2nd qtr rpmes 2012
TRANSCRIPT
Regional Project Monitoring and Evaluation System
Prepared by the
National Economic and Development Authority
Cordillera Administrative Region
RPMC Secretariat
1
Second Quarter CY 2012 RPMES Report
The Regional Project Monitoring and Evaluation System (RPMES) report is published quarterly
to provide an overall view on the status of major programs/projects (P/Ps) in the Cordillera
Administrative Region (CAR). The report is based primarily from the submission of eleven
regional line agencies (RLAs). The detailed report is regularly posted in the RDC-CAR webpage.
CY 2012 Major Programs / Projects
For CY 2012, the RPMES Report contains 46 major P/Ps with an aggregate cost of Php 10.414
Billion. These P/Ps were enrolled in the monitoring system by the eleven RLAs. The projects
are grouped according to sector/ program, namely: Social, Economic, Infrastructure and
Strategic Action Plan (SAP) for the rehabilitation & recovery of disaster-afflicted areas. The
following table shows the total cost and physical accomplishment by sector/ program as of end-
June 2012.
Cost and Physical Accomplishment by Sector/ Program, CAR
As of June 2012
Sector/ Program Cost (Php M.) Percentage
Cost
Accomplishment
(ao June 2012)
a) Social Sector 1,788.255 17.17 % 41.17 %
b) Economic Sector 5,424.533 52.09 % 26.37 %
c) Infrastructure Sector 2,794.801 26.83 % 30.61 %
d) Strategic Action Plan
(Rehabilitation &
Recovery Program)
406.722 3.91 % 96.24%
CAR Total 10,414.311 100 % 32.78 %
In terms of cost, Economic Sector has the highest with Php 5.4 B or 52 percent. This is
costing Php 3.1 Billion. Infrastructure Sector follows with Php
2.8 Billion or 26.83 percent. While the Social Sector and SAP have Php 1.8 B. or 17.17 percent
and Php 406.7 M. or barely 4 percent, respectively.
2
Some 7.11 percent, amounting to Php
740.45 M. are carryover projects. The
bulk of these are implemented by DepEd,
DPWH and DOH. While 38.27 percent or
Php 3.99 B. are multiyear projects and
54.62 percent, amounting to Php 5.79
Billion are new projects for the current
year. In terms of fund source, Php 3.34
B. or 32.12 percent are foreign-assisted
while Php 7.07 B or 67.88 % are GOP
funded.
In terms of implementation status, the overall physical accomplishment is 32.78 percent. It is
expected by the second semester, project progress will pick-up due to the improved weather
condition. The SAP which is mostly carryover projects posted 96.24 percent. The SAP projects,
by DPWH and DepEd, are rehabilitation and recovery projects for the disaster-affected areas
particularly Typhoons Juan, Pedring and Quiel.
The Social Sector obtained an accomplishment of 41.17 percent. The sector is dominated by
the Pantawid Pamilyang Pilipino Program (4Ps), Php 745.5 M.; Red & Black
School Building Program (Php 266.1 M.); health facilities (Php 453.1 M.) and water
system projects (Php 184.5 M.).
3
The Infrastructure Sector and Economic Sector achieved 30.61 percent and 26.37 percent,
respectively. The Infrastructure Sector is basically road and bridge projects.
The large projects in Economic Sector are (Php 1.078
B.),
The relatively low performance of the Economic Sector is largely attributed to the delayed
implementation of the multi-year and ODA-assisted CHARMP 2. This has bearing due to its
large cost and posting an accomplishment of merely 18.66 percent. The project underwent
another NEDA-ICC process for a project reconfiguration to address the concern of LGU
beneficiaries in putting up their cash counterpart.
CY 2012 Priority Sectoral Programs/ Projects
From among the 46 major program/ projects, priority P/Ps were selected by the Sectors based
on the RPMES national forum criteria: (a) foreign-assisted projects (FAP/ODA), (b)
interprovincial, (c) large scale cost, (d) national priority, critical projects by the Office of the
President (OP), and (e) regional priority.
