![Page 1: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/1.jpg)
EPCOR Water Services Inc. Gold Bar Wastewater Treatment Plant
2010 Wastewater Treatment Annual Report
SUBMITTED TO:
The City of Edmonton Asset Management and Public Works
Drainage Services
As per requirements of
APPROVAL TO OPERATE NO. 639-02-07
March - 2011
![Page 2: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/2.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011
TABLE OF CONTENTS
Approval No. 639-02-07 Requirement Page
2010 Overview N/A 1
Operational Activity Summary 5.1.3 (g) 3
Table 1. 2010 Plant Performance. 5.1.3 (a), (b) and (c); Wastewater Treatment Operations Plan Section 10 – Monitoring
Protocol
6
Table 2. 2010 Reclaimed Water Quality. 5.1.3 (c) and 3.1.3 (h); Wastewater Treatment Operations Plan Section 9 – Effluent Re-use
Protocol
7
Table 3. 2010 Effluent Toxicity. 3.1.3 (g); Wastewater Treatment Operations Plan Section 8 – Effluent Toxicity Testing
Protocol
8
Table 4. 2010 Summary of Gold Bar Laboratory Proficiency Testing.
3.1.3 (k); Wastewater Treatment Operations Plan Section 12 – Laboratory Accreditation
Program
9
Table 5. Environmental Release Reports & Administrative Non-Compliances.
5.1.3 (e) 10
Table 6. 2010 Summary of Monthly/Annual Chemical Usage at the Gold Bar WWTP.
3.1.3 (f); Wastewater Treatment Operations Plan Section 7 – Wastewater Treatment System
Chemical Usage Protocol
11
Table 7. 2010 List of Certified Wastewater Treatment Operators for the Gold Bar Wastewater Treatment Plant.
5.1.3 (d); 3.1.9; Wastewater Treatment Operations Plan Section 1 – Wastewater
Treatment Operator Certification Requirements
12
Table 8. 2010 Sampler Non-Conformance Summary As part of 5.1.3 (g) 13
Table 9. Summary of 2010 Major Work Program, not including Engineering Projects.
3.1.3 (a); Wastewater Treatment Operations Plan Section 3 – Preventative Maintenance
Treatment Capacity Protocol.
14
Table 10. Summary of 2010 Completed Projects and 2010 Planned Major Capital and Rehabilitation Projects.
5.1.3 (f) 17
Appendices Appendix A – 2010 Plant Performance Reports Appendix B – 2010 Enhanced Primary Treatment
Performance
20
![Page 3: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/3.jpg)
2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and
operated Gold Bar Wastewater Treatment Plant (“Plant”). On average, the Plant effluent
quality discharged to the North Saskatchewan River was 16% of the Approval to Operate
(639-02-07) effluent discharge limits (Figure 1). The previous best treatment was achieved
in 2008 with a score of 18%.
Figure 1. GBWWTP Annual Average Performance (100% meets Approval)
0%
5%
10%
15%
20%
25%
30%
35%
40%
2004 2005 2006 2007 2008 2009 2010
Cu
mu
lati
ve P
erfo
rman
ce
BOD (organics) TSS (solids) E.coli (bacteria) Total Phosphorus (nutrients) Ammonia - Summer Ammonia - Winter
For 2010, each parameter has been, on average, 16% of the limit specified in the Approval.
For 2010, all monthly limits for Approval to Operate 639-02-07 discharge parameters were
met (Table 1, Appendix A -Monthly Plant Performance Reports). A total of 97,996 million
litres, or megaliters (ML), of wastewater were conveyed to the Plant with 99.91%1 of the
flow receiving primary treatment during 2010. Secondary treatment and UV disinfection
was provided to 90,748 ML (92.6%) of the total influent flow, with 3,727 ML of Reclaimed
Water provided to industrial customers. A summary of Reclaimed Water quality in 2010 is
provided in Table 2. In addition to routine final effluent quality monitoring, a total of nine
final effluent samples were submitted for toxicity testing in 2010; all nine samples were
tested for acute toxicity, and three of the nine samples were tested for chronic toxicity. All 1 83.9 million litres of wastewater bypassed the Plant in 2010.
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 1 of 20
![Page 4: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/4.jpg)
results showed no toxic effects from the Plant’s final effluent (Table 3). All analytical data
included in the report were handled by the Gold Bar Wastewater Laboratory and performed
using ISO/IEC 17025:2005 accredited methods. Gold Bar Wastewater Laboratory is
accredited to ISO/IEC 17025:2005 by the Canadian Association for Laboratory
Accreditation (CALA) for those analyses as listed in the scope of accreditation
(http://www.cala.ca/scopes/3161.pdf). Chronic and acute toxicity bioassays where
conducted by contract laboratories accredited to perform these tests
(http://palcan.scc.ca/specs/pdf/114_e.pdf). The 2010 Gold Bar Wastewater Laboratory
Proficiency Testing results are summarized in Table 4.
The number of environmental incidents in 2010 dropped significantly compared to 2009,
primarily due to stable digester operation. Of the environmental incidents in 2010 (Table 5),
none were uncontrolled releases of biogas from the anaerobic digestion process. Stable
fermenter operation also played a significant role in safe operation of the digesters as well
contributing to the final effluent Total Phosphorus concentration setting a record low annual
average concentration of 0.48 mg/L. After a stabilization period, the fermenters provided
adequate carbon in the form of Volatile Fatty Acids (VFA’s) to provide for a stable and
robust Biological Phosphorus Removal process. This was evident in a 22% reduction of
aluminum sulfate (alum) consumption for secondary phosphorus removal as compared to
2009. Table 6 summarizes the Plant’s monthly chemical usage for 2010. Below is a
monthly summary of operational activities and issues for 2010 as per requirement of
Approval No. 639-02-07 section 5.1.3 (g). Table 7 outlines issues with the autosamplers for
both the Total Bypass and Final Effluent Combined composite samples. Table 8 lists the
name and position of Alberta Environment Certified Wastewater Treatment Operators for
the Plant. Table 9 summarizes major activities associated with the completion of the 2010
Major Work Program. As part of the Annual Report requirement, the 2010 Completed
Capital Projects and 2011 Capital Program are included in Table 10. 2010 marked the
completion of Digester 7 and 8 construction, as well as the commencement of construction
of a new boilerhouse to meet process heating requirements for the new digesters.
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 2 of 20
![Page 5: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/5.jpg)
Operational Summary2 January 2010
No main plant or secondary bypass events Eleven (11) bioreactors were in service for winter operation. All bioreactors were
operated in summer mode (cell 3 as second anoxic zone) Caustic spill to collection system – 100 cubic meters – pH 11.93 – no process
impacts Grit Blowers 1-2-3 replacement – Capital Project Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8 Recovery (Citric Acid) Clean - Trains1,2,3,4,5,6,7,8 Total = 8
February 2010
One (1) secondary bypass event. February 28th composite secondary bypass sample not collected. AE Ref no. 220803
U.V. Channel #1 lamp replacement Blend Tanks cleaned Recovery (Hypochlorite) Clean - Trains 1,2,3,4
March 2010
Six (6) secondary bypass events greater than two (2) hours in duration. March 1st composite secondary bypass sample not collected. AE Ref no. 234151
For the spring runoff period (March 1st to March 7th), all eleven (11) bioreactors/clarifiers were in-service
Screen 7 & 8 wash press installation U.V. Channel 2 lamp replacement Primary 3 and 4 – chain and sprocket repair Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,8; Total = 11 Recovery (Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 9 High efficiency flare put into service after winter shutdown.
April 2010
Two (2) secondary bypass events greater than two (2) hours in duration. April 23rd - Main Plant Bypass at less than 910 ML/day primary treatment capacity. AE Ref no.235173. April 23rd – Secondary bypass at less than 420 ML/day secondary treatment capacity. AE Ref no. 235174
U.V. Channel 5 Performance testing Acid Clean Supernatant Pipeline from Clover Bar Lagoons EPT tanks 9 through 12 in service – 5 through 8 for scum collection system
upgrades Recovery (Hypochlorite) Clean - Trains 3,5,7; Total = 4
2 As per Approval to Operate No. 639-02-07 requirement Section 5.1.3 (g).
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 3 of 20
![Page 6: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/6.jpg)
May 2010
One (1) main plant bypass after exceeding pre- and primary treatment capacity of 910 ML/day
Seven (7) secondary bypass events greater than two (2) hours in duration. May 19th and 21st, composite secondary bypass samples not collected due to autosampler failure. AE Ref no. 266998.
