2016 Integrated Resource Plan Update Tucson Electric Power (TEP) UNS Electric, Inc. (UNSE) 2016 IRP Workshop July 18, 2016

Upload: vuongdiep

Post on 11-Apr-2018

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 Integrated Resource Plan Update

Tucson Electric Power (TEP)UNS Electric, Inc. (UNSE)

2016 IRP WorkshopJuly 18, 2016

Page 2: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 IRP Workshop Topics

Victor AguirreManager,

Resource Planning

• Load Forecast • Loads and Resources Update• Current Renewable Projects• New Technologies

– Battery Storage Project– Reciprocating Engines – Small Modular Reactors – Energy Imbalance Market Update

Jeff YockeyManager, Environmental and

Long-Term Planning

• Portfolio Diversification• Renewable Outlook• Energy Efficiency Outlook• Clean Power Plan Update• U of A Water Study Update

Mike SheehanSenior Director, Fuels and

Resource Planning

• Forecast Assumptions• Scenarios and Sensitivities• Future Transmission Plans• EV Case Study• Future Operational Challenges• Three Year Action Plans

1

Page 3: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 Integrated Resource Plan Update

Victor AguirreManager, Resource Planning

2016 IRP WorkshopJuly 18, 2016

Page 4: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

TEP Retail Load Forecast

0

500

1000

1500

2000

2500

3000

2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

Peak

Dem

and,

MW

2014 IRP 2016 Pre-IRP 2016 TEP Forecast (w/out Mine Expansions)

Historical

3

Page 5: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

TEP Loads & Resources

4

Page 6: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

TEP Renewable Energy Portfolio

• Renewable Energy Standard (RES) requires 15% renewable energy supply by 2025

• TEP is ahead of schedule in achieving Arizona’s RES requirement

• 280 MWAC of solar and wind generation (PPA and owned)

• Red Horse – recent project (41 MWAC Solar/30 MW Wind)

• Approximately 12,000 TEP customers with distributed solar generation in TEP’s service area (~ 130 MWAC)

AmonixDual Axis Concentrated

PV 1.2 MW

AvalonFixed PV28.3 MW

CogenraSAT Concentrated

Thermal PV1.1 MW

E. ON.Single Axis Tracking PV

4.8 MW

Fort HuachucaFixed PV13.6 MW

Gato Montes SolarFixed PV 4.9 MW

Macho SpringsWind

50.4 MW

NRG Avra ValleyFixed PV25 MW

Picture Rocks SolarFixed PV20 MW

Solon Prairie FireFixed PV4.0 MW

SpringervilleFixed PV5.1 MW

Areva SolarConcentrated Solar Thermal

5.0 MW

Valencia SolarSingle Axis Tracking

PV 10 MW

Solon UASTP 1Single Axis Tracking PV

1.3 MW500 kW of Lithium-Ion Battery Storage

Solon UASP 3Fixed PV4.0 MW

White Mountain Solar

SAT Concentrated Thermal PV

8.3 MW5

Page 7: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

New Technology - Review

• Energy Storage Systems (ESS)– DeMoss Petrie Battery Storage– University of Arizona Tech Park Battery Storage

• Reciprocating Internal Combustion Engines (RICE)• Small Modular Nuclear Reactors (SMR)• Energy Imbalance Market (EIM)

6

Page 8: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

TEP Energy Storage Projects

• 2 Projects – Lithium-Ion Type Batteries

• NextEra Energy Resources

– 10 MW lithium nickel-manganese-cobalt battery system

– DeMoss Petrie Substation

– Operational by the end of 2016

• E.On Climate & Renewables

– 10 MW lithium titanate oxide battery storage

– Combined with 2 MW Solar PV

– University of Arizona Tech Park

– 2Q of 2017

• Frequency Regulation

• Research

NextEra Energy Resources 2015The 10 MW energy storage project to be installed near Interstate 10 and West Grant Road could be

similar to this NextEra Energy Frontier Battery Storage Project in Shabbona, Ill.

7

Page 9: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

CHARACTERISTICS• Fast Start Times• Flexible Run Time• Reduced O&M• Fast Ramping• Less Ambient Performance Degradation• Lower Gas Pressure Requirement • Low Water Consumption• Modularity

Reciprocating Engines

APPLICABILITY● Increased Reliability (EFOR spread across multiple units)● Renewable Integration Requirements

— Variability— Intermittency Mitigation— Other Ancillary Needs

● Potential EIM Participation● Long-Term Resource Diversification (Peaking)

The LCEC Generation PlantInside the engine hall of a

reciprocating engine power plant. The LCEC Generation Plant in Lovington,

New Mexico is powered by five Wärtsilä gas-fired engines.

