3gpp ts 25.331

1899
3GPP TS 25.331 V10.10.0 (2012-12) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Radio Resource Control (RRC); Protocol specification (Release 10) The present document has been developed within the 3 rd Generation Partnership Project (3GPP TM ) and may be further elaborated for the purposes of 3GPP. The present document has not been subject to any approval process by the 3GPP Organizational Partners and shall not be implemented. This Specification is provided for future development work within 3GPP only. The Organizational Partners accept no liability for any use of this Specification. Specifications and reports for implementation of the 3GPP TM system should be obtained via the 3GPP Organizational Partners' Publications Offices.

Upload: mircea-cretzu

Post on 16-Apr-2015

102 views

Category:

Documents


1 download

DESCRIPTION

25331

TRANSCRIPT

3GPP TS 25.331 V10.10.0 (2012-12)Technical Specification

3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Radio Resource Control (RRC); Protocol specification (Release 10)

The present document has been developed within the 3rd Generation Partnership Project (3GPP TM) and may be further elaborated for the purposes of 3GPP. The present document has not been subject to any approval process by the 3GPP Organizational Partners and shall not be implemented. This Specification is provided for future development work within 3GPP only. The Organizational Partners accept no liability for any use of this Specification. Specifications and reports for implementation of the 3GPP TM system should be obtained via the 3GPP Organizational Partners' Publications Offices.

Release 10

2

3GPP TS 25.331 V10.10.0 (2012-12)

KeywordsUMTS, radio

3GPP Postal address

3GPP support office address650 Route des Lucioles - Sophia Antipolis Valbonne - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16

Internethttp://www.3gpp.org

Copyright Notification No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. 2012, 3GPP Organizational Partners (ARIB, ATIS, CCSA, ETSI, TTA, TTC). All rights reserved. UMTS is a Trade Mark of ETSI registered for the benefit of its members 3GPP is a Trade Mark of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners LTE is a Trade Mark of ETSI currently being registered for the benefit of its Members and of the 3GPP Organizational Partners GSM and the GSM logo are registered and owned by the GSM Association

3GPP

Release 10

3

3GPP TS 25.331 V10.10.0 (2012-12)

ContentsForeword........................................................................................................................................................... 37 1 2 33.1 3.2

Scope ...................................................................................................................................................... 38 References .............................................................................................................................................. 38 Definitions and abbreviations................................................................................................................. 41Definitions ....................................................................................................................................................... 41 Abbreviations ................................................................................................................................................... 43

44.1 4.2 4.3

General ................................................................................................................................................... 46Overview of the specification .......................................................................................................................... 46 RRC Layer Model............................................................................................................................................ 47 Protocol specification principles ...................................................................................................................... 50

55.1 5.2 5.3

RRC Functions and Services provided to upper layers .......................................................................... 50RRC Functions................................................................................................................................................. 50 RRC Services provided to upper layers ........................................................................................................... 51 Primitives between RRC and upper layers ...................................................................................................... 51

66.1 6.2 6.3

Services expected from lower layers ...................................................................................................... 51Services expected from Layer 2 ....................................................................................................................... 51 Services expected from Layer 1 ....................................................................................................................... 51 Signalling Radio Bearers ................................................................................................................................. 51

77.1 7.2 7.2.1 7.2.2 7.2.2.1 7.2.2.2 7.2.2.3

Protocol states ........................................................................................................................................ 52Overview of RRC States and State Transitions including GSM and E-UTRA ............................................... 52 Processes in UE modes/states .......................................................................................................................... 53 UE Idle mode ............................................................................................................................................. 53 UTRA RRC Connected mode .................................................................................................................... 53 URA_PCH or CELL_PCH state ........................................................................................................... 53 CELL_FACH state ............................................................................................................................... 54 CELL_DCH state ................................................................................................................................. 55

8

RRC procedures ..................................................................................................................................... 56

8.1 RRC Connection Management Procedures...................................................................................................... 57 8.1.1 Broadcast of system information................................................................................................................ 57 8.1.1.1 General ................................................................................................................................................. 57 8.1.1.1.1 System information structure .......................................................................................................... 57 8.1.1.1.2 System information blocks.............................................................................................................. 58 8.1.1.1.3 Segmentation and concatenation of system information blocks ..................................................... 64 8.1.1.1.4 Re-assembly of segments ................................................................................................................ 65 8.1.1.1.5 Scheduling of system information .................................................................................................. 66 8.1.1.2 Initiation ............................................................................................................................................... 66 8.1.1.3 Reception of SYSTEM INFORMATION messages by the UE ........................................................... 66 8.1.1.4 Void ...................................................................................................................................................... 67 8.1.1.5 Actions upon reception of the Master Information Block and Scheduling Block(s) ............................ 67 8.1.1.6 Actions upon reception of system information blocks ......................................................................... 71 8.1.1.6.1 System Information Block type 1 ................................................................................................... 72 8.1.1.6.2 System Information Block type 2 ................................................................................................... 73 8.1.1.6.3 System Information Block type 3 ................................................................................................... 73 8.1.1.6.4 System Information Block type 4 ................................................................................................... 78 8.1.1.6.5 System Information Block type 5 and 5bis ..................................................................................... 78 8.1.1.6.6 System Information Block type 6 ................................................................................................... 84 8.1.1.6.7 System Information Block type 7 ................................................................................................... 87 8.1.1.6.8 Void ................................................................................................................................................ 87 8.1.1.6.9 Void ................................................................................................................................................ 87 8.1.1.6.10 Void ................................................................................................................................................ 87 8.1.1.6.11 System Information Block type 11 ................................................................................................. 87 8.1.1.6.11a System Information Block type 11bis ............................................................................................. 89 8.1.1.6.12 System Information Block type 12 ................................................................................................. 89

3GPP

Release 10

4

3GPP TS 25.331 V10.10.0 (2012-12)

