2009 water financing partnership facility: annual work report (january-december)
TRANSCRIPT
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 1/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 2/73
ABBREVIATIONS
ADB – Asian Development BankADF – Asian Development FundAPWF – Asia Pacific Water Forum
CoP – Community of PracticeDMC – developing member countryDMF – design and monitoring frameworkGCI – grant component of investmentIWRM – integrated water resources managementLao PDR – Lao People's Democratic RepublicMDG – Millennium Development GoalMFF – multitranche financing facilityOBA – output-based aidPDA – pilot and demonstration activityPPTA – project preparatory technical assistancePRC – People's Republic of China
PSOD – Private Sector Operations DepartmentRETA – regional technical assistanceSSTA – small scale technical assistanceTA – technical assistanceTALL – technical assistance attached to loanWFP – Water Financing ProgramWFPF – Water Financing Partnership Facility
NOTES
(i) In preparing any country program or strategy, financing any project, or by making anydesignation of, or reference to, a particular territory or geographic area in this document,the Asian Development Bank does not intend to make any judgment as to the legal orother status of any territory or area.
(ii) In this report, "$" refers to US dollars.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 3/73
WFPFSteeringCommittee Chair
Xianbin Yao, Director General, Regional and Sustainable Development Department(RSDD)
WFPF SteeringCommitteeMembers
Juan Miranda, Director General, Central and West Asia Department (CWRD)
Klaus Gerhaeusser, Director General, East Asia Department (EARD)
Robert Wihtol, Director General, Pacific Department (PARD)Philip Erquiaga, Director General, Private Sector Operations Department (PSOD)
Sultan Rahman, Director General, South Asia Department (SARD)
Kunio Senga, Director General, Southeast Asia Department (SERD)
Water CommitteeChair and Co-Chair
Amy Leung, Director, Social Sectors Division, EARD
Michael Peter Barrow, Director, Infrastructure Finance Division 1, PSOD
Water CommitteeMembers
In-Ho Keum, Principal Urban Development Specialist, CWRD
Thomas Panella, Senior Water Resources Management Specialist, CWRD
Maria Theresa Villareal, Senior Urban Development Specialist, EARDQingfeng Zhang, Senior Water Resources Engineer, EARD
Steven Blaik, Water Supply and Sanitation Specialist, PARD
Siddharta Shah, Investment Specialist, PSOD
Sherwin Pu, Investment Specialist (Infrastructure), PSOD
Katsuji Matsunami, Advisor,RSOD concurrently Practice Leader
(Agriculture, Food Security, and Rural Development), RSDD
Wouter Lincklaen Arriens, Lead Professional (Water Resources Management),
RSDD
Anand Chiplunkar, Senior Water Supply and Sanitation Specialist, RSDD
Kenichi Yokoyama, Principal Water Resources Management Specialist, SARD
KyongAe Choe, Principal Urban Development Specialist, SARDHubert Jenny, Senior Urban Development Specialist, SERD
Rudolf Frauendorfer, Senior Urban Development Specialist, SERD
Ian Makin, Senior Water Resources Management Specialist, SERD
WFPF FacilityManager
WooChong Um, Deputy Director General, RSDD
WFPF Secretariat Vergel Latay, Associate Project Analyst, RSDD
Ellen Pascua, Consultant, RSDD
Office ofCofinancingOperations (OCO)
Tadashi Kondo, HeadM. Teresa Kho, Director
Karen Decker, Principal Financing Partnerships Specialist
Paritha Tritasavit, Senior Financing Partnerships Specialist
Lucila S. Chan, Cofinancing Officer
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 4/73
CONTENTS
Page
I. INTRODUCTION
II. HIGHLIGHTS AND KEY ACHIEVEMENTS
1
1
III. RESULTS FRAMEWORKA. Progress Towards Impact 3B. Progress Towards Outcomes 3C. Output Performance 4D. Crosscutting Issues in WFPF Portfolio 10
III. FINANCIAL STATUS
A. Partner Contributions 10B. Resource Utilization 11
C. Resource Allocation 12 IV. MANAGEMENT OF THE FACILITY
A. Steering Committee and Water Committee Membership 15B. Water Committee Evaluation of Applications 15C. Procedural Matters 15D. Audit Compliance, Issues, and Actions 16E. Dissemination Activities 16
V. RELATIONSHIP WITH FINANCING PARTNERS 16 VI. LESSONS LEARNED, EXPERIENCES GAINED, AND KEY
CONSTRAINTS
18
VII. EXTERNAL FACTORS RELEVANT TO THE FACILITY 19 VIII. OVERVIEW OF 2009 ANNUAL WORK 19 APPENDIXES1. Overview and Governance Structure of WFPF2. WFPF Design and Monitoring Framework3. Status of Grant for the Multi-Donor Trust Fund4. Status of Grant for the Netherlands Trust Fund5. 2009 Approved WFPF Allocations
6. Multidonor Trust Fund Disbursement Projections7. Netherlands Trust Fund Disbursement Projections8. Approved Allocations by Modality9. Approved Allocations by Sector
10. Approved Allocations by Region
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 5/73
I. INTRODUCTION
1. Established on 29 November 2006, the Water Financing Partnership Facility (WFPF)aims to provide additional financial and knowledge resources from development partners tosupport the implementation of Asian Development Bank's (ADB) Water Financing Program andhelp achieve the Program’s targeted outcomes as follows:
(i) 200 million people with sustainable access to safe drinking water and improvedsanitation
(ii) 100 million people with reduced risks to floods
(iii) 40 million people with more productive and efficient irrigation and drainageservices
(iv) integrated water resources management (IWRM) introduced in 25 river basins
(v) improved water governance through national water reforms and capacitydevelopment.
2. Details on the Facility are provided in Appendix 1 (WFPF Overview and GovernanceStructure).
3. This Annual Report covers the period January to December 2009 and presents both theperformance for the year and the cumulative performance as of 31 December 2009 measuredagainst its Design and Monitoring Framework (DMF) presented in Appendix 2.
II. HIGHLIGHTS AND KEY ACHIEVEMENTS
4. WFPF allocations leveraged considerable water investments. Despite limitedresources available for allocation in 2009, the Facility managed to finance additional projects,leveraging additional $560 million in ADB investments. This brings to approximately $3.3 billionthe estimated water investments to be realized from the project preparatory technical assistance(PPTA), grant component of investments, TAs attached to loans, and other project development
activities funded by the Facility as of 31 December 2009. Of the $3.3 billion, $2.4 billion (or73%) have already been approved as of end-2009.
5. Benefits to 38 million people leveraged from WFPF. Approximately 38 million peopleare expected to benefit from the $3.3 billion estimated water investments, as follows: (i) 23million people to be provided access to safe drinking water supply and improved sanitation, (ii) 3million people to be provided more efficient and productive irrigation and drainage services, and(iii) 12 million people with reduced risk to floods.
6. WFPF outcomes pass 75% of target. The Facility’s DMF has set a target of at least 50million people attributable to WFPF resources, out of the 3401 million people targeted by theWater Financing Program by end 2010. The 38 million people achieved to date represents 76%
of the 50 million target which was achieved two years after full Facility operation. It is expectedthat the balance of 12 million people (or 24%) and more can be achieved between 2010 and2011 assuming that expected contributions from partners are received and additional resourcesmobilized.
7. Figure 1 below summarizes how WFPF approved allocations in 2009 and cumulativeallocations to date contribute toward the Facility’s target output of “increased investment levels”
1340 million people is the total of: (i) 200 million people with access to safe water supply and improved sanitation,
(ii) 100 million people with reduced risk to floods, and (iii) 40 million people with more efficient and productiveirrigation and drainage services
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 6/73
2
and targeted outcome in terms of the “number of people who stand to benefit from waterinvestments”.
Figure 1: WFPF Activities Contributing Toward Outputs and Outcomes
January-December 2009 Total as of December 2009
8. Commitment to allocate20% of WFPF resources tosanitation exceeded. The share ofsanitation from the cumulativeallocations as of 31 December2009 reached a total of 26%,exceeding by 6% the 20% targetset by ADB’s Water Committee todemonstrate ADB’s commitment toaccelerating sanitation action. For
2009, the share stood at 19%which is just 1% short of the target.Sanitation remained high on theFacility’s agenda in 2009. The yearstarted with a high-level SanitationDialogue between ADB and 17 ofits developing member countries,discussing strategies to push thebudget envelop to increasesanitation investments. The year ended with ADB acting as a major partner of the World Toilet
Box 1 - Sanitation Knowledge Products Released in 2009
• Asian Sanitation Databook. Provides comparativesanitation, water supply, health and environmental statisticsfrom 27 Asian cities. In December 2009, this book wasamong the top 20 most downloaded files in ADB website.
• Making Sanitation Everybody’s Business. Summarizespriority areas for action in 17 DMCs that participated in theMarch 2009 high level ADB-DMC Sanitation Dialogue. Itincludes a video showcasing the experiences of India,
Indonesia, Pakistan, PRC, Philippines, and Viet Nam thatprovide concrete examples of actions and solutions thathave worked.
• India’s Sanitation for All: How to Make it Happen.Offers key recommendations that can help policy makersand stakeholders in India work toward universal sanitationcoverage.
$3.3 billionin water
investments
23 millionpeople
with accessto safewater
supply andimprovedsanitation
3 million
peoplewith accessto moreefficientirrigationservices
12 millionpeople
withreduced risk
to floods
PPTAs
$10.28 M
GrantComponent
of Loans / TAs
Attached toLoans
$9.56 M
Other
Project Dev.Activities
$1.47 M
Activities(Project
Development)
Output(IncreasedInvestment
Level)
Outcomes(No. of
People toBenefit)
$560 millionin water
investments
8 millionpeople
with accessto safewater
supply andimprovedsanitation
663,000
peoplewith accessto moreefficientirrigationservices
1 millionpeople
withreduced risk
to floods
PPTAs
$0.96 M
GrantComponent
of Loans/ TAs
Attached toLoans
$0.50 M
OtherProject Dev.
Activities
$0.72 M
Activities(Project
Development)
Output(IncreasedInvestment
Level)
Outcomes(No. of
People toBenefit)
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 7/73
3
Organization in convening the World Toilet Summit and Expo 2010 and with three newpublications released as detailed in Box 1.
9. WFPF allocation followed 70–30% ratio. The Board Paper establishing WFPFprovides that about 70% of the Facility’s resources are to be allocated for direct project supportand the balance of about 30% for program quality support. Based on cumulative allocations as
of end-2009, the Facility registered a ratio of 69–31%, as compared to the ratio in December2008 which stood at 72–28%. For the past two years (2008 and 2009) of the Facility’s fulloperation, it has been able to adhere to this targeted ratio based on cumulative allocations.
III. RESULTS FRAMEWORK
10. The succeeding subsections on Progress Towards Impacts, Outcomes, and OutputPerformance discuss the WFPF’s performance in 2009 and the cumulative performance to dateagainst the targets set in the Facility’s DMF. As has been explained in previous reports, theFacility’s DMF is targeted at the same impact, outcomes, and outputs as that of the WaterFinancing Program.
A. Progress Towards Impact
11. The achievement of the WFPF (and the Water Financing Program) impact is measuredin terms of: (i) Millennium Development Goal (MDG) targets for water supply and sanitationbeing met, (ii) decrease in the incidence of water-related death and diseases, and (iii) increasein the number of countries implementing integrated water resources management (IWRM).
12. The 23 million expected beneficiaries of WFPF-supported water supply and sanitationprojects to date represent the Facility’s expected contributions toward meeting the MDG targets,and eventually toward the expected decrease in incidence of water-related death and diseases.It is understood that the actual number of beneficiaries can only be determined at the end ofproject implementation.
13. Furthermore, the 11 river basins referred to in para 16 below as one of the Facility’stargeted outcomes are expected to contribute toward increasing the number of countriesimplementing IWRM.
B. Progress Towards Outcomes
14. WFPF’s outcomes are being measured in terms of the number of people benefited bywater investments. A target of at least 50 million people has been set as the Facility’scontribution to the 340 million people targeted under the Water Financing Program. Of thistarget, the Facility expects to contribute 38 million people (or 76%) from the approvedallocations as of end 2009, of which 11 million were realized from the 2009 approvals. Again,
actual achievement of these outcomes can only be determined after project completion.
15. The other outcome measurement is the introduction of IWRM in river basins. As of end2009, the Facility has funded projects and activities that support implementation of IWRM in 11river basins spread across India, Indonesia, PRC and the countries in Central Asia. Four ofthese were realized from the allocations approved during the reporting period.
16. The number of people expected to benefit from water investments increased from 27million in December 2008 to 38 million as of end-2009, while the number of river basinsimplementing IWRM increased from 7 in end-2008 to 11 as of December 2009. Table 1 below
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 8/73
4
summarizes the expected cumulative contributions from the Facility toward the target outcomesdescribed above.
Table 1: Expected Contributions of WFPF to Water Financing Program Targeted Outcomes(as of 31 December 2009)
MeasurementWater FinancingProgram Target
WFPF ExpectedContributions from
ApprovedApplications
Number of people with access to safe drinkingwater and improved sanitation
200 million 23 million
Number of people with reduced risk to floods 100 million 12 million
Number of people with improved and efficientirrigation and drainage services
40 million 3 million
Total 340 million 38 million
Introduction of IWRM in river basins 25 river basins 11 river basins
C. Output Performance
Component 1: Increased Levels of Water Investment
17. The 2009 approved allocations are contributing about $560 million in ADB waterinvestments bringing to $3.3 billion the estimated cumulative investments as of end 2009 thatWFPF is able to leverage through its funding support for PPTAs, TAs attached to loans, grantcomponent of investments and other project development support as detailed below.
a. Support to PPTAs
18. Approximately $340 million in ADB investments are expected to be realized from theapproved funding support in 2009 for PPTAs. Thus, as of end 2009, the leveraged ADBinvestments from 15 PPTAs that WFPF has funded to date reached a total of $1.3 billion asshown in Table 2.
Table 2: WFPF Cumulative Funding Allocations for PPTAs as of 31 December 2009(in US$ Million)
Output Amount ofWFPF Support
EstimatedAmount of
Ensuing LoanNumber
of ProjectsSubsector
12
1
Water Supply, Sanitation, and WastewaterManagementIrrigation
8.52
0.26
1,030
402 Flood Management 1.50 200
15 10.28 1,270
19. Of the 15 PPTAs, three have already been processed and approved into investmentprojects at a total of $375 million in ADB financing, including a $300 million multitranchefinancing facility (MFF). Altogether, these three projects expect to benefit about 4.6 million
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 9/73
5
people in Kyrgyz Republic, Nepal and Uzbekistan through improved water supply, sanitationand wastewater management.
20. One of the three approved projects isthe $45 million loan for Nepal’s Second SmallTowns Water Supply and Sanitation Sector
Project which is the first water supply projectto include an output-based aid (OBA)component. Based on initial conceptdeveloped during project preparation, grantswill be provided to service providers, i.e.,water users and sanitation committees(WUSCs), for every poor and/or vulnerablehousehold connected to the water systemand assisted in private latrine construction,as verified by an independent verificationagent. The objective is to improve water supply and sanitation services to the poor andmarginalized communities of Nepal.
21. The other approved project is the $300 million MFF loan for Uzbekistan’s Water Supplyand Sanitation Services Project, for which the $60 million first tranche has already been signed.It will finance improvements to water source and distribution systems as well as upgradewastewater treatment plant and sewerage systems in the capital city of Sukhandarya province,benefiting an estimated 2 million people. Performance-based service and lease contracts will bepiloted for service agencies to improve service efficiency and encourage more privateinvestment in the sector.
b. Support to Grant Component of Investments and TAs Attached to Loans
22. In 2009, WFPF was able to leverage an additional $100 million in ADB investment by
funding a TA attached to an agriculture development project for PRC that supports increasedirrigation efficiency and adaptation to climate change through improved water resourcesmanagement. As of end-2009, the Facility has provided grants for 11 investment projects, thusleveraging a total of $1.5 billion in ADB investments. All 11 projects are already approved as of31 December 2009. Table 3 below provides the details.
