6 INFRASTRUCTURE INVESTMENT Key Issues The 2019-20 Budget continues the Government’s significant investment in infrastructure, with a record $2.8 billion in funding committed over the Budget and Forward Estimates period to agency projects across the State. Infrastructure investment allocated over the 2019-20 Budget and Forward Estimates period in the General Government Sector includes funding for roads and bridges ($1.6 billion); hospitals and health ($352.6 million); human services and housing ($212.5 million); schools, education and skills ($194 million); and law and order ($170.6 million). In addition, the 2019-20 Budget supports a significant level of investment outside the General Government Sector, with $792 million in equity contributions specifically for infrastructure investment to be undertaken by government businesses (together with TasWater) in 2019-20 and across the Forward Estimates period. This brings the Government’s total investment in infrastructure in Tasmania over the 2019-20 Budget and Forward Estimates period to a record and unprecedented total of $3.6 billion. Significant investment through equity contributions will support essential statewide infrastructure programs including: the Tasmanian Rail Revitalisation Program; the Tasmanian Irrigation Scheme; TasWater infrastructure investment programs; and the replacement of two new TT-Line vessels. The 2019-20 Budget provides over $90 million to deliver Stage 2 of the Royal Hobart Hospital Redevelopment, including $63 million in new funding. This brings the total funding allocated to the Royal Hobart Hospital Redevelopment over the 2019-20 Budget and Forward Estimates period to $172.8 million. Population growth and greater economic activity are placing pressure on the existing road network. The Government has committed an additional $189.5 million over the 2019-20 Budget and Forward Estimates period towards new projects that will ease congestion and Infrastructure Investment 117

Upload: others

Post on 24-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

6 INFRASTRUCTURE INVESTMENT

Key Issues

The 2019-20 Budget continues the Government’s significant investment in infrastructure, with a record $2.8 billion in funding committed over the Budget and Forward Estimates period to agency projects across the State.

Infrastructure investment allocated over the 2019-20 Budget and Forward Estimates period in the General Government Sector includes funding for roads and bridges ($1.6 billion); hospitals and health ($352.6 million); human services and housing ($212.5 million); schools, education and skills ($194 million); and law and order ($170.6 million).

In addition, the 2019-20 Budget supports a significant level of investment outside the General Government Sector, with $792 million in equity contributions specifically for infrastructure investment to be undertaken by government businesses (together with TasWater) in 2019-20 and across the Forward Estimates period. This brings the Government’s total investment in infrastructure in Tasmania over the 2019-20 Budget and Forward Estimates period to a record and unprecedented total of $3.6 billion.

Significant investment through equity contributions will support essential statewide infrastructure programs including: the Tasmanian Rail Revitalisation Program; the Tasmanian Irrigation Scheme; TasWater infrastructure investment programs; and the replacement of two new TT-Line vessels.

The 2019-20 Budget provides over $90 million to deliver Stage 2 of the Royal Hobart Hospital Redevelopment, including $63 million in new funding. This brings the total funding allocated to the Royal Hobart Hospital Redevelopment over the 2019-20 Budget and Forward Estimates period to $172.8 million.

Population growth and greater economic activity are placing pressure on the existing road network. The Government has committed an additional $189.5 million over the 2019-20 Budget and Forward Estimates period towards new projects that will ease congestion and improve safety.

The level of infrastructure investment allocated in the 2019-20 Budget remains well above long-term historical infrastructure investment levels. As a result, the Government continues to achieve its infrastructure related Fiscal Strategy Action which requires that the level of investment in non-financial assets exceeds the value of depreciation over the Budget and Forward Estimates period.

Infrastructure Investment 117

Page 2: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

118 Infrastructure Investment

Page 3: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

OVERVIEWOver the 2019-20 Budget and Forward Estimates period, the Government will invest $2.8 billion through Government agencies in vital community infrastructure projects, including: roads and bridges ($1.6 billion); hospitals and health ($352.6 million); human services and housing ($212.5 million); schools, education and skills ($194 million); law and order ($170.6 million); tourism, recreation and culture ($151.7 million); ICT to support service delivery ($53.3 million); and other infrastructure ($13 million).The record agency infrastructure investment of $2.8 billion over a four year period is significantly above long-term historical infrastructure investment levels, and maintains the Government’s continued focus on strategic investment to support the State’s economic growth.The agency infrastructure investment program includes State funding for co-funded (Australian and State Government) roads projects under the new National Partnership Agreement for Land Transport Infrastructure Projects, including the Roads of Strategic Importance projects and the new Urban Congestion Fund.It is essential that the Government invests in projects that will contribute to the improved delivery of Government services in Tasmania, and which will continue to support the State’s growing economy and population. The infrastructure program has been formulated having regard to the Government’s Fiscal Principles contained in its Fiscal Strategy and will deliver on Strategic Action 5, namely, infrastructure investment will maintain existing assets, respond to economic and population growth and reflect the changing needs of the community.Important infrastructure investment outside of the General Government Sector is also planned by government businesses and TasWater, supported by State Government equity investment of nearly $800 million over the Budget and Forward Estimates period. The Government’s planned infrastructure program presents a significant forward pipeline of infrastructure investment that can be relied upon by Tasmanian businesses and industry. It will continue to support economic activity and jobs growth across the State. This will be enhanced by the release of the State’s first 30-year Infrastructure Strategy this year. The Government will continue to work with agencies,

Infrastructure Investment 119

Page 4: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

government businesses and industry to manage the roll-out of this record level of infrastructure investment.