8.1.1.6.13 System Information Block type 13 ................................................................................................. 91 8.1.1.6.14 System Information Block type 14 ................................................................................................. 91 8.1.1.6.15 System Information Block type 15 ................................................................................................. 91 8.1.1.6.15.0 System Information Block type 15bis ....................................................................................... 91 8.1.1.6.15.1 System Information Block type 15.1 ......................................................................................... 92 8.1.1.6.15.1a System Information Block type 15.1bis .................................................................................... 92 8.1.1.6.15.2 System Information Block type 15.2 ......................................................................................... 92 8.1.1.6.15.2a System Information Block type 15.2bis .................................................................................... 93 8.1.1.6.15.2b System Information Block type 15.2ter..................................................................................... 93 8.1.1.6.15.3 System Information Block type 15.3 ......................................................................................... 93 8.1.1.6.15.3a System Information Block type 15.3bis .................................................................................... 94 8.1.1.6.15.4 System Information Block type 15.4 ......................................................................................... 95 8.1.1.6.15.5 System Information Block type 15.5 ......................................................................................... 95 8.1.1.6.15.6 System Information Block type 15.6 ......................................................................................... 95 8.1.1.6.15.7 System Information Block type 15.7 ......................................................................................... 95 8.1.1.6.15.8 System Information Block type 15.8 ......................................................................................... 95 8.1.1.6.16 System Information Block type 16 ................................................................................................. 96 8.1.1.6.17 System Information Block type 17 ................................................................................................. 96 8.1.1.6.18 System Information Block type 18 ................................................................................................. 96 8.1.1.6.19 System Information Block type 19 ................................................................................................. 98 8.1.1.6.20 System Information Block type 20 ................................................................................................. 98 8.1.1.7 Modification of system information ..................................................................................................... 98 8.1.1.7.1 Modification of system information blocks using a value tag ........................................................ 98 8.1.1.7.2 Synchronised modification of system information blocks .............................................................. 99 8.1.1.7.3 Actions upon system information change ....................................................................................... 99 8.1.1.7.4 Actions upon expiry of a system information expiry timer........................................................... 100 8.1.1.8 Reception of System Information Container by the UE ..................................................................... 100 8.1.2 Paging....................................................................................................................................................... 100 8.1.2.1 General ............................................................................................................................................... 100 8.1.2.2 Initiation ............................................................................................................................................. 101 8.1.2.3 Reception of a PAGING TYPE 1 message by the UE ....................................................................... 101 8.1.3 RRC connection establishment ................................................................................................................ 103 8.1.3.1 General ............................................................................................................................................... 103 8.1.3.2 Initiation ............................................................................................................................................. 103 8.1.3.3 RRC CONNECTION REQUEST message contents to set ................................................................ 104 8.1.3.4 Reception of an RRC CONNECTION REQUEST message by the UTRAN .................................... 107 8.1.3.5 Cell re-selection, T300 or T318 timeout ............................................................................................. 108 8.1.3.5a Abortion of RRC connection establishment ....................................................................................... 109 8.1.3.6 Reception of an RRC CONNECTION SETUP message by the UE .................................................. 109 8.1.3.7 Physical channel failure or cell re-selection ....................................................................................... 113 8.1.3.8 Invalid RRC CONNECTION SETUP message, unsupported configuration or invalid configuration....................................................................................................................................... 114 8.1.3.9 Reception of an RRC CONNECTION REJECT message by the UE ................................................ 115 8.1.3.10 Invalid RRC CONNECTION REJECT message ............................................................................... 118 8.1.4 RRC connection release ........................................................................................................................... 119 8.1.4.1 General ............................................................................................................................................... 119 8.1.4.2 Initiation ............................................................................................................................................. 119 8.1.4.3 Reception of an RRC CONNECTION RELEASE message by the UE ............................................. 119 8.1.4.4 Invalid RRC CONNECTION RELEASE message ............................................................................ 121 8.1.4.5 Cell re-selection or radio link failure .................................................................................................. 122 8.1.4.6 Expiry of timer T308, unacknowledged mode transmission .............................................................. 122 8.1.4.7 Void .................................................................................................................................................... 123 8.1.4.8 Reception of an RRC CONNECTION RELEASE COMPLETE message by UTRAN ..................... 123 8.1.4.9 Unsuccessful transmission of the RRC CONNECTION RELEASE COMPLETE message, acknowledged mode transmission ...................................................................................................... 123 8.1.4.10 Detection of loss of dedicated physical channel by UTRAN in CELL_DCH state ............................ 123 8.1.4.11 Failure to receive RRC CONNECTION RELEASE COMPLETE message by UTRAN .................. 123 8.1.4a RRC connection release requested by upper layers.................................................................................. 124 8.1.4a.1 General ............................................................................................................................................... 124 8.1.4a.2 Initiation ............................................................................................................................................. 124 8.1.5 Void .......................................................................................................................................................... 124

3GPP

Release 10

5

3GPP TS 25.331 V10.10.0 (2012-12)

8.1.6 8.1.6.1 8.1.6.2 8.1.6.3 8.1.6.4 8.1.6.5 8.1.6.6 8.1.7 8.1.7.1 8.1.7.2 8.1.7.3 8.1.7.4 8.1.8 8.1.8.1 8.1.8.2 8.1.8.2a 8.1.8.2ab 8.1.8.2b 8.1.8.2c 8.1.8.3 8.1.9 8.1.9.1 8.1.9.2 8.1.9.3 8.1.9.3a 8.1.9.4 8.1.10 8.1.10.1 8.1.10.2 8.1.10.2a 8.1.10.2b 8.1.10.2c 8.1.10.3 8.1.11 8.1.11.1 8.1.11.2 8.1.11.3 8.1.11.4 8.1.12 8.1.12.1 8.1.12.2 8.1.12.2.1 8.1.12.2.2 8.1.12.3 8.1.12.3.1 8.1.12.4 8.1.12.4a 8.1.12.4b 8.1.12.4c 8.1.12.5 8.1.12.6 8.1.13 8.1.13.1 8.1.13.2 8.1.13.3 8.1.13.4 8.1.13.5 8.1.14 8.1.14.1 8.1.14.2 8.1.14.2a

