2012 mill levy oversight committee - bond and mill...
TRANSCRIPT
Denver Public Schools
2012 Mill Levy Oversight Committee
April 15, 2015
Discussion of Draft 2003 Mill Levy Scorecards, Preparation for Second
Reporting of Scorecards in Fall 2015
Proposed Process for Scorecard Discussion
2
• 60 Minute World-Café Style Review: Each investment area hung around
the room with content-owner representation. Mill oversight members
asked to reflect upon:
o Key insights from analysis of investment scorecard
o Highlight/headline that is most important for the community to
understand
o Open questions for further inquiry or research
• 20 Minute Group Discussion:
• 10 minute Reflection on Scorecard Process:
o What worked well
o What could be improved
o What does this mean for our second report-out on scorecards in the
fall
Reminder: Mill Investment Scorecard Objectives
3
Objectives for Scorecards
• Report on important metrics to inform oversight committee discussions
• Provide the community with a clear picture into two key questions:
o Are we doing what we said we would do
o Are we seeing the results that we expected to see
• Note: Because we are developing these 2003 Mill scorecards ‘after-the-fact’, we are limited in what data is available to report. Important to think about how we can evolve the outcome metrics going forward
4
Mill Levy Override Allocations by Investment
Investment 2003 MLO
2013-14 Expenses
2012 MLO
Budgeted Additions
Arts and Music $7.2M – elem $5.2M – Middle and high
school
PE $6.8M
Improving Student Achievement $3.1M $13.1M for Math Tutoring
ECE and Full-Day Kindergarten $2.6M $15.5M
Textbooks $2.6M $4.0M
Improving Graduation Rates $2.2M
Capital Improvements/Maintenance $0.6M
Charter Schools $4.2M
Technology $4.4M
Counseling $0.6M
CTE $0.5M
Community Engagement $0.8M
TOTAL $22.7M* $50.9M
*Note: Annual revenue for 2003 Mill is approximately $20.0M so we were spending down reserves in 2013-14
Arts/Music Scorecard (for 13-14)
Metric Type Metric
Investment Objective: Increase student access to the arts in elementary grades. Distributed via a mandatory minimum staffing based on school enrollment with Mill Levy matches to support schools
Input Funding: $7.2M from 2003 Mill targeted at elementary 2012 Mill adds another $5.2M for middle and high school arts
Input Art/Music Staffing by level: Currently best approximation of student dosage Elementary Art Teachers**: 2011-12 – 177; 2012-13 – 169; 2013-14 – 180
Input and Outcomes
Based on discussion around Strategic Arts Plan 2020, we will have access to a much richer set of Art ‘supply’ data in the future, based on grade level and geographic region.
5 **Includes K-8’s
Note: Because a focus of our 3/25 meeting was Arts data and how we will be expanding it in the coming
years to the meet the Strategic Arts Plan 2020, the focus of our 4/15
meeting will be on investments with lower visibility to the committee
Improving Student Achievement: APEX (for 13-14)
6
Metric Type Metric
Investment Objective: Increase student achievement and decrease dropout rate by providing alternatives for students who need to make-up credits
Input
Funding: Mill Levy $900,000 • Apex Learning, Inc. Contract $420,000.00 • District Personnel Salaries & Benefits (Oversight of Apex program district-wide) $113,150.00 • Remaining Funding was Allocated to Schools to support their Credit Recovery Programs (Apex Site Coordinators, Teacher Salaries, Benefits & Tutor Pay) $366,850.00
Input Number of students participating in APEX programs: 4,481 students in 10,298 individual courses
Output Completions: 1,882 students completed APEX classes (42%) with 4,727 course completions (45%)
Output Boosting credit recovery has been proven to decrease dropouts. On average since its implementation in 2009-2010, APEX has boosted the number of credits recovered each year by 41%
Note: APEX Learning is a digital curriculum, for which the district has approved a total of 58 credit recovery courses (in English, Math, Science, Social Studies and Electives). The digital curriculum provides rigorous content; embedded scaffolds and supports through multiple curricular pathways, which are designed to meet students’ level of academic readiness; and integrated formative and summative assessments. To earn credit for the course(s), students must complete end of unit Computer Scored Tests & Teacher Scored Tests, and end of course final exam(s) with a mastery based learning requirement of a minimum of 80%.
