2. toilets & amenities restoration and 10. high tide … · 2. toilets & amenities 3....

1
11. ART SPACE 5. BONDI STORY ROOM 2. TOILETS & AMENITIES 4. TOURISM INFORMATION 7. FLEXIBLE FOYER AREA 6. ART GALLERY AND FLEXIBLE CULTURAL SPACE 8. THEATRE 9. MUSIC STUDIOS 10. HIGH TIDE ROOM 1. CAMPBELL PARADE ENTRANCE 13. INTERNAL COURTYARDS 3. COMMERCIAL TENANCIES AUGUST 2018 Providing a beer connecon from Campbell Parade for pedestrians is an important aspect of the design. The Gatehouse entrance and structure will be restored to become an inving entry to the Pavilion. The Gatehouse will also serve as a stage area for concerts and performances as it now does. Improved facilies will be provided servicing beach goers and Pavilion users. The main toilet block will be along the northern wall with dual access from the Pavilion internal courtyard and from the promenade. The amenies will include toilets, showers, change area, family and accessible facilies. Café and commercial tenants of the Pavilion will be focused along the eastern frontage facing the beach. Sufficient space for storage and food preparaon has been included and significantly improved recycling and waste management facilies have been incorporated. A staffed tourism informaon/ welcome centre/box office will be a vital new element in the Pavilion. The design provides three separate spaces for a ‘Bondi Story Room’ which will celebrate the rich history of the Pavilion, Bondi surf and beach social and cultural history, and recognise our Indigenous history. We are commied to ensuring the Pavilion remains a living community and cultural centre. More space will be provided for the art gallery and cultural acvies in a highly visible and funconal area. The main foyer on the ground floor will become a flexible display and funcon area and will welcome and encourage use of the surrounding spaces. The theatre will remain in its current locaon, with seang and staging revamped and improved back of stage facilies. Technology for live streaming of performances and funcons will be a crucial element of the success of this space. The music studios will be renovated in their current locaon. A space for a community radio staon will be created alongside. The High Tide Room will be renovated and new kitchenee, storage and amenies provided. A new art space will be created on the northern wall for art classes, poery, mosaic, design and pracce including a new kiln. The current first floor community space will be renovated and connue to be used for community hire, events and funcons. A restored bar area and new toilet facilies will add to the funconality. The internal courtyards will be level and landscaped with no car parking allowed. The currently grassed northern courtyard will be largely retained and improved. The importance of live music and cinema fesval space is central to the future use of the internal courtyard as well as ensuring visitors, residents, families and community hirers can use and enjoy the space on a day-to-day basis. 1. Campbell Parade Entrance 2. Toilets & Amenities 3. Commercial Tenancies 4. Tourism Information 5. Bondi Story Room 6. Art Gallery and Flexible Cultural Space 7. Flexible Foyer Area 8. Theatre 9. Music Studios 10. High Tide Room 11. Art Space 12. Community Space 13. Internal Courtyards Council’s concept design for the Pavilion is guided by the Bondi Pavilion Conservaon Management Plan (CMP) that was approved by the NSW Heritage Office in August 2018, and the Bondi Beach, Park and Pavilion 10-year Plan of Management. The design process has included extensive consultaon with the Bondi Pavilion Stakeholder Commiee. The CMP highlights two key elements of the Pavilion: the colonnade façade and the role of the Pavilion in Australian beach and surf culture. These two elements are centrepiece in the Pavilion Restoraon & Conservaon Project. Council is proposing to renovate all aspects of the current building and facade while retaining the general overall configuraon. The first floor will remain as a theatre, community space for hire, toilets and foyer bar area. The beach front cafe and commercial space will be reconfigured adding a tourism centre and ‘Bondi Story Room’. The ground floor community gallery space, music studios and ‘High Tide Room’ will all be refurbished. A new addion to the internal area of the northern wall is proposed to be built to accommodate an amenies area, art space and waste management facility. The detailed layout designs for the ground and first floor are online. Please head to haveyoursaywaverley.com.au/bondipavilion RESTORATION AND CONSERVATION PROJECT BONDI PAVILION 12. COMMUNITY SPACE