Transmission of UE capability information ............................................................................................. 124 General ............................................................................................................................................... 124 Initiation ............................................................................................................................................. 124 Reception of a UE CAPABILITY INFORMATION message by the UTRAN ................................. 127 Reception of the UE CAPABILITY INFORMATION CONFIRM message by the UE ................... 127 Invalid UE CAPABILITY INFORMATION CONFIRM message ................................................... 128 T304 timeout ...................................................................................................................................... 128 UE capability enquiry............................................................................................................................... 129 General ............................................................................................................................................... 129 Initiation ............................................................................................................................................. 129 Reception of a UE CAPABILITY ENQUIRY message by the UE.................................................... 129 Invalid UE CAPABILITY ENQUIRY message................................................................................. 129 Initial Direct transfer ................................................................................................................................ 130 General ............................................................................................................................................... 130 Initiation of Initial direct transfer procedure in the UE ...................................................................... 130 RLC re-establishment or inter-RAT change ....................................................................................... 132 Inter-RAT handover from UTRAN to GERAN Iu mode ................................................................... 132 Abortion of signalling connection establishment ............................................................................... 132 Inter-RAT handover from UTRAN to E-UTRAN.............................................................................. 133 Reception of INITIAL DIRECT TRANSFER message by the UTRAN ........................................... 133 Downlink Direct transfer .......................................................................................................................... 133 General ............................................................................................................................................... 133 Initiation of downlink direct transfer procedure in the UTRAN ........................................................ 133 Reception of a DOWNLINK DIRECT TRANSFER message by the UE .......................................... 134 No signalling connection exists .......................................................................................................... 134 Invalid DOWNLINK DIRECT TRANSFER message ....................................................................... 134 Uplink Direct transfer............................................................................................................................... 135 General ............................................................................................................................................... 135 Initiation of uplink direct transfer procedure in the UE ...................................................................... 135 RLC re-establishment or inter-RAT change ....................................................................................... 136 Inter-RAT handover from UTRAN to GERAN Iu mode ................................................................... 136 Inter-RAT handover from UTRAN to E-UTRAN.............................................................................. 136 Reception of UPLINK DIRECT TRANSFER message by the UTRAN ........................................... 136 UE dedicated paging ................................................................................................................................ 136 General ............................................................................................................................................... 137 Initiation ............................................................................................................................................. 137 Reception of a PAGING TYPE 2 message by the UE ....................................................................... 137 Invalid PAGING TYPE 2 message .................................................................................................... 137 Security mode control .............................................................................................................................. 138 General ............................................................................................................................................... 138 Initiation ............................................................................................................................................. 138 Ciphering configuration change .................................................................................................... 138 Integrity protection configuration change ..................................................................................... 139 Reception of SECURITY MODE COMMAND message by the UE ................................................. 141 New ciphering and integrity protection keys ................................................................................ 145 Void .................................................................................................................................................... 146 Incompatible simultaneous security reconfiguration .......................................................................... 146 Cell update procedure during security reconfiguration....................................................................... 147 Invalid configuration .......................................................................................................................... 148 Reception of SECURITY MODE COMPLETE message by the UTRAN......................................... 148 Invalid SECURITY MODE COMMAND message ........................................................................... 150 Signalling connection release procedure .................................................................................................. 151 General ............................................................................................................................................... 151 Initiation of SIGNALLING CONNECTION RELEASE by the UTRAN ......................................... 151 Reception of SIGNALLING CONNECTION RELEASE by the UE ................................................ 151 Invalid SIGNALLING CONNECTION RELEASE message ............................................................ 151 Invalid configuration .......................................................................................................................... 152 Signalling connection release indication procedure ................................................................................. 152 General ............................................................................................................................................... 152 Initiation ............................................................................................................................................. 152 RLC re-establishment or inter-RAT change ....................................................................................... 154

3GPP

Release 10

6

3GPP TS 25.331 V10.10.0 (2012-12)

8.1.14.3 8.1.14.4 8.1.15 8.1.15.1 8.1.15.2 8.1.15.3 8.1.15.4 8.1.15.5 8.1.15.6 8.1.16 8.1.16.1 8.1.16.2 8.1.16.3 8.1.17 8.1.17.1 8.1.17.2 8.1.17.3

Reception of SIGNALLING CONNECTION RELEASE INDICATION by the UTRAN ............... 154 Expiry of timer T323 .......................................................................................................................... 155 Counter check procedure .......................................................................................................................... 155 General ............................................................................................................................................... 155 Initiation ............................................................................................................................................. 155 Reception of a COUNTER CHECK message by the UE ................................................................... 155 Reception of the COUNTER CHECK RESPONSE message by UTRAN ......................................... 156 Cell re-selection .................................................................................................................................. 156 Invalid COUNTER CHECK message ................................................................................................ 156 Inter RAT handover information transfer................................................................................................. 157 General ............................................................................................................................................... 157 Initiation ............................................................................................................................................. 157 INTER RAT HANDOVER INFO message contents to set ................................................................ 157 ETWS primary notification with security procedure ............................................................................... 159 General ............................................................................................................................................... 159 Initiation ............................................................................................................................................. 160 Actions upon reception of the IE "ETWS information" in a PAGING TYPE 1 or a SYSTEM INFORMATION CHANGE INDICATION message ........................................................................ 160 8.1.17.3.1 Common actions ........................................................................................................................... 160 8.1.17.3.2 ETWS reception via S-CCPCH in idle mode, URA_PCH and CELL_PCH state ........................ 160 8.1.17.3.3 ETWS reception via HS-DSCH in URA_PCH and CELL_PCH state (FDD and 1.28 Mcps TDD only) ..................................................................................................................................... 161 8.1.17.3.4 ETWS reception via S-CCPCH in CELL_FACH state................................................................. 161 8.1.17.3.5 ETWS reception via HS-DSCH in CELL_FACH state, DRX not configured (FDD and 1.28 Mcps TDD only) ........................................................................................................................... 161 8.1.17.3.6 ETWS reception via HS-DSCH in CELL_FACH state, DRX configured (FDD and 1.28 Mcps TDD only) ........................................................................................................................... 161 8.1.17.4 Reception of the ETWS PRIMARY NOTIFICATION WITH SECURITY message ........................ 162 8.1.17.5 Forward of the ETWS primary notification to the upper layers ......................................................... 162 8.1.17.6 Expiry of timer T325 .......................................................................................................................... 163 8.2 Radio Bearer control procedures ................................................................................................................... 163 8.2.1 Radio bearer establishment ...................................................................................................................... 163 8.2.2 Reconfiguration procedures ..................................................................................................................... 163 8.2.2.1 General ............................................................................................................................................... 165 8.2.2.2 Initiation ............................................................................................................................................. 166 8.2.2.2a Initiation of handover from GERAN Iu mode .................................................................................... 167 8.2.2.3 Reception of RADIO BEARER SETUP or RADIO BEARER RECONFIGURATION or RADIO BEARER RELEASE or TRANSPORT CHANNEL RECONFIGURATION or PHYSICAL CHANNEL RECONFIGURATION message or Target cell HS-SCCH order by the UE....................................................................................................................................................... 168 8.2.2.3a Reception of RADIO BEARER RECONFIGURATION message by the UE performing handover from GERAN Iu mode ........................................................................................................ 186 8.2.2.4 Transmission of a response message by the UE, normal case ............................................................ 187 8.2.2.5 Reception of a response message by the UTRAN, normal case ......................................................... 189 8.2.2.5a Rejection by the UE ............................................................................................................................ 190 8.2.2.6 Unsupported configuration in the UE ................................................................................................. 190 8.2.2.7 Physical channel failure ...................................................................................................................... 191 8.2.2.8 Cell re-selection .................................................................................................................................. 192 8.2.2.9 Transmission of a response message by the UE, failure case ............................................................. 192 8.2.2.10 Reception of a response message by the UTRAN, failure case .......................................................... 193 8.2.2.11 Invalid configuration .......................................................................................................................... 193 8.2.2.12 Incompatible simultaneous reconfiguration........................................................................................ 193 8.2.2.12a Incompatible simultaneous security reconfiguration .......................................................................... 194 8.2.2.12b Cell update procedure during security reconfiguration....................................................................... 194 8.2.2.13 Invalid received message .................................................................................................................... 195 8.2.2.14 Radio link failure ................................................................................................................................ 195 8.2.3 Radio bearer release ................................................................................................................................. 196 8.2.4 Transport channel reconfiguration ........................................................................................................... 196 8.2.5 Transport format combination control...................................................................................................... 196 8.2.5.1 General ............................................................................................................................................... 197 8.2.5.2 Initiation ............................................................................................................................................. 197

