netxposurekingspan.netx.net/file/asset/12065/original/12065.pdf · 2013. 11. 13. · t h is nt alog...

1
3 1 4 5 2 a Fit closure flashing using low profile fasteners. An air seal consisting of an unbroken 6mm Ø bead of gun-grade sealant is required between support angle and floor b Line, level and fix drip flashing using low profile fasteners. Joints in the drip flashing to incorporate butt straps sealed with two runs of gun-grade sealant c Apply an unbroken 6mm Ø bead of gun-grade sealant to provide an air seal between back of panel and closure flashing d Galvanised angle & rail extensions to be installed to provide suitable bearing for fixing of panels on return elevation, by a steel fabricator f Apply an unbroken 6mm Ø bead of gun-grade sealant to galvanised angle ensuring it meets the previously installed air seals g Locate first panel (P1) ensuring it is correctly positioned lined and levelled h Install min. 2 No. main fasteners through the male joint at the top, intermediate and bottom locations Note: Some installations may require additional fasteners depending on wind loadings/specifications. Check project specific details. i At corner positions, through fix countersunk fasteners at 500mm max. centres into female panel joint Note: Fasteners to be suitably located to ensure they are covered by external corner flashing. Also applicable at door/window jamb abutments. e Apply an unbroken 6mm Ø bead of gun-grade sealant to top rail or internal flashing to provide an air seal j Run a gun-grade air seal across male joint ensuring it meets previously installed air seal l Locate next panel (P2) into position ensuring that the factory applied weather seal is compressed and that the AWP filler remains in position. Ensure panel is lined and levelled correctly in line with adjacent panel install min. 2 No. main fasteners through the male joint at the top, intermediate and bottom locations m Repeat processes j to l to complete elevation n Install site applied PIR insulation board and gun applied fire rated canister insulation into female joint to fill the gap between panels (P1) and (P5) to ensure continuity of insulation o Cut panel (P5) to size using an evolution type circular saw, ensuring it meets the outside edge of (P1) Note: Do not use abrasive wheel cutter. All cutting should be done at ground level. p Locate panel (P5) in to position ensuring factory applied weather seal is compressed and AWP filler remains in position q At corner positions, through fix countersunk fasteners at 500mm max. centres in to panel (P5) at cut edge of panel Note: Fasteners to be suitably located to ensure they are covered by external corner flashing. s Apply 4mm Ø butyl sealant (site applied) to the external legs of the internal corner flashing, ensure sealant is positioned weather side of fasteners r Apply 4mm Ø butyl sealant (site applied) to the back of the internal corner flashing, ensure sealant is positioned weather side of fastener. Fix internal corner flashing with low profile stitching screws at max. 450mm centre t Fix external corner flashing with low profile stitching screws at max. 450mm centres positioned as per detail. Joints in the corner flashing to incorporate butt straps sealed with two runs of gun-grade sealant AWP filler bedded on silicone sealant at every horizontal panel joint Run of gun-grade air seal across male joint Stanchion Sheeting rail Optional internal closure flashing to mask insulation from view PIR insulation board Air seal - continuous bead of gun-grade sealant The gap between the panel and the drip flashing needs to be 6mm minimum P1 P1 P5 P2 P3 P4 P1 P2 Benchmark Karrier Panel insulated wall panel vertically laid Air seal - 6mm Ø bead of gun-grade sealant, as per item l Note:The structure should be suitably designed to suit both the Benchmark Karrier Panel insulated panel and Benchmark Ceramic Tile Façade System. Ensure steelwork is suitably lined, levelled and within tolerance.Visually check the internal liner joint to ensure panels are