Canada-U.S. Trans-border Issues Bridges, Pipelines, Trade and Tourists

Upload: k-12-study-canada

Post on 14-Apr-2017

159 views

Category:

Education


3 download

TRANSCRIPT

Page 1: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Canada-U.S. Trans-border Issues

Bridges, Pipelines, Trade and Tourists

Page 2: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

NCSS Saturday, November 17, 2012 ____________________________________

Betsy Arntzen, University of Maine [email protected]

Ruth Writer, Western Michigan University [email protected]

Page 4: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 5: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Statistics Canada:

“North America increasingly appears to be a single continental market tied together by ribbons of steel and asphalt.

North America is now one market for overseas container trade, with ports in Canada and the U.S. competing with each other for traffic to the interior of North America. “

www.statcan.ca

Page 6: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

North American Bridges and Pipelines: Perfect foci for Social Studies investigations

MOVEMENT

BRIDGES •History •Economics –International trade –Jobs –Tourists

•Political Science –Policies, Agreements

•Geography –Movement of goods and people

MOVEMENT

PIPELINES •History •Economics

–International trade –Jobs

•Political Science –Policies, Agreements

•Geography -Movement of commodities

Page 7: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Land and Water Boundaries

Page 8: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Bridges

Page 9: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Bakers’ dozen plus one◦ Ontario/New York—7◦ Ontario/Michigan—3◦ Ontario/Minnesota—2◦ Quebec/New York—1 ◦ New Brunswick/Maine—1

Tunnels—3 and all Michigan/Ontario

Bridges

Page 10: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 11: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

BILATERAL--$195 million per day $70.2 billion each year

◦ Exports—$23.4 billion◦ Imports--$46.8 billion

Largest market in world is U.S. and Canada Michigan sells more to Canada than any other

country in the world—largest of 50 states 46% of Michigan exports go to Canada More than next 19 foreign markets combined 218,000 Michigan jobs depend on this trade 15,300 in Michigan employed by Canadian owned

businesses

Canada/Michigan Trade

Page 12: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Michigan Trade with Canada

Mich. Exports $23.4 B Mich. Imports $46.8 B

50% transportation 17% equipment &

machinery 12% minerals and

metals 8% energy 4% agriculture 3% plastics and rubber 6% other

64% transportation 13% energy 6% equipment &

machinery 6% minerals and

metals 2% plastic & rubber 2% agriculture 6% other

Page 13: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Michigan Ohio Illinois North Carolina Kentucky Indiana Ontario

Top exports/imports

Page 14: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Completed in 1930 [Holland Tunnel & Posey] 5160 feet under the Detroit River 72 below surface at lowest point Owned by Detroit and Windsor—50% each Second busiest crossing 13,000 vehicles [no trucks] each day

Detroit-Windsor Tunnel

Page 15: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 16: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 17: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Completed in 1929 amidst Great Depression Longest suspended central span at that time 1850 feet span with total length 7500 feet Towers at 386 feet above river and 115 below Road as high as 152 feet above Detroit River Four lanes with 10,000 commercial vehicles

each day—60-70% of truck traffic in region Canadian end connects to busy Windsor

streets=Congestion Privately owned by Matthew Moroun—Grosse

Point billionaire

Ambassador Bridge

Page 18: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Ambassador Bridge

Page 19: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Peak in 1999 with 12.3 million crossings 9/1/01 Recession in 2009 2011—7.2 million crossings plus 3.7 million

at tunnel DIBC assumes it will never return to 1999

levels—”best days are behind us”

MDOT projections with new DIRC bridge 20% reduction on Ambassador Bridge

Traffic on Ambassador

Page 20: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

DIBC proposed second span for some time◦ Accommodate most traffic with 6 lanes◦ Overflow would be on original bridge

Does not address Canadian concern about congestion◦ Lack of support on both sides of border

Second Ambassador Bridge

Page 21: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 22: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 23: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

June 2012 agreement in Windsor[cost of NITC $2.2 billion] ◦ Prime Minister Stephen Harper [Conservative]◦ Michigan Governor Rick Snyder [Republican]

Attempt to cancel NITC—Let the voters decide

Cost of the campaign to pass Prop 6◦ Petition drive Campaign contributions◦ Ads◦ Almost $35 million ◦ All funded by DIBC

Election 2012

Page 24: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Proposal 6 was on the Michigan Ballot “Let the people decide” DIBC vs. DRIC or NITC

◦ Detroit International Bridge Co.—Ambassador Bridge◦ Detroit River International Crossing◦ New International Trade Crossing