3GPP

Release 10

7

3GPP TS 25.331 V10.10.0 (2012-12)

8.2.5.3 Reception of a TRANSPORT FORMAT COMBINATION CONTROL message by the UE........... 197 8.2.5.4 Invalid configuration .......................................................................................................................... 199 8.2.5.5 Invalid TRANSPORT FORMAT COMBINATION CONTROL message ........................................ 199 8.2.6 Physical channel reconfiguration ............................................................................................................. 200 8.2.7 Physical Shared Channel Allocation [TDD only] .................................................................................... 200 8.2.7.1 General ............................................................................................................................................... 200 8.2.7.2 Initiation ............................................................................................................................................. 200 8.2.7.3 Reception of a PHYSICAL SHARED CHANNEL ALLOCATION message by the UE ................. 201 8.2.7.4 Invalid PHYSICAL SHARED CHANNEL ALLOCATION message .............................................. 203 8.2.8 PUSCH capacity request [TDD only] ...................................................................................................... 203 8.2.8.1 General ............................................................................................................................................... 203 8.2.8.2 Initiation ............................................................................................................................................. 203 8.2.8.3 PUSCH CAPACITY REQUEST message contents to set ................................................................. 204 8.2.8.4 Reception of a PUSCH CAPACITY REQUEST message by the UTRAN ....................................... 205 8.2.8.5 T310 expiry ........................................................................................................................................ 205 8.2.9 Void .......................................................................................................................................................... 205 8.2.10 Uplink Physical Channel Control [TDD only] ......................................................................................... 206 8.2.10.1 General ............................................................................................................................................... 206 8.2.10.2 Initiation ............................................................................................................................................. 206 8.2.10.3 Reception of UPLINK PHYSICAL CHANNEL CONTROL message by the UE ............................ 206 8.2.10.4 Invalid UPLINK PHYSICAL CHANNEL CONTROL message....................................................... 206 8.2.11 Physical channel reconfiguration failure .................................................................................................. 207 8.2.11.1 General ............................................................................................................................................... 207 8.2.11.2 Runtime error due to overlapping compressed mode configurations ................................................. 207 8.2.11.3 Void .................................................................................................................................................... 208 8.3 RRC connection mobility procedures ............................................................................................................ 208 8.3.1 Cell and URA update procedures ............................................................................................................. 208 8.3.1.1 General ............................................................................................................................................... 210 8.3.1.2 Initiation ............................................................................................................................................. 211 8.3.1.3 CELL UPDATE / URA UPDATE message contents to set ............................................................... 220 8.3.1.4 T305 expiry and the UE detects "out of service area" ........................................................................ 224 8.3.1.4.1 Re-entering "in service area" ........................................................................................................ 224 8.3.1.4.2 Expiry of timer T307 .................................................................................................................... 225 8.3.1.5 Reception of an CELL UPDATE/URA UPDATE message by the UTRAN ..................................... 225 8.3.1.6 Reception of the CELL UPDATE CONFIRM/URA UPDATE CONFIRM message by the UE ...... 226 8.3.1.7 Transmission of a response message to UTRAN ............................................................................... 236 8.3.1.7a Physical channel failure ...................................................................................................................... 239 8.3.1.8 Unsupported configuration by the UE ................................................................................................ 241 8.3.1.9 Invalid configuration .......................................................................................................................... 242 8.3.1.9a Incompatible simultaneous reconfiguration........................................................................................ 243 8.3.1.9b Security reconfiguration during Cell update procedure ...................................................................... 244 8.3.1.10 Confirmation error of URA ID list ..................................................................................................... 245 8.3.1.11 Invalid CELL UPDATE CONFIRM/URA UPDATE CONFIRM message ...................................... 246 8.3.1.12 T302 expiry or cell reselection ........................................................................................................... 246 8.3.1.13 T314 expiry ........................................................................................................................................ 250 8.3.1.14 T315 expiry ........................................................................................................................................ 250 8.3.1.15 Reception of the UTRAN MOBILITY INFORMATION CONFIRM message by the UTRAN ....... 251 8.3.1.16 T320 Expiry ........................................................................................................................................ 251 8.3.2 URA update .............................................................................................................................................. 252 8.3.3 UTRAN mobility information .................................................................................................................. 252 8.3.3.1 General ............................................................................................................................................... 252 8.3.3.2 Initiation ............................................................................................................................................. 252 8.3.3.3 Reception of UTRAN MOBILITY INFORMATION message by the UE ........................................ 252 8.3.3.4 Reception of an UTRAN MOBILITY INFORMATION CONFIRM message by the UTRAN ........ 256 8.3.3.5 Cell re-selection .................................................................................................................................. 256 8.3.3.5a Incompatible simultaneous security reconfiguration .......................................................................... 257 8.3.3.6 Invalid UTRAN MOBILITY INFORMATION message .................................................................. 257 8.3.3.7 T322 expiry ........................................................................................................................................ 257 8.3.4 Active set update ...................................................................................................................................... 258 8.3.4.1 General ............................................................................................................................................... 258 8.3.4.2 Initiation ............................................................................................................................................. 258

3GPP

Release 10

8

3GPP TS 25.331 V10.10.0 (2012-12)