The eight (8) major P/Ps are subject of closer RPMC-CAR monitoring through field validation
and inspection. These major P/Ps have a total cost of Php 5.3 B., to wit:
1. Second Cordillera Highland Agricultural Resource Management Project (CHARMP 2), Php
3.08 B;
2. Pantawid Pamilyang Pilipino Program (4Ps), Php 745.5 M;
3. Agrarian Reform Infrastructure Support Project, Phase III, Php 903.8 M;
4. Kabugao-Solsona, Apayao-Ilocos Norte Road, Php 100M;
5. Kabugao-Pudtol- Luna- Cagayan Boundary Road, Php 58.8 M;
6. Cordillera-wide Strengthening of Local health System for Effective and Efficient Delivery
of Maternal and Child Health Services, Php 43 M;
7. National Greening Program, Php 103.66 M; and
8. Red and Black Scholl Building Program, Php 266 M.
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
4
SOCIAL SECTOR
1. Pantawid Pamilyang Pilipino Program
(4Ps)
DSWD 745.512 Loan 47.09%
2. Red and Black School Building
Program
DepEd CY 2011:
50.952
CY 2012:
115.200
GOP CY 2011 fund:
89.22%
209 Classrooms
CY 2012 fund:
7.69%
143 Classrooms
3. Cordillera-wide Strengthening of
Local Health System for Effective and
Efficient Delivery of Maternal and
Child Health Services
DOH & LGUs
Abra Apayao
Benguet
43.00
JICA Project was
launched on
March 13, 2012.
However, the
project has yet
to fully take-off
since JICA has
yet to procure
and deliver the
medical
equipment for
the provinces of
Abra and
Apayao.
4. National Household Targeting System
for Poverty Reduction Program
DSWD 40.793 GOP,
Loan
57.20%
5. Rehabilitation of School Building
including Water Sanitation Facilities
DepEd CY 2011:
21.934
CY 2012:
29.340
GOP CY 2011 Fund:
89.99%
CY 2012 Fund:
Waiting for
SARO
6. Philippine Response to Indigenous
(PRIME)
DepEd 3.978 AusAid 19%
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
5
7. Construction of Various Health
Facility
DOH CY 2011:
117.867
CY 2012:
335.179
GOP CY 2011 fund:
58.55%
CY 2012 fund:
6.49%
8. Water Supply System DOH 184.500 GOP 57.98%
Sub-Total 1,788.255 41.17%
ECONOMIC SECTOR
9. Second Cordillera Highland
Agricultural Resource Management
Project (CHARMP2)
DA 3,081.862 IFAD,
ADB. OFID
18.66%
10. Agrarian Reform Infrastructure
Support Project Phase III
(Abra, Apayao, Benguet, Ifugao,
Kalinga and Mt. Province)
DAR Total Project
Cost: 903.863
CY 2011:
(2 projects)
16.718
CY 2012:
(12 projects)
167.445
Loan
GOP
42.60%
11. National Greening Program (NGP) DENR 103.663 GOP 48.53%
12. Farm-to-Market Roads
(CY 2011 Fund:
Abra, Kalinga and Mt. Province)
(CY 2012 Fund:
Abra, Baguio City, Benguet, Ifugao,
Kalinga and Mt. Province)
DA CY 2011:
53.00
CY 2012:
161.803
Grant CY 2011:
81.13%
CY 2012:
11.56%
13. Irrigation Projects NIA 1,078.046