Table 3: WFPF Funding Cumulative Allocations for Grant Components of Investmentsand TAs Attached to Loans, as of 31 December 2009 (in US$ Million)
Output Amount ofWFPF Grant Loan AmountNumber of
ProjectsSubsector
6 Water Supply, Sanitation, and WastewaterManagement 6.2 497
2 Water Resources Management 2.4 5452 Irrigation and Drainage 0.2 2571 Flood Management 0.1 200
11 8.9 1,499
23. The 11 approved investment projects include two MFF loans and cover: (i) water supply,sanitation, and wastewater management in PRC, Sri Lanka, Uzbekistan and Viet Nam; (ii)irrigation in India and PRC; (iii), flood management, also in India and PRC; and (iv) water
Box 2 - Improving Services to the Poor andMarginalized Communities through OBA
Some 17,000 poor and marginalized peoplestand to benefit from improved water supply andadditional 32,000 to have access to improvedsanitation through the OBA component ofNepal’s Second Small Towns Water Supply andSanitation Sector Project. This investment projectsupports the development of safe, adequate andaccessible water supply and sanitation facilitiesin about 20 small towns of Nepal. The OBAcomponent costs $1.3 million.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 10/73
6
resources management in Indonesia and PRC. Altogether, these 11 investment projects expectto benefit approximately 6.3 million people.
24. Among those approved within 2009 are three separate loans for PRC’s Small Cities andTowns Development Demonstration Sector Project for the provinces of Hebei, Liaoning andShanxi, at $100 million each. These projects address, among others, river water quality
improvement, groundwater pollution control, wastewater treatment upgrading, sewer networkrehabilitation and improvement of water supply quality and reliability. These projects support thePRC Government’s commitment to develop small cities and towns as a way to foster economicgrowth, generate employment, and narrow the rural–urban income gap.
c. Other Project Development Support
25. Other project development support was made possible through direct charges. Theseactivities include support for pre-PPTA or upstream work, provision of incremental expertiserequired during project preparation, support during pre-project implementation and other relatedactivities aimed at facilitating project development and improving quality of project design andimplementation.
26. In 2009, allocations were made for seven of these activities, from which some$120 million in additional ADB investments are expected to be generated, bringing to acumulative total of $588 million the estimated investments resulting from these other projectdevelopment activities.
27. Several of these activities, particularly those approved in previous year, have alreadybeen completed or close to completion and have contributed to project development as follows:
• In Pakistan, WFPF is providing support to accelerate implementation of sanitationand sewerage subprojects under the approved first tranche of the $300 million MFFLoan for Sindh Cities Improvement Investment Program. This MFF loan expects to
benefit a total of 4 million people in Sindh’s participating secondary towns.
• In Bangladesh, support was provided for further assessment and field validation ofactual operation and maintenance (O&M) needs and costs of water resourcesinfrastructure to inform an on-going PPTA for Participatory Small Scale WaterResources Project which is expected to be processed into a $100 million loan.
• In Lao PDR, the Facility supported the development of a plan for corporatizingservice providers (provincial nam papas) in preparation for the implementation of the$23 million loan for Small Towns Water Supply and Sanitation Sector Project whichwas approved in early 2009 and expected to benefit some 350,000 people.
• In India, the Facility made possible the engagement of legal expert to review projectdocuments for proposed water supply projects in Gujarat under public-privatepartnership (PPP) arrangements which, if realized, expect to benefit about 2 millionpeople.
• Also in India, provision of incremental expertise was supported by the Facility tosupport an on-going PPTA for flood management and a loan for irrigation projectwhich has recently been approved.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 11/73
7
Component 2: Policy and Institutional Reforms Accelerated
28. WFPF provided resources in 2009 to fund, through direct charges, a couple of activitiesthat seek to advance reform measures in water supply and sanitation covering policy,legislation, regulations, and institutional arrangements.
29. To date, the Facility has funded various TAs and direct charges that involve improvingregulation of urban water supply and sanitation, including facilitating private sector participation;enhancing water supply and sanitation policy and program and ensuring their inclusion innational development plans; developing policy on urban wastewater reuse and sludgeutilization; assessing potential for developing integrated renewable energy strategy forimproving irrigation service efficiency; developing water allocation system; developingguidelines and regulations for ecological compensation system; and development of benefitssharing mechanism for people adversely affected by hydropower projects. Initial results fromsome of these initiatives are summarized in the following presentation.
30. In Viet Nam, WFPF cofinancedthe small-scale TA (SSTA) on
developing benefits sharing mechanismfor people adversely affected byhydropower generation projects. The TAhas facilitated the formation of benefitsharing council and fund managementboard in the province of Quang Nam asa pilot, upon which to base theformulation of a strategy to scale up theimplementation of benefits sharingmechanisms nationally in existing andfuture hydropower projects in Viet Namand other countries in the lower Mekong
basin. This TA is expected to result in aDecree on Benefit Sharing for nationalimplementation in 2010.
31. In Mongolia, the Government has expressed strong support for the recommendations,including reform measures, from a WFPF-completed activity to improve the policy andregulatory framework for urban water supply delivery and create the enabling environment forprivate sector participation. Some actions are already expected to be adopted in an upcomingurban development project while some reforms still require additional work which thegovernment is committed to move forward with.
32. In PRC, the findings and lessons learned from the WFPF-supported development of
ecological payment system have been disseminated within PRC through a number ofworkshops convened by the government with inputs from international experts, and will informthe preparation of the national guidelines to implement eco-compensation in PRC’s river basinsunder an ADB advisory TA (ADTA) which the Facility is also supporting.
Component 3: Institutional Capacity Strengthened and Knowledge Base Expanded
33. Approved projects in 2009 included initiatives for enhancing capacity in managing theimpacts of climate change in water and in implementing IWRM; developing and sharingknowledge; and implementing pilot and demonstration projects. To date, the Facility has funded
Box 3 – Viet Nam SSTA: Developing BenefitsSharing Mechanism for People Adversely Affected
by Hydropower Generation Projects
The TA is aimed at developing an institutional andpolicy framework for sharing part of the economicbenefits of hydropower projects with the communitiesdirectly or indirectly affected for their socio-economicdevelopment and to mitigate long-term environmentalimpacts. The scope of the TA includes: (i) a review ofprevailing regulations, legislation, and other policiesaffecting benefit sharing with affected people, (ii)preparing guidelines for implementing a benefitsharing mechanism for Viet Nam, and (iii) preparing adetailed work plan to implement the proposed
guidelines for a selected hydropower project.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 12/73
8
activities that seek to produce the following outputs: (i) pilot and demonstration activities,(ii) water sector organizations capacity improvement, (iii) knowledge products, (iv) knowledgehubs, (v) knowledge sharing events, (v) regional cooperation/water partnerships, and (vi) otheractivities that cut across several of these outputs.
34. Supporting innovations is one of the objectives of the WFPF’s program quality support
window. Completed and on-going pilot and demonstration activities (PDAs) have so fardemonstrated the following replicable and/or scalable models and approaches that seek tointroduce innovations in delivering water services and managing water resources:
• Models for financing small scale water providers. Completed in November 2009in the Philippines, this PDA examined how the constraints that small scale waterproviders face in accessing funds to sustain and expand their services can beaddressed. This PDA triggered the interest of potential lenders, i.e. governmentfinancing institutions, rural banks, private and commercial banks, as well asinstitutions providing loans to micro, small and medium enterprises. These modelspresent potential for replication in other countries where small scale water providersare providing interim service to areas not yet served by the formal utilities but are
also faced with the problem of limited access to financing.
• Use of bamboo and vetiver2 for slopestabilization, erosion control and effluenttreatment. Initial results from the PDAs ontesting the use of bamboo and vetiver for slopestabilization, soil erosion control and effluenttreatment are already benefitting the $500million MFF loan for Indonesia’s IntegratedCitarum Water Resources ManagementInvestment Program where replication andscaling up of these methods are to be carried
out. Box 4 shows an on-the-job training offarmers on the proper planting of vetiver. ThesePDAs are also facilitating increased participationin project implementation by critical projectstakeholders, particularly the farmer groupswithin the Citarum river basin. Aside fromintroducing IWRM, this loan also contributestowards: (i) improving reliability of bulk supply for sustainable drinking water to over25 million people in the greater Jakarta and Bandung metropolitan areas, (ii)improving reliability of irrigation water to an area of 300,000 hectares, and (iii)reducing vulnerability to flooding of some 1 million people.
35. On knowledge development and dissemination, in addition to three new sanitationpublications shown in Box 1 above, two other major knowledge products were completed duringthe reporting period addressing irrigation and water resources management:
• “Revitalizing Asia’s Irrigation: To Sustainably Meet Tomorrow’s Food Needs”.This report resulted from the research commissioned to International Water
2 Vetiver is a clump grass with sterile seeds and cannot become a weed. It is perennial and permanentand only grows where it is planted. It forms a dense, permanent hedge preventing soil loss from runoff.
Box 4 – Pilot andDemonstration Projects in
Indonesia
... demonstrating low-cost andenvironment-friendly methods ofsoil and water conservation,sediment control as well astreatment and disposal of effluent.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 13/73
9
Management Institute (IWMI), which serves as the regional knowledge hub forirrigation service reforms. The report argues that irrigated agriculture still offers hugeopportunities but such potential can only be realized through new approaches toinvesting in infrastructure, reforming institutions and building capacity.
• “Water Rights and Water Allocation: Issues and Challenges for Asia”. This
knowledge product provides important information to DMCs who are working toimprove water rights and water allocation systems to increase water security.
36. WFPF continued supporting the work on establishing the regional water knowledge hubsunder the auspices of the Asia-Pacific Water Forum (APWF). To date, 17 knowledge hubs havebeen formed supported by a secretariat hosted at ADB starting November 2009. Several ofthese hubs are involved in the on-going preparation of Asian Water Development Outlook 2010which focuses on the following key dimensions of water security: (i) satisfying household needs,(ii) supporting productive economies, (iii) managing vibrant and livable cities, (iv) restoringhealthy rivers, and (v) building resilient communities.
37. The Facility’s activities to date and how they are contributing toward the target outputs
are summarized in Table 4 below.
Table 4: Summary of WFPF Cumulative Activities Contributing to WFPF Outputs(as of 31 December 2009)
WFPF Outputs(2008–2010)
Targets
WFPF Cumulative Activities as of 30 June 2009Grant
Component ofInvestments/TAs Attached
to Loans
TechnicalAssistance
DirectCharges
Total
Total WFPF Allocations(In US$ M)
$9.46 $18.20 $3.74 $31.40
Increased levels of investments $9.46 $10.43 $1.69 $21.58Loans supported with grantsFundable investment proposals
(PPTAs)Other project development
support
At least 15At least 30
At least 30
11-
-
-15
1
--
19
1115
20
Policy and institutional reformsaccelerated
- $2.72 $0.70 $3.40
• TAs and direct charges or anynonlending assistanceaddressing reforms in the areasof: policy, legislation, regulation,institutional arrangements
At least 15 - 7 5 12
Institutional capacitystrengthened and knowledgebase expanded through:
- $5.05 $1.37 $6.42
• Pilot and demonstrationactivities; water sectororganizations capacityimprovement; knowledgeproducts; knowledge hubs;knowledge sharing events;regional cooperation/ waterpartnerships
Targetsareexpressedin theDMFthroughqualitativeindicators
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 14/73
10
D. Crosscutting Issues in WFPF Portfolio
38. All ADB projects receiving WFPF allocations follow ADB’s policy on social safeguardsand environment policy. Overall, the projects that WFPF has supported to date will directly andindirectly benefit the poor, women and the environment as demonstrated in the sample projectin para 39 below for which the PPTA was cofinanced by WFPF.
39. Kyrgyz Republic’s Issyk-Kul Sustainable Development Project. Approved inSeptember 2009, this project is the first phase of a longer-term initiative by ADB to supportenvironmental management and to improve urban service delivery in the Issyk–Kul Oblast ,expecting to benefit some 136,000 people (68,000 people with improved water supply and$23,000 people with on-site sanitation and 45,000 people with sewerage system). The Projectwill, among others, replace and extend sewer network, rehabilitate pumping stations andprovide tools, equipment, and vehicles for sewer maintenance, water and sanitation facilities inpre-schools, schools, public places (market, public centers, health care organizations) andpublic institutions. The project includes a component for enterprise resource managementaimed at creating a culture of prudent financial management in the cities and service utilities,enabling them to generate revenue surpluses in the longer term for equity investments and
leveraging debt.
IV. FINANCIAL STATUS
A. Partner Contributions
40. As of end-2009, total committed contributions to the Multi-Donor Trust Fund andNetherlands Trust Fund stand at $28.36 million and $19.7 million, respectively, for a total of$48.11 million out of the initial target of $100 million. Of the $48.11 million committedcontributions, $32 million have been remitted to ADB. The balance of $16.11 million is expectedin 20103 and 2011. Details are shown in Table 5 below.
3As of 8 January 2010, the $5.0 million additional contribution from Spain has been received by ADB
Box 5 – Kyrgyz Republic: Issyk-Kul Sustainable Development Project
The 2009–2011 country development strategy emphasizes environmental sustainability, and itsstrategic investment project for the Issyk–Kul region focuses on protecting Lake Issyk–Kul. InFebruary 2009, the Concept of Sustainable Development of the Ecological and Economic System ofIssyk–Kul was passed through a presidential decree. Based on this, the Government of KyrgyzRepublic passed a resolution in May 2009 that prioritizes implementation of the Project.
Issyk–Kul Oblast ranks fourth in terms of poverty incidence, with 39%, and about 8% sufferingextreme poverty. The poor accounts for 19% of the beneficiary population, with the extremely poormaking up 9%.
The poverty and social assessment indicated that women strongly support the Project across allcomponents. Women perceive that the Project will improve their living environments, createemployment opportunities, and reduce the incidence of waterborne illnesses and associated costs.Implementation of the gender action plan will enhance the benefits to women through a training andawareness-raising program focusing on drinking water safety, water source protection and treatment,water and environmental sanitation and diseases, toilet renovation, and health education andpromotion.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 15/73
11
Table 5: Committed Partner Contributions as of 31 December 2009 (in US$ million)
Financing Partners AmountCommitted
Received by ADBas of end-2009
Receivable
Multi-Donor Trust Fund• Australia
• Norwaya
• Austria • Spain
28.368.69
4.675.0010.00
23.368.69
4.675.005.00
5.000.00
0.000.005.00
Netherlands Trust Fund 19.75 8.64 11.11
Total 48.11 32.00 16.11
41. The unaudited Status of Grants as of 31 December 2009 for both the Multi-Donor TrustFund and the Netherlands Trust Fund are presented in Appendixes 3 and 4, respectively.
42. WFPF also allows in-kind contribution in the form of experts secondment, technicalcooperation, and others. Discussions with Spain have further advanced on the proposed
technical cooperation between water utilities and water resources organizations. Plans for thesecondment of experts from Austria for water resources and urban water supply are alsoprogressing.
B. Resource Utilization
43. For 2009, the Facility had $5.6 million available for allocation out of which, $5.0 millionwas allocated to projects (please refer to Appendix 5 for the list of 2009 approved allocations).Thus, as of end-2009, a total of $31.4 million has been allocated out of the $32 millioncontributions received by ADB.
44. Out of the $31.4 million allocated, $30.4 million have been committed to projects through
formal ADB approval. An overview of the status of contributions received by ADB is presented inTable 6 below, with respect to allocation to projects, commitment, and disbursement as of31 December 2009.
Table 6: Status of Remitted Contributions as of 31 December 2009 (in US$ million)
FinancingPartners
Received byADB
Allocateda
(WFPF FundingApproved)
Committed(Project
Approved)Contracted
c Disbursed
d
Multi-Donor• Australia• Norway• Austria• Spain
Netherlands
23.368.694.675.00
5.00
8.64
22.91
8.49
21.91
8.49
18.34
5.38
6.71
3.11
Total 32.00 31.40 30.40 23.72 9.82a
Projects approved by Steering Committee for WFPF allocation.b
Projects approved by Steering Committee for WFPF allocation and by ADB management for implementation,including those approved but not yet effective.
cContracts awarded to third parties
dInclusive of financial expense/bank charges.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 16/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 17/73
13
49. With service fees and other charges included, the allocation rate is more than 100% asthe total exceeded the remitted amount. The shortfall was charged against interest earnings asof end-2009. Please see Table 7 below for the detailed status of funds.