Ten (10) out of eleven (11) bioreactors in-service (summer mode). Commencement of biosolids to farmland application program (Nutrigold Program) Secondary power shutdown – 2 hours Primary 5 and 6 in service Fermenter #4 In Service – May 5th Controlled U.V. power shutdown for power feed switch – AE Ref no. 235970
June 2010
Nine (9) secondary bypass events greater than two (2) hours in duration Primary 8 Loop Chain Install Ten (10) out of eleven (11) bioreactors in-service (summer mode). Primary 7 and 8 Out of Service – Retrofit Scum Collection – Engineering – June 1st New Grit Blower On Line (replacement for pre-treatment blowers 1-2-3 ) Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8 Recovery(Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8
July 2010
Three (3) main plant bypasses after exceeding pre- and primary treatment capacity of 910 ML/day
Eleven (11) secondary bypass events greater than two (2) hours in duration were recorded and sampled for in the month
Four (4) secondary bypass events less than two hours in duration Ten (10) out of eleven (11) bioreactors in-service (summer mode) Primary 3 and 4 Out of Service – Retrofit Scum Collection – Engineering - July 23rd Fermenter 1 In Service – July 6th Membrane Bubble Test – all eight trains EPT dry weather test (no bypass) with chemical addition (alum + polymer) – July
26th, refer to Appendix B for test results August 2010
Two (2) main plant bypasses after exceeding pre- and primary treatment capacity of 910 ML/day
Six (6) secondary bypass events greater than two (2) hours in duration Nine (9) out of eleven (11) bioreactors in-service (summer mode) Fermenter 3 out of service – Engineering Digester 4 Out of Service for cleaning Power failure - Membrane Plant Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 16 EPT Wet Weather Test with chemical addition (alum + polymer) – August 12th, refer
to Appendix B for test results
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 4 of 20
![Page 7: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/7.jpg)
September 2010
One (1) main plant bypass after exceeding pre- and primary treatment capacity of 910 ML/day
Six (6) secondary bypass events greater than two (2) hours in duration Nine (9) out of eleven (11) bioreactors in-service (summer mode) Primary 5 and 6 Out of Service – Retrofit Scum Collection – Engineering – Sept 13 Grit Tanks 1 and 3 Out of Service for Grit Removal – Sept 22 Controlled digester purge for Dig 4 – 1500 cu m – AE Ref no. 240157 Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8 Recovery (Citric Acid) Clean - Train 4; Total = 1
October 2010
One (1) secondary bypass events greater than two (2) hours in duration were recorded and sampled for in the month
Ten (10) out of eleven (11) bioreactors in-service (summer mode) Biogas Utilization System Chiller replacement – Oct 4 Fermenter 2 In Service – Oct 5 Recovery (Hypochlorite) Clean - Train 8; Total = 1
November 2010
No main plant or secondary bypass events Eleven (11) out of eleven (11) bioreactors in-service (summer mode) Membrane Repair Project - Trains 1,2,3,5,6,8 Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6 Total = 6 High efficiency flare out of service for winter shutdown
December 2010
No main plant or secondary bypass events Eleven (11) out of eleven (11) bioreactors in-service (summer mode). Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,7; Total = 6 Recovery (Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 5 of 20
![Page 8: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/8.jpg)
0.00
15.40
0.00
0.00
0.00
0.000.00
0.50
0.00
(ML/day)
171.10
14.65
0.00
40.41
0.00506.40
12.45
0.00116.80
8.63
0.0075.10
9.27
0.00106.90
237.60
22.55
0.00
3.36
0.0023.00
0.11
0.003.00
1427.37
0.00
0.000.00
12.20
9.94
8.4510.50
7.42
7.007.54
7.42
7.70
7.50
7.328.08
7.287.69
7.51
7.38
7.45
7.197.92
7.46
(ML)
7.35
7.057.76
TBP FEC TBP FECx 106FEC TBP FECTBP FEC TBP
BOD5/CBOD5 TSS E. coli Total Digested Sludge
(mg/L) (mg/L) (mg P/L) (mg N/L) Counts/100 mLTP
MonthpH
FEC MPW FECSECPBP RAW
FLOW
TBP
7.90
7.39
7.177.66
6.987.49
7.37
7.08
7.40
7.257.83
14
3
< 132
0.51 17.3 1.89 1.5
NH3-N
241.42 9.2023.3147
3.3 171 4.8 5.191.74 2.9 64.8 6.65 0.48
2009 Avg0.23 268.250.00 253.50
9.333.79
9.553.79
82.36
7.33
85.88
7.41
7.137.85
7.42
7.147.80
97,99683.90 90,748 3,7273,437 3,521
74.85
73.38
4.54.5
1.6
0.82.5
85.07
73.35
4
Annual Volume (ML)
250.10
236.02
209.30244.00
226.00290.10
73.30
< 1
6
3.9
1.7
6
77.44
< 1200
< 124
10
76.59
72.86
< 191
10
20
22
66.37
348
6
1
< 1
67.00
17
6
124
20
4
< 1
5
< 129
6
< 130
4
0.0
0.0
0.00.0
0.0
0.0
2.8
2.23.7
4.5
4.6
2.5
1.7
2.7
1.54.5
2.3
4.5
2.7
1.64.5
3.43.4
3.7
3.0
0.0
0.00.0
3.4
1.65
4.61
0.3010.20
8.14
0.75
0.12
0.75
0.113.08
0.96
0.25
0.15
0.020.60
0.071.38
0.16
0.040.41
1.19
0.075.16
0.35
5.30
3.77
0.717.39
1.354.77
2.76
1.72
2.22
0.268.25
3.18
0.0
0.0
0.00.0
30.830.8
0.0
0.0
21.3
14.227.8
30.8
24.2
16.4
8.020.5
14.027.0
17.5
7.9
23.7
14.638.7
21.6
39.0
20.2
17.326.6
nsns
34.7
26.4
0.0
0.00.0
ns
1.07
0.44
0.310.69
0.231.09
0.29
0.20
0.41
0.241.03
0.40
1.18
0.59
0.271.10
0.272.38
0.61
0.17
0.80
0.261.87
0.71
0.55
0.54
0.351.00
0.230.47
0.39
0.26
0.26
0.180.40
0.32
0.0
0.0
0.00.0
8.58.5
0.0
0.0
6.8
5.28.2
8.5
7.5
4.5
2.35.7
4.58.6
4.8
2.4
6.8
4.710.6
6.3
10.4
5.7
5.16.4
nsns
9.8
9.0
0.0
0.00.0
ns
8.4
5.9
3.18.4
3.59.2
4.2
2.8
5.1
3.38.7
5.1
15.0
4.3
2.412.0
3.17.9
4.8
2.6
5.7
3.720.0
5.6
5.6
5.1
3.79.4
3.25.9
4.3
3.4
4.2
2.66.5
4.0
0
0
00
117117
0
0
161
92356
117
244
139
86346
54220
90
16
162
61440
117
300
156
106226
nsns
235
169
0
00
ns
4.9
3.7
2.95.0
2.34.9
3.1
2.3
3.1
< 2.05.1
3.3
3.6
2.4
< 2.03.5
2.55.1
2.4
< 2.0
3.2
< 2.013.6
3.2
5.4
3.7
2.77.1
00
2.9
2.34.3
3.4
2.69.6
3.5
< 2.0
0
00
0
252
194
194194
49155
183
142
116
51230
104
246
131
109164
nsns
234
224
0
00
ns
12.30
11.15
10.3012.30
8.5013.00
10.90
8.20
10.55
9.6012.80
10.80
12.40
10.21
9.4011.60
10.04
7.20
9.37
8.2011.00
9.69
7.3011.40
10.82
9.77
9.65
8.1011.80
9.36
5.6011.30
232.06
223.30
250.08
229.60273.00
241.37
334.60
260.53
238.90322.10
276.53
217.50
268.24
238.80321.20
267.19
244.60321.40
269.80
235.52
210.60264.40
221.40251.20
246.00
230.00
232.77
204.10247.30
235.60
261.60
247.16
220.30254.70
237.40300.00
242.96
233.80
275.40
240.50432.00
252.67
873.00
284.03
248.30403.70
328.72
227.60
300.17
249.30565.00
285.52
167.30405.60
292.00
254.73
238.60368.10
231.70262.00
260.18
242.10
242.42
214.00256.80
245.06
0.00
0.00
0.000.00
0.000.00
0.00
0.00
0.003.50
0.00
0.84
0.0019.60
0.12
1.75
0.0028.78
0.10
0.00
0.000.00
0.00
0.000.00
0.01
0.000.20
0.00
0.00
908Total Digested Sludge (ML)
Max
0.00
0.000.00
0.00
0.000.00
Min
Min
Avg
MinMax
Avg
MinMax
Max
Avg
Avg
MinMax
Avg
MinMax
MinMax
Avg
MinMax
AvgJanuary
July
Avg
MinMax
Avg
MinMax
Avg
April
May
June
MinMax
MinMax
Avg
February
March
December
August
September
October
November
TABLE 1. 2010 Plant Performance. Summary of the Gold Bar Wastewater Treatment Plant performance from January 1 to December 31, 2010 as required under sections 5.1.3 (a) and 5.1.3 (b) of the Approval to Operate No. 639-02-07. All analytical data in the table were developed on 24-hour composite samples collected using autosamplers at the sampling location specified in Table 5-1 of the Approval to Operate No. 639-02-07. The 24-hour composite samples were retained in locked refrigerators until the laboratory staff removed them the following morning. The discreet samples for Escherichia coli (E. coli) determinations were collected at random times each day. All conditions and limits specified in the Table 5.1 of the Approval to Operate No. 639-02-07 were met in 2010.
