2015 bush connect application form - office of · web view2015 bush connect –...

29

Click here to load reader

Upload: hakiet

Post on 19-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Application FormClosing date 5:00 pm 19 June 2015

About the program

Bush Connect will fund and support community driven, consortium-based projects with an emphasis on on-ground activities to improve the condition of the natural environment within the New South Wales (NSW) portion of the Great Eastern Ranges (GER) corridor. Projects will be large-scale (tenure blind) and long-term (10 years).

For further information, please refer to the Bush Connect Program Guidelines.

Using this document

This document is the application template for the program and contains guidance on how to complete it. A variety of text styles have been employed throughout this document, and can be interpreted as follows:

Grey boxes (     ) represent sections which require your input. These boxes will expand as you type, however, the amount you can enter is restricted to the size of text boxes provided - please ensure you make good use of the available space.

Guidance on type of information required for each question/section has been provided.

Questions

If you require assistance with completing the application form, please contact theEnvironmental Trust on (02) 8837 6093 or [email protected]

Lead Applicant:      

Project Title:      

Funding Requested: $     

2015 Bush Connect – Application Form Page 1 of 20

Bush Connect Program - 2015

Page 2: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

     

     

Provide location information for your project. Decimal degrees can be determined by accessing Google maps, navigating to your project site and right-clicking on ‘What’s here?’

Main local government area      

Local Land Services area Select 1

State electorate      

Latitude (decimal degrees)      

Longitude (decimal degrees)      

Provide location map(s) and plan(s) of your project site(s) as attachments with your application.

Name of organisation      

ABN       Registered for GST Yes or No

Postal address      

Suburb       State       Postcode      

Community group Not-for-profit organisation

Incorporated association Other (please specify below):

     

2015 Bush Connect – Application Form Page 2 of 20

Section 1 – Registration and administration

1.1 Project title Provide a title for your project in 68 characters or less. If your application is successful, this project name will be

used on all grant documentation and for promotional purposes.

1.2 Project description Please describe your project in 100 words or less. Note: this summary will be used for all promotional material

relating to the grant, i.e. media, web site etc.)

1.3 Project location

1.4 Lead organisation details

1.5 What is the legal status of your organisation? (Select only ONE box for the lead organisation)

Page 3: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Title       First name       Surname      

Position       Daytime phone (0 )      

Mobile       Email      

Title       First name       Surname      

Position       Daytime phone (0 )      

Mobile       Email      

How does your organisation make decisions?(e.g. Board, Committee, Quorum of members, etc.)      

Office Bearers:President/Chair/CEO      

Treasurer/CFO      

Are your officer bearers: Elected Appointed

Number of years operating:

      Registration no.      

Number of employees Full-time       Part-time      

How many members are there in your organisation?

     

Can members of the public join your organisation? Yes No

     

2015 Bush Connect – Application Form Page 3 of 20

1.6 Project manager (Primary contact for the project) The project manager is responsible for overall project organisation, management, planning, implementation,

evaluation and reporting. A position description for the role of Project Manager that details the accountabilities and responsibilities should be included in the Appendices.

1.7 Senior authority (secondary contact for the project)Include contact details for the person responsible for appointing/supervising the project manager (e.g. chairperson, general manager, senior supervisor, etc.)

1.8 How does your organisation function?

1.9 Previous experience and relevance to local areaBriefly outline the previous experience held by your group and the project partners’ in undertaking projects of a similar nature. Explain how your organisation has links with the local area in which the project will take place.

Page 4: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Yes or No

Program(e.g. Restoration and

Rehabilitation)

Reference number Project name Amount Status

                  $           

                  $           

                  $           

                  $           

                  $           

Yes or No

Funding source Year Project name Amount Status

                  $           

                  $           

                  $           

                  $           

                  $           

Company      

Policy No.      

Coverage      

Currency (expiry date)      

Name of organisation

     Administrator’s ABN?

      Registered for GST Yes or No

Postal address      

Suburb       State       Postcode      

Contact: First name       Surname      

Position       Daytime phone (0 )      

Mobile       Email      

2015 Bush Connect – Application Form Page 4 of 20

1.10 Has your organisation previously received Environmental Trust funding?

1.11 Has your organisation previously received funding for this project site from a body other than the Environmental Trust?

1.12 InsuranceIt is a condition of your grant that you have adequate insurance cover including public liability insurance of $10 million, workers compensation and volunteer insurance.

1.13 Administrator details. If applicable see program guidelines for more information

Page 5: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Bush Connect projects are expected to be implemented through the collaborative efforts of a group of organisations (a Consortium).

