EPCOR Water Services Inc. Gold Bar Wastewater Treatment Plant 2010 Wastewater Treatment Annual Report SUBMITTED TO: The City of Edmonton Asset Management and Public Works Drainage Services As per requirements of APPROVAL TO OPERATE NO. 639-02-07 March - 2011

Upload: others

Post on 15-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. Gold Bar Wastewater Treatment Plant

2010 Wastewater Treatment Annual Report

SUBMITTED TO:

The City of Edmonton Asset Management and Public Works

Drainage Services

As per requirements of

APPROVAL TO OPERATE NO. 639-02-07

March - 2011

Page 2: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011

TABLE OF CONTENTS

Approval No. 639-02-07 Requirement Page

2010 Overview N/A 1

Operational Activity Summary 5.1.3 (g) 3

Table 1. 2010 Plant Performance. 5.1.3 (a), (b) and (c); Wastewater Treatment Operations Plan Section 10 – Monitoring

Protocol

6

Table 2. 2010 Reclaimed Water Quality. 5.1.3 (c) and 3.1.3 (h); Wastewater Treatment Operations Plan Section 9 – Effluent Re-use

Protocol

7

Table 3. 2010 Effluent Toxicity. 3.1.3 (g); Wastewater Treatment Operations Plan Section 8 – Effluent Toxicity Testing

Protocol

8

Table 4. 2010 Summary of Gold Bar Laboratory Proficiency Testing.

3.1.3 (k); Wastewater Treatment Operations Plan Section 12 – Laboratory Accreditation

Program

9

Table 5. Environmental Release Reports & Administrative Non-Compliances.

5.1.3 (e) 10

Table 6. 2010 Summary of Monthly/Annual Chemical Usage at the Gold Bar WWTP.

3.1.3 (f); Wastewater Treatment Operations Plan Section 7 – Wastewater Treatment System

Chemical Usage Protocol

11

Table 7. 2010 List of Certified Wastewater Treatment Operators for the Gold Bar Wastewater Treatment Plant.

5.1.3 (d); 3.1.9; Wastewater Treatment Operations Plan Section 1 – Wastewater

Treatment Operator Certification Requirements

12

Table 8. 2010 Sampler Non-Conformance Summary As part of 5.1.3 (g) 13

Table 9. Summary of 2010 Major Work Program, not including Engineering Projects.

3.1.3 (a); Wastewater Treatment Operations Plan Section 3 – Preventative Maintenance

Treatment Capacity Protocol.

14

Table 10. Summary of 2010 Completed Projects and 2010 Planned Major Capital and Rehabilitation Projects.

5.1.3 (f) 17

Appendices Appendix A – 2010 Plant Performance Reports Appendix B – 2010 Enhanced Primary Treatment

Performance

20

Page 3: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and

operated Gold Bar Wastewater Treatment Plant (“Plant”). On average, the Plant effluent

quality discharged to the North Saskatchewan River was 16% of the Approval to Operate

(639-02-07) effluent discharge limits (Figure 1). The previous best treatment was achieved

in 2008 with a score of 18%.

Figure 1. GBWWTP Annual Average Performance (100% meets Approval)

0%

5%

10%

15%

20%

25%

30%

35%

40%

2004 2005 2006 2007 2008 2009 2010

Cu

mu

lati

ve P

erfo

rman

ce

BOD (organics) TSS (solids) E.coli (bacteria) Total Phosphorus (nutrients) Ammonia - Summer Ammonia - Winter

For 2010, each parameter has been, on average, 16% of the limit specified in the Approval.

For 2010, all monthly limits for Approval to Operate 639-02-07 discharge parameters were

met (Table 1, Appendix A -Monthly Plant Performance Reports). A total of 97,996 million

litres, or megaliters (ML), of wastewater were conveyed to the Plant with 99.91%1 of the

flow receiving primary treatment during 2010. Secondary treatment and UV disinfection

was provided to 90,748 ML (92.6%) of the total influent flow, with 3,727 ML of Reclaimed

Water provided to industrial customers. A summary of Reclaimed Water quality in 2010 is

provided in Table 2. In addition to routine final effluent quality monitoring, a total of nine

final effluent samples were submitted for toxicity testing in 2010; all nine samples were

tested for acute toxicity, and three of the nine samples were tested for chronic toxicity. All 1 83.9 million litres of wastewater bypassed the Plant in 2010.

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 1 of 20

Page 4: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

results showed no toxic effects from the Plant’s final effluent (Table 3). All analytical data

included in the report were handled by the Gold Bar Wastewater Laboratory and performed

using ISO/IEC 17025:2005 accredited methods. Gold Bar Wastewater Laboratory is

accredited to ISO/IEC 17025:2005 by the Canadian Association for Laboratory

Accreditation (CALA) for those analyses as listed in the scope of accreditation

(http://www.cala.ca/scopes/3161.pdf). Chronic and acute toxicity bioassays where

conducted by contract laboratories accredited to perform these tests

(http://palcan.scc.ca/specs/pdf/114_e.pdf). The 2010 Gold Bar Wastewater Laboratory

Proficiency Testing results are summarized in Table 4.

The number of environmental incidents in 2010 dropped significantly compared to 2009,

primarily due to stable digester operation. Of the environmental incidents in 2010 (Table 5),

none were uncontrolled releases of biogas from the anaerobic digestion process. Stable

fermenter operation also played a significant role in safe operation of the digesters as well

contributing to the final effluent Total Phosphorus concentration setting a record low annual

average concentration of 0.48 mg/L. After a stabilization period, the fermenters provided

adequate carbon in the form of Volatile Fatty Acids (VFA’s) to provide for a stable and

robust Biological Phosphorus Removal process. This was evident in a 22% reduction of

aluminum sulfate (alum) consumption for secondary phosphorus removal as compared to

2009. Table 6 summarizes the Plant’s monthly chemical usage for 2010. Below is a

monthly summary of operational activities and issues for 2010 as per requirement of

Approval No. 639-02-07 section 5.1.3 (g). Table 7 outlines issues with the autosamplers for

both the Total Bypass and Final Effluent Combined composite samples. Table 8 lists the

name and position of Alberta Environment Certified Wastewater Treatment Operators for

the Plant. Table 9 summarizes major activities associated with the completion of the 2010

Major Work Program. As part of the Annual Report requirement, the 2010 Completed

Capital Projects and 2011 Capital Program are included in Table 10. 2010 marked the

completion of Digester 7 and 8 construction, as well as the commencement of construction

of a new boilerhouse to meet process heating requirements for the new digesters.

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 2 of 20

Page 5: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Operational Summary2 January 2010

No main plant or secondary bypass events Eleven (11) bioreactors were in service for winter operation. All bioreactors were

operated in summer mode (cell 3 as second anoxic zone) Caustic spill to collection system – 100 cubic meters – pH 11.93 – no process

impacts Grit Blowers 1-2-3 replacement – Capital Project Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8 Recovery (Citric Acid) Clean - Trains1,2,3,4,5,6,7,8 Total = 8

February 2010

One (1) secondary bypass event. February 28th composite secondary bypass sample not collected. AE Ref no. 220803

U.V. Channel #1 lamp replacement Blend Tanks cleaned Recovery (Hypochlorite) Clean - Trains 1,2,3,4

March 2010

Six (6) secondary bypass events greater than two (2) hours in duration. March 1st composite secondary bypass sample not collected. AE Ref no. 234151

For the spring runoff period (March 1st to March 7th), all eleven (11) bioreactors/clarifiers were in-service

Screen 7 & 8 wash press installation U.V. Channel 2 lamp replacement Primary 3 and 4 – chain and sprocket repair Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,8; Total = 11 Recovery (Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 9 High efficiency flare put into service after winter shutdown.

April 2010

Two (2) secondary bypass events greater than two (2) hours in duration. April 23rd - Main Plant Bypass at less than 910 ML/day primary treatment capacity. AE Ref no.235173. April 23rd – Secondary bypass at less than 420 ML/day secondary treatment capacity. AE Ref no. 235174

U.V. Channel 5 Performance testing Acid Clean Supernatant Pipeline from Clover Bar Lagoons EPT tanks 9 through 12 in service – 5 through 8 for scum collection system

upgrades Recovery (Hypochlorite) Clean - Trains 3,5,7; Total = 4

2 As per Approval to Operate No. 639-02-07 requirement Section 5.1.3 (g).

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 3 of 20

Page 6: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

May 2010

One (1) main plant bypass after exceeding pre- and primary treatment capacity of 910 ML/day

Seven (7) secondary bypass events greater than two (2) hours in duration. May 19th and 21st, composite secondary bypass samples not collected due to autosampler failure. AE Ref no. 266998.