(432 projects)
GOP 30.15%
14. One Town One Product Program
(OTOP)
DTI 2.747 GOP 84.68%
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
6
15. Rural Micro Enterprise Promotion
Programme (RuMEPP)
DTI 1.800 IFAD with
GOP
Counter
Part
90%
16. Shared Service Facilities Project
(SSF)
DTI 8.388 NEDAC
Fund
(National
Export
Develop-
ment and
Competi-
tiveness)
Awarding of
bidding
suppliers
17. Small Enterprise Technology
Upgrading Program (SETUP) Core
and Non-Core Funded Projects
DOST 28.673 GOP 100%
18. Packaging and Labeling DOST 688.00 GOP 100%
Sub-Total 5,424.533 26.37%
INFRASTRUCTURE SECTOR
Abra
19. Abra-Ilocos Sur Road DPWH 106.195 GOP 33.86%
20. Abra-Kalinga Road, K0467+000-
K0474+305
DPWH 147.691 GOP 1.44%
21. Abra-Ilocos Norte, K0436+700-
K0439+395
DPWH 62.00 GOP 7.17%
22. Road Upgrading along Abra-
Cervantes Road (Realigned from
Sto. Tomas-Manabo Bridge)
DPWH 60.00 GOP 1.03%
23. Sto. Tomas-Manabo Bridge DPWH 160.00 GOP 58.62%
24. Abra-Kalinga Road K0410+000-
K0413+810
DPWH 50.45 GOP 96.03%
25. Abra-Kalinga Road K0437+490-
K0455+890, K0432+000, K0450+800
DPWH 143.67 GOP 93%
Apayao
26. Kabugao-Pudtol-Luna-Cagayan
Boundary Road K0661+000-
K0661+321,K0643+646 - K0645+825
Gravel to Concrete
DPWH 58.827 GOP 40.70%
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
7
27. Kabugao, Apayao-Solsona, Ilocos
Norte Road
DPWH 100.00 GOP 0.50%
Benguet
28.
Kennon Road
DPWH 54.433 GOP 3.22%
29. Baguio-Bontoc Road (Pico-Lamtang
Rd., Baguio Itogon & Baguio-Bontoc)
DPWH 98.674 GOP 1.05%
30. Baguio-Bontoc Road, K0269+000-
K0275+000 (v.s.)& K0299+000-
K0300+900 (v.s.) & K0305+000-
K0308+500 (v.s.) & K0309+000-
K0311+000 (v.s.), K0317+415-
K0318+500 (v.s.), & K0323+000
K0328+000 (v.s.)
DPWH 109.332 GOP 15%
31. Gurel-Bokod-Kabayan-Buguias-
Abatan Road
DPWH 98.50 GOP 70%
32. Gurel-Bokod-Kabayan-Buguias-
Abatan Road K0303+600-
K03012+000
DPWH 116.50 GOP 88.88%
33. -Bokod-
Kabayan-Buguias Road including
RROW
DPWH 148.00 GOP 21.56%
34. Gurel-Bokod-Kabayan-Buguias-
Abatan Road, K0345+513-K0359+300
(vs.)
DPWH 68.921 GOP 24.43%
Ifugao
35. Banaue-Mayoyao-A Lista-Isabela
Bdry. Road
DPWH 58.064 GOP 0.50%
36. Nueva Vizcaya-Ifugao-Mt. Province
Road
DPWH 54.163 GOP 17%
Kalinga
37. Kalinga-Abra Road, K0470+000-
K0472+267
DPWH 53.057 GOP 13.05%
38. Kalinga-Abra Road, K0476+000-
K0480+1000, K0480+1000-
K0482+700 (with exceptions)
DPWH 135.27 GOP 0.60%
39. Balbalan-Pinukpuk Road K0485+000-
K0489+000
DPWH 100.00 GOP 63.80%
40. Balbalan-Pinukpuk Road
K0560+1061-K0520+449
DPWH 245.00 GOP 27.10%
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
8
41. Mt. Province Bdry. Calanan-
Pinukpuk Abbut Road (Pinukpuk)
(P209.0 M) K0499+674-K0509+294
(I.S.)