120 Infrastructure Investment

Page 5: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Chart 6.1 details agency infrastructure investment from 2013-14 to 2018-19 and the 2019-20 Budget and Forward Estimates.

Chart 6.1: Agency Infrastructure Investment, 2013-14 to 2022-23

Infrastructure Investment 121

Page 6: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

GENERAL GOVERNMENT SECTOR INFRASTRUCTURE INVESTMENT PROJECTS BY AGENCYTable 6.1 details infrastructure investment expenditure within the General Government Sector by agency.

Table 6.1: Infrastructure Expenditure by Agency1,2

2018-19  2018-19  2019-20  2020-21  2021-22  2022-23 Estimate

d  Forward  Forward  Forward Budget  Outcome  Budget  Estimate  Estimate  Estimate 

$m  $m  $m  $m  $m  $m 

AgenciesCommunities Tasmania 65.3  72.2  81.6  69.2  45.8  25.8 Education 59.0  29.8  51.0  46.2  44.0  43.0 Finance-General 24.8  25.8  12.3  10.0  10.0  15.0 Health 212.3  248.2  152.9  106.5  72.5  20.5 Justice 13.7  10.5  19.2  35.4  35.8  38.5 Legislative Council ....  0.7  ....  ....  ....  .... Legislature-General ....  1.8  0.2  ....  ....  .... Police, Fire and Emergency

Management 6.9  6.3  15.3  15.8  8.6  2.0 Premier and Cabinet 0.3  0.5  0.3  0.3  0.3  0.3 Primary Industries, Parks, Water

and Environment 42.1  22.6  50.2  52.5  35.9  11.1 State Growth 316.8  290.3  323.5  378.6  375.7  538.8 Treasury and Finance 1.5  1.2  1.3  ....  ....  .... 

Statutory AuthoritiesInland Fisheries Service 0.2  0.2  0.1  ....  ....  .... Marine and Safety Tasmania 1.6  1.6  0.8  1.5  1.5  .... Royal Tasmanian Botanical Gardens 1.0  1.0  2.6  ....  ....  .... TasTAFE 6.9  6.9  12.0  ....  ....  .... 

TOTAL INFRASTRUCTURE EXPENDITURE 752.4  719.6  723.3  715.9  630.1 695.0 

Notes:1. This Table includes expenditure (both Purchases of Non-Financial Assets and associated expenses) for

all infrastructure projects, but does not include minor asset purchases for non-infrastructure projects. For these reasons, the Table is not equivalent to the Purchases of Non-Financial Assets presented in chapter 4 of this Budget Paper. Table 6.5 provides a reconciliation of Purchases of Non-Financial Assets to Total Infrastructure Expenditure.

122 Infrastructure Investment

Page 7: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

2. Estimated Outcome expenditure for some agencies, when compared with the 2018-19 Original Budget, may reflect the expenditure of funding carried forward from previous years and additional funding provided for specific projects.

Infrastructure Investment 123

Page 8: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

GOVERNMENT BUSINESS INFRASTRUCTURE INVESTMENT (INCLUDING TASWATER)This chapter primarily provides information on infrastructure investment in the General Government Sector. Infrastructure investment undertaken by Government Business Enterprises or State-owned Companies is outside of the General Government Sector and is therefore not included as infrastructure investment for the purpose of this chapter. Information on infrastructure investment undertaken by these entities can be found in entity annual reports and on entity websites. The 2019-20 Budget does, however, include equity and other contributions provided through the General Government Sector to Metro Tasmania Pty Ltd, Tasmanian Irrigation Pty Ltd, Tasmanian Railway Pty Ltd and TT-Line Company Pty Ltd, to undertake major infrastructure works. Support is also provided to Tasmanian Water and Sewerage Corporation Pty Ltd.All equity contributions to these entities are made through Finance-General. In the 2019-20 Budget and Forward Estimates, the total equity funding allocated to infrastructure investment is $792 million. When combined with the General Government Sector agency infrastructure funding, this takes the total investment by the State and Australian Governments in infrastructure over this period to $3.6 billion.

Table 6.2: 2019-20 Budget Total Infrastructure Investment Funding

2018-19  2019-20  2020-21  2021-22  2022-23 Forward  Forward  Forward 

Budget  Budget  Estimate  Estimate  Estimate $m  $m  $m  $m  $m 

General Government Sector Infrastructure Investment 752.4  723.3  715.9  630.1  695.0 

Government BusinessesMetro Tasmania Pty Ltd 8.0  8.5  4.0  0.8  0.3 Tasmanian Irrigation Pty Ltd 53.5  22.7  57.0  80.0  25.0 Tasmanian Railway Pty Ltd 13.2  45.4  15.0  89.9  105.9 TT-Line Company Tasmania Pty Ltd ....  ....  ....  ....  157.5 

74.7  76.6  76.0  170.7  288.7 

Tasmanian Water and Sewerage Corporation Pty Ltd 20.0  20.0  50.0  50.0  60.0 

TOTAL 847.1  819.9  841.9  850.8  1 043.7 

124 Infrastructure Investment

Page 9: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Metro Tasmania Pty LtdThe 2019-20 Budget reflects equity contributions to Metro Tasmania Pty Ltd for the capital component of the Derwent River ferry service establishment ($500 000 per annum over three years from 2019-20) and investment in a single ticketing system ($7.5 million over four years from 2019-20), and $4.5 million in 2019-20 for the Metro Bus Infrastructure capital initiative.

