Page 1: 20110204 alarm management seminar ureason v1 3

Bergen op Zoom Seminar February 2011

Alarm ManagementPrinciples & Guidance

Page 2: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Today’s Seminar

Most of you here have a Plant, DCS system, ESD system Improving the effectiveness of the alarm systems improves overall operation and increases safety

Today’s seminar focuses on a good foundation to achieve this

Page 3: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Agenda

Introduction to UReason

Example Cases

Alarm Management Principals & Guidance

How UReason can help You!

Questions & Discussion

(Every attendee will receive the presentation)

Page 4: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

UReason is …

Anglo-Dutch Company with offices in Leiden and Maidenhead

Delivers real-time applications and solutions in the area of Operational Excellence

Customers in Europe, North-America and Middle-East. Industries: Oil & Gas, (Petro)chemical, Traffic, Energy and Utilities

“We Combine our Expertise and Technology with that of our

customers to improve Operational Excellence”.

Page 5: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Operational Excellence

Operational Advisories:– Sabic– DSM– Remote Surveillance:

• Siemens Power Generation• Vestolit• Shell Global Solutions/NAM

Alarm Management:– BASF– BP– KPE– Siemens Oil & Gas– LyondellBasell– Total E&P– Anglian Water

Simulation:– WaterSpot: DZH/PWN/Waternet

/ABB/DHV/Vitens/TU-Delft

– DISCONTO: PWN/DHV/TU-Delft/Vitens/Dunea/Brabant Water

Active Participant in:

• ANSI/ISA S18.02 Standard• ISA S18.02 TR Development• EEMUA 191 Guideline

Page 6: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Example: Northsea Gas producer

Scope of Supply:- Alarm Management Survey- Philosophy Development- Support Alarm Rationalization- Performance Auditing- Advanced Alarm Management System for Onshore Centralized Control Room

DCS: Foxboro IAA&E Historian: TiPS LogMateAlarm Reporting: OASYS-AMAdvanced Alarm Management: OASYS-AM

Alarm reduction on 4 platforms, Visionary Approach for Centralized Control Room

Alarm reduction on 4 platforms, Visionary Approach for Centralized Control Room

Page 7: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Overview of the reduction realized, varying between 30% – 65%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

300 Board Reduced 600 Board Reduced 800 Board Reduced All Boards

Next generation alarm management

Example: LyondellBasell

Scope of Supply:- Rule Discovery from Historical Data- Alarm Display Replacement- Alarm Predictions in Control Room

Corporate Agreement – Advanced Dynamic Alarm Management

DCS: Emerson DeltaVData: TiPS LogMateEmerson OPCAdvanced Alarm Management: OASYS-AM

Page 8: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Example: Chemical Plant Germany

Proactive 24x7 information on gas leaks

Vision/Smell & Sound Sensors Combined

Operators don’t have to do a 12 hours plant inspection

Important for keeping licence to operate

Operator Advisories

Interfaces: Emerson, ABB, Siemens

Page 9: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Example: Refinery Netherlands

Scope of Supply:

- Alarm & Event Historization- Alarm & Event Reporting- Alarm Awareness Workshops - Alarm Philosophy Development- Master Alarm Database- Alarm MOC

DCS: Honeywell TDC, Foxboro IA, Yokogawa CSHistorian: SQL Server

Page 10: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Example: Refinery Netherlands

Scope of Supply:

- Consultancy - Alarm Awareness Workshops - Alarm Philosophy Development- Setup Master Alarm Database- Vendor Selection

- A&E Historization- A&E Reporting- Master Alarm Database & MOC

DCS: Honeywell TDC, HIMA/MagLog ESD

Page 11: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Siemens – Process Real-Time Historian PIMAQ

SISOG PIMAQ System Embeds OASYS-AM

PIMAQ Examples:- Maersk Al-Shaheen FDP 2000- Maersk Al-Shaheen FDP 2005- Maersk Halfdan- Petrobas FPSO Piranema- Venture Oil FPSO Hummingbird- Statoil Snorre A, Snorre B- ConocoPhillips EldFiks- Hydro Njord A & B

Page 12: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Siemens - PIMAQ

Page 13: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Siemens - PIMAQ

Page 14: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Alarm ManagementPrinciples & Guidance

Page 15: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Just imagine … you drove to this seminar and every 2/3 minutes an alarm went off

Breaks are overheatingLeft front tire pressure is downOil Temperature drifting to High….

