BioGRID Joint Board AgendaFriday , December 19 2014, 8:00 AM
1. Call to Order
2. Declaration of Pecuniary Interest and the General Nature Thereof:
3. Minutes of Previous Meeting July 14, 2014
That the Joint Board minutes of July 14, 2014 be adopted as presented.
Resolution (Verbal)
4. Hearing of Delegations or Deputations
1) Rick Chappell Ministry of the Environment
5. Correspondence1) Veolia 2014 June to November, 2014 Wastewater reports
2) MOE Hauled Sewage Disposal Sites
6. Reports and Recommendations:
Operations:
1) Action Items Report
2) Replacement Netting
3) Engineering Fees and Site Operational Review by WSP
Resolutions
Finance:
1) Revenue and Expense reports year-to-date
2) 2014 Financial Impacts
3) Capital Life Expectancy Budgeting Schedule
4) 2014 Draft Budget
7. Public Question Period:
8. In Camera Session:
9. Accounts:
Approval of accounts for the period of July 10, 2014 to December 16, 2014.
Resolution
-
8/10/2019 2014 12 19 Agenda Package
2/67
10. Unfinished Business:
1) Georgian Bluffs draft By-Law to regulate the collection and disposal of septicwaste
2) Aeration Electrical Supply Quote
Resolution
11. New Business:
12. Adjournment:
-
8/10/2019 2014 12 19 Agenda Package
3/67
1 | P a g e
Georgian Bluffs Chatsworth BioGRID Joint Board
MinutesMonday July 14, 2014, 3:00 PM
Members Present:
Mayor Alan Barfoot, Township of Georgian Bluffs
Mayor
Bob Pringle, Township of Chatsworth (arrived at 9:02AM)Deputy Mayor Dwight Burley, Township of Georgian BluffsDeputy Mayor Terry McKay, Township of Chatsworth
Staff Present:
Chief Administrative Officer Murray Hackett, Township of Georgian BluffsDirector of Operations Peter Paquette, Township of Georgian BluffsTreasurer Holly Morrison, Township of Georgian BluffsTreasurer - Grace Nayler, Township of ChatsworthBiodigester Operator Troy Unruh, Township of Georgian BluffsOperations Assistant Desire van Dijk, Township of Georgian Bluffs (Recording
Secretary)
1. Call to Order:
Chair Alan Barfoot called the meeting to order at 3:00 PM
2. Declaration of Pecuniary Interest and the General Nature Thereof:
None at this time
3. Minutes of Previous Meeting:
Motion Number: BIO 023-2014
Moved by: Member Bob PringleSeconded by: Member Terry McKay
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Boardapproves minutes of the April 28, 2014 meeting as presented.
Carried
4. Hearing of Delegations or Deputations:
1) None
5. Correspondence
1) Veolia April, May 2014 Wastewater Report
Committee requests Veolia contact staff when complaints are received so thatthey can be addressed prior to receiving the monthly report.
Motion Number: BIO 024-2014Moved by: Member Dwight BurleySeconded by: Member Bob Pringle
-
8/10/2019 2014 12 19 Agenda Package
4/67
Georgian Bluffs Chatsworth BioGRID Joint Board MeetingMinutes
July 14, 2014
2 | P a g e
Be it resolved that the Georgian-Bluffs-Chatsworth BioGRID Joint Boardaccepts the Veolia April, May 2014 monthly wastewater report.
Carried
6. Reports and Recommendations:Operations1) Action Items Report
Source separated organics moved to a potential future capital list. Potential apple waste Have not been able to obtain a sample supplier
seems uninterested.
The following recommendation was made:
Motion Number: BIO 025-201Moved by: Member Terry McKay
Seconded by: Member Dwight Burley
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Board receivesthe July 2014 Action Items report.
Carried
2) BRO008-2014 Aeration System for Odour Control
Starting in late 2012, odour complaints have been reported to the MOE and theTownship from residents that live near the BioGRID. Township staff met with thelocal Ministry of the Environment staff on 2 occasions. We were asked tocommunicate proposed action plans to the MOE on how best to mitigate and
prevent the odors from occurring. It is believed the odours are coming from thelarge digestate tank. The stagnant liquid warms in the sun and begins to growalgae. Odours occur as the algae begin to breakdown. The dead algae give offthe odor as it decomposes. It is expected the problem can be solved by injectingair into the liquid, creating an aerobic decomposition of the bacteria. As apreventative measure, staff has investigated alternative pricing for an aerationsystem that could be installed in the large tank.
The following recommendation was made:
Motion Number: BIO 026-2014Moved by: Member Bob PringleSeconded by: Member Dwight Burley
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Board receivesthe report prepared by Peter Paquette, Director of Operations, recommendingthe supply and installation of an aerating system, to prevent odours fromoccurring in the BioGRID large holding tank, be approved at a cost of $15,000.00plus HST. And further, it is recommended that this expense be unfinanced forthe year 2014.
Carried
-
8/10/2019 2014 12 19 Agenda Package
5/67
-
8/10/2019 2014 12 19 Agenda Package
6/67
Georgian Bluffs Chatsworth BioGRID Joint Board MeetingMinutes
July 14, 2014
4 | P a g e
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Board receivesthe year-to-date revenue and expense reports to July 9, 2014.
Carried
7. Public Question Period:None
8. In Camera Session:
None
9. Accounts:
Approval of accounts for the period of April 23, 2014 to July 9, 2014.