Tasmanian Irrigation Pty LtdThe 2019-20 Budget reflects State equity contributions to Tasmanian Irrigation Pty Ltd for Tranche 3 irrigation projects of $70 million over four years from 2019-20, and support for on farm energy initiatives as announced in the 2018-19 Budget.In addition, the Australian Government has committed $100 million towards the Tasmanian Irrigation Scheme Tranche 3.

Tasmanian Railway Pty LtdThe Tasmanian Rail Revitalisation Program is a program to continue to remediate Tasmania’s Freight Rail Network.As part of the 2017-18 Budget, the State Government committed funding of $59.8 million over four years, commencing in 2019-20 to facilitate Tranche 2 of the Program. In its 2018-19 Budget, the Australian Government also reflected a matching contribution of $59.8 million. The State and Australian Governments have each committed a further $68 million towards Tranche 3 of this program, commencing in 2021-22.In addition, the State will contribute $575 000 to TasRail, towards the construction of a weighbridge at Parattah in 2019-20.

Tasmanian Water and Sewerage Corporation Pty LtdFunding totalling $300 million will be provided to TasWater over 10 years from 2018-19, representing an increase of $100 million in the 2019-20 Budget. An initial contribution of $20 million was made in January 2019. This funding will allow TasWater to implement its accelerated infrastructure program, as well as provide support for major infrastructure projects including the decommissioning of TasWater’s Macquarie Point wastewater treatment plant, the Launceston combined sewerage and stormwater system improvements and the Freycinet Peninsula wastewater system. Funding of $180 million is reflected in 2019-20 and over the Forward Estimates period.

TT-Line Company Tasmania Pty LtdTT-Line Company Pty Ltd has signed contracts for the construction of two new vessels, with an estimated total cost of $600 million, to replace the current Spirit of

Infrastructure Investment 125

Page 10: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Tasmania vessels. The design specifications provide for 212 metre long vessels that will accommodate 1 800 passengers and up to 600 passenger vehicles.

126 Infrastructure Investment

Page 11: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

DETAILED INFRASTRUCTURE INVESTMENT PROJECTS BY AGENCYTable 6.3 provides infrastructure investment project details for the General Government Sector by agency, including projects which are continuing from previous Budget years and new infrastructure projects that have been funded by the Government in the 2019-20 Budget.

Table 6.3: Infrastructure Investment Project Details by Agency1

Estimated2019-20  2020-21  2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

DEPARTMENT OF COMMUNITIES TASMANIAAshley Youth

Detention Centre Redevelopment Existing 2018 2021 7.3  3.6  3.3  ....  .... 

Housing Fund2 Existing 2008 2021 60.0  1.1  1.2  ....  .... Housing Program3 Existing Ongoing na  35.4  20.7  20.8  20.8 Indoor Multi-sports

Facility - Southern Tasmania Existing 2019 2021 10.0  1.0  9.0  ....  .... 

Tasmania’s Affordable Housing Action Plan 2 Existing 2018 2023 125.0  40.5  35.0  25.0  5.0 

TOTAL 81.6  69.2  45.8  25.8 

DEPARTMENT OF EDUCATIONDevonport High Existing 2020 2023 10.5  ....  0.5  6.5  3.5 East Launceston

Primary School Existing 2016 2020 4.5  2.3  ....  ....  .... Education Act

Implementation - Capital Existing 2018 2021 18.0  7.4  7.0  ....  .... 

Hobart College Existing 2018 2020 2.5  2.1  ....  ....  .... Illawarra Primary

School Existing 2017 2019 2.9  0.5  ....  ....  .... Lansdowne Crescent Existing 2019 2021 4.7  1.1  3.6  ....  .... 

Infrastructure Investment 127

Page 12: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Primary SchoolLegana Primary4 Existing 2021 2024 20.0  ....  ....  5.0  10.0 Molesworth Primary

School Existing 2019 2021 1.9  0.3  1.6  ....  .... Montagu Bay Primary

School Existing 2018 2020 1.8  1.6  ....  ....  .... New Brighton High

School4 Existing 2020 2024 30.0  ....  1.0  2.0  12.0 

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21 2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

New K-12 Penguin School Existing 2018 2022 20.0  4.8  7.5  7.5  .... 

New K-12 Sorell School Existing 2020 2023 22.0  ....  6.0  11.0  5.0 Revitalising Cosgrove

High School4 Existing 2021 2024 20.0  ....  ....  5.0  7.5 Riverside High School Existing 2017 2020 12.0  7.1  ....  ....  .... School Farm

Redevelopment (Brighton/JRLF) Existing 2019 2021 4.3  0.3  4.0  ....  .... 