Table 7 – Fund Status as of 31 December 2009 (in US Million)
Item Available Resources Allocations BalanceRemittances
to ADB Interest
EarningsTotal Projects Service
Feesa
OtherFees/
Chargesb
Total
MultidonorTrust Fund
AustraliaAustriaNorwaySpain
NetherlandsTrust Fund
23.36
8.695.004.675.00
8.64
0.5
0.2
23.86
8.84
22.91
8.49
0.91
0.28
0.03
0.0002
23.85
8.77
0.01
0.07
Total 32.00 0.7 32.70 31.40 1.19 0.0302 32.62 0.08
aService fees are computed as follows: 5% for TA and 2% for grant component of investment. However, forcontributions received after October 2009, the service fee for grant component of investment will increase to 5%
bOther fees and charges include audit fees and bank charges
50. The distribution of allocated resources by modality is shown in Figure 3 below anddetails are provided in Appendix 8. The share of technical assistance has remained at morethan 50% of the total allocated resources to date, and slightly increased from 54% in December2008 to 58% in end-2009.
Figure 3: Distribution of Approved Allocations by Modality
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 18/73
14
51. The distribution of allocated resources by sector is shown in Figure 4 below and detailsare provided in Appendix 9. Urban water still got the highest share but slightly decreased from59% in December 2008 to 55% as of end-2009. Rural water increased by 1% from its 6% sharein 2008 while basin water remained at 26%. Multisector registered a 3% increase largely due tothe approval of two regional TAs whose scope cuts across various subsectors.
Figure 4: Distribution of Approved Allocations by Sector
52. The distribution of allocated resources by region is shown in Figure 5 below and detailsare provided in Appendix 10. Except for East Asia whose overall share has remained at 13%,the share of all regions slightly decreased between 1% to 3%. Projects and activities that cutacross various regions (inter-regional) registered an increase of 6% from 2008. Again, this is
mainly on account of the two regional TAs approved during the reporting period which havemultiregional coverage.
Figure 5: Distribution of Approved Allocations by Region
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 19/73
15
IV. MANAGEMENT OF THE FACILITY
A. Steering Committee and Water Committee Membership
53. The 2008 Annual Report made mention of the expansion of Water Committeemembership in mid-2008 to include more members from operations department, including from
the Private Sector Operations Department (PSOD). The chairmanship of the Committee hassince then been shared between operations department and PSOD. The Committee continuedto strengthen itself by organizing a Climate Change Working Group in early 2009, in addition tothe Sanitation Action Group and the Rural, Urban, and Basin Streams formed in 2007. Theestablishment of such working groups allows the Committee to focus on various watersubsectors as well as on specific priorities and issues such as sanitation and climate change.
B. Water Committee Evaluation of Applications
54. As in 2008, the evaluation of applications in 2009 by the Water Committee continued tobe carried out by circulation, with thorough and interactive deliberation on comments via email.
55. The non-receipt of committed remittances in 2009 required more proactive managementof demand and expectations of user departments because the actual requirements farexceeded the resources available for allocation. Where possible, scaling down of amountrequested had to be resorted to.
C. Procedural Matters
56. During the 2nd Annual Consultation Meeting in March 2009, an amendment to theprovision for spring cleaning exercise in the Facility’s Implementation Guidelines was agreedbetween ADB and financing partners. The provision now reads “A review of all funds committedunder the WFPF will be undertaken periodically. Funds allocated to projects that are unlikely tobe approved by the Management/Board within six (6) months after confirming a WFPF
allocation will be reviewed to determine whether or not the allocated funds should be reverted tothe pool and be available for reallocation to other projects in the pipeline”.
57. Based on this amended provision, periodic spring cleaning exercise was carried out in2009 resulting in about $160,000 being freed up from the cancellation of one project and thereduction in approved allocation for another.
58. The Facility Secretariat also maintained close coordination with user departments andwith Controllers to track disbursement, ensure timely payment and facilitate closure of accountsfor completed projects, particularly those funded through direct charges. As of 31 December2009, a total 20 direct charge accounts have been financially closed from which about $392,000savings were realized.
59. In October 2009, ADB approved the new structure for service charges in administeringgrant cofinancing from external sources. The revised administration fees will take effect onfuture commitments to be effected through new Instruments of Contribution.
60. A template for reporting on outcomes and results of activities funded through directcharge modality was developed and used during the reporting period.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 20/73
16
D. Audit Compliance, Issues, and Actions
61. The audited financial statement for the multidonor trust fund for 2008 disbursements wassubmitted to financing partners in 2009. Audit of 2007 financial statements was agreed to beforegone since no expenses were incurred during the period other than the bank fees related toremittances of financing partners’ 2007 contributions. Therefore, the audit was considered
unnecessary.
E. Dissemination Activities
62. A monthly Water Community of Practice (CoP) e-newsletter serves as the internaldissemination mechanism by which information about the Facility is made available to ADBstaff, including announcements regarding submission deadlines.
63. Externally, ADB’s water website remains to be the Facility’s main communicationchannel. This website registers an average of 20,000 page views per month and has beenconsistently one of ADB’s top thematic sites. It has dedicated webpages for each of the twoexisting trust funds under the Facility which underwent
major reorganization in 2008 and 2009 to increase visibilityand ensure ease of navigation within the site.
64. In mid-2009, the Secretariat completed updatingand enhancing the WFPF promotional brochure called“Improving Results, Improving Lives: ADB’s Water Financing Partnership Facility” , which now highlightsresults to date. It provides a glimpse of how the facility ishelping achieve results on-the-ground. Specifically forfinancing partners, it tries to demonstrate how a financingpartnership facility such as WFPF is able to help themleverage their contributions for more results at lower
transaction costs. Regular updating will continue to beundertaken by the Secretariat as more results areachieved.
V. RELATIONSHIP WITH FINANCING PARTNERS
65. Coordinating on Schedule of Remittances. Through the Office of CofinancingOperations, the Facility Secretariat kept track of the transfer of partner contributions to ADB.The 2009 Annual Work Program indicated a total of $7.6 million in expected remittances for thatyear: $1.4 million into the Multi-Donor Trust Fund (from the governments of Australia, Austria,and Norway) and $6.2 into the Netherlands Trust Fund. This target was not achieved since onlythe contribution into the Multi-donor Trust Fund was received by ADB. Coordination with the
Government of Netherlands was sustained during the reporting period to provide the informationrequired to facilitate release of the contribution committed for 2009.
66. Coordinating on Report Submission. All scheduled reports to financing partners duein 2009 were delivered. These included the following: (i) 2008 Annual Report, (ii) 2009 AnnualWork Program, (iii) January–June 2009 Semiannual Progress Report, and (iv) 2008 auditedfinancial statements.
67. The January–June 2009 Semiannual Progress Report included information requestedduring the March 2009 Annual Consultation Meeting such as the definition of leveraging and an
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 21/73
17
explanation of how ADB is counting the beneficiaries of water supply and sanitation projects.The report also highlighted the financing partners suggestion for future reports to include moreinformation on lessons learned, innovations, successes and other highlights that can providemore insights to financing partners on how the Facility is achieving its objective. This 2009Annual Report has tried to include as much of these requested information as possible and allother comments received.
68. Agreeing on Strategic Directions. The 2nd Annual Consultation Meeting (ACM) withfinancing partners was held in March 2009 at ADB Headquarters in Manila. The discussion onWFPF revolved around:
(i) Strengthening of results monitoring, particularly in connection with MDGtargets for water supply and sanitation. This is related to the documentreferred to in para 67 above explaining how ADB is counting the beneficiaries ofwater supply and sanitation projects.
(ii) Need for more support towards rural sanitation and hygiene education .This is an area that admittedly still needs more work. Initial projects and activities
have, however, been discussed, including pilot testing of “Community-Led Total Sanitation” in PRC. Also in PRC, a pilot and demonstration activity on “Peer-to- Peer Learning Process for Rural Environmental Health and Sanitation Awareness” is planned for early 2010;
(iii) Leveraging of WFPF resources. As mentioned in para 67 above, WFPF hassubmitted, as part of the January–June 2009 semiannual progress report adocument defining leveraging in the context of WFPF operations. This AnnualReport has tried to report on how the Facility has leveraged outputs (increasedinvestment levels) and outcomes (people benefiting from water investments)from the approved allocations to date. The report has also made mention of thevery first output-based aid (OBA) in an ADB water project which is also a form of
leveraging additional resources particularly for reaching poor and marginalizedsections of society.
(iv) Assessment of demand from DMCs. As discussed during the ACM, priorityaccorded to water varies from country to country but is generally high across theregion. The need for water investment is obvious but translating this need intoactual demand remains a challenge. ADB’s continuing dialogue with government,including support for reforms and capacity development, help keep the watersector high on the DMC’s development agenda. The high-level ADB-DMCSanitation Dialogue in March 2009 was followed by an in-country dialogue in VietNam were specific priority actions and investment areas where discussed. Thesame dialogue is planned for Central Asia in early 2010.
69. WFPF Implementation Guidelines. Proposed amendments to the ImplementationGuidelines were also agreed during the 2nd ACM, such as the provisions for periodic review ofallocations to projects still awaiting ADB approval and the inclusion of an anticorruptionprovision. The ACM included a special session on ADB’s anticorruption measures.
70. Independent Review of the Facility. The conduct of an independent review in 2010 ofWFPF and CEFPF was also discussed during the ACM taking off from the draft terms ofreference and cost estimates prepared by ADB. Further discussion among financing partners is
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 22/73
18
required, particularly with regard to how the review will be funded. ADB has coordinated with theIndependent Evaluation Department on their possible involvement.
71. Responding to Financing Partners Specific Areas of Interest. In evaluatingapplications, WFPF continues to be guided by financing partners’ preferred geographic focus.The Channel Financing Agreement with the Netherlands stipulate that use of the trust fund
resources for water supply and sanitation projects should be limited to Asian Development Fund(ADF)-eligible countries. The contributions from the Government of Austria primarily supportwork in Central Asia and South Caucasus. For the Australian contributions, there are no countryrestrictions, but Australia’s policy seeks to demonstrate that investments in IWRM will contributeto sustainable economic growth, especially in Southeast Asia and the Pacific.
VI. LESSONS LEARNED, EXPERIENCES GAINED, AND KEY CONSTRAINTS
72. Evaluation and Approval of Applications. Processing applications for TAs and grantcomponent of investments in batches based on six submission deadlines in one year hasdefinitely helped both the user departments and the Facility Secretariat. On the part of the userdepartments, their being aware of submission deadlines enabled them to make a more realistic
programming of their applications. On the part of the Secretariat, it allowed better programmingof work involved in evaluating applications because peaks were known in advance. However,this process was interrupted after September 2009 due to lack of remittances into the Facility.Such interruption is expected to continue in 2010, specifically under the Netherlands Trust Fundpending receipt of the next remittance. For the Multidonor Trust Fund, the additional contributionfrom Spain has been remitted to ADB at the time of preparation of this report.
73. Regular discussion with user departments of their anticipated need for resources hasalso helped the Secretariat manage demand and expectations. This was particularly importantin 2009 when resources available were quite limited.
74. The use of application templates continued to facilitate the application process. User
departments have expressed appreciation for having these templates to guide them in preparingtheir applications. Admittedly though, continuing refinement of these templates is necessarybased on lessons learned to date. While some of these refinements may appear minor, they willcertainly help further improve the process.
75. Applications for all batches were processed based on the prescribed period of 5 weeksmaximum from the time of receipt of application to approval by the Steering Committee.
76. Use of Direct Charge Modality for Accessing WFPF Resources. The use of directcharge as an additional modality for accessing resources has helped the Facility respond toemerging needs in user departments and in client governments for funding small, standaloneactivities such as workshops, short study, knowledge product development, and others which,
without this modality may only be possible through TAs. This has also enabled the Facility tobenefit from quick results as demonstrated in para 27 above briefly describing projectdevelopment support through direct charges. More than 50% of approved allocations to directcharges have been disbursed, thus this modality also facilitates quick disbursement.
77. Lack of Resources a Constraint. The $48.1 million committed contributions to WFPFto date is less than half of the initial target of $100 million. This poses a constraint to thecapacity of the Facility to do more in 2010 and beyond. Aside from managing availableresources in such a way that it maximizes results, ADB is continuing its discussions with newand existing financing partners to mobilize additional contributions. Before the end of 2009,
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 23/73
19
additional contributions into the Multidonor Trust Fund were committed by Spain. Other potentialdonors have also been approached by ADB such as the Governments of Japan, Korea, andPRC.
VII. EXTERNAL FACTORS RELEVANT TO THE FACILITY
78. Rising Energy Costs and CO2 Emission Compliance. ADB has funded many and willcontinue to fund in the future viable water supply and sanitation projects that include watersupply infrastructures and wastewater/sewage treatment plants. Typically, the components ofthese projects that impact energy usage and energy efficiency are installation or replacement ofpumps and motors, reduction of non-revenue water (NRW) and demand side water losses.Opportunities exist for ADB’s water projects to be energy-efficient, thus contributing towardreduced CO2 emissions. Furthermore, improvement in project viability is expected as a result ofwater and energy savings, reduced CO2 emissions and possible CDM credits. The sameapplies to irrigation projects where opportunities to use energy-efficient irrigation pumps alsoexist.
79. Increasing and Changing Demand for Food. The need to produce more food to feed
the growing population in the Asian-Pacific Region is obliging governments and developmentpartners to improve productivity of irrigated agriculture. Experts estimate that demand for foodwill double during the next 50 years. The ADB-commissioned IWMI Report on RevitalizingAsia’s Irrigation referred to in para 35 above argues that policies and investment strategies toincrease food production will affect water use, among others, and identifies four potential waysto produce the required amounts of food for Asia’s swelling population: (i) investment in irrigatedagriculture, (ii) trade in agricultural commodities, (iii) upgrading rainfed farming, and (iv) a
judicious combination of all three strategies.
80. Water Identified as Most Sensitive to Climate Change-Induced Impacts in Asia.ADB, through its Long-Term Strategic Framework 2008–2020, acknowledges the urgency inmeeting the diverse water sector challenges posed by global and regional climate change,
considering that water, along with the agricultural sector, is identified as the “most sensitive toclimate change-induced impacts in Asia.” The projected impacts and associated risks to thewater sector will exhibit strong regional variability, given the diversity of hydro-climatic conditionsacross the Asia and Pacific region. Accordingly, ADB’s regional departments have developedclimate change implementation plans to “mainstream” climate change adaptation in water sectoractivities and projects. ADB is already implementing a range of climate change strategies,including portfolio risk assessment, the development of knowledge products and riskmanagement tools, regional knowledge networking, specialized funding mechanisms, andregional, national and project-level technical assistance.
81. Global Financial Crisis. The financial crisis affected the capacity of financing partnersto remit resources to WFPF in 2009.
VIII. OVERVIEW OF THE 2010 ANNUAL WORK PROGRAM
82. Guided by the status of output and outcome achievements to date against the Facility’stargets per DMF, the WFPF expects to focus the 2010 activities on the following strategicpriorities:
(i) reaching the target of 50 million people benefited by WFPF-funded projects;
(ii) Intensifying support for water and climate change;
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 24/73
20
(iii) Supporting integrated water resources management (IWRM) in river basins;
(iv) Targeting more support for irrigation reform and modernization;
(v) Keeping sanitation investments high on the agenda; and
(vi) Strengthening regional cooperation and knowledge networking
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 25/73
Appendix 1 21
WATER FINANCING PARTNERSHIP FACILITY (WFPF)OVERVIEW AND GOVERNANCE STRUCTURE
I. OVERVIEW
1. In December 2006, the Board of Directors of the Asian Development Bank (ADB)established the Water Financing Partnership Facility (WFPF) to provide additional financial andknowledge resources from development partners for the implementation of ADB’s WaterFinancing Program (WFP) to help achieve the targeted outcomes.
2. The WFPF includes:
a. A multidonor water trust fund (WTF);b. Single-donor water trust funds (WTFs);c. Framework agreements with partners for:
(i) Cofinancing, i.e., parallel or joint financing of lending and non-lending assistanceto ADB’s developing member countries (DMCs);
(i) Knowledge sharing, i.e., secondments, networks, etc.(ii) Risk sharing, i.e., credit enhancement, performance guarantees, etc.
d. Other forms of assistance.
3. The WFPF has two windows, the first for project support, and the second for programquality support. Project support (about 70% of WFPF) are provided for demonstration projects inthe three key areas of WFP (rural water, urban water, and basin water) through in-country workfor project preparation, implementation, reforms, and capacity development in the organizationsconcerned. Program quality support (about 30% of WFPF) are for facilitating reforms andstrengthening capacity, and helping ensure quality, synergy, and innovation in the
implementation of WFP, with priority given to reducing poverty, improving governance, andconserving the environment.
