v. 2.0 (5/2/2011) 1 2011 Annual Work Plan for Master Agreement for Timber Operations and Road Management Waste Discharge Requirements Pursuant to the Master Agreement for Timber Operations (MATO) (1600-2010-0114-R1) issued by the Department of Fish and Game (DFG) on May 18, 2010 and Road Management Waste Discharge Requirements (RMDR) (R1-2010-0044) issued by the North Coast Water Quality Control Board (NCWQCB) issued on June 10, 2010 an Annual Work Plan (AWP) is required to be submitted by Green Diamond Resource Co (GDRCo) describing all planned activities for 2011 for enrollment under these permits. The activities proposed under this AWP for sites not related to Timber Harvest Plans include watercourse crossing upgrading in the Hunter Creek, Terwer Creek, Mynot Creek, and Mad River drainages. These projects are being initiated per the Routine Road Maintenance standards under AHCP 6.2.3.9. The detailed site descriptions for all watercourse crossing sites can be found under the Road Work Order on pages 5 through 18 (Mad River) and on pages 87 through 171 (Klamath area). There is a significant amount of upgrading and decommissioning in this Annual Work Plan related to THPs. The sites included are within approved THPs, only. It is anticipated that additional sites will be amended to this Annual Work Plan as “New Site Revisions” as THPs are approved through the season. The detailed descriptions for the operating area south of Bald Hills Road can be found on pages 19 through 86 and the operating area north of Bald Hills Road can be found on pages 172 through 200. Water drafting activities are located in proximity to harvesting activities scheduled for 2011 on the property, specifically Little River, Maple Creek, North Fork Mad River, Ah-Pah Creek, Surpur Creek, Wilson Creek, Dominie Creek, and Rowdy Creek drainages. The notifications for these sites are the same notifications provided in the 2010 Annual Work Plan. Any site not previously included in a valid 1600-permit or the previous Annual Work Plan will be amended to this plan as “New Site Revisions”. The detailed descriptions for all water drafting sites can be found on pages 201 through 209. A monthly water drafting report will be submitted to DFG no later than 30 days after water drafting activities are reviewed and commence on the sites disclosed under this Plan. There are no in-stream restoration projects proposed. Maps and culvert calculations, where applicable, are located prior to the Road Work Orders for each distinct project area or THP. For sites associated with THPs the individual THP maps are included for each referenced plan. The review requirements for wildlife, plants, archaeology and non-fish aquatic vertebrates (refer to Section B and Attachments 1 through 3 of the MATO) are on-going.

Upload: others

Post on 06-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

v. 2.0 (5/2/2011)

1

2011 Annual Work Plan for Master Agreement for Timber Operations and

Road Management Waste Discharge Requirements

Pursuant to the Master Agreement for Timber Operations (MATO) (1600-2010-0114-R1) issued by the Department of Fish and Game (DFG) on May 18, 2010 and Road Management Waste Discharge Requirements (RMDR) (R1-2010-0044) issued by the North Coast Water Quality Control Board (NCWQCB) issued on June 10, 2010 an Annual Work Plan (AWP) is required to be submitted by Green Diamond Resource Co (GDRCo) describing all planned activities for 2011 for enrollment under these permits. The activities proposed under this AWP for sites not related to Timber Harvest Plans include watercourse crossing upgrading in the Hunter Creek, Terwer Creek, Mynot Creek, and Mad River drainages. These projects are being initiated per the Routine Road Maintenance standards under AHCP 6.2.3.9. The detailed site descriptions for all watercourse crossing sites can be found under the Road Work Order on pages 5 through 18 (Mad River) and on pages 87 through 171 (Klamath area). There is a significant amount of upgrading and decommissioning in this Annual Work Plan related to THPs. The sites included are within approved THPs, only. It is anticipated that additional sites will be amended to this Annual Work Plan as “New Site Revisions” as THPs are approved through the season. The detailed descriptions for the operating area south of Bald Hills Road can be found on pages 19 through 86 and the operating area north of Bald Hills Road can be found on pages 172 through 200. Water drafting activities are located in proximity to harvesting activities scheduled for 2011 on the property, specifically Little River, Maple Creek, North Fork Mad River, Ah-Pah Creek, Surpur Creek, Wilson Creek, Dominie Creek, and Rowdy Creek drainages. The notifications for these sites are the same notifications provided in the 2010 Annual Work Plan. Any site not previously included in a valid 1600-permit or the previous Annual Work Plan will be amended to this plan as “New Site Revisions”. The detailed descriptions for all water drafting sites can be found on pages 201 through 209. A monthly water drafting report will be submitted to DFG no later than 30 days after water drafting activities are reviewed and commence on the sites disclosed under this Plan. There are no in-stream restoration projects proposed. Maps and culvert calculations, where applicable, are located prior to the Road Work Orders for each distinct project area or THP. For sites associated with THPs the individual THP maps are included for each referenced plan. The review requirements for wildlife, plants, archaeology and non-fish aquatic vertebrates (refer to Section B and Attachments 1 through 3 of the MATO) are on-going.

v. 2.0 (5/2/2011)

2

To date, wildlife issues have been identified, specifically related to the northern spotted owl, willow fly catcher and marbled murrelet for non-THP projects. No operations will be conducted prior to official notification from GDRCo wildlife staff that seasonal restrictions can be lifted. Please refer to the Road Work Orders for specific species-related restrictions. Botantical surveys are on-going for non-THP projects. There have been no sensitive plant species identified to date. If specific operational restrictions are required for specific sites, then a Site Revision will be sent to DFG prior to the start of operations and CNDDB records submitted for qualifying plant species. No operations will be conducted prior to official notification from the GDRCo botanical staff that all surveys are complete and any mitigation measures are revised for any affected site. Requests for archaeological information related to Non-THP projects were sent to tribal organizations. To date GDRCo has not received any information indicating that Non-THP related projects would potentially affect any archaeological resources. Initial non-fish aquatic vertebrate surveys were completed on all sites included in this AWP. Staff herpetologists are currently reviewing the identified sites. Any mitigation measures performed at identified sites and results will be discussed in the 2011 Annual Work Report to be submitted on March 31, 2011. All sites included in this AWP for THP-related notifications shall follow all wildlife, botanical and archaeological restrictions set forth in the respective THPs. An Annual Report has been submitted to both agencies on March 31, 2011 summarizing the work completed in 2010. As a result of field review of this AWP revisions have been made to the first version submitted on March 1, 2011. A summary of these revisions are included below:

1. Site H400-03: DFG recommended that the proposed culvert size be increased to 48” diameter. The recommendation is included in the revised treatment for this site.

2. Site R32-01: DFG and NCWQCB recommended the option of cleaning the culvert with mitigation measures included to prevent significant sediment delivery from flushing of culvert be included in the proposed treatment. Additionally, NCWQCB recommended the site description be revised to reflect the current culvert diameter of 24”. These recommendations are included in the revised treatment for this site.

3. Site R32-03: DFG recommended that the site description be revised to state the current culvert is 60” in diameter. The recommendation is included in the site description for this site.

4. Site R32-04: DFG recommended that the proposed culvert size be increased to 36” diameter and to install a single-post trash rack. The recommendation is included in the revised treatment for this site.

5. Site T250-01: DFG recommended the outlet of the new culvert be armored. NCWQCB recommended that a Professional Geologist be on-site during installation of new crossing to direct the placement of the outlet. These recommendations are included in the revised treatment for this site.

v. 2.0 (5/2/2011)

3

6. Site T250-02: NCWQCB recommended the adjacent (left) in-board ditchline be rock armored if disturbed during crossing installation. The recommendation is included in the revised treatment for this site.

7. Site U10-26: DFG and NCWQCB recommended that a new site be included in the AWP (U-10-26.1) to install a culvert at the diverted watercourse located adjacent (left) to Site U10-26. This site is included in the New Site Revision submitted on May 2, 2011.

8. Site U430-01: DFG recommended that the proposed new culvert size be increased to 24” diameter. The recommendation is included in the revised treatment for this site.

9. Site U10-21: DFG recommended that excavation of the sediment wedge be limited to the area below the confluence of the main watercourse and a secondary watercourse which enters to the left. Additionally, the headcut will be armored, and extended to the inlet. Any trees removed during sediment wedge excavation will be placed stream-side outside the area of armor. The recommendation is included in the revised treatment for this site.

10. Non-THP Sites (all): All culvert sizes were recalculated for all Non-THP sites as a result of concerns related to passage of bedload and woody debris. Many proposed sizes were increased to account for this concern. No proposed sizes were decreased as a result of the calculations. Please refer to the culvert calculation reports included for each project which are located preceding the Road Work Orders.

Table 1. Fee summary.

Project Type Cost Per Project Total Number of

Projects Total Fee Annual Work Plan $1120.50 1 $1120.50

Class II/III $65.00 135 $8,775.00 Total $9,895.50

All fees have been paid. All correspondence should be directed to the following designated contact person for GDRCo: Jeremy Wright, RPF 2794 AHCP Roads Supervisor P.O Box 68 Korbel, California 95550 Email: [email protected] Office phone: (707) 668-4471 Mobile phone: (707) 498-9852

v. 2.0 (5/2/2011)

4

TABLE OF CONTENTS GDRCo # Date of Inclusion Page Number 4200/4100 Roads (Non-THP) 3/1/2011 5 THP #14-1001 3/1/2011 19 THP #14-1002 3/1/2011 35 THP #24-1002 3/1/2011 38 THP #40-1002 3/1/2011 40 THP #42-1004 3/1/2011 57 THP #45-1010 3/1/2011 71 THP #47-1012 3/1/2011 75 THP #47-1016 3/1/2011 83 H400/H410 Roads (Non-THP) 3/1/2011 87 H500/T900 Roads (Non-THP) 3/1/2011 102 T250/R32/Relim Right Spur Roads (Non-THP) 3/1/2011 115 U10/U430 Roads (Non-THP) 3/1/2011 137 T100 Road (Non-THP) 3/1/2011 152 THP #56-1001 3/1/2011 172 THP #56-1002 3/1/2011 175 THP #71-1001 3/1/2011 182 Water Drafting Sites 3/1/2011 201

DOG

DRY

MAD

SITE

CREEK

BLACK

CREEK

WATEK

CREEK

RIVER

VINCENT

SULLIVAN

LOW

4580

4540

5700

FLAT4250

5620

5750 57

10

4500

4530

4007

4008

40104020

4025

4030

4110

5600

4200 41284120

4200

4000

4040

4125

41454140

4100

4151

4150

4237

4230

4235

4200

5400

5000

XING421

03070

4100

4107

4190

4105

4000

3070

31203100

5850

5800

4200

4090

5600

5000

4230

4100

4100

4120

4200

4100

4100

5000

SWEET!>!>

!>!>

!>

!>

!>

!>!>

!>

!>!>

4100-05

4100-04

4100-02

4200-01

4200-02

4200-03

4200-04

4200-054200-09 4200-10

4200-07

4200-06

417000

417000

417500

417500

418000

418000

418500

418500

419000

419000

419500

419500

420000

420000

4519

500

4519

500

4520

000

4520

000

4520

500

4520

500

4521

000

4521

000

4521

500

4521

500

4522

000

4522

000

4522

500

4522

500

4523

000

4523

000

4523

500

4523

500

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

5

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

5577 491199 4100-02

22.7 0.27 410 860 405 3.27 20.50 30 Rational

5582 491199 4100-04

6.6 0.18 230 570 306 2.28 5.96 24 Rational

5583 491199 4100-05

17.1 0.34 220 850 567 3.74 15.44 30 Rational

21752 491199 4200-01

113.0 110.10 60 WC

21753 491199 4200-03

3.8 0.20 140 700 504 2.12 3.43 18 Rational

21754 491199 4200-04

9.8 0.30 140 770 567 3.24 8.85 24 Rational

21755 491199 4200-06

18.9 0.30 150 700 495 3.41 17.07 30 Rational

21758 491199 4200-09

51.6 0.75 160 950 711 8.56 46.59 42 Rational

21759 491199 4200-10

33.1 0.36 160 740 522 4.13 29.89 36 Rational

Culvert Report

6

CURRENT CONDITION : Class III watercourse crossing. Plastic pipe has become separated, water flows under culvert, outlet shotgunned, high plug potential, undersized, with diversion potential and a connected downcutting ditchline.

TREATMENT : Excavate xing from TOP to BOT install new 36" CMP to AHCP standards. Install 18"DRC 75ft to left

Excavated Volume 4124

Delivery Volume 2728

Disturbed Surface Area 4000

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

RMA

N : 419359

Rock

4100

4100-02

E : 4522599

Powers CreekCalwater Watershed

Legal Description 05.0N 02.0E 04

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.100104

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

7

CURRENT CONDITION : Class III watercourse crossing with a 18" CMP is rusted at inlet. Outlet is completely blocked by root ball and fill from OBF. Sediment accumulates above the inlet. Flow is emerging from OBF; outlet not visible under debris.

TREATMENT : Excavate from TOP to BOT. Remove old CMP. Install new 24" CMP at grade to AHCP standards.

Excavated Volume 360

Delivery Volume 153

Disturbed Surface Area 2236

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

RMA

N : 418863

Rock

4100

4100-04

E : 4522965

Powers CreekCalwater Watershed

Legal Description 06.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.100104

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

8

CURRENT CONDITION : Class II stream crossing with 50% plugged CMP inlet. Shotgun outlet is rusting out with holes.

TREATMENT : Excavate crossing from TOP to BOT. Replace with 36" CMP to AHCP standards.

Excavated Volume 727

Delivery Volume 459

Disturbed Surface Area 1200

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

RMA

N : 418833

Rock

4100

4100-05

E : 4523009

Powers CreekCalwater Watershed

Legal Description 06.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.100104

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

9

CURRENT CONDITION : Class2 xing with a 48" concrete pipe, pipe is seperating at last 4ft section. Outlet is shotgunned and causing OBF erosion.

TREATMENT : Excavate from TOP to BOT, remove old concrete pipe. Install new 60" CMP @ grade to AHCP standards. Install critical dip, rock armor OBF, IBF and side slopes below outlet.

Excavated Volume 355

Delivery Volume 286

Disturbed Surface Area 1297

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 417436

Rock

4200

4200-01

E : 4522009

Powers CreekCalwater Watershed

Legal Description 05.0N 02.0E 05

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.100104

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

10

CURRENT CONDITION : Ditchline blocked/ change in topography causes water to run through road. This has caused a large sink hole in the road.

TREATMENT : Install a 18" CMP DRC at current sinkhole location. Rebuild road prism using rock. Place rock below outlet.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority High

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 417447

Rock

4200

4200-02

E : 4521944

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 05

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

11

CURRENT CONDITION : Class III watercourse crossing has an 18" CMP that is partially plugged at inlet.

TREATMENT : Excavate from TOP to BOT. Remove old CMP. Install new 30" CMP at grade to AHCP standards. Excavate material from ditch and rock ditch.

Excavated Volume 62

Delivery Volume 44

Disturbed Surface Area 200

Erosion Potential High

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 417596

Rock

4200

4200-03

E : 4521389

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 05

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

12

CURRENT CONDITION : Class III watercourse with an 18" CMP. Inlet has been buried in the past and was re-opened with the top torn out to allow more water passage. Outlet is shotgunned with flow at outlet fallling approximately 20' down to the floodplain of Mad River.

TREATMENT : Excavate from TOP to BOT install new 24" CMP to AHCP standards.

Excavated Volume 158

Delivery Volume 115

Disturbed Surface Area 300

Erosion Potential High

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 417606

Rock

4200

4200-04

E : 4521287

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 08

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

13

CURRENT CONDITION : Water from ditch line is flowing through road. Water enters through a 6" hole in IBF. No outlet was visible.