And you were also expected to find your way, drive safe-fully, listen to the radio for traffic jams and decide on alternative routes…

Page 16: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

.. our car and our driver

Page 17: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Why Focus on Alarm Management ?

Abnormal conditions cost billions annually:– Loss of equipment and life– Off-spec Product and Lost Production (3-8% per year)– Environmental Excursions and Remediation

Major contributing factors include:– Information Overflow– Poorly Designed Operator Interfaces– Inadequate Alarm Management System

Alarm Management is recognized as a significant plant reliability improvement

Page 18: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

The Alarm System - Definition

The primary function of the alarm system is to warn the operator about a situation that is not normal

Operator’s Response to an alarm = action:

Source EEMUA 191

Page 19: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Some Examples …

Source HSE CRR 166

On 13th May 2002, pilot lights on the flare system at a chemical plant were extinguished. This occurred because there were fluctuations in the gas supply to the flare. A large gas cloud formed but, fortunately, did not ignite. The flare gas came from an installation which was being restarted.The restart process produced 3,700 alarms so, not surprisingly, the operators failed to detect the alarm for the flare.

HSE Briefing Note No. 9

Page 20: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Alarm System Contributes to Stress

Alarm annunciation is the biggest stress factor for operators

EquipmentFailure

Human Errors

Control failure

Picture Source: ASM Consortium

Stress is the main cause for human errors

Human errors are the most frequent cause for incidents and upsets

Human errors are caused by ineffective systems

Next generation alarm management

Page 21: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

How did we get here ?

Old days – hardwired – ‘optimized’ alarm system

(100 Light Fixtures)

DCS systems – Inflation of number of configured alarms per operator station:

0

500

1000

1500

2000

2500

3000

3500

4000

1960 1970 1980 1990 2000

Page 22: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

What Do you Have?

Seminar Attendees:

Question1: How many configured alarms does your plant have?

Question2: How many Operator stations does your plant have?

Question3: Has an HAZOP ever revealed information overload and led to operability improvements?

Page 23: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Unfortunately incidents (re)focus attention

• Esso LongFord• Total BunceField• BP Refinery Texas City• Texaco Refinery Milford Haven

Increased attention leads to regulation and improvements

Page 24: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

An Example - Milford Haven (’94)

On 24th July 1994 there was a major explosion at the oil refinery at Milford Haven jointly owned by Texaco and Gulf. There was plant damage that cost about £48M to repair. There was also two months lost production from the complete plant and four months lost production from the area that was damaged. The plant owners were prosecuted and fined a total of £200,000 plus costs.

Alarm system shortcomings were one major contributor to this incident. There was a lightning strike which caused a significant plant upset. For several hours after the lightning strike the operators were For several hours after the lightning strike the operators were heavily loaded with alarms at a rate estimated to be in excess of 1 heavily loaded with alarms at a rate estimated to be in excess of 1 every 2-3 seconds. During this period several operators failed to every 2-3 seconds. During this period several operators failed to identify the build up of liquid in a knock-out vessel.identify the build up of liquid in a knock-out vessel. This eventually overfilled and resulted in the explosion taking place. A number of instrument faults contributed to the operating confusion. A large number of people (26) sustained minor injuries as a result of the explosion, but fortunately there were no major injuries.