DPWH 209.00 GOP 38%
42. Balbalan-Pinukpuk Road, Abut A of
Baay Bridge+(-18502) to Abut A of
Baay Bridge+0
DPWH 183.239 GOP Advertised June
21-25, 2012.
Scheduled for
bidding on July
10, 2012.
Mountain Province
43. Mt. Province Ilocos Sur via Tue Road DPWH 81.815 GOP 20.75%
44. Mt. Province-Ilocos Sur via Kayan DPWH 92.00 GOP 30.35%
Sub-Total 2,794.801 30.61%
STRATEGIC ACTION PLAN (SAP)
(Rehabilitation and Recovery of Areas Affected by Disasters)
45. Disaster Related Rehabilitation
Project (DRRP)
DPWH DRRP
Calamity
Fund
CY 2011
a. Apayao 1st
District Engineering
Office (16 projects)
74,550.0 87.73%
b. Apayao 2nd
District Engineering
Office (5 projects)
14,000.0 100%
c. Benguet 1st
District Engineering
Office (15 projects)
45,469.0 100%
d. Benguet 2nd
District Engineering
Office (6 projects)
39,279.1 100%
e. Baguio City District Engineering
Office (1 project)
600.0 100%
f. Ifugao 1st
District Engineering
Office (2 projects)
8,580.0 100%
g. Ifugao 2nd
District Engineering
Office (4 projects)
25,850.0 100%
h. Kalinga District Engineering
Office (9 projects)
85,910.5 95.93%
i. Mt. Province District Office
(28 projects)
102,459.4 100%
Sub-Total 396.697 96.81%
RPMES 2nd Quarter Report
CY 2012 MAJOR PROGRAMS/PROJECTS Cordillera Administrative Region
As of June 2012
PROGRAM/PROJECT IMPLEMENTING
AGENCY
PROJECT COST
(PhP M)
FUNDING
SOURCE
STATUS/
REMARKS
9
46. Quick Response Fund (QRF) DepEd GOP
a. Cabaroan ES Dolores, Abra
(Construction of 1 unit-2
classroom in Bldg.1)
1.201 56%
b. Cabaroan ES Dolores, Abra
(Construction of 1 unit-2
classroom in Bldg.2)
1.201 100%
c. Cabaroan ES Dolores, Abra
(Construction of 3 Seater Toilet
type III with handwashing)
318.0 79%
d. Cabaroan ES Dolores, Abra
(1 classroom repair)
219.0 71%
e. Tonglo Carino PS, Buguias,
Benguet
1.201 15%
f. Talubin NHS, Bontoc Mt. Province
(Construction of 2cl /
Replacement of Burned Bldg.)
1.143 65%
g. Tumog Es, Luna, Apayao
(Construction of 1stry 3
Classroom 7x9 type I)
1.942 70%
h. Lagawe CS, Lagawe, Ifugao
(Construction of 2cl /
Replacement of Burned Bldg.)
1.200 100%
i. Bañacao ES, Bangued West, Abra
(Repair of Classrooms /
Construction of Slope Protection
/Water System)
1.600 100%
Sub-Total 10.025 73.44%
SAP Sub-Total 406.722 96.24%
CAR Total 10,414.311 32.78%
Sources: Agencies' RPMES PMC Form I - 2 as of end of June 2011
Pri
ori
ty S
ec
tora
l P
rog
ram
s/
Pro
jec
ts,
CA
R
As
of
Ju
ne
20
12
Na
me
of
Pro
jec
t/S
ec
tor
De
sc
rip
tio
n
Lo
ca
tio
n
Co
st
(Ph
p)
M
Fu
nd
S
ou
rce
Imp
E
nti
ty
Sta
tus
/ R
em
ark
s
As
of
Ju
ne
2
01
2
1
Se
co
nd
C
ord
ille
ra
Hig
hla
nd
A
gri
cu
ltu
ral
Res
ou
rce
M
an
ag
em
en
t P
roje
ct
(CH
AR
MP
2)
Th
e p
roje
ct
ha
s fiv
e c
om
po
ne
nts
:
(1)
Com
mu
nity m
ob
iliza
tio
n, p
art
icip
ato
ry
pla
nnin
g o
f in
ve
stm
en
ts,
an
d la
nd
titlin
g;
(2)
co
mm
un
ity w
ate
rsh
ed
co
nserv
atio
n (
inclu
din
g
fore
st
ma
na
ge
me
nt
an
d a
gro
fore
str
y
de
ve
lop
me
nt)
; (3
) a
gri
cultura
l a
nd
a
gri
bu
sin
ess d
evelo
pm
en
t, a
nd
pro
mo
tio
n o
f in
co
me
-ge
ne
ratin
g a
ctivitie
s; (4
) ru
ral
infr
astr
uctu
re d
evelo
pm
en
t; a
nd
(5
) pro
ject
ma
na
ge
me
nt
an
d c
oo
rdin
ation
.
