2. lean concrete
DESCRIPTION
Site Work FormTRANSCRIPT
![Page 1: 2. Lean Concrete](https://reader036.vdocuments.mx/reader036/viewer/2022082411/5695d0801a28ab9b0292b391/html5/thumbnails/1.jpg)
GOLENGOL HYDROPOWER PROJECT (LOT-4) PACKAGE-1
Procurement / Design, Supply, Erection, Stringing, Testing and Commission of 113Km, 132Kv Double Circuit Transmission Line & Chitral Grid Station
CLIENT:WAPDA CONTRACTOR:NETRACON NEIE/HOLLEY CONSULTANT:GGHPC JVLean Concrete
Date: ____________________ Grid Station: ___________________________Drawing No.: _______________________________________________________________________________
DescriptionTransformer Bay
DS (3 No.) CT (3 No.) CB (1 No.) SA (3 No.) 10/13 MVA Transf. (1 No.)
Lean Concrete
Length (mm)
Width (mm)
Depth/Height (mm)
Volume (Cum)
DescriptionTimergara Bay (Line Bay - OUT) Date 20.10.2015
LT (2 No.) DS (Line) (3 No.) CB (1 No.) CT (3 No.) DS (Bus) (3 No.)
Lean Concrete
Length (mm) 0
Width (mm)
Depth/Height (mm)
Volume (Cum)
DescriptionGolengol Bay (Line Bay - IN)
LT (2 No.) DS (Line) (3 No.) CB (1 No.) CT (3 No.) DS (Bus) (3 No.)
Lean Concrete
Length (mm)
Width (mm)
Depth/Height (mm)
Volume (Cum)
DescriptionPT Bay
Earth Mast 11 Kv StructureDS (3 No.) PT (3 No.)
Lean Concrete
Length (mm)
Width (mm)Depth/
Height (mm)Volume (Cum)
DescriptionGantry
Gantry-1 Gantry-2 Gantry-3 Gantry-4 Gantry-5 Gantry-6
Lean Concrete
Length (Mtr)
Width (Mtr)Depth/
Height (Mtr)Volume (Cum)
Contractor’s Representative: Consultant’s Representative:
Name: __________________________ Name: _________________________
Designation: __________________________ Designation: _________________________
Signature: __________________________ Signature: _________________________
Date: __________________________ Date: _________________________