8.3.4.3 Reception of an ACTIVE SET UPDATE message by the UE ........................................................... 259 8.3.4.3a Handling of ACTIVE SET UPDATE message on secondary uplink frequency (FDD only)............. 261 8.3.4.4 Unsupported configuration in the UE ................................................................................................. 262 8.3.4.5 Invalid configuration .......................................................................................................................... 263 8.3.4.5a Void .................................................................................................................................................... 264 8.3.4.5b Incompatible simultaneous reconfiguration........................................................................................ 264 8.3.4.6 Reception of the ACTIVE SET UPDATE COMPLETE message by the UTRAN ............................ 264 8.3.4.7 Reception of the ACTIVE SET UPDATE FAILURE message by the UTRAN ................................ 265 8.3.4.8 Invalid ACTIVE SET UPDATE message .......................................................................................... 265 8.3.4.9 Reception of an ACTIVE SET UPDATE message in wrong state ..................................................... 265 8.3.5 Hard handover .......................................................................................................................................... 265 8.3.5.1 Timing re-initialised hard handover ................................................................................................... 266 8.3.5.1.1 General .......................................................................................................................................... 266 8.3.5.1.2 Initiation (FDD only) .................................................................................................................... 266 8.3.5.2 Timing-maintained hard handover ..................................................................................................... 267 8.3.5.2.1 General .......................................................................................................................................... 267 8.3.5.2.2 Initiation (FDD only) .................................................................................................................... 267 8.3.6 Inter-RAT handover to UTRAN .............................................................................................................. 268 8.3.6.1 General ............................................................................................................................................... 268 8.3.6.2 Initiation ............................................................................................................................................. 268 8.3.6.3 Reception of HANDOVER TO UTRAN COMMAND message by the UE ...................................... 269 8.3.6.4 Invalid Handover to UTRAN command message .............................................................................. 274 8.3.6.4a Unsupported configuration in HANDOVER TO UTRAN COMMAND message ............................ 274 8.3.6.5 UE fails to perform handover ............................................................................................................. 274 8.3.6.6 Reception of message HANDOVER TO UTRAN COMPLETE by the UTRAN ............................. 275 8.3.7 Inter-RAT handover from UTRAN .......................................................................................................... 275 8.3.7.1 General ............................................................................................................................................... 275 8.3.7.2 Initiation ............................................................................................................................................. 275 8.3.7.3 Reception of a HANDOVER FROM UTRAN COMMAND message by the UE ............................. 276 8.3.7.4 Successful completion of the inter-RAT handover ............................................................................. 277 8.3.7.5 UE fails to complete requested handover ........................................................................................... 278 8.3.7.6 Invalid HANDOVER FROM UTRAN COMMAND message .......................................................... 278 8.3.7.7 Reception of an HANDOVER FROM UTRAN FAILURE message by UTRAN ............................. 279 8.3.7.8 Unsupported configuration in HANDOVER FROM UTRAN COMMAND message ...................... 279 8.3.7.8a Reception of HANDOVER FROM UTRAN COMMAND message by UE in CELL_FACH .......... 280 8.3.8 Inter-RAT cell reselection to UTRAN ..................................................................................................... 280 8.3.8.1 General ............................................................................................................................................... 280 8.3.8.2 Initiation ............................................................................................................................................. 280 8.3.8.2a Initiation of inter-RAT cell reselection from GERAN Iu mode ......................................................... 281 8.3.8.3 UE fails to complete an inter-RAT cell reselection ............................................................................ 281 8.3.8.3a UE fails to complete an inter-RAT cell reselection from GERAN Iu mode ....................................... 281 8.3.9 Inter-RAT cell reselection from UTRAN................................................................................................. 282 8.3.9.1 General ............................................................................................................................................... 282 8.3.9.2 Initiation ............................................................................................................................................. 282 8.3.9.2a Initiation of inter-RAT cell reselection to GERAN Iu mode .............................................................. 282 8.3.9.3 Successful cell reselection .................................................................................................................. 282 8.3.9.4 UE fails to complete an inter-RAT cell reselection ............................................................................ 282 8.3.10 Inter-RAT cell change order to UTRAN .................................................................................................. 283 8.3.10.1 General ............................................................................................................................................... 283 8.3.10.2 Initiation ............................................................................................................................................. 283 8.3.10.3 UE fails to complete an inter-RAT cell change order......................................................................... 283 8.3.11 Inter-RAT cell change order from UTRAN ............................................................................................. 283 8.3.11.1 General ............................................................................................................................................... 283 8.3.11.2 Initiation ............................................................................................................................................. 284 8.3.11.3 Reception of an CELL CHANGE ORDER FROM UTRAN message by the UE ............................. 284 8.3.11.4 Successful completion of the cell change order.................................................................................. 285 8.3.11.5 Expiry of timer T309 or UE fails to complete requested cell change order........................................ 285 8.3.11.6 Unsupported configuration in CELL CHANGE ORDER FROM UTRAN message ......................... 286 8.3.11.7 Invalid CELL CHANGE ORDER FROM UTRAN message ............................................................ 287 8.4 Measurement procedures ............................................................................................................................... 287 8.4.0 Measurement related definitions .............................................................................................................. 287

3GPP

Release 10

9

3GPP TS 25.331 V10.10.0 (2012-12)

8.4.1 8.4.1.1 8.4.1.2 8.4.1.3 8.4.1.4 8.4.1.4a 8.4.1.5 8.4.1.6 8.4.1.6.1 8.4.1.6.2 8.4.1.6.3 8.4.1.6.4 8.4.1.6.5 8.4.1.6.6 8.4.1.6.7 8.4.1.6.8 8.4.1.6a 8.4.1.7 8.4.1.7.1 8.4.1.7.2 8.4.1.7.3 8.4.1.7.4 8.4.1.7.5 8.4.1.7.6 8.4.1.8 8.4.1.8.1 8.4.1.8.2 8.4.1.8.3 8.4.1.8.4 8.4.1.8.5 8.4.1.9 8.4.1.9.1 8.4.1.9.2 8.4.1.9.3 8.4.1.9.4 8.4.1.9.5 8.4.1.9a 8.4.1.9a.1 8.4.1.9a.2 8.4.1.9a.3 8.4.1.9a.4 8.4.1.9b 8.4.1.9b.1 8.4.1.9b.2 8.4.1.9b.3 8.4.1.9b.4 8.4.1.9b.5 8.4.1.9c 8.4.1.9c.1 8.4.1.9c.2 8.4.1.9c.3 8.4.1.10 8.4.1.10.1 8.4.1.10.2 8.4.1.10.3 8.4.1.11 8.4.1.11.1 8.4.2 8.4.2.1 8.4.2.2 8.4.3