School Farm Redevelopment (Sheffield) Existing 2019 2020 3.0  3.0  ....  ....  .... 

School Infrastructure Upgrades Existing 2018 2021 6.8  3.2  3.1  ....  .... 

Six New Child and Family Learning Centres4 Existing 2019 2024 21.0  0.5  5.0  5.0  5.0 

Snug Primary School Existing 2018 2020 2.5  2.1  ....  ....  .... Sorell School Existing 2018 2021 3.8  1.0  2.5  ....  .... Southern Support

School Existing 2018 2020 4.3  4.0  ....  ....  .... Spreyton Primary

School Existing 2019 2021 1.7  0.3  1.4  ....  .... Taroona High School Existing 2017 2020 5.0  4.5  ....  ....  .... Tasmanian Archives Existing 2018 2020 3.0  2.2  ....  ....  .... Year 7-12

Implementation Plan - Capital Existing 2014 2022 16.5  3.0  3.0  2.0  .... 

128 Infrastructure Investment

Page 13: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

TOTAL 51.0  46.2  44.0  43.0 

FINANCE-GENERALDigital Transformation

Priority Expenditure Program Existing Ongoing na  10.0  10.0  10.0  15.0 

Digital Transformation -Project Unify Existing 2017 2020 11.9  2.3  ....  ....  .... 

TOTAL 12.3  10.0  10.0  15.0 

Infrastructure Investment 129

Page 14: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21 2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

DEPARTMENT OF HEALTH27 New Mental Health

Beds in Southern Tasmania

New/ Existing 2018 2021 20.7  6.5  13.8  ....  .... 

Aeromedical Helicopter Service Existing 2018 2020 1.6  0.4  ....  ....  .... 

Air Conditioning Upgrades - Statewide Existing 2018 2021 4.9  2.5  1.5  ....  .... 

Better Accommodation for Health Professionals on Flinders Island Existing 2018 2019 0.5  0.4  ....  ....  .... 

Burnie and Glenorchy Ambulance Stations Existing 2018 2021 12.0  5.9  5.9  ....  .... 

Campbell Town Ambulance Station Existing 2019 2021 3.0  2.2  0.6  ....  .... 

Health Transport and Coordination Infrastructure Existing 2017 2021 10.0  0.9  0.9  ....  .... 

Kingston Health Centre5 Existing 2013 2019  6.5  0.8  ....  ....  .... 

Launceston General Hospital - More Car Parking Existing 2018 2021 5.0  1.4  3.3  ....  .... 

Launceston General Hospital -Redevelopment4 Existing 2018 2024 87.3  11.5  12.5  12.0  20.5 

Maternity Services at the North West Regional Hospital Existing 2018 2020 2.1  2.0  ....  ....  .... 

Mersey Community Hospital Capital Upgrades Existing 2018 2021 35.0  10.0  17.5  4.1  .... 

Mersey Hospital Upgrades5 Existing 2013 2020 1.9  1.0  ....  ....  .... 

Midlands Multipurpose Existing 2018 2020 2.5  1.9  ....  ....  .... 

130 Infrastructure Investment

Page 15: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Centre (Oatlands Hospital) Upgrade

Royal Hobart Hospital Pharmacy Redevelopment Existing 2019 2021 3.8  1.0  2.8  ....  .... 

Royal Hobart Hospital Redevelopment6 Existing 2011 2019 469.2  82.3  ....  ....  .... 

Royal Hobart Hospital Stage 2 Redevelopment7

New/ Existing 2019 2022 91.1  4.2  32.6  53.7  .... 

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21  2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

Smithton Ambulance Training Station Existing 2018 2020 1.1  1.0  ....  ....  .... 

Stage 2 of the King Island Hospital Redevelopment Existing 2018 2022 10.5  3.8  3.3  2.7  .... 

Statewide - Rural Hospital and Ambulance Station Upgrade Fund Existing 2018 2021 15.0  8.1  5.9  ....  .... 

Statewide Hospital Critical Facility Upgrades Existing 2018 2021 10.5  3.0  3.6  ....  .... 

Statewide Rural Health Facility Infrastructure Upgrades Existing 2018 2021 4.7  1.5  1.2  ....  .... 

THS Infrastructure Upgrades Existing 2019 2021 1.9  0.7  1.2  ....  .... 

TOTAL 152.9 106.5  72.5  20.5 

DEPARTMENT OF JUSTICEAn Upgraded Burnie

Court Complex4 Existing 2020 2024 15.0  ....  0.5  1.9  5.9 iPlan Stage Two:

Integrated Planning Existing 2017 2020 1.9  0.5  ....  ....  .... 

Infrastructure Investment 131

Page 16: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

and Building PortalNew Northern Prison4 Existing 2019 2029  270.0  1.0  3.9  7.8  32.6 New Southern Remand

Centre Existing 2018 2022 70.0  17.0  31.0  16.8  .... O'Hara Pre-Release

Facility - Additional Units Existing 2018 2020 1.5  0.7  ....  ....  .... 

