    OPERATOR: DATE / TIME OF INSPECTION: LEASE NAME AND NUMBER:

    Company Name Sunday, January 01, 2012 Lease Name

    8:00 AM

    DRILLING CONTRACTOR / RIG #: STATE / COUNTY INSPECTED BY:

    OIL AND GAS DRILLING RIG

    INSPECTION FORM

    ,

    DRILLING FOREMAN: TOOL PUSHER: DRILLER

    Drilling Foreman Tool Pusher Name Driller Name

    Compliant - Condition meets compliance Total Deficiencies: 27 out of 363

    Non-Complaint - Condition does not meet compliance

    Yes - Condition meets compliance

    No - Condition does not meet compliance

    N/A- Not Applicable

    StandardApplicable-OSHA, API, ANSI, RAPPS, IADC or other government or industry recognized standard.

    (RAGAGEP) Recognized And Generally Accepted Good Engineering Practice per "OSHA"

  • 8/13/2019 2. Final Inspection Report With Codes Example

    2/23

    No. Condition Rating Standard Comments

    I. DRILL SITE/LOCATION1 Authorized Personnel Sign posted at

    entrance to site identifying requirements

    for hard hat, safety glasses, safety toe

    footwear.

    Non

    Compliant

    1910.145(c)(2)(i), RP54 7.1.2-3 No signs at entrance.

    2 No Smoking Areas Designated & Posted. Non

    Compliant

    RP54 7.1.2-3 1910.145(c)(2)(i) Need signs for designated areas.

    3 No Parking within 100 ft of the rig.Compliant

    RP54 6.1.15 No one parked within 100 feet with the exception of the BOP

    testing equipment.

    4 Are H2S controls in place where applicable

    including; warning signs, H2S monitors,

    SCBA(s)/escape air, wind socks and H2S

    certification training?

    N/A

    1910.145(c)(2)(i), 1910.1000(e), 1910.1000(e),

    1910.1200(f)(5-6), RP54 7.1.2-3

    5 Escape & Guy wires flagged with visible

    material.

    Non

    Compliant

    RP4G 14.5.f No flagging and no tie wire on shackle. Min 3 clamps with 3 inch

    spacing

    5.1 Capacity of guywire anchors verified RP4G 14.1-4 No verification or certification tag found.

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    Base Beam Anchor Screw-type Anchor

    Permanent (Cement) Anchor Other____________ Verification

    Method:____________________________

    No

    6 Outhouse/restroom facility provided. Compliant 1910.141(c)(1)(i)

    7 Hard hats & Safety glasses available for

    visitors at Tool Pusher/Drilling Foreman's

    office?

    Yes

    1910.132(a)

    8 All temporary housing/offices must be

    securely positioned and properly grounded. Compliant

    RP54 6.1.16

    9 Housekeeping, Is the area clean and free of

    debris and tripping hazards?Yes

    1910.22(a)(1), RP54 6.5.1

    10 Distance from overhead power lines GT 10

    ft.N/A

    RP54 10.1.1

    11 Muster area designated and posted? Non

    Compliant

    1910.38(c)(4) Required signs are not available for area.

    12 Sign posted directing visitors to report to

    the Drilling Foreman / Toolpusher upon

    entry, visitors signed in and out?

    NonCompliant

    1910.145(c)(3) No signs posted for sign in & out.

    Confidential

    Page 2

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    3/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    II. TRAINING, PPE & GENERAL SAFETY1 First Aid Training provided, minimum of 2

    certified per location.Compliant

    1910.151(b), RP54 4.3.1

    2 H2S Training provided, if applicable Compliant RP55 5.1-8

    3 Face shield provided for removing tong dies

    with proper toolYes

    1910.133

    4 Any prior incidents, near miss,

    observations, etc. if any, are discussed

    during safety meeting

    Yes

    RP54 6.1.7

    5 No smoking rules observed Compliant RP54 7.1.3

    6 Emergency Phone numbers posted Non

    Compliant

    RP54 4.2.1, RP55 4.6 Not in Dog House. Need to place in dog house area. Place inside

    board area on picture.

    7 Do Employees know were designated

    smoking areas are located?Yes

    RP54 8.3.2, 1910.145(c)(2)(i)

    8 Do employees know were SPCC plan is

    located?Yes

    Best Practice Tool pusher house

    9 Are full body harness and lanyard

    inspections being conducted monthly anddocumented?

    Non

    Compliant

    1910.66 Monthly inspection must be done on lanyard and harness. Systems

    are in good visual shape, no paperwork for monthly inspectionskept.

    10 SRL's being inspected monthly and copies

    being obtained at location?Yes

    ANSI Z 3591

    11 Rig inspections being performedYes

    1910.212; 212(a)(2). 212(a) (3)(ii) HSE inspection being done by HSE department and kept at office.