joined fully. Check panel cover width module as works progress to ensure “creep” does not occur,particularly important when windows are incorporated into the elevation. Joints need to be aligned correctly during installation to prevent the ‘saw tooth’ effect at the drip. Gun-grade sealant type – non-setting butyl sealant – silicone sealant. This is a generic Benchmark Karrier Panel wall installation guide and details may differ from project to project. Project specific construction details must be used. Please contact Kingspan envirocare ® technical services for further information on 0800 587 0090. Drip flashing 50mm Verge flashing with 150mm sealed butt straps Site applied PIR insulation or gun applied fire rated canister insulation 20mm x 3mm butyl rubber sealant Cleader angle by steel sub- contractor with air seal Vapourflex sealant applied at joints KS1000 LP insulated roof panel Air seal - 8mm Ø approx. gun-grade sealant 4mm Ø butyl rubber sealant Air seal - 6mm Ø bead of gun-grade sealant Benchmark Karrier Panel insulated wall panel vertically laid Verge flashing with 150mm sealed butt straps Site applied PIR insulation or gun applied fire rated canister insulation 20mm x 3mm butyl rubber sealant Cleader angle by steel sub- contractor with air seal Vapourflex sealant applied at joints KS1000 LP insulated roof panel Air seal - 8mm Ø approx. gun-grade sealant 4mm Ø butyl rubber sealant Air seal - 6mm Ø bead of gun-grade sealant Benchmark Karrier Panel vertically laid Air seal - 6mm bead of gun-grade sealant 4mm Ø butyl rubber sealant Low profile fastener External corner flashing Inner corner flashing Gun applied fire rated canister insulation Edge of vertical panel site cut Galvanised angle Air seal - 6mm bead of gun-grade sealant 4mm Ø butyl rubber sealant Low profile fastener External corner flashing Inner corner flashing Gun applied fire rated canister insulation Edge of vertical panel site cut Galvanised angle This installation guide should be read in conjunction with the ‘project specific’ design drawings and method statements. Although this ‘installation guide’ is deemed to be correct at the time of publication, Kingspan Benchmark reserve the right to amend the information at any time in the future. Installation Guides are available for the full range of Roof, Wall & Façade Systems. Tel: 01352 716100 Fax: 01352 710161 Email: [email protected] Benchmark Karrier Panel Components 6mm Ø Primary/Main Fastener Gun-Grade Sealant PIR Insulation Closure Flashing AWP Filler 4mm Ø 20 x 3mm Fire-rated Canister Insulation Silicone Sealant External Corner Flashing Internal Corner Flashing Counter Sunk Main Fastener Drip Flashing Secondary/ Stitching Screw Low Profile Fastener Closure flashing with lap joints air sealed Air seal - 6mm Ø bead of gun-grade sealant Direction of lay Direction of lay Direction of lay Direction of lay Direction of lay Direction of lay k Bed an AWP filler in silicone sealant at top of panel only, and run a gun-grade air seal across male joint ensuring it meets previously installed air seal Note: Position of AWP filler at top of panel (parapet/bottom of window) needs to reflect project specific details in order to achieve airtightness performance. Run of gun-grade air seal across male joint Air seal - Vapourflex sealant applied over joints in supports Air seal - 6mm bead of gun-grade sealant Air seal - 6mm bead of gun-grade sealant 4mm Ø butyl rubber sealant AWP joint filler and gun-grade sealant Air seal - gun-grade sealant at male panel joint Air seal - gun-grade sealant at male panel joint Gun applied fire rated canister insulation on site Drip flashing Stack Joint Detail Benchmark Karrier Panel insulated wall panel vertically laid Benchmark Karrier Panel insulated wall panel vertically laid Note: Care should be taken to ensure that the stack joint detail does not coincide with a support rail position. Butyl Rubber Tape Sealants KARRIER PANEL Insulated Wall Panel Vertically Laid Installed On Multibeam Purlin & Rail System July 2010

