5S is the base for all the TPM activities.A proper implementation of 5S is required to improve the efficiency . The goal of 5S is to create a work environment that is clean and well-organized.Problems can not be clearly seen when the workplace is unorganized.
. The below 5S road map in Excel for PepsiCO plant can be used throughout 5S activities to clarify boundaries, assign responsibilities, and divide tasks into bite-size pieces.
What ? Where? Team
Leader Team Members P-D-C-A
Oct- 15Wk04
Nov - 15Wk 01 to
03
Nov - 15Wk 04 &
Dec-15 (Wk01 to
02)
Oct - 15Wk 01 &
02
Oct- 15Wk 03 &
04
Nov 15Wk 01 -
03
Nov 15Wk 04
Dec 15Wk 01 -
04
Jan 15Wk 01 -
04
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
'5-S' Road map - SIPA (PET )To do Who ? When?
Remarks Why ?
S4 S5
1 ] Preparation for implementing 5S 2 ] Motiating people for change
Zero defect
S0 S1 S2 S2 S3 S4 S4 S5
S0 S1 S2 S2
1 ] Develop criteria for need/want to release 30% place
Zero inventory/
More space
1 ] PEEP: Place for everything & everything in its place
Zero waiting
S3 S4
S0 = Enablers [Motivate people for 5-S
implementation]Na
me
S3
SIPA
DIM
AC
Palle
tizer
S0
S0
S3 = Shine (Seiso) [Ensure spic & span
cleanliness with inspection]
SIPA
CSD
PE
T BM
SIPA
Fi
ller/R
inse
r/Cap
per
SIPA
Lab
eller
/S
leeve
r
S2 = Set in Order(Seiton) [Do systematic
arrangement for all needed items]
S1 = Sort(Seiri) [Sort out what is needed
and what is not]
Zero breakdown
S0 S0 S1 S2 S2 S3 S4 S4 S5
1 ] CLITA: Deploy Clean-Lubricate-Inspect-Tighten-Adjust 2 ]
S4 S4 S5S5 = Sustain (Shitsuke) [Self -
discipline at workplace]
1 ] Through continuous education, training, display of results & PDCA improvement cycles
Zero changeove
r/setup
S4 = Standardise (Seiketsu)
[Create a highly standardised workplace]
1 ] SOPs Developed & Displayed 2 ]
Zero accidents
S0 S0 S1 S2 S2
To implement the first S the Red-Tag process is commonly employed. The Red-Tag strategy helps to identify unwanted items and determine their usefulness. For the implementation of first S, the work area is classified and the list of wants and wastes are identified.
Requisites Area Who Status Remark
TM
TM
TM
TM
TM X
TM X
TM X
TM X
X
X
X
X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
Scrap Disposal
Listing Wants in an Area after eliminating waste
ACTION PLAN FOR "S1" Seiri
Sorting out what is required & dipose unwanted ()
Work Area
Classification in work areas
Audit / Visual Inspection of wants / wastes
TL
Waste identification checklist provides a way to classify the items and removing unnecessary items in the work place.
GembaWork AreaTM
Freq. Rare Never Good Worst Yes No Yes No Yes No
Waste Remark
(S1) Waste Identification Checklist
Process / Equipment / Item in areaUsage Condition Repairable
Usage outside
area
Better Substitute
avl
Once the first S has been successfully implemented, what is left should be arranged so that there is ease of use and storage.
ACTION PLAN FOR "S2" Seiton
Systematic Arrangement of wanted ()
Requisites Area Who Status Remark
Organising wants in an area in terms of usage / value / importance to process / life cycle
TM X
TM X
TM X
TM X
Identifying amenities / infrastructure / tools required for correct organisation (P tags)
TM X
TM X
TM X
TM X
Organising in compliance with PEEP & Identifying missing / abnormal item or structure
TM X
TM X
TM X
TM X
GembaWork AreaTM
Process / Equipment / Item in area Usage Value Qty (Nos)Critical to process
Total Pref. No
0
0
0
0
0
0
0
0
0
0
0
0
(S2) Systematic arrangement checklist
Scores can be 1/ 3/ 5 for low / Med / High categories repectively & Pref.no will be in descending order of total score
Item with pref. no "1" should always be the easiest accesible and further on
In case of consumables qty. to be re-ordered when inventory level for Highitems reaches 25 % / 50 % levels
Arrangement to comply PEEP concept so that any missing / misplaced item can be identified by visual inspection
List down amenities / tools / structure for correct arrangement. When identified can be purchased or can be picked up from scrap
The third S is to thoroughly clean the work area. Daily follow-up cleaning is absolutely necessary to maintain a clutter-free workplace and a desirable environment. SHINE speaks for itself. Everyone enjoys working in a clean environment which raises morale and increases productivity.