4. The WFPF's support for demonstration projects in the three key areas of the WFP takeplace through in-country work for project preparation, implementation, reforms, and capacitydevelopment in the organizations concerned:
a. Rural Water Service Projects aim to improve health and livelihoods in ruralcommunities. Projects may include investments in water supply and sanitation,irrigation and drainage, and multiple uses of water in rural communities.
b. Urban Water Service Projects support sustained economic growth in cities, and
may include investments in water supply, sanitation, and wastewatermanagement, and environmental improvement.
c. Basin Water Management Projects in River Basins promote integrated waterresources management (IWRM) and healthy rivers. They may includeinvestments in the infrastructure and management of multifunctional waterregulation and hydropower facilities developed in a basin context, floodmanagement, and the conservation and improvement of watersheds, wetlands,and ecosystems.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 26/73
22 Appendix 1
5. WFPF resources for program quality support are provided for facilitating reforms andstrengthening capacity. They are aimed at helping ensure quality, synergy, and innovation in theimplementation of the WFP, with priority given to reducing poverty, improving governance, andconserving the environment. The scope is outlined below:
a. Knowledge, Capacity, and Innovation Services. WFPF supports investment in(a) knowledge and policy services for ADB's operations departments and itsclients, (b) expert services through a pool of contracted and seconded specialiststo supplement ADB's own staff resources, (c) pilot and demonstration activitiesbuilding on a similar program under the Cooperation Fund for the Water Sector,and (d) innovative approaches to empower water organizations.
b. Engaging Civil Society. Engaging civil society organizations in water reformsand investment is an important part of the Agenda for Change adopted at ADB'sWater Week in 2004. WFPF supports three ways for civil society organizationsengagement in ADB-financed water projects in consultation with ADB's regionaldepartments: (a) project preparation support, (b) independent monitoring of
project progress and results by civil society organizations where appropriate, and(c) capacity development to improve collaboration between ADB and civil societyorganizations.
c. Regional Cooperation. WFPF supports regional cooperation activities thatincrease water financing, catalyze reforms, share knowledge and experience,and build capacity in critical water sector organizations, including the introductionof performance benchmarking services and peer review processes. In supportingregional cooperation, ADB is partnering with the Asia-Pacific Water Forum(APWF), the Global Water Partnership, the United Nations Secretary-General'sAdvisory Board for Water and Sanitation, UN Habitat, the Water and SanitationProgram, and others. Partnerships are guided by the five key result areas of
APWF: (a) developing knowledge and lessons on priority water sector topicsthrough a network of knowledge hubs, (b) increasing local capacity throughnetworking among practitioner organizations, (c) increasing public outreach andawareness, (d) monitoring water investments and results, and (e) organizingAsia-Pacific Water Summits. ADB has accepted the responsibility of serving aslead organization for APWF's theme of water financing and for its key result areaof increasing public outreach and awareness.
6. All DMCs are eligible for project support1, and program quality support activities may beimplemented in DMCs or in other countries as needed. Project proposals for WFPF supportshould:
1 For the Netherlands contribution under WFPF (through single donor trust fund), support for water supply and
sanitation projects will be limited to ADF countries. The Netherlands support for other water projects is available
to all DMCs. For the Australian contribution under WFPF (through multidonor trust fund), there are no country
restrictions. However, Australia’s policy seeks to demonstrate that investments in IWRM will contribute to
sustainable economic growth, especially in Southeast Asia and the Pacific. For the Austrian contribution under
WFPF (through multidonor trust fund), there are no country restrictions. However, Austria would like to support
activities in the listed Central Asian Republics and South Caucuses (Armenia, Azerbaijan, Georgia, Kazakhstan,
Kyrgyz Republic, Tajikistan, Turkmenistan, and Uzbekistan) as a priority.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 27/73
Appendix 1 23
a. be consistent with ADB’s Water for All policy;b. contribute significantly to WFP targets2;c. introduce innovative solutions;d. adopt a participatory approach;e. have high demonstration value in the sector;f. have good potential for replication in the country and/or region; and
g. link with CPSs and results frameworks.
II. GOVERNANCE STRUCTURE OF WFPF
7. The Financing Partners and ADB jointly steer the implementation of WFPF and meetannually to review progress, administration matters, Annual Work Programs, and strategicdirections of WFPF.
8. A Steering Committee for WFPF (WSC) provides strategic direction for WFPF. TheChair of the SC is the designated authority for approving the allocation of WFPF resources forspecific projects. Chair: Director General, Regional and Sustainable Development Department(RSDD); and Members: Director Generals of user departments (UDs).
9. ADB’s Water Committee (WC) reviews and makes recommendations on projectproposals for assistance from WFPF, and makes policy and procedural recommendations to theWSC regarding WFPF operations.
10. The Sustainable Infrastructure Division (RSID) of RSDD manages WFPF. Director, RSIDor his/her designate acts as the Facility Manager for WFPF and oversees the day to dayoperations, monitoring and evaluation, and reporting of WFPF, with assistance from a team ofconsultants who have technical and administrative expertise serving in a management unit. TheFacility Manager serves as the secretariat for WFPF operations, prepares semi-annual progressreports on WFPF and serves as the focal point for WFPF partners for technical matters.
11. The Office of Cofinancing Operations (OCO) facilitates contributions to the WTF andWTFs, and act as the official channel of communication for financial issues between ADB andWFPF partners. OCO also leads negotiations and discussions with such partners on proceduralagreements for contributions and framework agreements, where applicable.
12. The organization structure for WFPF governance is shown on the attached sheet.
2Through project implementation or through reforms or capacity development.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 28/73
24 Appendix 1
The WFPF Governance Structure
Party ResponsibilitiesFinancing Partners
Members: WFPF contributors (i) Provide strategic direction to WFPF
(ii) Meet with ADB for Annual Consultation(iii) Review progress and administration and
Annual Work Program
WFPF Steering Committee (SC) Chair: DG, RSDDSeretariat: RSIDMembers: DGs of User Departments(UDs)
(i) Provide strategic direction to WFPF(ii) DG, RSDD approves WFPF policy and
procedures(iii) Approves allocation of funds to applications for
TAs and grant components of investments
Water Committee (WC)
Chair and Co-Chair: Directors, EASSand PSIF 1Secretariat: RSIDMembers: Water specialists nominatedby the Chair as members
(i) Review and endorse proposals for WFPFsupport
(ii) Advise SC on strategic direction policy &procedures of WFPF to support WFPimplementation
Facility ManagerManager: Director, RSIDAssistant: A team of consultants
(i) Serve as Secretariat and oversee WFPF day-to-day operations
(ii) Oversee review process for applications(iii) Review applications for compliance with
Implementation Guidelines for use of fundsand eligibility criteria
(iv) Prepare Annual Work Program and progressreports
(v) Serve as focal point for WFPF partners fortechnical matters
OCOContact: Designate by PrincipalDirector, OCO
(i) Facilitate partner contributions to WFPF(ii) Communicate on financial issues among the
partners(iii) Lead negotiations with partners on financial
and procedural agreements for WFPFcontributions and framework agreements
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 29/73
Appendix 2 25
WATER FINANCING PARTNERSHIP FACILITYDESIGN AND MONITORING FRAMEWORK
Introduction
1. Since the Water Financing Partnership Facility (WFPF) was established to provideadditional financial and knowledge resources for the implementation of ADB’s Water FinancingProgram, it is thought sufficient to have one design and monitoring framework (DMF) to coverthe objectives of both the Program and one of its critical funding sources—the WFPF. This alsoavoids confusion in having two separate DMFs that are targeted ultimately at the same impactsand outcomes.
2. The key points to note are:
a. The DMF for the Water Financing Program has been expanded to add more detail
on specific outputs that fall within its three major output components as these outputs
are financed from the WFPF;
b. The target outputs indicated in the WFPF DMF were defined using as basis the $100
million expected total contributions from the WFPF financing partners and using
2008–2010 as the period covered since full operationalization of WFPF began in
January 2008 and committed contributions to date are 2010.
3. A pictorial version of the objectives tree is attached.
4. The Water Financing Program aims to double ADB’s investments in water during the
period 2006–2010, thus resulting in significant increase in the number of people in Asia-Pacific
region with access to safe and water supply and sanitation services, higher productivity andefficiency of irrigation and drainage services, coupled with the integrated management of water
resources in river basins for sustained economic growth and environmental improvement. With
these as targeted outcomes, the activities to be supported by the resources from WFPF are
those directly contributing to the achievements of such outcomes as described below.
How WFPF Resources will help achieve WFP Targeted Outcomes: Rationale for Choice of
Indicators
5. The specific output indicators used in the proposed DMF for WFPF are those thatdirectly reflect the activities to be financed from WFPF resources and directly contribute to the
following 3 major outputs of WFP:
a. Component 1: Increased levels of water investment – to be supported by WFPFin terms of additional resources to:
(i) prepare projects (through PPTAs) resulting in fundable investment proposals,(ii) finance grant components of investments that support either works, goods
and services designed to enhance project design and implementation, and(iii) finance specific activities that directly support project development
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 30/73
26 Appendix 2
Furthermore, it is envisaged that the WFPF will not only provide additional resources toproduce the outputs described above but also provide added value such as:
(i) greater assurance of outcomes by increasing country commitments through
sector assessments and investment dialogues with government.
(ii) greater reach to the underserved by facilitating preparation of additionalprojects and leveraging more resources from partners.
(iii) faster decision making by means of: WFPF-financed activities such as water
services expert pool that makes possible provision of incremental experts to help
in project design and implementation; knowledge products and tools; or use of
direct charge as a modality to access WFPF resources in addition to loans and
TAs.
(iv) boosting innovation and business unusual by supporting activities like pilot
and demonstration, development of knowledge products and organization of
knowledge events.
(v) being more strategic by addressing specific and priority issues such as gender,
climate change, environment and sanitation.
b. Component 2: Policy and institutional reforms accelerated – supported byWFPF in terms of additional resources to fund loans, TAs or other modalities thataddress policy, legislation, regulations and institutional; and related undertakingssuch as: support to reform assessments and studies; support to strengtheningcoordination mechanism and facilitating reform process such as assistance inestablishing or strengthening national water sector apex bodies; and engagement ofcivil society.
c. Component 3: Institutional capacity strengthened and knowledge baseexpanded – supported by WFPF in terms of additional resources for pilot anddemonstrations that produce new and innovative approaches, strategies andtechnologies; capacity development interventions targeted at key water sectororganizations such as water utilities, river basin organizations, water usersassociations/irrigators association and apex bodies as well asimplementing/executing agencies, knowledge products development, establishmentof knowledge partnerships, regional cooperation, and civil society participation.
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 31/73
Appendix 2 27
WFPDesign Summary
PerformanceTargets/Indicators
Data Sources/ReportingMechanisms
Assumptions and Risks
ImpactHealthy people andenvironment
MDG goals on water andsanitation
Reduction in the incidence ofwater related fatalities anddisease
Increase in the number ofcountries implementing IWRM
Country-level and UNprogress reports on
MDGs.
UNDP/WHO countryreports.
Country water sectorstrategies and reports ofGlobal Water Partnership
Assumptions• Governments make
achievement of water MDGs
a priority• Sustained emphasis on water
investment to keep pace withincreased demand -population and economicgrowth
• Financial mechanisms forsustainable maintenanceprograms in place
• IWRM policies adopted in linewith WSSD commitments
OutcomeImproved coverage, quality andcontinuity of water service
delivery within a framework ofsustainable management ofnatural resources
200 million with increasedaccess to safe water and
sanitation
100 million with reduced riskto floods
40 million with improvedirrigation
IWRM introduced into 25 riverbasins
Improved water governanceas demonstrated by theoutcome achievement onpolicy and reform measures
6
In terms of investments:Between 2006-2010,25% of ADB lending is inwater, $12 M in ADB fundsinvested in water, and $8additional investmentsleveraged from other donors,government and privatesector.
Country sector reportsand analysis prepared by
ADB (e.g. Water UtilitiesData Handbook).
Reports of UN and otheragencies.
Reports of researchbodies e.g. IWMI.
Governance surveys intargeted countries
Project documents
Assumptions• Leadership of key agencies
and utilities•
Implementation ofgovernance reforms forresource management andservice delivery
• Community involvement• Application of IWRM
principlesRisks
• Intensified opposition toprivate sector involvement inwater service delivery
• Budgetary constraints
Output
Component 1Increased levels of water
Investment (infrastructure)
• Fundable investmentprojects
70% or $70 Million of WFPFresources spent on project
investment support
At least 307
PPTAs eitherfunded in full or cofinancedwith other sources, of whichno less than 50% translate to
Published ADB data onpast and future publicand private sectorinvestments and
Assumptions• ADB investment products are
attractive to DMCs• Replenishment of OCR/ADF
to support increased waterinvestment
• Internal resources allocatedto deliver increased waterprogram
• WFPF contributions are
6Governance indicators are under development
730 PPTAs is based on average cost of $800K per TA or a total of $24M during the period 2008–2010
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 32/73
28 Appendix 2
WFPDesign Summary
PerformanceTargets/Indicators
Data Sources/ReportingMechanisms
Assumptions and Risks
• Loans supported withgrants
• Project developmentsupport
Such increase in investmentlevel is supported by theadded value provided byWFPF in terms of:
Faster decision making bymeans of:• WFPF governance and
approval processes,including use of templatesand tools
• Use of direct chargemodality support for short-term and stand aloneactivities with specificoutputs and outcomes ismade possible withoutneed for RETA
Greater assurance ofoutcomes by increasingcountry commitment• Investment Dialogues• Use of knowledge products
Greater reach to underservedby• More PPTAs• More knowledge products • More partners
Boosts innovation andbusiness unusual• PDA financing• Knowledge products• Knowledge events• Take up of new products
investment projects
At least 158
loans providedgrant support for either
goods, works or services
At least 309
applications fordirect charges add value toproject development throughimproved design andimplementation, bettercommunication withstakeholders, etc.
Applications for TAs andGCIs are approved within 1month upon receipt of bi-monthly applications thatmeet qualification criteria
Applications for directcharges are approved withinone week upon receipt ofapplications that meetqualification criteria
Dialogues conducted in eachof six priority countries thatproduce updated waterpriorities
At least 50 million populationof WFP targeted outcomesdirectly traceable to WFPFfunding
Post evaluation confirms newideas, methods, technologyand approaches taken up andapplied from WFPF financedinitiatives
technical assistance.
Water InformationSystem using as source
data CSPs, PPRs andreports of individualfunded outputs.
ADB databases
WFPF reports onapproved applications
WFPF financingproposals screeninganalyses
BTOR on dialogues
ADB water database
Post evaluation study ofPPTAs and subsequentloan project design
Post evaluation ofapproved technicalassistance projects
received based on thecommitted date ofcontirbutions
Risks
• Low DMC demand forincreased investment in thesector
AssumptionThat ADB existing processes arenot applied in each case but areable to be modified to enablethese features to speed upprocessing
815 grant component of loan is based on average cost of $1M per project or a total of $15M during 2008–2010
930 applications for direct charges is based on average cost of $100K each or a total of $3M during 2008–2010
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 33/73
Appendix 2 29
WFPDesign Summary
PerformanceTargets/Indicators
Data Sources/ReportingMechanisms
Assumptions and Risks
Being more strategic by
• Funding climate change
• Funding sanitation
• Funding environment
• Funding gender initiatives
• Funding initiatives that helpstrengthen partnership withor empower civil society
Component 2Policy and institutionalreforms accelerated
• Nonlending assistanceaddressing reforms in theareas of: policy, legislation
regulation institutionalarrangements
Component 3Institutional capacitystrengthened and knowledgebase expanded
• Pilot and demonstrationprojects
• Water sector organizationscapacity improvement
Water Utilities
River BasinOrganizations (RBOs)
At least 15 projectsdemonstrating climate change
adaptation measures
At least 15 projectsdemonstrating increasedinvestment in sanitation
At least 15 projectsdemonstrating environmentalprotection and preservation
At least 10 projectsdemonstrating gendermainstreaming
At least 10 projects
demonstrating greaterinvolvement of civil societyboth at policy and projectlevels
At least 15% or $15M ofWFPF resources allocated tothis component
At least 15 TAs (ADTAs,piggy-backed TAs, SSTAs,RETAs) and direct chargeapplications are designed toadvance reform measures ineach of the areas of policy,
legislation, regulation orinstitutional arrangements
At least 15% or $15M ofWFPF resources allocated tothis component
80% of approved projectscompleted within scheduleand replication /upscalingoccurring for at least 40%
Improvement in utilitiesperformance using as basisthe adopted utilityperformance indicators
Implementation ofbenchmarking and peerreview process in RBOs in
ADB project documents(loans and TAs); WFPF
application documents
Project documents,WFP/WFPF reports
Project documents,WFP/WFPF reports
Project documents,WFP/WFPF reports
Project documents,
WFP/WFPF reports
TA documents, reportson sector work dealingwith policies andlegislation
PDA Project CompletionReports
Reports andbenchmarking activities
Benchmarking reports,Reports by NARBO(Network of Asian River
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 34/73
30 Appendix 2
WFPDesign Summary
PerformanceTargets/Indicators
Data Sources/ReportingMechanisms
Assumptions and Risks
Irrigation Water UsersAssociation (WUA)
Sector Apex Bodies
Water sector agencies
• Knowledge products
• Knowledge hubs
• Knowledge sharing events
• Regional cooperationengaging with selectedregional entities such asGlobal Water Partnership,Netherlands WaterPartnership, Asia PacificWater Forum
Asia-Pacific Region
Program for benchmarkingirrigation service providers
developed and implemented
Implementation ofbenchmarking and peerprocess in apex bodiescompleted for all regions.