The following recommendation was made:
Motion Number: BIO 029-2014Moved by: Member Terry McKaySeconded by: Member Dwight Burley
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Boardapproves accounts in the amount of $101,122.39 for the period of April 23, 2014to July 9, 2014.
Carried
10. Unfinished Business:
None11. New Business:
1) We have lost one of our suppliers to a co-operative and until a high-energy supply can be obtained, the BioGRID is operating at approximately50%.
12. Future Meeting Date:
Friday, August 22, 2014 at 8:00AM
13. Adjournment:
The Georgian Bluffs-Chatsworth BioGRID Joint Board meeting adjourned at5:00PM on a motion moved by Member Bob Pringle.
Mayor Alan Barfoot Desire van Dijk,Recording Secretary
-
8/10/2019 2014 12 19 Agenda Package
7/67
-
8/10/2019 2014 12 19 Agenda Package
8/67
-
8/10/2019 2014 12 19 Agenda Package
9/67
-
8/10/2019 2014 12 19 Agenda Package
10/67
-
8/10/2019 2014 12 19 Agenda Package
11/67
-
8/10/2019 2014 12 19 Agenda Package
12/67
-
8/10/2019 2014 12 19 Agenda Package
13/67
-
8/10/2019 2014 12 19 Agenda Package
14/67
-
8/10/2019 2014 12 19 Agenda Package
15/67
-
8/10/2019 2014 12 19 Agenda Package
16/67
-
8/10/2019 2014 12 19 Agenda Package
17/67
-
8/10/2019 2014 12 19 Agenda Package
18/67
-
8/10/2019 2014 12 19 Agenda Package
19/67
-
8/10/2019 2014 12 19 Agenda Package
20/67
-
8/10/2019 2014 12 19 Agenda Package
21/67
-
8/10/2019 2014 12 19 Agenda Package
22/67
-
8/10/2019 2014 12 19 Agenda Package
23/67
-
8/10/2019 2014 12 19 Agenda Package
24/67
-
8/10/2019 2014 12 19 Agenda Package
25/67
-
8/10/2019 2014 12 19 Agenda Package
26/67
-
8/10/2019 2014 12 19 Agenda Package
27/67
-
8/10/2019 2014 12 19 Agenda Package
28/67
-
8/10/2019 2014 12 19 Agenda Package
29/67
-
8/10/2019 2014 12 19 Agenda Package
30/67
-
8/10/2019 2014 12 19 Agenda Package
31/67
Date Project Details Action by
Nov23/12
Sunset StripSewage
Maximum allowable agreements to be reviewedand specified if they are being charged by tonneor m3
HM
Feb14/13
Meet withSunset StripHauler
Peter to review with Holly PP & HM
Feb14/13
OdourControl
MegaLab Bacteria Seeding of digestate tominimize odours has begun.
PP
May 3/13 By-Law Possible start date for by-law. Awaiting response
from Minister (MOE).
AB/BP
J uly14/14
Tipping fees Staff to bring back a revised document on tippingfees
HM/GN/PP/WM
J uly14/14
2014 Budget Budget to be brought forward for approval HM
J uly14/14
BioGRID Charge BioGRID expenses to assessment roll HM
J uly14/14
VeoliaContract
Re-negotiate Veolia Contract and hire full-timeOperator
PP
J uly14/14
Tipping fees Staff to bring forward a recommendation oncommercial tipping fees
HM/GN/PP/WM
GEORGIAN BLUFFS & CHATSWORTHDATE: August 22, 2014REPORT TO: Bio Digester J oint BoardFROM: Desire van Dijk, Operations AssistantSUBJECT: Action Items
-
8/10/2019 2014 12 19 Agenda Package
32/67
TOWNSHIP OF GEORGIAN BLUFFS
Date: December 19, 2014Report To: GB Chatsworth Biodigester BoardFrom: Peter Paquette, DirectorSubject: Replacement netting (Biodigester) BR10-2014
Strategic Plan:
3.1 Water & Waste Water System
Operate water and waste water systems to maintain a high standard of public health andsafety, protect the environment and ensure long term financial sustainability.
Summary:
On September 6th, 2014 staff arrived on the Biodigester site to find the Mesh thatcontains the vulcanized rubber membrane over the Biodigester had been damagedduring a severe wind and thunder storm. The tear in the mesh was observed to be morethan 20 feet long. The damaged mesh was installed 2 years ago and does not have awarranty. Staff proceeded to obtain quotes from 2 specialty mesh suppliers. Quotes aresummarized below. Staff proceeded to make temporary repairs to the mesh by sewing arope through the torn portion of the mesh opening. The bio was then brought back online.
Comments:
Options:1-Replace with exactly the same: (Single Layer)Supplier: InCord;
Product #120 3.5 inch diamond Nylon rope Cost : $4,143.00us
2- Replace with ( Single layer)Supplier: InCord;Produce N815 2 inch Square Polypropylene Cost $3,654.00us
3- Replace with (Double layer)Supplier: InCordProduct: N815 2 inch Square Pollypropylene Cost $6,748.00usShipping Taxes and currency exchange extra)Note: InCords mesh includes a sewn in perimeter rope.
4- Replace with: (Single layer)Supplier: Redden Net Custom Nets Ltd.Product #RN1168 2.5 inch square Nylon $6500.00Perimeter rope extra 200 feet $5.95 per foot. $1190.00Total estimate (shipping and taxes extra) Cost $7,690.00ca
The InCord N815 product is used in Europe extensively on bio digesters.