Ten (10) out of eleven (11) bioreactors in-service (summer mode). Commencement of biosolids to farmland application program (Nutrigold Program) Secondary power shutdown – 2 hours Primary 5 and 6 in service Fermenter #4 In Service – May 5th Controlled U.V. power shutdown for power feed switch – AE Ref no. 235970

June 2010

Nine (9) secondary bypass events greater than two (2) hours in duration Primary 8 Loop Chain Install Ten (10) out of eleven (11) bioreactors in-service (summer mode). Primary 7 and 8 Out of Service – Retrofit Scum Collection – Engineering – June 1st New Grit Blower On Line (replacement for pre-treatment blowers 1-2-3 ) Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8 Recovery(Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8

July 2010

Three (3) main plant bypasses after exceeding pre- and primary treatment capacity of 910 ML/day

Eleven (11) secondary bypass events greater than two (2) hours in duration were recorded and sampled for in the month

Four (4) secondary bypass events less than two hours in duration Ten (10) out of eleven (11) bioreactors in-service (summer mode) Primary 3 and 4 Out of Service – Retrofit Scum Collection – Engineering - July 23rd Fermenter 1 In Service – July 6th Membrane Bubble Test – all eight trains EPT dry weather test (no bypass) with chemical addition (alum + polymer) – July

26th, refer to Appendix B for test results August 2010

Two (2) main plant bypasses after exceeding pre- and primary treatment capacity of 910 ML/day

Six (6) secondary bypass events greater than two (2) hours in duration Nine (9) out of eleven (11) bioreactors in-service (summer mode) Fermenter 3 out of service – Engineering Digester 4 Out of Service for cleaning Power failure - Membrane Plant Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 16 EPT Wet Weather Test with chemical addition (alum + polymer) – August 12th, refer

to Appendix B for test results

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 4 of 20

Page 7: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

September 2010

One (1) main plant bypass after exceeding pre- and primary treatment capacity of 910 ML/day

Six (6) secondary bypass events greater than two (2) hours in duration Nine (9) out of eleven (11) bioreactors in-service (summer mode) Primary 5 and 6 Out of Service – Retrofit Scum Collection – Engineering – Sept 13 Grit Tanks 1 and 3 Out of Service for Grit Removal – Sept 22 Controlled digester purge for Dig 4 – 1500 cu m – AE Ref no. 240157 Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8 Recovery (Citric Acid) Clean - Train 4; Total = 1

October 2010

One (1) secondary bypass events greater than two (2) hours in duration were recorded and sampled for in the month

Ten (10) out of eleven (11) bioreactors in-service (summer mode) Biogas Utilization System Chiller replacement – Oct 4 Fermenter 2 In Service – Oct 5 Recovery (Hypochlorite) Clean - Train 8; Total = 1

November 2010

No main plant or secondary bypass events Eleven (11) out of eleven (11) bioreactors in-service (summer mode) Membrane Repair Project - Trains 1,2,3,5,6,8 Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,6 Total = 6 High efficiency flare out of service for winter shutdown

December 2010

No main plant or secondary bypass events Eleven (11) out of eleven (11) bioreactors in-service (summer mode). Recovery (Hypochlorite) Clean - Trains 1,2,3,4,5,7; Total = 6 Recovery (Citric Acid) Clean - Trains 1,2,3,4,5,6,7,8; Total = 8

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 5 of 20

Page 8: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

0.00

15.40

0.00

0.00

0.00

0.000.00

0.50

0.00

(ML/day)

171.10

14.65

0.00

40.41

0.00506.40

12.45

0.00116.80

8.63

0.0075.10

9.27

0.00106.90

237.60

22.55

0.00

3.36

0.0023.00

0.11

0.003.00

1427.37

0.00

0.000.00

12.20

9.94

8.4510.50

7.42

7.007.54

7.42

7.70

7.50

7.328.08

7.287.69

7.51

7.38

7.45

7.197.92

7.46

(ML)

7.35

7.057.76

TBP FEC TBP FECx 106FEC TBP FECTBP FEC TBP

BOD5/CBOD5 TSS E. coli Total Digested Sludge

(mg/L) (mg/L) (mg P/L) (mg N/L) Counts/100 mLTP

MonthpH

FEC MPW FECSECPBP RAW

FLOW

TBP

7.90

7.39

7.177.66

6.987.49

7.37

7.08

7.40

7.257.83

14

3

< 132

0.51 17.3 1.89 1.5

NH3-N

241.42 9.2023.3147

3.3 171 4.8 5.191.74 2.9 64.8 6.65 0.48

2009 Avg0.23 268.250.00 253.50

9.333.79

9.553.79

82.36

7.33

85.88

7.41

7.137.85

7.42

7.147.80

97,99683.90 90,748 3,7273,437 3,521

74.85

73.38

4.54.5

1.6

0.82.5

85.07

73.35

4

Annual Volume (ML)

250.10

236.02

209.30244.00

226.00290.10

73.30

< 1

6

3.9

1.7

6

77.44

< 1200

< 124

10

76.59

72.86

< 191

10

20

22

66.37

348

6

1

< 1

67.00

17

6

124

20

4

< 1

5

< 129

6

< 130

4

0.0

0.0

0.00.0

0.0

0.0

2.8

2.23.7

4.5

4.6

2.5

1.7

2.7

1.54.5

2.3

4.5

2.7

1.64.5

3.43.4

3.7

3.0

0.0

0.00.0

3.4

1.65

4.61

0.3010.20

8.14

0.75

0.12

0.75

0.113.08

0.96

0.25

0.15

0.020.60

0.071.38

0.16

0.040.41

1.19

0.075.16

0.35

5.30

3.77

0.717.39

1.354.77

2.76

1.72

2.22

0.268.25

3.18

0.0

0.0

0.00.0

30.830.8

0.0

0.0

21.3

14.227.8

30.8

24.2

16.4

8.020.5

14.027.0

17.5

7.9

23.7

14.638.7

21.6

39.0

20.2

17.326.6

nsns

34.7

26.4

0.0

0.00.0

ns

1.07

0.44

0.310.69

0.231.09

0.29

0.20

0.41

0.241.03

0.40

1.18

0.59

0.271.10

0.272.38

0.61

0.17

0.80

0.261.87

0.71

0.55

0.54

0.351.00

0.230.47

0.39

0.26

0.26

0.180.40

0.32

0.0

0.0

0.00.0

8.58.5

0.0

0.0

6.8

5.28.2

8.5

7.5

4.5

2.35.7

4.58.6

4.8

2.4

6.8

4.710.6

6.3

10.4

5.7

5.16.4

nsns

9.8

9.0

0.0

0.00.0

ns

8.4

5.9

3.18.4

3.59.2

4.2

2.8

5.1

3.38.7

5.1

15.0

4.3

2.412.0

3.17.9

4.8

2.6

5.7

3.720.0

5.6

5.6

5.1

3.79.4

3.25.9

4.3

3.4

4.2

2.66.5

4.0

0

0

00

117117

0

0

161

92356

117

244

139

86346

54220

90

16

162

61440

117

300

156

106226

nsns

235

169

0

00

ns

4.9

3.7

2.95.0

2.34.9

3.1

2.3

3.1

< 2.05.1

3.3

3.6

2.4

< 2.03.5

2.55.1

2.4

< 2.0

3.2

< 2.013.6

3.2

5.4

3.7

2.77.1

00

2.9

2.34.3

3.4

2.69.6

3.5

< 2.0

0

00

0

252

194

194194

49155

183

142

116

51230

104

246

131

109164

nsns

234

224

0

00

ns

12.30

11.15

10.3012.30

8.5013.00

10.90

8.20

10.55

9.6012.80

10.80

12.40

10.21

9.4011.60

10.04

7.20

9.37

8.2011.00

9.69

7.3011.40

10.82

9.77

9.65

8.1011.80

9.36

5.6011.30

232.06

223.30

250.08

229.60273.00

241.37

334.60

260.53

238.90322.10

276.53

217.50

268.24

238.80321.20

267.19

244.60321.40

269.80

235.52

210.60264.40

221.40251.20

246.00

230.00

232.77

204.10247.30

235.60

261.60

247.16

220.30254.70

237.40300.00

242.96

233.80

275.40

240.50432.00

252.67

873.00

284.03

248.30403.70

328.72

227.60

300.17

249.30565.00

285.52

167.30405.60

292.00

254.73

238.60368.10

231.70262.00

260.18

242.10

242.42

214.00256.80

245.06

0.00

0.00

0.000.00

0.000.00

0.00

0.00

0.003.50

0.00

0.84

0.0019.60

0.12

1.75

0.0028.78

0.10

0.00

0.000.00

0.00

0.000.00

0.01

0.000.20

0.00

0.00

908Total Digested Sludge (ML)

