2002 GAS-LIFT WORKSHOP 2002 GAS-LIFT WORKSHOP 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Gas-lift Automation: Pilot Project Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo Henke Alves de Oliveira PETROBRAS - UN-BC HOUSTON - FEBRUARY, 2002 HOUSTON - FEBRUARY, 2002

Upload: crystal-maxwell

Post on 28-Dec-2015

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

2002 GAS-LIFT WORKSHOP2002 GAS-LIFT WORKSHOP

PETROBRAS - Petróleo Brasileiro S.A.PETROBRAS - Petróleo Brasileiro S.A.

Gas-lift Automation: Pilot ProjectGas-lift Automation: Pilot Project

Edson Henrique Bolonhini

PETROBRAS - UN-RNCE

Galileu Paulo Henke Alves de Oliveira

PETROBRAS - UN-BC

HOUSTON - FEBRUARY, 2002HOUSTON - FEBRUARY, 2002

Page 2: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Gas-lift automation - TARGETS

• GUIDELINESGUIDELINES– control Pwf (bottom hole

flowing pressure)– action over Pcas (wellhead

casing pressure)

Page 3: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Gas-lift automation - TARGETS (cont.)

• OBJECTIVESOBJECTIVES– to get the minimum Pwfminimum Pwf by

controlling Pcas– to observe the well delay timedelay time

after a change in Pcas– to verify the adequacy of a

PIDPID controller for Pcas– to verify the adequacy and

controllability of globe valvesglobe valves for lift-gas injection

– to observe the effects of ambient temperatureambient temperature on Pwf

Page 4: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hardware

• InstrumentsInstruments

– bottom hole pressure transmitter– wellhead flowing pressure transmitter– gas-lift supply pressure transmitter– gas-lift rate transmitter– gas-lift control valve– ambient temperature transmitter– data acquisition and control module

Page 5: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Tubing: Ø 2 3/8” Casing: Ø 5 1/2”

Depth: 1500 m

Gas-lift valves: Ø 1/8”2 IPO

1 venturi

Liquid flowrate: 25

m3/dGOR: 130

BSW: 35 %

Bottom hole pressure and temperature transmitter: 1500 psi /

100 °C

The well

Page 6: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Instruments

Radio and data acquisition and

PID control

Control valve

globe Ø ¾”

Page 7: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Monitoring

Supervision and control room

Page 8: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Results

Data obtained from Dec/2001 until Jan/2002Data obtained from Dec/2001 until Jan/2002

Page 9: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hora da Aquisição09:00:0008:00:0007:00:0006:00:0005:00:0004:00:0003:00:0002:00:0001:00:0000:00:0023:00:0022:00:0021:00:0020:00:0019:00:0018:00:0017:00:0016:00:0015:00:00

58

56

54

52

50

48

46

44

42

40

38

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Oscillation

Heading

Flow regime effects on Pwf

Tubing head pressure [kgf/cm2]Ambient temperature [oC]Control valve Opening [%]Gas-lift injection rate [Mm3/d]

Casing head pressure [kgf/cm2]Gas-lift injection pressure [kgf/cm2]Bottom hole pressure [kgf/cm2]

PID controller under manual operation

Page 10: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hora da Aquisição00:00:0022:00:0020:00:0018:00:0016:00:0014:00:0012:00:0010:00:0008:00:0006:00:0004:00:0002:00:0000:00:0022:00:0020:00:0018:00:0016:00:0014:00:0012:00:0010:00:00

60

58

56

54

52

50

48

46

44

42

40

38

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Ambient temperature effects on Pwf

Tubing head pressure [kgf/cm2]Ambient temperature [oC]Control valve Opening [%]Gas-lift injection rate [Mm3/d]

Casing head pressure [kgf/cm2]Gas-lift injection pressure [kgf/cm2]Bottom hole pressure [kgf/cm2]

PID controller under manual operation

Night Day

Page 11: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hora da Aquisição06:00:0000:00:0018:00:0012:00:0006:00:0000:00:0018:00:0012:00:00

60

58

56

54

52

50

48

46

44

42

40

38

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Tubing head pressure [kgf/cm2]Ambient temperature [oC]Control valve Opening [%]Gas-lift injection rate [Mm3/d]

Casing head pressure [kgf/cm2]Gas-lift injection pressure [kgf/cm2]Bottom hole pressure [kgf/cm2]

Casing pressure set point [kgf/cm2]

PID control on casing pressure

Page 12: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hora da Aquisição06:00:0004:00:0002:00:0000:00:0022:00:0020:00:0018:00:0016:00:0014:00:0012:00:0010:00:0008:00:0006:00:00

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

0

Automatic reactivation - Pwf > 53 kgf/cm2

Tubing head pressure [kgf/cm2]Ambient temperature [oC]Control valve Opening [%]Gas-lift injection rate [Mm3/d]

Casing head pressure [kgf/cm2]Gas-lift injection pressure [kgf/cm2]Bottom hole pressure [kgf/cm2]

Casing pressure set point [kgf/cm2]

PID action

Gas compressor shutdown

Gas compressor start-up

Reactivation algorithm

Page 13: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Hora da Aquisição06:00:0000:00:0018:00:0012:00:0006:00:0000:00:0018:00:0012:00:0006:00:0000:00:00

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

0

Tubing head pressure [kgf/cm2]Ambient temperature [oC]Control valve Opening [%]Gas-lift injection rate [Mm3/d]

Casing head pressure [kgf/cm2]Gas-lift injection pressure [kgf/cm2]Bottom hole pressure [kgf/cm2]

PID controller under manual operation

Condensate effects on Pwf

Reactivation algorithm Pwf > 53 kgf/cm2

Injecting gas throughthe 2nd GLV

Circulating liquidthrough Venturi GLV

Rain

Page 14: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

Final remarks

– It is possible to control the Pwf behaviour through the proposed approach

– PID controller-globe valve assembly showed to be efficient and beneficial

– Ambient temperature has effect on the well behavior and it shows the importance of a dynamic injection control

– The experiment allowed us to evaluate the system response with time

– A global control algorithm should consider the conditioning of Pwf signal and its tendency

• ConclusionsConclusions

Page 15: 2002 GAS-LIFT WORKSHOP PETROBRAS - Petróleo Brasileiro S.A. Gas-lift Automation: Pilot Project Edson Henrique Bolonhini PETROBRAS - UN-RNCE Galileu Paulo

2002 GAS-LIFT WORKSHOP

2002 GAS-LIFT WORKSHOP2002 GAS-LIFT WORKSHOP

PETROBRAS - Petróleo Brasileiro S.A.PETROBRAS - Petróleo Brasileiro S.A.

Gas-lift Automation: Pilot ProjectGas-lift Automation: Pilot Project

Edson Henrique Bolonhini

PETROBRAS - UN-RNCE

Galileu Paulo Henke Alves de Oliveira

PETROBRAS - UN-BC

HOUSTON - FEBRUARY, 2002HOUSTON - FEBRUARY, 2002