G:\Biodigester\Council & Bylaws\Reports to Council\ 2014 reports draft
-
8/10/2019 2014 12 19 Agenda Package
33/67
Financial Considerations:
The cost of the repair will be coming out of the 2014 repair and maintenance budget.
Recommendation:
That; the Joint BIO Board accept the report submitted by Peter Paquette, Director of
Operations and further that; the Joint Board instruct the Director of Operations topurchase new mesh as described above as Option 2. Supplied by InCord N815 Nylonmesh at a cost of $3,654.00us plus taxes, shipping and currency exchange..
Submitted for the joint Boards consideration and direction.
Peter Paquette
Director of Operations.
G:\Biodigester\Council & Bylaws\Reports to Council\ 2014 reports draft
-
8/10/2019 2014 12 19 Agenda Package
34/67
GEORGIAN BLUFFS-CHATSWORTH BIOGRID
Date: December 17, 2014Report To: Georgian BluffsChatsworth BioGRID Joint BoardFrom: Peter Paquette, Director of OperationsSubject: Engineering fees and site operational review by WSP
BR009-2014
Strategic Plan:
3.2 Solid Waste Management
Manage solid waste to protect public health and minimize environmental impact throughwaste reduction, diversion, recycling and re-use.
Summary:
In 2013 WSP (Genivar) was contracted by the Township to complete an engineeringdesign that included improvements the existing facilities at the Biogrid site. The finalengineering fees for the work were over the estimate. Subsequently, only part of thefees were paid at that time. The Joint board has been withholding the remaining feesuntil a settlement was reached.
In November of 2013 Staff met with WSP to discuss this issue. It was decided that WSPwould review the digester and mechanical process provide a review summary and offersuggestions/ recommendations on how to better operate the facility with the existingequipment. This service was to be provided free of charge. The township agreed to payall outstanding Engineering fees for the design work after the inspection was completed.
Comments:The inspection of the BIOGRID facility by WSP was completed in November 2014 byChris Wilson P. Eng. Please see attached inspection summary. Recommendations in thesummary are for the committees consideration. Staff will present any capitalimprovements suggested by the engineer at the 2015 budget meeting early in 2015.
Financial Considerations:
The municipality has been holding payment of the outstanding engineering fees untilthe evaluation was complete. All outstanding engineering fees will be paid as soon aspossible, as per the resolutions passed by the joint board in 2014 that instructed staff to
pay the engineering fees.
Recommendation:
Be it resolved that the Georgian Bluffs-Chatsworth BioGRID Joint Board receive thereport from Peter Paquette, Director of Operations for information.
G:\Biodigester\Council & By-Laws\C5,6,11 Committee Agendas, Minutes & Reports\BioGRID TemporaryScans\GEORGIAN BLUFFS BIO reviewWSP 2014.docx
-
8/10/2019 2014 12 19 Agenda Package
35/67
Respectfully submitted,
Peter Paquette,Director of Operations
G:\Biodigester\Council & By-Laws\C5,6,11 Committee Agendas, Minutes & Reports\BioGRID TemporaryScans\GEORGIAN BLUFFS BIO reviewWSP 2014.docx
-
8/10/2019 2014 12 19 Agenda Package
36/67
G:\Biodigester\Council & By-Laws\C5,6,11 Committee Agendas, Minutes & Reports\BioGRID Temporary Scans\Copy of 2014 WSP Issues Review Chr
Table 1
Review of Biod igester Operation - 2014
4-De
W
SO-03-012-11
No. Description Current/Past Issues Remedial Action Taken/Recommended
1.0 Dumping Stat ion
Control Panel
Past computer software and hardware issues. Operator resolved issues with control panel manufacturer.
2.0 Bar Screen Currently approximately 3-4 septage loads are dumped at
the site each day.
Operator has to rake the Bar Screen between each load or
Bar Screen Tank will plug and overflow during the following
dump.
Operator should continue to complete raking of Bar Screen betw
loads.
The Bar Screen design was selected over a septage receiving
station and holding tank by the Township's due to cost.
Expansion design for new septage receiving station and holding
is complete, which includes a washing station at the current Bar
Screen.
3.0 Drum Screen
(Control Building)
Drum Screen blocks up occasional, backing up the mixing
tank (prior) whereby the mixing tank can potentially overflow
into the building.
Outlet trough from Drum Screen can plug on occasion likely
due to intermittent flows to flush downstream piping.
No automatic control of polymer injection is currently
possible due to low solids in incoming material. Injectionrate has been manually selected.
Angle of Consistency Meter (analyses material to adjust
polymer injection rate) is not correctly installed at right angle
(required is 90o, but currently installed at 110
o)
Water supply to Drum Screen was restricted by 1" piping.
Operator has dealt with backup issue from Drum Screen to the
mixing tank.
The issue with the outlet trough from the Drum Screen plugging
would likely be remediated by having more consistent setpage su
to the site.
Automatic control of polymer injection is not possible with curren
setup as material source is weak in solids content. Sources of hisolids content are required. Further review into the issue should
explored to optimize polymer injection.
Water supply piping to Drum Screen increased to 2" in building
which solved the supply problem.
4.0 Flow Meter (Control
Building)
Discrepancy between recorded flow meter volume for a
truck septage dump in comparison to the actual volume of
septage in a truck.