Max

0.00

0.000.00

0.00

0.000.00

Min

Min

Avg

MinMax

Avg

MinMax

Max

Avg

Avg

MinMax

Avg

MinMax

MinMax

Avg

MinMax

AvgJanuary

July

Avg

MinMax

Avg

MinMax

Avg

April

May

June

MinMax

MinMax

Avg

February

March

December

August

September

October

November

TABLE 1. 2010 Plant Performance. Summary of the Gold Bar Wastewater Treatment Plant performance from January 1 to December 31, 2010 as required under sections 5.1.3 (a) and 5.1.3 (b) of the Approval to Operate No. 639-02-07. All analytical data in the table were developed on 24-hour composite samples collected using autosamplers at the sampling location specified in Table 5-1 of the Approval to Operate No. 639-02-07. The 24-hour composite samples were retained in locked refrigerators until the laboratory staff removed them the following morning. The discreet samples for Escherichia coli (E. coli) determinations were collected at random times each day. All conditions and limits specified in the Table 5.1 of the Approval to Operate No. 639-02-07 were met in 2010.

2010 Avg 248.49 10.21 159 3.2

Avg

144

80231

164

119226

0.00

0.000.00

0.11

0.003.00

3.36

0.0023.00

9.27

0.00106.90

22.55

0.00237.60

8.63

0.0075.10

42.15

0.00531.70

174.60

13.29

0.00123.20

0.00

0.00

0.000.00

VOLUME(ML)

0.00

0.00

0.50

0.0015.40

14.77

0.00

PBP – Plant Bypass FEC – Final Effluent, Combined TSS – Total Suspended Solids MPW – Membrane Product Water TBP – Total Bypass Plant (including plant and secondary) RAW – Influent TP – Total Phosphorus ns – No sample SEC – Secondary Bypass Plant BOD5 – 5-day Biochemical Oxygen Demand NH3-N – Ammonia as nitrogen CBOD5 – 5-day Inhibited BOD

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 6 of 20

Page 9: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

1.13

0.13

13 6

0 38

0 04

6 28

0.40

0 05

1 05

3 06

0 07

0 51

1 60

0 08

0 03

0 98

4 29

0.12

1 09

0 06

7.18

2 89

4 07

6 20

0 60

9 82

4 35

0 90

TABLE 2. 2010 Reclaimed Water Quality. Summary of data developed on the ultrafiltered final effluent (i.e. reclaimed water) samples from January 1 to December 31, 2010 as required under section 3.1.3 (h) and 5.1.3 (c) of the Approval to Operate No. 639-02-07. All parameters except E. coli which were developed on daily 24-hour composite samples of the recycled water. The E. coli testing was conducted on discrete samples collected on a daily basis..

Avg

1

11

< 1

240

< 1

11

2 97

December

August

September

October

November

April

May

June

Min

Max

Min

Max

Avg

February

March

Avg

January

July

Avg

Min

Max

Avg

Min

Max

Avg

Min

Max

Min

Max

Avg

Min

Max

Avg

Avg

Min

Max

Avg

Min

Max

Avg

Min

Max

Max

9 65

8.10

11.80

9 36

5 60

11.30

Min

Min

Avg

8.45

9 37

8 20

10.04

7 20

12.40

11.00

7 30

11.40

0.27

4 36

0 25

0 02

1 28

0.11

0 01

< 2 0

8.8

< 2 0

10.82

9.77

12.20

9 67

9 60

12.80

10.80

10.21

9.40

11.50

10.55

8 50

13.00

10.90

8 20

12.30

11.15

10.30

12.30

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

3.4

< 2 0

8.9

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

< 2 0

2.7

2.1

< 2 0

13 0

20 6

18 5

2.4

2.1

< 2 0

2.5

2.2

< 2 0

3.4

21 8

14 2

17 5

19 5

58 6

53.7

21 8

18 2

71.4

57 9

79 5

14.7

29 6

20 3

24 5

16 2

4.0

22 0

25.1

19 2

66.7

60 2

70.4

27.7

19.1

33 3

73 8

46 2

70 8

53 0

84.1

72 0

62 6

80 8

116

73 0

63 5

80 9

70 0

58.1

78 2

69 9

64 9

73 8

75 8

64 5

111

89.4

74 2

112

4

< 1

500

3

< 1

22

4

< 1

48

3

< 1

39

< 1

< 1

1

< 1

3

< 1

7.84

7.26

< 1

< 1

< 1

< 1

< 1

< 1

< 1

< 1

8.09

7.88

7.74

8.02

7.90

8.14

7.87

7.65

8.02

7.50

8.12

7.94

7.64

8.18

7.94

7.76

8.11

7.98

7.81

8.16

8.07

7.92

8.20

8.02

7.57

8.15

8.01

7.86

8.13

0 3

< 0.3

0.4

0 3

< 0.3

0 6

0 3

< 0.3

0 6

0 6

< 0.3

0 8

0.7

< 0.7

1 6

0 9

< 0.7

3 5

0 8

< 0.7

1.7

0.7

< 0.7

0.7

0 9

< 0.7

2 8

0.7

< 0.7

1 6

0.7

< 0.7

1 0

0.7

< 0.7

1.1

8.42

7.14

10 8

9.37

8.30

7.51

11 0

7.84

7.74

8.07

7.73

8.30

8.13

7.00

9.60

7.33

6.24

8.20

0.26

0.09

0.38

0.34

0.13

0.50

8.82

8.55

8.84

8.35

9.20

8.38

8.09

8.66

8.69

0.126

< 0.040

1.14

0.197

0 056

0 531

0.125

< 0.040

0 506

0 296

0 076

0.769

0 521

0 044

1 610

0.436

0 086

1.32

0.406

0 058

1.31

0.195

0 059

0 875

0.122

0 053

0 267

0.413

0 049

0 332

0 082

4.18

0.125

0 070

0 829

0.124

522

472

615

514

429

571

522

440

745

490

444

562

575

401

659

624

496

726

633

387

784

598

493

660

538

439

585

554

424

593

230

1,280

420

435

599

527

0.18

< 0.14

0.44

0.22

0.14

0.41

0.23

0.15

0.44

0.18

0.12

0.42

0.23

0.12

0.41

0.32

0.11

1.81

0.29

0.13

1.40

0.20

0.08

0.99

0.26

0.11

1.11

0.42

0.17

0.81

0.16

0.93

0.35

0.14

0.70

0.31

36.7

21 6

19.7

23.4

2 6410.18 32.1 81.1144 1 85

10.50 < 2 0 27 520.4

230 0.08

1,280 1.81

Month

Max

779

1,300

828

780

875

788

1,010

896

Total Suspended

Solids

(mg/L)

Dissolved Organic Carbon

946

861

795

1,030

8.00

7.94

7.54

911

697

988

pH

7.85

7.62

8.01

7.90

7.73

960

809

1,070

984

625

1,400

938

803

994

871

722

939

873

807

926

847

992

500

798

997

911

865 < 1

< 1

< 1

< 1

79.4

63 3

122

75 2

141

109

69 6

141

136

147

245

91.4

76 3

142

98 9

60.4

15.7

132

141

152

138

115

151

133

128

140

157

133

113

159

154

167

182

163

171

165

168

152

180

9 69 134

138

126

88

158

114

162

145

153

136

124

FLOW

ML (mg CaCO3 /L)

Total AlkalinityBiochemical

Oxygen Demand

(mg/L)(mg N/L)

AmmoniaChemical

Oxygen Demand

(mg/L)

Chloride

(mg Cl/L)

Conductivity

(mS/cm)

E. coli

(Counts/100 mL) (mg/L)

Total Phosphorus

(mg P/L)

Total Disolved Solids

(mg/L)

Turbidity

(NTU)

Annual Summary

Avg 896 4 7.93 0 6 6.97 0 257 543

Min 5 60 88 0 01 < 2 0 4.0 46 2 625 < 1 7.26 < 0.3 0.09 < 0.040

Max 13.00 182 20.4 8 90 79 5 245 1,400 8.20 3 5 11 0 4.180

Notes: 1) NTU – Nephelometric turbidity units 2) Counts/100mL – Counts per 100 mL of sample 3) ML – Megaliters (1,000,000 liters)