Source HSE CRR 166

Page 25: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

An Example - Milford Haven (’94)

Lesson 1 - Alarm System– The control displays and alarms did not aid operatives– A process overview would have helped diagnosis– The alarms appeared faster than they could be responded to

and key alarms were missed in the flood– 87% of the 2040 alarms displayed as "high" priority, despite

many being informative only - safety critical alarms were not distinguishable from the rest

Lesson 2 - Safety Management System (SMS)SMS failures included:

– The plant modification procedure did not prevent removal of the flare knock-out drum emptying facility

– The instrument maintenance system did not prevent 40% of instruments from being defective

Page 26: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

An Example - Milford Haven (’94)

Lesson 3 - Training and competenceTraining should include:

– Clear guidance on how to manage unplanned events– Clear guidance on when to initiate emergency plant shutdown– Clear authority to initiate shutdown

Lesson 4– Ultimate plant safety must not depend on operator response

Page 27: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Milford Haven Has Led To ?

Recognition of the Alarm Management Problem

Definition of Alarm MetricsEEMUA 191 (1999/2007)

…. and Many Alarm Improvement Programs based on EEMUA 191 Guidelines Be careful with using this picture .. Statistics and Averaging tend to hide real issues

Page 28: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Some EEMUA Metrics

Source EEMUA 191

Page 29: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Some EEMUA Metrics

Source EEMUA 191

Message: Start Measuring Your Alarm System Performance Compare and Take Action

Page 30: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

OKAY …..

We know what to measure and how to compare

We are engineers …

Lets Start !

Using What Framework ?

Page 31: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Don’t start building your house without a good foundation

Foundation:

− Alarm Philosophy (Rules)− Management of Change− Monitoring & Assesment

KPIs + Follow-up

Page 32: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

The SP18 – The Alarm Management Lifecycle

The lifecycle model is useful in identifying the requirements and responsibilities for

implementing an alarm management system.

The lifecycle is applicable for the installation of new alarm

systems or managing an existing system.

Source ISA SP18

Philosophy

Identification

Rationalization

Detailed Design

Implementation

Operation

Maintenance

Monitoring & Assessment

Management of Change

Audit

A

B

C

D

E

F

G

H

I

J

Page 33: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

The Alarm Philosophy

Source ISA SP18

Page 34: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

The Alarm Philosophy

The Alarm Philosophy Document can be a small document. Keep in mind that the purpose is to get common understanding, metrics and rules for MOC

Page 35: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

First Focus On?

When writing an Alarm Philosophy first Focus on:

1. Roles & Responsibilities2. Alarm Prioritization Method3. Key Performance Indicators

Page 36: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Roles & Responsibilities in Alarm Management

Key is to (re)define Roles & Responsibilities related to alarm management activities. An example:

Page 37: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Prevent Information Overflow

Adopt a Single Prioritization Method:

1. Classify the Health, Safety, Environment, Financial & Reputation Consequences

2. Decide what Operator Response Times you use to prioritize• < 3 minutes = Immediate Action• 3 – 10 minutes = Swift Action• 10 minutes > = Take Action

3. Decide levels for Consequences of no Response, f.ex.:• Small - Immediate Action required but Small Consequence = LOW

Priority• Moderate - Immediate Action required but Medium Consequence =

HIGH Priority• High - Immediate Action required but Severe Consequence =

EMERGENCY Priority

Page 38: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Example Matrix

Page 39: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Set Targets

Set Targets for:

• Average Alarm Rate per time period (day/hour/minute) ~ 6 per hour

• Percentage of hours containing more than >= N alarms – 2% = 14 hours per month in flood condition

• Percentage contribution of the top 10 most frequent alarms to the overall alarm load

• Number of standing alarms on any day • Annunciated priority distribution

during alarm flood• Annunciated priority distribution in

steady operation• The top 10 most frequent

disabled/enabled alarms. • The top 10 most frequent inhibited

alarms.

→ ~ 6 per hour

→ 2% = 14 hours per month in flood condition

→ < 5% (otherwise many bad actors)

→ < 5

→ ~5%, 15%, 80% (Emergency, High Low)

→ <1%, 10%, 90% (Emergency, High Low)

→ <1% of total configured alarms

→ < 1% of total configured alarms

Page 40: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Monitor & Take Action

Monitor Weekly/Bi-Weekly/MonthlyFollowed by quick bad-actor mitigation to improve

Actual

Target

Page 41: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Identify & Improve

Bad Actor Mitigation is a quick-win solution (fixes the alarms that are a problem now).