Operator worked with programming to attempt to narrow the gap
Through discussions with WSP and supplier, Operator installed a
release valve prior to the flow meter.
Based on the changes made by the Operator, including the fixed
programming, installation of air release valve, and throttling of the
inlet valve, the volume accuracy per dump has neared 95%.
With a gravity flow system, there will always be some inaccurac
There are inaccuracies in pumped systems as well, both in watersewage.
Recommendation to the Operator was to attempt to establish a
starting flor adjustment factor, based on different starting truck
volumes. Once documented, it could be rationalized for auditing
purposes that for a dump of A) 3,400 GAL, the flow meter read
associated should be multiply by B) 1.05% to account for the erro
(e.g. 5% error on low side or other as proved by testing), where y
should get a modified flow quantity much closer to the 3,400 GAL
The hauler could be billed accordingly based on this modified #.
Pasteurizer (Control
Building)Vent for pasteurizer plugs. Vent comes out at 4" but
reduces to 1".
Recommendation to increase size of vent to 4" if feasible.
5.0 Septage Pumps
(Control Building)
Pumps are used by operator to pump to the Hydrolyzer on
occasion, however until the flow rate of incoming septage
can be reduced to below the Drum Screen/Pumps capacity,
the pumps cannot be used in automatic mode.
Operator would like to see a flow meter on the pumps
discharge.
No capital works recommendations.
A flow meter for the pumps discharge was not part of the projec
scope of work. Based on the configuration of the pumps, it would
likely be difficult to install flow monitoring.
6.0 Water Treatment
(Control Building)Issues with water treatment equipment alarming out. Recommendation to complete a review of water quality and to re
the operation of the water treatment equipment.
Township of Georgian Bluffs/Township of Chatsworth
-
8/10/2019 2014 12 19 Agenda Package
37/67
-
8/10/2019 2014 12 19 Agenda Package
38/67
-
8/10/2019 2014 12 19 Agenda Package
39/67
G:\Biodigester\Council & By-Laws\C5,6,11 Committee Agendas, Minutes & Reports\BioGRID Temporary Scans\Copy of 2014 WSP Issues Review Chr
Table 1
Review of Biod igester Operation - 2014
4-De
W
SO-03-012-11
Township of Georgian Bluffs/Township of Chatsworth
15.0 Hydrolyzer Issues with dumping of materials with some spillage around
hydrolyzer dumping area.
The hydrolyzer was designed to receive agricultural products. W
the high costs to bring in agricultural products, other waste stream
were added to the CofA for the facility. These other waste streamare brought in by various types of supply vehicles, some of which
cannot dump appropriately into the hydrolyzer i.e. resulting in som
spillage.
Recommend review be completed to see if a spill collection pad
be provided.
-
8/10/2019 2014 12 19 Agenda Package
40/67
-
8/10/2019 2014 12 19 Agenda Package
41/67
-
8/10/2019 2014 12 19 Agenda Package
42/67
TOWNSHIP OF GEORGIAN BLUFFS
Date: July 9, 2014Report To: Biodigester BoardFrom: Holly Morrison, TreasurerSubject: 2014 Financial Impacts
Strategic Plan:
2.0 Environment
Apply principles of sustainable development, reduce the Townships environmentalfootprint, and improve quality of life.
2.0 Accountability
Communicate actively and transparently while providing a high level of customer serviceto ratepayers, associations, business interests, visitors and others involved in Townshipinitiatives.
2.1 Water and Waste Water Systems
Operate water and waste water systems to maintain a high standard of public health andsafety, protect the environment and ensure long term financial sustainability.
Summary:
Georgian Bluffs and Chatsworth Council have met to discuss the current and futureoperations of the Biodigester. In preparation of the upcoming Joint Meeting, staff wouldlike direction as to what information (and format) is required.
Comments:Staff is recommending that the Board consider the following financial impact issues andprovide staff with direction (where required).
1. Budgeta) A budget has not been adopted by the Joint Board for 2014; however, the two
respective Municipalities have adopted their respective budgets, including aset amount to transfer to the Biodigester Board.
b) The Biodigester Board ended 2013 with an operating deficit, which was to befunded from 2014.
c) The draft budget has been amended with reduced revenue
2. Producta) Increase in septage product is beneficial. Consideration to reduce or eliminate
tipping fees will require revising the fees bylaw for the respectivemunicipalities, as well as the projected revenue.
b) Increase in organic waste and FOG (fats, oils and grease) products isbeneficial. Consideration to reduce or eliminate tipping fees will require
C:\Committees\BIO\Staff Reports\2014\Financial Impact July 14 2014
-
8/10/2019 2014 12 19 Agenda Package
43/67
revising the fees bylaw for the respective municipalities, as well as theprojected revenue.
c) Revenue for septage produced within the municipal boundaries, to beinvoicing to the residents (included in the tax rate). The residents will pay thehauler direct.
d) Accountability at the site regarding the amount of product received forinvoicing and tracking purposes.
Financial Consideration:
The financial impact will vary based on the direction given by the Board.
Recommendation:
That the 2014 Financial Impact report be received, and direction provided.