Risdon Prison Shared Facilities Upgrade Existing 2021 2022 9.3  ....  ....  9.3  .... 

TOTAL 19.2  35.4  35.8  38.5 

132 Infrastructure Investment

Page 17: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21  2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

LEGISLATURE-GENERALParliament Garden

Lighting Project8

New/ Existing 2019 2019 0.3  ....  ....  ....  .... 

Parliament Television Broadcast System

New/ Existing 2019 2019 1.4  0.1  ....  ....  .... 

TOTAL 0.2  ....  ....  .... 

DEPARTMENT OF POLICE, FIRE AND EMERGENCY MANAGEMENTBody Worn Video Existing 2019 2021 0.7  ....  0.7  ....  .... Crackdown on Anti-

Social Driving Existing 2018 2022 0.4  0.1  0.1  0.1  .... Increased Police

Support Existing 2020 2021 0.1  ....  0.1  ....  .... Large Vessel

Replacement Program Existing 2014 2021 19.3  1.2  5.0  4.0  0.5 

Longford Police Station Existing 2018 2021 5.0  2.7  1.5  ....  .... New Norfolk Police

Station Existing 2018 2021 5.0  3.5  1.0  ....  .... Sorell Emergency

Services Hub Existing 2018 2022 12.0  3.5  5.5  2.5  .... Police Infrastructure New 2019 2020 1.0  1.0  ....  ....  .... Supporting our

Emergency Services Volunteers Existing 2018 2022 2.0  0.5  0.5  0.5  .... 

Upgrade Police Housing

New/ Existing 2015 2023 11.0  2.8  1.5  1.5  1.5 

TOTAL 15.3  15.8  8.6  2.0 

DEPARTMENT OF PREMIER AND CABINET

Infrastructure Investment 133

Page 18: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Service Tasmania Shops Capital Investment Existing Ongoing na 0.3  0.3  0.3  0.3 

TOTAL 0.3  0.3  0.3  0.3 

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21 2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

DEPARTMENT OF PRIMARY INDUSTRIES, PARKS, WATER AND ENVIRONMENTBiosecurity Risk

Management and Truck and Machinery Washes Existing 2018 2022 2.0  0.6  0.6  0.6  .... 

Community Recovery Fund - Parks Infrastructure New 2019 2020 8.3  8.3  ....  ....  .... 

Cradle Mountain Experience6 Existing 2019 2022 65.0  10.2  34.0  20.7  .... 

Cradle Mountain Visitor Experience Existing 2017 2021 21.8  13.2  2.0  ....  .... 

Crown Land Services -Structural Asset Upgrades Existing Ongoing na  0.6  0.6  0.6  0.6 

Fisheries Digital Transition Project9 Existing 2017 2022 6.2  1.7  1.5  1.5  .... 

Implementing the Bee Industry Futures Report Existing 2019 2020 0.5  0.5  ....  ....  .... 

Improved Statewide Visitor Infrastructure Existing 2018 2022 16.0  5.0  4.5  4.5  .... 

Modernise our Research Farms Existing 2019 2021 7.0  3.5  3.5  ....  .... 

Move 100 DPIPWE Staff to North Existing 2019 2020 0.6  0.4  ....  ....  .... 

National Parks - Maintenance Boost Existing 2018 2022 8.0  2.0  2.0  2.0  .... 

134 Infrastructure Investment

Page 19: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Next Iconic Walk Existing 2018 2023 20.0  0.5  2.9  6.0  10.5 Recreational Fishing -

Improved Boat and Trailer Parking Existing 2019 2021 2.2  0.6  1.0  ....  .... 

Three Capes Track - Stage 36 Existing 2015 2020 7.8  3.2  ....  ....  .... 

TOTAL 50.2  52.5  35.9  11.1 

Infrastructure Investment 135

Page 20: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20  2020-21 2021-22  2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

DEPARTMENT OF STATE GROWTHA Workforce for Now

and the Future Existing 2017 2021 0.2  0.1  0.1  ....  .... Roads Program

ExpenditureNew/

Existing Ongoing na  323.5  378.5  375.7  538.8 

TOTAL 323.5  378.6  375.7  538.8 

DEPARTMENT OF TREASURY AND FINANCEBudget Information

Management System Project Existing 2014 2020 7.5  1.3  ....  ....  .... 

TOTAL 1.3  ....  ....  .... 

INLAND FISHERIES SERVICEUpgrade of Amenities

at High Visitation Trout Waters Existing 2018 2020 0.3  0.1  ....  ....  .... 

TOTAL 0.1  ....  ....  .... 

MARINE AND SAFETY TASMANIADevelop a new online

marketing portal - one stop shop Existing 2018 2020 0.2  0.1  ....  ....  .... 

Improve catch opportunities - artificial reefs Existing 2020 2022 1.0 ....  0.5  0.5  .... 

Shore Based Fishing Existing 2018 2022 1.6 0.1  0.4  0.7  .... Stronger Safety

Arrangements Existing 2018 2022 2.0 0.7  0.5  0.3  .... 

TOTAL 0.8  1.5  1.5  .... 