Source: http://lcecnet.coopwebbuilder.com/content/lcec-generation-llc8

Page 10: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Small Modular Nuclear Reactors

• Modular – Factory Built• Passive Safety Features – Infinite Cooling• Zero Emission• Long-lead time• Expensive• Potential baseload resource to replace coal• Outside of TEP planning horizon

• Utah Associated Municipal Power Systems (UAMPS) – Carbon Free Power Project (CFPP)– 46 members in 8 states– Commercial Operation – 2025

Source http://www.nuscalepower.com/

9

Page 11: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

10

Page 12: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Energy Imbalance Market

EIM Benefits• Pool generation resources over a wider area• Sub-hourly real-time energy market• Automated region-wide dispatch• Moderate intermittent resources/demand

EIM Status● E3 Consultant● Initiated March 2016● Data Collection – April - June 2016● Analysis – June - August 2016● Results – September 2016● Next Steps

• Studying Cost-Benefits of CAISO Energy Imbalance Market

11

Page 13: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2017 2021 2024 2028 2031

TEP’s Future Resources Needs

Future Natural GasResources

Target 30% Renewables by

2030

20 MW Battery Storage

Technology

SMRTechnology

For BaseloadReplacement

RegionalTransmission

Projects

Natural Gas StorageAnd

Gas Infrastructure

Fully Compliant with Arizona Energy

Efficiency Standard22% by 2020

Energy Imbalance

Market

PORTFOLIO DIVERSITY

TECHNOLOGY REVIEW

12

Page 14: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

UNSE Retail Load Forecast

-

100

200

300

400

500

600

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

2014 IRP 2016 Pre-IRP

13

Page 15: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

UNSE Loads & Resources

14

Page 16: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

UNSE Renewable Energy Portfolio

Red Horse SolarFixed PV30 MW

Kingman Wind & SolarWind & Fixed PV

10.2 MW

Black Mountain SolarFixed PV8.9 MW

La SenitaSingle Axis PV

0.98 MW

• Renewable Energy Standard (RES) requires 15% renewable energy supply by 2025

• UNSE is ahead of schedule in achieving Arizona’s RES requirement

• 56 MW of solar and wind generation

• Red Horse Solar – In Service Summer 2016 (30 MWAC)

• GrayHawk Solar (PURPA) –Summer 2017 (46 MWAC)

• Approximately 2,000 UNSE customers with distributed solar generation in UNSE’s service area (~ 21 MWAC)

15

Page 17: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

UNSE’s Future Resources Needs

2016 2019 2021 2023 2026 2030

Future Natural GasResources

Target 15% Renewables by

2018

Battery Storage

Technology

Regional

TransmissionProjects

Natural Gas Storage

Fully Compliant with Arizona Energy

Efficiency Standard22% by 2020

RICE

PORTFOLIO DIVERSITY

TECHNOLOGY REVIEW

Energy Imbalance

Market

16

Page 18: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 Integrated Resource Plan Update

Jeff YockeyManager of Environmental and

Long-Term Planning

2016 IRP WorkshopJuly 18, 2016

Page 19: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2017 2021 2024 2028 2031

+197 MWOperationalControl of

Springerville Unit 12017

Coal Diversification Strategy

-170 MWRetire TEP’s Share of San Juan Unit 2

December 2017

-170 MWOption to Exit

San Juan Unit 1July 2022

-168 MWOption to Exit

Navajo GeneratingStation

December 2030

-110 MWOption to ExitFour CornersPower Plant

June 2031

San Juan Economic Viability Assessment

and Participant Commitment

June 2018

SCR Required on Remaining Navajo UnitsJanuary 2031

Four Corners Coal Supply Agreement ExpirationJuly 2031

18

Page 20: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Assumptions – Renewable Energy

Renewable Energy

• TEP - 30% Renewable Energy by 2030– Exceed REST requirements for total renewable

energy

• UNSE - Meet REST requirements for total renewable energy early

• Meet REST requirements for distributed generation

• Regulatory Rate Reform

• Diversification of RE Portfolio– Mix of distributed generation, community

solar, and wind

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

GWh

TEP Renewable Energy Production

Wind Solar DG REST Target Energy

19

Page 21: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Renewable Contribution to Peak Capacity