Measurement control ................................................................................................................................ 289 General ............................................................................................................................................... 289 Initiation ............................................................................................................................................. 289 Reception of MEASUREMENT CONTROL by the UE.................................................................... 290 Unsupported measurement in the UE ................................................................................................. 300 Configuration Incomplete ................................................................................................................... 300 Invalid MEASUREMENT CONTROL message ............................................................................... 301 Measurements after transition from CELL_DCH to CELL_FACH/CELL_PCH/URA_PCH state ... 301 Intra-frequency measurement ....................................................................................................... 301 Inter-frequency measurement ....................................................................................................... 302 Inter-RAT measurement ............................................................................................................... 303 Quality measurement .................................................................................................................... 303 UE internal measurement .............................................................................................................. 303 Traffic volume measurement ........................................................................................................ 303 UE positioning measurement ........................................................................................................ 304 CSG Proximity detection measurement ........................................................................................ 306 Actions in CELL_FACH/CELL_PCH/URA/PCH state upon cell re-selection.................................. 306 Measurements after transition from CELL_FACH to CELL_DCH state ........................................... 306 Intra-frequency measurement ....................................................................................................... 307 Inter-frequency measurement ....................................................................................................... 307 Inter-RAT measurement ............................................................................................................... 307 Traffic volume measurement ........................................................................................................ 307 UE positioning measurement ........................................................................................................ 308 CSG Proximity detection measurement ........................................................................................ 309 Measurements after transition from idle mode to CELL_DCH state ................................................. 309 Intra-frequency measurement ....................................................................................................... 309 Inter-frequency measurement ....................................................................................................... 309 Inter-RAT measurement ............................................................................................................... 309 Traffic volume measurement ........................................................................................................ 309 UE positioning measurement ........................................................................................................ 310 Measurements after transition from idle mode to CELL_FACH state ............................................... 310 Intra-frequency measurement ....................................................................................................... 310 Inter-frequency measurement ....................................................................................................... 310 Inter-RAT measurement ............................................................................................................... 310 Traffic volume measurement ........................................................................................................ 311 UE positioning measurement ........................................................................................................ 311 Measurements after transition from connected mode to idle mode .................................................... 311 Intra-frequency measurement ....................................................................................................... 311 Inter-frequency measurement ....................................................................................................... 311 Inter-RAT measurement ............................................................................................................... 312 UE positioning measurement ........................................................................................................ 312 Measurements after transition from CELL_FACH to CELL_PCH/URA_PCH ................................ 312 Traffic volume measurement ........................................................................................................ 312 UE positioning measurement ........................................................................................................ 312 Inter-RAT measurement ............................................................................................................... 313 Intra-frequency measurement ....................................................................................................... 313 Inter-frequency measurement ....................................................................................................... 313 Measurements after transition from CELL_PCH/URA_PCH to CELL_FACH ................................ 313 Traffic volume measurement ........................................................................................................ 313 UE positioning measurement ........................................................................................................ 314 Inter-RAT measurement ............................................................................................................... 314 Changes in measurement objects ........................................................................................................ 314 Traffic volume measurement ........................................................................................................ 314 Quality measurement .................................................................................................................... 315 Intra-frequency, Inter-frequency and Inter-RAT measurements ................................................... 315 Cell Reselection (FDD only and 1.28 Mcps TDD only) .................................................................... 315 Traffic volume measurement ........................................................................................................ 315 Measurement report.................................................................................................................................. 316 General ............................................................................................................................................... 316 Initiation ............................................................................................................................................. 316 Assistance Data Delivery ......................................................................................................................... 319

3GPP

Release 10

10

3GPP TS 25.331 V10.10.0 (2012-12)

8.4.3.1 8.4.3.2 8.4.3.3 8.4.3.4 8.5 8.5.1 8.5.2 8.5.3 8.5.4 8.5.4A 8.5.4B 8.5.5 8.5.5.1 8.5.5.1.1 8.5.5.1.2 8.5.5.1.3 8.5.5.1.4 8.5.5.2 8.5.5.2.1 8.5.5.2.2 8.5.5.3 8.5.5.4 8.5.6 8.5.6a 8.5.7 8.5.8 8.5.9 8.5.10 8.5.10.1 8.5.10.2 8.5.10.3 8.5.11 8.5.11a 8.5.12 8.5.13 8.5.14 8.5.14a 8.5.15 8.5.15.1 8.5.15.2 8.5.15.3 8.5.15.4 8.5.15.5 8.5.16 8.5.17 8.5.18 8.5.18.1 8.5.18.2 8.5.19 8.5.19a 8.5.20 8.5.21 8.5.22 8.5.23 8.5.24 8.5.25 8.5.26

General ............................................................................................................................................... 319 Initiation ............................................................................................................................................. 319 Reception of ASSISTANCE DATA DELIVERY message by the UE .............................................. 319 Invalid ASSISTANCE DATA DELIVERY message ........................................................................ 319 General procedures ........................................................................................................................................ 320 Selection of initial UE identity ................................................................................................................. 320 Actions when entering idle mode from connected mode ......................................................................... 320 Open loop power control upon establishment of DPCCH........................................................................ 322 Physical channel establishment criteria in CELL_DCH state .................................................................. 322 Physical channel establishment criteria for Enhanced Uplink in CELL_FACH state and Idle mode ...... 323 Physical channel establishment criteria in CELL_DCH state on the secondary uplink frequency (FDD only) ............................................................................................................................................... 323 Actions in "out of service area" and "in service area" .............................................................................. 323 Detection of "out of service" area ....................................................................................................... 323 Actions following detection of "out of service" area in URA_PCH or CELL_PCH state.................. 323 Actions following detection of "out of service" area in CELL_FACH state ...................................... 323 Actions following detection of "out of service" area on transition from CELL_DCH to URA_PCH or CELL_PCH ................................................................................................................. 324 Actions following detection of "out of service" area on transition from CELL_DCH to CELL_FACH ..................................................................................................................................... 324 Detection of "in service" area ............................................................................................................. 324 Actions following Re-entry into "in service area" in URA_PCH or CELL_PCH state ...................... 324 Actions following re-entry into "in service area" in CELL_FACH state ........................................... 324 T316 expiry ........................................................................................................................................ 325 T317 expiry ........................................................................................................................................ 325 Radio link failure criteria and actions upon radio link failure .................................................................. 325 Radio link failure criteria and actions upon radio link failure on the secondary uplink frequency (FDD only) ............................................................................................................................................... 326 Open loop power control .......................................................................................................................... 326 Maintenance of Hyper Frame Numbers ................................................................................................... 331 START value calculation ......................................................................................................................... 332 Integrity protection ................................................................................................................................... 332 Integrity protection in downlink ......................................................................................................... 333 Integrity protection in uplink .............................................................................................................. 334 Calculation of message authentication code ....................................................................................... 335 FACH measurement occasion calculation................................................................................................ 335 CELL_DCH measurement occasion calculation (1.28 Mcps TDD only) ................................................ 337 Establishment of Access Service Classes ................................................................................................. 337 Mapping of Access Classes to Access Service Classes ............................................................................ 338 PLMN Type Selection .............................................................................................................................. 338 Neighbour cells list narrowing for cell reselection ................................................................................... 339 CFN calculation ....................................................................................................................................... 339 Initialisation for CELL_DCH state after state transition .................................................................... 339 Initialisation in CELL_DCH state at hard handover........................................................................... 339 Initialisation for CELL_FACH ........................................................................................................... 340 Initialisation after intersystem handover to UTRAN .......................................................................... 340 Initialisation for MTCH and/or MSCH carried on S-CCPCH that may be soft combined ................. 340 Configuration of CTCH occasions ........................................................................................................... 340 PRACH selection ..................................................................................................................................... 341 Selection of RACH TTI ........................................................................................................................... 342 FDD .................................................................................................................................................... 342 1.28 Mcps TDD .................................................................................................................................. 343 Secondary CCPCH selection .................................................................................................................... 343 Secondary CCPCH and FACH selection for MCCH reception ............................................................... 344 Unsupported configuration ....................................................................................................................... 344 Actions related to Radio Bearer mapping ................................................................................................ 344 Actions when entering another RAT from connected mode .................................................................... 352 Measured results on RACH...................................................................................................................... 353 Change of PLMN while in RRC connected mode ................................................................................... 354 Actions related to HS_DSCH_RECEPTION variable ............................................................................. 355 Service prioritisation ................................................................................................................................ 357