Upload: others

Post on 11-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • 31

    45

    2

    aFit closure flashingusing low profilefasteners. An air sealconsisting of anunbroken 6mm Øbead of gun-gradesealant is requiredbetween supportangle and floor

    bLine, level and fix drip flashing using low profile fasteners. Joints in the dripflashing to incorporate butt straps sealed with two runs of gun-grade sealant

    cApply an unbroken 6mm Ø bead of gun-grade sealant toprovide an air seal between back of panel and closure flashing

    dGalvanised angle & rail extensions to be installed to provide suitablebearing for fixing of panels on return elevation, by a steel fabricator

    fApply an unbroken 6mm Øbead of gun-grade sealant togalvanised angle ensuring itmeets the previously installedair seals

    gLocate first panel (P1)ensuring it is correctlypositioned lined and levelled

    hInstall min. 2 No. main

    fasteners through the malejoint at the top, intermediate

    and bottom locations

    Note: Some installations may requireadditional fasteners depending on windloadings/specifications. Check project

    specific details.

    iAt corner positions, throughfix countersunk fastenersat 500mm max. centresinto female panel joint

    Note: Fasteners to be suitably located toensure they are covered by external cornerflashing. Also applicable at door/window

    jamb abutments.

    eApply an unbroken 6mm Øbead of gun-grade sealant totop rail or internal flashing to

    provide an air seal

    jRun a gun-grade air seal across male jointensuring it meets previously installed air seal

    lLocate next panel (P2) into position

    ensuring that the factory applied weatherseal is compressed and that the AWP fillerremains in position. Ensure panel is linedand levelled correctly in line with adjacent

    panel install min. 2 No. main fastenersthrough the male joint at the top,intermediate and bottom locations

    mRepeat processes j to l to

    complete elevation

    nInstall site applied PIR insulationboard and gun applied fire rated

    canister insulation into female jointto fill the gap between panels

    (P1) and (P5) to ensurecontinuity of insulation

    oCut panel (P5) to size usingan evolution type circular saw,ensuring it meets the outside

    edge of (P1)

    Note: Do not use abrasive wheel cutter.All cutting should be done at ground level.

    pLocate panel (P5) in to position

    ensuring factory applied weather sealis compressed and AWP filler

    remains in position

    qAt corner positions, through fixcountersunk fasteners at 500mm

    max. centres in to panel (P5) at cutedge of panel

    Note: Fasteners to be suitably located to ensurethey are covered by external corner flashing.

    sApply 4mm Ø butyl sealant (site applied) to theexternal legs of the internal corner flashing, ensuresealant is positioned weather side of fasteners

    rApply 4mm Ø butyl sealant (site applied) to theback of the internal corner flashing, ensure sealantis positioned weather side of fastener. Fix internalcorner flashing with low profile stitching screws atmax. 450mm centre

    tFix external corner flashingwith low profile stitchingscrews at max. 450mm

    centres positioned as perdetail. Joints in the cornerflashing to incorporate buttstraps sealed with two runs

    of gun-grade sealant

    AWP filler beddedon silicone sealantat every horizontalpanel joint

    Run of gun-grade air sealacross male joint

    Stanchion

    Sheeting rail

    Optional internal closureflashing to mask insulation

    from view

    PIR insulation board

    Air seal - continuous beadof gun-grade sealant

    The gap betweenthe panel and the drip

    flashing needsto be 6mm minimum

    P1

    P1P5 P2

    P3P4

    P1 P2

    Benchmark Karrier Panelinsulated wall panel vertically laid

    Air seal - 6mm Øbead of gun-grade

    sealant, as per item l

    Note:The structure should be suitably designed to suitboth the Benchmark Karrier Panel insulated panel andBenchmark Ceramic Tile Façade System. Ensure steelwork issuitably lined, levelled and within tolerance.Visually check theinternal liner joint to ensure panels are joined fully.Check panel cover width module as works progress to ensure“creep” does not occur, particularly important when windowsare incorporated into the elevation.Joints need to be aligned correctly during installation toprevent the ‘saw tooth’ effect at the drip.Gun-grade sealant type – non-setting butyl sealant

    – silicone sealant.This is a generic Benchmark Karrier Panel wall installationguide and details may differ from project to project.Project specific construction details must be used. Pleasecontact Kingspan envirocare® technical services for furtherinformation on 0800 587 0090.