YES—DIBC [Ambassador Bridge Company], owner Matthew Moroun, Grover Norquist, Teamsters in exchange for promise by Moroun for union jobs

NO—Over 180 organizations and groups including all current and former Michigan Governors—bipartisan

MAJOR concern of 2012

Page 25: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

VOTE NO: New bridge will create jobs, fortify Michigan's economic future

Page 26: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Cost $2.2 billion By 2016 carry 5.6 million vehicles 34.5% of overall border traffic by 2025

DIRC/NITC Bridge

Page 27: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

I-75 interchange: $385.9 million U.S. Customs plaza: $413.6 million NITC bridge: $949.1 million Canadian Customs plaza: $387.6 million Windsor Essex Parkway: $1.4 billion*

*The Windsor-Essex Parkway is entirely a Canadian project and has a separate public-private partnership concession. It previously has been estimated at $1.67 billion but was contracted for less

Source—Michigan Department of Transportation

Cost of the New International Trade Crossing by project component:

Page 28: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Michigan: Zero Federal Highway Administration: Zero General Services Administration: $263.6 million

Canada: $2.337 billion** Private sector partner: $949.1 million Total: $3.536 billion

** Includes $550 million of U.S.-side costs that Canada has offered to coverSource—Michigan Department of Transportation

Cost breakdown by agency:

Page 29: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 30: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

NO—60% Yes—40% Bridge building to begin in 2013 or 2014"We are happy with the investment made in this campaign on behalf of taxpayers and the 5,000 families employed by Ambassador Bridge family of companies,” Mickey Blashfield [Moroun’s director of government affairs] said. “Like any family business, we would do it again - and will in different ways - to defend economic freedom and limited government. If the governmental proposal doesn’t collapse from the weight of legal and congressional scrutiny, the NITC will never be built over unstable salt mine foundations, where land speculators are lining up to get rich on the government’s tab.”

http://michigantruthsquad.com/the-people-should-decide-anti-new-detroit-bridge-tv-ads/

Results of Proposal 6

Page 31: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 32: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 33: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Tourists

Page 34: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

119 border crossings between Canada and U.S. 300,000 cross this border each day Almost 16 million between two nations by air Canadian trips to U.S.—over 39 million U.S. trips to Canada—over 20 million Total spent by travelers—almost $14,000,000,000 State statistics:

◦ Florida—state where Canadians spent most time◦ New York received the most visits by Canadians ◦ Michigan visits by Canadians

2,435,700 $445 million spent

◦ Canadian visits by Michigan residents 3,217,100 $491 million spend

Tourism

Page 35: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)
Page 36: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

December 2011

Page 37: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Better balance in dealing with regulations◦ Coordinating regulations that cost $16 billion

Smoother trade: world largest trade partners◦ Improve travel—dedicated lanes for trucks

Ease cross-border business◦ Ease of market standards—medical

Improved security◦ Shared information about citizens

Key to President Obama’s plan to grow the U.S. economy

Perimeter Security and Trade Agreement—December 2011

Page 38: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

“These agreements represent the most significant step forward in Canada-U.S. co-operation since the North American Free Trade Agreement.” ~~Stephen Harper

Page 39: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Pipelines

Page 40: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Kalamazoo River Oil Spill

Page 41: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Transcontinental pipeline—1950s debate—1760 miles◦ Enbridge Energy to Sarnia refineries

Northern Route—UP and Lower Peninsula Southern Route—circles Lake Michigan then across

Michigan 2010 accident—840,000 gallons leaked into Kazoo

River Still cleaning up after more than 2 years

◦ Half owned by U.S. company

Page 42: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

•1,149,109 gallons of oil collected •189,205 cubic yards soil/debris disposed

CHICAGO (Oct. 3, 2012) — “The U.S. Environmental Protection Agency today notified Enbridge that more work is needed in Michigan's Kalamazoo River to clean up oil from the company's pipeline spill in July 2010. EPA is proposing further action upstream of Ceresco Dam, upstream of the Battle Creek Dam (Mill Ponds area), and in the delta upstream of Morrow Lake.”

Cleanup by the numbers

Page 43: (2012) Part 1: Canada-U.S. Trans-border Issues (3.2 MB)

Crews use "stingers" to pump water into the sediment and flush oil to the surface. (6/25/2011)

Crews remove oiled vegetation in Delta A of Morrow Lake. (6/28/2011)

Swamp Buggy performing submerged oil remediation in the Delta of the Kalamazoo River (7/18/2011 

http://www.epa.gov/enbridgespill/