Capacity building of sectoragencies supported either aspart of loans and TAs or asstand alone activities
Knowledge productsdeveloped on schedule andachieve targeted distribution
levels
At least 5 regional knowledgehubs operational by end 2010
At least 2 annual major waterevents participated in, i.e.World Water Week,Singapore International WaterWeek.
Scheduled outputs completedon time.
Basin Organizations)
Benchmarking reports,project reports
Benchmarking reports
Water Committee andWFPF reports
Water Committee reports
Water Committee reports
Events-related reports,back-to-office reports(BTORs)
Water Committee reports
ActivitiesInvestment
• Demonstrate expansion in 5 target countries• Mobilize private finance• Build momentum for water investments
Reforms• Intensify support for national water sector reforms• Support development of regulatory frameworks• Extend support for IWRM into the targeted 25 basins
Capacity Development• Develop new and innovative approaches, methodologies• Strengthen institutional capacity• Enhance the knowledge base and knowledge products• Strengthen regional partnerships
Inputs:ADB TA grant resourcesADB LendingADB staff resources
Asia Financing PartnershipFacility approx $100 million• Project Support Window
(70%)• Program Quality Window
(30%)
Government resourcesPrivate sector resourcesNGO resources
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 35/73
Appendix 2 31
Acronyms
ADF - Asian Development FundADTA - Advisory Technical AssistanceCASCWUA - Central Asia and South Caucasus Water Utilities AssociationDMC - Developing Member Country
DMF - Design and Monitoring FrameworkIWRM - Integrated Water Resources ManagementKP - Knowledge ProductMDG - Millennium Development GoalNARBO - Network of Asian River Basin OrganizationsOCR - Ordinary Capital ResourcesPDA - Pilot and Demonstration ActivitiesPPTA - Project Preparation Technical AssistanceRETA - Regional Technical AssistanceSAWUN - South Asia Water Utilities NetworkSEAWUN - Southeast Asia Water Utilities NetworkSSTA - Small Scale Technical Assistance
TA - Technical AssistanceUN - United NationsUNDP - United Nations Development ProgramWFP - Water Financing ProgramWFPF - Water Financing Partnership FacilityWHO - World Health OrganizationWSSD - World Summit on Sustainable DevelopmentWUA - Water Users Association
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 36/73
32 Appendix 2
Healthy and safe population
Water Sector ResultsFrameworkMarch 2008
Protection from floods
Access to safe and sustainable water and
sanitation Sufficient food
Sufficient and efficient irrigation
infrastructure Adequate water
supplies Water and sanitation infrastructure in place
Effective Water agencies /utilities in
place Government
adoption of sound water policies
Government willing to borrow for investment
ADB has suitable financing products ADB has sufficient
grant financing ADB has sufficient lending resources
Adequate structural and non structural investment
Civil society vocal about their needs
ADB can mobilize other funds ADB has sufficient knowledge and
innovation
Institutional capacity strengthened and knowledge base
expanded Greater awareness by stakeholders Increased levels of
water investments Policy and institutional reforms
accelerated
Unpolluted rivers Uncontaminated
ground water
Healthy environment sustained
Effective RBOs and Apex bodies in place
Government adoption of IWRM and water rights
Government willing to borrow for remedial action
Civil society vocal about their needs
Sustainable ground water extraction and
surface water catchment
WFPOutputs
WFPOutcome
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 37/73
Appendix 3 33
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 38/73
34 Appendix 3
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 39/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 40/73
36 Appendix 3
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 41/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 42/73
38 Appendix 3
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 43/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 44/73
40 Appendix 4
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 45/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 46/73
42 Appendix 4
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 47/73
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 48/73
Appendix 5 44
Water Financing Partnership Facility (WFPF) Project DatabaseList of 2009 Approved Allocations
No. Region Country Project Name
Date ofApproval of
WFPFFunding
Allocation
Modality for
AccessingWFPF
Resources
Am
TOTAL ALLOCATIONS AS OF END-2008 26,36
1CentralWest
Pakistan
Preparation of KhairpurWastewater ManagementPlanning Methodology,Strategic Plan and PriorityInvestment Program
25-Mar-09 Direct Charges 12
2CentralWest
PakistanPPTA: Pubjab CitiesImprovement Investment
Program
12-May-09Technical
Assistance40
3 East Asia PRC
Loan: Shanxi IntegratedAgricultural DevelopmentProject (TALL: ClimateChange Adaptation throughImproved Water ResourcesManagement
12-May-09Grant
Component ofInvestment
50
4Inter-region
VariousCountries
RETA: SupportingInvestments in Water andClimate Change
12-May-09Technical
Assistance1,00
5 East Asia PRC
Preliminary Survey andAssessment for InitiatingInterventions on Zhangye
Wetlands Protection andRehabilitation in Hei RiverBasin
8-Jun-09 Direct Charges 15
6 PacificPacific
CountriesPacific Water Conference andExpo 2009
8-Jun-09 Direct Charges 2
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 49/73
No. Region Country Project Name
Date ofApproval of
WFPFFunding
Allocation
Modality forAccessing
WFPFResources
Am
7 SouthAsia
India Scoping Study for CDTA onIntegrated Water ResourcesManagement
8-Jun-09 Direct Charges 6
8SouthAsia
Sri Lanka
CDTA: Supporting CapacityDevelopment for WastewaterManagement Services inColombo
17-Jun-09Technical
Assistance15
9Inter-region
VariousCountries
RETA: Knowledge andInnovation Support for ADB'sWater Financing Program(replenishment)
17-Jun-09Technical
Assistance1,50
10 SoutheastAsia
Indonesia
Support to Indonesia's
Preparation of NationalMedium-Term Plan 2010-2014(Water Supply and SanitationSector)
27-Jul-09 Direct Charges 15
11Inter-region
VariousCountries
Support to WFPFOperationalization:Engagement of FacilityAccount Analyst(supplemental)
28-Jul-09 Direct Charges 1
12Southeast
AsiaPhilippines
PPTA: Pasig River CatchmentSewerage Project (throughPrivate Sector OperationsDepartment)
18-Aug-09Technical
Assistance30
13SouthAsia
BangladeshPPTA: Chittagong Hill TractsRural Development Project II
18-Aug-09Technical
Assistance26
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 50/73
46 Appendix 5
No. Region Country Project Name
Date ofApproval of
WFPFFunding
Allocation
Modality forAccessing
WFPFResources
Am
14Southeast
AsiaViet Nam
Water Expert Pool:Engagement of InternationalUrban Water Supply andSanitation Specialist to SupportPortfolio Development in VietNam
14-Sep-09 Direct Charges 15
15Southeast
AsiaViet Nam
Water Expert Pool:Engagement of NationalWater Supply and SanitationSpecialist to Support PortfolioDevelopment in Viet Nam
14-Sep-09 Direct Charges 4
16Southeast
AsiaViet Nam
Water Expert Pool:
Engagement of InternationalRural Water Supply andSanitation Specialist to SupportPortfolio Development in VietNam
14-Sep-09 Direct Charges 11
17SouthAsia
India
Development of FloodManagement InfrastructureAsset Management InformationSystem
17-Sep-09 Direct Charges 5
18 East Asia Mongolia
Market Sounding with PotentialPrivate Investors andOperators and Further
Refinement of EnablingEnvironment for PSP in Waterand Sanitation ServiceProvision in Mongolia's UrbanAreas
18-Sep-09 Direct Charges 5
TOTAL 2009 ALLOCATIONS 5,03
TOTAL ALLOCATIONS AS OF END-2009 31,40
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 51/73
Appendix 6 47
Water Financing Partnership Facility (WFPF) – Multidonor Trust FundDisbursement as of 31 December 2009 and Projections until December 2010
Projects/ActivitiesExpected
Closing DateAllocation
Disbursedas of 31 Dec
2009
ProjectedDisbursements
in 2010
TotalProjected
Disbursementby December
2010
Technical Assistance (TA)
IND: PPTA - Integrated Flood andRiverbank Erosion Management Project(Phase 2) - Strengthening of Policy andInstitutional Framework
10-Feb-10 750,000.00 378,258.68 371,741.32 750,000.00
IND: PPTA - Integrated Flood andRiverbank Erosion Risk ManagementProject (Phase 2) - Project Processingand Institutional Development
31-May-10 750,000.00 462,922.08 287,077.92 750,000.00
IND: ADTA - Water Users AssociationEmpowerment for Improved IrrigationManagement in Chattisgarh
28-Nov-12 550,000.00 335,104.70 214,895.30 550,000.00
INO: PPTA - Metropolitan SanitationManagement and Health Project
31-Dec-09 500,000.00 285,288.67 214,711.33 500,000.00
REG: TA - Knowledge and InnovationSupport for ADB's Water FinancingProgram
31-Mar-11 2,400,000.00 626,549.74 1,046,000.00 1,672,549.74
KYG: PPTA - Issyk-Kul SustainableDevelopment Project
30-Nov.09 700,000.00 488,398.45 211,601.55 700,000.00
PRC: ADTA - Urban Wastewater Re-useand Sludge Utilization Policy Study
31-Mar-11 300,000.00 245,795.14 54,204.86 300,000.00
PRC: ADTA - River Basin Water
Resources Allocation and ManagementPolicy
30-Sep-10 250,000.00 178,600.00 71,400.00 250,000.00
PRC: PATA - Strategy for DroughtManagement
12-Jul-10 230,000.00 210,000.00 20,000.00 230,000.00
VIE: SSTA - Developing Benefit SharingMechanisms for People AdverselyAffected by Power Generation Projects
31-Dec-09 240,000.00 152,994.15 87,005.85 240,000.00
VIE: PPTA - Preparing Da Nang WaterSupply Project
31-May-10 1,500,000.00 582,793.48 917,206.52 1,500,000.00
PHI: PPTA - Preparing the Water DistrictDevelopment Sector Project
31-Mar-10 1,200,000.00 765,332.61 434,667.39 1,200,000.00
PAK: PPTA - Punjab Cities ImprovementInvestment Program
31-Dec-10 400,000.00 2,295.00 397,705.00 400,000.00
SRI: CDTA - Supporting CapacityDevelopment for WastewaterManagement
30-Apr-11 150,000.00 24,232.00 125,768.00 150,000.00
UZB: PPTA - Water Supply andSanitation Services Project
31-Jan-10 850,000.00 404,596.10 445,403.90 850,000.00
PRC: ADTA - Preparing NationalGuidelines for Eco-Compensation inRiver Basins and Framework for SoilPollution Management
31-Jul-10 400,000.00 0.00 400,000.00 400,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 52/73
48 Appendix 6
Projects/ActivitiesExpected
Closing DateAllocation
Disbursedas of 31 Dec
2009
ProjectedDisbursements
in 2010
TotalProjected
Disbursementby December
2010
REG: Improved Management of WaterResources in Central Asia
31-Aug-10 998,000.00 97,649.97 900,350.03 998,000.00
REG: Supporting Investments in Waterand Climate Change
- 1,000,000.00 0.00 400,000.00 400,000.00
PHI: PPTA - Pasig River CatchmentSewerage Project
30-Apr-10 300,000.00 0.00 300,000.00 300,000.00
BAN: PPTA - Chittagong Hill TractsRural Development Project II
31-Dec-10 265,000.00 0.00 265,000.00 265,000.00
Sub-Total (TA) 13,733,000.00 5,240,810.77 7,164,738.97 12,405,549.74
Grant Components of Investments (GCI)
UZB: Sukhandarya Water Supply andSanitation Project
30-Sep-14 1,500,000.00 40,143.28 1,459,856.72 1,500,000.00
VIE: Thanh Hoa City ComprehensiveSocio-Economic Development Project
30-Jun-14 1,200,000.00 0.00 0.00 0.00
PRC: Loan - Liaoning Small Cities andTowns Development DemonstrationSector Project
31-Mar-16 250,000.00 0.00 100,000.00 100,000.00
PRC: Loan - Hebei Small Cities andTowns Development DemonstrationSector Project
31-Dec-15 250,000.00 0.00 100,000.00 100,000.00
PRC: Loan - Shanxi Small Cities andTowns Development DemonstrationSector Project
31-Dec-15 250,000.00 0.00 100,000.00 100,000.00
PRC: Loan - Shanxi IntegratedAgricultural Development Project
31-May-12 500,000.00 0.00 200,000.00 200,000.00
Sub-Total (GCI) 3,950,000.00 40,143.28 1,959,856.72 2,000,000.00
TAs Attached to Loans (TALLs)
IND: Loan-Orissa Integrated Agricultureand Water Management InvestmentProgram (TALL: InstitutionalDevelopment of Integrated WaterResources Management in Orissa)
31-Aug-10 250,000.00 0.00 250,000.00 250,000.00
PRC: Loan - Qingdao Water Resourcesand Wetland Protection Project (TALL:Enabling the Protection of Jiaozhou BayWater Quality and Wetland Ecosystem)
14-Dec-10 400,000.00 121,000.00 279,000.00 400,000.00
INO: Loan - Integrated Citarum Water
Resources Management InvestmentProgram (TALL: InstitutionalStrengthening for Integrated WaterResources Management in 6 Ci's RiverBasin Territory)
31-Dec-12 2,000,000.00 0.00 0.00 0.00
Subtotal (TALLs) 2,650,000.00 121,000.00 529,000.00 650,000.00
Direct Charges (DC)
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 53/73
Appendix 6 49
Projects/ActivitiesExpected
Closing DateAllocation
Disbursedas of 31 Dec
2009
ProjectedDisbursements
in 2010
TotalProjected
Disbursementby December
2010
CAM: Long-Term Capacity DevelopmentSupport to the Ministry of RuralDevelopment of Cambodia in the RuralWater Supply and Sanitation Sector
31-Dec-09 140,000.00 92,051.13 47,948.87 140,000.00
UZB: Capacity and PerformanceDiagnosis of Water Supply andSanitation Enterprises
7-Apr-09 47,009.36 47,009.36 0.00 47,009.36
IND: Institutional Study for IntegratingFlood Risk Management into DisasterRisk Management in Assam
30-Jun-09 47,992.41 47,992.41 0.00 47,992.41
PHI: Initial Assessment of the MetroKotkot Dam Projedt
15-Sep-09 58,350.21 58,350.21 0.00 58,350.21
REG: Singapore International WaterWeek 2008
26-Mar-09 38,577.73 38,577.73 0.00 38,577.73
PRC: Workshop on Lakes and WetlandsRestoration and Sustainable AlternativeLivelihoods
9-Aug-09 20,000.00 20,000.00 0.00 20,000.00
REG: Pacific Water Conference 2008 27-Apr-09 43,912.45 43,912.45 0.00 43,912.45
PAK: Increasing Public Awareness andSupport for Improved Urban Services:Campaign to Support Sindh CitiesImprovement Investment Program
2-Oct-09 26,376.26 26,376.26 0.00 26,376.26
PAK: Developing Design-BuildPerformance-Based Arrangement forWater Supply Improvements(Engagement of Contract and
Procurement Expert)
18-Jun-09 17,740.36 17,740.36 0.00 17,740.36
BAN/NEP: Sharing Best Practices inWater Supply and WastewaterManagement