Upload: others

Post on 27-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2. TOILETS & AMENITIES RESTORATION AND 10. HIGH TIDE … · 2. Toilets & Amenities 3. Commercial Tenancies 4. Tourism Information 5. Bondi Story Room 6. Art Gallery and Flexible Cultural

11. ART SPACE

5. BONDI STORY ROOM

2. TOILETS & AMENITIES

4. TOURISM INFORMATION

7. FLEXIBLE FOYER AREA

6. ART GALLERY AND FLEXIBLE CULTURAL SPACE

8. THEATRE9. MUSIC STUDIOS

10. HIGH TIDE ROOM

1. CAMPBELL PARADE ENTRANCE 13. INTERNAL COURTYARDS

3. COMMERCIAL TENANCIES

AUGUST 2018

Providing a better connection from Campbell Parade for pedestrians is an important aspect of the design. The Gatehouse entrance and structure will be restored to become an inviting entry to the Pavilion. The Gatehouse will also serve as a stage area for concerts and performances as it now does.

Improved facilities will be provided servicing beach goers and Pavilion users. The main toilet block will be along the northern wall with dual access from the Pavilion internal courtyard and from the promenade. The amenities will include toilets, showers, change area, family and accessible facilities.

Café and commercial tenants of the Pavilion will be focused along the eastern frontage facing the beach. Sufficient space for storage and food preparation has been included and significantly improved recycling and waste management facilities have been incorporated.

A staffed tourism information/welcome centre/box office will be a vital new element in the Pavilion.

The design provides three separate spaces for a ‘Bondi Story Room’ which will celebrate the rich history of the Pavilion, Bondi surf and beach social and cultural history, and recognise our Indigenous history.

We are committed to ensuring the Pavilion remains a living community and cultural centre. More space will be provided for the art gallery and cultural activities in a highly visible and functional area.

The main foyer on the ground floor will become a flexible display and function area and will welcome and encourage use of the surrounding spaces.

The theatre will remain in its current location, with seating and staging revamped and improved back of stage facilities. Technology for live streaming of performances and functions will be a crucial element of the success of this space.

The music studios will be renovated in their current location. A space for a community radio station will be created alongside.

The High Tide Room will be renovated and new kitchenette, storage and amenities provided.

A new art space will be created on the northern wall for art classes, pottery, mosaic, design and practice including a new kiln.

The current first floor community space will be renovated and continue to be used for community hire, events and functions. A restored bar area and new toilet facilities will add to the functionality.

The internal courtyards will be level and landscaped with no car parking allowed. The currently grassed northern courtyard will be largely retained and improved. The importance of live music and cinema festival space is central to the future use of the internal courtyard as well as ensuring visitors, residents, families and community hirers can use and enjoy the space on a day-to-day basis.

1. Campbell Parade Entrance

2. Toilets & Amenities

3. Commercial Tenancies

4. Tourism Information

5. Bondi Story Room

6. Art Gallery and Flexible Cultural Space

7. Flexible Foyer Area

8. Theatre

9. Music Studios

10. High Tide Room

11. Art Space

12. Community Space

13. Internal Courtyards

Council’s concept design for the Pavilion is guided by the Bondi Pavilion Conservation Management Plan (CMP) that was approved by the NSW Heritage Office in August 2018, and the Bondi Beach, Park and Pavilion 10-year Plan of Management. The design process has included extensive consultation with the Bondi Pavilion Stakeholder Committee.

The CMP highlights two key elements of the Pavilion: the colonnade façade and the role of the Pavilion in Australian beach and surf culture. These two elements are centrepiece in the Pavilion Restoration & Conservation Project.

Council is proposing to renovate all aspects of the current building and facade while retaining the general overall configuration. The first floor will remain as a theatre, community space for hire, toilets and foyer bar area. The beach front cafe and commercial space will be reconfigured adding a tourism centre and ‘Bondi Story Room’. The ground floor community gallery space, music studios and ‘High Tide Room’ will all be refurbished. A new addition to the internal area of the northern wall is proposed to be built to accommodate an amenities area, art space and waste management facility. The detailed layout designs for the ground and first floor are online. Please head to haveyoursaywaverley.com.au/bondipavilion

RESTORATION AND CONSERVATION PROJECT

BONDI PAVILION

12. COMMUNITY SPACE