TREATMENT : Install 18" DRC to AHCP standards rock armor below outlet.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 417666

Rock

4200

4200-05

E : 4521057

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 08

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

14

CURRENT CONDITION : Class III watercourse hits ditchline and diverts approximately 120' to an 18" aluminum culvert that has become separated with a sink hole developing in the outboard edge if the road.It should also be noted that below the road within the natural channel are a series of unstable features which make evident the need to continue to divert the watercourse rather than re-place it in its natural channel.

TREATMENT : Excavate from TOP to BOT instal new 36" CMP to AHCP standards. Recut and rockline ditch from natural channel down to CMP inlet.

Excavated Volume 103

Delivery Volume 77

Disturbed Surface Area 853

Erosion Potential Medium

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 418567

Rock

4200

4200-06

E : 4520760

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 09

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

15

CURRENT CONDITION : A DRC, buried at inlet, with long left road ditch. Flow gullies on outboard fill.

TREATMENT : Install 24" DRC to AHCP standards, dig out inlet basin.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority High

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 418593

Rock

4200

4200-07

E : 4520779

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 09

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

False

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

16

CURRENT CONDITION : 24" CMP on Class II watercourse with springs beside inlet providing year round flow. Inlet has high plug potential due to the heavy debris load brought down by a past debris torrent in the channel.A second smaller CMP inlet is burried, and shotgunned outlet is visible stickoug out of the outboard fill at a 45 degree angle from the natural channel alignment. Functioning 24" CMP also has a shotgunned outlet with a past erosional void and evidence of flow under culvert.

TREATMENT : Excavate from TOP to BOT install new 42" CMP @ grade to AHCP standards

Excavated Volume 146

Delivery Volume 86

Disturbed Surface Area 440

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 419294

Rock

4200

4200-09

E : 4520924

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 09

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

17

CURRENT CONDITION : 24" CMP on a Class II watercourse atop a Humboldt crossing. Sediment wedge above inlet, channel agraded above top flag. Inlet of culvert is 80% plugged with sediment and a small hole (approximately 6" wide, 12" deep, and a couple of feet deep) is visible to the left of the inlet. On the outboard edge of the road, in-line with the small hole near the inlet, is a larger sink hole (approximately 3' wide, 4' long and 4' deep). The outlet of the pipe is shotgunned with an approximate 12' drop and no energy dissipaters.

TREATMENT : Excavate from TOP to BOT remove old CMP and wood install new 42" CMP @ grade to AHCP standards.

Excavated Volume 718

Delivery Volume 548

Disturbed Surface Area 2845

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

RMA

N : 419529

Rock

4200

4200-10

E : 4520912

Lower Cannon CreekCalwater Watershed

Legal Description 05.0N 02.0E 09

N/A

2011

No Operations Prior to Wildlife Clearance

Willow Fly Catcher

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300602

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Korbel

18

19

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

12383 141001 01 9.2 0.24 300 630 297 3.21 10.24 24 Rational

12393 141001 08 9.1 0.30 610 810 180 5.04 10.13 24 Rational

Culvert Report

20

CURRENT CONDITION : Class III watercourse crossing with erosional void and flow under culvert.

TREATMENT : Install new 24 inch culvert crossing to THP and FPR standards. Road approach surfaces on the following shall be treated with either: rock, slash, seed and straw mulch, seed and stabilized straw, or seed and slash: (i) all seasonal roads used for hauling in the current year (ii) all seasonal roads used from October 16* to May 14* for purposes other than hauling

Excavated Volume 612

Delivery Volume 439

Disturbed Surface Area 1200

Erosion Potential High

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401274

Native

S1000

01

1-10-113

141001

E : 4501687

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 10

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

21

CURRENT CONDITION : Previously pulled Class III watercourse crossing (1-02-149H). Fill was not pulled to grade and has a sink hole in the bottom of the channel.

TREATMENT : Prior to operations, a temporary watercourse crossing shall be installed. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing The existing crossing shall be abandoned to THP and FRP standards.

Excavated Volume

Delivery Volume

Disturbed Surface Area 1800

Erosion Potential

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401545

Native

S1000spur1

02

1-10-113

141001

E : 4501866

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 10

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

22

CURRENT CONDITION : Humboldt crossing on a Class II watercourse has failed. Some deliverable road fill and debris remain.

TREATMENT : Prior to operations temporary crossing shall be constructed for operational use. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing The existing crossing shall be abandoned to THP and FPR standards.

Excavated Volume 410

Delivery Volume 362

Disturbed Surface Area 2200

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401586

Native

S1000spur1

03

1-10-113

141001

E : 4501903

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 10

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

23

CURRENT CONDITION : Existing Humboldt crossing on a Class III watercourse with sink holes throughout.

TREATMENT : Prior to operations, a temporary watercourse crossing shall be installed. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing. Existing crossing shall be abandoned to THP and FPR standards.

Excavated Volume 733

Delivery Volume 621

Disturbed Surface Area 1800

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401695

Native

S1000spur1

07

1-10-113

141001

E : 4502158

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 10

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

24

CURRENT CONDITION : Failing Humboldt crossing on Class III watercourse.

TREATMENT : Abandon crossing to THP and FPR standards.

Excavated Volume

Delivery Volume

Disturbed Surface Area 1000

Erosion Potential

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401693

Native

S1000spur1

07.1

1-10-113

141001

E : 4502251

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 03

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

25

CURRENT CONDITION : Class III watercourse crossing with a 24 inch CMP and downspout. The culvert is rusted through greater than 25% of the length of the culvert with erosional void under outlet.

TREATMENT : Install new crossing with a 24 inch culvert to THP and FPR standards. Road approach surfaces on the following shall be treated with either: rock, slash, seed and straw mulch, seed and stabilized straw, or seed and slash: (i) all seasonal roads used for hauling in the current year (ii) all seasonal roads used from October 16* to May 14* for purposes other than hauling

Excavated Volume 621

Delivery Volume 494

Disturbed Surface Area

Erosion Potential Medium

AHCP Priority Medium

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401382

Native

S2100

08

1-10-113

141001

E : 4502368

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 03

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

26

CURRENT CONDITION : Class III watercourse crossing with a 36 inch CMP and half-round downspout. Windfall has smashed the downspout and is obstructing the outlet of the culvert.

TREATMENT : The trees shall be removed and the downspout shall either be repaired or replaced with energy dissipater. Road approach surfaces on the following shall be treated with either: rock, slash, seed and straw mulch, seed and stabilized straw, or seed and slash: (i) all seasonal roads used for hauling in the current year (ii) all seasonal roads used from October 16* to May 14* for purposes other than hauling

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 401199

Native

S2100

09

1-10-113

141001

E : 4502691

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 03

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

27

CURRENT CONDITION : Class III watercourse crossing with a 24 inch plastic culvert. The inlet is buried.

TREATMENT : Clean inlet area. Road approach surfaces on the following shall be treated with either: rock, slash, seed and straw mulch, seed and stabilized straw, or seed and slash: (i) all seasonal roads used for hauling in the current year (ii) all seasonal roads used from October 16* to May 14* for purposes other than hauling

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 400419

Native

S2100

10

1-10-113

141001

E : 4502506

Middle Salmon CreekCalwater Watershed

Legal Description 03.0N 01.0W 03

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000604

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

28

CURRENT CONDITION : Old Humboldt crossing on a legacy road with a 12 inch plastic pipe. The inlet of the pipe is currently obstructed. Most water likely flows under the pipe.

TREATMENT : The existing crossing is to be used as is for operations. The existing crossing shall be abandoned to THP and FPR standards.

Excavated Volume 887

Delivery Volume 710

Disturbed Surface Area 1800

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 400022

Native

S2170

13

1-10-113

141001

E : 4502592

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

29

CURRENT CONDITION : Fill crossing on a Class III watercourse.

TREATMENT : Prior to operations, a temporary watercourse crossing shall be installed. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing. Temporary crossing shall be removed prior to the Winter Period.

Excavated Volume 290

Delivery Volume 210

Disturbed Surface Area 1600

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 399899

Native

S2170

14

1-10-113

141001

E : 4502501

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

30

CURRENT CONDITION : Existing fill crossing on a Class III watercourse.

TREATMENT : A temporary crossing shall be installed prior to operations. If water is present at time of operations, a temporary drain pipe of adequate size to transmit flows present shall be installed. Prior to the Winter Period, the crossing shall be abandoned to THP and FPR standards.

Excavated Volume 311

Delivery Volume 203

Disturbed Surface Area 1300

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 399865

Native

S2170

15

1-10-113

141001

E : 4502474

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

31

CURRENT CONDITION : Existing fill crossing on a Class III watercourse.

TREATMENT : A temporary crossing shall be installed prior to operations. If water is present at time of operations, a temporary drain pipe of adequate size to transmit flows present shall be installed. Prior to the Winter Period, the crossing shall be abandoned to THP and FPR standards.

Excavated Volume 189

Delivery Volume 99

Disturbed Surface Area

Erosion Potential Medium

AHCP Priority Medium

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 399795

Native

S2170

16

1-10-113

141001

E : 4502459

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

32

CURRENT CONDITION : Proposed temporary crossing on a Class III watercourse.

TREATMENT : Prior to operations, a temporary watercourse crossing shall be installed. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing. Temporary crossing shall be removed prior to the Winter Period.

Excavated Volume

Delivery Volume

Disturbed Surface Area 200

Erosion Potential

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 399777

Native

S2170

17

1-10-113

141001

E : 4502482

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

False

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

33

CURRENT CONDITION : Failing fill crossing on a Class III watercourse.

TREATMENT : Prior to operations, a temporary crossing shall be installed. If water is present at time of operations, a temporary pipe of adequate size to transmit flows present shall be installed in the crossing. The crossing shall be abandoned prior to the Winter Period.

Excavated Volume 740

Delivery Volume 511

Disturbed Surface Area 1800

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 399641

Native

S2170

18

1-10-113

141001

E : 4502430

Fields LandingCalwater Watershed

Legal Description 03.0N 01.0W 04

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000603

GDRCo Name S2100 '11

Annual Work Plan : Road Work Order Korbel

34

35

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

8531 141002 058 8.7 0.24 920 1320 360 2.98 9.68 24 Rational

Culvert Report

36

CURRENT CONDITION : Ephemeral Class III watercourse was diverted from original channel during past logging activities. Currently, the water flows down an existing skid trail and crosses the existing road. This Watercourse flows subsurface and flows on the surface only during large storm events.

TREATMENT : Install a 24 inch culvert crossing to THP and FPR standards. The TOP of excavation shall be approximately 20 feet above the road and approximately 5 feet deep to capture the flow and to prevent future diversion. The BOT shall extend approximately 60 feet below the road to the existing channel. These TOP and BOT locations shall be flagged in the field prior to operations.

Excavated Volume 83

Delivery Volume 30

Disturbed Surface Area 1000

Erosion Potential Low

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Humboldt Bay

THP

N : 406472

Native

S2541

058

1-10-107

141002

E : 4501368

Lower S. Fork Elk RiverCalwater Watershed

Legal Description 03.0N 01.0E 07

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1110.000302

GDRCo Name McCloud Creek #4

Annual Work Plan : Road Work Order Korbel

37

38

CURRENT CONDITION : Temporary crossing on a Class II watercourse.

TREATMENT : If water is flowing at the time of operations install a spittler or other temporary crossing of sufficient size to conduct flows present to allow equipment and truck passage. Decommission to FPR and THP standards prior to October 16th of the year of use.

Excavated Volume

Delivery Volume

Disturbed Surface Area 1500

Erosion Potential

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Mad River

THP

N : 427158

Native

241002TB1

01

1-10-096

241002

E : 4520243

Upper Cannon CreekCalwater Watershed

Legal Description 05.0N 03.0E 08

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.300603

GDRCo Name Ward RD 4 Pack

Annual Work Plan : Road Work Order Korbel

39

40

Culvert Report THP# Road Pt# Acres Length (miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam (inches)

Method

401002 1 36 0.5 690 5 33 36 Rational 401002 2 23 0.5 690 5 21 30 Rational 401002 3 92 0.6 810 7 92 60 Rational 401002 4 9 0.6 930 6 8 24 Rational 401002 5 17 0.6 770 6 15 30401002 6 14 0.4 510 4 13 24 Rational 401002 7 6 0.2 350 3 5 24 Rational 401002 8 41 0.6 890 6 37 42 Rational 401002 9 17 0.4 520 5 15 30 Rational

41

jwright
Typewritten Text
Rational
jwright
Typewritten Text

CURRENT CONDITION : A Class II watercourse with a 12" CMP has a sediment wedge and an inlet that is completely buried by accumulated sediment. The watercourse has overtopped the road and gullied through the outboard fill, and there has been some past failure of the over steepened fill face as a result. The culvert is short and set high in the fill. There is some water emerging from the base of the fill, where old Humboldt logs emerge.

TREATMENT : Excavate from the flagged bottom to the flagged top, including the sediment wedge at the top and any buried logs. Install a 36" culvert that meets the standards of the FPRs and this THP on grade with drainage disconnect structures on both approaches to hydrologically disconnect the watercourse from the road .

Excavated Volume 1041

Delivery Volume 895

Disturbed Surface Area 3713

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421667

Native

NF1100

01

1-10-094

401002

E : 4528280

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

42

CURRENT CONDITION : A Class II watercourse with a 30" CMP is mostly bypassed through the fill by flow around old Humboldt logs buried below the culvert. The culvert is set high in the fill and shotguns onto the toe of the fillslope when there is enough discharge to actually make it through the culvert. The watercourse makes a sharp angled turn at the inlet.

TREATMENT : Excavate from the flagged bottom to the flagged top, including any sediment accumulated at the top and any buried logs. Install a 30" culvert that meets the standards of the FPRs and this THP on the natural channel grade; OR excavate and remove the existing culvert and install a single 60" culvert for Points 2 & 3 that meets the standards of the FPRs and this THP on the natural channel grade

Excavated Volume 172

Delivery Volume 155

Disturbed Surface Area 986

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421584

Native

NF1100

02

1-10-094

401002

E : 4528375

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

43

CURRENT CONDITION : A partially washed out Humboldt crossing on a Class II watercourse is not passable to vehicles. The channel has not yet cut completely down to grade and the sides remain over steepened.

TREATMENT : Excavate from the flagged bottom to the flagged top, including any sediment accumulated at the top and any buried logs. Install a 60" culvert that meets the standards of the FPRs and this THP on the natural channel grade. This installation may be combined with Point 2 as a single crossing. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 1003

Delivery Volume 403

Disturbed Surface Area 3000

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421573

Native

NF1100

03

1-10-094

401002

E : 4528375

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

44

CURRENT CONDITION : A crossing on a Class III watercourse lacks a drainage structure. Some water runs down the road to an adjacent area of instability approximately 75’ down the road to the left, and some overtops the road and erodes the outboard fill.

TREATMENT : Excavate from flagged bottom to flagged top and install a 24" culvert to that meets the standards of the FPRs and this THP on grade with a critical dip over the left hinge-line of the excavation and armor at the transition point near the inlet to minimize headcutting above. Or: Install a rocked ford that is armored past the transition in grade on the outboard edge of the road. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 21

Delivery Volume 10

Disturbed Surface Area 299

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421566

Native

NF1100

04

1-10-094

401002

E : 4528329

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

45

CURRENT CONDITION : A collapsing Humboldt crossing sits on a Class II watercourse with slumping fill in the middle of the road and a past failure of the outboard fill to the left. Some water goes subsurface at a sediment and debris plug up the channel and emerges below a log at the base of fill. At high flows water appears to overtop and runs uncontrolled over the surface of the road delivering sediment to the watercourse below. It appears that water used to divert to the left but now that the crossing has lowered, diversion is less likely.