0

1

2

3

4

5

6

7

8

9

10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Rene

wab

le O

utpu

t, M

W

Solar Fixed PV Solar Single Axis Tracking Solar Thermal - 6 Hour Storage AZ Wind NM Wind

Technology NM Wind AZ Wind Solar PV (Fixed) Solar PV (Single-Axis) Solar CSP (Storage)Annual Capacity Factor 38% 30% 17% 24% 38%System NCP Peak Factor 9% 9% 33% 51% 83%

System Peak

Representative of 10MW Facilities

No other renewables

Average of Typical Summer Day (June – August)

20

Page 22: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

TEP Duck Curve

-

200

400

600

800

1,000

1,200

1,400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

MW

Hour

30% Target2030 Winter/Spring DayExisting Solar (6% of 2030 Target)15% of 2030 Target

Reduced Thermal Unit Minimums

Thermal Unit Ramp UpThermal Unit Ramp Down

No Peak Contribution

100% Fixed PV

21

Page 23: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Adjustments to Peak

-

500

1,000

1,500

2,000

2,500

3,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

MW

Hour

30% Target

2030 Typical Summer Peak Day

Existing Solar (6% of 2030 Target)

15% of 2030 Target

Shifted

Reduced Peak

Reduced Thermal Unit Minimums

Thermal Unit Ramp Up

Thermal Unit Ramp Down

22

Page 24: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Energy Efficiency

• Meet EE Standard through 2020

• Further growth between 2020-2032?– Program Adoption– Rate Incentives– In-home Technology

• Assess EM&V under the CPP

• Leverage Clean Energy Incentive Program (CEIP)

– Low Income Communities

Common Practice Baseline

Persistence

Annualized Savings

Building Codes

23

Page 25: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Clean Power Plan

• Regulates CO2 from existing power plants based on best system of emission reduction, “BSER”

• States set standards through implementation plans• BSER Establishes emission goals for two subcategories of power plants• State goals derived based on proportional generation

CO2 Rate (lbs/MWh) 2022-2024 2025-2027 2028-2029 2030+

Subcategorized Rate - Steam EGUs 1,671 1,500 1,308 1,305

Subcategorized Rate - NGCC 877 817 784 771

State Rate - Arizona 1,263 1,149 1,074 1,031

State Rate - New Mexico 1,435 1,297 1,203 1,146

State Rate - Navajo Nation 1,671 1,500 1,380 1,305

● Rate goals converted to total mass goals (i.e. short tons of CO2) for each state24

Page 26: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Clean Power Plan

• Timing of CPP Implementation uncertain due to litigation– Supreme Court stayed rule in February pending litigation in the DC

Circuit Court– DC Circuit Court to hear oral arguments in September 2016, en banc

• Ruling possible in late 2016

– Appeal to Supreme Court a near certainty• Decision in late 2017 or early 2018

• All deadlines to be shifted in proportion to the length of the litigation

• States individually electing whether to proceed with, slow, or stop CPP planning

25

Page 27: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Clean Power Plan

• Navajo Nation– Coal retirements– No existing NGCC– Limited energy efficiency– Point to mass-based

• New Mexico– Coal retirements– Point to mass-based

• Arizona– Proceeding slowly– Evaluating rate vs. mass

26

Page 28: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Restricted © Siemens AG 2014 All rights reserved.Page 27

0

200

400

600

800

1,000

1,200

1,400

1,600

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Emis

sion

Rat

e (lb

s/M

Wh)

Arizona Emission Rate vs. Official Emission Rate

AZ CPP Rate Goal Projected AZ Rate

0

5

10

15

20

25

30

35

40

45

50

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Emis

sion

s (M

illion

Sho

rt To

ns)

Arizona CO2 Emissions

AZ Affected Coal AZ Affected Gas CC AZ Affected Oil/Other AZ Mass Goal

Summary of Base Case State Rate and Mass AnalysisCoal Reduction and ERCs from Renewables and Efficiency Position Arizona for Compliance Under Rate Goal

• This analysis suggests that Arizona is well positioned for rate approach based on the Base Case outlook due to increased reliance on gas expected and significant energy efficiency and new renewables.