Partner organisation name Contact details Role in project Governance agreement

E.g. East-West Local Land Services

John Citizen – Team Leader Land Services. [email protected] (02) 4399 1234

Coordinator of four private landholder project sites. Will oversee bush regeneration and fencing contractors working on those sites and liaise with landholders. Responsible for vegetation monitoring for those sites.

Memorandum of understanding detailing expected contributions and input of E-W LLS signed on 21 May 2015.

E.g. National Parks and Wildlife Service (Rocky Creek NP)

Joan Smith - Ranger (Rocky Creek National Park). [email protected] (02) 4399 1235

Oversee linkages of new habitat corridors with existing National Park Reserve. Arrange promotion of the project to park visitors. Maintenance of regeneration works within National Park.

Letter of support outlining in-kind contribution value and commitment terms.

                       

                       

                       

                       

                       

                       

2015 Bush Connect – Application Form Page 5 of 20

Section 2 – Partnerships and stakeholders

2.1 Partner organisationsProvide information on the partners, their role and type of agreement reached for their involvement. Examples have been provided, please delete and use these rows for providing your own responses.

Page 6: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

     

     

     

     

     

2015 Bush Connect – Application Form Page 6 of 20

2.2 Consortium establishment Provide a brief summary of the process conducted to identify and engage relevant project partners.

2.3 Internal communication and decision making Describe the expected channels and frequency of communication between the project partners throughout the

project. Describe the decision making processes and procedures that will be adopted by the consortium for this project.

2.4 Core businessExplain why this project is not the core business of the lead group or any of the partner organisations and how it value adds to core business. You should also demonstrate the project is not cost-shifting or replacement funding.

2.5 Financial governanceDetail the internal control systems you will put in place to ensure that project funding will be utilised and managed appropriately and not used for cost shifting of proponent or partner activities.

2.6 Conflicts of interest You are required to declare and manage any real, potential or perceived conflicts of interest that you may be aware

of. Failure to declare a conflict of interest may amount to providing false information to the Trust and could cause your grant to be revoked.

Page 7: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

2015 Bush Connect – Application Form Page 7 of 20

2.7 Funding allocations within consortiumProvide information on the partner organisations expected to receive Trust funding and/or provide financial or in-kind contributions to the project. This section allows for an overview of the distribution of Trust funds to project partners as well as cash and in-kind contributions they will provide (over the full 10 year life of the project). A detailed breakdown of costings will be captured in the Project Budget Form (Appendix 1). An example has been provided, please delete and use this row for providing your own response.

Partner organisation Purpose of Funding Trust funding allocated ($)

In-kind contribution ($)

Cash contribution ($) Total ($)

E.g. East-West Local Land ServicesEcological restoration and fencing on project site to reduce threats. Monitoring of reduction in threats and response of species.

$50,000 $50,000 $30,000 $130,000

                                   

                                   

                                   

                                   

                                   

                                   

                                   

                                   

TOTAL                        

Page 8: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Organisation or group Type of organisation(Community group, individual, business, etc.)

Description of their interest, views or key skills Type of engagement in the project

E.g. Rocky Creek Twitchers Community group

The group has been active for several years and have strong local knowledge on bird species in the area. They are interested in improvements to local bird habitat, particularly for rare and endangered species

The group have agreed to assist with monitoring the project by conducting regular (bi-annual) bird surveys in set locations

E.g. Rocky Creek Hardware and Landscape supplies

Business Important hub for the communityThe store has agreed to put promotional materials in their shop window and is providing $500 toward fencing materials

                       

                       

                       

                       

                       

2015 Bush Connect – Application Form Page 8 of 20

2.8 Stakeholder identification and mapping While this project will be delivered by the project consortium, other interested stakeholders may be involved. List the stakeholders to be involved in your project, and the type of

engagement those involved will have. Mapping your stakeholders (both those you have an existing relationship with and those you seek to target) will help you identify early what communication tools you may need. Examples have been provided, please delete and use these rows for providing your own responses.

Page 9: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

     

     

2015 Bush Connect – Application Form Page 9 of 20

Section 3 – Project information

3.1 Project rationale What is the environmental need or problem that your project is addressing?

3.2 Project approach What do you intend to do to address the problem, and why is this the best way of dealing with it?

Page 10: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

     

     

     

2015 Bush Connect – Application Form Page 10 of 20

3.3 Alignment with program objectives Describe how your project meets the objectives of the Bush Connect program:

3.3 (i) Improve the condition and connectivity of natural resources and ecosystems with the GER corridor.Ensure you identify how the project will involve creation and/or enhancement of biodiversity corridors.