3GPP

Release 10

11

3GPP TS 25.331 V10.10.0 (2012-12)

8.5.27 8.5.28 8.5.29 8.5.30 8.5.31 8.5.32 8.5.33 8.5.34 8.5.35 8.5.36 8.5.37 8.5.37a 8.5.38 8.5.39 8.5.40 8.5.40a 8.5.41 8.5.42 8.5.43 8.5.44 8.5.45 8.5.45a 8.5.46 8.5.47 8.5.48 8.5.49 8.5.49a 8.5.50 8.5.51 8.5.52 8.5.53 8.5.54 8.5.55 8.5.56 8.5.57 8.5.58 8.5.59 8.5.60 8.5.61 8.5.62 8.5.63 8.5.63.1 8.5.63.2 8.5.63.3 8.5.63.4 8.5.63.5 8.5.64 8.5.64.1 8.5.64.2 8.5.64.3 8.5.64.4 8.5.65 8.5.65.1 8.5.65.2 8.5.66 8.5.66.1

MBMS frequency selection ...................................................................................................................... 357 Actions related to E_DCH_TRANSMISSION variable........................................................................... 359 MBMS modification period identity calculation ...................................................................................... 362 Detecting MBMS service reception inability ........................................................................................... 362 Actions related to DEFERRED_MEASUREMENT_STATUS variable ................................................. 363 Actions related to MIMO_PARAMS variable ......................................................................................... 363 Actions related to MIMO_STATUS variable .......................................................................................... 364 Actions related to DTX_DRX_STATUS variable (FDD only)................................................................ 365 Actions related to HS_SCCH_LESS_STATUS variable (FDD only) ..................................................... 366 Actions related to HS_DSCH_RECEPTION_CELL_FACH_STATE variable (FDD and 1.28 Mcps TDD only) ................................................................................................................................................ 367 Actions related to HS_DSCH_RECEPTION_OF_CCCH_ENABLED and HS_DSCH_RECEPTION_OF_ETWS_ENABLED variables (FDD and 1.28 Mcps TDD only) ........... 369 Actions related to HS_DSCH_RECEPTION_GENERAL ...................................................................... 370 Common H-RNTI selection (FDD and 1.28 Mcps TDD only) ................................................................ 370 PICH selection for HSDPA based paging (FDD and 1.28 Mcps TDD only) ........................................... 370 HS_DSCH Reception in CELL_PCH and URA_PCH (FDD only) ......................................................... 371 HS_DSCH Reception in CELL_PCH and URA_PCH (1.28 Mcps TDD only) ....................................... 372 HS-PDSCH channelisation codes selection for paging reception (FDD and 1.28 Mcps TDD only) ....... 373 Autonomous UTRAN DRX Cycle length coefficient change .................................................................. 374 Reception of MBMS from a cell operating in MBSFN mode .................................................................. 374 HS-DSCH CQI reporting tables ............................................................................................................... 374 Enhanced Uplink in CELL_FACH state and Idle mode (FDD only) ....................................................... 374 Enhanced Uplink in CELL_FACH state and Idle mode (1.28 Mcps TDD only) ..................................... 375 Actions related to COMMON_E_DCH_TRANSMISSION variable (FDD and 1.28 Mcps TDD only) ......................................................................................................................................................... 376 Actions related to READY_FOR_COMMON_EDCH variable (FDD and 1.28 Mcps TDD only) ......... 378 Actions related to HS_DSCH_DRX_CELL_FACH_STATUS variable (FDD and 1.28 Mcps TDD only) ......................................................................................................................................................... 379 CELL_FACH HS-DSCH DRX operation (FDD only) ............................................................................ 380 CELL_FACH HS-DSCH DRX operation (1.28Mcps TDD only) ........................................................... 381 Common E-RNTI selection (1.28 Mcps TDD only) ................................................................................ 381 Actions related to SECONDARY_CELL_HS_DSCH_RECEPTION variable (FDD only) ................... 382 Actions related to TARGET_CELL_PRECONFIGURATION variable (FDD only) ............................. 383 Actions related to CONTROL_CHANNEL_DRX_STATUS variable (1.28 Mcps TDD only) .............. 384 Actions related to E_DCH_SPS_STATUS variable (1.28 Mcps TDD only) ........................................... 384 Actions related to HS_DSCH_SPS_STATUS variable (1.28 Mcps TDD only) ...................................... 385 Actions related to HSPA_RNTI_STORED_CELL_PCH variable (FDD and 1.28 Mcps TDD only) ..... 385 Actions related to SECONDARY_CELL_MIMO_STATUS variable .................................................... 387 Actions related to SECONDARY_CELL_E_DCH_TRANSMISSION variable (FDD only) ................. 388 Actions related to reception of a HS-SCCH order for secondary uplink frequency activation/deactivation (FDD only) .......................................................................................................... 390 Configuration of "TSN field extension" for MAC-ehs entity .................................................................. 390 Actions related to MU_MIMO_STATUS variable (1.28 Mcps TDD only) ............................................ 391 Actions related to MULTI_CARRIER_ E_DCH_TRANSMISSION variable (1.28Mcps TDD only) ... 391 Logged Measurements Configuration ...................................................................................................... 392 General ............................................................................................................................................... 392 Initiation ............................................................................................................................................. 392 Reception of LOGGING MEASUREMENT CONFIGURATION by the UE................................... 392 T326 Expiry ........................................................................................................................................ 393 T327 Expiry ........................................................................................................................................ 393 UE INFORMATION................................................................................................................................ 394 General ............................................................................................................................................... 394 Initiation ............................................................................................................................................. 394 Reception of the UE INFORMATION REQUEST message by the UE ............................................ 394 Reception of the UE INFORMATION RESPONSE message by the UTRAN .................................. 395 Measurements logging ............................................................................................................................. 395 General ............................................................................................................................................... 395 Initiation ............................................................................................................................................. 395 Release of Logged Measurements Configuration ................................................................................... 396 General ............................................................................................................................................... 396