5-May-09 27,506.89 27,506.89 0.00 27,506.89
NEP: Capacity Building Support toKathmandu Water Supply Utility
31-Dec-09 150,000.00 87,918.19 62,081.81 150,000.00
REG: Support to WFPF Operation -Engagement of Facility Account Analyst
31-Aug-09 13,212.89 13,212.89 0.00 13,212.89
REG: Providing for Secretariat Support toEstablished Asia Water Utilities Networksunder the Water Operators Partnerships(WOPS) Program
31-Dec-10 90,000.00 9,643.88 80,356.12 90,000.00
IND: Support to Orissa IntegratedAgriculture and Water ManagenentInvestment Program (Engagement ofIrrigation Management and Water UsersAssociation Specialists)
4-Jun-09 64,811.25 64,811.25 0.00 64,811.25
LAO: Support to Northern and CentralWater Supply and Sanitation SectorProject (Engagement of Water SupplyExpert)
31-Mar-10 108,000.00 64,811.25 43,188.75 108,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 54/73
50 Appendix 6
Projects/ActivitiesExpected
Closing DateAllocation
Disbursedas of 31 Dec
2009
ProjectedDisbursements
in 2010
TotalProjected
Disbursementby December
2010
REG: Developing Knowledge Product on
Community-Driven Development inWater Supply and Sanitation: CaseStudies of ADB Projects in Indonesia,Philippines and Sri Lanka)
4-Aug-09 43,760.26 43,760.26 0.00 43,760.26
INO: Increasing Awareness and Supportfor Participatory Irrigation DevelopmentThrough Multimedia Production of WaterAwareness Video on ParticipatoryApproaches in Irrigation SchemeReconstruction and Rehabilitation -Lessons from Nanggroe AcehDarussalam, Indonesia
9-Jun-09 55,986.85 55,986.85 0.00 55,986.85
PRC: Capacity Building of 2nd and 3rd
Tier Cities for Preparing NonsovereignUrban Infrastructure Projects in PRC
31-Dec-09 150,000.00 78,501.53 71,498.47 150,000.00
REG: Good Practices for Urban WaterManagement in Asia
31-Dec-09 150,000.00 40,699.51 109,300.49 150,000.00
KYG: Engagement of EnvironmentSpecialist for Kyrgyz Sanitation
31-Dec-09 57,900.00 47,965.68 9,934.32 57,900.00
PAK: Preparation of Larkana Sanitation,Drainage and Wastewater ManagementStrategic Action Plan and PriorityInvestment Program
31-Dec-09 92,000.00 71,194.64 20,805.36 92,000.00
REG: Regional Workshop on DevelopingPartnerships for Water and ClimateChange Adaptation, Malaysia, 1-5 Dec2009
23-Jun-09 66,053.37 66,053.37 0.00 66,053.37
NEP: Engagement of CommunicationDevelopment Expert to Support ADTA onStrengthening Capacity for ManagingClimate Change and the Environment
31-Dec-10 125,476.00 10,035.35 115,440.65 125,476.00
IND: Legal Review of Project Documentsfor PPP in Water Projects
31-Dec-09 150,000.00 65,000.00 85,000.00 150,000.00
PAK: Preparation of KhairpurWastewater Management PlanningMethodology, Strategic Plan and PriorityInvestment Program
31-Dec-09 120,000.00 105,009.91 14,990.09 120,000.00
IND: Scoping Study for CDTA onIntegrated Water ResourcesManagement in Karnataka
30-Jun-10 64,000.00 3,881.06 60,118.94 64,000.00
PRC: Preliminary Survey andAssessment for Initiating Interventions onZhangye Wetlands Protection andRehabilitation in Hei River Basin
30-Jun-10 150,000.00 0.00 150,000.00 150,000.00
REG: Pacific Water Conference 2009 31-Aug-09 20,000.00 19,951.63 48.37 20,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 55/73
Appendix 6 51
Projects/ActivitiesExpected
Closing DateAllocation
Disbursedas of 31 Dec
2009
ProjectedDisbursements
in 2010
TotalProjected
Disbursementby December
2010
INO: Support to Indonesia's Preparationof National Medium-Term Plan 2010-
2014 (Water Supply and SanitationSector)
31-Dec-09 150,000.00 0.00 150,000.00 150,000.00
VIE: Engagement of National WaterSupply and Sanitation Specialist toSupport Portfolio Development in VietNam
30-Jun-10 40,000.00 0.00 40,000.00 40,000.00
VIE: Engagement of International UrbanWater Supply and Sanitation Specialist toSupport Portfolio Development in VietNam
30-Jun-10 150,000.00 35,657.35 114,342.65 150,000.00
IND: Development of Flood ManagementInfrastructure Asset ManagementInformation System
30-Jun-10 50,000.00 0.00 50,000.00 50,000.00
MON: Market Sounding with Potential
Private Investors and Operators andFurther Refinement of EnablingEnvironment for PSP in Water andSanitation Service Provision inMongolia's Urban Areas
30-Jun-10 50,000.00 0.00 50,000.00 50,000.00
Sub-Total (DC) 2,578,666.29 1,303,611.40 1,275,054.89 2,578,666.29
TOTAL 22,911,666.29 6,705,565.45 10,928,650.58 17,634,216.03
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 56/73
52 Appendix 7
Water Financing Partnership Facility (WFPF) – Netherlands Trust FundDisbursements as of 31 December 2009 and Projections Until 2010
Projects/ActivitiesClosing
Date
Allocationsas of
End-2009
Disbursedas of 31 Dec
09
ProjectedDisbursement
s in 2010
Total ProjectedDisbursements
by 2010
Technical Assistance (TA)
NEP: PPTA- Second Small Towns WaterSupply and Sanitation Sector Project
31-Aug-09 119,707.05 119,707.05 0.00 119,707.05
NEP: PPTA-Secondary Towns IntegratedUrban Environmental Improvement
31-Dec-09 146,000.00 93,422.91 52,577.09 146,000.00
PRC: ADTA-Implementing the National FloodManagement Strategy
27-Feb-10 300,000.00 214,313.15 85,686.85 300,000.00
MEK: PPTA for Mekong Water Supply andSanitation
30-Apr-10 300,000.00 300,000.00 0.00 300,000.00
VIE: PPTA for Hai Phong Water Supply 31-Mar-10 1,000,000.00 393,969.94 606,030.06 1,000,000.00
VIE: PPTA for Thua Thien Hue ProvincialWater Supply
30-Jun-10 1,500,000.00 873,326.80 626,673.20 1,500,000.00
REG: TA for Knowledge and InnovationSupport for ADB's Water Financing Program
31-Mar-11 1,100,000.00 216,713.97 883,286.03 1,100,000.00
Sub-Total (TA) 4,465,707.05 2,211,453.82 2,254,253.23 4,465,707.05
Grant Components of Investments (GCI)
SRI: Dry Zone Water Supply and Sanitation 2,000,000.00 0.00 800,000.00 800,000.00
VIE: Thanh Hoa City Comprehensive Socio-Economic Development Project
800,000.00 0.00 800,000.00 800,000.00
Sub-Total (GCI) 2,800,000.00 0.00 1,600,000.00 1,600,000
TAs Attached to Loans (TALLs)
PRC: Hunan Flood Management (TALL:
Strengthening Flood ManagementSustainability in Hunan) 60,000.00 60,000.00 0.00 60,000.00
Sub-Total (TALLs) 60,000.00 60,000.00 0.00 60,000.00
Direct Charges (DC)
SRI: Increasing Awareness and Support forRural Water Supply Through Production ofVideo on South Asia Rural Water Supply andSanitation Experience
23-Mar-09 84,947.28 84,947.28 0.00 84,947.28
MON: Sector Review and Assessment ofImproved Water and Sanitation Provision inUrban Areas
31-Aug-09 199,207.86 199,207.86 0.00 199,207.86
REG: Training Workshop on New Concepts ofIWRM on Urban Water Cycle ADB's WaterFinancing Program
27-Apr-09 53,367.20 53,367.20 0.00 53,367.20
INO: PDA on Demonstrating Application of
Vetiver System for SlopeStabilization andErosion Control in Citarum RiparianCommunities
31-Mar-10 50,000.00 29,738.38 20,261.62 50,000.00
PRC: PDA on Developing and DemonstratingSustainable Wetlands Planning andManagement in Jiangsu Yancheng Wetlands
31-Mar-10 50,000.00 14,728.32 35,271.68 50,000.00
PRC: Developing Sustainable WaterMonitoring and Ecological Payment System
31-Dec-09 200,000.00 150,516.25 49,483.75 200,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 57/73
Appendix 7 53
Projects/ActivitiesClosing
Date
Allocationsas of
End-2009
Disbursedas of 31 Dec
09
ProjectedDisbursement
s in 2010
Total ProjectedDisbursements
by 2010
BAN: O&M Study for Small Scale WaterResources Project
21-May-09 51,812.00 51,812.00 0.00 51,812.00
LAO: Developing a Plan for CorporatizingProvincial Nam Papas 20-May-09 66,987.00 66,987.00 0.00 66,987.00
INO: Catalyzing Performance Benchmarkingof River Basin Organizations
17-Jun-09 59,455.00 59,455.00 0.00 59,455.00
PAK: Support for Start-Up of North SindhUrban Services Corporation Operations
31-Dec-09 134,000.00 76,967.32 57,032.68 134,000.00
PRC: Qinghai Pasture Conservation UsingSolar Photovoltaic-Driven Irrigation
31-Mar-10 85,500.00 33,021.75 52,478.25 85,500.00
REG: Support to WFPF Operation -Engagement of Facility Account Analyst
31-Aug-10 17,400.00 4,465.75 12,934.25 17,400.00
VIE: Water Expert Pool - Engagement ofInternational Rural Water Supply andSanitation Specialist to Support Portfolio
Development in Viet Nam
30-Apr-10 110,000.00 18,871.86 91,128.14 110,000.00
Sub-Total (DC) 1,162,676.34 844,085.97 318,590.37 1,162,676.34
TOTAL 8,428,383.39 3,055,539.79 4,172,843.60 7,288,383.39
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 58/73
54 Appendix 8
Water Financing Partnership Facility (WFPF) Project DatabaseApproved Allocations - By Modality
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPF
Allocations
TECHNICAL ASSISTANCE
1 29-Nov-07 NepalPPTA - Second Small Towns Water Supply and SanitationSector Project
119,707.00
2 29-Nov-07 Viet Nam PPTA - Thua Thien Hue Provincial Water Supply 1,500,000.00
3 29-Nov-07 PRCADTA: Implementing the National Flood ManagementStrategy
300,000.00
4 29-Nov-07 Viet Nam PPTA: Haiphong Water Supply Project 1,000,000.00
5 25-Jan-08 IndiaADTA: Empowerment of Water User Associations forImproved Water Management
550,000.00
6 25-Jan-08 Indonesia PPTA: Metropolitan Santation Management and HealthProject
500,000.00
7 25-Jan-08 Philippines PPTA: Water District Development Project 1,200,000.00
8 25-Jan-08 IndiaPPTA: Integrated Flood and Riverbank ErosionManagement Project (Phase 2) - Strengthening of Policyand Institutional Framework
750,000.00
9 25-Jan-08 IndiaPPTA: Integrated Flood and Riverbank Erosion RiskManagement Project (Phase 2) - Project Processing andInstitutional Development
750,000.00
10 25-Jan-08 Viet NamSSTA: Developing Benefits Sharing Mechanisms forPeople Adversely Affected by Hydropower Projects
240,000.00
11 25-Jan-08 Viet Nam PPTA: Da Nang Water Supply Project 1,500,000.00
12 30-Apr-08 PRCADTA: Urban Wastewater Reuse and Sludge UtilizationPolicy Study
300,000.00
13 23-Jun-08Cambodia,Laos, Viet
NamPPTA: Mekong Water Supply and Sanitation Project 300,000.00
14 23-Jun-08 PRCADTA: River Basin Water Resources Allocation andManagement Policy
250,000.00
15 27-Aug-08Central AsiaRepublics
RETA: Improved Management of Water Resources inCentral Asia
998,000.00
16 27-Aug-08 NepalPPTA: Secondary Towns Integrated Urban EnvironmentalImprovement Project
146,000.00
17 4-Nov-08 PRC ADTA: Preparing National Guidelins for Eco-Compensation in River Basins and a Framework for SoilPollution Management
400,000.00
18 4-Nov-08Various
CountriesRETA: Knowledge and Innovation Support for ADB'sWater Financing Program
2,000,000.00
19 12-Jan-09Kyrgyz
RepublicPPTA: Issyk-Kul Sustainable Development Project 700,000.00
20 12-Jan-09 Uzbekistan PPTA: Water Supply and Sanitation Services Project 850,000.00
21 12-Jan-09 PRC PATA: Strategy for Drought Management 230,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 59/73
Appendix 8 55
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
22 12-May-09 Pakistan PPTA: Punjab Cities Improvement Investment Program 400,000.00
23 12-May-09Various
CountriesRETA: Supporting Investments in Water and ClimateChange
1,000,000.00
24 17-Jun-09 Sri LankaCDTA: Supporting Capacity Development for WastewaterManagement Services in Colombo
150,000.00
25 17-Jun-09Various
CountriesRETA: Knowledge and Innovation Support for ADB'sWater Financing Program (replenishment)
1,500,000.00
26 18-Aug-09 Philippines PPTA: Pasig River Catchment Sewerage Project 300,000.00
27 18-Aug-09 Bangladesg PPTA: Chittagong Hill Tracts Rural Development Project II 265,000.00
TOTAL TECHNICAL ASSISTANCE 18,198,707.00
GRANT COMPONENT OF INVESTMENT
1 25-Jan-08 PRC Loan: Hebei Small Cities and Towns DemonstrationDevelopment Project 250,000.00
2 25-Jan-08 PRCLoan: Shanxi Small Cities and Towns DemonstrationDevelopment Project
250,000.00
3 25-Jan-08 PRCLoan: Liaoning Small Cities and Towns DemonstrationDevelopment Project
250,000.00
4 30-Apr-08 UZB Loan: Surkhandarya Water Supply and Sanitation Project 1,500,000.00
5 23-Jun-08 SRI Loan: Dry Zone Urban Water Supply and SanitationProject
2,000,000.00
6 12-Jan-09 VIELoan: Thanh Hoa City Comprehensive Socio-EconomicDevelopment Project
2,000,000.00
TOTAL GRANT COMPONENT OF INVESTMENT 6,250,000.00
TA ATTACHED TO LOANS
1 25-Jan-08 PRCLoan: Hunan Flood Management Sector Project (TALL:Strengthening Flood Management Sustainability in Hunan)
60,000.00
2 4-Nov-08 PRCLoan: Qingdao Water Resources and Wetland ProtectionProject (TALL: Enabling the Protection of Jiaozhou BayWater Quality and Wetland Ecosystem)
400,000.00
3 4-Nov-08 IND
Loan: Orissa Integrated Irrigated Agriculture and WaterManagement Investment Program (TALL: InstitutionalDevelopment of Integrated Water Resources Managementin Orissa)
250,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 60/73
56 Appendix 8
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
4 4-Nov-08 INO
Loan: Integrated Citarum Water Resources ManagementInvestment Program (TALL: Institutional Strengthening forIntegrated Water Resources Management in the 6 Ci'sRiver Basin Territory)
2,000,000.00
5 12-May-09 PRCLoan: Shanxi Integrated Agricultural Development Project(TALL: Climate Change Adaptation through ImprovedWater Resources Management)
500,000.00
TOTAL TA ATTACHED TO LOANS (TALLS) 3,210,000.00
DIRECT CHARGES
1 28-Jan-08 CambodiaLong Term Capacity Development Support to Ministry ofRural Development on Rural Water Supply and Sanitation
140,000.00
2 1-Feb-08 UzbekistanCapacity and Peformance Diagnosis of Water Supply and
Sanitation Enterprises47,009.36
3 26-Feb-08 PRC
Pilot and Demonstration Activity: Learning fromAgriculture-Developing and Demonstrating SustainableWetlands Planning and Management in Jiangsu YanchengWetlands
50,000.00
4 5-Mar-08 IndiaInstitutional Study for Integrating Flood Risk Managementinto Disaster Risk Management
47,992.41
5 24-Mar-08 Sri LankaIncreasing Awareness and Support for Rural Water SupplyThrough Production of Video on South Asia Rural WaterSupply and Sanitation Experiece
84,947.28
6 3-Apr-08 MongoliaSector Review and Assessment for Improved Water andSanitation Service Provision in Urban Areas
199,207.86
7 16-Apr-08 Indonesia Pilot and Demonstration Activity: DemonstratiogApplication of Vetiver System for Slope Stabilization andErosion Control in Citarum Riparian Communities