136 Infrastructure Investment

Page 21: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Infrastructure Investment 137

Page 22: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Table 6.3: Infrastructure Investment Project Details by Agency (continued)1

Estimated2019-20 2020-21 2021-22 2022-23 

New/ Total Forward Forward Forward 

Existing StartComplet

e Cost Budget Estimate Estimate Estimate $m  $m  $m  $m  $m 

ROYAL TASMANIAN BOTANICAL GARDENSNew Visitor Centre Existing 2018 2020 3.6  2.6  ....  ....  .... 

TOTAL 2.6  ....  ....  .... 

TASTAFEAgricultural Centre of

Excellence Existing 2019 2020 5.0  5.0  ....  ....  .... Trades and Water

Centre of Excellence Existing 2019 2020 7.0  7.0  ....  ....  .... 

TOTAL 12.0  ....  ....  .... 

TOTAL INFRASTRUCTURE PROJECTS 723.3  715.9  630.1  695.0 

Notes: 1. This Table does not include irrigation, water and sewerage or rail related expenditure, as this type of

expenditure is in the form of grants or equity injections outside of the General Government Sector and the resulting infrastructure is not held within the General Government Sector.

2. Funding remaining in the Housing Fund as at 30 June 2019 has been transferred from Finance-General to the Department of Communities Tasmania. There has been no change to the projects being undertaken or the level of funding available as a result of this administrative change.

3. More details on the Housing Program are provided in the Department of Communities Tasmania chapter in Government Services Budget Paper No 2.

4. The Estimated Total Cost for this item reflects funding allocated beyond the 2019-20 Budget and Forward Estimates period.

5. Funding remaining in the Hospital Capital Fund and the Infrastructure Tasmania Fund as at 30 June 2019 has been transferred from Finance-General to the Department of Health. There has been no change to the projects being undertaken or the level of funding available as a result of this administrative change.

6. This project is funded by both the State and Australian Government. 7. This includes $28.1 million allocated to the Royal Hobart Hospital Ward Upgrades in the

2018-19 Budget, and the additional $63 million provided in the 2019-20 Budget. 8. This project has $26 000 allocated in 2019-20.9. This project was previously referred to as the Fisheries Integrated Licensing Management System

(FILMS).10.

138 Infrastructure Investment

Page 23: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

MAJOR AREAS OF AGENCY INFRASTRUCTURE INVESTMENT IN 2019-20This section provides an overview of the key projects being undertaken in 2019-20 within each of the major areas of agency infrastructure expenditure. Further details on these, and other, infrastructure projects is available in individual agency chapters in Government Services Budget Paper No 2.Chart 6.2 provides a breakdown of 2019-20 agency infrastructure expenditure by ABS classification.

Chart 6.2: 2019-20 Infrastructure Investment by Classification

Schools, Education and SkillsIn 2019-20, total Schools, Education and Skills infrastructure is budgeted to be $60.8 million. Major infrastructure projects include: Education Act Implementation ($7.4 million); Riverside High School ($7.1 million); Trades and Water Centre of Excellence ($7 million); Agricultural Centre of Excellence ($5 million); New K-12 Penguin School ($4.8 million); Taroona High School ($4.5 million);

Infrastructure Investment 139

Page 24: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Southern Support School ($4 million); and School Infrastructure Upgrades ($3.2 million).

Human Services and HousingIn 2019-20, total Human Services and Housing infrastructure funding is budgeted to be $80.6 million. Major infrastructure projects include: Affordable Housing Strategy Stage II ($40.5 million); Housing Program ($35.4 million); and Ashley Youth Detention Centre Redevelopment ($3.6 million).

Hospitals and HealthIn 2019-20, total Hospitals and Health infrastructure funding is budgeted to be $152.9 million. Major infrastructure projects include: Royal Hobart Hospital Redevelopment Projects ($86.5 million); Launceston General Hospital Redevelopment ($11.5 million); Mersey Community Hospital Capital Upgrades ($10 million); Statewide - Rural Hospital and Ambulance Station Upgrade Fund ($8.1 million); and 27 New Mental Health Beds in Southern Tasmania ($6.5 million).

Law and OrderIn 2019-20, total Law and Order infrastructure funding is budgeted to be $34.5 million. Major infrastructure projects include: New Southern Remand Centre ($17 million); New Norfolk Police Station ($3.5 million); Sorell Emergency Services Hub ($3.5 million); and Longford Police Station ($2.7 million).

Roads and BridgesIn 2019-20, total Roads and Bridges funding is budgeted to be $323.5 million. Major infrastructure projects include: Infrastructure Maintenance ($72.1 million); Midland Highway ($52.7 million); State Road Upgrades - Southern Region ($25.2 million);

140 Infrastructure Investment

Page 25: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Urban Congestion Fund ($24.2 million); Roads Package to Support Tasmania’s Visitor Economy ($20.7 million); Road Safety and Traffic Management ($19.3 million); Roads of Strategic Importance ($15.2 million); Hobart Airport Interchange ($9.5 million); New Bridgewater Bridge ($8 million); and State Road Upgrades - Northern Region ($7.2 million). Further detail on the Roads Program is provided later in this chapter.