3GPP

Release 10

12

3GPP TS 25.331 V10.10.0 (2012-12)

8.5.66.2 Initiation ............................................................................................................................................. 396 8.5.67 Measurements logging for ANR .............................................................................................................. 396 8.5.67.1 General ............................................................................................................................................... 396 8.5.67.2 Initiation ............................................................................................................................................. 396 8.5.68 Release of ANR Logging Measurements Configuration .......................................................................... 398 8.5.68.1 General ............................................................................................................................................... 398 8.5.68.2 Initiation ............................................................................................................................................. 398 8.6 Generic actions on receipt and absence of an information element ............................................................... 398 8.6.1 CN information elements ......................................................................................................................... 398 8.6.1.1 Void .................................................................................................................................................... 398 8.6.1.2 CN information info ........................................................................................................................... 398 8.6.1.3 Signalling connection release indication ............................................................................................ 399 8.6.2 UTRAN mobility information elements ................................................................................................... 399 8.6.2.1 URA identity ...................................................................................................................................... 399 8.6.2.2 Mapping info ...................................................................................................................................... 400 8.6.2.3 RNC support for change of UE capability .......................................................................................... 400 8.6.2.4 CSG PSC Split Information ................................................................................................................ 400 8.6.2.5 E-UTRA detection .............................................................................................................................. 401 8.6.3 UE information elements ......................................................................................................................... 401 8.6.3.1 Activation time ................................................................................................................................... 401 8.6.3.1a CN domain specific DRX cycle length coefficient............................................................................. 402 8.6.3.1b H-RNTI .............................................................................................................................................. 402 8.6.3.2 UTRAN DRX Cycle length coefficient .............................................................................................. 403 8.6.3.3 Generic state transition rules depending on received information elements ....................................... 403 8.6.3.4 Ciphering mode info ........................................................................................................................... 404 8.6.3.5 Integrity protection mode info ............................................................................................................ 407 8.6.3.5.1 Initialisation of Integrity Protection .............................................................................................. 408 8.6.3.5.2 Integrity Protection Re-configuration for SRNS Relocation, intra-RAT SR-VCC and handover from GERAN Iu mode .................................................................................................. 409 8.6.3.5.3 Integrity Protection modification in case of new keys or initialisation of signalling connection.. 410 8.6.3.6 Void .................................................................................................................................................... 411 8.6.3.7 Void .................................................................................................................................................... 411 8.6.3.8 Integrity check info ............................................................................................................................. 411 8.6.3.9 New C-RNTI ...................................................................................................................................... 411 8.6.3.9a New DSCH-RNTI .............................................................................................................................. 411 8.6.3.10 New U-RNTI ...................................................................................................................................... 411 8.6.3.11 RRC transaction identifier .................................................................................................................. 411 8.6.3.12 Capability Update Requirement ......................................................................................................... 416 8.6.3.13 Group release information .................................................................................................................. 417 8.6.3.14 New E-RNTI ...................................................................................................................................... 417 8.6.3.15 SR-VCC Info ...................................................................................................................................... 418 8.6.4 Radio bearer information elements .......................................................................................................... 418 8.6.4.1 Signalling RB information to setup list .............................................................................................. 418 8.6.4.2 RAB information for setup ................................................................................................................. 420 8.6.4.2a RAB information to reconfigure ......................................................................................................... 421 8.6.4.3 RB information to setup ..................................................................................................................... 422 8.6.4.4 RB information to be affected ............................................................................................................ 424 8.6.4.4a Void .................................................................................................................................................... 424 8.6.4.5 RB information to reconfigure............................................................................................................ 424 8.6.4.6 RB information to release ................................................................................................................... 425 8.6.4.7 RB with PDCP information ................................................................................................................ 425 8.6.4.8 RB mapping info ................................................................................................................................ 425 8.6.4.9 RLC Info ............................................................................................................................................. 428 8.6.4.10 PDCP Info .......................................................................................................................................... 432 8.6.4.11 PDCP SN Info .................................................................................................................................... 433 8.6.4.12 NAS Synchronisation Indicator .......................................................................................................... 433 8.6.4.13 PDCP context relocation info ............................................................................................................. 434 8.6.4.14 RLC Info MBMS ................................................................................................................................ 434 8.6.4.15 RAB information for MBMS ptp bearer............................................................................................. 434 8.6.5 Transport channel information elements .................................................................................................. 434 8.6.5.1 Transport Format Set .......................................................................................................................... 434

3GPP

Release 10

13

3GPP TS 25.331 V10.10.0 (2012-12)

8.6.5.2 8.6.5.3 8.6.5.4 8.6.5.5 8.6.5.5a 8.6.5.6 8.6.5.6a 8.6.5.6b 8.6.5.6c 8.6.5.7 8.6.5.8 8.6.5.9 8.6.5.10 8.6.5.11 8.6.5.12 8.6.5.12a 8.6.5.13 8.6.5.14 8.6.5.15 8.6.5.16 8.6.5.17 8.6.5.18 8.6.5.19 8.6.5.20 8.6.5.21 8.6.5.22 8.6.5.23 8.6.5.24 8.6.6 8.6.6.1 8.6.6.2 8.6.6.2a 8.6.6.3 8.6.6.3a 8.6.6.3b 8.6.6.4 8.6.6.4a 8.6.6.5 8.6.6.6 8.6.6.7 8.6.6.8 8.6.6.9 8.6.6.10 8.6.6.11 8.6.6.12 8.6.6.13 8.6.6.14 8.6.6.15 8.6.6.16 8.6.6.16a 8.6.6.17 8.6.6.18 8.6.6.19 8.6.6.20 8.6.6.21 8.6.6.22 8.6.6.23 8.6.6.24 8.6.6.25 8.6.6.26 8.6.6.26a

Transport format combination set ....................................................................................................... 436 Transport format combination subset ................................................................................................. 438 DCH quality target ............................................................................................................................. 439 Added or Reconfigured UL TrCH information .................................................................................. 439 Added or reconfigured MAC-d flow .................................................................................................. 440 Added or Reconfigured DL TrCH information .................................................................................. 441 Void .................................................................................................................................................... 442 HARQ Info ......................................................................................................................................... 442 Void .....................