600 v 2021 - crsresources.org

14
1/13/2021 1 Visual 600-1 600 – Warning and Response Visual 600-2 Activity 610 – Flood warning and response Activity 620 – Levees Activity 630 – Dams Manual Page 600-2 600 – Warning and Response Visual 600-3 Activity 610 – Flood warning and response Elements: a. Flood threat recognition system (FTR) b. Emergency warning dissemination (EWD) c. Flood response operations (FRO) d. Critical facilities planning (CFP) e. StormReady community (SRC) f. TsunamiReady community (TRC) Manual Page 600-2 600 – Warning and Response Visual 600-4 600 – Warning and Response Threat recognition Warning Operations Critical facilities Manual Page 600-2 600 – Warning and Response 1 2 3 4

Upload: others

Post on 20-Feb-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

1/13/2021

1

Visual 320.1Visual 600-1

600 – Warning and Response

Visual 320.2Visual 600-2

Activity 610 – Flood warning and responseActivity 620 – LeveesActivity 630 – Dams

Manual Page 600-2600 – Warning and Response

Visual 320.3Visual 600-3

Activity 610 – Flood warning and responseElements:a. Flood threat recognition system (FTR)b. Emergency warning dissemination (EWD)c. Flood response operations (FRO)d. Critical facilities planning (CFP)e. StormReady community (SRC)f. TsunamiReady community (TRC)

Manual Page 600-2600 – Warning and Response

Visual 320.4Visual 600-4

600 – Warning and Response

Threat recognition

Warning

Operations

Critical facilities

Manual Page 600-2600 – Warning and Response

1 2

3 4

1/13/2021

2

Visual 320.5Visual 600-5

610 Flood Warning and Response

611.b Activity credit criteria

(1) First four elements: must have credit from each

(2) Description of the flood hazard

(Could be in floodplain management/mitigation plan)

(3) Flood inundation map

(4) Adopted warning and response plan

(5) Outreach project

Manual Pages 610-3 – 4610 – Flood Warning and Response

Visual 320.6Visual 600-6

(5) Outreach project

(a) Annual notice to everyone in the community

(b) Annual notice to everyone in the floodplain

(c) Another approach developed in the PPI

(d) If > 3 days advance notice → watches & warnings OK

(e) Different flooding sources → different types of projects

Manual Pages 610-4 – 5610 – Flood Warning and Response

Visual 320.7Visual 600-7

611.b Activity credit criteria

(1) First four elements: must have credit from each

(2) Description of the flood hazard

(Could be in floodplain management/mitigation plan)

(3) Flood inundation map

(4) Adopted warning and response plan

(5) Outreach project

(6) Annual exercise and evaluation

Manual Page 610-5610 – Flood Warning and Response

Visual 320.8Visual 600-8

610 – Flood Warning and Response

5 6

7 8

1/13/2021

3

Visual 320.9Visual 600-9

610 – Flood Warning and Response

www.weather.gov/ahps/ Visual 320.10Visual 600-10www.weather.gov/ahps/

610 – Flood Warning and Response

Visual 320.11Visual 600-11

National Hurricane Center

610 – Flood Warning and Response

Visual 320.12Visual 600-12

612.a Flood threat recognition system (FTR)

Level 1: Manual system

Level 2: Automated alarm: flood is coming

Level 3: Automated warning: predicted time and crest

Credit criteria

(1) Meet activity credit criteria

(2) System for at least one place in community

(3) Keyed to flood inundation map, showing what will be affected

Manual Pages 610-5 – 6610 – Flood Warning and Response

9 10

11 12

1/13/2021

4

Visual 320.13Visual 600-13

612.a Flood threat recognition system (FTR)

Documentation

(1) At visit(i) Hazard description(ii) Flood inundation map(iii) Plan (and adoption documentation)(iv) Description of the FTR system(v) Maintenance procedures (vi) Impact adjustment map

(2) At visit and recertification:(a) Outreach project(b) Report on annual exercise

Manual Pages 610-7 – 8610 – Flood Warning and Response

Visual 320.14Visual 600-14

Get

the warning out

610 – Flood Warning and Response

Visual 320.15Visual 600-15

612.b Emergency warning dissemination (EWD)