• Arizona meets CPP interim goal under a rate-based approach – falls slightly short of meeting final goal.

– ERCs banked during interim period could be used to meet compliance with final goal.

• On a mass basis, Pace Global projects a net annual allowance deficit that would equate to retiring another ~1,900 MW of coal to comply by 2030.

AZ Rate v. CPP Rate Goal

AZ Emissions v. CPP Mass Goal

Report Available on http://www.azdeq.gov/node/1206

Page 29: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Resource Diversification Water Use

Resource Diversification to

Result in Lower Water Use Overall

Qualitative Risk Assessment with

University of Arizona

28

Page 30: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Other Environmental Impacts

• 2015 Ozone NAAQS– Standard lowered to 0.70 ppm– Could impact permitting for new gas generation

• Regional Haze– EPA proposal to adjust state plan deadlines from July 2018 to July 2021– Springerville and other sources to be evaluated for emission

reductions to achieve “reasonable progress”

October 2017Final EPA

Designations for 2015 Ozone NAAQS

2017 2018 2019 2020 2021

July 2018Regional Haze SIPs

due to EPA (currently)

December 2020Attainment date for

Marginal Ozone Non-attainment

July 2021Proposed due date for Regional Haze

SIPs

29

Page 31: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 Integrated Resource Plan Update

Mike SheehanSenior Director of Fuels and Resource Planning

2016 IRP WorkshopJuly 18, 2016

Page 32: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Resource Planning Data Assumptions

• Future Resource Assumptions– PACE Global– Wood MacKenzie– Electric Power Research Institute (EPRI)– Black & Veatch– National Renewable Energy Laboratory (NREL)– IHS CERA– National Energy Technology Laboratory (NETL)– Request for Proposals (RFPs)

• Independent Third-Party Data Sources– Avoid internal biases– In-depth analysis behind data– Forward thinking outcomes

31

Page 33: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Natural Gas Fundamental Supply & Demand Model

Exports from U.S.

5

1

2

43

End-Use Customer Demands

Supplier Production Costs

Pipeline andStorage

Capacities

Natural GasClearingPrices

Power Generation Demand

32

Page 34: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

$-

$1.00

$2.00

$3.00

$4.00

$5.00

$6.00

$7.00

2015 2017 2019 2021 2023 2025 2027 2029

Low Case Base Case High Case

Forward Permian Natural Gas Prices

High Case $4.75/mmBtu

Base Case $3.77/mmBtu

Low Case $3.01/mmBtu

33

Page 35: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Scenarios and SensitivitiesPortfolios

1. Energy Storage Case2. Small Nuclear Reactor Case3. Full Coal Retirement Case4. High Energy Efficiency Case5. High Renewables Case6. Market Reference Case

Sensitivities1. Natural Gas Prices2. Wholesale Power Prices3. Retail Load and Demand4. CO2 Compliance

Combined Scenario Planning

Combined Scenarios Load Growth Natural Gas Prices

Coal Retirements

EnvironmentalCompliance Costs Capital Costs

Environmental Regulation Low High Full High Moderate

Technology Evolution Moderate Moderate Moderate Low High

Economic Turmoil Low Low Low Low Moderate

34

Page 36: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Electric Vehicles (EVs)

Tesla Model 3: Does it signal an Electric Car Revolution?Cost - The base version of the Model 3 will be produced at $35,000.

Performance - 0-60 in less than 6 seconds in the base version.

Range - The base model with a 50-60 kWh battery - 215 miles per charge.

Charging - Supercharging to near full capacity in 40 minutes compared to multiple hours with other EVs. Regular charging in 5-6 hours from a home charger.Note: Data based on Wood-MacKenzie Electric Vehicle Case Study and www.teslamotors.com

35

Page 37: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Jeffrey Pyun Department of Chemistry & Biochemistry, University of Arizona Department of Chemical & Biological Engineering Seoul National University, World Class University Program

36

Page 38: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Future EV Charging Profiles

• Workplace incentives to charge during the day to utilize solar generation resources.

• Maximizes carbon reduction in the transportation sector while reducing the “duck-curve” effects in power generation sector.

Today’s EV Charging Profile

• Current battery technology has 85% of EV owners charging overnight at home.

• Results in off-peak reliance of predominately coal, natural gas and wind generation resources.