Respectfully submitted,
Holly MorrisonTreasurer
C:\Committees\BIO\Staff Reports\2014\Financial Impact July 14 2014
-
8/10/2019 2014 12 19 Agenda Package
44/67
GB/Chatsworth BiodigesterCapital Life Expectancy Budgeting SchedulePrepared October 28, 2013
C:\Users\christine\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\HNODKFNI\2014 Bio Capital LIfe Expectancy Report Oct 20
BIO 2014 Budget Consideration
Capital Asset 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023
Estimated
Cost 2011
Life
ExpectancSewage logging System 3,304.70 3,403.84 3,505.96 3,611.14 3,719.47 3,831.06 3,945.99 4,064.37 4,186.30 4,311.89 62,300.00 20Electrical Panels (Anaerobic) 13,075.59 13,467.86 13,871.90 14,288.05 14,716.69 15,158.20 15,612.94 16,081.33 16,563.77 17,060.68 246,500.00 20Screening Station 2,376.42 2,447.71 2,521.14 2,596.77 2,674.68 2,754.92 2,837.56 2,922.69 3,010.37 3,100.68 112,000.00 50100kw Generator 15,117.83 15,571.36 16,038.50 16,519.66 17,015.25 17,525.70 18,051.47 18,593.02 19,150.81 19,725.33 285,000.00 20Odour Control System 1,140.47 1,174.68 1,209.92 1,246.22 1,283.61 1,322.11 1,361.78 1,402.63 1,444.71 1,488.05 21,500.00 20El ectrical Panles (Control Bldg) 5,569.73 5,736.82 5,908.92 6,086.19 6,268.77 6,456.84 6,650.54 6,850.06 7,055.56 7,267.23 105,000.00 20Log ic Control System (computer) 2,864.43 2,950.36 3,038.87 3,130.04 3,223.94 3,320.66 3,420.28 3,522.89 3,628.57 3,737.43 54,000.00 20Chopper/Feeder Pumps (2) 5,941.04 6,119.27 6,302.85 6,491.93 6,686.69 6,887.29 7,093.91 7,306.73 7,525.93 7,751.71 112,000.00 20Boiler/Radiator System 5,304.50 5,463.64 5,627.54 5,796.37 5,970.26 6,149.37 6,333.85 6,523.87 6,719.58 6,921.17 100,000.00 20
Pasteurizer System 9,601.15 9,889.18 10,185.85 10,491.43 10,806.17 11,130.36 11,464.27 11,808.20 12,162.44 12,527.32 181,000.00 20Drum Separa to r & Pumps /Tanks 21,695.41 22,346.27 23,016.66 23,707.15 24,418.37 25,150.92 25,905.45 26,682.61 27,483.09 28,307.58 409,000.00 20Pipes for Anaerobic Digestor 16,178.73 16,664.09 17,164.01 17,678.93 18,209.30 18,755.58 19,318.24 19,897.79 20,494.72 21,109.57 305,000.00 20Pipes Control Building 6,312.36 6,501.73 6,696.78 6,897.68 7,104.61 7,317.75 7,537.28 7,763.40 7,996.30 8,236.19 119,000.00 20Auxiliary Heating Unit 875.24 901.50 928.54 956.40 985.09 1,014.65 1,045.09 1,076.44 1,108.73 1,141.99 16,500.00 20Vehicle Total 109,357.57 112,638.30$ 116,017.45$ 119,497.97$ 123,082.91$ 126,775.40$ 130,578.66$ 134,496.02$ 138,530.90$ 142,686.83$
Lagoon Building 488.01 502.65 517.73 533.27 549.26 565.74 582.71 600.20 618.20 636.75 23,000.00 50Anaerobic Digestor Structure 14,269.11 14,697.18 15,138.09 15,592.24 16,060.00 16,541.80 17,038.06 17,549.20 18,075.68 18,617.95 672,500.00 50Control Bldg 5,962.26 6,141.13 6,325.36 6,515.12 6,710.57 6,911.89 7,119.25 7,332.83 7,552.81 7,779.39 281,000.00 50Gnerator Structure 6,821.59 7,026.23 7,237.02 7,454.13 7,677.76 7,908.09 8,145.33 8,389.69 8,641.38 8,900.62 321,500.00 50Digestate Storage Structure 5,453.03 5,616.62 5,785.12 5,958.67 6,137.43 6,321.55 6,511.20 6,706.53 6,907.73 7,114.96 257,000.00 50Digestate Storage 5,824.34 5,999.07 6,179.04 6,364.41 6,555.35 6,752.01 6,954.57 7,163.20 7,378.10 7,599.44 274,500.00 50Fencing & Gates 464.14 478.07 492.41 507.18 522.40 538.07 554.21 570.84 587.96 605.60 8,750.00 20
Driveway 1,129.86 1,163.75 1,198.67 1,234.63 1,271.67 1,309.82 1,349.11 1,389.58 1,431.27 1,474.21 106,500.00 100
Tractor/Snow Removal 1,670.92 1,721.05 1,772.68 1,825.86 1,880.63 1,937.05 1,995.16 2,055.02 2,116.67 2,180.17 31,500.00 20Equipment/Building Total 42,083.25 43,345.75$ 44,646.12$ 45,985.50$ 47,365.07$ 48,786.02$ 50,249.60$ 51,757.09$ 53,309.80$ 54,909.10$
TOTAL 151,440.82$ 155,984.05$ 160,663.57$ 165,483.48$ 170,447.98$ 175,561.42$ 180,828.26$ 186,253.11$ 191,840.70$ 197,595.92$
Capital - 10 YEAR PROJECTION FORECAST
-
8/10/2019 2014 12 19 Agenda Package
45/67
-
8/10/2019 2014 12 19 Agenda Package
46/67
Operating or Capital/Long Term Planning
Budget?