2010 Avg 248.49 10.21 159 3.2
Avg
144
80231
164
119226
0.00
0.000.00
0.11
0.003.00
3.36
0.0023.00
9.27
0.00106.90
22.55
0.00237.60
8.63
0.0075.10
42.15
0.00531.70
174.60
13.29
0.00123.20
0.00
0.00
0.000.00
VOLUME(ML)
0.00
0.00
0.50
0.0015.40
14.77
0.00
PBP – Plant Bypass FEC – Final Effluent, Combined TSS – Total Suspended Solids MPW – Membrane Product Water TBP – Total Bypass Plant (including plant and secondary) RAW – Influent TP – Total Phosphorus ns – No sample SEC – Secondary Bypass Plant BOD5 – 5-day Biochemical Oxygen Demand NH3-N – Ammonia as nitrogen CBOD5 – 5-day Inhibited BOD
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 6 of 20
![Page 9: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/9.jpg)
1.13
0.13
13 6
0 38
0 04
6 28
0.40
0 05
1 05
3 06
0 07
0 51
1 60
0 08
0 03
0 98
4 29
0.12
1 09
0 06
7.18
2 89
4 07
6 20
0 60
9 82
4 35
0 90
TABLE 2. 2010 Reclaimed Water Quality. Summary of data developed on the ultrafiltered final effluent (i.e. reclaimed water) samples from January 1 to December 31, 2010 as required under section 3.1.3 (h) and 5.1.3 (c) of the Approval to Operate No. 639-02-07. All parameters except E. coli which were developed on daily 24-hour composite samples of the recycled water. The E. coli testing was conducted on discrete samples collected on a daily basis..
Avg
1
11
< 1
240
< 1
11
2 97
December
August
September
October
November
April
May
June
Min
Max
Min
Max
Avg
February
March
Avg
January
July
Avg
Min
Max
Avg
Min
Max
Avg
Min
Max
Min
Max
Avg
Min
Max
Avg
Avg
Min
Max
Avg
Min
Max
Avg
Min
Max
Max
9 65
8.10
11.80
9 36
5 60
11.30
Min
Min
Avg
8.45
9 37
8 20
10.04
7 20
12.40
11.00
7 30
11.40
0.27
4 36
0 25
0 02
1 28
0.11
0 01
< 2 0
8.8
< 2 0
10.82
9.77
12.20
9 67
9 60
12.80
10.80
10.21
9.40
11.50
10.55
8 50
13.00
10.90
8 20
12.30
11.15
10.30
12.30
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
3.4
< 2 0
8.9
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
< 2 0
2.7
2.1
< 2 0
13 0
20 6
18 5
2.4
2.1
< 2 0
2.5
2.2
< 2 0
3.4
21 8
14 2
17 5
19 5
58 6
53.7
21 8
18 2
71.4
57 9
79 5
14.7
29 6
20 3
24 5
16 2
4.0
22 0
25.1
19 2
66.7
60 2
70.4
27.7
19.1
33 3
73 8
46 2
70 8
53 0
84.1
72 0
62 6
80 8
116
73 0
63 5
80 9
70 0
58.1
78 2
69 9
64 9
73 8
75 8
64 5
111
89.4
74 2
112
4
< 1
500
3
< 1
22
4
< 1
48
3
< 1
39
< 1
< 1
1
< 1
3
< 1
7.84
7.26
< 1
< 1
< 1
< 1
< 1
< 1
< 1
< 1
8.09
7.88
7.74
8.02
7.90
8.14
7.87
7.65
8.02
7.50
8.12
7.94
7.64
8.18
7.94
7.76
8.11
7.98
7.81
8.16
8.07
7.92
8.20
8.02
7.57
8.15
8.01
7.86
8.13
0 3
< 0.3
0.4
0 3
< 0.3
0 6
0 3
< 0.3
0 6
0 6
< 0.3
0 8
0.7
< 0.7
1 6
0 9
< 0.7
3 5
0 8
< 0.7
1.7
0.7
< 0.7
0.7
0 9
< 0.7
2 8
0.7
< 0.7
1 6
0.7
< 0.7
1 0
0.7
< 0.7
1.1
8.42
7.14
10 8
9.37
8.30
7.51
11 0
7.84
7.74
8.07
7.73
8.30
8.13
7.00
9.60
7.33
6.24
8.20
0.26
0.09
0.38
0.34
0.13
0.50
8.82
8.55
8.84
8.35
9.20
8.38
8.09
8.66
8.69
0.126
< 0.040
1.14
0.197
0 056
0 531
0.125
< 0.040
0 506
0 296
0 076
0.769
0 521
0 044
1 610
0.436
0 086
1.32
0.406
0 058
1.31
0.195
0 059
0 875
0.122
0 053
0 267
0.413
0 049
0 332
0 082
4.18
0.125
0 070
0 829
0.124
522
472
615
514
429
571
522
440
745
490
444
562
575
401
659
624
496
726
633
387
784
598
493
660
538
439
585
554
424
593
230
1,280
420
435
599
527
0.18
< 0.14
0.44
0.22
0.14
0.41
0.23
0.15
0.44
0.18
0.12
0.42
0.23
0.12
0.41
0.32
0.11
1.81
0.29
0.13
1.40
0.20
0.08
0.99
0.26
0.11
1.11
0.42
0.17
0.81
0.16
0.93
0.35
0.14
0.70
0.31
36.7
21 6
19.7
23.4
2 6410.18 32.1 81.1144 1 85
10.50 < 2 0 27 520.4
230 0.08
1,280 1.81
Month
Max
779
1,300
828
780
875
788
1,010
896
Total Suspended
Solids
(mg/L)
Dissolved Organic Carbon
946
861
795
1,030
8.00
7.94
7.54
911
697
988
pH
7.85
7.62
8.01
7.90
7.73
960
809
1,070
984
625
1,400
938
803
994
871
722
939
873
807
926
847
992
500
798
997
911
865 < 1
< 1
< 1
< 1
79.4
63 3
122
75 2
141
109
69 6
141
136
147
245
91.4
76 3
142
98 9
60.4
15.7
132
141
152
138
115
151
133
128
140
157
133
113
159
154
167
182
163
171
165
168
152
180
9 69 134
138
126
88
158
114
162
145
153
136
124
FLOW
ML (mg CaCO3 /L)
Total AlkalinityBiochemical
Oxygen Demand
(mg/L)(mg N/L)
AmmoniaChemical
Oxygen Demand
(mg/L)
Chloride
(mg Cl/L)
Conductivity
(mS/cm)
E. coli
(Counts/100 mL) (mg/L)
Total Phosphorus
(mg P/L)
Total Disolved Solids
(mg/L)
Turbidity
(NTU)
Annual Summary
Avg 896 4 7.93 0 6 6.97 0 257 543
Min 5 60 88 0 01 < 2 0 4.0 46 2 625 < 1 7.26 < 0.3 0.09 < 0.040
Max 13.00 182 20.4 8 90 79 5 245 1,400 8.20 3 5 11 0 4.180
Notes: 1) NTU – Nephelometric turbidity units 2) Counts/100mL – Counts per 100 mL of sample 3) ML – Megaliters (1,000,000 liters)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 7 of 20
![Page 10: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/10.jpg)
Type of Analysis Dates Acute Chronic
01/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201001/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201001/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201003/10/2010 Survival: all LC50 @ 7 days > 100%08/10/2010 Growth: All IC50 @ 7 days > 100%12/07/201003/10/2010 Survival: all LC50 @ 7 days > 100%08/10/2010 Growth: All IC50 @ 7 days > 100%12/07/2010
TABLE 3. 2010 Effluent Toxicity. Summary of chronic and acute toxicity testing as outlined in the sections 3.1.3 (g) and 5.1.3 (c) of the Approval to Operate No. 639-02-07. Both acute and chronic toxicity testing were carried out by contract laboratories in accordance with the Environmental Canada Biological Test Methods (Environment Canada 1990 and 1992). The acute testing included 48-hour Rainbow Trout static toxicity, 48-hour static toxicity using Daphnia magnia and 15-minute Microtox tests using luminescence bacteria. Seven-day Ceriodaphnia dubia, Fathead minnows survial and reproductive impairment test were used to determine chronic toxicity. The samples tested in 2010 appeared to be non-toxic to all organisms used for the acute and chronic testing.
