Investment in LNG
Different approaches in EU
FRANCISCO DE LA FLOR - GLE PRESIDENTFRANCISCO DE LA FLOR - GLE PRESIDENT
26/04/2007 GLE 222/11/2007 GIE Annual Conference 2007- Madrid 2
LNG Increasing Demand
SOURCE: TOTAL
26/04/2007 GLE 322/11/2007 GIE Annual Conference 2007- Madrid 3
x27
Existing LNG Terminals
LNG Terminals under construction / committed
LNG Terminals planned/under study
LNG Infrastructures in the World 2007
Existing Liquefaction Terminals Liquefaction Terminals under construction/planned/under study
(58)
(35-40)
(70-80)
(21)(40-50)SOURCE: PETROLEUM ECONOMIST &
LNG JOURNAL
26/04/2007 GLE 422/11/2007 GIE Annual Conference 2007- Madrid 4
SOURCE: NATURAL GAS MARKET REVIEW 2007, IEA
600
400
200
0
bcm
60-100 bcm 80-160 bcm
Regional Production LNG Imports Pipeline Imports
LNG Increasing Demandin OCDE Countries
2005 2010 2015
26/04/2007 GLE 522/11/2007 GIE Annual Conference 2007- Madrid 5
15 Existing LNG
Terminals
8 LNG Terminals
under construction/ commmitted
23 LNG Terminals
under study/planned
- LNG plays different roles in each EU country.
- LNG regulation differs in each MS depending on national needs and particularities.
LNG Terminals in Europe
26/04/2007 GLE 622/11/2007 GIE Annual Conference 2007- Madrid 6
Different Approaches: SPAIN
(1)(1)
Barcelona - ENAGASSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
6
540.000
1.700.000Tenerife - GASCAN
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1
150.000
150.000
Gijón - ENAGAS
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2
300.000
800.000
Gran Canaria-GASCAN
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1150.000
150.000
COMMITTED/ UNDER CONSTRUCTION
Sagunto - SAGGASSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2
300.000
800.000
Cartagena- ENAGASSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
3
290.000
1.200.000Huelva- ENAGAS
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
4
470.000
1.200.000
Ferrol - REGANOSASEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2300.000
412.000
Bilbao - BBGSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
3
300.000
1.200.000
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
• Demand Growth (PowerGen + Backing-up Renewables)
• Full r-TPA without exemptions
• Government’s Infrastructure Mandatory Planning
• LNG terminals considered Basic Infrastructures as Pipelines and UGSs.
26/04/2007 GLE 722/11/2007 GIE Annual Conference 2007- Madrid 7
Spanish LNG Infrastructures to 2011
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Gran Canaria TenerifeGijón
2002 2003 2004 2005 2006 2007 2008 20110
800.000
1.600.000
2.400.000
3.200.000
4.000.000
4.800.000
5.600.000
6.400.000
7.200.000
8.000.000
8.800.000m(n)
3/h
0
7
17
27
37
47
57
67
77bcm/y
x 4,1
Regasification CapacityRegasification Capacity
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Gran Canaria TenerifeGijón
0
24
6
810
12
1416
18
202224
262830
32
2002 2003 2004 2005 2006 2007 2008 2011
nº
x 4
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Gran Canaria TenerifeGijón
0
24
6
810
12
1416
18
202224
262830
32
2002 2003 2004 2005 2006 2007 2008 2011
nº
x 4
Number of tanksNumber of tanks
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Gran Canaria TenerifeGijón
0
800.000
1.600.000
2.400.000
3.200.000
4.000.000
2002 2003 2004 2005 2006 2007 2008 2011
m3
x 7,1
Storage CapacityStorage Capacity
26/04/2007 GLE 822/11/2007 GIE Annual Conference 2007- Madrid 8
Different Approaches: UNITED KINGDOM
Anglesey
Canvey Island
STORAGE (m3 LNG)
Isle of Grain - NGCSEND-OUT (m3/h)
Nº TANKS 4
200.000
708.000
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
SouthHook – SOUTHOOK LNG
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2.400.000
775.0005
Dragon – DRAGON LNG
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1.050.000
3
504.000
• Cover Increasing Dependency on gas imports
• Allow Supply Diversification
• All terminals exempted
26/04/2007 GLE 922/11/2007 GIE Annual Conference 2007- Madrid 9
DIFFERENT APPROACHES: ITALY
Panigaglia - SRGSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2
100.000
439.000
Adriatic – ADRIATIC LNG
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1.000.0002
250.000
BrindisiSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1.300.000
4
640.000
Toscana Offshore
Rosignano
Porto EmpedocieTaranto
San Ferdinando
Gioia Tauro
Priolo
Trieste Zaule
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
• Cover Increasing Dependency
• New terminals almost completely exempted (80%)
• Many projects announced, only few in progress
26/04/2007 GLE 1022/11/2007 GIE Annual Conference 2007- Madrid 10
DIFFERENT APROACHES: FRANCE
Montoir - GdFSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
3360.000
1.380.400
Fos Tonkin - GdFSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
3
150.000
150.000
Le Verdon
Le Havre
Fos-sur-Mer
Fos Cavaou – STMFC
SEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
1.160.000
3330.000
Dunkerque
Le Verdon
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
• Supply diversification
• r-TPA for existing terminals
• New terminals exempted/regulated ?
26/04/2007 GLE 1122/11/2007 GIE Annual Conference 2007- Madrid 11
DIFFERENT APROACHES: BELGIUM
Zeebrugge – FLUXYS LNGSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
3261.000
750.000
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
• Strategic Geographic situation (Zeebrugge Hub)
• Transition to multi-shipper environment
• r-TPA with long term contracts
26/04/2007 GLE 1222/11/2007 GIE Annual Conference 2007- Madrid 12
Other Approaches: PORTUGAL AND GREECE
Revithoussa - DESFASEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)2
130.000
240.000
Sines – REN ATLANTICOSEND-OUT (m3/h)
Nº TANKS
STORAGE (m3 LNG)
2240.000
900.000
EXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
• Security and diversification of Supply
• Regulated terminals
• r-TPA
26/04/2007 GLE 1322/11/2007 GIE Annual Conference 2007- Madrid 13
Other Approaches (II):
WILHELMSHAFEN
GERMANY
POLANDSWINOUJSCIE
THE NETHERLANDSGATE TERMINAL
EEMSHAVEN
LIONGAS
CROATIAOMISALJ
CYPRUSVASSILIKOEXISTING
UNDER STUDY/PLANNED
UNDER EXPANSION PROCESS
COMMITTED/ UNDER CONSTRUCTION
• Supply diversification.
• Exempted terminals with long-term contracts.
• Long permits/authorisations/exemptions phase.
26/04/2007 GLE 1422/11/2007 GIE Annual Conference 2007- Madrid 14
EU FUTURE LNG INVESTMENTS2007-2012
0
2
4
6
8
10
12
14
Existing(Expansion)
Committed/ Underconstruction
Planned/ Understudy
bn €
SOURCE: GLE MAP & ROUGH INTERNAL ASSESSMENT
• Significant Investments ongoing
• Allowing Supply Diversification
• Increasing Gas Supply competition
• Long-term Commitment (regulatory and/or contractual)