Information and Communication TechnologyIn 2019-20, total Information and Communication Technology funding is budgeted to be $15.3 million. Major infrastructure projects include: Digital Transformation Priority Expenditure Program ($10 million); Digital Transformation - Project Unify ($2.3 million); and Fisheries Integrated Licensing Management System ($1.7 million).

Tourism, Recreation and CultureIn 2019-20, total Tourism, Recreation and Culture funding is budgeted to be $48.6 million. Major infrastructure projects include: Cradle Mountain Visitor Experience ($13.2 million); Cradle Mountain Experience ($10.2 million); Community Recovery Fund - Parks Infrastructure ($8.3 million); Improved Statewide Visitor Infrastructure ($5 million); Three Capes Track - Stage 3 ($3.2 million); and Royal Tasmanian Botanical Gardens New Visitor Centre ($2.6 million).

Other InfrastructureIn 2019-20, total Other Infrastructure funding is budgeted to be $7.1 million. Major projects include: Modernise our Research Farms ($3.5 million); and Tasmanian Archives and Heritage Office ($2.2 million).

Infrastructure Investment 141

Page 26: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

ROADS PROGRAMThe Roads Program comprises new works projects and the upgrade and maintenance of established roads. In 2019-20, total roads program expenditure is $323.5 million. This includes a State Government allocation of $206.4 million and an Australian Government allocation of $117 million. Completion dates reflect the current best estimates.

Table 6.4: Roads Program ExpenditureEstimate

d 2019-20  2020-21  2021-22  2022-23 Total Forward  Forward  Forward 

Start Complete Cost Budget  Estimate  Estimate  Estimate       $m $m $m $m $m

STATE FUNDED              Co-contribution Projects              

Brooker Highway - Elwick, Goodwood, Howard Roads1 2015 2021 32.0 ....  1.0 ....  .... 

Greater Hobart Traffic Solution1,2,3,4,5 2019 2024 93.8 8.8 13.0 25.1 25.2

Hobart Airport Interchange1 2018 2021 30.0 2.5 ....  ....  .... Midland Highway6 2014 2024 450.0 0.4 ....  ....  .... New Bridgewater Bridge1,2,3,7 2019 2025 576.0 2.0 3.0 15.0 38.0Roads of Strategic

Importance1,3,7 2019 2028 606.3 2.2 5.4 9.1 9.1

South East Traffic Solution1,2,8 2019 2023 27.0 4.9 13.0 2.0 6.0State Road Upgrades - North

West and West Coast Regions1,2,3,8 2019 2024 50.1 3.6 11.1 10.0 11.0

State Road Upgrades - Northern Region1,6 2019 2023 54.2 7.2 17.8 9.2 10.7

State Road Upgrades - Southern Region1,3,6 2018 2024 99.8 25.2 17.6 15.3 27.6

Urban Congestion Fund1 2019 2023 84.7 8.0 8.0 8.0 ....         64.8 89.9 93.7 127.6

Roads for Our Future Program              

Bridge Strengthening on Esk and Tasman Highways 2016 2020 10.0 5.1 ....  ....  .... 

        5.1 ....  ....  .... 

Other Roads Infrastructure              Asset Management   Ongoing na 5.8 5.9 6.1 6.2Environmental Management   Ongoing na 0.6 0.6 0.6 0.6

142 Infrastructure Investment

Page 27: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Extending the Great Eastern Drive - Binalong Bay Road2 2019 2022 4.5

0.2 0.7 3.6 .... Freight Access Bridge

Upgrades 2017 2021 19.1 4.4 4.5....  .... 

Table 6.4: Roads Program Expenditure (continued)Estimate

d 2019-20  2020-21  2021-22  2022-23 Total Forward  Forward  Forward 

Start Complete Cost Budget  Estimate  Estimate  Estimate       $m $m $m $m $mGreat Eastern Drive 2018 2020 6.3 3.0 ....  ....  .... Infrastructure Development   Ongoing na 1.0 1.0 1.1 1.1Infrastructure Maintenance   Ongoing na 64.4 66.2 68.0 70.0Launceston and Tamar Valley

Traffic Vision2 2019 2023 75.1 4.8 9.4 20.5 40.0Mowbray Interconnector 2018 2020 7.0 6.0 ....  ....  .... Program Management   Ongoing na 1.2 1.3 1.3 1.4Road Safety and Traffic

Management   Ongoing na 6.3 6.2 6.4 6.6Road Safety Strategy -

Infrastructure   Ongoing na 9.0 9.2 8.7 8.2Roads Package to Support

Tasmania's Visitor Economy2 2019 2023 66.1 20.7 20.9 13.1 3.3Strategic Planning and Policy   Ongoing na 3.0 3.1 3.2 3.2Tasmanian Journeys2 2019 2022 0.8 0.3 0.3 0.2 …West Tamar Highway Traffic

Solution2 2019 2021 12.0 5.8 5.4 ....  ....         136.5 134.7 132.8 140.6               

TOTAL STATE FUNDED ROADS       206.4 224.6 226.5 268.2               

AUSTRALIAN GOVERNMENT FUNDED              

Investment Program              Brooker Highway - Elwick,

Goodwood, Howard Roads1 2015 2021 32.0.... 