TREATMENT : Excavate from the flagged bottom to the flagged top, including the sediment plug at the top and any buried logs. Install a 30" culvert that meets the standards of the FPRs and this THP on grade with a critical dip over the left hinge-line of the excavation. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 1166

Delivery Volume 595

Disturbed Surface Area 2100

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421205

Native

NF1100

05

1-10-094

401002

E : 4528329

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

46

CURRENT CONDITION : A 24" CMP on a Class II watercourse crossing has some rust holes and a separation at the joint which causes water to bypass the downspout below the outlet with some erosion underneath, but only a small erosional void so far. There are suspected Humboldt logs protruding from the base of the fill. Sediment has built up above the inlet due to the shallow culvert gradient.

TREATMENT : Excavate from the flagged bottom to the flagged top, including the sediment built up at the top and any buried logs. Install a 24" culvert that meets the standards of the FPRs and this THP on grade with a critical dip over the left hinge-line of the excavation.

Excavated Volume 277

Delivery Volume 188

Disturbed Surface Area 1300

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 422293

Native

NF1200

06

1-10-094

401002

E : 4528766

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 14

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

47

CURRENT CONDITION : A Class II watercourse diverts down the inboard ditch approximately 75 feet to a ditch relief culvert that is a 24" CMP with a half round downspout that effectively conveys water past the end of the fill, but then dumps it on the hillslope where it gullies back to the watercourse below. There is evidence of overtopping at the crossing that has led to a past failure of the outboard fill with delivery to the watercourse

TREATMENT : Excavate from the flagged bottom to the flagged top. Install a 24" culvert that meets the standards of the FPRs and this THP on grade along the natural alignment of the watercourse with a critical dip over the left hinge-line of the excavation. The existing culvert may be left in place as a ditch relief culvert. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 159

Delivery Volume 402

Disturbed Surface Area 1850

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 422424

Native

NF1202

07

1-10-094

401002

E : 4529107

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 14

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

48

CURRENT CONDITION : A Class II watercourse has a 24" CMP with an extensive sediment wedge accumulated upstream of an inlet that is partially crushed. The culvert appears to be separated at an interior joint and water flows out underneath the culvert, bypassing the half round downspout. There are voids forming in the fill where the culvert has been bypassed and there is additional water emerging from the bottom of the fill, indicating that there may be old Humboldt logs buried below.

TREATMENT : Excavate from the flagged bottom to the flagged top, including the sediment wedge at the top and any buried logs. Install a 42" culvert that meets the standards of the FPRs and this THP on the natural watercourse grade. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 1625

Delivery Volume 632

Disturbed Surface Area 2200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 422404

Native

NF1202

08

1-10-094

401002

E : 4529268

Denman CreekCalwater Watershed

Legal Description 06.0N 02.0E 14

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200001

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

49

CURRENT CONDITION : A Class II watercourse with an 18" CMP has a sediment wedge and an inlet that is completely buried by accumulated sediment. The watercourse is diverted approximately 120’ to the right via the inboard ditch before it gullies across the road and outboard fill. The watercourse has also overtopped the road at the crossing site and there has been some past failure of the over steepened fill face as a result. The culvert is separated and is visible through a collapse hole in the center of the road. It is also short, set high in the fill and has a long half round downspout that is filled with debris from an old failure adjacent to the left. There is water emerging from the bottom of the fill, indicating that there may be old Humboldt logs buried below. TREATMENT : Excavate from the flagged bottom to the flagged top, including the sediment wedge at the top and any buried logs. Install a 30" culvert that meets the standards of the FPRs and this THP on grade with a critical dip over the right hinge-line of the excavation. Install a drainage disconnect structure on the left approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 337

Delivery Volume 188

Disturbed Surface Area 1700

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 422241

Native

NF1200

09

1-10-094

401002

E : 4529159

Denman CreekCalwater Watershed

Legal Description 06.0N 02.0E 14

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200001

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

50

CURRENT CONDITION : A fill crossing on a Class II watercourse has overtopped. Water flows uncontrolled over the surface of the road and gullies through the outboard fill to the channel below.

TREATMENT : If water is flowing at the time of operations install a spittler or other temporary crossing of sufficient size to conduct flows present to allow equipment and truck passage. Excavate from the flagged bottom to the flagged top, including any sediment accumulated at the top and any buried logs. Abandon the crossing to the standards of the FPRs and this THP. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 125

Delivery Volume 53

Disturbed Surface Area 1375

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421532

Native

NF1410 spur

13

1-10-094

401002

E : 4528803

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

51

CURRENT CONDITION : A fill crossing on a Class II watercourse with collapsing outboard fill has a sediment wedge upstream that has caused the watercourse to overtop. Water flows uncontrolled over the surface of the road, mostly diverting to the left, and gullies through the outboard fill before making its way back to the channel.

TREATMENT : If water is flowing at the time of operations install a spittler or other temporary crossing of sufficient size to conduct flows present to allow equipment and truck passage. Excavate from the flagged bottom to the flagged top, including the sediment plug at the top and any buried logs. Abandon the crossing to the standards of the FPRs and this THP. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 376

Delivery Volume 154

Disturbed Surface Area 1450

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421466

Native

NF1410 spur

14

1-10-094

401002

E : 4528847

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

52

CURRENT CONDITION : A partially washed out Humboldt crossing on a Class II watercourse is not passable to vehicles. The channel has not yet cut completely down to grade and the sides remain over steepened.

TREATMENT : Abandon the remaining crossing to the standards of the FPRs and this THP as feasible.

Excavated Volume 308

Delivery Volume 108

Disturbed Surface Area 1600

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421394

Native

NF1410 spur

16

1-10-094

401002

E : 4528914

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

53

CURRENT CONDITION : A collapsing Humboldt crossing sits on a Class II watercourse with sinkholes and slumping fill in the road and outboard fill. Some water goes subsurface at a sediment wedge and emerges below a log at the base of fill. There is direct delivery of sediment to the watercourse below. This site is currently impassable to vehicles.

TREATMENT : If water is flowing at the time of operations install a spittler or other temporary crossing of sufficient size to conduct flows present to allow equipment and truck passage. Excavate from the flagged bottom to the flagged top and abandon the crossing to the standards of the FPRs and this THP. Install drainage disconnect structures on both approaches to hydrologically disconnect the watercourse from the road.

Excavated Volume 427

Delivery Volume 172

Disturbed Surface Area 850

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421582

Native

NF1415

17

1-10-094

401002

E : 4528857

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

54

CURRENT CONDITION : A fill crossing on a Class II watercourse has a sediment wedge and has caused the watercourse to overtop. Water flows uncontrolled over the surface of the road, mostly diverting to the right, and gullies through the outboard fill before making its way back to the channel. The channel is crossed by a legacy skid road approximately 75' downstream which also has diversion potential.

TREATMENT : If water is flowing at the time of operations install a spittler or other temporary crossing of sufficient size to conduct flows present to allow equipment and truck passage. Excavate from the flagged bottom to the flagged top and abandon the crossing to the standards of the FPRs and this THP.

Excavated Volume 150

Delivery Volume 47

Disturbed Surface Area 799

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421496

Native

NF1415

18

1-10-094

401002

E : 4528879

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

55

CURRENT CONDITION : A partially washed out Humboldt crossing on a Class II watercourse is not passable to vehicles. The channel has not yet cut completely down to grade and the sides remain over steepened.

TREATMENT : Abandon the remaining crossing to the standards of the FPRs and this THP as feasible. Install a drainage disconnect structure on the right approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 451

Delivery Volume 149

Disturbed Surface Area 1750

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421371

Native

NF1415

19

1-10-094

401002

E : 4528937

Pollock CreekCalwater Watershed

Legal Description 06.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200003

GDRCo Name NF1200 ‘11

Annual Work Plan : Road Work Order Korbel

56

57

58

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

4867 421004 08 16.0 0.45 1372 1975 542.7 5.26 14.45 30 Rational

4868 421004 09 21.0 0.39 1371 1973 541.8 4.46 18.96 30 Rational

4873 421004 12 15.0 0.41 1400 1959 503.1 4.87 13.55 30 Rational

4875 421004 14 12.0 0.40 1392 1946 498.6 4.75 10.84 24 Rational

4877 421004 15 24.0 0.55 1398 2185 708.3 5.99 21.67 36 Rational

4878 421004 16 23.0 0.51 1384 2184 720 5.45 20.77 30 Rational

Culvert Report

59

CURRENT CONDITION : Site is a fill crossing on a Class III watercourse. The road prism shows signs of slumping at the crossing. No diversion potential exists.

TREATMENT : Excavate the remaining fill from the top to bottom flagging, including large woody debris. Decommission the crossing to THP and FPR standards. Install a waterbar on the right approach to disconnect the surface drainage.

Excavated Volume 223

Delivery Volume 223

Disturbed Surface Area 1400

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 419745

Native

K&K601

01

1-10-105

421004

E : 4535672

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 28

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

60

CURRENT CONDITION : Installation of a new roaded ford across a small Class II watercourse.

TREATMENT : Install a permanent rocked ford at the crossing. Use rock of sufficient size to allow for the passage of water. Minimize channel disturbance to the greatest degree feasible. After use the RPF or designee shall evaluate the need for seasonal removal of ford prior to the winter period.

Excavated Volume

Delivery Volume

Disturbed Surface Area 400

Erosion Potential

AHCP Priority

Excavated materials Soil

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420273

Native

K&K604

05

1-10-105

421004

E : 4537216

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 21

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

False

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

61

CURRENT CONDITION : Site is a decommissioned crossing on a Class II stream. Perched channel banks above the inlet near the large stump show potential to deliver sediment. The steepened bank to the bottom left also shows signs of erosion.

TREATMENT : Install a 30" CMP on channel grade to THP and FPR standards. Pull back the steep banks at the top and bottom of the crossing and apply stabilizing rock armor. Install a hydrologic disconnect on the left approach. Note: The excavation of this site will tie in together with the adjacent crossing (Site 9). The installation of culverts at both sites will require their outlets aligned with the single channel below.

Excavated Volume 0

Delivery Volume 0

Disturbed Surface Area 2100

Erosion Potential Low

AHCP Priority Low

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420709

Native

K&K605

08

1-10-105

421004

E : 4537638

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

62

CURRENT CONDITION : Site is a fill crossing on a Class III watercourse. Two channels merge above the top flagging at a bedrock outcrop. The fillslope has failed, exposing large rock and possible Humboldt logs. A swale 120’ to right (Site 10) contributes road surface flow to the outboard road edge of this site.

TREATMENT : Excavate from top to bottom flagging, removing all Humboldt logs and woody debris. Install a 30" CMP on grade to THP and FPR standards. Install a hydrologic disconnect on the right approach and apply energy dissipating rock below the outlet. Apply rock armor where necessary to stabilize the stream banks and fill slope. Note: The excavation of this site will tie in together with the adjacent crossing (Site 8). The installation of culverts at both sites will require their outlets aligned with the single channel below.

Excavated Volume 311

Delivery Volume 126

Disturbed Surface Area 800

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420715

Native

K&K605

09

1-10-105

421004

E : 4537650

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

63

CURRENT CONDITION : Site is a fill crossing on a Class III watercourse. Sink holes have formed at the inboard road edge with flow crossing the road surface and gullying the fill slope. Additional flow emerges from under Humboldt logs at the bottom flagging. Intermittent cracks exist in the road prism for 100’ to the left approach. No diversion potential exists.

TREATMENT : Excavate from top to bottom flagging, removing large woody debris. Install a 30” CMP on grade to THP and FPR standards. Repair the road prism to the left approach and install a hydrologic disconnect on both the left and right approaches. Apply rip-rap at head cut and culvert outlet if needed for grade control.

Excavated Volume 666

Delivery Volume 434

Disturbed Surface Area 3200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420626

Native

K&K605

12

1-10-105

421004

E : 4537886

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

64

CURRENT CONDITION : Site is a fill crossing on a Class III watercourse. Heavy tractor activity in the past has fractured the watercourse into multiple channels upslope. The channel at right is well defined upslope and cuts askew across the road. A cutbank seep 150’ to the right approach runs down the road surface, combining with the right channel in a gully down the fillslope. The center channel is swale-like and not well defined upslope. Surface runoff from two skid trails 100’ to the left combine with the center channel, forming large sink holes in the road prism. The combined flow enters a second fillslope gully on the left hinge line.

TREATMENT : Excavate the entire crossing between both top flags down to the bottom flagging, removing all large woody debris. Install a 24” CMP on grade to THP and FPR standards. Apply rip-rap at head cut and at culvert outlet if needed for grade control. Install a hydrologic disconnect on the left approach as feasible with new spur road. Install outsloped rocked dip or ditch at the right approach within 100-150 feet to disconnect runoff from seep and entrenched skid trail.

Excavated Volume 648

Delivery Volume 384

Disturbed Surface Area 3800

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420666

Native

K&K605

14

1-10-105

421004

E : 4537991

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

65

CURRENT CONDITION : Site is a Humboldt crossing on a Class II watercourse. The crossing is 90% failed with the inboard road edge remaining intact. Woody debris and sediment fill the upper channel leading to a Humboldt skid crossing at the top flagging.

TREATMENT : Excavate from the top to bottom flagging,also removing the Humboldt skid crossing upslope and any remaining fill and woody debris plugging the channel. Install a 36” CMP on grade to THP and FPR standards. Apply rip-rap at head cut and at culvert outlet if needed for grade control. Install a hydrologic disconnect on the left approach.

Excavated Volume 1406

Delivery Volume 658

Disturbed Surface Area 4600

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420715

Native

K&K605

15

1-10-105

421004

E : 4538102

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

66

CURRENT CONDITION : Site is a Humboldt crossing on a Class III watercourse. The upper channel is filled in and has collapsed holes to the top flag, where the channel is clearly defined. Hillslope runoff collects on the left approach and combines with the watercourse, gullying across the road and down the fillslope. Flow emerges from Humboldt logs at the bottom flagging.

TREATMENT : Excavate from top to bottom flagging, removing the large woody debris. Install a 30” CMP on grade to THP and FPR standards. Apply rip-rap to head cut and to culvert outlet if needed for grade control. Install a critical dip on the right hinge and a hydrologic disconnect on the left approach.

Excavated Volume 931

Delivery Volume 931

Disturbed Surface Area 3200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420723

Native

K&K605

16

1-10-105

421004

E : 4538170

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

67

CURRENT CONDITION : Site is a failed Humboldt crossing on a Class II perennial stream. The remaining banks are steep with perched fill likely to fail. Large woody debris chokes the channel.

TREATMENT : Excavate the remaining fill from the top to bottom flagging, including large woody debris. Decommission the crossing to THP and FPR standards. If feasible, install a waterbar on the right approach to disconnect the surface drainage.

Excavated Volume 421

Delivery Volume 288

Disturbed Surface Area 3200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 420730

Native

K&K605

17

1-10-105

421004

E : 4538212

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

68

CURRENT CONDITION : Class II perennial watercourse with a 24” plastic pipe set high in the fill. The outlet is short in the fill with a half-round shotgun downspout, perched 15’ high on a Humboldt log. An erosional void under the downspout is beginning to undermine the culvert. A swale 140’ to the right contributes ditchline flow to the watercourse.