Ab
ra,
Ap
aya
o,
Be
ng
ue
t,
Ifu
ga
o,
Ka
ling
a,
Mt.
P
rovin
ce
3,0
81.8
62
IFA
D,
AD
B.
OF
ID
DA
1
8.6
6%
Pa
nta
wid
P
am
ilya
ng
P
ilip
ino
Pro
gra
m
(4P
s)
Th
e p
rog
ram
ad
dre
sse
s th
e M
ille
nniu
m
Deve
lop
me
nt
Go
als
su
ch a
s r
ed
ucin
g o
f e
xtr
em
e p
ove
rty a
nd
hu
ng
er,
achie
vin
g
un
ivers
al pri
ma
ry e
du
ca
tion
, re
du
cin
g c
hild
mo
rta
lity
, im
pro
vin
g m
ate
rna
l h
ealth
, a
nd
p
rom
otin
g g
end
er
eq
ualit
y a
nd
em
po
we
rme
nt
of
wo
me
n.
Th
e b
en
eficia
rie
s m
ust
me
et
the
co
nd
itio
ns o
f th
e p
rog
ram
to
ava
il ca
sh
gra
nts
a
nd
ea
ch
ho
use
ho
ld b
ene
ficia
ry w
ill r
ece
ive
ca
sh
gra
nts
fo
r a
t m
ost
five
ye
ars
.
Re
gio
n-
wid
e
74
5.5
12
Lo
an
DS
WD
4
7.0
9%
Ag
rari
an
Re
form
In
fra
str
uc
ture
S
up
po
rt P
roje
ct
Ph
as
e I
II
Th
e p
roje
ct
involv
es c
olla
bo
ratio
n a
mo
ng
th
e
imp
lem
en
tin
g a
gen
cie
s (
DA
R,
DP
WH
, LG
U,
an
d N
IA)
an
d I
rrig
ato
rs A
sso
cia
tion
s.
It
involv
es c
on
str
uctio
n/r
eh
abili
tatio
n o
f ru
ral
Ab
ra,
Ap
aya
o,
Be
ng
ue
t,
Ifu
ga
o,
To
tal
Pro
ject
Cost:
90
3.8
63
Lo
an
GO
P
DA
R
42
.60
%
Pri
ori
ty S
ec
tora
l P
rog
ram
s/
Pro
jec
ts,
CA
R
As
of
Ju
ne
20
12
Na
me
of
Pro
jec
t/S
ec
tor
De
sc
rip
tio
n
Lo
ca
tio
n
Co
st
(Ph
p)
M
Fu
nd
S
ou
rce
Imp
E
nti
ty
Sta
tus
/ R
em
ark
s
As
of
Ju
ne
2
01
2
2
infr
astr
uctu
re s
uch
as irr
iga
tio
n f
acili
tie
s,
farm
-to
-ma
rke
t ro
ad
s,
po
st-
harv
est
facili
tie
s, a
nd
ru
ral w
ate
r su
pp
ly s
yste
ms,
ag
rari
an
re
form
in
form
atio
n a
nd m
ark
etin
g c
en
ter
build
ing
, d
eve
lop
me
nt
of
co
op
ma
na
ge
d a
gri
-b
usin
ess/r
ura
l e
nte
rpri
se
/ l
org
aniz
ation
s in
th
e A
RC
s t
hro
ugh
a
pp
ropri
ate
tra
inin
g a
nd
ca
pa
city b
uild
ing
ap
pro
ach
es.