0.5....  .... 

Grants to Local Government9 2017 2020 na 0.1 ....  ....  .... Hobart Airport Interchange1 2017 2021 30.0 7.0 16.2 ....  .... Midland Highway1,6 2014 2024 450.0 52.3 17.6 1.5 40.0New Bridgewater Bridge1,3,7 2019 2025 576.0 6.0 30.0 50.0 150.0Urban Congestion Fund1 2019 2023 84.7 16.2 23.5 12.9 6.1        81.6 87.8 64.4 196.1

Infrastructure Investment 143

Page 28: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

144 Infrastructure Investment

Page 29: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

Table 6.4: Roads Program Expenditure (continued)Estimate

d 2019-20  2020-21  2021-22  2022-23 Total Forward  Forward  Forward 

Start Complete Cost Budget  Estimate  Estimate  Estimate       $m $m $m $m $m

Off-Network              Domain Highway Planning10 2015 2020 5.0 1.7 ....  ....  .... Highland Lakes Road10 2018 2020 9.0 0.1 ....  ....  ....         1.8 ....  ....  .... Other Roads

Infrastructure             

Bridge Renewal Program   Ongoing na 4.2 1.6 2.2 1.7Heavy Vehicle Safety and

Productivity10   Ongoing na 4.7 2.0 2.2 …Road Safety and Traffic

Management   Ongoing na 4.0 2.8 2.8 2.8Road Specific Maintenance   Ongoing na 7.7 7.7 7.7 .... Roads of Strategic

Importance3,7 2019 2028 606.3 13.0 52.0 70.0 70.0

        33.6 66.1 84.9 74.5               

TOTAL AUSTRALIAN GOVERNMENT FUNDED ROADS

     117.0 153.9 149.3 270.6

               TOTAL ROADS PROGRAM

EXPENDITURE       323.5 378.5 375.7 538.8               

Notes:1. These projects are funded by both the State and Australian Government. 2. Funding for these projects was part of the State Government’s 2018 election commitments. 3. The Estimated Total Cost for this item reflects funding beyond the 2019-20 Budget and Forward

Estimates period.4. This project includes the Government’s commitment of $20 million for Kingborough Congestion as

part of the Hobart City Deal. 5. This project includes the balance of the State funding contribution to the Tasman Highway Intelligent

Transport Solutions initiative as part of the Urban Congestion Fund.6. The State Government’s contribution to the Midland Highway has now been reflected in the State

Road Upgrades - Southern Region and State Road Upgrades - Northern Region. 7. The completion date for this project is yet to be finalised. 8. Includes the balance of the State funding contribution to Roads of Strategic Importance.9. The Australian Government committed funding for a number of 2016 election commitments that

relate specifically to Local Government roads. This funding will be provided to the relevant council via the State Government.

10. These projects include State Government funding that was expended in previous years. 11.

Infrastructure Investment 145

Page 30: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

RECONCILIATION BETWEEN INFRASTRUCTURE INVESTMENT AND PURCHASES OF NON-FINANCIAL ASSETSPurchases of Non-Financial Assets is an accounting classification under the Australian Accounting Standards. It appears on the Income Statement and Cash Flow Statement and reflects purchases of non-financial assets such as land, buildings, plant and equipment, infrastructure and intangible assets. While the majority of the Purchases of Non-Financial Assets is comprised of Infrastructure Investment projects, there is a portion of Purchases of Non-Financial Assets expenditure that is not included in this chapter. Such items include Budget allocations for: the Government’s fleet management services; ambulance, surgical and medical equipment; computer software; and other smaller capital items. Conversely, Infrastructure Investment projects can include allocations of expenditure which are not classified as Purchases of Non-Financial Assets under the Australian Accounting Standards, but are directly related to infrastructure projects. This expenditure can include items such as employee entitlements, infrastructure maintenance, Australian Government Loan Repayments and other supplies and consumables. Table 6.5 provides a reconciliation between the two measures.

Table 6.5: Reconciliation between Purchases of Non-Financial Assets and Infrastructure Investment

2018-19 2018-19 2019-20 2020-21 2021-22 2022-23 Estimate

d  Forward Forward Forward 

Budget Outcome Budget Estimat

e Estimat

e Estimat

e $m  $m  $m  $m  $m  $m 

Purchases of Non-Financial Assets1 731.8  699.1  688.4  706.5  601.9  665.0 Less Purchases of non-financial assets excluded

from Infrastructure Investment 88.5  96.2  67.6  81.4  61.5  59.7 Plus Infrastructure Investment not included in

Purchases of non-financial assets 109.1  116.7  102.4  90.8  89.7  89.6 

146 Infrastructure Investment

Page 31: 2019-20 Budget Paper 1 - Chapter 6 - Infrastructure … · Web viewThis project was previously referred to as the Fisheries Integrated Licensing Management System (FILMS). Major Areas

TOTAL INFRASTRUCTURE EXPENDITURE 752.4  719.6  723.3  715.9  630.1  695.0 

Note:1. Reflects Purchases of Non-Financial Assets as detailed in the General Government Sector Cash Flow

Statement.

Infrastructure Investment 147