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 7 of 20

Page 10: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Type of Analysis Dates Acute Chronic

01/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201001/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201001/13/201002/10/201003/10/201004/14/201006/09/201007/15/201008/10/201010/14/201012/07/201003/10/2010 Survival: all LC50 @ 7 days > 100%08/10/2010 Growth: All IC50 @ 7 days > 100%12/07/201003/10/2010 Survival: all LC50 @ 7 days > 100%08/10/2010 Growth: All IC50 @ 7 days > 100%12/07/2010

TABLE 3. 2010 Effluent Toxicity. Summary of chronic and acute toxicity testing as outlined in the sections 3.1.3 (g) and 5.1.3 (c) of the Approval to Operate No. 639-02-07. Both acute and chronic toxicity testing were carried out by contract laboratories in accordance with the Environmental Canada Biological Test Methods (Environment Canada 1990 and 1992). The acute testing included 48-hour Rainbow Trout static toxicity, 48-hour static toxicity using Daphnia magnia and 15-minute Microtox tests using luminescence bacteria. Seven-day Ceriodaphnia dubia, Fathead minnows survial and reproductive impairment test were used to determine chronic toxicity. The samples tested in 2010 appeared to be non-toxic to all organisms used for the acute and chronic testing.

All LC50 @ 48 hours > 100% (Non-toxic)

Microtox

Daphnia magnaAll LC50 @ 48 hours > 100% (Non-

toxic)

Rainbow TroutAll LC50 @ 48 hours > 100% (Non-

toxic)

Fathead minnows

Ceriodaphnia dubia

Number of Samples 9 3

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 8 of 20

Page 11: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Study Date

mm/yy

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

PT

Sco

re

Avg

. z-s

core

CALA 03/10 93 0.473 94 0.431 97 0.200 98 0.145 93 0.461 72H 1.867 81VL 1.265

CALA 10/10 78 0.083 80 0.234 90 0.047 95 0.315 85 0.988 89 -0.045 93 -0.385

Notes:

IDEXX - Sample analyzed using the IDEXX (Quanti-tray) method.MF - Sample analyzed using membrane filtration (mENDO) method.

BOD - 5-day Biochemical Oxygen Demand, C-BOD - 5-day Carbonaceous Biochemical Oxygen Demand, TSS - Total Suspended Solids, NH3-N - Ammonia as Nitrogen, TP - Total Phosphorous.

CALA - Canadian Association for Laboratory Accreditation.

VH - Very high bias, H - High bias, L - Low bias, A - Acceptable, Q - Questionable, U - Unsatisfactory

PT Score > 70 acceptable.

NHs-N TPE. coli

(IDEXX)

TABLE 4. 2010 Summary of Gold Bar Wastewater Laboratory Proficiency Testing. Summary of quality assurance data as required under sections 3.1.3 (k) and 5.1.3 (c ) of the Approval to Operate No. 639-02-07, and includes the Laboratory z-scores achieved from analyzing proficiency testing (PT) samples for constituents required by the Approval to Operate No. 639-02-07. The 2010 PT samples were provided by the Canadian Association for Laboratory Accreditation (CALA). A PT scores greater than or equal to 70 or z-scores less than equal to 3.000 are considered acceptable. The PT data indicates that the instruments and the methodology used by the Laboratory were under control during the testing.

BOD C-BOD TSS E. coli (MF)

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 9 of 20

Page 12: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Occurred Date

ESS Incident No.

Incident DescriptionContravention

TypeAENV Ref.

No.

03/12/2010 ENV-00041

Approval to Operate Contravention - Composite secondary bypass samples were not collected. Samples dates are as follows: January 29, 2009 (discovered during annual report reconciliation) September 6, 2009 (discovered during annual report reconciliation) February 28, 2010 (discovered during Monthly report review) March 1, 2010 (discovered during Monthly report review)

Administrative(Monitoring)

234151

04/23/2010 ENV-00049Approval to Operate Contravention - Premature secondary bypass prior to meeting secondary treatment capacity of 420 ML/day.

UncontrolledRelease

235174

04/23/2010 ENV-00051Approval to Operate Contravention - Premature main plant bypass prior to meeting 910 ML/day pre- and primary treatment capacity.

UncontrolledRelease

235173

05/18/2010 ENV-00059Controlled shutdown of UV system for preventive maintenance.

ControlledRelease

235970

05/19/2010 ENV-00082Approval to Operate Contravention - Composite secondary bypass sample not collected due to autosampler failure.

Administrative(Monitoring)

236998

07/04/2010 ENV-00089

Secondary Short Term Bypass sampler failed to sample for bypass event <2 hours in duration. Grab sample taken by hand 250 ml every 30 min as per new procedure update. Approval requirements met.

Not Reportable 237576

07/12/2010 ENV-00095Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.

Not Reportable 237898

07/13/2010 ENV-00096Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.

Not Reportable 237908

07/13/2010 ENV-00097Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.

Not Reportable 237944

08/10/2010 ENV-00107Main plant bypass at influent flow greater than 910 ML/day. Approval to Operate requirements met.

Not Reportable 239002

09/01/2010 ENV-00114Approval to Operate Contravention - UV disinfection capacity of 420 ML/day not met.

UncontrolledRelease

239773

09/14/2010 ENV-00121Controlled nitrogen purge of biogas from anaerobic digester (#4) headspace as preparation for cleaning.

ControlledRelease

240157

12/29/2010 ENV-00166Approval to Operate Contravention - Final effluent sample for E.coli not analyzed. "No Result" reported.

Administrative(Monitoring)

243624

Table 5. Environmental Release Reports & Administrative Non-Compliances. Summary of environmental incidents as required under sections 5.1.3 (e) of the Approval to Operate No. 639-02-07 for 2010.

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 10 of 20

Page 13: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Table 6. 2010 Summary of Monthly/Annual Chemical Usage at the Gold Bar Wastewater Treatment Plant

Chemical NameCaustic Soda

(Bagged)Citric Acid Hydrogen Peroxide Liquid Nitrogen Sodium Bisulfite Softner Salt

Chemical Formula NaOH C6H8O7 H2O2 N2 Zetag 8180Magnafloc

1011Magnafloc

110LNaHSO3 NaCl

Chemical SupplierClearTech

Industries Inc.ClearTech

Industries Inc.US Peroxide LLC

Air Liquide Canada Inc.

ClearTech Industries Inc.

ClearTech Industries Inc.

ClearTech Industries Inc.

Various-City Stores Inventory

Purpose Used/Dosage point

Phosphate trimming in secondary effluent / Mixed liquor channel to secondary clarifier

Enhanced Primary Treatment

Chemical cleaning of sludge lines

Odour Control - pH adjustment / Odour Control Facilties

Membrane cleaning - pH adjustment / Membrane tanks

Chemical cleaning of ultrafiltration membranes - reverses inorganic fouling / Membrane tanks

Odour Control - oxidizes H2S / Plant Influent Channels 1 and 2

Purging of biogas system / Digester Headspace and biogas piping

Flocculating agent for Waste Activated Sludge (WAS) / Dissolved Air Flotation Thickening Facility

Chlorine neutralizing agent for ultrafiltration membrane cleaning / Membrane tanks

East Scrubber: Odour Control - oxidizes of H2S / Odour Control Facilities

A. Chemical cleaning of ultrafiltration membranes - reverses biofouling of membranes / Membrane tanks

B. Maintain chlorine residual in product water distribution to Strathcona County / Contact tanks

Water Softening for Odour Control Chemical Solution / Odour Control Facilities

Concentration Used50% NaOH -

diluted with H2O and heated

50% 50% by Weight 100%0.25% to 0.35% (introduced as

solution)

Dry Powder(100%)

Emulsion(50%)

38 to 44% Dry Weight

Feed Rate

Used when efffluent

phosphate concentration >0.5 mg/L P

ContinuousFeed

Applied Sparingly as required

Intermittent Intermittent Continuous Feed Continuous Feed Continuous Feed Continuous Feed Continuous Feed Intermittent Intermittent Intermittent