TREATMENT : Remove plastic downspout from outlet of culvert. Remove imbedded logs and woody chunks in fill at the culvert outlet. Excavate the existing fill slope below the pipe to a stable grade. Rebuild the fill slope using heavy rock from the culvert outlet to the bottom of the fill slope. Position rock armoring to act as dissipater for outlet. Place additional rock in plunge pool at bottom of fill slope. Install an 18” DRC with a full-round downspout at the swale 140’ up the right approach to function as a hydrologic disconnect to Class II. watercourse.

Excavated Volume 410

Delivery Volume 270

Disturbed Surface Area 350

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421070

Admin.Rock

CR3000

19

1-10-105

421004

E : 4538029

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

69

CURRENT CONDITION : Site of an abandoned crossing on a Class III watercourse. The site receives flow from a crossing on the CR3000, 130’ up channel.

TREATMENT : Install a 24" CMP on grade to THP and FPR standards. Install a hydrologic disconnect on the right ditch line.

Excavated Volume 0

Delivery Volume

Disturbed Surface Area 1400

Erosion Potential

AHCP Priority Low

Excavated materials Soil

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

North Fork Mad River

THP

N : 421025

Native

K&K CR3000 tie

21

1-10-105

421004

E : 4537948

Canyon CreekCalwater Watershed

Legal Description 07.0N 02.0E 15

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

False

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1109.200005

GDRCo Name K&K 601/605

Annual Work Plan : Road Work Order Korbel

70

71

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

6865 451010 01 23.4 0.47 1800 2310 459 5.90 20.64 30 Rational

Culvert Report

72

CURRENT CONDITION : Previously pulled crossing on a Class II watercourse.

TREATMENT : Install new 30 inch culvert crossing to THP and FPR standards. Culvert shall be set at the natural stream grade

Excavated Volume

Delivery Volume

Disturbed Surface Area 200

Erosion Potential

AHCP Priority

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 417737

Native

CR2810

01

1-10-100

451010

E : 4549513

Maple CreekCalwater Watershed

Legal Description 08.0N 02.0E 08

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100003

GDRCo Name CR2800 Rock Pit

Annual Work Plan : Road Work Order Korbel

73

CURRENT CONDITION : Temporary road crosses Class II watercourse and needs crossing at this point.

TREATMENT : Install a temporary crossing sufficient to conduct flows at the time of operations. Abandon the crossing as per the standards of the FPRs and this THP.

Excavated Volume

Delivery Volume

Disturbed Surface Area 500

Erosion Potential

AHCP Priority NAP

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 417768

Native

CR2811TempA

05

1-10-100

451010

E : 4549145

Maple CreekCalwater Watershed

Legal Description 08.0N 02.0E 08

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100003

GDRCo Name CR2800 Rock Pit

Annual Work Plan : Road Work Order Korbel

74

75

CURRENT CONDITION : A previously pulled Class III watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409439

Native

BL2411

01

1-10-098

471012

E : 4554811

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 28

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

76

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 18-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409155

Native

BL2205

02

1-10-098

471012

E : 4553630

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 32

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

77

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409171

Native

BL2205

03

1-10-098

471012

E : 4553619

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 32

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

78

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409355

Native

BL2205

04

1-10-098

471012

E : 4553632

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 32

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

79

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409404

Native

BL2205

05

1-10-098

471012

E : 4553618

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 33

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

80

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409486

Native

BL2205

06

1-10-098

471012

E : 4553609

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 33

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

81

CURRENT CONDITION : A previously pulled Class II watercourse crossing.

TREATMENT : Install temporary crossing. If water is present during operations, a Spittler-type crossing may be installed or a temporary pipe of adequate size to transmit flows shall be installed (minimum 6-inch diameter). Abandon crossing as per the timing stated above. See item 18 for soil stabilization specifications.

Excavated Volume

Delivery Volume

Disturbed Surface Area

Erosion Potential

AHCP Priority NAP

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 409597

Native

BL2205

09

1-10-098

471012

E : 4553238

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 33

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2210 '12

Annual Work Plan : Road Work Order Korbel

82

83

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

38172 471016 02 7.0 0.20 1710 1980 243 2.81 6.17 24 Rational

38174 471016 03 13.0 0.30 1720 2090 333 3.98 11.47 24 Rational

Culvert Report

84

CURRENT CONDITION : Class II watercourse with Humboldt crossing on old legacy road.

TREATMENT : Install 24 inch culvert crossing to THP and FPR standards.rock armor will be installed at the head of the watercourse channel following channel excavation.

Excavated Volume 373

Delivery Volume 52

Disturbed Surface Area 1700

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 414902

Native

BL2900spur

02

1-10-111

471016

E : 4553303

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 36

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2900 '12

Annual Work Plan : Road Work Order Korbel

85

CURRENT CONDITION : A Class III watercourse diverts down legacy road at a fill crossing to the adjacent crossing site to the right.

TREATMENT : Install 24 inch culvert crossing to THP and FPR standards.

Excavated Volume 66

Delivery Volume 21

Disturbed Surface Area 800

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Lagoons

THP

N : 414939

Native

BL2900spur

03

1-10-111

471016

E : 4553308

Pitcher CreekCalwater Watershed

Legal Description 09.0N 01.0E 36

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1108.100001

GDRCo Name BL2900 '12

Annual Work Plan : Road Work Order Korbel

86

CREEK

HUNTER

H400

H510

H305

H160

H161

H400

H310

H310

H300

H300

H300

H300

H330H330

H200

H200

H210

H220

H200H255

W100

H260

W300

H410

H500

H510

H510H400

H400

H480

H400

H420 H410

H400

H300

H340

H289

H200E

!>!>!> !>!> !>!>

!>

!>!>!>

!>!>

H400-05

H400-04H410-02

H410-01

H400-02

H400-03H400-01

H400-05.1

H400-04.1

H400-03.2

H400-02.1

H400-03.1

H400-01.1

412000

412000

412500

412500

413000

413000

413500

413500

414000

414000

414500

414500

415000

415000

4607

500

4607

500

4608

000

4608

000

4608

500

4608

500

4609

000

4609

000

4609

500

4609

500

4610

000

4610

000

4610

500

4610

500

4611

000

4611

000

4611

500

4611

500

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

87

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

21770 991199 H400-01

43.0 0.60 830 1620 711 6.61 50.57 48 Rational

38445 991199 H400-01.1

20.0 0.57 830 1630 720 6.20 23.52 36 Rational

21768 991199 H400-02

43.0 0.75 860 1760 810 8.14 50.57 48 Rational

38446 991199 H400-02.1

45.0 0.75 862 1773 819.9 8.10 52.92 48 Rational

21533 991199 H400-03

33.0 0.64 950 1760 729 7.06 38.81 42 Rational

38447 991199 H400-03.1

152.0 183.12 84 WC

38481 991199 H400-03.2

11.0 0.26 1170 1530 324 3.41 12.94 30 Rational

21532 991199 H400-04

26.5 0.58 1190 1710 468 7.47 31.16 36 Rational

38483 991199 H400-04.1

4.8 0.19 1210 1460 225 2.73 5.64 24 Rational

38448 991199 H400-05

88.0 113.82 60 WC

38484 991199 H400-05.1

1.6 0.14 1240 1440 180 2.09 1.94 18 Rational

21678 991199 H410-01

44.0 0.77 830 1760 837 8.28 51.74 48 Rational

21679 991199 H410-02

41.0 0.85 800 1760 864 9.17 48.22 48 Rational

Culvert Report

88

CURRENT CONDITION : Class II watercourse with a 36” CMP high in fill. The inlet is set to left of the channel center profile, adjacent to a 24" CMP on a smaller Class II watercourse (site 01.1). Both watercourses combine at the BOT flagging. The 36" CMP is separated 10’ from outlet and is rusted though <25%.

TREATMENT : Excavate from both TOP flags (left and right) to the shared BOT flag. Install a 48” CMP on right watercourse and a 36” CMP on the left watercourse, both on grade and to AHCP specs. Align the culverts inlet with their channel center profile and direct the outlets toward the BOT. Armor inboard and outboard fill slopes and install a critical dip. Install an 18” DRC 75’ up the left approach and add energy dissipating rock or downspout as necessary. Right approach low gradient and short distance and has no need for a DRC.

Excavated Volume 399

Delivery Volume 318

Disturbed Surface Area 1681

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413736

Rock

H400

H400-01

E : 4609731

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

89

CURRENT CONDITION : Class II watercourse with a 24” CMP completely rusted through and slightly crushed. This culvert is adjacent to a 36" CMP set askew for a larger Class II watercourse right (site 01). Both watercourses combine at the BOT flagging.

TREATMENT : Excavate from both TOP flags (left and right) to the shared BOT flag. Install a 36” CMP on the left watercourse and a 48” CMP on right watercourse, both on grade and to AHCP specs. Align the culvert inlets with their channel center profiles and direct the outlets toward the BOT. Place energy diffusing rock below the outlets. Armor inboard and outboard fill slopes and install a critical dip. Install an 18” DRC 75’ up the left approach and add energy dissipating rock or downspout as necessary. Right approach low gradient and short distance and has no need for a DRC

Excavated Volume 182

Delivery Volume 173

Disturbed Surface Area 1158

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413723

Rock

H400

H400-01.1

E : 4609734

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

90

CURRENT CONDITION : 30” CMP on a Class II watercourse. Flow currently diverted by a skid road ~100’ above (site 02.1) going subsurface and passing under the H400 and H410, emerging again at the BOT of Site H410-01. At peak flow, the water course re-enters the natural channel via a gullied channel at left. The CMP is rusted through >25% and disconnected at the OBR. The OBF has failed completely with LWD throughout the failed fill. BOT flag for this site is the TOP flag for site H410-01.

TREATMENT : Excavate from TOP to BOT flagging, removing all LWD. Install a 48” CMP on grade to AHCP specs. Re-build the road prism with a critical dip on the right hingeline. Armor the fillslopes and place energy diffusing rock below the outlet. Install DRC’s on the left and right approaches. Install a second DRC on the H310 to break the ditchline.

Excavated Volume 1271

Delivery Volume 1081

Disturbed Surface Area 3572

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413647

Rock

H400

H400-02

E : 4609795

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

91

CURRENT CONDITION : Fill/ Humboldt crossing on a Class II watercourse located on an old skid road ~100’ above site H400-02. The watercourse diverts down the left approach at an elbow in the road having no headwall. At time of visit, flow enters a sink hole 40’ down the left approach and goes sub-surface, passing under the H400 and H410 then emerging at the BOT of Site H410-01.Note: BOT flag is the TOP flag for site H400-02.

TREATMENT : Pull crossing to AHCP specs. Excavate from TOP to BOT flagging with a 4’ wide channel bed. Pull back channel banks to stable gradient. Install cross drains on the right approach to the hydrologic divide. Armor the channel banks and headcut where necessary to stabilize.

Excavated Volume 451

Delivery Volume 141

Disturbed Surface Area 4107

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413622

Rock

H400

H400-02.1

E : 4609762

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

92

CURRENT CONDITION : Class II watercourse with a 30” CMP not to grade. Outlet is rusted through and separating causing erosion of OBF. Large Humboldt logs placed throughout fill. Part of the left bank above the inlet has slumped off with a large stump; potential to cause blockage of inlet in future.

TREATMENT : Excavate from TOP to BOT including slump on left bank above the inlet and large logs in fill. Install a new 48” CMP to AHCP specs on grade. Armor IBF, OBF, inlet, and below outlet. Install critical dip on the right hinge line.Install an 18” CRC 75’ to left of crossing as a hydro disconnect. Install single-post trash rack 48" on center from the inlet of the culvert.

Excavated Volume 1484

Delivery Volume 1213

Disturbed Surface Area 4036

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413433

Rock

H400

H400-03

E : 4609789

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

93

CURRENT CONDITION : A large class II crossing with a 48” CMP. Pipe is separated and 80%plugged 10’ from inlet. Outlet is rusted through and partially separated. Pipe is installed at grade.

TREATMENT : Excavate from TOP to BOT. Remove old pipe and any wood. Install a new 84” CMP (~80 length) on grade (~10%) to AHCP specs. Install and 18” DRC 75’ to right of crossing as hydro disconnect. Road is out sloped to left of crossing but a ditch and 18” DRC may need to be installed 45’ to the left of the crossing to capture runoff from rock pit. Install a critical dip.

Excavated Volume 1286

Delivery Volume 1092

Disturbed Surface Area 2991

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413166

Rock

H400

H400-03.1

E : 4609752

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 03

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

94

CURRENT CONDITION : Class III water course crossing with an 18"CMP pipe is rusted through at inlet and outlet is ripped. Water diverts underground through old Humboldt above inlet, water reenters channel approx. 100' downstream. Large sediment wedge above inlet, pipe acts as overflow for Humboldt. Through cut to left of crossing no place to install DRC.

TREATMENT : Excavate from TOP to BOT removing sediment wedge and old skid road Humboldt crossing above inlet. Install new 24"CMP to AHCP standards. Rock line channel from top to inlet, install critical dip.

Excavated Volume 398

Delivery Volume 344

Disturbed Surface Area 2205

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 412934

Rock

H400

H400-03.2

E : 4609904

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 03

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

95

CURRENT CONDITION : Class II watercourse crossing with a rusted through 24” CMP sitting on top of a Humboldt crossing. Large sediment wedge above inlet. Flow goes through sink hole 20’ above inlet. Outlet is rusted through and has eroded base of OBF.

TREATMENT : Excavate from TOP to BOT, removing sediment wedge, CMP, and Humboldt logs. Install a new 42” CMP at grade to AHCP specs (~80' at 14%). Armor the IBF, OBF, and channel from TOP to inlet. Lower road height over crossing to reduce fill volume and create a critical dip. Install an 18” DRC to left of crossing as hydro disconnect.

Excavated Volume 1586

Delivery Volume 1362

Disturbed Surface Area 4261

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 412820

Rock

H400

H400-04

E : 4610086

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 03

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

96

CURRENT CONDITION : Class III water course with a rusted through 18"CMP. Inlet is sitting 6" above ponded water from large seep. Water is flowing through road during normal flows. OBF has sink holes and evidence of past diversion. Outlet is high in fill and eroding OBF.

TREATMENT : Excavate from TOP to BOT removing old CMP and wood, install new 24” CMP @grade to AHCP standards. Install 18” DRC 75’ to left of crossing.

Excavated Volume 190

Delivery Volume 125

Disturbed Surface Area 1109

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 412800

Rock

H400

H400-04.1

E : 4610133

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 03

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

97

CURRENT CONDITION : Class II watercourse crossing with a completely buried inlet. The inboard fill has failed and plugged the inlet 100%. Flow goes subsurface and re-emerges 100’ below the outlet. The 36” CMP looks to be separated in the center of the fill.

TREATMENT : Excavate from TOP to BOT, removing logs, fill and old CMP. Install a new 60” CMP on grade to AHCP specs (~130' at 16%). Armor the IBF, OBF, and transition from TOP to inlet. Lower road height to create a dip over the crossing and reduce the fill volume. No DRC’s needed; short ditch line.

Excavated Volume 3528

Delivery Volume 3137

Disturbed Surface Area 6204

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 412650

Rock

H400

H400-05

E : 4610280

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

98

CURRENT CONDITION : Class III water course crossing with an 18"CMP rusted out partially crushed inlet. Water is ponding above inlet with evidence of past diversion. Pipe is set to right of natural channel 3 ft.

TREATMENT : Excavate from TOP to BOT removing old CMP and wood, install new 24”CMP @grade to AHCP standards. Armor head cut and Inlet basin. Install critical dip, armor ditch for 10' to left to catch seeps.

