8/12/2019 3. Design Issues for Bulk Carriers
1/27
Tripartite 2009
-
Design Issues forBulk Carriers
Ian Harrison
Intercargo Technical Manager
-
8/12/2019 3. Design Issues for Bulk Carriers
2/27
Design Issues for Bulk Carriers
Introduction
Operational and Regulatory Challenges Design Challenges
Examples:
Cargo Residues
Excessive Loading Rates
IMSBC Code
-
8/12/2019 3. Design Issues for Bulk Carriers
3/27
Design Issues for Bulk Carriers
MARPOL Annex V (Garbage) and Cargo Residues
Definitions Cargo Residue is defined as garbage in guidelines
Cargo hold washing water not definedalthough interpreted asgarbage
Requirements Must be discharged when greater than 12 nm from shore
Cannot be discharged in a special area
Special Areas a Problem
Bulk carriers generally not design to handle washing water Adequate port reception facilities for washing water
-
8/12/2019 3. Design Issues for Bulk Carriers
4/27
Design Issues for Bulk Carriers
MARPOL Annex V (Garbage) and Cargo Residues
Recent special areas Gulfs Area became effective in August 2008
Mediterranean Area became effective May 2009
Reception Facilities in Special Areas (Gulf and Med)
PRF must be in place before special area becomes effective MEPC 59 Intercargo and BIMCO paper
Circular issued (MEPC.1/Circ. 675)
Next steps
Continuation of review of Annex V Possible IMSBC Code reference to discharge requirements?
-
8/12/2019 3. Design Issues for Bulk Carriers
5/27
Design Issues for Bulk Carriers
Design Issues
Handling hold washing water
Can be problematic
Holding tanks
Pumpslarge particles
Cargo properties
Coatings (PSPC?)
Ballast water management systems
Hold cleaning systems
Possible treatment systems
-
8/12/2019 3. Design Issues for Bulk Carriers
6/27
Design Issues for Bulk Carriers
Design Issues
Images courtesy of EMS Ship Supply
-
8/12/2019 3. Design Issues for Bulk Carriers
7/27
Design Issues for Bulk Carriers
Design Issues
Courtesy of EMS Ship Supply
-
8/12/2019 3. Design Issues for Bulk Carriers
8/27
Design Issues for Bulk Carriers
Bulk Carrier Loading Rates
Terminal requirements Buoyant market queuing optimising loading
Ponta da Madeira - Brazil
16 000 t/hr
Minimum ballast
14 hr turnaround
-
8/12/2019 3. Design Issues for Bulk Carriers
9/27
Design Issues for Bulk Carriers
Intercargo Survey
Key Findings:
85% of masters indicated that they considered such a rate of
loading to be beyond the safe operational limits of their vessel:
Manoeuvrability
Hull structure
Two thirds of respondents stated they had concerns with regard tostructural stresses if loading at such a rate.
-
8/12/2019 3. Design Issues for Bulk Carriers
10/27
Design Issues for Bulk Carriers
Validation of Masters Views
Manoeuvrability StudyBMT SeaTech Concurred with Masters opinion
ABS study
Confirmed many risks
Submission of paper to IMO MSC 84 (MSC 84/INF.8)
Referred to DSC 13
Considered by Correspondence Group reviewing BLU Code
Reports to DSC 14 next week
-
8/12/2019 3. Design Issues for Bulk Carriers
11/27
Design Issues for Bulk Carriers
Outcome of Correspondence Group
Reports to DSC 14 (DSC 14/7)
Proposes an MSC Circular providing guidance:
Time taken for loading
Arrival Condition
Loading sequence
During loading
Consequences of failure to apply BLU Code
IACS Recommendation 46
-
8/12/2019 3. Design Issues for Bulk Carriers
12/27
Design Issues for Bulk Carriers
Design Issues
De-ballasting capacity
Typically two 2000-2500 M3/hr pumps (4000-5000 M3/hr total)
Should this be increased?
Pump size
Power requirements
Piping systems (water and air)
BWM treatment systems
-
8/12/2019 3. Design Issues for Bulk Carriers
13/27
Design Issues for Bulk Carriers
Information
IACS UR S1A
Sample sequences often not realistic
Information provision should be reviewed
-
8/12/2019 3. Design Issues for Bulk Carriers
14/27
Design Issues for Bulk Carriers
IMSBC Code (formally BC Code)
Revised and updated Voluntary from Jan 2009
Mandatory from Jan 2011
New Schedules
DRI
Sulphur (formed)
DSC 14 (next week)
Coal and hot areas
DRI
Survey and certification
-
8/12/2019 3. Design Issues for Bulk Carriers
15/27
Design Issues for Bulk Carriers
Direct Reduced Iron (DRI)
What is it? Iron Ore Pellets subjected to a reducing gas in a reactor
Oxygen chemically removed
Fe content increased from ~65% to ~85%
Pellets then formedcold or hot moulded
What are the dangers?
Process is reversibleFe re-oxidises
Oxidisation releases energy as heatpossible thermal runaway
Hydrogen also liberated
-
8/12/2019 3. Design Issues for Bulk Carriers
16/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
17/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
18/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
19/27
Design Issues for Bulk Carriers
IMSBC Code: Direct Reduced Iron (DRI)
DRI (A) Briquettes, hot moulded Monitoring requirements
DRI (B) Lumps, pellets, cold-moulded briquettes
Moisture
-
8/12/2019 3. Design Issues for Bulk Carriers
20/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
21/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
22/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
23/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
24/27
Design Issues for Bulk Carriers
Picture courtesy of Burgoynes
-
8/12/2019 3. Design Issues for Bulk Carriers
25/27
Design Issues for Bulk Carriers
Design Issues
DRI an extreme example Are bulk carrier designed to carry DRI?
Do we design bulk carriers around cargoes?
Are we ready for a mandatory IMSBC Code?
-
8/12/2019 3. Design Issues for Bulk Carriers
26/27
Design Issues for Bulk Carriers
Conclusions
Operational and Regulatory Challenges Design Challenges
Design and regulatory (& rule) development needs to consider:
Operational environmentloading rates example
Cargo propertiesDRI example
Feedback from designersMARPOL Annex V example
Co-operation of all parties
Ships that are safe and fit for purpose
-
8/12/2019 3. Design Issues for Bulk Carriers
27/27
Design Issues for Bulk Carriers
Thank you