Minimum 8 mg/L 100 mg/L 500 kg/day N/A 1 mg/L 1 mg/LFunction of

Sulphide Loading

Function of Product Water

flow

Function of Sulphide Loading

Maximum 100 mg/L 200 mg/L 2000 kg/dayAs controlled by feed equipment

2 mg/L 2 mg/LControlled by PID

loop and PLC controlled

Controlled by PID loop and PLC

controlled

Controlled by PID loop and PLC

controlled

Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total Used Total UsedScrubbers Membrane Scrubbers Membrane

litres litres kg litres litres litres kg sm3 kg kg kg litres litres litres kg

January 44,952 0 0 444 242 424 5,219 0 3,144 0 0 635 14,539 8,807 100

February 65,004 0 0 444 17 820 1,000 0 2,396 0 0 419 11,679 9,343 0

March 72,960 0 0 518 1,092 1,592 528 0 2,552 0 0 1,227 12,501 11,545 0

April 95,601 0 0 370 191 345 3,624 0 2,420 0 0 6 24,040 16,368 3,100

May 278,426 0 0 740 40 495 132 0 2,400 0 0 178 16,877 5,100 142

June 255,791 0 0 13,372 753 1,483 1,315 0 120 0 0 214 19,004 6,557 2,620

July 254,020 8,352 0 6,289 6 138 1,334 0 3,388 54 0 1 16,455 9,279 1,300

August 259,593 15,744 0 2,146 35 0 2,450 0 2,196 102 0 10 26,708 4,817 96

September 31,031 0 0 814 440 468 202 4,000 1,796 0 0 224 30,922 5,378 2,200

October 4,171 0 0 2,664 151 229 0 0 2,276 0 0 195 34,735 5,522 1,480

November 305 0 0 3,223 205 267 0 0 1,368 0 0 406 6,342 6,236 79

December 12,209 0 0 740 253 1,023 0 0 1,704 0 0 797 8,006 4,677 1,380

2010 - Annual Total 1,374,063 24,096 0 31,764 3,425 7,284 15,804 4,000 25,760 156 0 4,312 221,808 93,629 12,497

Months

16%

Sodium Hypochlorite

NaOCl

50%

Caustic Soda (Liquid)

NaOH

ClearTech Industries Inc.

Alum

Al2(SO4)3•14H2O

Marsulex

48.5%

Polymer

BASF (formerly CIBA Specialty Chemicals)

Flocculating agent for Enhanced Primary Treatment

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 11 of 20

Page 14: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Name Title WWT Certification Level

Corkery,Vince M Director, Wastewater Treatment Plant Edmonton IV

Heise,Geoffry R Senior Manager, Operations II

Grossell,Ken M Manager, Operations IV

Lin, Bing Manager, Production Engineering I

Schneider,Brian P WWTP Operator Foreman IV

Kerr,David A WWTP Operator Foreman IV

Graham,Thomas A WWTP Operator Foreman IV

Jones,Kira I WWTP Lead Operator III

Kwan,Tom WWTP Lead Operator IV

Ropchan,Ross M WWTP Lead Operator II

Paszkiewicz,Marek WWTP Lead Operator - Utility Crew Foreman III

Feltmate,Colleen J WWTP Lead Operator - Training Foreman III

Rindero,Billy J WWTP Operator III

Blatz,Kevin M WWTP Operator III

Barrett,Jeremy L WWTP Operator III

Li,Bing BL WWTP Operator III

Burton,Morley WWTP Operator II

Budden,Curt W WWTP Operator II

Mota,Ricardo L WWTP Operator II

Dawson,Terena M WWTP Operator lll

Mann,Kelly WWTP Operator II

Marcinek,David A WWTP Operator II

Espinosa,Diego F WWTP Operator I

Ketchum, Glen WWTP Operator I

Holman,Kenneth E WWTP Operator II - Restricted

Resler,Kenny A WWTP Operator I - Restricted

Hillaby,Greg WWTP Operator I - Restricted

Atkinson,Mike W WWTP Operator l

Table 7. 2010 List of Certified Wastewater Treatment Operators (as of March 2011)

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 12 of 20

Page 15: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Collection Date

Sampling Site Sampling Issue Action Taken

02/28/2010 BYPASS

03/01/2010 BYPASS

05/19/2010 BYPASS

05/21/2010 BYPASS

07/04/2010 BYPASSShort Term Bypass Autosampler

Failed

Grab samples manually collected by Operations staff. Approval requirements met.

Reported to AE, ref no. 237576

12/29/2010 FECSample collected, but not analyzed

at the correct temperature

Reported to Alberta Environment as "Administrative Non-Compliance", reference

number 243624

NS - No SampleFEC - Final Effluent, combined

TABLE 8. 2010 Sampler Non-Conformance Summary

Abbrevations

Reported to Alberta Environment as "Administrative Non-Compliance", reference number 234151. Manual sampling response

protocol implemented.

Reported to Alberta Environment as "Administrative Non-Compliance", reference number 236998. Maintenance procedures updated for sampler hose replacement and installation and improved communications

protocols between Lab and Operations implemented.

Long Term Bypass Autosampler Failed

Long Term Bypass Autosampler Failed

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 13 of 20

Page 16: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

FL 3 FL4 Task NameWork Group

% Work Complete Duration Start Finish

JANUARYDIG Digester Gas Line Valves for Mixing Compressor for Dig 4 100% 41 days 01/01/2010 02/26/2010PRI LOOPS Digester Auto Control Conversion to Delta V 0% 151 days 01/01/2010 07/30/2010DIS SCRNS Screen Wash (200A) Ops 100% 1 day 01/12/2010 01/12/2010DIS SCRNS Screen Inspection (200A) Maint 100% 3 days 01/12/2010 01/12/2010SEC Secondary 6, 7, 8 Separation Gate Replacement Maint 0% 4 days 01/12/2010 01/15/2010DIS SCRNS Screen Wash (200B) Ops 100% 1 day 01/13/2010 01/13/2010DIS SCRNS Screen Inspection (200B) Maint 100% 1 day 01/13/2010 01/13/2010

FEBRUARYFER BLND1 Blend Tank 1 Clean Ops 100% 3 days 02/02/2010 02/04/2010FER BLND2 Blend Tank 2 Clean Ops 100% 3 days 02/09/2010 02/11/2010PCS DLTAV Blower 6 - Delta V Maint/TS 0% 41 days 02/15/2010 04/12/2010DIS UVS01 UV Channel 1 Relamp Maint 100% 28 days 02/15/2010 02/26/2010ODR ASCR1 Media Replacement for East Scrubber Ops 100% 9 days 02/16/2010 02/17/2010

MARCHPTR SCRS3 Screens 7 and 8 Wash Press Eng/TS 100% 80 days 03/01/2010 06/18/2010MEM CCTK1 Chlorine Contact Tank 1 Clean and Inspect Ops 100% 1 day 03/09/2010 03/09/2010MEM CCTK2 Chlorine Contact Tank 2 Clean and Inspect Ops 100% 1 day 03/10/2010 03/10/2010DIS UVS02 UV Chanel 2 Relamp Maint 100% 38 days 03/15/2010 03/26/2010PTR GRIT2 Grit Tank 2 Clean Ops 100% 1 day 03/29/2010 03/30/2010PTR SCRS1 Screen 2 Clean Ops 100% 1 day 03/31/2010 03/31/2010PTR SCRS1 Screen 2 Inspection Maint 100% 1 day 03/31/2010 03/31/2010

APRILDIS UVS05 Channel 5 Performance Testing 100% 5 days 04/01/2010 04/07/2010PTR GRIT1 Grit Tank 1 Clean Ops 100% 1 day 04/06/2010 04/07/2010FER FERM3 Fermenter 3 Clean Ops 100% 5 days 04/06/2010 04/08/2010PTR SCRS1 Screen 1 Clean Ops 100% 1 day 04/08/2010 04/08/2010PTR SCRS1 Screen 1 Inspection Maint 100% 1 day 04/08/2010 04/08/2010PTR GRIT4 Grit Tank 4 Clean Ops 100% 4 days 04/12/2010 04/12/2010PTR GRIT5 Grit Tank 5 Clean Ops 100% 14 days 04/12/2010 04/23/2010PTR GRIT4 Grit Tank 4 Inspection Maint 100% 1 day 04/13/2010 04/13/2010PTR SCRS2 Screen 5 Clean Ops 100% 2 days 04/13/2010 04/13/2010PTR SCRS2 Screen 5 Inspection Maint 100% 1 day 04/13/2010 04/13/2010PTR GRIT5 Grit Tank 5 Inspection Maint 100% 10 days 04/26/2010 04/27/2010SSP PPIPE Acid Clean Pipeline from Lagoons Ops 100% 4 days 04/27/2010 04/28/2010PTR GRIT3 Grit Tank 3 Clean Ops 100% 1 day 04/28/2010 04/29/2010PTR SCRS1 Screen 3 Clean Ops 100% 1 day 04/30/2010 04/30/2010PTR SCRS1 Screen 3 Inspection Maint 100% 5 days 04/30/2010 04/30/2010