Improving Student Achievement: SIG Awards (for 13-14)
Metric Type Metric
Investment Objective: Provide additional funds for schools that are working on turnaround initiatives and also allow schools to pilot innovative practices
7
SCHOOL # OF YEARS
PROPOSAL AWARD 2013 SPF 2014 SPF
College View 3 Reading Action 100 Module replacements costs; PD modules $92,250
Yellow 49.3%
Green 60.0%
Knapp 2 0.5 School Counselor to better meet social-emotional needs of students $65,616
Green 63.0%
Green 58.4%
Stedman 2 Writer's Workshop, Core Standards PD, Humanities Facilitator $119,836
Yellow 49.3%
Green 50.3%
DCIS Montbello 3 DCISM literacy curriculum development $20,000 Yellow 47.3%
Yellow 40.0%
Martin Luther King, Jr. Early College 3
Summer AVID/AP Conferences; .3 Dean of Instruction; Consultant; teacher stipends; summer academy program extra pay. $120,000
Green 51.1%
Yellow 49.1%
North 3 PD with focus on diverse learners $120,000 Yellow 44.2%
Yellow 49.5%
Note: As discussed at the Mill Oversight Committee’s 3/25/15 meeting, in making awards for 15-16 we are instituting more mechanisms to gather qualitative impact of the grants
Full-day Kinder (for 13-14)
Metric Type Metric
Investment Objective: Expand full-day kindergarten funding (only funded at 50% from the state level). Reduce tuition requirements for our neediest students
Input
Funding: $2.6M from the 2003 mill targeted at full-day kinder. The 2012 Mill adds another $15M to expand ECE (though we have not been using this full quantity because of additional supports from DPP and ECARE)
Input
Number of Full-day Kinder Students: 2003-04 (before Mill) Half-Day: 4633 students (70.1%) Full-day: 1974 students (29.9%) Total: 6607
Input Amount of Kindergarten Tuition Collected: $3,579,347
Input Tuition Matrix for 13-14: in appendix
Outcome
Student Performance on Word Analysis in Fall 2013: Of the 6864 students who received a Word Analysis Assessment in the fall of 2013, 2494 (36%) registered 4 or more word tasks correctly (out of 7) which can be considered a proxy for being ‘at grade level’. Another 632 students registered 3 out of 7 tasks correctly (9%)
Outcome Student Performance on Word Analysis in Spring 2014 Of the 7261 students who received a DRA or EDL (English and Spanish reading assessments) in the Spring of 2014, 5117 or 70% were considered at grade level
8
2013-14 Half-Day: 55students (0.7%) Full-day: 7713 students (99.3%) Total: 7768
Textbooks (for 13-14)
Metric Type Metric
Investment Objective: Provide schools funding ($10 per student, K-12) to both replace lost/obsolete textbooks and purchase new curricula that are aligned with unique school community needs
Input Funding: $2.6M
Input
Textbooks Purchases at Top Vendors:
9
COLLEGE BOARD $465,804 CENGAGE LEARNING $354,747 MONDO PUBLISHING $209,142 IAT INTERACTIVE $144,708 MCGRAW-HILL $95,788 TEACHERS CURRICULUM INSTITUTE $92,378 MACKIN EDUCATIONAL RESOURCES $91,256 FILTER PRESS $87,607 BENCHMARK EDUCATION CO $74,499 HOUGHTON MIFFLIN HARCOURT PUBL $56,781 KENDALL HUNT PUBLISHING $53,419
Note: The 2012 Mill Levy also provides funds for textbook investments (~$4M annually). DPS is completing a long-term curricular rollout plan to align with Colorado Academic Standards and intends
to make these purchases centrally, with school input, to minimize costs
Improving Graduation Rates (for 13-14)
10
Metric Type Metric
Investment Objective: Increase Student Graduation Rates through both Concurrent Enrollment Offerings (remedial and 100+ coursework) and other college readiness investments (e.g., school counselors)
Input Funding: $1.6M
Input
Concurrent Enrollment Courses: $690K 7269 (CU Succeed = 1519, Non-CU Succeed Remedial = 2026, Non-CU Succeed 100+ Coursework = 3724; Concurrent Enrollment Courses by School: Highest enrollment rates at CEC Middle College (98%), Contemporary Learning Academy HS (77%), West HS (71%), Montbello HS (61%); Concurrent Enrollment Courses by School: Highest enrollment rates at CEC Middle College (98%), Contemporary Learning Academy HS (77%), West HS (71%), Montbello HS (61%)
Input Provide district wide support for ACT test prep (Princeton Review), AVID, AP/IB programs: $500K
Input
College and career readiness initiatives: $410K - 8th Grade career fair – annual event servicing 4,000 students with over 200 businesses and post secondary