Requisites Area Who Status Remark
TL / TM X
TL / TM X
TL / TM X
TL / TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
TM X
ACTION PLAN FOR "S3" Seiso
Systematic Arrangement of wanted ()
External / Internal man power arrangement for through cleaning
Through cleaning done & scrap disposed safely
All Items / Process / Equipments easly identifiable / accesible / safe
Once the 3S are in place, the next step is to concentrate on standardising best practises.The plan must include the creation of procedures and simple daily checklists which are to be visibly displayed at every workplace.
ACTION PLAN FOR "S4" Seiketsu
Systematic Arrangement of wanted ()
Requisites Area Who Status Remark
Daily Inspection / Reporting abnormalities
TM X
TM X
TM X
TM X
Action for deviation / 5S awareness session or training
TM X
TM X
TM X
TM X
The fifth S is to make it a habit of maintaining the momentum of the previous four S to ensure sustainability of the system.
ACTION PLAN FOR "S5" Shitsuke
Systematic Arrangement of wanted ()
Requisites Area Who Status Remark
Monthly / Qtrly. "5S" audit by Internal / External accesor
TL / Auditor X
TL / Auditor X
TL / Auditor X
TL / Auditor X
Action for deviation / findings / document learnings
TL / TM X
TL / TM X
TL / TM X
TL / TM X
5S awareness session / training for continual improvement / Visits
TL / TM X
TL / TM X
TL / TM X
TL / TM X
Gains in terms of value, life cycle, availability to be published
TL X
TL X
TL X
TL X
SEIRI 8
SEITON 8
SEISO 7
SEIKTSU 6SHITSUKE
7
1SCheck Item
DescriptionScore
0 1 2 3 4
SE
IRI
Materials / partsDoes the inventory or in-process inventory include unneeded mtrl / parts
3
Machines / Equipment
Are there any unused machines or other equipment 1
Papers / Plastic Mtrl Is there any paper / plastic scrap around 2 0
Visual Control Is the waste identified 2
Sub Total 0 1 4 3 0
2S Check Item DescriptionScore
0 1 2 3 4
SE
ITO
N
Location Indicators Are shelves and other storage areas marked with addresses 2
Item Indicators Do the shelves have signboards showing which items go where 2
Qty. Indicators Are Max / Min Inventory levels indicated 1Walkway Demarcation
Storage areas / Process Area / Units marked 3
Sub Total 0 1 4 3 0
3S Check Item DescriptionScore
0 1 2 3 4
SE
ISO Floor / Work station Are floors / work station shiny to spot any waste 2
M/c & Equipments Are they Dust free, running healthy with allowed noise / vibration 2
Cleaning Stewards Is there a dedicated staff / do they do it voluntarily 3
Sub Total 0 0 4 3 0
4S Check Item DescriptionScore
0 1 2 3 4
SE
IKT
SU
Improvement Idea Is any action plan in place for its deployment 1
Standard procedureIs the 5S implementation plan documented / published / communicated
1
Future scope Any continual improvement idea / process / recognition 2
First 3S Is Seiri / Seiton / Seiso maintained 2
Sub Total 0 2 4 0 0
5S Check Item DescriptionScore
0 1 2 3 4
SH
ITS
UK
E
Equipments / Process
Are they easily gettable / managable 1
Stock levels Is the inventory control adhered to 2
Training Is Training / 5S awareness in progress 2
Support Is top management active support available 1
5-S Billboards Are they updated 1
Sub Total 0 3 4 0 0
PILOT TEST CONDUCTED FOR 5S
A pilot allows teams to test and revise solutions before deploying them across an organization.
SEIRI
SEITON
SEISOSEIKTSU
SHITSUKE
0
5
10
Audit Result