EV Charging Infrastructure and Incentives

0%

5%

10%

15%

20%

25%

6:00 10:00 14:00 18:00 22:00 2:00Source: Wood Mackenzie; Idaho National Laboratory

0%

5%

10%

15%

20%

25%

30%

6:00 10:00 14:00 18:00 22:00 2:00

Discounted Charging Rates for EV Customers

9AM to 3PM

Utility Programs to

Curtail Charging

Loads3PM to 9PM

EV Charging Peak around

2 AM

37

Page 39: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

EV Scenarios for TEP

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

2015 2018 2021 2024 2027 2030

Perc

ent o

f Loa

d %

TEP EV Penetration Scenario

Base EV Case Aggressive EV Adoption

-

20

40

60

80

100

120

140

2015 2018 2021 2024 2027 2030

EV D

eman

d (M

W)

EV Demand (MW)

Base EV Case Aggressive EV Adoption

Source: Adapted from Wood Mackenzie Long-Term Forecast Assumptions - 2016

5% of LoadUnder

Aggressive Adoption

2.5% of LoadUnderBaseCase

136 MW By 2030

(Aggressive Case)

72 MWBy

2030(Base Case)

– Implementation of new TOU rates, demand response and direct load control strategies for EVs– Promotion of workplace charging systems and Level 3 charging stations sourced from renewables– Incremental EV load growth could help creates volumetric opportunities to reduce overall customer rates

38

Page 40: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

2016 Levelized Cost of Energy ($/MWh)$279

$222

$161 $145

$106

$82 $70

$54 $49

$36 $-

$50

$100

$150

$200

$250

$300

FrameCombustion

Turbine

AeroderivitiveCombustion

Turbine

Solar Thermal- Six HourStorage

Small ModularReactor

Natural GasReciprocating

Engines

Natural GasCombined

Cycle

Solar PV -Fixed Tilt

Solar PV -Tracking

WindResources

EnergyEfficency

$/M

Wh

$50 (a)

(b)

Assumptions:The LCOE analysis assumes 43.5% debt at 5.2% interest rate and 56.5% equity at 10% cost for both conventional and renewable generation technologies based on 2016 in-service date. A levelized natural gas price of $3.77 per MMBtu is assumed for all applicable natural gas technologies. All solar resources reflect the investment tax credit changes associated with the December 2015 Consolidated Appropriations Act. Wind resources represent on-shore technologies and assume all production tax credits based on the December 2015 Consolidated Appropriations Act. Analysis does not reflect potential impact of evolving regulations/rules promulgated pursuant to the EPA’s Clean Power Plan. The LCOE reflects interconnected bus bar costs and excludes reliability–related costs (i.e., system integration and backup capacity costs associated with renewables) and potential social and environmental externality costs. Energy efficiency notes (a) Estimates per National Action Plan for Energy Efficiency; (b) Costs based on Arizona total and program administrator cost of saved electricity for various initiatives in 2012 dollars. Source: Lawrence Berkeley National Laboratory (LBNL) Demand-Side Management (DSM) Program Database for the period 2009 to 2013.

39

Page 41: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Conventional Technologies

Plant Construction Costs UnitsFrame

Combustion Turbine

AeroderivativeCombustion

Turbine

Natural Gas Reciprocating

Engines

Small Modular Reactor (SMR)

Natural Gas Combined

Cycle (NGCC)

Project Lead Time Years 4 4 2 12 4Installation Years First Year Available 2020 2020 2018 2028 2020Peak Capacity , MW MW 75 45 20 300 550Plant Construction Cost 2016 $/kW $770 $1,200 $1,070 $6,000 $1,135EHV/Interconnection Cost 2016 $/kW $30 $50 $30 $400 $165Total Construction Cost 2016 $/kW $800 $1,250 $1,200 $6,400 $1,300

Operating Characteristics Fixed O&M 2016 $/kW-Yr $13.25 $12.50 $17.50 $29.30 $16.50Variable O&M 2016 $/MWh $3.75 $3.50 $12.50 $5.00 $2.00Gas Transportation 2016 $/kW-Yr $16.80 $16.80 $16.80 - $16.80Annual Heat Rate Btu/kWh 10,500 9,800 8,000 10,400 7,200Typical Capacity Factor Annual % 8% 15% 45% 85% 50%Expected Annual Output GWh 53 59 79 2,234 2,409Fuel Source Fuel Source Natural Gas Natural Gas Natural Gas Uranium Natural GasUnit Fuel Cost $/mmBtu $3.77 $3.77 $3.77 $0.90 $3.77Net Coincident Peak NCP% 100% 100% 100% 100% 100%Water Usage Gal/MWh 150 150 50 800 350