Excavated Volume 227

Delivery Volume 156

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 412640

Rock

H400

H400-05.1

E : 4610325

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

99

CURRENT CONDITION : Class II watercourse with a 24” CMP completely rusted through. Flow goes sub-surface ~200’ above at Site H400-02.1 and emerges at the toe of the OBF below.The last 20’ section of pipe is completely separated and on its back in the remnants of failed outboard fill. The outlet of an older 24” CMP was found 50’ below at the toe of the failed fill.The failed fill material is benched behind a cluster of Alders with potential to deliver. The remnants of a failed Humboldt skid crossing exist just below at the BOT flagging.

TREATMENT : Excavate from TOP to BOT flagging, removing old CMP’s, woody debris, failed fill, and remnant Humboldt skid crossing at BOT flag. Access BOT from skid road right. Potentially spoil the failed fill by grading into old skid road if possible. Re-establish the upper channel from the inlet to the bottom of Site H400-02 above and armor the left channel bank where necessary to reduce diversion potential. Install a 48” CMP (~80’ length) on grade to AHCP specs. Armor the fill slopes and place energy diffusing rock below the outlet. Install an 18” DRC ~75’ to the right approach and add energy dissipating rock or downspout as needed. . Install critical dip on the left hingeline.

Excavated Volume 1030

Delivery Volume 804

Disturbed Surface Area 3565

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413673

Native

h410

H410-01

E : 4609819

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

100

CURRENT CONDITION : Humboldt crossing on a Class II watercourse. IBF is steep and unstable. A 30” CMP set high in the fill (12’ above channel) serves as an over flow. At time of visit, flow enters a hole at the base of IBF and exists from under Humboldt logs near the toe of the OBF. Many logs extending out of the fill and lower channel choked with woody debris.

TREATMENT : Excavate from TOP to BOT flagging, removing all LWD. Install a 48” CMP (~70’ length) on grade to AHCP specs. Re-build the road prism with a lower fill depth and armor the fill slopes. Install 18” DRC’s on the left and right approach and add energy dissipating rock or downspout as needed.

Excavated Volume 1295

Delivery Volume 1072

Disturbed Surface Area 3377

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 413651

Native

H410

H410-02

E : 4610012

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 02

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

101

CREEK

TERWER

TERWER

T10

H571

H570

H570

H570

H585

H580

H560

H500

H500

H500H550

H540

T-700

T-932

T-900

!>

!>

!>

!>!>!>!>!>

!>!>

!> 0908

0710

1112

13

14

10.3

10.210.1

417000

417000

417500

417500

418000

418000

418500

418500

419000

419000

419500

419500

420000

420000 4606

000

4606

500

4606

500

4607

000

4607

000

4607

500

4607

500

4608

000

4608

000

4608

500

4608

500

4609

000

4609

000

4609

500

4609

500

4610

000

4610

000

4610

500

4610

500

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

102

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

20313 991199 07 26.0 0.46 1400 2250 765 4.73 30.58 36 Rational

20494 991199 08 17.0 0.42 1390 2130 666 4.49 19.99 30 Rational

22480 991199 09 13.0 0.37 1460 2080 558 4.15 15.29 30 Rational

22482 991199 10 6.0 0.30 1610 2210 540 3.30 7.06 24 Rational

38216 991199 10.1 5.0 0.20 1650 2180 477 2.17 5.88 24 Rational

38217 991199 10.2 7.0 0.23 1620 2180 504 2.49 8.23 24 Rational

38218 991199 10.3 6.0 0.30 1610 2210 540 3.30 7.06 24 Rational

22483 991199 11 6.0 0.27 1660 2210 495 3.02 7.06 24 Rational

20413 991199 12 9.0 0.32 1960 2310 315 4.38 10.58 24 Rational

20568 991199 13 21.0 0.28 2130 2780 585 2.96 24.70 36 Rational

20567 991199 14 17.0 0.31 2100 2790 621 3.25 19.99 30 Rational

Culvert Report

103

CURRENT CONDITION : Class II watercourse is diverting to left about 100' down ditchline. Flows exceeded ditch capacity and crossed the road causing a slump in outboard fill. Install a 36" CMP place at bot of fill

TREATMENT : Install AHCP crossing with a 36" culvert.

Excavated Volume 448

Delivery Volume 388

Disturbed Surface Area 1200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 417383

Rock

H500

07

N/A

N/A

E : 4610043

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

104

CURRENT CONDITION : A Class II stream has an 18" CMP that is misaligned. The culvert and downspout are rusted out with on-going erosion under the culvert.

TREATMENT : Excavate from flagged bottom to flagged top, including any buried logs. Install a 24" culvert to AHCP standards.

Excavated Volume 105

Delivery Volume 105

Disturbed Surface Area 775

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 417935

Rock

H500

08

N/A

N/A

E : 4610110

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

105

CURRENT CONDITION : A 24" CMP on a Class II watercourse is rusted out more than 25% of total length and eroding the outboard fill, causing outboard fill failure. There is diversion potential to right.

TREATMENT : Excavate from flagged bottom to flagged top. Install a 30" culvert to AHCP standards with a critical dip over the right hinge-line of the excavation.

Excavated Volume 81

Delivery Volume 58

Disturbed Surface Area 700

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 418188

Rock

H500

09

N/A

N/A

E : 4610183

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

106

CURRENT CONDITION : A near origin Class III watercourse crossing has a 24" CMP. The inlet is set 10' to the left of the center line of profile. The pipe is rusting out. The outlet is set high in the fill with a gully under the downspout.

TREATMENT : Install new 24" culvert to AHCP standards.

Excavated Volume 346

Delivery Volume 307

Disturbed Surface Area 1390

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 418045

Rock

H500

10

N/A

N/A

E : 4609893

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

107

CURRENT CONDITION : Fill crossing on Class III watercourse diverts right down inboard ditch to the adjacent crossing.

TREATMENT : Install 24 inch culvert crossing to AHCP standards.

Excavated Volume 89

Delivery Volume 42

Disturbed Surface Area 1000

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 417985

Rock

H500

10.1

N/A

N/A

E : 4609805

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

108

CURRENT CONDITION : Class III watercourse crossing lack a drainage stucture.

TREATMENT : Install 24 inch culvert crossing to AHCP standards.

Excavated Volume 115

Delivery Volume 73

Disturbed Surface Area 1000

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 417984

Rock

H500

10.2

N/A

N/A

E : 4609840

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

109

CURRENT CONDITION : Class III watercourse and seeps from past slide lack a drainage structure

TREATMENT : Install 24 inch culvert crossing to AHCP standards.

Excavated Volume 95

Delivery Volume 65

Disturbed Surface Area 1000

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 418023

Rock

H500

10.3

N/A

N/A

E : 4609869

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

110

CURRENT CONDITION : Class II with an 18" CMP, damaged inlet, more than 25% rusted through the total length, potential blockage of culvert and evidence of past diversion. This culvert appears to be undersized. Watercourse carries heavy bedload during high flow. Flow under culvert with a recent debris torrent below outlet running down and onto the lower road causing failure of that crossing. Site also has an outboard berm.

TREATMENT : Replace existing crossing with a 24" culvert to AHCP standards.

Excavated Volume 156

Delivery Volume 118

Disturbed Surface Area 780

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 418036

Rock

H500

11

N/A

N/A

E : 4609836

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 06

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

111

CURRENT CONDITION : Class III watercourse crossing has a 24" CMP installed. The inlet has a wooden trash rack with sediment backed up to the top of the inlet. There is a 3' drop to the inlet from the trash rack. Boards from trash rack are beginning to weaken and could plug the pipe. The inlet has advanced rust. The outlet is set near the base of fill. Sediment at trash rack qualifies as debris within one culvert diameter of inlet that could cause blockage. A rust line that is >50% at the outlet indicates that the culvert is undersized. The channel is head-cutting at low gradient just below the outlet.

TREATMENT : Excavate from top to bottom flags and install 36" culvert to AHCP standards.

Excavated Volume 389

Delivery Volume 222

Disturbed Surface Area 12500

Erosion Potential Medium

AHCP Priority NAP

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 418414

Rock

H500

12

N/A

N/A

E : 4609630

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 05

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

112

CURRENT CONDITION : A 24" CMP with a rusty bottom, drains a Class II spring and probable headwall swale. There is potential unique amphibian habitat above. The outlet was 90% plugged, partly cleared by hand, but large rocks remain in interior. Culvert gradient not steep enough.

TREATMENT : Replace crosing with a 36" culvert to AHCP standards.

Excavated Volume 915

Delivery Volume 633

Disturbed Surface Area 1500

Erosion Potential High

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 419699

Rock

T900

13

N/A

N/A

E : 4607698

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 08

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

113

CURRENT CONDITION : A Class III watercourse has a recently failed crossing of unknown size and type. Stream flow is diverted and will continue to divert down the road a few hundred feet to two other culverts and over the outboard edge of the road at various locations.

TREATMENT : Excavated exisiting crossing and install a 36" culvert to AHCP standards.

Excavated Volume 346

Delivery Volume 346

Disturbed Surface Area 825

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 419840

Rock

T900

14

N/A

N/A

E : 4607615

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 08

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

114

CREEK

MYNOT

CREEK

HUNTER

T10

R-32

H112

!>!>

!>

!> !>

!>

!>!>

!>!>

!>

!>

!>!>

!>

!>!>

!>

34

33

2930

R32-06

R32-05R32-01

R32-04R32-02

R32-03

T250-08

T250-07T250-09

T250-06T250-05T250-04

T250-10

T250-03

T250-02

T250-01

414000

414000

414500

414500

415000

415000

415500

415500

416000

416000

416500

416500

417000

4170004600

500

4600

500

4601

000

4601

000

4601

500

4601

500

4602

000

4602

000

4602

500

4602

500

4603

000

4603

000

4603

500

4603

500

4604

000

4604

000

4604

500

4604

500

4605

000

4605

000

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

115

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

21581 991199 T250-01

5.1 0.26 1010 1610 540 2.80 6.00 24 Rational

37921 991199 T250-02

7.8 0.20 990 1610 558 2.04 9.17 24 Rational

22683 991199 T250-03

15.6 0.20 910 1470 504 2.12 18.35 30 Rational

21584 991199 T250-06

9.1 0.20 860 1410 495 2.14 10.70 24 Rational

37918 991199 T250-07

5.5 0.10 850 1240 351 1.10 6.47 24 Rational

22681 991199 T250-08

7.5 0.10 750 1180 387 1.06 8.82 24 Rational

37920 991199 T250-09

9.5 0.10 850 1340 441 1.00 11.17 24 Rational

Culvert Report

116

CURRENT CONDITION : Fill crossing of Class II watercourse with catastrophic failure between Sept 2008 and Jan 2009. Fill is saturated due to lack of drainage structure.

TREATMENT : Prior to the start of operations a Professional Geologist will flag the location of the proposed outlet. Excavate unstable slide debris from TOP to excavation BOT. Install 24" culvert to AHCP standards along natural watercourse at left margin of fill failure and armor the outlet. Regrade road along left and right approaches to drain IBD runoff into drainage structure. Install 18" DRC 75ft to left of crossing. Install 18"DRC 100ft to right in center of failure.

Excavated Volume 470

Delivery Volume 333

Disturbed Surface Area 2209

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414634

Native

Relim Right Teepo Ridge Connector

T250-01

E : 4603339

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 26

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

117

CURRENT CONDITION : Class II annual stream with no culvert. Stream entering IBD and overtopping the road fill. Fill slope is saturated and partially failed. Stream goes subsurface just below BOT.

TREATMENT : Excavate from TOP to BOT. Install 24-inch culvert on grade to AHCP standards. Armour headcut. If left inboard ditchline is disturbed it will be rocked through the area of bank seeps.

Excavated Volume 146

Delivery Volume 94

Disturbed Surface Area 1160

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414669

Native

T-250

T250-02

E : 4603516

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 26

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

118

CURRENT CONDITION : Class II stream without culvert or adequate drainage relief. Flow currently entering inboard ditch and diverting over road prism. Outboard fill is slumping and slowly eroding away to outboard road edge.

TREATMENT : Excavate from TOP to BOT, removing large woody debris. Install 42" culvert on natural stream grade (41% ) to AHCP standards. Armor/buttress headcut and armor fill slope. Install 18" DRC with downspout 80' up left approach.

Excavated Volume 557

Delivery Volume 397

Disturbed Surface Area 2366

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414605

Native

Relim Right Teepo Ridge Connector

T250-03

E : 4603841

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 26

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

119

CURRENT CONDITION : Potentially ephemeral seep/spring with flow emerging from vertical bedrock outcrop and from cutbank slope ~40' left lacks drainage structure. Seep/spring drains to IBD and flows right ~150' to Site ID# 21584. Steep fillslope (42%) has backtilted/ j-shaped trees and evidence of surface erosion likely related to emergent groundwater thru fill prism.

TREATMENT : Install 24" DRC to AHCP standards. Install 18" DRC 100ft to left.

Excavated Volume 50

Delivery Volume 40

Disturbed Surface Area

Erosion Potential

AHCP Priority

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414541

Native

T-250

T250-05

E : 4604118

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 23

N/A

2011

N/A

NONE

Permanent Road Restrictions

YES

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

120

CURRENT CONDITION : Class II stream crossing with 24” CMP has a buried inlet. Pipe is disconnected due to recent catastrophic fill slope failure. Disconnected segment of pipe is located in the slide toe. Active fill failure scarp narrows road to 6’ wide.

TREATMENT : Excavate unstable material from excavation BOT to TOP install new 24" CMP to AHCP Standards. Install DRC ~150’ left of stream crossing.

Excavated Volume 490

Delivery Volume 473

Disturbed Surface Area 1200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414521

Native

Relim Right Teepo Ridge Connector

T250-06

E : 4604179

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 23

N/A

2011

N/A

NONE

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

121

CURRENT CONDITION : Class III water course with no culvert is over topping road fill. Ditch water combines with stream water at IBR. OBF is eroding away the OBR edge. Large diameter logs extend at an angle out of the fill downstream, possibly Humboldt logs. DRC 100ft to right is ruted through.

TREATMENT : Excavate TOP to BOT install new 24” CMP at grade to AHCP standards. Install new 18” DRC 100ft to right at existing DRC.

Excavated Volume 241

Delivery Volume 184

Disturbed Surface Area 1497

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414563

Native

T-250

T250-07

E : 4604392

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 23

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

122

CURRENT CONDITION : 24" CMP on a Class II stream crossing has sediment wedge (25’x25’x3’) with buried inlet. Road has been overtopped by sediment and water. Channel flow goes subsurface thru sediment wedge and fill prism then emerges below pipe and Humboldt logs. Seep 100ft to right crosses road surface causing recent fill slope failure.

TREATMENT : Excavate Humboldt logs and unstable fill material from excavation BOT to TOP install new 24" CMP to AHCP standards. Clean IBD along left approach. Install 18" DRC for seep ~100’ right of stream crossing and rebuild road prism.

Excavated Volume 745

Delivery Volume 843

Disturbed Surface Area 2000

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414534

Native

Relim Right Teepo Ridge Connector

T250-08

E : 4604736

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 23

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

123

CURRENT CONDITION : Class III water course with no culvert is actively over-topping road. No apparent erosion of fill but fill is heavily saturated. Seep located 80’ up road to left.

TREATMENT : Excavate TOP to BOT install new 24”CMP at grade to AHCP standards. Install 18” DRC 75ft to left.