50,000.00
8 30-Apr-08Various
CountriesTraining Woskhop on New Concepts in IntegratedManagement of Urban Water Cycle
53,367.20
9 13-May-08 PRCDeveloping Sustainable Water Monitoring and EcologicalPayment System
200,000.00
10 13-May-08 Bangladesh O&M Study of Small Scale Water Resources Project 51,811.71
11 13-May-08 Philippines Initial Assessment of the Metro Cebu Kotkot Dam Project 58,350.21
12 16-May-08Various
CountriesSingapore International Water Week 38,577.73
13 27-May-08 PRCWorkshop on Lakes and Wetlands Restoration and
Sustainable Alternative Livelihood
20,000.00
14 9-Jun-08 Lao PDRDeveloping a Plan for Corporatizing Provincial Nam Papasin Lao PDR
66,986.85
15 9-Jun-08Pacific
CountriesPacific Water Conference 2008 43,912.45
16 16-Jun-08 IndonesiaCatalyzing Performance Benchmarking of River BasinOrganizations in Indonesia
59,454.69
17 25-Jun-08 NepalCapacity Building Support to Kathmandu Valley WaterSupply Utility
150,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 61/73
Appendix 8 57
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
18 25-Jun-08 Nepal/ Bangladesh
Sharing Best Practices in Water Supply and WastewaterManagement
27,506.89
19 2-Jul-08 PakistanDeveloping Design-Build-Performance Based Arrangementfor Water Supply Improvements
17,740.36
20 3-Jul-08 PakistanIncreasing Public Awareness and Support for ImprovedUrban Services: Campaign to Support Sindh CitiesImprovement Investment Program
26,376.26
21 24-Jul-08Various
CountriesSupport to WFPF Operationalization: Engagement ofFacility Account Analyst
13,212.89
22 5-Aug-08 IndiaSupport to India Orissa Integrated Agriculture and WaterManagement Investment Program
64,811.25
23 6-Aug-08 VariousCountries
Providing for Secretariat Support to Established Asia Water
Utilities Network under the Water Operators Partnerships(WOPs) Program
90,000.00
24 12-Aug-08 Lao PDRSupport to Northern and Central Water and Central WaterSupply and Sanitation Sector Project
108,000.00
25 15-Aug-08Indonesia,
Nepal,Philippines
Developing Knowledge Product on Community-DrivenDevelopment in Water Supply and Sanitation: CaseStudies of ADB Projects in Indonesia, Nepal andPhilippines
43,760.26
26 22-Aug-08 Indonesia
Increasing Awareness and Support for ParticipatoryIrrigation Development Through Multimedia: Production ofWater Awareness Video on Participatory Approaches inIrrigation Scheme Reconstruction and Rehabilitation -Lessons from Nanggroe Aceh Darussalam, Indonesia
55,986.85
27 29-Aug-08 PRCCapacity Building of 2nd and 3rd Tier Cities for PreparingNonsovereign Urban Infratscture Projects in PRC
150,000.00
28 15-Sep-08Various
CountriesGood Practices for Urban Water Management in Asia 150,000.00
29 25-Sep-08Kyrgyz
RepublicWater Expert Services Pool: Engagament of EnvironmentSpecialist
57,900.00
30 3-Oct-08 PakistanPreparation of Larkana Sanitation, Drainage andWastewater Management Strategic Action Plan and PriorityInvestment Program
92,000.00
31 10-Nov-08Various
CountriesRegional Workshop on Developing Partnerships for Waterand Climate Change Adaptation
66,053.37
32 4-Dec-08 Nepal Support to ADTA on Strengthening Capacity for ManagingClimate Change 125,476.00
33 5-Dec-08 IndiaLegal review of project documents for PPP in waterprojects India
150,000.00
34 16-Dec-08 PakistanSupport for Start-Up Operation of North Sindh UrbanServices Corporation
134,000.00
35 6-Jan-09 PRCQinghai Pasture Conservation Using Solar Photovoltaic(PV)-Driven Irrigation
85,500.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 62/73
58 Appendix 8
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
36 25-Mar-09 Pakistan Preparation of Khairpur Wastewater Management PlanningMethodology, Strategic Plan and Priority InvestmentProgram
120,000.00
37 8-Jun-09 PRCPreliminary Survey and Assessment for InitiatingInterventions on Zhangye Wetlands Protection andRehabilitation in Hei River Basin
150,000.00
38 8-Jun-09 IndiaScoping Study for CDTA on Integrated Water ResourcesManagement
64,000.00
39 8-Jun-09Pacific
CountriesPacific Water Conference and Expo 2009 20,000.00
40 27-Jul-09 IndonesiaSupport to Indonesia's Preparation of National Medium-Term Plan 2010-2014 (Water Supply and SanitationSector)
150,000.00
41 28-Jul-09 VariousCountries
Support to WFPF Operationalization: Engagement ofFacility Account Analyst
17,400.00
42 14-Sep-09 Viet NamWater Expert Pool: Engagament of International UrbanWater Supply and Sanitation Specialist to Support PortfolioDevelopment in Viet Nam
150,000.00
43 14-Sep-09 Viet NamWater Expert Pool: Engagament of National Water Supplyand Sanitation Specialist to Support Portfolio Developmentin Viet Nam
40,000.00
44 14-Sep-09 Viet NamWater Expert Pool: Engagament of International RuralWater Supply and Sanitation Specialist to Support PortfolioDevelopment in Viet Nam
110,000.00
45 17-Sep-09 India
Development of Flood Management Infrastructure Asset
Mangaement Information System 50,000.00
46 18-Sep-09 Mongolia
Market Sounding with Potential Private Investors andOperators and Further Refinement of EnablingEnvironment for PSP in Water and Sanitation Provision inMongolia's Urban Areas
50,000.00
TOTAL DIRECT CHARGES 3,741,341.88
GRANTD TOTAL 31,400,048.88
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 63/73
Appendix 9 59
Water Financing Partnership Facility (WFPF) Project DatabaseApproved Allocations - By Sector (Rural, Urban, Basin)
No.
Date ofApproval of
WFPFFundingAllocation
Country Project Name
Total WFPF
Allocations
RURAL WATER
1 25-Jan-08 IndiaADTA: Empowerment of Water User Associations forImproved Water Management
550,000.00
2 25-Jan-08 India
Loan: Orissa Integrated Irrigated Agriculture and WaterManagement Investment Program (TALL: InstitutionalDevelopment of Integrated Water ResourcesManagement in Orissa)
250,000.00
3 28-Jan-08 CambodiaLong Term Capacity Development Support to Ministry ofRural Development on Rural Water Supply and
Sanitation
140,000.00
4 24-Mar-08 Sri LankaIncreasing Awareness and Support for Rural WaterSupply Through Production of Video on South Asia RuralWater Supply and Sanitation Experiece
84,947.28
5 5-Aug-08 India
Support to India Orissa Integrated Agriculture and WaterManagement Investment Program (Water ExpertServices Pool: Engagement of Irrigation ManagementSpecialist and Water Users Association Specialists
64,811.25
6 15-Aug-08Indonesia,
Nepal,Philippines
Developing Knowledge Product on Community-DrivenDevelopment in Water Supply and Sanitation: CaseStudies of ADB Projects in Indonesia, Nepal andPhilippines
43,760.26
7 22-Aug-08 Indonesia
Increasing Awareness and Support for ParticipatoryIrrigation Development Through Multimedia: Productionof Water Awareness Video on Participatory Approachesin Irrigation Scheme Reconstruction and Rehabilitation -Lessons from Nanggroe Aceh Darussalam, Indonesia
55,986.85
8 6-Jan-09 PRCQinghai Pasture Conservation Using Solar Photovoltaic(PV)-Driven Irrigation
85,500.00
9 12-May-09 PRCLoan: Shanxi Integrated Agricultural DevelopmentProject (TALL: Climate Change Adaptation throughImproved Water Resources Management
500,000.00
10 18-Aug-09 BangladeshPPTA: Chittagong Hill Tracts Rural Development ProjectII
265,000.00
11 14-Sep-09 Viet Nam
Water Expert Pool: Engagement of International Rural
Water Supply and Sanitation Specialist to SupportPortfolio Development in Viet Nam
110,000.00
TOTAL RURAL WATER 2,150,005.64
URBAN WATER
1 29-Nov-07 NepalPPTA - Second Small Towns Water Supply andSanitation Sector Project
119,707.00
2 29-Nov-07 Viet Nam PPTA - Thua Thien Hue Provincial Water Supply 1,500,000.00
3 29-Nov-07 Viet Nam PPTA: Haiphong Water Supply Project 1,000,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 64/73
60 Appendix 9
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
4 25-Jan-08 PRCLoan: Hebei Small Cities and Towns DemonstrationDevelopment Project
250,000.00
5 25-Jan-08 PRCLoan: Shanxi Small Cities and Towns DemonstrationDevelopment Project
250,000.00
6 25-Jan-08 PRCLoan: Liaoning Small Cities and Towns DemonstrationDevelopment Project
250,000.00
7 25-Jan-08 Philippines PPTA: Water District Development Project 1,200,000.00
8 25-Jan-08 IndonesiaPPTA: Metropolitan Santation Management and HealthProject
500,000.00
9 25-Jan-08 Viet Nam PPTA: Da Nang Water Supply Project 1,500,000.00
10 1-Feb-08 UzbekistanCapacity and Peformance Diagnosis of Water Supplyand Sanitation Enterprises
47,009.36
11 3-Apr-08 MongoliaSector Review and Assessment for Improved Water andSanitation Service Provision in Urban Areas
199,207.86
12 30-Apr-08 UzbekistanLoan: Surkhandarya Water Supply and SanitationProject
1,500,000.00
13 30-Apr-08 PRCADTA: Urban Wastewater Reuse and Sludge UtilizationPolicy Study
300,000.00
14 30-Apr-08Various
CountriesTraining Woskhop on New Concepts in IntegratedManagement of Urban Water Cycle
53,367.20
15 13-May-08 Philippines Initial Assessment of the Metro Cebu Kotkot Dam Project 58,350.21
16 9-Jun-08Pacific
CountriesPacific Water Conference 2008 43,912.45
17 9-Jun-08 Lao PDR
Developing a Plan for Corporatizing Provincial Nam
Papas in Lao PDR 66,986.85
18 23-Jun-08 Sri LankaLoan: Dry Zone Urban Water Supply and SanitationProject
2,000,000.00
19 23-Jun-08Cambodia,Lao PDR,Viet Nam
PPTA: Mekong Water Supply and Sanitation Project 300,000.00
20 25-Jun-08Nepal/
BangladeshSharing Best Practices in Water Supply and WastewaterManagement
27,506.89
21 25-Jun-08 NepalCapacity Building Support to Kathmandu Valley WaterSupply Utility
150,000.00
22 2-Jul-08 PakistanDeveloping Design-Build-Performance BasedArrangement for Water Supply Improvements
17,740.36
23 3-Jul-08 Pakistan Increasing Public Awareness and Support for ImprovedUrban Services: Campaign to Support Sindh CitiesImprovement Investment Program
26,376.26
24 6-Aug-08Various
Countries
Providing for Secretariat Support to Established AsiaWater Utilities Network under the Water OperatorsPartnerships (WOPs) Program
90,000.00
25 12-Aug-08 Lao PDRSupport to Northern and Central Water and CentralWater Supply and Sanitation Sector Project
108,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 65/73
Appendix 9 61
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
26 27-Aug-08 NepalPPTA: Secondary Towns Integrated UrbanEnvironmental Improvement Project
146,000.00
27 29-Aug-08 PRCCapacity Building of 2nd and 3rd Tier Cities for PreparingNonsovereign Urban Infratscture Projects in PRC
150,000.00
28 15-Sep-08Various
CountriesGood Practices for Urban Water Management in Asia 150,000.00
29 25-Sep-08Kyrgyz
RepublicWater Expert Services Pool: Engagament ofEnvironment Specialist
57,900.00
30 3-Oct-08 PakistanPreparation of Larkana Sanitation, Drainage andWastewater Management Strategic Action Plan andPriority Investment Program
92,000.00
31 5-Dec-08 Pakistan Support for Start-Up of North Sindh Urban ServicesCorporation Operations 134,000.00
32 5-Dec-08 IndiaLegal review of project documents for PPP in waterprojects India
150,000.00
33 12-Jan-09Kyrgyz
RepublicPPTA: Issyk-Kul Sustainable Development Project 700,000.00
34 12-Jan-09 Viet NamLoan: Thanh Hoa City Comprehensive Socio-EconomicDevelopment Project
2,000,000.00
35 12-Jan-09 Uzbekistan PPTA: Water Supply and Sanitation Services Project 850,000.00
36 25-Mar-09 PakistanPreparation of Khairpur Wastewater ManagementPlanning Methodology, Strategic Plan and PriorityInvestment Program
120,000.00
37 12-May-09 Pakistan PPTA: Punjab Cities Improvement Investment Program 400,000.00
38 8-Jun-09Pacific
CountriesPacific Water Conference and Expo 2009 20,000.00
39 17-Jun-09 Sri LankaCDTA: Supporting Capacity Development forWastewater Management Services in Colombo
150,000.00
40 27-Jul-09 IndonesiaSupport to Indonesia's Preparation of National Medium-Term Plan 2010-2014 (Water Supply and SanitationSector)
150,000.00
41 18-Aug-09 PhilippinesPPTA: Pasig River Catchment Sewerage Project(through PSOD)
300,000.00
42 14-Sep-09 Viet NamWater Expert Pool: Engagement of International UrbanWater Supply and Sanitation Specialist to SupportPortfolio Development in Viet Nam
150,000.00
43 14-Sep-09 Viet NamWater Expert Pool: Engagement of National WaterSupply and Sanitation Specialist to Support PortfolioDevelopment in Viet Nam
40,000.00
44 18-Sep-09 Mongolia
Market Sounding with Potential Private Investors andOperators and Further Enhancement of EnablingEnvironment for PSP in Water and Sanitation Provisionin Mongolia's Urban Areas
50,000.00
TOTAL URBAN WATER 17,368,064.44
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 66/73
62 Appendix 9
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
BASIN WATER
1 29-Nov-07 PRCADTA: Implementing the National Flood ManagementStrategy
300,000.00
2 25-Jan-08 Viet NamSSTA: Developing Benefits Sharing Mechanisms forPeople Adversely Affacted by Hydropower Projects
240,000.00
3 25-Jan-08 IndiaPPTA: Integrated Flood and Riverbank ErosionManagement Project (Phase 2) - Strengthening of Policyand Institutional Framework
750,000.00
4 25-Jan-08 IndiaPPTA: Integrated Flood and Riverbank Erosion RiskManagement Project (Phase 2) - Project Processing andInstitutional Development
750,000.00
5 26-Feb-08 PRC
Pilot and Demonstration Activity: Learning fromAgriculture-Developing and Demonstrating SustainableWetlands Planning and Management in JiangsuYancheng Wetlands
50,000.00
6 5-Mar-08 IndiaInstitutional Study for Integrating Flood RiskManagement into Disaster Risk Management
47,992.41
7 16-Apr-08 IndonesiaPilot and Demonstration Activity: DemonstratiogApplication of Vetiver System for Slope Stabilization andErosion Control in Citarum Riparian Communities
50,000.00
8 13-May-08 BangladeshO&M Study of Small Scale Water Resources Project(Water Expert Services Pool: Engagement Small ScaleWater Resources Specialist and Sociologist)
51,811.71
9 13-May-08 PRCDeveloping Sustainable Water Monitoring and Ecological
Payment System200,000.00
10 27-May-08 PRCWorkshop on Lakes and Wetlands Restoration andSustainable Alternative Livelihood
20,000.00
11 16-Jun-08 IndonesiaCatalyzing Performance Benchmarking of River BasinOrganizations in Indonesia
59,454.69
12 23-Jun-08 PRCADTA: River Basin Water Resources Allocation andManagement Policy
