4k_-_startup_and_commissioningÊÔÔËÐÐ
TRANSCRIPT
-
7/31/2019 4K_-_Startup_and_Commissioning
1/17
PM Workshop
Start-up & Commissioning
-
7/31/2019 4K_-_Startup_and_Commissioning
2/17
Slides\execution\startup.ppt
2
Start-up & Commissioning
What Is It? Comprehensive Process of Testing and Starting
Facility & Production Systems
What Does It Do?
Demonstrate That the System Can Perform
A Means for Owners Acceptance
What Else? Documents Tests (Part of Quality Plan)
-
7/31/2019 4K_-_Startup_and_Commissioning
3/17
Slides\execution\startup.ppt
3
Start-up & Commissioning
Keys to Success Start-up & Commissioning Schedule
Production Schedule
Utilities Needed
Earliest Date System Needed
Organization
Start-up Coordinator
System Teams
-
7/31/2019 4K_-_Startup_and_Commissioning
4/17
Slides\execution\startup.ppt
4
Start-up & Commissioning
Keys to Success (Continued) Documentation
Project Quality Plan
Standard Forms
Written Procedures
Design Team System Owner
Material & Utility Needs
Identify and Validate Availability
-
7/31/2019 4K_-_Startup_and_Commissioning
5/17
Slides\execution\startup.ppt
5
Start-up & Commissioning
Keys to Success (Continued)
Regular Meetings
System Team
Construction Meeting
System Readiness
Design Verification
Past Tests OAT and FAT
Permits, As Needed
-
7/31/2019 4K_-_Startup_and_Commissioning
6/17
Slides\execution\startup.ppt
6
Start-up & Commissioning
Caution:
Do Not Start Vendor Systems WithoutManufacturers Representative
-
7/31/2019 4K_-_Startup_and_Commissioning
7/17Slides\execution\startup.ppt
7
Start-up & Commissioning
Planning
Begin Early in Construction
Review P&IDs and PFDs
Validate Factory Test/receiving Reports Identify & Calibrate Instrumentation
Compile Forms for Documentation
Participate in Construction Meetings
-
7/31/2019 4K_-_Startup_and_Commissioning
8/17Slides\execution\startup.ppt
8
Start-up & Commissioning
Scheduling Start-up & Commissioning Develop Schedule
Integrate Into Construction Schedule
Must Drive Construction Activities
Administering & Witnessing
Walk the System
Validate Set-points
Document Tests (Signatures)
-
7/31/2019 4K_-_Startup_and_Commissioning
9/17Slides\execution\startup.ppt
9
Start-up & Commissioning
Reporting Status
System Team Meetings
Weekly Construction Meetings
Obtaining & Compiling O & M Manuals
From Vendors/manufacturers
From Contractors
From the Design Team
-
7/31/2019 4K_-_Startup_and_Commissioning
10/17Slides\execution\startup.ppt
10
Start-up & Commissioning
Acceptance & Turnover Documents
Performance Tests
Signoff and Turnover
Warranty
-
7/31/2019 4K_-_Startup_and_Commissioning
11/17Slides\execution\startup.ppt
11
Start-up & Commissioning
Activities
Pre-commissioning
Design Verification
OAT
Commissioning
FAT
Start-up
-
7/31/2019 4K_-_Startup_and_Commissioning
12/17Slides\execution\startup.ppt
12
Start-up & Commissioning
Activities (Continued)
Acceptance Tests (Performance Tests)
Document What Needs Fix
Witness and Signatures
Turnover (Warranty)
O & M Manual
Test Documentation (Option)
Training (Option)
-
7/31/2019 4K_-_Startup_and_Commissioning
13/17Slides\execution\startup.ppt
13
Start-up & Commissioning
Task Often Overlooked
Failure to Understand Relation to Production Start