Excavated Volume 113

Delivery Volume 112

Disturbed Surface Area 1994

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414576

Native

T-250

T250-09

E : 4604350

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 23

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

124

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

37896 991199 29 18.0 0.20 1120 1660 486 2.15 21.17 36 Rational

21537 991199 30 9.0 0.23 1080 1700 558 2.40 10.58 24 Rational

37877 991199 33 71.0 0.30 980 1790 729 2.94 83.50 54 Rational

37876 991199 34 5.0 0.17 1030 1670 576 1.67 5.88 24 Rational

Culvert Report

125

CURRENT CONDITION : An 18" CMP on a Class III watercourse also drains a perennial seep below a swale 120' to the left. The inlet is 50% plugged with sediment and the outlet has a broken downspout. The culvert is separated at a joint approximately 8’ up from the inlet and water flows out under the end. This watercourse flows into an adjacent Class II watercourse approximately 550’ downstream.

TREATMENT : Excavate from flagged bottom to flagged top. Install a 30" culvert to AHCP standards as close to the natural gradient as feasible, with a critical dip along the right hinge-line of the excavation. Install DRC approx. 100' at cutbank seep uproad (left).

Excavated Volume 414

Delivery Volume 316

Disturbed Surface Area 1690

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 416030

Native

Rellim Right Spur #2

29

E : 4602894

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 25

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

126

CURRENT CONDITION : A Class II watercourse crossing has an 18" CMP and a twisted and crushed half round downspout. Sediment has built up at the inlet forming a sediment wedge that plugs the inlet approximately 80%. There is a sinkhole in the inboard fill face. The culvert is separated and has advanced rust and holes at the outlet. There is a diversion of flow to the right via the inboard ditch that delivers to adjacent watercourse crossing.

TREATMENT : Excavate site from bottom to top, including any buried logs and the sediment wedge. Install a 24" culvert to AHCP standards on grade with a critical dip over the right hinge-line of the excavation. Install an 18" ditch relief culvert up-road to the left.

Excavated Volume 286

Delivery Volume 239

Disturbed Surface Area 1200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 416129

Native

Rellim Right Spur #2

30

E : 4602876

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 25

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

127

CURRENT CONDITION : A Class II watercourse with a 36" CMP plugged by large woody debris has overtopped and mostly washed out. There is a sediment wedge above the inlet.

TREATMENT : Excavate the remaining fill from flagged bottom to flagged top. Install a 54" culvert to AHCP standards with a critical dip over the right hinge-line of the excavation.

Excavated Volume 609

Delivery Volume 539

Disturbed Surface Area 5228

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 416584

Native

Rellim Right Spur #2

33

E : 4603153

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 02.0E 30

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

128

CURRENT CONDITION : The road crosses a swale at the head of a Class III watercourse. The 18" CMP is installed as a DRC. The culvert is rusted through less than 25% of its length and is separated at a joint approximately 5' before the outlet. Flow emerges from a small void below the outlet.

TREATMENT : Excavate from flagged bottom to flagged top. Install a 24" culvert to AHCP standards with a critical dip over the right hinge-line of the excavation.

Excavated Volume 90

Delivery Volume 71

Disturbed Surface Area 557

Erosion Potential High

AHCP Priority High

Excavated materials Soil

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP YES

YES

II/III

Coastal Klamath

RMA

N : 416503

Native

Rellim Right Spur #2

34

E : 4603233

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 02.0E 30

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

2011 Annual Work Plan : Road Work Order

129

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

22773 991199 R32-01 5.4 0.20 870 1220 315 2.54 6.35 24 Rational

21527 991199 R32-02 33.7 0.34 780 1410 567 3.74 39.63 42 Rational

21528 991199 R32-03 60.1 0.51 760 1800 936 4.93 70.68 54 Rational

21553 991199 R32-04 5.0 0.16 740 1240 450 1.71 4.41 18 Rational

38917 991199 R32-05 16.4 0.28 760 1470 639 2.86 19.29 30 Rational

22684 991199 R32-06 137.7 168.03 72 WC

Culvert Report

130

CURRENT CONDITION : 24" CMP on Class II stream with past debris torrent. Sediment and woody debris have deposited into channel and buried the culvert inlet, creating a 36'W x 20'L pond behind fill crossing. Sediment plug in culvert 10' from outlet.

TREATMENT : Either clean inlet and flush culvert ensuring appropriate measures are in place to minimize downstream sediment delivery (i.e. silt fence, catch basin, etc) --OR-- Excavate from TOP to BOT removing large woody debris and sediment wedge. Armor headcut and left stream bank below TOP flag.Install new 24" CMP to AHCP standards. Install 18" DRC 75ft to left.

Excavated Volume 3525

Delivery Volume 3376

Disturbed Surface Area 9119

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414638

Rock

R32

R32-01

E : 4601513

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 35

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

131

CURRENT CONDITION : Class III watercourse has sediment wedge (42’x48’x3’) and pond (31’x29’x8’) above potential fill crossing. Inlet and outlet are not visible. If crossing has a pipe it may be undersized. Sediment evidence suggests water level was about 6” from overtopping the road.

TREATMENT : Excavate stream crossing from BOT to TOP. Remove sediment wedge above crossing. Install 42" pipe on grade to AHCP standards. Install 18" DRC 75ft to left.

Excavated Volume 4814

Delivery Volume 4738

Disturbed Surface Area 10164

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 414934

Native

R32

R32-02

E : 4601154

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 36

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

132

CURRENT CONDITION : 60" CMP on Class II stream. Outlet shotgun for 6', suspended 8', and rusted through mid-way, permitting flow to undercut road fill. Culvert miss-aligned with stream centerline profile.

TREATMENT : Excavate from TOP to BOT, removing large woody debris. Install new 60"culvert to AHCP standards on stream grade (26%) and align (horizontally) with natural stream center line. Install 18" DRC 75ft to left.

Excavated Volume 972

Delivery Volume 986

Disturbed Surface Area 3789

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 415162

Native

R32

R32-03

E : 4601134

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 36

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

133

CURRENT CONDITION : Class III water course crossing, inlet of 18" CMP is buried under sediment wedge. Outlet is clear but has no water flowing through. Pipe is installed close to natural gradient.

TREATMENT : Excavate around inlet and attempt to clear material from inlet. Or excavate TOP to BOT remove old CMP and install new 36” CMP @ grade to AHCP standards. Either way excavate sediment wedge between TOP flag and inlet. Install single-post trash rack 36" on center from the inlet of the culvert.

Excavated Volume 2215

Delivery Volume 2122

Disturbed Surface Area 6126

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 415213

Rock

R32

R32-04

E : 4601299

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 36

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

134

CURRENT CONDITION : Class II water course crossing with a rusted through 30” CMP. Water is flowing through rust holes before outlet and eroding the outboard fill.

TREATMENT : Excavate TOP to BOT remove old CMP install new 30”CMP at grade to AHCP standards. Remove wood and sediment above inlet, layback right bank 2:1 and rock armor. Lower fill height over center of crossing to reduce fill volume and create critical dip.

Excavated Volume 4888

Delivery Volume 4546

Disturbed Surface Area 7343

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 415196

Rock

R32

R32-05

E : 4601544

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 36

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

135

CURRENT CONDITION : Steep (26%) class II flows over bedrock and has deposited a thick sediment wedge (54'x81') that buries a 60" CMP completely. Pipe is disconnected about 20' from the outlet causing fill saturation, erosional voids, and gullying of the fillslope. Low gradient half round downspout with sediment accumulation in pipe. Outfall is suspended ~8' over natural channel.

TREATMENT : Excavate from TOP to BOT, including slide debris along right bank where the natural watercourse and diverted slide flow intersect near BOT. Lay slope back and amour right bank (toe of slide). Remove sediment wedge at inlet. Replace pipe with 72", 120' long culvert and install on grade (-26%). Install critical dip at road/stream xing and energy dissipater rock at outlet. Excavate slide debris to toe of the slide (confluence w/ stream). Rebuild road prism including IBD between stream and slide. Armor road fill slope and cutbank for stabilization. Install 18" DRC 75ft to left, re cut ditchline for 150ft at cutbank failures.

Excavated Volume 4154

Delivery Volume 3121

Disturbed Surface Area 8892

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 415381

Native Rock

R32

R32-06

E : 4601933

Lower West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 36

N/A

2011

No Operations Prior to September 15th

MAMU Restrictions

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110803

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

136

CREEK

DANDY

U10

U10

U10

U10

U10U10

A200

A250

A240

A230U100

U600

U500

U470

U460

U420

U900

U900

U700

U700

U700

U1320

U1310U1300

U1500

U1400

U1000

U1100

U1000

!>

!>!>!>

!>!>

!>

!>

!>

!>

!>!>

!>!>

!>

U10-15U10-16

U10-17 U10-13

U10-11U10-19

U10-20

U10-21

U10-22 U10-23U10-25

U10-26 U430-01

U10-14

420000

420000

420500

420500

421000

421000

421500

421500

422000

422000

422500

422500

4598

500

4598

500

4599

000

4599

000

4599

500

4599

500

4600

000

4600

000

4600

500

4600

500

4601

000

4601

000

4601

500

4601

500

4602

000

4602

000

4602

500

4602

500

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

137

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

21338 991199 U10-11 2.0 0.19 900 1270 333 2.35 2.35 18 Rational

21335 991199 U10-13 2.8 0.19 950 1270 288 2.48 3.32 18 Rational

21334 991199 U10-14 34.0 0.60 970 1810 756 6.46 39.98 42 Rational

21005 991199 U10-15 65.0 0.72 1010 1810 720 8.12 76.44 54 Rational

21303 991199 U10-16 54.0 0.60 1080 1810 657 6.82 63.50 48 Rational

21302 991199 U10-17 7.0 0.29 1100 1480 342 3.79 8.23 24 Rational

21297 991199 U10-19 16.0 0.47 1210 1800 531 5.58 18.82 30 Rational

21295 991199 U10-20 27.0 0.43 1240 1780 486 5.21 31.75 36 Rational

21294 991199 U10-21 67.2 0.60 1290 2010 648 6.85 79.03 54 Rational

21293 991199 U10-22 16.4 0.53 1370 1980 549 6.33 19.29 30 Rational

21292 991199 U10-23 16.0 0.51 1410 1980 513 6.22 18.82 30 Rational

21290 991199 U10-25 2.8 0.10 1610 1810 180 1.42 3.29 18 Rational

21289 991199 U10-26 4.4 0.10 1620 1810 171 1.45 5.17 18 Rational

Culvert Report

138

CURRENT CONDITION : Class III water course crossing with no drainage strucutre present. Fill failure 13ft wide from OBR towards IBR 25ft long aprox 6ft deep at inside edge of failure. There is also a sink hole at the IBR where water is flowing from the ditch through the failure.

TREATMENT : Re-establish road prism and properly drain this seep with a 24"CMP to AHCP standards and rock line ditch to transport seep flows from spring 50ft to left.

Excavated Volume 341

Delivery Volume 275

Disturbed Surface Area 2500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 421083

Native

U10

U10-11

E : 4601535

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

139

CURRENT CONDITION : Class II watercourse with fill crossing diverts down ditch line to site U10-12. Ditch line is being filled with gravels.

TREATMENT : Install 30”CMP to AHCP standards. No DRC IS NEEDED

Excavated Volume 666

Delivery Volume 460

Disturbed Surface Area 1800

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420919

U10

U10-13

E : 4601632

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

140

CURRENT CONDITION : Class II watercourse crossing with two 24" CMPs on top of each other with large sediment wedge above inlet almost as high as top of inlet. Inlet is clear at this time but has a high potential for plugging.

TREATMENT : Excavate sediment wedge above inlet. Excavate down to grade and remove both CMPs. Install new 48” CMP at grade to AHCP standards. Install 18" DRC 100ft to left.

Excavated Volume 1318

Delivery Volume 735

Disturbed Surface Area 1500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420813

U10

U10-14

E : 4601670

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

141

CURRENT CONDITION : 24" CMP on a Class II watercourse. Currently flow goes subsurface well before inlet of culvert and water flows heavily out from below outlet through an old Humboldt. This crossing is 30' wide with a large sediment wedge above inlet. Outboard fill shows signs of slumping with active erosion occurring where water exits Humboldt.

TREATMENT : Install 60”CMP to AHCP standards narrow road width and lower fill height to reduce fill volume and create critical dip. Rock line channel from TOP flag down to inlet. Install 18" DRC 150ft to left due to road through cut.

Excavated Volume 6302

Delivery Volume 5830

Disturbed Surface Area 5250

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420715

U10

U10-15

E : 4601834

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

142

CURRENT CONDITION : Class II water course crossing. Inlet of 18" CMP completely buried by sediment wedge. Inlet is 100% plugged water is filtering through sediment wedge and flowing through culvert to outlet.

TREATMENT : Replace with 48” CMP at grade to AHCP standards. Install 18" DRC 75ft to right

Excavated Volume 3458

Delivery Volume 1811

Disturbed Surface Area 2500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420531

U10

U10-16

E : 4601796

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

143

CURRENT CONDITION : Class II watercourse crossing with a separated 24" CMP. Pipe is separated 20ft from and inlet and 10ft from outlet.

TREATMENT : Replace with 36”CMP to AHCP standards. Install 18" DRC 75ft to right.

Excavated Volume 2363

Delivery Volume 1392

Disturbed Surface Area 1500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420590

U10

U10-17

E : 4601736

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

144

CURRENT CONDITION : Class III watercourse with an 18" culvert and Humboldt. Outboard fill cracking and past erosional voids with gully below

TREATMENT : Remove CMP and Humboldt replace with 36” CMP to AHCP standards. Install 18" DRC 75ft to right.

Excavated Volume 503

Delivery Volume 303

Disturbed Surface Area 500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420865

U10

U10-19

E : 4601333

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

145

CURRENT CONDITION : 18" CMP on Class III watercourse, culvert set off to the side acts as an overflow. Most of the water goes subsurface through sediment wedge and into Humboldt.

TREATMENT : Remove CMP and Humboldt replace with 36” CMP to AHCP standards. Install 18" DRC 75ft to right, remove cutbank failure material from ditch.

Excavated Volume 2006

Delivery Volume 1374

Disturbed Surface Area 1800

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420881

U10

U10-20

E : 4601168

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

146

CURRENT CONDITION : Class II watercourse with an 18" CMP that is undersized and high in fill.

TREATMENT : Excavate sediment wedge from the inlet of the culvert to the confluence of the two streams above. The headcut will be armored and extend to the inlet of the new culvert. Any alders removed during sediment wedge excavation will be placed on the slopes above the armoring to the extent feasible. Install new 54” CMP to AHCP standards. Install 18" DRC 75ft to left.

Excavated Volume 2779

Delivery Volume 1892

Disturbed Surface Area 2000

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420875

U10

U10-21

E : 4600963

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

147

CURRENT CONDITION : 12" CMP drains Class II and IBD. Sinkhole developed below inlet. Inlet is perched 12" above bottom of channel/ditch. Water may be passing through fill (no flow at this time).

TREATMENT : Excavate TOP to BOT install new 36" CMP at grade to AHCP standards. Install 18" DRC 75 ft to right.

Excavated Volume 232

Delivery Volume 130

Disturbed Surface Area 2000

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 421141

Rock

U10

U10-22

E : 4600713

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

148

CURRENT CONDITION : Class III watercourse crossing with a buried 12” CMP.

TREATMENT : Install 36” CMP to AHCP standards.Install 18" DRC 75ft to left.

Excavated Volume 383

Delivery Volume 238

Disturbed Surface Area 500

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 421119

U10

U10-23

E : 4600689

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

149

CURRENT CONDITION : Class III watercourse with a 12" rusted out CMP

TREATMENT : Remove old CMP and Humboldt replace with 24”CMP to AHCP standards.

