENTS: BEARING HOUSING HEAT EXCHANGER STEAM PIPING: TUBING (m /h) (m /h) PIPE @ @ (MPa) (MPa)</p> <p>BEARINGS AND LUBRICATION</p> <p>BEARING (TYPE/NUMBER) (5.10.1): RADIAL THRUST LUBRICATION (5.11.3, 5.11.4): RING OILHYDRODYNAMIC PURGE OIL MIST PURE OIL MIST</p> <p>/ /</p> <p>35 ROTOR: 36 37 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3)</p> <p>CONSTANT LEVEL OILER PREFERENCE (5.10.2.2): PRESSURE LUBE SYS. ISO 10438-3 OIL VISC. ISO GRADE ISO 10438-2 (8.2.6.1/8.2.6.5)</p> <p>38 COUPLINGS: (6.2.2) 39 40 41 42 43 44 45 46 47 48 49 50 MANUFACTURER RATING (kW per 100 r/min) SPACER LENGTH (mm) SERVICE FACTOR MODEL</p> <p>OIL PRESS. TO BE GREATER THAN COOLANT PRESSURE REVIEW AND APPROVE THRUST BEARING SIZE [8.2.5.2 d)] OIL HEATER REQUIRED: STEAM ELECTRICINSTRUMENTATION (6.4.2)</p> <p>DRIVER HALF-COUPLING MOUNTED BY: PUMP MFR. DRIVER MFR. PURCHASER</p> <p>SEE ATTACHED API 670 DATA SHEET ACCELEROMETER(S) (6.4.2.1) PROVISION FOR VIBRATION PROBES (6.4.2.2) RADIAL PER BRG. AXIAL PER BRG.</p> <p>COUPLING WITH HYDRAULIC FIT (6.2.10) COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) COUPLING PER ISO 14691 (6.2.4) COUPLING PER ISO 10441 (6.2.4) COUPLING PER API 671 (6.2.4) NON-SPARK COUPLING GUARD (6.2.14c) COUPLING GUARD STANDARD PER (6.2.14a)</p> <p>PROVISION FOR MOUNTING ONLY (5.10.2.11) FLAT SURFACE REQ'D (5.10.2.12) RADIAL BEARING METAL TEMP. TEMP. GAUGES (WITH THERMOWELLS) MONITORS AND CABLES SUPPLIED BY (6.4.2.4) (ANNEX D) REMARKSTHRUST BRG METAL TEMP.</p> <p>51 BASEPLATES: 52 53 54 API BASEPLATE NUMBER NON-GROUT CONSTRUCTION (6.3.13) OTHER</p> <p>55 MECHANICAL SEAL: (5.8.1) 56 57 58 59 60 61 PUMP DRIVER GEAR SEE ATTACHED ISO 21049/API 682 DATA SHEET MASSES (kg) BASEPLATE TOTAL</p> <p>PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23OTHER PURCHASER REQUIREMENTS SPARE PARTS (TABLE 18)</p> <p>4</p> <p>OF</p> <p>QA INSPECTION AND TESTING (CONT.)</p> <p>START-UP SPECIFY</p> <p>NORMAL MAINTENANCE</p> <p>TEST HYDROSTATIC (7.3.2) PERFORMANCE (7.3.3) NPSH (7.3.4.2)</p> <p>NON-WIT</p> <p>WIT</p> <p>OBSERVE</p> <p>COORDINATION MEETING REQUIRED (9.1.3) MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) MAX RELATIVE DENSITY MAX DIA. IMPELLERS AND/OR NO. OF STAGES OPERATION TO TRIP SPEED CONNECTION DESIGN APPROVAL (5.12.3.4/8.2.1.4) INERT GAS INHIBITED STORAGE - SPARE CARTRIDGE (8.2.8.4) TORSIONAL ANALYSIS REQUIRED (5.9.2.1) TORSIONAL ANALYSIS REPORT (5.9.2.6) PROGRESS REPORTS (9.3.3) OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) LATERAL ANALYSIS REQUIRED (8.2.4.1 / 8.2.4.1.3) DYNAMIC BALANCE ROTOR (8.2.4.2) MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) VENT DRAIN COOLING WATER</p> <p>RETEST ON SEAL L'KGE (7.3.3.2d) RETEST REQUIRED AFTER FINAL HEAD ADJUSTMENT (7.3.3.5b) COMPLETE UNIT TEST (7.3.4.3) SOUND LEVEL TEST (7.3.4.4) CLEANLINESS PRIOR TO FINAL ASSEMBLY (7.2.2.2) NOZZLE LOAD TEST (6.3.6) CHECK FOR CO-PLANAR MOUNTING PAD SURFACES (6.3.3) MECHANICAL RUN UNTIL OIL TEMP. STABLE (7.3.4.7.1) 4 h MECHANICAL RUN AFTER OIL TEMP. STABLE (7.3.4.7.3) 4 h MECH. RUN TEST(7.3.4.7.2) TRUE PEAK VELOCITY DATA (7.3.3.4d) BRG HSG RESONANCE TEST (7.3.4.6)</p> <p>MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8)</p> <p>24 CONNECTION BOLTING 25 26 27 28 29 30 31 32 33 34 35 PTFE COATING PAINTED ASTM A 153 GALVANIZED SSQA INSPECTION AND TESTING</p> <p>REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST (8.2.7.5) AUXILIARY EQUIPMENT TEST (7.3.4.5) CHARPY TEST (EN 13445/ASME VIII)</p> <p>INSTALLATION LIST IN PROPOSAL (9.2.3L)</p> <p>SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPR. TEST WITH SUBSTITUTE SEAL (7.3.3.2) MATERIAL CERTIFICATION REQUIRED (5.12.1.8) CASING OTHER CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) IMPELLER SHAFT</p> <p>VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5) VENDOR SUBMIT TEST DATA WITHIN 24 h (7.3.3.3e) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3) RECORD FINAL ASSEMBLY RUNNING CLEARANCES COMPLETION OF INSPECTION CHECK LIST (7.1.6)</p> <p>36 37 38 39 40 41 42 43 44</p> <p>MAG. PARTICLE RADIOGRAPHIC</p> <p>LIQUID PENETRANT ULTRASONIC</p> <p>INSPECTION REQUIRED FOR CASTINGS (7.2.1.3)(5.12.1.5) MAG. PARTICLE RADIOGRAPHIC HARDNESS TEST REQUIRED: LIQUID PENETRANT ULTRASONIC (7.2.2.3)</p> <p>ADDITIONAL SURFACE / SUBSURFACE EXAMINATION (7.2.1.3) FOR METHODREMARKS</p> <p>45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61</p> <p>PAGE</p> <p>3</p> <p>OF</p> <p>CENTRIFUGAL PUMP DATA SHEET API 610 10TH EDITION / ISO 13709 VERTICALLY SUSPENDED (TYPE VS) SI UNITS1CONSTRUCTION</p> <p>JOB NO. REQ. / SPEC. NO. PURCH. ORDER NO.INQUIRY NO.</p> <p>ITEM NO.(S)...</p>

Recommended

View more >