250,000.00
13 27-Aug-08Central AsiaRepublics
RETA: Improved Management of Water Resources inCentral Asia
998,000.00
14 4-Nov-08 PRCLoan: Hunan Flood Management Sector Project (TALL:Strengthening Flood Management Sustainability inHunan)
60,000.00
15 4-Nov-08 PRC Loan: Qingdao Water Resources and WetlandProtection Project (TALL: Enabling the Protection ofJiaozhou Bay Water Quality and Wetland Ecosystem)
400,000.00
16 4-Nov-08 PRCADTA: Preparing National Guidelins for Eco-Compensation in River Basins and a Framework for SoilPollution Management
400,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 67/73
Appendix 9 63
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project NameTotal WFPFAllocations
17 4-Nov-08 Indonesia
Loan: Integrated Citarum Water Resources ManagementInvestment Program (TALL: Institutional Strengtheningfor Integrated Water Resources Management in the 6Ci's River Basin Territory)
2,000,000.00
18 4-Dec-08 NepalSupport to ADTA on Strengthening Capacity forManaging Climate Change
125,476.00
10 12-Jan-09 PRC PATA: Strategy for Drought Management 230,000.00
20 12-May-09Various
CountriesRETA: Supporting Investments in Water and ClimateChange
1,000,000.00
21 8-Jun-09 IndiaScoping Study for CDTA on Integrated Water ResourcesManagement
64,000.00
22 8-Jun-09 PRC Preliminary Survey and Assessment for InitiatingInterventions on Zhangye Wetlands Protection andRehabilitation in Hei River Basin
150,000.00
23 17-Sep-09 IndiaDevelopment of Flood Management Infrastructure AssetManagement Information System
50,000.00
TOTAL BASIN WATER 8,246,734.81
MULTISECTOR
1 16-May-08Various
CountriesSingapore International Water Week 38,577.73
2 24-Jul-08Various
CountriesSupport to WFPF Operationalization: Engagement ofFacility Account Analyst
13,212.89
3 4-Nov-08Various
Countries
RETA: Knowledge and Innovation Support for ADB's
Water Financing Program
2,000,000.00
4 10-Nov-08Various
CountriesRegional Workshop on Developing Partnerships forWater and Climate Change Adaptation
66,053.37
5 18-Jun-09Various
CountriesRETA: Knowledge and Innovation Support for ADB'sWater Financing Program (replenishment)
1,500,000.00
6 28-Jul-09Various
CountriesSupport to WFPF Operationalization: Engagement ofFacility Account Analyst (Replenishment)
17,400.00
TOTAL MULTISECTOR 3,635,243.99
GRAND TOTAL 31,400,048.88
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 68/73
64 Appendix 10
Water Financing Partnership Facility (WFPF) Project DatabaseApproved Allocations - By Region
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
CENTRAL WEST
1 1-Feb-08 UzbekistanCapacity and Peformance Diagnosis ofWater Supply and Sanitation Enterprises
Urban 47,009.36
2 30-Apr-08 UzbekistanLoan: Surkhandarya Water Supply andSanitation Project
Urban 1,500,000.00
3 3-Jul-08 Pakistan
Increasing Public Awareness and Supportfor Improved Urban Services: Campaignto Support Sindh Cities ImprovementInvestment Program
Urban 26,376.26
4 2-Jul-08 PakistanDeveloping Design-Build-PerformanceBased Arrangement for Water SupplyImprovements
Urban 17,740.36
5 27-Aug-08Central AsiaRepublics
RETA: Improved Management of WaterResources in Central Asia
Basin 998,000.00
6 25-Sep-08Kyrgyz
RepublicWater Expert Services Pool: Engagamentof Environment Specialist
Urban 57,900.00
7 3-Oct-08 Pakistan
Preparation of Larkana Sanitation,Drainage and Wastewater ManagementStrategic Action Plan and PriorityInvestment Program
Urban 92,000.00
8 5-Dec-08 PakistanSupport for Start-Up of North Sindh UrbanServices Corporation Operations
Urban 134,000.00
9 12-Jan-09 KyrgyzRepublic
PPTA: Issyk-Kul SustainableDevelopment Project
Urban 700,000.00
10 12-Jan-09 UzbekistanPPTA: Water Supply and SanitationServices Project
Urban andrural
850,000.00
11 25-Mar-09 Pakistan
Preparation of Khairpur WastewaterManagement Planning Methodology,Strategic Plan and Priority InvestmentProgram
Urban 120,000.00
12 12-May-09 PakistanPPTA: Punjab Cities ImprovementInvestment Program
Urban 400,000.00
TOTAL CENTRAL WEST 4,943,025.98
EAST ASIA
1 29-Nov-07 PRC
ADTA: Implementing the National Flood
Management Strategy Basin 300,000.00
2 25-Jan-08 PRCLoan: Hebei Small Cities and TownsDemonstration Development Project
Urban 250,000.00
3 25-Jan-08 PRCLoan: Shanxi Small Cities and TownsDemonstration Development Project
Urban 250,000.00
4 25-Jan-08 PRCLoan: Liaoning Small Cities and TownsDemonstration Development Project
Urban 250,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 69/73
Appendix 10 65
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
5 26-Feb-08 PRC
Pilot and Demonstration Activity: Learning
from Agriculture-Developing andDemonstrating Sustainable WetlandsPlanning and Management in JiangsuYancheng Wetlands
Basin 50,000.00
6 3-Apr-08 MongoliaSector Review and Assessment forImproved Water and Sanitation ServiceProvision in Urban Areas
Urban 199,207.86
7 30-Apr-08 PRCADTA: Urban Wastewater Reuse andSludge Utilization Policy Study
Urban 300,000.00
8 13-May-08 PRCDeveloping Sustainable Water Monitoringand Ecological Payment System Basin 200,000.00
9 27-May-08 PRC
Workshop on Lakes and Wetlands
Restoration and Sustainable AlternativeLivelihood
Basin 20,000.00
10 23-Jun-08 PRCADTA: River Basin Water ResourcesAllocation and Management Policy
Basin 250,000.00
11 29-Aug-08 PRCCapacity Building of 2nd and 3rd TierCities for Preparing Nonsovereign UrbanInfratscture Projects in PRC
Urban 150,000.00
12 4-Nov-08 PRCLoan: Hunan Flood Management SectorProject (TALL: Strengthening FloodManagement Sustainability in Hunan)
Basin 60,000.00
13 4-Nov-08 PRC
Loan: Qingdao Water Resources andWetland Protection Project (TALL:Enabling the Protection of Jiaozhou Bay
Water Quality and Wetland Ecosystem)
Basin 400,000.00
14 4-Nov-08 PRCADTA: Preparing National Guidelins forEco-Compensation in River Basins and aFramework for Soil Pollution Management
Basin 400,000.00
15 6-Jan-09 PRCQinghai Pasture Conservation Using SolarPhotovoltaic (PV)-Driven Irrigation
Rural 85,500.00
16 12-Jan-09 PRC PATA: Strategy for Drought Management Basin 230,000.00
17 12-May-09 PRC
Loan: Shanxi Integrated AgriculturalDevelopment Project (TALL: ClimateChange Adaptation through ImprovedWater Resources Management
Basin 500,000.00
18 8-Jun-09 PRC
Preliminary Survey and Assessment for
Initiating Interventions on ZhangyeWetlands Protection and Rahabilitation inHei River Basin
Basin 150,000.00
19 18-Sep-09 Mongolia
Market Sounding with Potential PrivateInvestors and Operators and FurtherRefinement of Enabling Environment forPSP in Water Supply and SanitationProvision in Mongolia's Urban Areas
Urban 50,000.00
TOTAL EAST ASIA 4,094,707.86
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 70/73
66 Appendix 10
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
PACIFC
1 9-Jun-08 PacificCountries
Pacific Water Conference 2008 Multisector 43,912.45
2 8-Jun-09Pacific
CountriesPacific Water Conference and Expo 2009 Multisector 20,000.00
TOTAL PACIFIC 63,912.45
SOUTH ASIA
1 29-Nov-07 NEPPPTA - Second Small Towns WaterSupply and Sanitation Sector Project
Urban 119,707.00
2 25-Jan-08 INDADTA: Empowerment of Water UserAssociations for Improved WaterManagement
Rural 550,000.00
3 25-Jan-08 IND
PPTA: Integrated Flood and RiverbankErosion Management Project (Phase 2) -
Strengthening of Policy and InstitutionalFramework
Basin 750,000.00
4 25-Jan-08 IND
PPTA: Integrated Flood and RiverbankErosion Risk Management Project (Phase2) - Project Processing and InstitutionalDevelopment
Basin 750,000.00
5 25-Jan-08 IND
Loan: Orissa Integrated IrrigatedAgriculture and Water ManagementInvestment Program (TALL: InstitutionalDevelopment of Integrated WaterResources Management in Orissa)
Rural 250,000.00
6 5-Mar-08 INDInstitutional Study for Integrating FloodRisk Management into Disaster RiskManagement
Basin 47,992.41
7 24-Mar-08 SRI/ NEP
Increasing Awareness and Support forRural Water Supply Through Production ofVideo on South Asia Rural Water Supplyand Sanitation Experiece
Rural 84,947.28
8 13-May-08 BANO&M Study of Small Scale WaterResources Project
Basin 51,811.71
9 23-Jun-08 SRILoan: Dry Zone Urban Water Supply andSanitation Project
Urban 2,000,000.00
10 25-Jun-08 NEP/BANSharing Best Practices in Water Supplyand Wastewater Management
Urban 27,506.89
11 25-Jun-08 NEPCapacity Building Support to KathmanduValley Water Supply Utility
Urban 150,000.00
12 5-Aug-08 IND Support to India Orissa IntegratedAgriculture and Water ManagementInvestment Program
Rural 64,811.25
13 27-Aug-08 NEPPPTA: Secondary Towns IntegratedUrban Environmental Improvement Project
Urban 146,000.00
14 4-Dec-08 NEPSupport to ADTA on StrengtheningCapacity for Managing Climate Change
Basin 125,476.00
15 5-Dec-08 INDLegal review of project documents for PPPin water projects India
Urban 150,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 71/73
Appendix 10 67
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
16 8-Jun-09 INDScoping Study for CDTA on Integrated
Water Resources ManagementBasin 64,000.00
17 17-Jun-09 SRICDTA: Supporting Capacity Developmentfor Wastewater Management Services inColombo
Urban 150,000.00
18 18-Aug-09 BANPPTA: Chittagong Hill Tracts RuralDevelopment Project II
Rural 265,000.00
19 17-Sep-09 INDDevelopment of Flood ManagementInfrastructure Asset ManagementInformation System
Basin 50,000.00
TOTAL SOUTH ASIA 5,797,252.54
SOUTHEAST ASIA
1 29-Nov-07 VIEPPTA - Thua Thien Hue Provincial WaterSupply
Urban 1,500,000.00
2 29-Nov-07 VIE PPTA: Haiphong Water Supply Project Urban 1,000,000.00
3 25-Jan-08 INOPPTA: Metropolitan SantationManagement and Health Project
Urban 500,000.00
4 25-Jan-08 VIESSTA: Developing Benefits SharingMechanisms for People AdverselyAffacted by Hydropower Projects
Basin 240,000.00
5 25-Jan-08 VIE PPTA: Da Nang Water Supply Project Urban 1,500,000.00
6 25-Jan-08 PHIPPTA: Water District DevelopmentProject
Urban 1,200,000.00
7 28-Jan-08 CAMLong Term Capacity Development Supportto Ministry of Rural Development on RuralWater Supply and Sanitation
Rural 140,000.00
8 16-Apr-08 INOPilot and Demonstration Activity:Demonstratiog Application of VetiverSystem for Slope Stabilization and ErosionControl in Citarum Riparian Communities
Basin 50,000.00
9 13-May-08 PHIInitial Assessment of the Metro CebuKotkot Dam Project
Urban 58,350.21
10 23-Jun-08CAM, LAO,
VIEPPTA: Mekong Water Supply andSanitation Project
Urban 300,000.00
11 16-Jun-08 INOCatalyzing Performance Benchmarking ofRiver Basin Organizations in Indonesia
Basin 59,454.69
12 9-Jun-08 LAODeveloping a Plan for CorporatizingProvincial Nam Papas in Lao PDR
Urban 66,986.85
13 12-Aug-08 LAO
Support to Northern and Central Water
and Central Water Supply and SanitationSector Project (Water Expert ServicesPool: Engagement of Water SupplyExpert)
Urban 108,000.00
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 72/73
68 Appendix 10
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
14 22-Aug-08 INO
Increasing Awareness and Support for
Participatory Irrigation DevelopmentThrough Multimedia: Production of WaterAwareness Video on ParticipatoryApproaches in Irrigation SchemeReconstruction and Rehabilitation -Lessons from Nanggroe AcehDarussalam, Indonesia
Rural 55,986.85
15 4-Nov-08 INO
Loan: Integrated Citarum WaterResources Management InvestmentProgram (TALL: InstitutionalStrengthening for Integrated WaterResources Management in the 6 Ci's RiverBasin Territory)
Basin 2,000,000.00
16 12-Jan-09 VIELoan: Thanh Hoa City ComprehensiveSocio-Economic Development Project
Urban 2,000,000.00
17 27-Jul-09 INOSupport to Indonesia's Preparation ofNational Medium-Term Plan 2010-2014(Water Supply and Sanitation Sector)
Urban 150,000.00
18 18-Aug-09 PHIPPTA: Pasig River Catchment SewerageProject (through PSOD)
Urban 300,000.00
19 14-Sep-09 VIE
Water Expert Pool: Engagament ofInternational Urban Water Supply andSanitation Specialist to Support PortfolioDevelopment in Viet Nam
Urban 150,000.00
20 14-Sep-09 VIE
Water Expert Pool: Engagament ofNational Water Supply and SanitationSpecialist to Support PortfolioDevelopment in Viet Nam
Urban 40,000.00
21 14-Sep-09 VIE
Water Expert Pool: Engagament ofInternational Rural Water Supply andSanitation Specialist to Support PortfolioDevelopment in Viet Nam
Urban 110,000.00
TOTAL SOUTHEAST ASIA 11,528,778.60
INTER-REGIONAL
1 30-Apr-08Various
Countries
Training Woskhop on New Concepts inIntegrated Management of Urban WaterCycle
Urban 53,367.20
2 16-May-08Various
CountriesSingapore International Water Week Multisector 38,577.73
3 24-Jul-08Various
CountriesSupport to WFPF Operationalization:Engagement of Facility Account Analyst
Multisector 13,212.89
4 6-Aug-08Various
Countries
Providing for Secretariat Support toEstablished Asia Water Utilities Networkunder the Water Operators Partnerships(WOPs) Program
Urban 90,000.00
5 15-Aug-08INO, SRI,
NEP
Developing Knowledge Product onCommunity-Driven Development in WaterSupply and Sanitation: Case Studies ofADB Projects in Indonesia, Nepal and SriLanka
Rural 43,760.26
8/3/2019 2009 Water Financing Partnership Facility: Annual Work Report (January-December)
http://slidepdf.com/reader/full/2009-water-financing-partnership-facility-annual-work-report-january-december 73/73
Appendix 10 69
No.
Date ofApproval of
WFPFFunding
Allocation
Country Project Name SubsectorTotal WFPFAllocations
6 15-Sep-08Various
Countries
Good Practices for Urban Water
Management in AsiaUrban 150,000.00
7 4-Nov-08Various
Countries
RETA: Knowledge and InnovationSupport for ADB's Water FinancingProgram
Multisector 2,000,000.00
8 10-Nov-08Various
Countries
Regional Workshop on DevelopingPartnerships for Water and ClimateChange Adaptation
Multisector 66,053.37
9 12-May-09Various
CountriesRETA: Supporting Investments in Waterand Climate Change
Basin 1,000,000.00
10 17-Jun-09Various
Countries
RETA: Knowledge and InnovationSupport for ADB's Water FinancingProgram (supplemental)
Multisector 1,500,000.00
11 27-Jul-09Various
Countries
Support to WFPF Operationalization:
Engagement of Facility Account Analyst(supplemental)
Multisector 17,400.00
TOTAL INTER-REGIONAL 4,972,371.45
GRAND TOTAL 31,400,048.88