Alarm Performance Monitoring may have identified following Issues:

- Priority Distribution is Off- Too many alarms in stable operation- Too many alarms during and following trips- Large number of disabled alarms

Rationalize: rethink and document your alarms

Page 42: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Document & Rationalize

Choose a fitting Rationalization approach:

1. Unit-by-Unit2. Full-scale

Reduce scope: Only rationalize the alarms that actually triggered during the last 12 months

Document and Rationalize according to your rules in your Alarm Philosophy.

Page 43: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Alarm Rationalization & Documentation

What Alarm Information Should you document:

– Alarm Rationale– Alarm Cause– Alarm Consequences– Alarm Consequential Alarms– Alarm Actions– Alarm Settings– Alarm Priority– Alarm Mode Dependencies

Tools available that help you retrieve current settings and alarm information, store and audit

(and enforce) unrequested changes

ALARM

- Type- Priority- Trip point- Dead band

AlarmConfigurations

CAUSE(S)

CONSEQUENCE(S)

ACTION(S)

AlarmHistorian

Page 44: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

What Do you Have?

Seminar Attendees:

Question 1: Does your plant/site have an Alarm Philosophy?

Question 2: Do you have clear metrics whereby you can measure system performance? .. And do you frequently monitor these?

Question 3: Do you have an alarm historian?

Question 4: Do you store and audit changes on your alarm configuration data?

Page 45: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Where to Start?

HELP … I just experienced an Alarm Management Information Overflow … Where to Start:

1. Alarm Philosophy Document

2. Use Current Systems Improve Procedures:

- Document- Measure- Audit- Take Actions (Weekly/Bi-Weekly)

3. Invest in Alarm Systems:

- Alarm & Event Historization- Master Alarm Configuration Database- Alarm MOC (Electronic)- OASYS-AM

- State Based Alarming/Shelving- Operator Advisories: supporting the non routine situations- Reducing the alarm load- Prevent Alarm Storms with Alarm Predictions

- HMI improvements : sounds and presentation!

Foundation

Document/Measure & Improve

Page 46: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Your Goal ?!

Good Alarm Management Practices:

1. Allow your operator to focus on improving the process instead of responding to the system

2. Result in less stress and reduction of human failure

3. Result in less excursions to the safety and integrity limits of your operations and as a result fewer trips and reduction of downtime

Page 47: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

UReason can help you in the entire Alarm Management Lifecycle:

- Alarm Awareness Workshops- Alarm Philosophy Development- Alarm Rationalization & Documentation- Alarm MOC- Measuring & Improving Alarm Systems Performance- Alarm Management Systems:

- A&E Historian, A&E Reporting, Master Alarm Database, Alarm MOC

- Advanced Alarm Reduction

Page 48: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Thank You for your Attention !!Questions !??

Page 49: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Contact Details:

UReason LeidenPompoenweg 92321DK Leiden071-5281700www.UReason.com

Presenters:Lieven Dubois: [email protected] Jules Oudmans: [email protected]

Page 50: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Future developments

The average age of control room operators is high – knowledge retention is becoming more and more a hot topic

There is a change in workforce:1. Higher educated control room operators staying short

period of time (2/3 yrs in control room)2. Lower educated control room operators requiring

smarter systems helping them

Improved Operational Information (at the fingertips) and Operator Training !

Page 51: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Future developments

ISA S18 is released this will lead to updated OSHA regulations in turn leading to investments in Improved AM procedures, Reporting and Improved Alarm Management systems

New regulations to follow …

Page 52: 20110204 alarm management seminar ureason v1 3

Next generation alarm management

Further reading:

ISA SP18:http://www.isa.org/MSTemplate.cfm?Site=SP18,_Instrument_Signals_and_Alarms

EEMUA 191:

http://www.eemua.co.uk/p_instrumentation.htmHSE CRR 166: ISBN: 0717615154Human Factors & Alarm Management:

http://www.hse.gov.uk/humanfactors/topics/alarm-management.htm