Excavated Volume 411

Delivery Volume 239

Disturbed Surface Area 600

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420786

U10

U10-25

E : 4600576

Upper Turwar CreekCalwater Watershed

Legal Description 14.0N 02.0E 33

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

150

CURRENT CONDITION : Class II stream, no visible inlet or outlet. Water audible below crossing.

TREATMENT : Remove Humboldt and install new 30”CMP to AHCP standards. Replace rusted out DRC 100ft to left of crossing.

Excavated Volume 306

Delivery Volume 173

Disturbed Surface Area 900

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420737

U10

U10-26

E : 4600552

Upper Turwar CreekCalwater Watershed

Legal Description 13.0N 02.0E 04

N/A

2011

No Operations Prior to Wildlife & Botany Clearance

NSO

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110808

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

151

TECT

AH

ROAD

J110J100

T105

T500T510

J500

T510

T520

T500 T110

T100

T120

T121T123

T122

T120

T130 T145

T140

T135

T100

T100

T150

JOHNSON

HANCORNE

!>

!>!>

!>

!>

!>!>

!>

!>

!>

!>

!>

!>

!>

!>

!>!>

!>T100-21

T100-17T100-16

T100-15

T100-14T100-13

T100-12

T100-11

T100-10T100-09

T100-08

T100-07

T100-06

T100-04T100-03

T100-01

T100-02

T100-06.5

419000

419000

419500

419500

420000

420000

420500

420500

421000

421000

421500

421500

422000

422000

4564

500

4564

500

4565

000

4565

000

4565

500

4565

500

4566

000

4566

000

4566

500

4566

500

4567

000

4567

000

4567

500

4567

500

4568

000

4568

000

4568

500

4568

500

g2011 Annual Work Plan:

Road Work Required

Seasonal Road, Native SurfacePermanent Road, Rocked SurfaceClass I WatercourseClass II WatercourseClass III Watercourse

!> Project Site

¯RF 1:18,000

1 inch = 1,500 feetUTM Zone 10, NAD 1983

March 1, 2011

152

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

38915 991199 T100-01

8.3 0.19 2300 2580 252 2.61 9.76 24 Rational

17668 991199 T100-02

6.7 0.14 2320 2550 207 1.98 7.88 24 Rational

17671 991199 T100-03

7.5 0.24 2270 2530 234 3.52 8.82 24 Rational

17673 991199 T100-04

18.2 0.36 2210 2560 315 5.02 21.40 36 Rational

22915 991199 T100-06

17.0 0.35 2160 2560 360 4.61 14.99 30 Rational

21590 991199 T100-06.5

17.4 0.37 2080 2560 432 4.58 20.46 30 Rational

17422 991199 T100-07

14.5 0.35 2060 2540 432 4.30 17.05 30 Rational

17222 991199 T100-08

17.4 0.26 1980 2440 414 3.10 20.46 30 Rational

17224 991199 T100-09

18.4 0.28 1930 2320 351 3.60 21.64 36 Rational

38916 991199 T100-10

12.3 0.27 1880 2190 279 3.77 14.46 30 Rational

17229 991199 T100-11

10.3 0.24 1830 2070 216 3.63 12.11 24 Rational

17232 991199 T100-12

17.4 0.28 1760 2030 243 4.15 20.46 30 Rational

17233 991199 T100-13

7.6 0.23 1740 1970 207 3.51 8.94 24 Rational

17234 991199 T100-14

16.4 0.25 1710 1970 234 3.69 19.29 30 Rational

17236 991199 T100-15

16.4 0.28 1640 1940 270 3.98 19.29 30 Rational

17238 991199 T100-16

11.5 0.33 1550 1910 324 4.49 13.52 30 Rational

17239 991199 T100-17

14.6 0.28 1530 1880 315 3.75 17.17 30 Rational

Culvert Report

153

CURRENT CONDITION : Class II water course diverts down ditch for 700ft to 18" DRC. No drainage structure present at road crossing. Large sediment wedge above road.

TREATMENT : Excavate TOP to BOT, rock line transition channel from TOP to inlet. Install new 24" CMP @ grade (19%) to AHCP standards. Install 18" DRC 75ft to the right of crossing.

Excavated Volume 858

Delivery Volume 705

Disturbed Surface Area 3222

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419852

Rock

T100

T100-01

E : 4564729

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

154

CURRENT CONDITION : Swale, no culvert, not a watercourse, likely collects water during the winter. IBD flows into swale.

TREATMENT : Install 24” CMP on grade to AHCP standards, install critical dip on left hinge.

Excavated Volume 2766

Delivery Volume 2112

Disturbed Surface Area 2500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419758

Rock

T100

T100-02

E : 4564621

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

155

CURRENT CONDITION : 24"CMP filled 90% at inlet and 100% at outlet. Class II watercourse

TREATMENT : Install new 24”CMP grade to AHCP standards, install critical dip on left hinge. Install 18” DRC 75ft to right.

Excavated Volume 290

Delivery Volume 246

Disturbed Surface Area 500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419977

Rock

T100

T100-03

E : 4564773

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

156

CURRENT CONDITION : Class III crossing with a 24" CMP. Pipe is rusted out from the outlet toward the center line of road, at least 15'. Water is down cutting a gully below pipe and causing sink holes and cracks in the OBF.

TREATMENT : Install a new 36"CMP at grade to AHCP standards. Armor the inlet area. Install 18" DRC 75ft to the right of crossing.

Excavated Volume 645

Delivery Volume 434

Disturbed Surface Area 600

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420238

Rock

T100

T100-04

E : 4564856

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

YES

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

157

CURRENT CONDITION : Class III watercourse diverts down ditch line 35ft to 18” CMP. Culvert is rusted through completely at inlet causing water to pond above inlet. Full round downspout is separated with water leaking through rust holes onto outboard fill. Outlet is set high in fill.

TREATMENT : Remove existing CMP and rebuild road prism at its current location. Excavate TOP to BOT install new 30” at correct channel alignment to AHCP standards. Install 18” DRC 75ft to right.

Excavated Volume 742

Delivery Volume 607

Disturbed Surface Area 2490

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420315

Rock

T100

T100-06

E : 4565130

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

158

CURRENT CONDITION : Sediment wedge is diverting flow from Class III water course down to site T100-07. 18" CMP is rusted through at inlet and at outlet. Pipe is currently functioning as DRC.

TREATMENT : Excavate TOP to BOT remove old CMP install new 30”CMP at grade to AHCP standards. Install 18” DRC 75ft to right.

Excavated Volume 989

Delivery Volume 451

Disturbed Surface Area 1231

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420280

Rock

T100

T100-06.5

E : 4565494

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

159

CURRENT CONDITION : Class II watercourse diverted down ditch approximately 60' to a 24" CMP that is 100% rusted through. Outlet has a large erosion void and past fill failures. Water flows out from under culvert.

TREATMENT : Install new 30" CMP on correct grade and alignment to AHCP standards.

Excavated Volume 978

Delivery Volume 430

Disturbed Surface Area 900

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420273

Rock

T100

T100-07

E : 4565537

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

160

CURRENT CONDITION : Class III watercourse crossing with a rusted out 12" CMP. Pipe is currently plugged near center of road.

TREATMENT : Install new 36" CMP on propper grade and allignment to AHCP standards, install critical dip, install 18" DRC to 75' to right.

Excavated Volume 1079

Delivery Volume 840

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 420005

Rock

T100

T100-08

E : 4565848

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

161

CURRENT CONDITION : Class II watercourse crossing with an 18" CMP that isrusted through. Flow is going under culvert and coming out in fill under outlet.

TREATMENT : Install new 30" CMP on proper grade and alignment to AHCP standards, install critical dip. Install an 18" DRC 75ft to the right of crossing.

Excavated Volume 1069

Delivery Volume 831

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419872

Rock

T100

T100-09

E : 4566053

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

162

CURRENT CONDITION : Class III watercourse crossing with a 18” CMP. Culvert is rusted through completely at inlet causing water to pond above inlet. Full round downspout is separated with water leaking through rust holes onto outboard fill.

TREATMENT : Excavate TOP to BOT remove old CMP install new 24”CMP at grade to AHCP standards. Install 18” DRC 75ft to right.

Excavated Volume 172

Delivery Volume 136

Disturbed Surface Area 975

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419895

Rock

T100

T100-10

E : 4566264

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

163

CURRENT CONDITION : Class III watercourse crossing combined with IBD flow with an 18" CMP rusted through at outlet.

TREATMENT : Excavate from TOP to BOT. Remove old pipe. Replace with 30" CMP. Install to AHCP standards. Install 18" DRC 75 ft to right.

Excavated Volume 254

Delivery Volume 191

Disturbed Surface Area 600

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419757

Rock

T100

T100-11

E : 4566513

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

164

CURRENT CONDITION : Class II watercourse with Humboldt crossing and an undersized CMP with trash rack. Inlet and outlet are 100% rusted through, water tunnels under pipe. Outboard fill failure has covered outlet.

TREATMENT : Excavate TOP to BOT install a 30" CMP placed in the bottom of the fill and swale to AHCP standards.

Excavated Volume 1432

Delivery Volume 1009

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419627

Rock

T100

T100-12

E : 4566822

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

165

CURRENT CONDITION : Class II watercourse with CMP offset approximately 40' down the road. Humboldt crossing at the natural swale. Past outboard fill failure. Current culvert is more than 25% rusted out with an erosion void at inlet and outlet. Sediment wedge has built up above Humboldt.

TREATMENT : Excavate from TOP to BOT removing old Humboldt crossing. Install new 24"CMP @ grade to AHCP standards. Remove old pipe down road and rebuild prism Instal 18" DRC if needed.

Excavated Volume 935

Delivery Volume 736

Disturbed Surface Area 1000

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419686

Rock

T100

T100-13

E : 4566957

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 21

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

166

CURRENT CONDITION : Class II watercourse crossing with a 24" CMP, inlet is rusted through with a sediment wedge above. Seep is about 75' to the right and diverts into crossing.

TREATMENT : Excavate from TOP to BOT remove old CMP, Install new 30"CMP @grade to AHCP standards install 18"DRC 70ft to right.

Excavated Volume 1208

Delivery Volume 1037

Disturbed Surface Area 1500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419662

Rock

T100

T100-14

E : 4567077

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 16

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

167

CURRENT CONDITION : Class II watercourse crossing with a 24" CMP rusted through more than 25% of length. Outboard fill erosion with a shot gunned outlet undermining the fill and flow under culvert. Possible Humboldt crossing under culvert and a sediment wedge above the inlet..

TREATMENT : Excavate from TOP to BOT removing old Humboldt crossing. Install new 30"CMP @ grade to AHCP standards.. Install 18” DRC 75ft to right.

Excavated Volume 2219

Delivery Volume 1986

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419619

Rock

T100

T100-15

E : 4567380

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 16

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

168

CURRENT CONDITION : 18" CMP on a Class III watercourse crossing with a rusted through inlet. Water flows out from under culvert, outlet is shot gunned with a 15' drop and a resulting erosion void.

TREATMENT : Excavate from TOP to BOT removing old Humboldt crossing. Install new 30"CMP @ grade to AHCP standards. . Install 18” DRC 75ft to right.

Excavated Volume 991

Delivery Volume 843

Disturbed Surface Area 1000

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419413

Rock

T100

T100-16

E : 4567763

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 16

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

169

CURRENT CONDITION : Class III watercourse crossing, 18" CMP is rusted through for most of pipe length. Flow is down cutting under pipe at inlet and appears fairly stable. Large sediment wedge above inlet could cause plugging and diversion. Active erosion and head cutting are occurring at the outlet where water is flowing through rust holes onto fill before outlet.

TREATMENT : Excavate from TOP to BOT removing old Humboldt crossing. Install new 30"CMP @ grade to AHCP standards.. Install 18” DRC 75ft to right.

Excavated Volume 1403

Delivery Volume 1244

Disturbed Surface Area 1000

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 419347

Rock

T100

T100-17

E : 4567786

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 16

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

170

CURRENT CONDITION : An 18 in. ditch relief culvert delivers sediment via a gully to stream below. Gully is well established. DRC has rust holes throughout. Outlet is set high in fill.

TREATMENT : Replace with 24"CMP and include a downspout. Add 18"DRC to 175 to left.

Excavated Volume 320

Delivery Volume 314

Disturbed Surface Area 1500

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

RMA

N : 418995

Rock

T100

T100-21

E : 4568200

Upper Tectah CreekCalwater Watershed

Legal Description 10.0N 02.0E 17

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

False

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110405

GDRCo Name AWP 2011

Annual Work Plan : Road Work Order Klamath

171

172

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

37987 561001 2 46.0 0.63 1110 1920 729 6.93 54.10 48 Rational

Culvert Report

173

CURRENT CONDITION : A segment of road with no recent usage has a partially washed out Humboldt crossing on a Class II watercourse. The side slopes are over steepened and over 1000 cubic yards of materials remain in the channel, including the remains of the old sediment wedge.

TREATMENT : The work at this location shall be conducted under the supervision of the Green Diamond Resource Company Staff Professional Geologist. Excavate the site from the flagged bottom to the flagged top including any buried logs. Install a 48” culvert to FPR and THP standards on the natural channel grade with a critical dip. Armor the top of the excavation to minimize head-cutting if necessary. Install a drainage structure on the left approach to hydrologically disconnect the watercourse from the road.

Excavated Volume 1363

Delivery Volume 1012

Disturbed Surface Area 5290

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 420046

Native

CL1065

2

1-10-130

561001

E : 4581973

Ah Pah CreekCalwater Watershed

Legal Description 12.0N 02.0E 33

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110702

GDRCo Name 584

Annual Work Plan : Road Work Order Klamath

174

175

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

38084 561002 04 6.0 0.13 1590 1850 234 1.73 7.06 24 Rational

38100 561002 06 7.0 0.15 1640 1910 243 2.02 8.23 24 Rational

Culvert Report

176

CURRENT CONDITION : A Class II watercourse has an incompletely decommissioned crossing. Water flows into a sinkhole at the unexcavated top, and flows out of the right flank near the bottom by way of unexcavated Humboldt logs.

TREATMENT : Excavate from bottom to top including any buried logs and install a 30” CMP at the natural channel grade with a critical dip. The excavated channel at both the inlet and outlet shall be lined with rock.

Excavated Volume 77

Delivery Volume 42

Disturbed Surface Area 762

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 418586

Native

CL1035

04

1-10-112

561002

E : 4581814

Ah Pah CreekCalwater Watershed

Legal Description 12.0N 02.0E 32

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110702

GDRCo Name 585

Annual Work Plan : Road Work Order Klamath

177

CURRENT CONDITION : A 24” CMP on a Class II watercourse is not on grade and the downspout is detached from the outlet. Water is flowing under the culvert inlet and emerges below the culvert outlet. A Class II spring above the road drains water to the inboard ditch approximately 50' to the South.

TREATMENT : Excavate from bottom to top including any buried logs and install a 30” CMP at the natural channel grade with a critical dip. Rock line the inboard ditch for approximately 50' to the south to convey water from the Class II spring to this culvert.

Excavated Volume 264

Delivery Volume 218

Disturbed Surface Area 1183

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 418514

Native

CL1035

06

1-10-112

561002

E : 4582024

Ah Pah CreekCalwater Watershed

Legal Description 12.0N 02.0E 32

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110702

GDRCo Name 585

Annual Work Plan : Road Work Order Klamath

178

CURRENT CONDITION : A Class II spring is drained by a 24” CMP with an attached downspout. Minor cut-bank failures associated with the spring have caused debris to collect at the inlet.