All LC50 @ 48 hours > 100% (Non-toxic)
Microtox
Daphnia magnaAll LC50 @ 48 hours > 100% (Non-
toxic)
Rainbow TroutAll LC50 @ 48 hours > 100% (Non-
toxic)
Fathead minnows
Ceriodaphnia dubia
Number of Samples 9 3
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 8 of 20
![Page 11: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/11.jpg)
Study Date
mm/yy
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
PT
Sco
re
Avg
. z-s
core
CALA 03/10 93 0.473 94 0.431 97 0.200 98 0.145 93 0.461 72H 1.867 81VL 1.265
CALA 10/10 78 0.083 80 0.234 90 0.047 95 0.315 85 0.988 89 -0.045 93 -0.385
Notes:
IDEXX - Sample analyzed using the IDEXX (Quanti-tray) method.MF - Sample analyzed using membrane filtration (mENDO) method.
BOD - 5-day Biochemical Oxygen Demand, C-BOD - 5-day Carbonaceous Biochemical Oxygen Demand, TSS - Total Suspended Solids, NH3-N - Ammonia as Nitrogen, TP - Total Phosphorous.
CALA - Canadian Association for Laboratory Accreditation.
VH - Very high bias, H - High bias, L - Low bias, A - Acceptable, Q - Questionable, U - Unsatisfactory
PT Score > 70 acceptable.
NHs-N TPE. coli
(IDEXX)
TABLE 4. 2010 Summary of Gold Bar Wastewater Laboratory Proficiency Testing. Summary of quality assurance data as required under sections 3.1.3 (k) and 5.1.3 (c ) of the Approval to Operate No. 639-02-07, and includes the Laboratory z-scores achieved from analyzing proficiency testing (PT) samples for constituents required by the Approval to Operate No. 639-02-07. The 2010 PT samples were provided by the Canadian Association for Laboratory Accreditation (CALA). A PT scores greater than or equal to 70 or z-scores less than equal to 3.000 are considered acceptable. The PT data indicates that the instruments and the methodology used by the Laboratory were under control during the testing.
BOD C-BOD TSS E. coli (MF)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 9 of 20
![Page 12: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/12.jpg)
Occurred Date
ESS Incident No.
Incident DescriptionContravention
TypeAENV Ref.
No.
03/12/2010 ENV-00041
Approval to Operate Contravention - Composite secondary bypass samples were not collected. Samples dates are as follows: January 29, 2009 (discovered during annual report reconciliation) September 6, 2009 (discovered during annual report reconciliation) February 28, 2010 (discovered during Monthly report review) March 1, 2010 (discovered during Monthly report review)
Administrative(Monitoring)
234151
04/23/2010 ENV-00049Approval to Operate Contravention - Premature secondary bypass prior to meeting secondary treatment capacity of 420 ML/day.
UncontrolledRelease
235174
04/23/2010 ENV-00051Approval to Operate Contravention - Premature main plant bypass prior to meeting 910 ML/day pre- and primary treatment capacity.
UncontrolledRelease
235173
05/18/2010 ENV-00059Controlled shutdown of UV system for preventive maintenance.
ControlledRelease
235970
05/19/2010 ENV-00082Approval to Operate Contravention - Composite secondary bypass sample not collected due to autosampler failure.
Administrative(Monitoring)
236998
07/04/2010 ENV-00089
Secondary Short Term Bypass sampler failed to sample for bypass event <2 hours in duration. Grab sample taken by hand 250 ml every 30 min as per new procedure update. Approval requirements met.
Not Reportable 237576
07/12/2010 ENV-00095Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.
Not Reportable 237898
07/13/2010 ENV-00096Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.
Not Reportable 237908
07/13/2010 ENV-00097Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.
Not Reportable 237944
08/10/2010 ENV-00107Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.
Not Reportable 239002
09/01/2010 ENV-00114Approval to Operate Contravention - UV disinfection capacity of 420 ML/day not met.
UncontrolledRelease
239773
09/14/2010 ENV-00121Controlled nitrogen purge of biogas from anaerobic digester (#4) headspace as preparation for cleaning.
ControlledRelease
240157
12/29/2010 ENV-00166Approval to Operate Contravention - Final effluent sample for E.coli not analyzed. "No Result" reported.
Administrative(Monitoring)
243624
Table 5. Environmental Release Reports & Administrative Non-Compliances. Summary of environmental incidents as required under sections 5.1.3 (e) of the Approval to Operate No. 639-02-07 for 2010.
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 10 of 20
![Page 13: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/13.jpg)
Table 6. 2010 Summary of Monthly/Annual Chemical Usage at the Gold Bar Wastewater Treatment Plant
Chemical NameCaustic Soda
(Bagged)Citric Acid Hydrogen Peroxide Liquid Nitrogen Sodium Bisulfite Softner Salt
Chemical Formula NaOH C6H8O7 H2O2 N2 Zetag 8180Magnafloc
1011Magnafloc
110LNaHSO3 NaCl
Chemical SupplierClearTech
Industries Inc.ClearTech
Industries Inc.US Peroxide LLC
Air Liquide Canada Inc.
ClearTech Industries Inc.
ClearTech Industries Inc.
ClearTech Industries Inc.
Various-City Stores Inventory
Purpose Used/Dosage point
Phosphate trimming in secondary effluent / Mixed liquor channel to secondary clarifier
Enhanced Primary Treatment
Chemical cleaning of sludge lines
Odour Control - pH adjustment / Odour Control Facilties
Membrane cleaning - pH adjustment / Membrane tanks
Chemical cleaning of ultrafiltration membranes - reverses inorganic fouling / Membrane tanks
Odour Control - oxidizes H2S / Plant Influent Channels 1 and 2
Purging of biogas system / Digester Headspace and biogas piping
Flocculating agent for Waste Activated Sludge (WAS) / Dissolved Air Flotation Thickening Facility
Chlorine neutralizing agent for ultrafiltration membrane cleaning / Membrane tanks
East Scrubber: Odour Control - oxidizes of H2S / Odour Control Facilities
A. Chemical cleaning of ultrafiltration membranes - reverses biofouling of membranes / Membrane tanks
B. Maintain chlorine residual in product water distribution to Strathcona County / Contact tanks
Water Softening for Odour Control Chemical Solution / Odour Control Facilities
Concentration Used50% NaOH -
diluted with H2O and heated
50% 50% by Weight 100%0.25% to 0.35% (introduced as
solution)
Dry Powder(100%)
Emulsion(50%)
38 to 44% Dry Weight
Feed Rate
Used when efffluent
phosphate concentration >0.5 mg/L P
ContinuousFeed
Applied Sparingly as required
Intermittent Intermittent Continuous Feed Continuous Feed Continuous Feed Continuous Feed Continuous Feed Intermittent Intermittent Intermittent
Minimum 8 mg/L 100 mg/L 500 kg/day N/A 1 mg/L 1 mg/LFunction of
Sulphide Loading
Function of Product Water
flow
Function of Sulphide Loading
Maximum 100 mg/L 200 mg/L 2000 kg/dayAs controlled by feed equipment
2 mg/L 2 mg/LControlled by PID
loop and PLC controlled
Controlled by PID loop and PLC
controlled
Controlled by PID loop and PLC
controlled
Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total UsedScrubbers Membrane Scrubbers Membrane
litres litres kg litres litres litres kg sm3 kg kg kg litres litres litres kg
January 44,952 0 0 444 242 424 5,219 0 3,144 0 0 635 14,539 8,807 100
February 65,004 0 0 444 17 820 1,000 0 2,396 0 0 419 11,679 9,343 0
March 72,960 0 0 518 1,092 1,592 528 0 2,552 0 0 1,227 12,501 11,545 0
April 95,601 0 0 370 191 345 3,624 0 2,420 0 0 6 24,040 16,368 3,100
May 278,426 0 0 740 40 495 132 0 2,400 0 0 178 16,877 5,100 142
June 255,791 0 0 13,372 753 1,483 1,315 0 120 0 0 214 19,004 6,557 2,620
July 254,020 8,352 0 6,289 6 138 1,334 0 3,388 54 0 1 16,455 9,279 1,300
August 259,593 15,744 0 2,146 35 0 2,450 0 2,196 102 0 10 26,708 4,817 96
September 31,031 0 0 814 440 468 202 4,000 1,796 0 0 224 30,922 5,378 2,200
October 4,171 0 0 2,664 151 229 0 0 2,276 0 0 195 34,735 5,522 1,480
November 305 0 0 3,223 205 267 0 0 1,368 0 0 406 6,342 6,236 79
December 12,209 0 0 740 253 1,023 0 0 1,704 0 0 797 8,006 4,677 1,380
2010 - Annual Total 1,374,063 24,096 0 31,764 3,425 7,284 15,804 4,000 25,760 156 0 4,312 221,808 93,629 12,497
Months
16%
Sodium Hypochlorite
NaOCl
50%
Caustic Soda (Liquid)
NaOH
ClearTech Industries Inc.