Credit criteria

(1) Meet activity credit criteria

(2) Must reach people in a timely manner

(3) Testing

Credit points

Cumulative

Max: 75

Manual Pages 610-8 – 9610 – Flood Warning and Response

Visual 320.16Visual 600-16

610 – Flood Warning and Response

13 14

15 16

1/13/2021

5

Visual 320.17Visual 600-17

Flood Inundation Map

610 – Flood Warning and Response

Visual 320.18Visual 600-18

610 – Flood Warning and Response

Visual 320.19Visual 600-19

610 – Flood Warning and Response

Visual 320.20Visual 600-20

610 – Flood Warning and Response

17 18

19 20

1/13/2021

6

Visual 320.21Visual 600-21

612.c Flood response operations (FRO)

Credit criteria

Describe the tasks to be taken at each flood level

Credit points

More details = more points

Manual Pages 610-12 – 14610 – Flood Warning and Response

Visual 320.22Visual 600-22

610 – Flood Warning and Response

Visual 320.23Visual 600-23

612.d Critical Facilities Planning (CFP)

Credit criteria

CFP1 is a prerequisite

CFP1: List of critical facilities, warning needs

CFP2: Coordinated warning and response plans

Credit points

CFP1 = up to 25 points

CFP2 = up to 50 points

Manual Pages 610-15 – 16610 – Flood Warning and Response

Visual 320.24Visual 600-24

612.e StormReady community (SRC)

Credit criteria

(1) Meet activity credit criteria

(2) Be designated by the National Weather Service

www.nws.noaa.gov/stormready/Credit points

SRC = 25 points

Manual Pages 610-17 – 18610 – Flood Warning and Response

21 22

23 24

1/13/2021

7

Visual 320.25Visual 600-25

612.f TsunamiReady community (TRC)

Credit criteria

(1) Meet activity credit criteria

(2) Be designated by the National Weather Service

(3) Meet the hazard mapping requirements in CRS Credit for Mitigation of Tsunami Hazards

(4) Adopted tsunami hazards operations plan

Credit points

SRC = 30 points

Manual Page 610-18610 – Flood Warning and Response

Visual 320.26Visual 600-26

613 Impact adjustment

r = number of buildings affected by the elementnumber of buildings in the SFHA (bSF)

Manual Page 610-19610 – Flood Warning and Response

Visual 320.27Visual 600-27

Questions?

Threat recognition

Warning

Operations

Critical facilities

610 – Flood Warning and Response

Visual 320.28Visual 600-28

Poll Questions

610 – Flood Warning and Response

25 26

27 28

1/13/2021

8

Visual 320.29Visual 600-29

620 – Levees

Visual 320.30Visual 600-30

620 – Levees

Visual 320.31Visual 600-31

Activity 620 – LeveesElements:a. Levee maintenance (LM)b. Levee failure threat recognition system (LFR)c. Levee failure warning (LFW)d. Levee failure response operations (LFO)e. Levee failure critical facilities planning (LCF)