    Drip flashing50mm

    Verge flashing with150mm sealed butt straps

    Site applied PIRinsulation or gunapplied fire ratedcanisterinsulation

    20mm x 3mm butylrubber sealant

    Cleader angle by steel sub-contractor with air seal Vapourflex

    sealant applied at joints

    KS1000 LP insulatedroof panel

    Air seal - 8mm Øapprox. gun-grade

    sealant

    4mm Ø butylrubber sealant

    Air seal - 6mm Ø beadof gun-grade sealant

    Benchmark Karrier Panelinsulated wall panelvertically laid

    Verge flashing with150mm sealed butt straps

    Site applied PIRinsulation orgun applied firerated canisterinsulation

    20mm x 3mm butylrubber sealant

    Cleader angle by steel sub-contractor with air seal Vapourflex

    sealant applied at joints

    KS1000 LP insulatedroof panel

    Air seal - 8mm Øapprox. gun-grade

    sealant

    4mm Ø butylrubber sealant

    Air seal - 6mm Ø beadof gun-grade sealant

    Benchmark Karrier Panelvertically laid

    Air seal - 6mm beadof gun-grade sealant

    4mm Ø butylrubber sealant

    Low profile fastener

    External cornerflashing

    Inner cornerflashing

    Gun applied fire ratedcanister insulation

    Edge of verticalpanel site cut

    Galvanised angle

    Air seal - 6mm beadof gun-grade sealant

    4mm Ø butylrubber sealant

    Low profile fastener

    External cornerflashing

    Inner cornerflashing

    Gun applied fire ratedcanister insulation

    Edge of verticalpanel site cut

    Galvanised angle

    This installation guide should be read inconjunction with the ‘project specific’design drawings and method statements.Although this ‘installation guide’ is deemedto be correct at the time of publication,Kingspan Benchmark reserve the right toamend the information at any time in thefuture. Installation Guides are available forthe full range of Roof, Wall & FaçadeSystems.Tel: 01352 716100Fax: 01352 710161Email: [email protected]

    Benchmark Karrier PanelComponents

    6mm Ø

    Primary/MainFastener

    Gun-GradeSealant

    PIRInsulation

    ClosureFlashing

    AWP Filler

    4mm Ø 20 x 3mm

    Fire-ratedCanisterInsulation

    SiliconeSealant

    External CornerFlashing

    Internal CornerFlashing

    Counter SunkMain Fastener

    Drip Flashing

    Secondary/Stitching Screw

    Low ProfileFastener

    Closure flashing withlap joints air sealed

    Air seal - 6mm Ø beadof gun-grade sealant

    Direction of

    layDirect

    ion oflay

    Direction of lay

    Direction of

    lay

    Direction of lay

    Direction of

    lay

    kBed an AWP filler in silicone sealant at topof panel only, and run a gun-grade air sealacross male joint ensuring it meetspreviously installed air seal

    Note: Position of AWP filler at top of panel (parapet/bottomof window) needs to reflect project specific details in order toachieve airtightness performance.

    Run of gun-grade air sealacross male joint

    Air seal - Vapourflexsealant applied overjoints in supports

    Air seal - 6mm beadof gun-grade sealant

    Air seal - 6mm beadof gun-grade sealant

    4mm Ø butylrubber sealant

    AWP joint filler andgun-grade sealant

    Air seal - gun-grade sealantat male panel joint

    Air seal - gun-gradesealant at male

    panel joint

    Gun applied firerated canister

    insulation on site

    Drip flashing

    Stack Joint Detail

    Benchmark KarrierPanel insulated wallpanel vertically laid

    Benchmark Karrier Panelinsulated wall panel vertically laid

    Note: Care should be taken to ensure that the stack jointdetail does not coincide with a support rail position.

    Butyl RubberTape Sealants

    KARRIER PANELInsulatedWall Panel VerticallyLaid Installed On MultibeamPurlin & Rail System

    July 2010