Ka
ling
a,
Mt.
P
rovin
ce
( 2
01
1)
16
.71
8
(20
12
)
16
7.4
45
Kab
ug
ao
, A
pa
ya
o-S
ols
on
a,
Ilo
co
s N
ort
e
Ro
ad
Th
e r
oa
d is a
ma
jor
co
mp
on
en
t o
f th
e
Cord
ille
ra R
oad
s I
mp
rove
me
nt
Pro
ject
(CR
IP)
as late
ral ro
ad
; it c
on
ne
cts
Ilo
co
s R
egio
n a
nd
th
e N
ort
he
rn C
ord
ille
ras. It
tra
ve
rse
s th
e
mu
nic
ipalit
ies o
f K
ab
ug
ao
an
d C
ala
na
sa
n in
A
pa
ya
o a
nd
tu
rns w
est
to S
ols
on
a in Ilo
co
s
Nort
e.
Ka
bu
ga
o,
Ap
aya
o
10
0
GO
P
DP
WH
0
.50
%
Kab
ug
ao
-Pu
dto
l-L
un
a-C
ag
aya
n
Bo
un
da
ry R
oa
d
K0
66
1+
00
0 -
K
06
61
+3
21
, K
06
43
+6
46
-
K0
64
5+
82
5 G
ravel
to C
on
cre
te
Th
e r
oa
d is a
ma
jor
co
mp
on
en
t o
f th
e
Cord
ille
ra R
oad
s I
mp
rove
me
nt
Pro
ject
(CR
IP)
as t
he
nort
hern
tip
of th
e r
egio
nal b
ackb
one
. It
tra
ve
rse
s t
he
mu
nic
ipalit
ies o
f K
ab
ug
ao,
Pu
dto
l a
nd
Lun
a in
Ap
ayao
an
d t
urn
s e
ast
to
Ab
ulo
g in C
ag
ayan
.
Ap
aya
o
58
.82
7
GO
P
DP
WH
4
0.7
0%
Pri
ori
ty S
ec
tora
l P
rog
ram
s/
Pro
jec
ts,
CA
R
As
of
Ju
ne
20
12
Na
me
of
Pro
jec
t/S
ec
tor
De
sc
rip
tio
n
Lo
ca
tio
n
Co
st
(Ph
p)
M
Fu
nd
S
ou
rce
Imp
E
nti
ty
Sta
tus
/ R
em
ark
s
As
of
Ju
ne
2
01
2
3
Co
rdil
lera
-wid
e
Str
en
gth
en
ing
of
Lo
ca
l H
ea
lth
S
ys
tem
fo
r E
ffe
cti
ve
an
d
Eff
icie
nt
De
live
ry
of
Ma
tern
al
an
d
Ch
ild
He
alt
h
Se
rvic
es
co
nd
itio
n h
ea
lth
co
nditio
n p
art
icula
rly o
f w
om
en
an
d c
hild
ren
th
rou
gh
th
e d
eliv
ery
of
eff
ective
and
effic
ien
t M
ate
rnal a
nd
Child
H
ea
lth (
MC
H)
se
rvic
es.
Th
e p
roje
ct
se
eks t
o:
(a)
str
en
gth
en
th
e lo
cal
he
alth
syste
ms in
all
the C
AR
Pro
vin
ce
s;
an
d
(b)
imp
rove
th
e q
ua
lity o
f h
ea
lth
se
rvic
es.