3.3 (ii) Increase the area of land (public and private) suitable for long-term protection for its environmental value through appropriate conservation mechanisms.

3.3 (iii) Increase the number of partnerships and alignment of efforts that protect the environmental values of the GER corridor.

Page 11: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Objective 1:      

What would success look like?      

Activity(Significant steps or actions that are

needed to produce the identified objective)

Project measures(refer to Project Measures

table for a range of measures that may be

suitable for your project)

Totalprojected

(this is what you aim to achieve by undertaking the

activity)

How will you monitor your progress?

Year activity will be undertaken?(may occur over multiple years] of

the project)

Activitycompletion date(s)(this should be the

actual date you intend to complete each

activity)                                   

                                 

                                                                    

                                                                    

                                                                    

                                                                    

Lay out your project objectives (up to three), vision of success and activities for achieving this. A list of relevant Environmental Trust Project Measures can be found on the Trust website. Make sure you also include appropriate monitoring methods for determining the effectiveness of each activity. An example of a completed objective table is available on the Trust website.

2015 Bush Connect – Application Form Page 11 of 20

3.4 Project plan

Page 12: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Objective 2:      

What would success look like?      

Activity(Significant steps or actions that are

needed to produce the identified objective)

Project measures(refer to Project Measures

table for a range of measures that may be

suitable for your project)

Totalprojected

(this is what you aim to achieve by undertaking the

activity)

How will you monitor your progress?

Year activity will be undertaken?(may occur over multiple years] of

the project)

Activitycompletion date(s)(this should be the

actual date you intend to complete each

activity)                                   

                                 

                                                                    

                                                                    

                                                                    

                                                                    

2015 Bush Connect – Application Form Page 12 of 20

Page 13: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Objective 3:      

What would success look like?      

Activity(Significant steps or actions that are

needed to produce the identified objective)

Project measures(refer to Project Measures

table for a range of measures that may be

suitable for your project)

Totalprojected

(this is what you aim to achieve by undertaking the

activity)

How will you monitor your progress?

Year activity will be undertaken?(may occur over multiple years] of

the project)

Activitycompletion date(s)(this should be the

actual date you intend to complete each

activity)                                   

                                 

                                                                    

                                                                    

                                                                    

                                                                    

2015 Bush Connect – Application Form Page 13 of 20

Page 14: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Site(map reference) Landowner Consent Status

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

            Permission granted In-principle approval No approval

Studies, reports, assessments or plans e.g. local environment plans,

catchment action plans, vegetation management plans, state of the environment reports?

Describe which particular component of thedocument/s your project relates to and how it will

attempt to address the issue/meet a particular target.

           

           

           

           

List any threatened species, populations and EECs relevant to your project site/s (as listed under the NSW Threatened Species Conservation Act 1995.) The Saving Our Species conservation projects database provides a map showing the location of all threatened species and populations in your LGA for your reference.

Common Name Scientific Name Saving our Species Management Stream

2015 Bush Connect – Application Form Page 14 of 20

3.5 Site ownership and consent Who owns and/or has legal responsibility for the project site? What permission do you have from the landowner to

undertake your project on the site? (Complete as many as apply. If your application is successful, you will need to show proof of this approval and ensure that long-term maintenance requirements of the site have been identified and agreed to.)

3.6 Existing site information3.7 Threatened species, populations and communities

Page 15: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

                 

                 

                 

                 

                 

     

     

2015 Bush Connect – Application Form Page 15 of 20

3.8 Licenses What scientific licenses or permits, if any, will be required to undertake your project? Advise if they are already in

effect, or if an application will be necessary.

3.9 Site maintenance Describe how the site will be maintained beyond the 10 year project period. Who will be responsible for the

maintenance activities?

Page 16: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

2015 Bush Connect – Application Form Page 16 of 20

Page 17: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Two documents exist to assist you with completing table 4.2:

1. Risk Management Framework (guidance on how to complete table 4.2)2. Corridor Risk Assessment Framework (a guide to identifying and managing risks specific to habitat corridor creation).

I have read both of the above documents

Potential RiskStep 1

LikelihoodStep 2

ImpactStep 3

RatingStep 4

Mitigating actionsStep 5

E.g. Increased risk of bushfires being hosted and spreading via using the vegetation corridors created through the project

Moderate Major HighEnsure minimum buffer zones are retained between revegetation areas and buildings/assets. Consider appropriate fire regimes for future implementation in consultation with RFS and NPWS.

E.g. Fox harbour and passage enabled by the creation of the habitat linkages Moderate Moderate Medium Establish fox monitoring and baiting program to be conducted by East-

West Local Land Services an in-kind contribution.