Alum
Al2(SO4)3•14H2O
Marsulex
48.5%
Polymer
BASF (formerly CIBA Specialty Chemicals)
Flocculating agent for Enhanced Primary Treatment
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 11 of 20
![Page 14: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/14.jpg)
Name Title WWT Certification Level
Corkery,Vince M Director, Wastewater Treatment Plant Edmonton IV
Heise,Geoffry R Senior Manager, Operations II
Grossell,Ken M Manager, Operations IV
Lin, Bing Manager, Production Engineering I
Schneider,Brian P WWTP Operator Foreman IV
Kerr,David A WWTP Operator Foreman IV
Graham,Thomas A WWTP Operator Foreman IV
Jones,Kira I WWTP Lead Operator III
Kwan,Tom WWTP Lead Operator IV
Ropchan,Ross M WWTP Lead Operator II
Paszkiewicz,Marek WWTP Lead Operator - Utility Crew Foreman III
Feltmate,Colleen J WWTP Lead Operator - Training Foreman III
Rindero,Billy J WWTP Operator III
Blatz,Kevin M WWTP Operator III
Barrett,Jeremy L WWTP Operator III
Li,Bing BL WWTP Operator III
Burton,Morley WWTP Operator II
Budden,Curt W WWTP Operator II
Mota,Ricardo L WWTP Operator II
Dawson,Terena M WWTP Operator lll
Mann,Kelly WWTP Operator II
Marcinek,David A WWTP Operator II
Espinosa,Diego F WWTP Operator I
Ketchum, Glen WWTP Operator I
Holman,Kenneth E WWTP Operator II - Restricted
Resler,Kenny A WWTP Operator I - Restricted
Hillaby,Greg WWTP Operator I - Restricted
Atkinson,Mike W WWTP Operator l
Table 7. 2010 List of Certified Wastewater Treatment Operators (as of March 2011)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 12 of 20
![Page 15: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/15.jpg)
Collection Date
Sampling Site Sampling Issue Action Taken
02/28/2010 BYPASS
03/01/2010 BYPASS
05/19/2010 BYPASS
05/21/2010 BYPASS
07/04/2010 BYPASSShort Term Bypass Autosampler
Failed
Grab samples manually collected by Operations staff. Approval requirements met.
Reported to AE, ref no. 237576
12/29/2010 FECSample collected, but not analyzed
at the correct temperature
Reported to Alberta Environment as "Administrative Non-Compliance", reference
number 243624
NS - No SampleFEC - Final Effluent, combined
TABLE 8. 2010 Sampler Non-Conformance Summary
Abbrevations
Reported to Alberta Environment as "Administrative Non-Compliance", reference number 234151. Manual sampling response
protocol implemented.
Reported to Alberta Environment as "Administrative Non-Compliance", reference number 236998. Maintenance procedures updated for sampler hose replacement and installation and improved communications
protocols between Lab and Operations implemented.
Long Term Bypass Autosampler Failed
Long Term Bypass Autosampler Failed
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 13 of 20
![Page 16: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/16.jpg)
FL 3 FL4 Task NameWork Group
% Work Complete Duration Start Finish
JANUARYDIG Digester Gas Line Valves for Mixing Compressor for Dig 4 100% 41 days 01/01/2010 02/26/2010PRI LOOPS Digester Auto Control Conversion to Delta V 0% 151 days 01/01/2010 07/30/2010DIS SCRNS Screen Wash (200A) Ops 100% 1 day 01/12/2010 01/12/2010DIS SCRNS Screen Inspection (200A) Maint 100% 3 days 01/12/2010 01/12/2010SEC Secondary 6, 7, 8 Separation Gate Replacement Maint 0% 4 days 01/12/2010 01/15/2010DIS SCRNS Screen Wash (200B) Ops 100% 1 day 01/13/2010 01/13/2010DIS SCRNS Screen Inspection (200B) Maint 100% 1 day 01/13/2010 01/13/2010
FEBRUARYFER BLND1 Blend Tank 1 Clean Ops 100% 3 days 02/02/2010 02/04/2010FER BLND2 Blend Tank 2 Clean Ops 100% 3 days 02/09/2010 02/11/2010PCS DLTAV Blower 6 - Delta V Maint/TS 0% 41 days 02/15/2010 04/12/2010DIS UVS01 UV Channel 1 Relamp Maint 100% 28 days 02/15/2010 02/26/2010ODR ASCR1 Media Replacement for East Scrubber Ops 100% 9 days 02/16/2010 02/17/2010
MARCHPTR SCRS3 Screens 7 and 8 Wash Press Eng/TS 100% 80 days 03/01/2010 06/18/2010MEM CCTK1 Chlorine Contact Tank 1 Clean and Inspect Ops 100% 1 day 03/09/2010 03/09/2010MEM CCTK2 Chlorine Contact Tank 2 Clean and Inspect Ops 100% 1 day 03/10/2010 03/10/2010DIS UVS02 UV Chanel 2 Relamp Maint 100% 38 days 03/15/2010 03/26/2010PTR GRIT2 Grit Tank 2 Clean Ops 100% 1 day 03/29/2010 03/30/2010PTR SCRS1 Screen 2 Clean Ops 100% 1 day 03/31/2010 03/31/2010PTR SCRS1 Screen 2 Inspection Maint 100% 1 day 03/31/2010 03/31/2010
APRILDIS UVS05 Channel 5 Performance Testing 100% 5 days 04/01/2010 04/07/2010PTR GRIT1 Grit Tank 1 Clean Ops 100% 1 day 04/06/2010 04/07/2010FER FERM3 Fermenter 3 Clean Ops 100% 5 days 04/06/2010 04/08/2010PTR SCRS1 Screen 1 Clean Ops 100% 1 day 04/08/2010 04/08/2010PTR SCRS1 Screen 1 Inspection Maint 100% 1 day 04/08/2010 04/08/2010PTR GRIT4 Grit Tank 4 Clean Ops 100% 4 days 04/12/2010 04/12/2010PTR GRIT5 Grit Tank 5 Clean Ops 100% 14 days 04/12/2010 04/23/2010PTR GRIT4 Grit Tank 4 Inspection Maint 100% 1 day 04/13/2010 04/13/2010PTR SCRS2 Screen 5 Clean Ops 100% 2 days 04/13/2010 04/13/2010PTR SCRS2 Screen 5 Inspection Maint 100% 1 day 04/13/2010 04/13/2010PTR GRIT5 Grit Tank 5 Inspection Maint 100% 10 days 04/26/2010 04/27/2010SSP PPIPE Acid Clean Pipeline from Lagoons Ops 100% 4 days 04/27/2010 04/28/2010PTR GRIT3 Grit Tank 3 Clean Ops 100% 1 day 04/28/2010 04/29/2010PTR SCRS1 Screen 3 Clean Ops 100% 1 day 04/30/2010 04/30/2010PTR SCRS1 Screen 3 Inspection Maint 100% 5 days 04/30/2010 04/30/2010