MAYCBF Sludge to Farmland Ops 100% 152 days 05/03/2010 11/30/2010CBF Geotube Pilot Project Ops 0% 152 days 05/03/2010 11/30/2010PRI PRI07 Primary 7 Wash Ops 100% 2 days 05/03/2010 05/03/2010SEC SCL05 Secondary Clarifier 5 Clean Ops 100% 2 days 04/14/2010 04/15/2010PRI PRI07 Primary 7 Chain Removal Maint 100% 9 days 05/04/2010 05/14/2010PRI PRI08 Primary 8 Wash Ops 100% 1 day 05/04/2010 05/04/2010SEC SCL05 Secondary Clarifier 5 Inspection Maint 100% 6 days 04/15/2010 04/22/2010PRI PRI07 Primary 7 Motor Drive Replacement (Pumps) Maint 100% 1 day 05/05/2010 05/05/2010PTR CHANL Primary 7-8 Influent Channel Inspection Ops 100% 2 days 05/05/2010 05/06/2010PRI PRI08 Primary 8 Motor Drive Replacement (Pumps) Maint 100% 1 day 05/06/2010 05/06/2010PTR GRIT6 Grit Tank 6 Clean Ops 100% 10 days 05/10/2010 05/21/2010PTR SCRS3 Screen 7 Clean Ops 100% 0 days 05/11/2010 05/11/2010SEC BIO05 Secondary Bio 5 Inspection Maint 100% 1 day 05/11/2010 05/11/2010PTR SCRS3 Screen 7 Inspection Maint 100% 1 day 05/12/2010 05/12/2010PRI PRI07 Primary 7 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 05/17/2010 05/28/2010PRI PRI08 Primary 8 Chain Removal Maint 100% 10 days 05/17/2010 05/28/2010SEC SCL08 Secondary Clarifier 8 Clean Ops 100% 2 days 05/17/2010 05/18/2010SEC SCL08 Secondary Clarifier 8 Inspection Maint 100% 4 days 05/18/2010 05/21/2010PTR GRIT6 Grit Tank 6 Inspection Maint 100% 2 days 05/25/2010 05/26/2010PRI PRI07 Primary 7 Install Loop Chain Maint 100% 10 days 05/31/2010 06/11/2010PRI PRI08 Primary 8 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 05/31/2010 06/11/2010SEC SCL04 Secondary Clarifier 4 Clean Ops 100% 1 day 05/31/2010 06/01/2010

JUNEDIG BIOUS Flowmeter Installation - High Pressure Biogas Eng/TS 100% 44 days 06/01/2010 07/30/2010SEC SCL04 Secondary Clarifier 4 Inspection Maint 100% 4 days 06/01/2010 06/04/2010UTL HTWAT Hot Water System Flushing Maint/Ops 10% 66 days 06/01/2010 08/31/2010PTR SCRS2 Screen 4 Clean Ops 100% 2 days 06/07/2010 06/07/2010

Table 9. Summary of 2010 Major Work Program. "FL3" and "FL4" refer to Asset Management Functional Location Level 3 and 4, respectively.

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 14 of 20

Page 17: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

FL 3 FL4 Task NameWork Group

% Work Complete Duration Start Finish

PTR SCRS2 Screen 4 Inspection Maint 100% 1 day 06/07/2010 06/07/2010UTL SUB01 SUB 1 Maintenance Maint 100% 10 days 06/07/2010 06/18/2010PTR SCRS2 Screen 6 Clean Ops 100% 0 days 06/08/2010 06/08/2010PTR SCRS2 Screen 6 Inspection Maint 100% 1 day 06/08/2010 06/08/2010PRI PRI03 Primary 3 Wash Ops 100% 1 day 06/09/2010 06/09/2010PRI PRI04 Primary 4 Wash Ops 100% 1 day 06/10/2010 06/10/2010PRI PRI08 Primary 8 Install Loop Chain Maint 100% 10 days 06/14/2010 06/25/2010SEC SCL07 Secondary Clarifier 7 Clean Ops 100% 2 days 06/14/2010 06/15/2010PRI PRI03 Primary 3 Replace Magmeter Maint. 100% 1 day 06/15/2010 06/15/2010SEC CHANL Replace Actuator on Butterfly Gate 2 Maint/TS 100% 1 day 06/15/2010 06/15/2010SEC SCL07 Secondary Clarifier 7 Inspection Maint 100% 4 days 06/17/2010 06/22/2010PTR GRIT7 Grit Tank 7 Clean Ops 100% 10 days 06/21/2010 07/02/2010SEC BIO07 Secondary Bio 7 Inspection Maint 100% 1 day 06/22/2010 06/22/2010PRI PRI03 Primary 3 Inspection Maint 100% 4 days 06/28/2010 07/01/2010SEC SCL01 Secondary Clarifier 1 Clean Ops 100% 2 days 06/28/2010 06/29/2010SEC SCL01 Secondary Clarifier 1 Inspection Maint 100% 4 days 06/29/2010 07/02/2010

JULYPTR GRIT7 Grit Tank 7 Inspection Maint 100% 4 days 07/05/2010 07/08/2010PTR SCRS3 Screen 8 Clean Ops 100% 3 days 07/05/2010 07/05/2010PTR SCRS3 Screen 8 Inspection Maint 100% 3 days 07/06/2010 07/06/2010PRI PRI05 Primary 5 Wash Ops 100% 1 day 07/07/2010 07/07/2010PRI PRI06 Primary 6 Wash Ops 100% 1 day 07/08/2010 07/08/2010PRI PRI04 Primary 4 Inspection Maint 100% 4 days 07/12/2010 07/15/2010PRI PRI05 Primary 5 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 10 days 07/12/2010 07/23/2010SEC SCL11 Secondary Clarifier 11 Clean Ops 100% 2 days 07/12/2010 07/13/2010PRI PRI06 Primary 6 Motor Drive Replacement (Pumps) Maint 100% 3 days 07/13/2010 07/13/2010SEC SCL11 Secondary Clarifier 11 Inspection Maint 100% 4 days 07/13/2010 07/16/2010PRI PRI05 Primary 5 Motor Drive Replacement (Pumps) Maint 100% 1 day 07/14/2010 07/14/2010SEC BIO11 Secondary Bio 11 Inspection Maint 100% 1 day 07/20/2010 07/20/2010PRI PRI05 Primary 5 Inspection Maint 100% 4 days 07/26/2010 07/29/2010PRI PRI06 Primary 6 Scum Tank, Valves, Pumps, and Pipe Work Eng/Maint 75% 9 days 07/26/2010 08/05/2010SEC SCL02 Secondary Clarifier 2 Clean Ops 100% 2 days 07/26/2010 07/27/2010SEC SCL02 Secondary Clarifier 2 Inspection Maint 100% 3 days 07/27/2010 07/30/2010PTR CHANL Primary 5-6 Influent Channel Inspection Ops 100% 2 days 07/28/2010 07/29/2010

AUGUSTDIG DIG04 Digester 4 Cleaning Ops 75% 42 days 08/02/2010 09/28/2010PRI PRI06 Primary 6 Inspection Maint 100% 4 days 08/09/2010 08/12/2010SEC SCL10 Secondary Clarifier 10 Clean Ops 100% 2 days 08/09/2010 08/10/2010SEC SCL10 Secondary Clarifier 10 Inspection Maint 100% 4 days 08/10/2010 08/13/2010SEC BIO10 Bio 10 Replace WAS Seed Valve Actuator Maint 100% 1 day 08/13/2010 08/13/2010DIG DIG04 Digester 4 Electrical Work Maint 0% 4 days 08/16/2010 08/19/2010PRI PRI01 Primary 1 Wash Ops 100% 1 day 08/16/2010 08/16/2010PRI PRI01 Primary 1 Inspection Maint 100% 2 days 08/17/2010 08/18/2010PRI PRI02 Primary 2 Wash Ops 100% 1 day 08/17/2010 08/17/2010DIG DIG04 Digester 4 Inspect 3-Ways, PRV's, and Main Gas Line Maint 100% 3 days 08/17/2010 08/19/2010PTR CHANL Primary 1-4 Influent Channel Inspection Ops 0% 2 days 08/18/2010 08/19/2010PRI PRI02 Primary 2 Inspection Maint 100% 2 days 08/19/2010 08/20/2010SEC SCL03 Secondary Clarifier 3 Clean Ops 100% 3 days 08/23/2010 08/24/2010SEC SCL03 Secondary Clarifier 3 Inspection Maint 100% 6 days 08/24/2010 08/27/2010SEC CHANL Replace Actuator on Butterfly Gate 3 Maint/TS 0% 1 day 08/24/2010 08/24/2010SEC BIO03 Secondary Bio 3 Inspection Maint 100% 1 day 08/31/2010 08/31/2010