Assigned To Others (I & C)
Owner Does Not Know How to Start/operate
Ownership (Designer)
Original Owner on Another Project/not in Field
-
7/31/2019 4K_-_Startup_and_Commissioning
14/17Slides\execution\startup.ppt
14
Start-up & Commissioning
Junior
Staff
-
7/31/2019 4K_-_Startup_and_Commissioning
15/17Slides\execution\startup.ppt
15
Start-up & Commissioning
Construction
Developdesignsolutionsf
or
processdevelopmentdesig
n
issues
STARTUP AND TRAINING
OPERATOR TRAINING FIELD ENGINEERING SYSTEM TEAM CONSTRUCTION
Develop Startup plan,
checklists, procedures, andperformance testing plans
Respond to RFIs, review
submittals, observe construction
Punchlist and FixupPunchlist
Develop SOPs, and
Training Manuals with
Engineering assistance
Pre-startup ChecklistTrain the Trainer
Fix Critical Items
Component Operational Test
(check PLC function, check component mechanical operation, energize equipment, run
in manual)Fix Critical Items
System Operational Test
(auto operation, set control tuning, begin process testing using product)
On-the-Job and Classroom
Training of Equipment
OperatorsFix Critical Items
System Performance Acceptance Test
(system performance demonstration through a range of operating conditions using product where
possible)
Training Complete
System Turnover
Fix Critical Items
Full Line Performance Acceptance Test
Full Line Turnover for
Production Operation
Final Inspection Report
Review Startup Plan and
SOPs
-
7/31/2019 4K_-_Startup_and_Commissioning
16/17Slides\execution\startup.ppt
16
Start-up & Commissioning
VentilationDustCollection
System
220-1
CA
Electrical
DRY RUN MATERIAL
Recycle
800-1
Electrical
Vent Cyclone
Starch Tank
110-1Storage
Truck
CA
Elect
Gain In Wt
Feeder
190-1
Mix Transfer
Presses
300-x
Trimming
310-x
4:1 Merge &
Conveyors
320-1
Continued
Mag Stearate
Tank 120-1Storage
Truck
CA
Elect Guar Gum
Tank 130-1StorageTruck CA
Elect
Calc. Carb.
Tank 105-1Truck
CA
Elect
Fiber
Tank 180-1StorageTruck
CAElect
Mixer
200-1
Recycle
900-1
Hot and Cold
Water
CA
Elect
CA
Elect
CAElect
CA
Elect
CA
Elect
CACIP
Mold
Bad
Batch
CW
Truck to
Landfill
Liquid
Waste
LPCLPS
CWElect
Liquid
Waste
Elect
Liquid WasteHeat Vent
VentReject
VentCWElect
Vision
Inspection
330-1
CA
Elect
Ventilation
SUPPORTREQUIREMENTS for
PROCESS STEPS
-
7/31/2019 4K_-_Startup_and_Commissioning
17/17Slides\execution\startup ppt
17
Start-up & CommissioningCoating
No.1
340-1
CACW
Coating
No.2
360-1
Airveyor
380-1
CAElect
Stacking
390-1
CAElect
Packaging
700-1
CAElect
Conveyor
400-1
CAElect
Printer /
Bagger
600-1
CAElect
Heater170-1
Store
HVAC
CIP
Elect
Gas
Drains
SCADA
Paraffin Wax
160-1
Vinac &
Benzoflex
140-1
Hinge Coat140-1
Boiler
Process
Chiller
Air
Compressor
VOC
AbatementWarehouse
Forklift
Truck
VOCHeat Exhaust
Reject (Trash)
Heat Exhaust
Reject (Trash)
Recycle
N2DIW
Elect
CA
HPCHPSCA
HPCHPS
WET RAW MATERIALS
LPCLPS
Elect
CATruck
ElectCATruck
ElectCA
Truck
Trays
Trays
Ink
Wrapping Film (Rolls)VOCReject
(Trash)
PalletsStretch
Wrap FilmCoding Ink
TapeBoxes
Cooling
Tower
Permit
Plant
City Utility
City Utility
City Utility
Plant
Plant
10-13
IACA
Elect
PCW
PCR
CWSCWR Elect
PermitElect
Coating No.1
VentHPC
LPCHPS
LPS
CWGasElect
SUPPORT REQUIREMENTS for
PROCESS STEPS