MAYCBF Sludge to Farmland Ops 100% 152 days 05/03/2010 11/30/2010CBF Geotube Pilot Project Ops 0% 152 days 05/03/2010 11/30/2010PRI PRI07 Primary 7 Wash Ops 100% 2 days 05/03/2010 05/03/2010SEC SCL05 Secondary Clarifier 5 Clean Ops 100% 2 days 04/14/2010 04/15/2010PRI PRI07 Primary 7 Chain Removal Maint 100% 9 days 05/04/2010 05/14/2010PRI PRI08 Primary 8 Wash Ops 100% 1 day 05/04/2010 05/04/2010SEC SCL05 Secondary Clarifier 5 Inspection Maint 100% 6 days 04/15/2010 04/22/2010PRI PRI07 Primary 7 Motor Drive Replacement (Pumps) Maint 100% 1 day 05/05/2010 05/05/2010PTR CHANL Primary 7-8 Influent Channel Inspection Ops 100% 2 days 05/05/2010 05/06/2010PRI PRI08 Primary 8 Motor Drive Replacement (Pumps) Maint 100% 1 day 05/06/2010 05/06/2010PTR GRIT6 Grit Tank 6 Clean Ops 100% 10 days 05/10/2010 05/21/2010PTR SCRS3 Screen 7 Clean Ops 100% 0 days 05/11/2010 05/11/2010SEC BIO05 Secondary Bio 5 Inspection Maint 100% 1 day 05/11/2010 05/11/2010PTR SCRS3 Screen 7 Inspection Maint 100% 1 day 05/12/2010 05/12/2010PRI PRI07 Primary 7 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 05/17/2010 05/28/2010PRI PRI08 Primary 8 Chain Removal Maint 100% 10 days 05/17/2010 05/28/2010SEC SCL08 Secondary Clarifier 8 Clean Ops 100% 2 days 05/17/2010 05/18/2010SEC SCL08 Secondary Clarifier 8 Inspection Maint 100% 4 days 05/18/2010 05/21/2010PTR GRIT6 Grit Tank 6 Inspection Maint 100% 2 days 05/25/2010 05/26/2010PRI PRI07 Primary 7 Install Loop Chain Maint 100% 10 days 05/31/2010 06/11/2010PRI PRI08 Primary 8 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 05/31/2010 06/11/2010SEC SCL04 Secondary Clarifier 4 Clean Ops 100% 1 day 05/31/2010 06/01/2010
JUNEDIG BIOUS Flowmeter Installation - High Pressure Biogas Eng/TS 100% 44 days 06/01/2010 07/30/2010SEC SCL04 Secondary Clarifier 4 Inspection Maint 100% 4 days 06/01/2010 06/04/2010UTL HTWAT Hot Water System Flushing Maint/Ops 10% 66 days 06/01/2010 08/31/2010PTR SCRS2 Screen 4 Clean Ops 100% 2 days 06/07/2010 06/07/2010
Table 9. Summary of 2010 Major Work Program. "FL3" and "FL4" refer to Asset Management Functional Location Level 3 and 4, respectively.
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 14 of 20
![Page 17: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/17.jpg)
FL 3 FL4 Task NameWork Group
% Work Complete Duration Start Finish
PTR SCRS2 Screen 4 Inspection Maint 100% 1 day 06/07/2010 06/07/2010UTL SUB01 SUB 1 Maintenance Maint 100% 10 days 06/07/2010 06/18/2010PTR SCRS2 Screen 6 Clean Ops 100% 0 days 06/08/2010 06/08/2010PTR SCRS2 Screen 6 Inspection Maint 100% 1 day 06/08/2010 06/08/2010PRI PRI03 Primary 3 Wash Ops 100% 1 day 06/09/2010 06/09/2010PRI PRI04 Primary 4 Wash Ops 100% 1 day 06/10/2010 06/10/2010PRI PRI08 Primary 8 Install Loop Chain Maint 100% 10 days 06/14/2010 06/25/2010SEC SCL07 Secondary Clarifier 7 Clean Ops 100% 2 days 06/14/2010 06/15/2010PRI PRI03 Primary 3 Replace Magmeter Maint. 100% 1 day 06/15/2010 06/15/2010SEC CHANL Replace Actuator on Butterfly Gate 2 Maint/TS 100% 1 day 06/15/2010 06/15/2010SEC SCL07 Secondary Clarifier 7 Inspection Maint 100% 4 days 06/17/2010 06/22/2010PTR GRIT7 Grit Tank 7 Clean Ops 100% 10 days 06/21/2010 07/02/2010SEC BIO07 Secondary Bio 7 Inspection Maint 100% 1 day 06/22/2010 06/22/2010PRI PRI03 Primary 3 Inspection Maint 100% 4 days 06/28/2010 07/01/2010SEC SCL01 Secondary Clarifier 1 Clean Ops 100% 2 days 06/28/2010 06/29/2010SEC SCL01 Secondary Clarifier 1 Inspection Maint 100% 4 days 06/29/2010 07/02/2010
JULYPTR GRIT7 Grit Tank 7 Inspection Maint 100% 4 days 07/05/2010 07/08/2010PTR SCRS3 Screen 8 Clean Ops 100% 3 days 07/05/2010 07/05/2010PTR SCRS3 Screen 8 Inspection Maint 100% 3 days 07/06/2010 07/06/2010PRI PRI05 Primary 5 Wash Ops 100% 1 day 07/07/2010 07/07/2010PRI PRI06 Primary 6 Wash Ops 100% 1 day 07/08/2010 07/08/2010PRI PRI04 Primary 4 Inspection Maint 100% 4 days 07/12/2010 07/15/2010PRI PRI05 Primary 5 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 07/12/2010 07/23/2010SEC SCL11 Secondary Clarifier 11 Clean Ops 100% 2 days 07/12/2010 07/13/2010PRI PRI06 Primary 6 Motor Drive Replacement (Pumps) Maint 100% 3 days 07/13/2010 07/13/2010SEC SCL11 Secondary Clarifier 11 Inspection Maint 100% 4 days 07/13/2010 07/16/2010PRI PRI05 Primary 5 Motor Drive Replacement (Pumps) Maint 100% 1 day 07/14/2010 07/14/2010SEC BIO11 Secondary Bio 11 Inspection Maint 100% 1 day 07/20/2010 07/20/2010PRI PRI05 Primary 5 Inspection Maint 100% 4 days 07/26/2010 07/29/2010PRI PRI06 Primary 6 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 9 days 07/26/2010 08/05/2010SEC SCL02 Secondary Clarifier 2 Clean Ops 100% 2 days 07/26/2010 07/27/2010SEC SCL02 Secondary Clarifier 2 Inspection Maint 100% 3 days 07/27/2010 07/30/2010PTR CHANL Primary 5-6 Influent Channel Inspection Ops 100% 2 days 07/28/2010 07/29/2010
AUGUSTDIG DIG04 Digester 4 Cleaning Ops 75% 42 days 08/02/2010 09/28/2010PRI PRI06 Primary 6 Inspection Maint 100% 4 days 08/09/2010 08/12/2010SEC SCL10 Secondary Clarifier 10 Clean Ops 100% 2 days 08/09/2010 08/10/2010SEC SCL10 Secondary Clarifier 10 Inspection Maint 100% 4 days 08/10/2010 08/13/2010SEC BIO10 Bio 10 Replace WAS Seed Valve Actuator Maint 100% 1 day 08/13/2010 08/13/2010DIG DIG04 Digester 4 Electrical Work Maint 0% 4 days 08/16/2010 08/19/2010PRI PRI01 Primary 1 Wash Ops 100% 1 day 08/16/2010 08/16/2010PRI PRI01 Primary 1 Inspection Maint 100% 2 days 08/17/2010 08/18/2010PRI PRI02 Primary 2 Wash Ops 100% 1 day 08/17/2010 08/17/2010DIG DIG04 Digester 4 Inspect 3-Ways, PRV's, and Main Gas Line Maint 100% 3 days 08/17/2010 08/19/2010PTR CHANL Primary 1-4 Influent Channel Inspection Ops 0% 2 days 08/18/2010 08/19/2010PRI PRI02 Primary 2 Inspection Maint 100% 2 days 08/19/2010 08/20/2010SEC SCL03 Secondary Clarifier 3 Clean Ops 100% 3 days 08/23/2010 08/24/2010SEC SCL03 Secondary Clarifier 3 Inspection Maint 100% 6 days 08/24/2010 08/27/2010SEC CHANL Replace Actuator on Butterfly Gate 3 Maint/TS 0% 1 day 08/24/2010 08/24/2010SEC BIO03 Secondary Bio 3 Inspection Maint 100% 1 day 08/31/2010 08/31/2010