Manual Page 620-2

620 – Levees

Visual 320.32Visual 600-32

621.b Activity Credit Criteria

(1) Designed and constructed as a levee

(2) Operated and maintained by a public agency

(3) Map and data on the area affected

145 homesNo critical facilities

Manual Page 620-3620 – Levees

29 30

31 32

1/13/2021

9

Visual 320.33Visual 600-33

621.b Activity Credit Criteria

(1) Designed and constructed as a levee

(2) Operated and maintained by a public agency

(3) Map and data on the area affected

(4) Levee maintenance plan with annual inspections

(5) Outreach project

Manual Page 620-4620 – Levees

Visual 320.34Visual 600-34

(5) Outreach project

(a) Notice to everyone in protected area

(b) Another approach developed in the PPI

Gets Activity 330 (Outreach Projects) credit

Manual Page 620-4620 – Levees

Visual 320.35Visual 600-35

621.b Activity Credit Criteria

(1) Designed and constructed as a levee

(2) Operated and maintained by a public agency

(3) Map and data on the area affected

(4) Levee maintenance plan with annual inspections

(5) Outreach project

(6) Must obtain some credit in LFR, LFW, LFO, LCF

(7) Adopted levee failure flood warning and response plan

(8) Annual exercise

Manual Pages 620-3 – 5620 – Levees

Visual 320.36Visual 600-36

621.c Map of the Affected Area

Accredited levees: B Zone/shaded X Zone

Manual Pages 620-5 – 6620 – Levees

33 34

35 36

1/13/2021

10

Visual 320.37Visual 600-37

621.c Map of the Affected Area

Accredited levees: B Zone/shaded X Zone

Non-accredited levees: area lower than top of levee

Manual Pages 620-5 – 6620 – Levees

Visual 320.38Visual 600-38

621.c Map of the Affected Area

Manual Pages 620-5 – 6620 – Levees

Visual 320.39Visual 600-39

622.a Levee maintenance (LM)

(1) LM1: Annual inspection and maintenance

(2) LM2: Levee agency’s emergency action plan

Need both for LM credit and need LM credit for 620 credit

Manual Pages 620-6 – 8620 – Levees

Visual 320.40Visual 600-40

Levee failure warning and response plan

622.b Levee failure threat recognition system (LFR)

622.c Levee failure warning (LFW)

622.d Levee failure response operations (LFO)

622.e Levee failure critical facilities planning (LCF)

Manual Pages 620-10 – 18620 – Levees

37 38

39 40

1/13/2021

11

Visual 320.41Visual 600-41

623 Impact adjustment

r = number of buildings affected by the element .number of buildings affected by levee failure (bLF)

Manual Pages 620-18 – 19620 – Levees

Visual 320.42Visual 600-42

Questions?

620 – Levees

Visual 320.43Visual 600-43

630 – Dams

Visual 320.44Visual 600-44

630 – Dams

41 42

43 44

1/13/2021

12

Visual 320.45Visual 600-45

Activity 630 – DamsElements:a. State dam safety program (SDS)b. Dam failure threat recognition system (DFR)c. Dam failure warning (DFW)d. Dam failure response operations (DFO)e. Dam failure critical facilities planning (DCF)

Manual Page 630-2

630 – Dams

Visual 320.46Visual 600-46

632.a State dam safety program (SDS)

State self-assesses its program for:

• Assessment of condition of dams in the state

• Risk communication and public awareness

• Promotion of emergency action plans by operators

Community must be impacted by a high hazard dam failure

Community must be in compliance with state program

Credit points

SDS = up to 45 points

Manual Page 630-5630 – Dams

Visual 320.47Visual 600-47

630 – Dams

Visual 320.48Visual 600-48

632.a State dam safety program (SDS)

Documenting impact by a dam failure

• Provide a copy of a dam failure inundation map

• Show ISO a copy of the map

• Get a letter from the state dam safety office

http://crsresources.org/600-2/

Manual Page 630-5630 – Dams

45 46

47 48

1/13/2021

13

Visual 320.49Visual 600-49

631.b Activity Credit Criteria

(1) > 1 building subject to dam failure flooding

(2) Description of the dam failure threat

1,453 homes75 businesses

22 critical facilities

Manual Page 630-3630 – Dams

Visual 320.50Visual 600-50

631.b Activity Credit Criteria

(1) > 1 building subject to dam failure flooding

(2) Description of the dam failure threat

(3) Must obtain some credit in DFR, DFW, DFO, DCF

(4) Adopted dam failure flood warning and response plan

(5) Outreach project

(6) Annual exercise

Manual Pages 630-3 – 5630 – Dams

Visual 320.51Visual 600-51

Dam failure warning and response plan

632.b Dam failure threat recognition system (DFR)

632.c Dam failure warning (DFW)

632.d Dam failure response operations (DFO)

632.e Dam failure critical facilities planning (DCF)

Manual Pages 630-6 – 13630 – Dams

Visual 320.52Visual 600-52

633 Impact adjustment

r = number of buildings affected by the element .number of buildings affected by dam failure (bDF)

Manual Pages 630-13 – 14630 – Dams

49 50

51 52

1/13/2021

14

Visual 320.53Visual 600-53

Questions?

630 – Dams

Visual 320.54Visual 600-54

Poll Questions

630 – Dams

53 54