Ab
ra,
Ap
aya
o
43
JIC
A
DO
H &
L
GU
s
Ab
ra
Ap
aya
o
B
en
gu
et
Pro
ject
wa
s
lau
nch
ed
on
M
arc
h 1
3,
20
12
. H
ow
eve
r, t
he
p
roje
ct
ha
s y
et
to f
ully
ta
ke
-off
sin
ce
JIC
A
ha
s y
et
to
pro
cu
re a
nd
d
eliv
er
the
m
ed
ica
l e
qu
ipm
en
ts
for
the
p
rovin
ce
s o
f A
bra
an
d
Ap
aya
o.
Nati
on
al
Gre
en
ing
P
rog
ram
(N
GP
)
An
ad
min
istr
ation
priori
ty p
rog
ram
(E
xe
cu
tive
O
rde
r N
o.
26
) th
at
see
ks t
o a
ttain
a
su
sta
ina
ble
hu
ma
n d
eve
lop
me
nt,
eco
no
mic
a
nd
ecolo
gic
al se
cu
rity
th
roug
h t
he p
lan
tin
g o
f 1
.5 b
illio
n t
ree
s in
aro
un
d 1
.5 m
illio
n h
ecta
res
of
pu
blic
la
nd w
ith
in s
ix y
ea
rs f
rom
ye
ar
20
11
to 2
01
6.
Th
e N
GP
als
o a
ims t
o e
nsu
re fo
od
se
cu
rity
, b
iodiv
ers
ity c
on
se
rva
tion
an
d a
dd
ress c
lim
ate
Reg
ion
-w
ide
1
03
.66
3
GO
P
DE
NR
4
8.5
3%
Pri
ori
ty S
ec
tora
l P
rog
ram
s/
Pro
jec
ts,
CA
R
As
of
Ju
ne
20
12
Na
me
of
Pro
jec
t/S
ec
tor
De
sc
rip
tio
n
Lo
ca
tio
n
Co
st
(Ph
p)
M
Fu
nd
S
ou
rce
Imp
E
nti
ty
Sta
tus
/ R
em
ark
s
As
of
Ju
ne
2
01
2
4
ch
an
ge
.
In t
he
Co
rdill
era
, th
e t
arg
et
for
CY
20
12 is 7
.5
millio
n tre
es c
ove
rin
g 1
5,0
00
he
cta
res.
Red
an
d B
lac
k
Sc
ho
ol
Bu
ild
ing
P
rog
ram
Th
e R
eg
ula
r S
ch
ool B
uild
ing
Pro
gra
m
sp
ecific
ally
ta
rgets
sch
ools
wh
ich a
re
ca
teg
ori
zed
un
der
the R
ed
Zo
ne
or
tho
se
wh
ich
ha
ve
a r
atio
of 5
6 o
r m
ore
stu
de
nts
to
on
e c
lassro
om
: a
nd
th
e B
lack Z
on
e, o
r sch
oo
ls w
hic
h m
ake
use
of
ma
ke
sh
ift
cla
ssro
om
s a
nd
fa
cili
tie
s.
Th
e s
tand
ard
De
pE
d d
esig
n is 7
m x
9m
cla
ssro
om
fo
r ru
ral are
as w
ith
a c
lassro
om
-stu
de
nt
ratio
of 1
:45
. T
his
sta
nd
ard
als
o
ap
plie
s t
o a
ll pu
blic
se
co
nda
ry s
cho
ols
, re
ga
rdle
ss o
f lo
catio
n a
nd
cla
ss s
ize
.
Reg
ion
-w
ide
(C
Y 2
01
1)
15
0.9
52
(CY
20
12
)
11
5.2
00
GO
P
Dep
Ed
(C
Y 2
01
1)
89
.22
%
(CY
20
12
) 7
.69
%
TO
TA
L:
5
,30
2.8
79
2
8.8
4%