SEPTEMBERDIG DIG04 Digester 4 Mechanical Work Maint 0% 7 days 09/01/2010 09/09/2010SEC SCL09 Secondary Clarifier 9 Clean Ops 100% 2 days 09/07/2010 09/08/2010SEC SCL09 Secondary Clarifier 9 Inspection Maint 100% 4 days 09/08/2010 09/13/2010SEC BIO09 Bio 9 Replace WAS Seed Valve Actuator Maint 0% 1 day 09/10/2010 09/10/2010SSP SQ1TP Square 1 Replace Transfer Pump C-Crew 0% 10 days 09/13/2010 09/24/2010SEC SCL06 Secondary Clarifier 6 Clean Ops 100% 2 days 09/20/2010 09/21/2010SEC SCL06 Secondary Clarifier 6 Inspection Maint 100% 4 days 09/21/2010 09/24/2010
OCTOBERPCS DLTAV Digester 7 and 8 - Delta V Maint/TS 80% 43 days 10/01/2010 11/30/2010DIG DIG04 Digester 4 Inspection Maint 0% 1 day 10/04/2010 10/04/2010DIG BIOUS Digester Square 1 Replace Chiller Eng/TS 100% 42 days 10/04/2010 11/30/2010PTR GRIT6 Grit Tank 6 Clean Ops 100% 5 days 10/04/2010 10/08/2010PTR GRIT6 Grit Tank 6 Inspection Maint 100% 4 days 10/12/2010 10/15/2010PTR SCRS3 Screen 7 Clean Ops 100% 1 day 10/12/2010 10/12/2010PTR SCRS3 Screen 7 Inspection Maint 100% 1 day 10/13/2010 10/13/2010PTR GRIT7 Grit Tank 7 Clean Ops 100% 5 days 10/18/2010 10/22/2010MEM CCTK1 Chlorine Contact Tank 1 Clean and Inspect Ops 0% 1 day 10/19/2010 10/19/2010
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 15 of 20
![Page 18: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/18.jpg)
FL 3 FL4 Task NameWork Group
% Work Complete Duration Start Finish
MEM CCTK2 Chlorine Contact Tank 2 Clean and Inspect Ops 0% 1 day 10/20/2010 10/20/2010PTR GRIT7 Grit Tank 7 Inspection Maint 100% 4 days 10/25/2010 10/28/2010PTR SCRS3 Screen 8 Clean Ops 100% 1 day 10/25/2010 10/25/2010PTR SCRS3 Screen 8 Inspection Maint 100% 1 day 10/26/2010 10/26/2010
NOVEMBERPRI PRI09 Primary 9 Wash Ops 0% 3 days 11/01/2010 11/03/2010PRI PRI09 Primary 9 Inspection Maint 0% 3 days 11/02/2010 11/04/2010PTR SCRS2 Screen 4 Clean Ops 100% 1 day 11/02/2010 11/02/2010PTR SCRS2 Screen 4 Inspection Maint 100% 1 day 11/02/2010 11/02/2010PTR SCRS2 Screen 5 Clean Ops 100% 1 day 11/03/2010 11/03/2010PTR SCRS2 Screen 5 Inspection Maint 100% 1 day 11/03/2010 11/03/2010PTR SCRS2 Screen 6 Clean Ops 100% 1 day 11/04/2010 11/04/2010PTR SCRS2 Screen 6 Inspection Maint 100% 1 day 11/04/2010 11/04/2010PRI PRI10 Primary 10 Wash Ops 0% 3 days 11/08/2010 11/10/2010PTR GRIT1 Grit Tank 1 Clean Ops 0% 2 days 11/08/2010 11/09/2010PRI PRI10 Primary 10 Inspection Maint 0% 3 days 11/09/2010 11/11/2010PTR SCRS1 Screen 1 Clean Ops 0% 1 day 11/10/2010 11/10/2010PTR SCRS1 Screen 1 Inspection Maint 0% 1 day 11/10/2010 11/10/2010PRI PRI11 Primary 11 Wash Ops 0% 3 days 11/15/2010 11/17/2010PTR GRIT2 Grit Tank 2 Clean Ops 0% 2 days 11/15/2010 11/16/2010PRI PRI11 Primary 11 Inspection Maint 0% 3 days 11/16/2010 11/18/2010PTR SCRS1 Screen 2 Clean Ops 0% 1 day 11/17/2010 11/17/2010PTR SCRS1 Screen 2 Inspection Maint 0% 1 day 11/17/2010 11/17/2010PRI PRI12 Primary 12 Wash Ops 0% 3 days 11/22/2010 11/24/2010PTR GRIT3 Grit Tank 3 Clean Ops 0% 2 days 11/22/2010 11/23/2010PRI PRI12 Primary 12 Inspection Maint 0% 3 days 11/23/2010 11/25/2010PTR SCRS1 Screen 3 Clean Ops 0% 1 day 11/24/2010 11/24/2010PTR SCRS1 Screen 3 Inspection Maint 0% 1 day 11/24/2010 11/24/2010
DECEMBERNo Major Work scheduled in December
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 16 of 20
![Page 19: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/19.jpg)
2010 Major Capital Projects Status Target Completion
Membrane Filtration 2010: No work in 20102011: Subject to Capital spending agreement with Suncor.
Biosolids Upgrading 2010: Facility construction completed; Mechtronix equipment delivered2011: Equipment assembly in Q1; system testing phase completed by end of 2011 December-11
Boiler/Plant Heating 2010: Construction commenced in late Q2 of 2010. 2011: Substantial completion and commissioning by end of Q2 2011. June-11
Grit Tanks and Screens 2010: Completed work on blower replacement for grit tanks. 2011: Start design in Q2, commence screen replacement in Q4 of 2011. Screens - March 2012Grit portion construction will commence Q3/Q4 of 2012 and be complete end of 2013. Grit Tanks - 2013
Sludge Fermenter Odour Control 2010: Project closed in early 2010. Complete
Sludge Fermenter Phase 2 2010: Addressed issues with scum removal and Fermenter 3 rake. Project closed. Complete
Twinning of Sludge Line 2010: Completed construction on booster pump station. 2011: Final commissioning and start up. June-11
Enhanced Primary Treatment2010: Completed commissioning of Chemical Dosing systems; installation of automated air scour system.
Complete
2011: Commissioning and start-up of Enhanced Primary Effluent pumps. Q3-2011
Digester 8 and Digester 7 2010: Commissioning with FE completed and substantial completion issued Dec. 20102011: Final commissioning and digester start up. June-11
Lagoon Supernatant Treatment 2010: Rezoning complete. Project design and construction deferred until 2012 Delayed
Plant Emergency Systems / Security Upgrade 2010: Completed in early 2010 Complete
Laboratory Building Mechanical Upgrades 2010: Main HVAC fan motor and VFD upgrade completed. 2011: Remaining Mechanical upgrade and roof repair to be completed in 2011. December-11
2010 Rehabilitation Projects Status Target Completion
Mechanical RehabilitationPrimary 5-8 Scum Pumping Renewel CompleteSquare 1 Sludge Transfer Pump Delayed May-11
Table 10. Summary of 2010 Completed Projects and 2011 Planned Major Capital and Rehabilitation Projects. Reported as per Approval No.639-0207, Section 5.1.3 (f).
