4th Workshop on ALICE Installation and Commissioning

January 16th & 17th , CERN

Muon Tracking(MUON_TRK, MCH, MTRK)

Conclusion of the first ALICE COSMIC run in December 2007.

[email protected]

Page 2: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Status of Hardware during Run

Dimuon Forward Spectrometer (DFS) Tracking Chambers :5 stations, each station has 2 detection planes or chambers1 chamber/plane gives an (x,y) coordinates

μ+

μ-

primary vertex

ZY

X

Station 1Station 2

[email protected]

3

4 5

read out during the december cosmic run.

Page 3: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Status of Hardware during Run

Dimuon Forward Spectrometer (DFS) Tracking Chambers :5 stations, each station has 2 detection planes or chambers1 chamber/plane gives an (x,y) coordinates

During the december cosmic run :almost everything is installed (but local commissioning is not finished yet) 1/5 of the DFS was powered

• Full Station 1 most of the time• part of Station 1 + part of Station 2 for the “2 LDC in global” test

no particular issues • air cooling (St1 and St2 is very stable), temperatures look fine• power ok (a few trips have been seen on HV and LV)• our last day (Tuesday 18th) was perfectly stable !

[email protected]

Page 4: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

DAQ

No real DAQ issues :compliance with DAQ global achievedreally stable

Readout times (in 0-suppressed mode after taking pedestal runs, threshold calculation with a DA included in our rpm, etc… = conditions of real data taking ):

Trigger 4 kHz Busy 307 us Readout rate 2050Trigger 40 kHz Busy 485 us Readout rate 2050Trigger 400 kHz Busy 496 us Readout rate 2050Trigger 4 MHz Busy 497 us Readout rate 2050Trigger 40 MHz Busy 497 us Readout rate 2050

Readout rate is slower than expected (lab measurements gave busy ~ 220 μs) : looking for possible explanation

→ saturating the buffer slows down the readout (algorithm scan through a lot of events in the DSP memory)in normal data taking mode, an “open” muon trigger (no pT cut) will not be greater than 5KHz.

[email protected]

Page 5: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

DCS/ECS/Trigger/HLT

DCS in very good shape :final state machine for low & high voltage works temperatures, gas flow is monitored

ECS :scripts are ready (close to final) and working (tested during run)automatic generation of command depending on which DDL/equipId are declared in DATE

Connection DCS-ECS (?) is not done yet

Trigger : first days have been painful… but it finally worked we played at “you’re busy; not we’re not ; yes you are ; etc…” along with trigger people and other subsystem ;-)

HLT : some global run were taken with HLT ; is it ok ?

[email protected]

Page 6: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Online Monitoring/Offline

Online Monitoring :MOOD for muon_trk is in very good shape

pedestal and gains visualizationsome global histograms (pad occupancy, hit map, errors)

Data from gdc have been monitored during run in global and …

That’s clearly a hit

[email protected]

Page 7: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Online Monitoring/Offline

Data Storage :data are on CASTOR and some ESD are produced

Data Quality Checks :?? Is it about QA histograms…?

[email protected]

Page 8: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

COSMIC Data, Analysis Results

Raw data quality, event displays, Calibration results, Alignment results,Data reconstruction (ESD)Data analysis, First performance estimates i.e. signal/noise, tracks etc.

All this is ongoing, but no results so far… calibration runs have been taken pedestal runs show nominal/expected noisegms doesn’t seem to increase noise when runningESD are not analyzed yet ; we will probably reconstruct a few clusters (give an idea on clusters size, charge and S/N )

[email protected]

Page 9: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Hardware/Software Status for February Run + Goals

February Run : Full station 1 (as in december)Full station 2 (1/4 was successfully included in global in december)1 DDL from station either 3, 4 or 5

Goals :Pedestal/noise : done with the DA (committed in AliRoot) calibration : done running with 0-suppression : donealignment and tracks : needs tracks ! (and all the stations + survey)

Mostly the february run will be useful for testing the stability and training people. Some software work is needed as well to test and to finalize pieces of software (calibration, ECS scripts).

[email protected]

Page 10: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Action to Completion

Station 1 : ready for beam (dead channels ? but <<1%, all HV ok) Station 2 : ready for beam (to be confirmed this week)Station 3 : finishing the local commissioningStation 4 : finishing the local commissioningStation 5 : finishing the local commissioning

[email protected]

can not be stopped during the 5 weeks of the feb. cosmic run !

Page 11: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Conclusion

• Very good behavior of St1 : Cathode Pad Chambers works ;-)• Readout (CROCUS) is compliant with DATE and Trigger patterns handling is fine (L1/2 reject are implemented and tested in lab)

1 LDC fully loaded okand going to 2 LDC (partially loaded) was straightforward

→ including more should not be a problem (parallel treatment)• software for data taking (DA, ECS scripts, MOOD) is in very good shape• offline is working on the data ; pedestals runs are in OCDB and look fine

[email protected]

Visualization of a pedestal runin the OCDB.(L.Aphecetche)

Page 12: 4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC

Muon_trk questions

•Standalone runs with CTP emulator : will it possible to have an “all.seq” that include an sod+l2a+eod ? (without loading the 3 seq)

•What about documentation for shifters : ACR machines are disconnected from outside world. Everything should be done locally…

• ksnapshot + “openoffice, or anything else convenient”