TREATMENT : Clean debris from inlet of 24” CMP. Place rock buttressing on cut bank above the inlet to prevent future failures.

Excavated Volume 10

Delivery Volume

Disturbed Surface Area 100

Erosion Potential

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 419385

Rock

CL700

11

1-10-112

561002

E : 4580009

Surpur CreekCalwater Watershed

Legal Description 11.0N 02.0E 05

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110704

GDRCo Name 585

Annual Work Plan : Road Work Order Klamath

179

CURRENT CONDITION : A Class II spring emerges from the cutbank and is drained by an 18” CMP. Minor cut-bank failures associated with the spring have caused debris to collect at the inlet. The failing cut bank has undermined the root system of an approximately 24" Douglas-fir tree just above this road point. The tree is leaning and has most of its limb weight towards the road creating a potential hazard.

TREATMENT : Remove the hazardous Douglas-fir tree. Excavate the debris accumulated at the culvert inlet. Buttress the cutbank with rip-rap to protect the culvert and minimize the potential for future cutbank failures.

Excavated Volume

Delivery Volume

Disturbed Surface Area 100

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 419569

Rock

CL700

12

1-10-112

561002

E : 4580084

Surpur CreekCalwater Watershed

Legal Description 11.0N 02.0E 05

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110704

GDRCo Name 585

Annual Work Plan : Road Work Order Klamath

180

CURRENT CONDITION : The inlet of an 18” corrugated plastic pipe conducting a Class II watercourse across the road has become buried by a cut bank failure above. There is an approximately 4’ drop at the outlet of the downspout.

TREATMENT : Excavate material blocking the inlet. Place rock buttressing at the base of the cut bank excavation to prevent future failures. Install energy dissipating rock at the outfall of the downspout.

Excavated Volume 10

Delivery Volume

Disturbed Surface Area 150

Erosion Potential

AHCP Priority NAP

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 419932

Rock

CL South

15

1-10-112

561002

E : 4579081

Surpur CreekCalwater Watershed

Legal Description 11.0N 02.0E 09

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110704

GDRCo Name 585

Annual Work Plan : Road Work Order Klamath

181

182

183

184

Site Id THP# Road Pt#

Acres Length(miles)

Lower Elev

Upper Elev

Altitude Tc Cfs C.Diam(inches)

Method

38924 711001 0 17.0 0.41 1060 1700 576 4.62 19.99 30 Rational

8670 711001 02 10.0 0.36 1020 1500 432 4.44 11.76 24 Rational

8666 711001 03 8.0 0.22 1030 1290 234 3.18 9.41 24 Rational

8665 711001 04 39.0 0.53 1020 1540 468 6.73 45.86 42 Rational

8669 711001 06 16.0 0.34 1170 1540 333 4.60 18.82 30 Rational

35461 711001 07 33.0 0.55 380 1520 1026 5.19 38.81 42 Rational

21771 711001 17 51.0 0.44 1390 1720 297 6.47 59.98 48 Rational

37983 711001 20 5.0 0.26 1390 1670 252 3.75 5.88 24 Rational

37870 711001 21 7.0 0.25 1080 1340 234 3.69 8.23 24 Rational

37868 711001 22 8.0 0.23 1490 1720 207 3.51 9.41 24 Rational

37789 711001 24 10.0 0.32 1350 1680 297 4.48 11.76 24 Rational

21531 711001 25 12.0 0.36 1360 1720 324 4.96 14.11 30 Rational

21529 711001 29 9.0 0.34 1200 1580 342 4.55 10.58 24 Rational

21530 711001 30 21.0 0.44 1180 1580 360 6.01 24.70 36 Rational

Culvert Report

185

CURRENT CONDITION : A seasonal spring overwhelmed the inside ditch during a large rain event saturating the fill slope of an approximately 125' section of road, causing it to slip vertically 6 to 8 inches. The movement of the road surface caused a 24" CMP on a Class II watercourse to shear in half. Approximately 1 yd3 of material from the road surface collapsed into the pipe partially plugging the outlet.

TREATMENT : Replace the sheared CMP with a 24” culvert installed to AHCP standards on grade with a critical dip. Install an additional 24” culvert to conduct the seasonal spring across the road. The remainder of this road segment shall be reshaped with a grader to facilitate log hauling.

Excavated Volume 206

Delivery Volume 111

Disturbed Surface Area 1500

Erosion Potential

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Smith River

THP

N : 410821

Rock

H200

0

1-10-083

711001

E : 4610539

North of Teds RidgeCalwater Watershed

Legal Description 15.0N 01.0E 33

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1103.500001

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

186

CURRENT CONDITION : A Class II watercourse with a 12" CMP has a sediment wedge and a very rusty inlet that is almost completely blocked by built up sediment. There has been some past failure of the over steepened fill face. The culvert is short, set high in the fill and has eroded fill below the outfall. Most of the flow goes subsurface below the shotgun outlet and reemerges at the base of fill.

TREATMENT : Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 24" culvert to AHCP standards on grade with a critical dip.

Excavated Volume 162

Delivery Volume 77

Disturbed Surface Area 975

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Smith River

THP

N : 410045

Rock

H200

02

1-10-083

711001

E : 4613043

North of Teds RidgeCalwater Watershed

Legal Description 15.0N 01.0E 29

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1103.500001

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

187

CURRENT CONDITION : A 12" rusty CMP on a Class II watercourse is misaligned causing a gully where it discharges on to fill. The outlet is nearly buried by fill face failures and there are multiple holes in the outboard fill face. Stream flow goes subsurface before the culvert inlet at the sediment wedge and emerges at the base of the outboard fill. The existing culvert may be separated at an interior joint.

TREATMENT : Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 24" culvert to AHCP standards on grade with a critical dip.

Excavated Volume 716

Delivery Volume 508

Disturbed Surface Area 1200

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Smith River

THP

N : 410077

Admin.Rock

H200

03

1-10-083

711001

E : 4613067

North of Teds RidgeCalwater Watershed

Legal Description 15.0N 01.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1103.500001

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

188

CURRENT CONDITION : A Class II watercourse with an 18" CMP set high in the fill over old Humboldt logs has a shotgun outlet. There is a large sediment wedge above the inlet and evidence of overtopping. The outboard fill face is gullied and the culvert is prone to plugging.

TREATMENT : Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 42" culvert to AHCP standards on grade with a critical dip.

Excavated Volume 1210

Delivery Volume 1009

Disturbed Surface Area 1900

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Smith River

THP

N : 410340

Admin.Rock

H200

04

1-10-083

711001

E : 4613183

North of Teds RidgeCalwater Watershed

Legal Description 15.0N 01.0E 28

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1103.500001

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

189

CURRENT CONDITION : A Humboldt crossing on a Class II watercourse has a sediment wedge built up above the road. The channel above is disrupted by a legacy skid road approximately 75' above the top and there are legacy tractor impacts to the channel itself. There is some erosion of the fill slope where water appears to have overtopped the road at high flows, but most water flows subsurface through the site.

TREATMENT : Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 30" culvert to AHCP standards on grade with a critical dip. The transition point on the sediment wedge may require buttressing with riprap to minimize future headcutting.

Excavated Volume 214

Delivery Volume 223

Disturbed Surface Area 1446

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Smith River

THP

N : 410353

Native

H279 (named)

06

1-10-083

711001

E : 4612908

North of Teds RidgeCalwater Watershed

Legal Description 15.0N 01.0E 28

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1103.500001

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

190

CURRENT CONDITION : A Class II watercourse crossing has an extensive sediment wedge behind it that has buried the original culverts. A 36” diversion culvert was recently installed to channel water to an adjacent gully, but a sinkhole has since opened up at the inlet of an old culvert along the original alignment causing the watercourse to incise through the sediment wedge leaving the diversion high and dry. Water currently makes its way through cavities in the fill and through one of 4 old rusted out CMPs protruding from the fill along the original alignment set at various depths.

TREATMENT : Excavate from the flagged bottom to the flagged top on the sediment wedge and install a 42" culvert to AHCP standards. The transition point on the sediment wedge may require buttressing with riprap to minimize future headcutting. The diversion culvert can be left in place as overflow protection, or install a critical dip.

Excavated Volume 1542

Delivery Volume 1182

Disturbed Surface Area 4727

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 413621

Rock

H300

07

1-10-083

711001

E : 4607846

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 14.0N 01.0E 11

N/A

2011

N/A

NONE

Permanent Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

191

CURRENT CONDITION : A 30" CMP on a low gradient Class II watercourse is rusted through for most of its length.

TREATMENT : Excavate from the flagged bottom to the flagged top and install a 48" culvert to AHCP standards, with a critical dip. Install an 18” ditch relief culvert approximately 80’ up-road to disconnect the inboard ditch from the watercourse.

Excavated Volume 69

Delivery Volume 37

Disturbed Surface Area 562

Erosion Potential Medium

AHCP Priority Medium

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411924

Native

H300

17

1-10-083

711001

E : 4610459

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

False

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

192

CURRENT CONDITION : An ephemeral Class III watercourse crossing on a seasonal road lacks a drainage structure.

TREATMENT : Either: Install a 24" culvert to AHCP standards on grade with a critical dip. Or: Install a rocked ford that is armored to the base in fill on the outboard edge of the road.

Excavated Volume 10

Delivery Volume 15

Disturbed Surface Area 262

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 412054

Native

H340

20

1-10-083

711001

E : 4611005

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

193

CURRENT CONDITION : An unclassified ephemeral watercourse crossing lacks a drainage structure. Stream flow is captured by the road and forms a surface gully that is hydrologically connected to another watercourse approximately 250 feet down the road.

TREATMENT : Either: Install a 24" culvert to AHCP standards on grade with a critical dip. Or: Install a rocked ford that breaches the outboard berm and is armored past the transition in grade on the outboard edge of the road.

Excavated Volume 54

Delivery Volume 33

Disturbed Surface Area 655

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411960

Native

H340

21

1-10-083

711001

E : 4610994

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

194

CURRENT CONDITION : A Class III watercourse crossing lacks a drainage structure. Stream flow overtops the road and erodes the outboard fill.

TREATMENT : Either: Install a 24" culvert to AHCP standards on grade with a critical dip. Or: Install a rocked ford that breaches the outboard berm and is armored past the transition in grade on the outboard edge of the road.

Excavated Volume 27

Delivery Volume 13

Disturbed Surface Area 512

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411857

Native

H340

22

1-10-083

711001

E : 4610964

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

195

CURRENT CONDITION : A Class II watercourse crossing is drained by Humboldt logs. There is a sediment wedge built up above the road, and legacy impacts associated with past tractor operations at this site. There is a small gully in the fill slope where water may have overtopped the road in the past. There is a high potential for diversion and some past diversion from this site appears to have contributed to the fill failure associated with the right approach to Road Point 19. This site is downstream of Road Point 15 and may receive somewhat higher flows after the road work is completed at that site.

TREATMENT : Treat prior to the Winter Period (Oct.16), unless "Unseasonably Dry Fall" conditions are in effect (Oct.16 - Nov.15) of the year Road Point 15 is upgraded. Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 24" culvert to AHCP standards on grade with a critical dip.

Excavated Volume 319

Delivery Volume 286

Disturbed Surface Area 1637

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 412050

Native

H300

24

1-10-083

711001

E : 4611053

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

196

CURRENT CONDITION : A Class II watercourse crossing with a 12" CMP has a sediment wedge above the inlet. The culvert inlet has collapsed and the fill adjacent the culvert is eroded undercutting the road to the approximate centerline. Humboldt logs are visible protruding from the base of fill. There is an old shallow fill failure along right margin of the outboard fill and the toe slope is undercut by a gully channel from the shotgun culvert outfall. The fill failure appears to be the result of a drainage diversion from another site up the road that was conveyed to this site by the inboard ditch. Water goes subsurface at the sediment wedge approx 20' from the culvert inlet and reemerges near the bottom.

TREATMENT : Excavate from the flagged bottom to the flagged top, and install a 30" culvert to AHCP standards, with a critical dip. Install an 18” ditch relief culvert approximately 80’ up-road to disconnect the inboard ditch from the watercourse.

Excavated Volume 155

Delivery Volume 126

Disturbed Surface Area 887

Erosion Potential Medium

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411992

Native

H300

25

1-10-083

711001

E : 4611127

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

197

CURRENT CONDITION : A 12” culvert fed by cutbank seeps and the Class II unit boundary watercourse is rusted out and eroding the outboard edge of the road. The road is undercut and may be unsafe to haul on prior to road work. There is a Class II watercourse immediately below with direct delivery to a Class I watercourse 80 feet downstream. The existing culvert is accumulating sediment at the inlet and is approximately 25% plugged.

TREATMENT : Rock line the inboard ditch for approximately 75' from the boundary watercourse to the culvert and replace the existing 12” ditch relief culvert with a 24” culvert placed on a steeper gradient to reduce plug potential. Install a critical dip and rock armor at the culvert outlet.

Excavated Volume 17

Delivery Volume 12

Disturbed Surface Area 183

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411792

Native

H280

29

1-10-083

711001

E : 4611913

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

198

CURRENT CONDITION : A Class II watercourse crossing has an 18" CMP placed off the natural alignment and grade and a sediment wedge above the inlet. The inboard ditch delivers directly to the culvert inlet. The culvert is rusted through for more than 25% of its length and approximately 25% of flow bypasses the culvert underneath. The road is severely undercut and the outboard fill face is badly eroded where the outlet used to shotgun onto the fill.

TREATMENT : Excavate from flagged bottom to flagged top, including the sediment wedge at the top and any buried logs. Install a 36" culvert with an inlet cut at an angle to AHCP standards, with a critical dip. Install an 18” ditch relief culvert approximately 75’ up-road to disconnect the inboard ditch from the watercourse and inslope or crown the road for at least 50’ leading down to the ditch relief culvert.

Excavated Volume 310

Delivery Volume 228

Disturbed Surface Area 1682

Erosion Potential High

AHCP Priority High

Excavated materials Soil,Gravel,Rock and Wood

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 411940

Native

H280

30

1-10-083

711001

E : 4611806

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

True

True

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

199

CURRENT CONDITION : There is approximately 70' of cracked fill along the outboard edge of the road. The cracks are approximately 6"-8" wide and extend up to 6’ from the outboard edge of the road. This site is within the WLPZ, approximately 60' from the toe of fill to the Class II watercourse below. The estimated approximate dimensions are w:70' x l:10' x d: 3'

TREATMENT : Excavate the unstable fill material between the flagged margins. The road’s running surface can be moved toward the cutbank. The road is wide and the cutbank probably does not need excavation.

Excavated Volume 1050

Delivery Volume 315

Disturbed Surface Area

Erosion Potential Medium

AHCP Priority Medium

Excavated materials

GDRCo#

State THP#

Road Point

Road Name

Road Class

UTM

Hydrologic Planning Area

Project Type

PreConsultation Completed?

Fees Payed From Previous AWP NO

NO

II/III

Coastal Klamath

THP

N : 412681

Native

H420

34

1-10-083

711001

E : 4611054

Upper West Fork Hunter CreekCalwater Watershed

Legal Description 15.0N 01.0E 34

N/A

2011

N/A

NONE

Seasonal Road Restrictions

NO

1600 Timing

Annual Plan Year

Work Timing

Wildlife Restrictions

Road Use Restrictions

Aquatic Habitat Survey Req?

ECP Req ?

1600 Req ?

Work Type

1105.110802

GDRCo Name 583

Annual Work Plan : Road Work Order Klamath

200

201

202

203

204

205

206

207

208

209

210

211

212

213