SEPTEMBERDIG DIG04 Digester 4 Mechanical Work Maint 0% 7 days 09/01/2010 09/09/2010SEC SCL09 Secondary Clarifier 9 Clean Ops 100% 2 days 09/07/2010 09/08/2010SEC SCL09 Secondary Clarifier 9 Inspection Maint 100% 4 days 09/08/2010 09/13/2010SEC BIO09 Bio 9 Replace WAS Seed Valve Actuator Maint 0% 1 day 09/10/2010 09/10/2010SSP SQ1TP Square 1 Replace Transfer Pump C-Crew 0% 10 days 09/13/2010 09/24/2010SEC SCL06 Secondary Clarifier 6 Clean Ops 100% 2 days 09/20/2010 09/21/2010SEC SCL06 Secondary Clarifier 6 Inspection Maint 100% 4 days 09/21/2010 09/24/2010

OCTOBERPCS DLTAV Digester 7 and 8 - Delta V Maint/TS 80% 43 days 10/01/2010 11/30/2010DIG DIG04 Digester 4 Inspection Maint 0% 1 day 10/04/2010 10/04/2010DIG BIOUS Digester Square 1 Replace Chiller Eng/TS 100% 42 days 10/04/2010 11/30/2010PTR GRIT6 Grit Tank 6 Clean Ops 100% 5 days 10/04/2010 10/08/2010PTR GRIT6 Grit Tank 6 Inspection Maint 100% 4 days 10/12/2010 10/15/2010PTR SCRS3 Screen 7 Clean Ops 100% 1 day 10/12/2010 10/12/2010PTR SCRS3 Screen 7 Inspection Maint 100% 1 day 10/13/2010 10/13/2010PTR GRIT7 Grit Tank 7 Clean Ops 100% 5 days 10/18/2010 10/22/2010MEM CCTK1 Chlorine Contact Tank 1 Clean and Inspect Ops 0% 1 day 10/19/2010 10/19/2010

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 15 of 20

Page 18: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

FL 3 FL4 Task NameWork Group

% Work Complete Duration Start Finish

MEM CCTK2 Chlorine Contact Tank 2 Clean and Inspect Ops 0% 1 day 10/20/2010 10/20/2010PTR GRIT7 Grit Tank 7 Inspection Maint 100% 4 days 10/25/2010 10/28/2010PTR SCRS3 Screen 8 Clean Ops 100% 1 day 10/25/2010 10/25/2010PTR SCRS3 Screen 8 Inspection Maint 100% 1 day 10/26/2010 10/26/2010

NOVEMBERPRI PRI09 Primary 9 Wash Ops 0% 3 days 11/01/2010 11/03/2010PRI PRI09 Primary 9 Inspection Maint 0% 3 days 11/02/2010 11/04/2010PTR SCRS2 Screen 4 Clean Ops 100% 1 day 11/02/2010 11/02/2010PTR SCRS2 Screen 4 Inspection Maint 100% 1 day 11/02/2010 11/02/2010PTR SCRS2 Screen 5 Clean Ops 100% 1 day 11/03/2010 11/03/2010PTR SCRS2 Screen 5 Inspection Maint 100% 1 day 11/03/2010 11/03/2010PTR SCRS2 Screen 6 Clean Ops 100% 1 day 11/04/2010 11/04/2010PTR SCRS2 Screen 6 Inspection Maint 100% 1 day 11/04/2010 11/04/2010PRI PRI10 Primary 10 Wash Ops 0% 3 days 11/08/2010 11/10/2010PTR GRIT1 Grit Tank 1 Clean Ops 0% 2 days 11/08/2010 11/09/2010PRI PRI10 Primary 10 Inspection Maint 0% 3 days 11/09/2010 11/11/2010PTR SCRS1 Screen 1 Clean Ops 0% 1 day 11/10/2010 11/10/2010PTR SCRS1 Screen 1 Inspection Maint 0% 1 day 11/10/2010 11/10/2010PRI PRI11 Primary 11 Wash Ops 0% 3 days 11/15/2010 11/17/2010PTR GRIT2 Grit Tank 2 Clean Ops 0% 2 days 11/15/2010 11/16/2010PRI PRI11 Primary 11 Inspection Maint 0% 3 days 11/16/2010 11/18/2010PTR SCRS1 Screen 2 Clean Ops 0% 1 day 11/17/2010 11/17/2010PTR SCRS1 Screen 2 Inspection Maint 0% 1 day 11/17/2010 11/17/2010PRI PRI12 Primary 12 Wash Ops 0% 3 days 11/22/2010 11/24/2010PTR GRIT3 Grit Tank 3 Clean Ops 0% 2 days 11/22/2010 11/23/2010PRI PRI12 Primary 12 Inspection Maint 0% 3 days 11/23/2010 11/25/2010PTR SCRS1 Screen 3 Clean Ops 0% 1 day 11/24/2010 11/24/2010PTR SCRS1 Screen 3 Inspection Maint 0% 1 day 11/24/2010 11/24/2010

DECEMBERNo Major Work scheduled in December

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 16 of 20

Page 19: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

2010 Major Capital Projects Status Target Completion

Membrane Filtration 2010: No work in 20102011: Subject to Capital spending agreement with Suncor.

Biosolids Upgrading 2010: Facility construction completed; Mechtronix equipment delivered2011: Equipment assembly in Q1; system testing phase completed by end of 2011 December-11

Boiler/Plant Heating 2010: Construction commenced in late Q2 of 2010. 2011: Substantial completion and commissioning by end of Q2 2011. June-11

Grit Tanks and Screens 2010: Completed work on blower replacement for grit tanks. 2011: Start design in Q2, commence screen replacement in Q4 of 2011. Screens - March 2012Grit portion construction will commence Q3/Q4 of 2012 and be complete end of 2013. Grit Tanks - 2013

Sludge Fermenter Odour Control 2010: Project closed in early 2010. Complete

Sludge Fermenter Phase 2 2010: Addressed issues with scum removal and Fermenter 3 rake. Project closed. Complete

Twinning of Sludge Line 2010: Completed construction on booster pump station. 2011: Final commissioning and start up. June-11

Enhanced Primary Treatment2010: Completed commissioning of Chemical Dosing systems; installation of automated air scour system.

Complete

2011: Commissioning and start-up of Enhanced Primary Effluent pumps. Q3-2011

Digester 8 and Digester 7 2010: Commissioning with FE completed and substantial completion issued Dec. 20102011: Final commissioning and digester start up. June-11

Lagoon Supernatant Treatment 2010: Rezoning complete. Project design and construction deferred until 2012 Delayed

Plant Emergency Systems / Security Upgrade 2010: Completed in early 2010 Complete

Laboratory Building Mechanical Upgrades 2010: Main HVAC fan motor and VFD upgrade completed. 2011: Remaining Mechanical upgrade and roof repair to be completed in 2011. December-11

2010 Rehabilitation Projects Status Target Completion

Mechanical RehabilitationPrimary 5-8 Scum Pumping Renewel CompleteSquare 1 Sludge Transfer Pump Delayed May-11

Table 10. Summary of 2010 Completed Projects and 2011 Planned Major Capital and Rehabilitation Projects. Reported as per Approval No.639-0207, Section 5.1.3 (f).