Levelized Cost of Energy $/MWh $279 $222 $106 $145 $82

40

Page 42: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Renewable Technologies

Plant Construction Costs($2016)

UnitsSolar Thermal 6 Hour Storage

(100 MW)

Solar Fixed PV(20 MW)

Solar Single Axis Tracking(20 MW)

Wind Resources(50 MW)

Project Lead Time Years 4 2 2 2Installation Years First Year Available 2020 2018 2018 2018Peak Capacity MW 100 20 20 50Plant Construction Cost 2016 $/kW $9,800 $1,450 $1,700 $1,250EHV/Interconnection Cost 2016 $/kW 200 50 50 200Total Construction Cost 2016 $/kW $10,000 $1,500 $1,750 $1,450

Operating Characteristics Fixed O&M 2016 $/kW-Yr $80.00 $10.00 $13.00 $40.00Typical Capacity Factor Annual % 50% 25% 32% 33%Expected Annual Output GWh 438 44 56 145Net Coincident Peak NCP% 85% 33% 51% 13%Water Usage Gal/MWh 800 0 0 0ITC Percent 30% 30% 30% -PTC $/MWh - - - $23.00

Levelized Cost of Energy $/MWh $161 $70 $54 $49

41

Page 43: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Levelized Cost of Energy and Storage Technologies

• Levelized Cost of Energy – https://www.lazard.com/perspective/levelized-cost-of-energy-analysis-90/

• Levelized Cost of Storage Technologies– https://www.lazard.com/perspective/levelized-cost-of-storage-analysis-10/

42

Page 44: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Renewable ResourcesTechnology Innovation Curves and Renewable Tax Credits

$70

$67$64

$62$63

$65

$74

$55

$60

$65

$70

$75

0

500

1000

1500

2000

2016 2017 2018 2019 2020 2021 2022

LCO

E, $

/MW

h

Inst

alle

d Co

st, $

/kW

Solar PV - Fixed Tilt (20 MW)

$/MWh $/KW

$54 $51 $49 $49$51 $54

$61

-$4$6$16$26$36$46$56$66$76

0

500

1000

1500

2000

2016 2017 2018 2019 2020 2021 2022

LCO

E, $

/MW

h

Inst

alle

d Co

st, $

/kW

Solar SAT - Tracking (20 MW)

$/MWh $/KW

$49 $54 $59$64

$75 $75 $75

-$4$6$16$26$36$46$56$66$76

$0

$500

$1,000

$1,500

$2,000

2016 2017 2018 2019 2020 2021 2022

LCO

E, $

/MW

h

Inst

alle

d Co

st, $

/kW

Wind (50 MW)

$/MWh $/KW

$161 $157 $153 $151 $158 $165$188

$0

$50

$100

$150

$200

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

2016 2017 2018 2019 2020 2021 2022

LCO

E, $

/MW

h

Inst

alle

d Co

st, $

/kW

Solar Thermal - 6 Hour Storage (100 MW)

$/MWh $/KW

Note: Utility projects which have commenced construction before December 31, 2021 may still qualify for the 30, 26 or 22 percent ITC if they are placed in service before December 31, 2023. The Treasury and IRS are currently drafting guidance which will inform solar developers of which percentage of ITC they will qualify for depending on when they started their project

43

Page 45: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

CAISO Spring 2016 Price Curves($/MWh)

Historical Hourly Price Curves($/MWh)

Solar Penetration Impacts on Hourly Wholesale Power Prices

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

1 3 5 7 9 11 13 15 17 19 21 23$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

1 3 5 7 9 11 13 15 17 19 21 23

Prices Collapse

8AM to 2PMDue to Solar

Surplus

Prices Increases

4PM to 10PMDue to Fast

Ramping Requirements

Typical Spring Day Typical Spring Day

Wholesale power prices are in process of undergoing a fundamental hourly price shift to accommodate the integration of solar resources

Market Prices Aligned with Customer Demand

44

Page 46: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Future Natural Gas Infrastructure Requirements