                             

                             

                             

                             

                             

                             

                             

Bush Connect – Application Form and Guidelines Page 17 of 19

Section 4 – Risk management

4.1 Risk management documents Implementation of your project will require ongoing adaptive management. This can be informed by effective risk identification and development of mitigation strategies at the project

planning stage

4.2 Risk management. Examples have been provided, please delete and use these rows for providing your own responses.

Page 18: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Funds Year 1$

Year 2$

Year 3$

Year 4$

Year 5$

Year 6$

Year 7 $

Year 8$

Year 9$

Year 10$ Total

Environmental Trust Grant                                     N/A N/A N/A N/A      

Consortium financial contribution                                                                  

Consortium in-kind contribution                                                                  

TOTAL                                                                  

Bush Connect – Application Form and Guidelines Page 18 of 19

Section 5 – Finances

5.1 Budget summary The information within this table should reflect funding for the life of the project. Greater detail should be provided in the full budget template.

The total budget in years 1-6 should equate to approximately 80 per cent of the overall budget, with years 7-10 accounting for the remaining 20 per cent.

80% of total budget over first six years from a combination of Trust and consortium contributions

Remaining 20% solely from consortium contributions

Page 19: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Name      

Title/position      

Organisation      

E-mail      

Phone no (0 )      

Date      

Note: If the project is on land owned by the office-bearers, those office-bearers cannot authorise the application

Bush Connect – Application Form and Guidelines Page 19 of 19

Section 6 – Certification and feedback

6.1 RefereesPlease provide details of two referees we can talk to about your organisation and your project.

6.2 Authorisation - applicantInclude the names of an office-bearer* in your organisation (e.g. Chairperson, Treasurer, Chief Executive Officer or Executive Officer) who are able to attest to the accuracy of the information within the application.

6.3 Authorisation – administrator. Only necessary if the grant is being administered by another organisation.Please provide the name of senior manager within the administering organisation who can confirm that the organisation is prepared to act as administrator should the application be successful.

Application evaluation

Referee 1 Referee 2Name       Name      

Title/position       Title/position

     

Organisation       Organisation

     

E-mail       E-mail      

Phone no (0 )       Phone no (0 )      

Mobile no       Mobile no      

Fax no (0 )       Fax no (0 )      

Name      

Title/position      

Organisation      

Email      

Phone No. (0 )      

Date      

Page 20: 2015 Bush Connect Application Form - Office of · Web view2015 Bush Connect – Application FormPage 1 of 19 2015 Bush Connect – Application FormPage 10 of 19 2015 Bush Connect –

Please provide some basic feedback on your experience with applying to the Bush Connect program. All feedback will be collated to provide overall picture and used to assist development of future Environmental Trust documentation.

<5 hours 5-20 hours

20-40 hours >40 hours

<2 hours 2-5 hours

5-10 hours >10 hours

Very easy Easy Moderate Difficult Very difficult

     

Grant application checklist

Answer all the questions in the application.

Include a completed full budget template (financial information) with your application.Have your application authorised by the appropriately delegated person.Attach all required supporting information: certified organisational documents, CVs (maximum two page), briefs and job descriptions, letters confirming other funding. Additional information should be kept to a minimum. If your application refers to a large document, only include the relevant pages of that document i.e. title page, executive summary, relevant pages.Attach as many maps as necessary to clearly show the layout of your project site(s).Submit your application by the closing date – 5.00pm 19 June 2015We are unable to accept faxed applications or posted hardcopies.If your application and attachments are greater than 10MB, you may post a USB hard drive or CD containing these files along with a cover note to the below address.

Email to: [email protected]

Ensure you email your entire application, including all attachments, e.g. maps; CVs.

Note: Emailed applications must not be larger than 10MB including all attachments.

Please email the application form as a Word document and the budget spreadsheet as an Excel document - DO NOT PDF.

Attachments can be emailed as Word, Excel or PDF documents.

Post to:NSW Environmental TrustPO Box 644PARRAMATTA NSW 2124

USB or CD only with cover letter

Any application that is late, incomplete or not eligible will not be considered.

Published by the NSW Environmental Trust, PO Box 644, Parramatta 2124 Phone: 02 8837 6093 Fax: 02 9895 6548Email: [email protected] Website: www.environmentaltrust.nsw.gov.au OEH 2015/0216 April 2015

Bush Connect – Application Form and Guidelines Page 20 of 19

6.4 Time taken to develop your project (incl. negotiation with consortium members)

6.5 Time taken to complete the application form

6.6 Difficulty completing the application

6.7 Where did you hear about this program?

Section 7 – Submission