The operating budget provides funds for the day-to-day operations
Includes maintenance of existing capital assets
The capital budget process involves consideration of prioritycapital needs, and financing capabilities, and planning for thefuture
-
8/10/2019 2014 12 19 Agenda Package
47/67
-
8/10/2019 2014 12 19 Agenda Package
48/67
Depreciation ComparisonCategory 2012 Actual Depreciation 2013 Budgeted Future Capital
Building $ 38,390.00
Equipment $ 102,193.00
Internal Roadways $ 1,525.00
Future Replacements $ 170,000.00
Total $ 142,108.00 $ 170,000.00
-
8/10/2019 2014 12 19 Agenda Package
49/67
-
8/10/2019 2014 12 19 Agenda Package
50/67
-
8/10/2019 2014 12 19 Agenda Package
51/67
2013.09.03 8.0 9759 GB/CHATSWORTH BIODIGESTOR 01/21/2014 2:31PM
General Ledger
2013 Actual 2014 Actual2013 Total Budget Proposed Budget Final Budget
Revenue and Expense Working Current Budget ReportUp To Period 12 Accounts: ??-????-???? by Department
Account Description
Fund: 04 GB Biodigestor
0150 Biodigestor - Capital Assets
Revenue04-0150-9998 Change in Tangible Capital Assets 0.00 0.000.00
Total Revenue 0.00 0.00 0.00
0150 Biodigestor - Capital Assets 0.00 0.00 0.00Total
Page 1
-
8/10/2019 2014 12 19 Agenda Package
52/67
-
8/10/2019 2014 12 19 Agenda Package
53/67
2013.09.03 8.0 9759 GB/CHATSWORTH BIODIGESTOR 01/21/2014 2:31PM
General Ledger
2013 Actual 2014 Actual2013 Total Budget Proposed Budget Final Budget
Revenue and Expense Working Current Budget ReportUp To Period 12 Accounts: ??-????-???? by Department
Account Description
1062 Biodigestor - Expenditures
Expense
04-1062-1110 Salaries 5,789.04 0.0013,000.00 13,000.0004-1062-1111 Benefits 1,135.63 0.003,500.00 3,500.00
04-1062-1112 Mileage 0.00 0.000.00 1,000.00
04-1062-1241 Office Supplies 199.44 0.00500.00 500.00
04-1062-1242 Heat & Hydro 23,381.56 0.0028,000.00 28,000.00
04-1062-1249 Materials & Supplies 4,049.49 0.0017,000.00 5,000.00
04-1062-1251 Postage & Freight 75.82 0.00500.00 500.00
04-1062-1252 Audit Fees 6,500.00 0.000.00 6,500.00
04-1062-1253 Service Contracts - Sunset Strip 42,235.39 0.0050,000.00 60,000.00
04-1062-1254 Service Contracts 142,693.03 0.00150,000.00 140,000.00
04-1062-1255 Telephone/Internet 1,765.89 0.005,000.00 2,500.00
04-1062-1258 Insurance 15,955.92 0.0016,500.00 17,000.00
04-1062-1259 Other Services 10,487.64 0.005,000.00 5,000.00
04-1062-1260 Professional Fees - Maintenance 12,382.80 0.0025,000.00 10,000.00
04-1062-1261 Professional Fees - Spec Projects 16,968.56 0.0030,000.00 10,000.00
04-1062-1280 Septage Management 1,480.80 0.008,000.00 5,000.00
04-1062-1281 Repairs & Maintenance 58,086.30 0.0054,000.00 20,000.00
04-1062-1282 Licenses 0.00 0.00500.00 500.00
04-1062-1283 Digestate Disposal 32,805.30 0.0018,000.00 15,000.00
04-1062-1289 Taxes 8,026.98 0.006,000.00 6,000.00
04-1062-1290 Capital 32,472.53 0.0010,000.00 100,000.00
04-1062-1300 Transfer to Georgian Bluffs 0.00 0.000.00
04-1062-1301 Transfer to Chatsworth 0.00 0.000.00
04-1062-1310 Depreciation 0.00 0.000.00
04-1062-1311 Future Capital - Building 0.00 0.0045,000.00 40,000.00
04-1062-1312 Future Capital - Equipment 0.00 0.00120,000.00 100,000.00
04-1062-1313 Future Capital - Internal Roadways 0.00 0.005,000.00 10,000.00
Total Expense 610,500.00 416,492.12 0.00 599,000.00
1062 Biodigestor - Expenditures 610,500.00 416,492.12 0.00Total 599,000.00
Page 3
-
8/10/2019 2014 12 19 Agenda Package
54/67
2013.09.03 8.0 9759 GB/CHATSWORTH BIODIGESTOR 01/21/2014 2:31PM
General Ledger
2013 Actual 2014 Actual2013 Total Budget Proposed Budget Final Budget
Revenue and Expense Working Current Budget ReportUp To Period 12 Accounts: ??-????-???? by Department
Account Description
1064 Biodigestor - Revenue
Revenue
04-1064-7110 Tipping Fees -40,241.16 0.00-70,000.00 -70,000.0004-1064-7111 Sunset Strip Sewage -66,029.57 0.00-60,000.00 -65,000.00
04-1064-7112 Hydro Generating -68,987.33 0.00-90,000.00 -90,000.00
04-1064-7113 Hauled Sewage -11,269.22 0.00-95,000.00 -10,000.00
04-1064-7114 Restaurant Waste 0.00 0.000.00
04-1064-7115 Bank Interest Earned -842.68 0.00-500.00
04-1064-7116 Miscellaneous Revenue -90.40 0.000.00
04-1064-7200 Transfer From GB (Operating) -60,000.00 0.00-60,000.00 -60,000.00
04-1064-7201 Transfer From Chats (Operating) -60,000.00 0.00-60,000.00 -60,000.00
04-1064-7210 Transfer from GB (Capital) 0.00 0.00-90,000.00 -125,000.00
04-1064-7211 Transfer from Chats (Capital) 0.00 0.00-90,000.00 -125,000.00
Total Revenue -615,500.00 -307,460.36 0.00 -605,000.00