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 17 of 20
![Page 20: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/20.jpg)
High Pressure Biogas Flow Meter CompleteCBF Supernatant Pumphouse Piping Upgrades CompletePrimary Influent/Effluent Channel Isolation Gates Delayed 2012Biogas Chiller Replacement CompleteSecondary 7/8 Clarifer Gear Drive Replacement CompleteDigester Square Sediment Trap Upgrades CompleteScreen 7-8 Wash Press CompleteElectrical/Instrumentation RehabilitationLab Transformer Replacement CompleteSecondary Area Lighting Renewal CompleteEast Parking Lot Lighting CompleteSecondary VFD Replacements CompleteProcess Control System Hardware UpgradesDigester 1-6 Auto Sequencing Platform Conversion CompleteSite/Building RehabilitationMisc Structural Safety/jAccess projects CompleteDAF Tank Fall Arrest System CompleteEyewash Station Upgrades Cancelled Not RequiredVentilation System in Sample Buildings Cancelled Not RequiredControl Room Renovations CompleteLandscaping/Paving CompleteMaintenance - Metal Storage Building Complete2010 Flight and Chain Replacement ProgramPrimary Clarifier 7/8 CompleteScum Gallery 1-3 CompletePlant Equipment ProjectsGrit 6 Incline Auger CompleteGrit 7 Horizontal Auger CompleteSecondary DO Probe Replacement Complete
2011 Project/Sub-Project Target Completion
160979 PCS UpgradesER-0127 Migrate Blower 6 Controls November-11ER-0196 Alarm Management July-05ER-0197 Migrate Primary 3-8 Controls September-11ER-0198 HMI Graphics Conversion July-05ER-0199 Migrate Digester 1-6 Hopper Valves May-11140990 Mechanical RehabER-0121 Digester Sludge Transfer Pump April-11ER-0173 Supernatant to CRWWC May-11ER-0189 Fermenter Dewatering Line September-11ER-0190 Primary Dewatering Discharge Relocation July-11ER-0200 Primary Instrument Air system August-11ER-0188 EPT Process Pipe Flushing Upgrades October-11ER-0201 Emergency Biogas Bypass to Flares November-11
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 18 of 20
![Page 21: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/21.jpg)
150981 Plant Equipment ER-0192 75Hp Diesel Power Unit May-11ER-0207 Grit #7 Incline Auger May-11ER-0208 TPS Replacement Parts May-11ER-0209 Magnetic Flow Meter - Bio #5 RAS April-11140987 Electrical and Instrumentation RehabER-0202 Primary Area Lighting Renewal June-11ER-0203 Secondary RAS Flow Meters and VFDs June-11ER-0197 Primary 3-8 Sludge Pump DeviceNet Conversion September-11ER-0031 Plant Communication System Extension October-11140986 Buildings & Site RehabER-0071 GB Site Entrance Security Upgrades May-11ER-0187 EPT HVAC Structures July-11ER-0109 West Scrubber Bldg Platform & Stairs July-11ER-0206 Channel Gate Actuator Access July-11ER-0204 DAF Tank Hopper Covers November-11140992 Primary 7&8 Structural Rehab November-11140991 Structural Rehab PrgER-0066 Primary Influent Channel Rehab November-11ER-0205 Pretreatment/Primary Odour Cover Renewal November-11ER-0114 Fermenter #4 Trough Liner October-11
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 19 of 20
![Page 22: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/22.jpg)
Appendices
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
March 2011 Page 20 of 20
![Page 23: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/23.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 24: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/24.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 25: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/25.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 26: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/26.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 27: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/27.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 28: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/28.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 29: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/29.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 30: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/30.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 31: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/31.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 32: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/32.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 33: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/33.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 34: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/34.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 35: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/35.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 36: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/36.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 37: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/37.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 38: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/38.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 39: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/39.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 40: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/40.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 41: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/41.jpg)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix A - 2010 Plant Performance Reports
![Page 42: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/42.jpg)
2010 EPT Chemical Test Condition
1. July 26, 2010 EPT dry weather test
1. In order to compare the EPT effluent/sludge parameters with and without chemical addition, EPT tanks were operating as conventional primary clarifier and reached steady state before alum and polymer were dosed
2. EPT effluent/sludge were sampled at 9:30 am before chemical dosing 3. EPT effluent/sludge were sampled at 15:30 pm and 17:30 pm after chemical dosing (6 hr
> EPT HRT) 4. Effluent sampling location: EPT effluent channel near to gate MOG 2727. 5. Sludge sampling location: EPT #9 sludge sampling line. 6. Both effluent and sludge were sampled at the same location before and after the
chemical dosing 7. Alum dosing rate 150 mg/L, polymer dosing rate 1.5 mg/L
2. Aug 12, 2010 EPT wet weather test
1. No sludge was sampled and tested 2. EPT influent and effluent were sampled at the same time but different location. 3. Influent sampling location: West channel that fed to EPT, before alum and polymer
mixers 4. Effluent sampling location: (EPT effluent channel) 5. Both influent and effluent were sampled at 1 hr interval (started at 11:30am and ended
22:30 pm) 6. Run out of polymer at time of 16:30 pm. 7. Alum dosing rate 150 mg/L, polymer dosing rate 1.5 mg/L
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix B - 2010 Enhanced Primary Treatment Performance Testing
![Page 43: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/43.jpg)
Sample 1Removal (%)
Sample 2Removal (%)
Sampling Time 9:30BOD (mg/L) 162 95.1 41.30 91.4 43.58 42.44COD (mg/L) 303 201 33.66 199 34.32 33.99TSS (mg/L) 47 32 31.91 49 -4.26 13.83
UVT 24.6 27.9 -13.41 31.4 -27.64 -20.53
Sample 1Change
(%)Sample 2
Change(%)Sampling Time 9:30
ALUMINUM 877 822 6.27 788 10.15 8.21%TS 8.47 8.1 4.37 8.1 4.37 4.37%VS 4.28 4.36 -1.87 4.35 -1.64 -1.75
TOTAL ALUMIN 0.0877 0.0822 6.27 0.0788 10.15 8.21PH 5.06 4.97 1.78 4.93 2.57 2.17
SludgeEPT Sludge
before dosing
EPT Sludge after Alume/Polymer dosing
July 26, 2010 EPT dry weather test result (Alum dose rate 150 mg/L, polymer dose rate 1.5 mg/L)
15:30 17:30
EffluentEPT
Effluent before
EPT Effluent after Alume/Polymer dosing
15:30 17:30
Ave Removal (%)
Ave Change (%)
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix B - 2010 Enhanced Primary Treatment Performance Testing
![Page 44: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater](https://reader036.vdocuments.mx/reader036/viewer/2022063002/5f4b39a283deba48e5268756/html5/thumbnails/44.jpg)
Aug 12, 2010 EPT wet weather test result (Alum dose rate 150 mg/L, polymer dose rate 1.5 mg/L)8/12/2010
Time Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Change% Influent Effluent Change%8/12/2010 11:30 78 6 121 -53 94 354 249 29 66 443 73 83 52 160 46 71 25 7 42 7 44 -0 27 22 8 20 5 10 098/12/2010 12:30 102 42 6 58 24 410 131 68 05 437 51 88 33 163 36 77 91 7 44 7 12 4 30 14 3 44 3 -209 798/12/2010 13:30 107 32 9 69 25 313 109 65 18 249 22 91 16 114 14 87 72 7 56 7 09 6 22 19 5 42 8 -119 498/12/2010 14:30 128 29 3 77 11 325 88 72 92 249 20 91 97 140 16 88 57 7 59 7 15 5 80 19 4 41 3 -112 898/12/2010 15:30 164 36 1 77 99 403 112 72 21 246 25 3 89 72 149 16 89 26 7 56 7 28 3 70 15 9 38 2 -140 258/12/2010 16:30 188 34 6 81 60 388 156 59 79 242 15 93 80 148 11 92 57 7 55 7 29 3 44 13 2 35 6 -169 708/12/2010 17:30 218 55 5 74 54 412 148 64 08 223 21 90 58 150 16 89 33 7 68 7 36 4 17 14 6 32 6 -123 298/12/2010 18:30 212 78 4 63 02 383 205 46 48 185 29 84 32 127 22 82 68 7 7 7 35 4 55 13 4 24 1 -79 858/12/2010 19:30 224 71 9 67 90 454 188 58 59 228 26 88 60 173 21 87 86 7 62 7 34 3 67 13 4 25 0 -86 578/12/2010 20:30 203 89 0 56 16 454 223 50 88 208 31 85 10 148 23 84 46 7 59 7 40 2 50 14 3 22 6 -58 048/12/2010 21:30 241 101 58 09 398 254 36 18 160 74 53 75 120 35 70 83 7 60 7 43 2 24 12 7 20 2 -59 068/12/2010 22:30 239 101 57 74 459 256 44 23 202 44 78 22 150 32 78 67 7 56 7 41 1 98 14 5 19 7 -35 86
Ave of 12:30 ~ 16:30 137.8 35.1 72.8 367.8 119.2 67.6 284.6 26.7 91.0 142.8 18.6 87.2 7.5 7.2 4.7 16.5 40.4 -150.4Note: run out of polymer starting 16:30 pm
PH UVTBOD COD TSS VSS
EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07
Appendix B - 2010 Enhanced Primary Treatment Performance Testing