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24M

cf

2032 Daily Natural Gas Usage (Mcf)

TEP

UNSE

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Mcf

2016 Daily Natural Gas Usage (Mcf)

TEP

UNSE

Hourly Gas Usage Hourly Gas Usage

Peak Hour Usage 3,400 McfMax Ramp Up 2,500 McfMax Ramp Down (1,400) Mcf

Peak Hour Usage 9,100 McfMax Ramp Up 4,300 McfMax Ramp Down (3,900) Mcf

Average Summer Daily Usage 75,000 Mcf Average Summer Daily Usage 175,000 Mcf

TEP’s 2016 Resource PortfolioCoal Resources and

10% Renewables

Future Coal Retirements

andHeavy SolarRenewable

Portfolio

45

Page 47: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Future Regional Transmission Projects

Tucson

Springerville

Greenlee

South

Tortolita

Palo Verde

San Juan

Four Corners

PinalCentral

Navajo

Kyrene

Valencia

Jojoba

Willow

Sunzia East

SouthlineTransmission

Project

SunziaTransmission

Project

Westwing

Western Spirit

Project

Coal Generation

Natural Gas Generation

Wind Generation

Solar Generation

Sunzia Project

Southline Project

Western Spirit Project

Future EHV Upgrades

Merchant Generation at

Palo Verde

46

Page 48: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Renewable Portfolio Diversification

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Mcf

2032 Heavy Solar Portfolio

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24M

cf

2032 Balanced Solar / Wind Portfolio

Hourly Gas Usage Hourly Gas Usage

Peak Hour Usage 8,800 McfMax Ramp Up 3,400 McfMax Ramp Down (2,800) Mcf

Peak Hour Usage 9,100 McfMax Ramp Up 4,300 McfMax Ramp Down (3,900) Mcf

Overall Decrease in Ramp Up and

Ramp Down During Typical Day

80% Solar and 20% Wind 50% Solar and 50% Wind

47

Page 49: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

(300.0)

200.0

700.0

1,200.0

1,700.0

2,200.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour

ly U

nit D

ispa

tch

Coal Natural Gas Wind Market Purchases Over Generation

2017 IRP Portfolio Diversification Strategy

• Compliance with Clean Power Plan

• Fast Ramping Natural Gas Resources

• Renewable Portfolio Diversification

• Energy Storage Technologies

• Regional Transmission and Imbalance Markets

• Natural Gas Storage

• Demand Response Programs

• Energy Efficiency

– Low Income Programs

– Clean Power Plan Compliant

• Improvements in Rate Design1 – Downward Ramping2 – Minimum Generation3 – Upward Ramping4 – Peak Shift5 – Over-Generation

Hourly Dispatch

5

1

2

4

3

48

Page 50: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Future IRP Requirements

• TEP and UNSE Support a Three-Year Planning Cycle

• Three Year Action Plans– Provides detailed overview on Company’s near-term initiatives– Need to have a process to change plans between IRP planning cycles– Acknowledgement that these updates may be competitively sensitive

April 20172017 Final IRP

Report

2017 2018 2019 2020 2021Stakeholder Workshops

April 2018ACC

Acknowledgement of 2017 Final IRP

April 20192019 PreliminaryIRP Report Due

April 20202020 Final IRP

Report

April 2021ACC

Acknowledgement of 2020 Final IRP

Staff Review Staff ReviewStart of New IRP Planning Cycle

49

Page 51: 2016 Integrated Resource Plan Update - TEP provides …€“ DeMoss Petrie Substation ... 2016 Integrated Resource Plan Update Mike Sheehan Senior Director of Fuels and Resource Planning

Planning to Meet Future Operational Requirements

201480% Coal

4% Renewables

202350% Coal

20% Renewables

203230% Coal

30% Renewables

• Regional Haze Compliance• Renewable Portfolio Standard• Energy Efficiency Standard

• Coal Plant Retirements• Additional Natural Gas• Additional Renewables

• Clean Power Plan Compliance• Resolving “Duck Curve” Challenges• Regional Transmission Development• Natural Gas Infrastructure Development

• Renewable Portfolio Diversification• Energy Storage Technologies• Reciprocating Engines• Energy Imbalance Market• Regional Transmission Markets• Natural Gas Storage• New TOU Rate Designs• Demand Response

Operational Requirements

Operational RequirementsPortfolio Solutions

Portfolio Solutions

• Baseload Coal Replacements

• Future Clean Power Plan Compliance

Operational Requirements

50