1064 Biodigestor - Revenue -615,500.00 -307,460.36 0.00Total -605,000.00
Page 4
-
8/10/2019 2014 12 19 Agenda Package
55/67
2013.09.03 8.0 9759 GB/CHATSWORTH BIODIGESTOR 01/21/2014 2:31PM
General Ledger
2013 Actual 2014 Actual2013 Total Budget Proposed Budget Final Budget
Revenue and Expense Working Current Budget ReportUp To Period 12 Accounts: ??-????-???? by Department
Account Description
0.0004-0150 Biodigestor - Capital Assets 0.00 0.00
0.00 6,000.0004-1061 Biodigestor - V238 - New Holland Tractor 5,000.00 107.08
0.00 599,000.0004-1062 Biodigestor - Expenditures 610,500.00 416,492.12
0.00 -605,000.0004-1064 Biodigestor - Revenue -615,500.00 -307,460.36
0.00-307,460.36 -605,000.00
0.00 605,000.00
0.00
Total Revenues: -615,500.00
Total Expenses: 615,500.00 416,599.20
0.00Report Net: 109,138.84
Page 5
-
8/10/2019 2014 12 19 Agenda Package
56/67
-
8/10/2019 2014 12 19 Agenda Package
57/67
-
8/10/2019 2014 12 19 Agenda Package
58/67
-
8/10/2019 2014 12 19 Agenda Package
59/67
-
8/10/2019 2014 12 19 Agenda Package
60/67
-
8/10/2019 2014 12 19 Agenda Package
61/67
-
8/10/2019 2014 12 19 Agenda Package
62/67
THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BLUFFS
BY-LAW NO. 2014
Being a By-law to regulate the collection and disposal of septic waste within the
Township of Georgian Bluffs.
WHEREASthe Municipal Act, 2001, S.O. 2001, c.25 provides that Waste Management is within
the sphere of jurisdiction of a lower tier municipality and
WHEREAS pursuant to the Ontario Water Resources Act, R.S.O. c.40, every municipality
which discharges , deposits, causes or permits the discharge or deposit of material of any kind
into any well, river, pond, spring, stream, reservoir or other water or watercourse that may
impair the spring, stream, reservoir or other water or watercourses is guilty of an offence and;
WHERAS the Council of the Corporation of the Township of Georgian Bluffs considers it
necessary and desirable to institute a system for the collection and disposal of septic waste
from Class 4, 5 and 6 systems, as set out in the Ontario Building Code, within the Township of
Georgian Bluffs;
NOW, THEREFORE, the Council of the Corporation of the Township of Georgian Bluffs enacts
as follows:
1. Definitions
(1) In this By-law:
Building Code Act means the Building Code Act, 1992, S.O. 1992, c.23, as amended, or any
successor legislation thereto;
By-Law Enforcement Officer meansa police officer, Municipal Law Enforcement Officer, special
constable or any other public officer engaged in the enforcement of this or any other by- law;
Hauler means a person whois licensed to transport hauled liquid waste to the septic waste
disposal site for disposal;
Hauled Liquid Waste means waste removed from a sewage system, including a cesspool, a
septic tank system. A privy vault or privy pit, a chemical toilet, a portable toilet, or a sewageholding tank but does not include sludge removed from a wastewater treatment plant;
Person includes an individual, association, partnership, corporation, municipality, Provincial or
Federal agency, or an agent or employee thereof.
Director of Operations means the Director of Operationsof the Township of GeorgianBluffs.
-
8/10/2019 2014 12 19 Agenda Package
63/67
Sewage means any liquid waste containing animal, vegetable, chemical or mineral matter in
solution or in suspension, but does not include stormwater or uncontaminated water;
Township means the municipal corporation of the Township of Georgian Bluffs or the
geographic area of the Township of Georgian Bluffs, as the context requires;
2. Disposal of Hauled Liquid Waste
1.That all liquid waste from a Class 4, 5 and 6 sewage waste system within the
Township of Georgian Bluffs, as defined by the Ontario Building Code, that is collected
by any hauler licensed by the Province of Ontario to collect and transport liquid waste,
shall be transported to the Township of Georgian Bluffs/Township of Chatsworth waste
disposal site located at the South part of Lot 4, Concession 6, in the geographic area of
the former Township of Derby and municipally known as 062111 Sideroad 3.
3. Hauled Liquid Waste Permit
Permit Required
(1) No person shall collect and dispose of hauled liquid waste of any type within the
Township unless:
(a) The person has first procured a Hauled Liquid Waste Permit; and
(b) The discharge or deposit of the hauled liquid waste is fully compliant with the terms
and conditions of the Hauled Liquid Waste Permit and this By-law.