institutions represented - 9th Grade expo – On the campus of CCD, UCD, and Metro servicing 1,100 students - In state and out of state college field trips
- Summer melt program - 15-20 counselors working 20 hours/week in the summer servicing 3,000+ students
Outcome
CE enrollment has increased by 59.6% from 2012/13, with 86% pass rates. The number of ACT tests taken has increased by 6% from 2012/13, and the average score has increased to 19 Our 4-year graduation rate has increased 24 percentage points from 2006 to 63%; this means over 800 more graduates a year
Maintenance (for 13-14)
Metric Type Metric
Investment Objective: Ensure safe and effective learning environments in our schools by focusing on preventative maintenance needs
Input Funding: $636,055
Input
Team composition: The mill supports this 11 person team 6 preventative maintenance technicians, 2 pest management technicians, 1 warehouse buyer, 1 crew chief and 1 supervisor. 2 general laborers funded out general fund (not always focused on preventative maintenance
Input
Preventative Maintenance Areas of Responsibility: Three annual cycles through schools (for more detail, reference appendix): - Cycle 1 (Jan – Apr): HVAC Systems, Cooling Towers and Stage Riggings, HVAC filters - Cycle 2 (May – Aug): Boiler, Water Heaters, Backflow Prevention Device, Continued HVAC, Playground Safety - Cycle 3 (Sept – Dec): Steam Boilers, HVAC filters, Air Compressors, Cooling Tower Shut Down, Overhead
Door and Lunchroom Table Safety
Output Work Task Completion: - Pest Management: 2012-13 – 1026; 2013-14 – 1206 - Preventative Maintenance: 2012-13 – 2900; 2013-14 – 2538
11
Next Steps
12
• April 23rd Mill Report to the BoE
• Will circulate to the committee by Friday with input from today’s discussion
• Focus on programmatic updates and next reporting of scorecards
• May 6th Joint Meeting on Technology with Bond Oversight Committee
• Tentative ECE Site Visit on Wednesday May 20th
Appendix: Kinder Tuition Matrix for 13-14
13
Appendix: Improving Grad Rates – Concurrent Enrollment Participation
14
83.3% 84.1% 85.5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
0
1000
2000
3000
4000
5000
6000
7000
8000
2011-2012 2012-2013 2013-2014
Total Enrolled Courses
Total Passed Courses
Pass Rate
Co
urs
es
Pass
Rat
e
Appendix: Improving Grad Rates – AP Participation and Qualifying Scores
15
As presented Aug 18, 2014. An Advanced Placement score of 3 or higher is consider a qualifying score and equivalent to a college course of “middle C” or above.
Appendix: Improving Grad Rates – Trending ACT Scores
16
Appendix: Preventative Maintenance Areas of Responsibility
17
Cycle One – January through April
HVAC System Preventive Maintenance
Change air filters
Inspect/Replace belts
Lubricate bearings, motors, and
pumps
Exhaust Fan Inspections
Water treatment and testing
Safety Inspections
Gym equipment indoor
Fire extinguisher inspection and
maintenance year round (oversee
contracted services)
Stage Rigging Inspections
Inspect chains, ropes, cables, poles,
and pulleys for safety and operation
Cooling Tower Start up
April 15th thru April 30th
Cycle two – May through August
Annual Boiler Maintenance
Clean and inspect boilers
Preform 12 month and 24 month
maintenance
Clean and inspect low water safety
fuel cut-offs
Lubricate pumps
Water treatment and testing
Water heater maintenance/safety testing
Clean and inspect
Inspect relief valve
Clean combustion chamber
Lubricate pumps
Preform 12 month and 24 month
maintenance
Backflow Prevention Device
Test/Inspection
Test and repair backflow devices
File test report with Denver Water
Burmont valve testing including
battery replacement
HVAC System Preventive Maintenance
Condenser Coil Cleaning
Cooling tower monthly inspection and
water sampling
Filtration change by operations staff
(we fill orders)
Safety Inspections
Playground Equipment Inspections
exterior
Cycle Three – September through
December
Steam Boiler Start Up – September 1st –
September 14th
Start and test fire
Test safeties
Boilers left in standby and ready for
operation
HVAC System Preventive Maintenance
Change air filters
Inspect/Replace belts
Lubricate bearings, motors, and
pumps
Air Compressor Preventive Maintenance
Change oil
Replace air filter
Lubricate motor
Replace toilet paper filter
Inspect belt
Cooling Tower Shut Down
Last week in October or as requested
by HVAC
Safety Inspections
Overhead Door Inspections
Lunchroom Tables Inspections