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 17 of 20

Page 20: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

High Pressure Biogas Flow Meter CompleteCBF Supernatant Pumphouse Piping Upgrades CompletePrimary Influent/Effluent Channel Isolation Gates Delayed 2012Biogas Chiller Replacement CompleteSecondary 7/8 Clarifer Gear Drive Replacement CompleteDigester Square Sediment Trap Upgrades CompleteScreen 7-8 Wash Press CompleteElectrical/Instrumentation RehabilitationLab Transformer Replacement CompleteSecondary Area Lighting Renewal CompleteEast Parking Lot Lighting CompleteSecondary VFD Replacements CompleteProcess Control System Hardware UpgradesDigester 1-6 Auto Sequencing Platform Conversion CompleteSite/Building RehabilitationMisc Structural Safety/jAccess projects CompleteDAF Tank Fall Arrest System CompleteEyewash Station Upgrades Cancelled Not RequiredVentilation System in Sample Buildings Cancelled Not RequiredControl Room Renovations CompleteLandscaping/Paving CompleteMaintenance - Metal Storage Building Complete2010 Flight and Chain Replacement ProgramPrimary Clarifier 7/8 CompleteScum Gallery 1-3 CompletePlant Equipment ProjectsGrit 6 Incline Auger CompleteGrit 7 Horizontal Auger CompleteSecondary DO Probe Replacement Complete

2011 Project/Sub-Project Target Completion

160979 PCS UpgradesER-0127 Migrate Blower 6 Controls November-11ER-0196 Alarm Management July-05ER-0197 Migrate Primary 3-8 Controls September-11ER-0198 HMI Graphics Conversion July-05ER-0199 Migrate Digester 1-6 Hopper Valves May-11140990 Mechanical RehabER-0121 Digester Sludge Transfer Pump April-11ER-0173 Supernatant to CRWWC May-11ER-0189 Fermenter Dewatering Line September-11ER-0190 Primary Dewatering Discharge Relocation July-11ER-0200 Primary Instrument Air system August-11ER-0188 EPT Process Pipe Flushing Upgrades October-11ER-0201 Emergency Biogas Bypass to Flares November-11

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 18 of 20

Page 21: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

150981 Plant Equipment ER-0192 75Hp Diesel Power Unit May-11ER-0207 Grit #7 Incline Auger May-11ER-0208 TPS Replacement Parts May-11ER-0209 Magnetic Flow Meter - Bio #5 RAS April-11140987 Electrical and Instrumentation RehabER-0202 Primary Area Lighting Renewal June-11ER-0203 Secondary RAS Flow Meters and VFDs June-11ER-0197 Primary 3-8 Sludge Pump DeviceNet Conversion September-11ER-0031 Plant Communication System Extension October-11140986 Buildings & Site RehabER-0071 GB Site Entrance Security Upgrades May-11ER-0187 EPT HVAC Structures July-11ER-0109 West Scrubber Bldg Platform & Stairs July-11ER-0206 Channel Gate Actuator Access July-11ER-0204 DAF Tank Hopper Covers November-11140992 Primary 7&8 Structural Rehab November-11140991 Structural Rehab PrgER-0066 Primary Influent Channel Rehab November-11ER-0205 Pretreatment/Primary Odour Cover Renewal November-11ER-0114 Fermenter #4 Trough Liner October-11

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 19 of 20

Page 22: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Appendices

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

March 2011 Page 20 of 20

Page 23: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 24: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 25: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 26: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 27: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 28: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 29: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 30: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 31: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 32: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 33: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 34: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 35: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 36: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 37: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 38: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 39: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 40: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 41: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix A - 2010 Plant Performance Reports

Page 42: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

2010 EPT Chemical Test Condition

1. July 26, 2010 EPT dry weather test

1. In order to compare the EPT effluent/sludge parameters with and without chemical addition, EPT tanks were operating as conventional primary clarifier and reached steady state before alum and polymer were dosed

2. EPT effluent/sludge were sampled at 9:30 am before chemical dosing 3. EPT effluent/sludge were sampled at 15:30 pm and 17:30 pm after chemical dosing (6 hr

> EPT HRT) 4. Effluent sampling location: EPT effluent channel near to gate MOG 2727. 5. Sludge sampling location: EPT #9 sludge sampling line. 6. Both effluent and sludge were sampled at the same location before and after the

chemical dosing 7. Alum dosing rate 150 mg/L, polymer dosing rate 1.5 mg/L

2. Aug 12, 2010 EPT wet weather test

1. No sludge was sampled and tested 2. EPT influent and effluent were sampled at the same time but different location. 3. Influent sampling location: West channel that fed to EPT, before alum and polymer

mixers 4. Effluent sampling location: (EPT effluent channel) 5. Both influent and effluent were sampled at 1 hr interval (started at 11:30am and ended

22:30 pm) 6. Run out of polymer at time of 16:30 pm. 7. Alum dosing rate 150 mg/L, polymer dosing rate 1.5 mg/L

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix B - 2010 Enhanced Primary Treatment Performance Testing

Page 43: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Sample 1Removal (%)

Sample 2Removal (%)

Sampling Time 9:30BOD (mg/L) 162 95.1 41.30 91.4 43.58 42.44COD (mg/L) 303 201 33.66 199 34.32 33.99TSS (mg/L) 47 32 31.91 49 -4.26 13.83

UVT 24.6 27.9 -13.41 31.4 -27.64 -20.53

Sample 1Change

(%)Sample 2

Change(%)Sampling Time 9:30

ALUMINUM 877 822 6.27 788 10.15 8.21%TS 8.47 8.1 4.37 8.1 4.37 4.37%VS 4.28 4.36 -1.87 4.35 -1.64 -1.75

TOTAL ALUMIN 0.0877 0.0822 6.27 0.0788 10.15 8.21PH 5.06 4.97 1.78 4.93 2.57 2.17

SludgeEPT Sludge

before dosing

EPT Sludge after Alume/Polymer dosing

July 26, 2010 EPT dry weather test result (Alum dose rate 150 mg/L, polymer dose rate 1.5 mg/L)

15:30 17:30

EffluentEPT

Effluent before

EPT Effluent after Alume/Polymer dosing

15:30 17:30

Ave Removal (%)

Ave Change (%)

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix B - 2010 Enhanced Primary Treatment Performance Testing

Page 44: 2010 Wastewater Treatment Annual Report · 2017-09-07 · 2010 Overview 2010 marked the best year of treatment in the 54 year history of the EPCOR owned and operated Gold Bar Wastewater

Aug 12, 2010 EPT wet weather test result (Alum dose rate 150 mg/L, polymer dose rate 1.5 mg/L)8/12/2010

Time Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Removal% Influent Effluent Change% Influent Effluent Change%8/12/2010 11:30 78 6 121 -53 94 354 249 29 66 443 73 83 52 160 46 71 25 7 42 7 44 -0 27 22 8 20 5 10 098/12/2010 12:30 102 42 6 58 24 410 131 68 05 437 51 88 33 163 36 77 91 7 44 7 12 4 30 14 3 44 3 -209 798/12/2010 13:30 107 32 9 69 25 313 109 65 18 249 22 91 16 114 14 87 72 7 56 7 09 6 22 19 5 42 8 -119 498/12/2010 14:30 128 29 3 77 11 325 88 72 92 249 20 91 97 140 16 88 57 7 59 7 15 5 80 19 4 41 3 -112 898/12/2010 15:30 164 36 1 77 99 403 112 72 21 246 25 3 89 72 149 16 89 26 7 56 7 28 3 70 15 9 38 2 -140 258/12/2010 16:30 188 34 6 81 60 388 156 59 79 242 15 93 80 148 11 92 57 7 55 7 29 3 44 13 2 35 6 -169 708/12/2010 17:30 218 55 5 74 54 412 148 64 08 223 21 90 58 150 16 89 33 7 68 7 36 4 17 14 6 32 6 -123 298/12/2010 18:30 212 78 4 63 02 383 205 46 48 185 29 84 32 127 22 82 68 7 7 7 35 4 55 13 4 24 1 -79 858/12/2010 19:30 224 71 9 67 90 454 188 58 59 228 26 88 60 173 21 87 86 7 62 7 34 3 67 13 4 25 0 -86 578/12/2010 20:30 203 89 0 56 16 454 223 50 88 208 31 85 10 148 23 84 46 7 59 7 40 2 50 14 3 22 6 -58 048/12/2010 21:30 241 101 58 09 398 254 36 18 160 74 53 75 120 35 70 83 7 60 7 43 2 24 12 7 20 2 -59 068/12/2010 22:30 239 101 57 74 459 256 44 23 202 44 78 22 150 32 78 67 7 56 7 41 1 98 14 5 19 7 -35 86

Ave of 12:30 ~ 16:30 137.8 35.1 72.8 367.8 119.2 67.6 284.6 26.7 91.0 142.8 18.6 87.2 7.5 7.2 4.7 16.5 40.4 -150.4Note: run out of polymer starting 16:30 pm

PH UVTBOD COD TSS VSS

EPCOR Water Services Inc. 2010 Wastewater Treatment Annual Report Approval to Operate No. 639-02-07

Appendix B - 2010 Enhanced Primary Treatment Performance Testing