(2) Every applicant for the issuance of a Hauled Liquid Waste permit under this By-lawshall:
(a) file with the Director of Operations, an application in the form established by the
Township from time to time which:
(1) identifies the name, municipal address, mailing address, telephone number,
fax number and email address of the applicant
(2) sets out contact information including emergency contact information;
(3) provides particulars of any Provincially issued septic waste disposal permits
currently held by the applicant;
(4) sets out such other particulars as the Director of Operations may require to
investigate and process the application;(5) is signed by the applicant, or in the case of a corporate applicant, by the
authorized signing officer of the corporation, certifying as to the accuracy of
the information in the application.
(b) file with the Director of Operations, as part of the application for the Hauled Liquid
Waste Permit:
-
8/10/2019 2014 12 19 Agenda Package
64/67
(1) An insurance certificate evidencing a policy of insurance held by the applicant
with an insurance company licensed to operate in Ontario, with limits of not
less than $100,000 for property damage and $1,000,000 general liability and
the Township of Georgian Bluffs and the Township of Chatsworth shall be
named as additional insured parties; and
(c) Pay the applicable non-refundable application fee determined in accordance withthe Townships Fees and Services By-law
(3) The Director of Operations shall be guided by the Townships policy for the issuance
or refusal to issue a Hauled Liquid Waste permit as amended from time to time.
4. Fees for the processing of Hauled Liquid Waste
(1) All haulers of liquid waste that have been issued a permit from the Township shall be
permitted to dispose of septic waste, free of charge, at the Townships waste
disposal facility.
5. Offences
(1) Every person other than a Corporation who contravenes any provision of this By-
law is guilty of an offence and on conviction is liable for every day or part thereof
upon which such offence occurs or continues to a fine of not more than $5,000
for the first offence and $10,000 for any subsequent conviction.
(2) Every corporation who contravenes any provision of this By-law and every
director or officer of a corporation who knowingly concurs in such contravention
is guilty of an offence and on conviction is liable for every day or part there of
upon which such offence occurs or continues to a fine of not more than $25,000for the first offence and $50,000 for any subsequent conviction.
(3) Notwithstanding subsections 5(1) and 5 (2), every person who contravenes any
provision of any other section of this By-law is guilty of an offence and on
conviction is liable for every day or part thereof upon which such offence occurs
or continues to a fine of not more than $2,500 as provided for in the Provincial
Offences Act, R.S.O. 1990, c. P.33as amended.
(4) In this By-law, subsequent conviction means a conviction for an offence which
offence occurs after the date of conviction for an earlier offence under this By-
law.
(5) When a person has been convicted of an offence under this By-law, the Ontario
Court (Provincial Division), or any court of competent jurisdiction thereafter may,
in addition to any penalty imposed on the person convicted, issue an Order
prohibiting the continuation or repetition of the offence of the doing of any act or
thing by the person convicted directed toward the continuation or repetition of the
offence.
(6) An offence and subsequent conviction under this By-law pursuant to the
Provincial Offences Act. R.S.O.1990, c.P.33 or the Municipal Act, 2001, shall not
-
8/10/2019 2014 12 19 Agenda Package
65/67
be deemed in any way to preclude the Township from issuing a separate legal
proceeding to recover charges, costs and expenses incurred by the Township
and which may be recovered in a Court of competent jurisdiction.
GENERAL PROVISIONS
6. Confidential Information
(1) All information submitted to and collected by the Township, will, except as
otherwise provided in this Section, be available for disclosure to the public in
accordance with the Municipal Freedom of Information and Protection of Privacy
Act, R.S.O. 1990, c.M.56 (MFIPPA).
(2) In the event that any person, in submitting information to the Township or to the
Director of Operations, in any form, as required by this By-law, where such
information is confidential or proprietary or otherwise may be exempt from
disclosure under the MFIPPA, the person submitting the information shall so
identify that information upon its submission to the Township or the Director of
Operations and shall provide sufficient details as to the reason for its purported
exemption from disclosure.
7. Severability
(1) If any section, clause or provision of this By-law, including anything contained in
any Schedule attached hereto, is for any reason declared in a court of competent
jurisdiction to be invalid, the same shall not affect the validity of this By-law as a whole
or any part thereof other than the section, clause or provision so declared to be invalid
and it is hereby declared to be the intention that all remaining sections, clauses or
provisions of the By-law shall remain in full force and effect until repealed,
notwithstanding that one or more provisions thereof shall have been declared to be
invalid.
(2) Nothing in this By-law relieves any person from complying with any provision of
any Federal or Provincial legislation or any other By-law of the Township.
(3) Where a provision of this By-law conflicts with the provisions of another By-law in
force in the Township, the provision that establishes the higher standard to protect the
health, safety and welfare of the general public shall prevail.
8. That this By-Law shall come into full force and effect upon the final passing thereof.
9. This By-law may be referred to as the Septic Waste Disposal By-law
-
8/10/2019 2014 12 19 Agenda Package
66/67
Read a first and second time this ______ day of ________, 2014.
Read a third time and passed this _____ day of _________, 2014
_______________________ __________________
MayorAlan Barfoot C.A.O.ClerkMurray Hackett
-
8/10/2019 2014 12 19 Agenda Package
67/67