    12 Pre-spud, periodic, HSE, etc.? Yes Best Practice

    13 All employees familiar with LOTO

    procedures and policies?Yes

    29CFR 1910.147

    14 Safe work permits being used and properemployees understand how to complete this

    form?

    NoBest Practice Needs to be performed. No forms being done.

    15 Atmospheric tester available? Yes 1910.146 (B)

    16 Near Miss program being utilized on this

    location?Yes

    29 C.F.R. 1904.35(B)(1)

    17 Does rig crew know where to dispose of

    hazardous waste and are all containers

    labeled? (used oil, diapers, etc)

    Yes

    1910.12 DOT drums are not marked and one drum needs to be emptied and

    properly disposed of by rig company. Personnel are disposing of

    product properly in drums.

    Confidential

    Page 3

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    4/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    18 Does the rig crew know how to perform aBOP Drill? No

    1926.21 Need to have record on location. Need to have (at the minimum) anonline copy that can be pulled during inspections.

    19 Are the rig crew training records on site

    and current?Yes

    RP54 4.3.1

    20 Are fuel transfer sheets being performed?Yes

    Best Practice

    21 Is the escape buggy getting inspected

    monthly?No

    RP54 6.10.1 When rigged up. Documented needs to be done monthly. Currently

    rigged up with improper clamping.

    22 Is the Confined Space Entry equipment in

    good working order?N/A

    29 CFR 1910.146(d)(1)

    23 Is the Gas Detector in working order

    (charged) and calibrated?Yes

    Best Practices

    24 How is the general safety culture on this

    location?Yes

    Opinionated. Think if you would want to

    work on this rig?

    25 Safety meetings conducted and properly RP54 6.1.7

    ocumen e : pre- our, pre- o s,

    weekly?

    es

    26 Accidents, if any, are discussed during

    safety meetings.Yes

    RP54 6.1.7

    27 Proper clothing worn by crew; no loose

    clothing or jewelry, hard hat, glasses, safety

    shoes, gloves, fall protection other PPE as

    necessar ?

    Yes

    RP54 5.1, RP54 5.2 1-8, 1910.132(a)

    28 Are designated "Smoking Areas"

    established? Are smoking rules observed? No

    RP54 7.1.3 Needs to be established "Smoking Area" with signs

    and insure all are following designated area.

    29 Injuries reported and documented

    immediately.Yes

    RP54 4.1.1-2

    30 First Aid Kit/Bloodborne Pathogen Kit

    available on site.Yes

    RP54 4.3.2, 1910.151(b), At pusher house. Tool pusher knows the incidents when first aid

    kept in his office. One on rig floor also.

    31 Are all containers properly labeled per

    HAZCOM?Compliant

    1910.1200(e)(1-5)

    32 Are MSDS available and accessible at all

    times?Compliant

    1910.1200 (g) (1) MSDS sheet need to be in shaker area if doors are available. No

    doors on shaker system. Compliant results good.

    33 Does contractor have a Hazard RecognitionProgram in use?

    YesIADC

    Confidential

    Page 4

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    5/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    34 BOP training provided for Pushers andDrillers? Is BOP training documented at

    the rig?

    YesRP54 6.4.4

    35 Written Contractor Safety Program in

    place?Yes

    RP54 6.1.7

    36 Hearing protection required and provided. Compliant RP54 5.3.1-2, 1910.95(a)

    37 Does the Operator / Drilling Contractor

    have a New Hire Training Program in

    place? Explain-Type?

    Yes

    IADC and RP54 6.1.7b. Yellow for new employee. Green, grey, black, and white for other

    employee. See Justiss SOP.

    38 Are all injuries and illnesses reported

    immediately to a supervisor? Are written

    reports prepared as soon as practical and is

    every incident involving an injury being

    investigated and are steps being taken to

    revent recurrence?

    Yes

    RP54 4.1.1-3

    39 Is there an Emergency Response Plan 1910.38 (b)

    ava a e as personne een ra ne on

    the plan?

    es

    IIIA. MUD PUMP AREA1 Is all rotating equipment properly guarded;

    drive belts, shafts, pony rods, etc.?Non

    Compliant

    RP54 6.8.2-3, 1910.219(e)(1-6),

    1910.219(c)(2)(i)

    Need to use guards on hole open area. Reposition meters if

    possible.

    2 Head and valve covers fully bolted. Compliant

    3 Shear pin pop-off valve present and

    covered.Compliant

    1910.169(b)(3)(i-iv)

    4 Ends of relief lines secured with adequate

    safety cable.Compliant

    IADC

    5 Ends of mud vibrator hose snubbed with

    adequate safety cable.Compliant

    IADC

    6 Housekeeping - Is area clean and free of

    debris and tripping hazards?Yes

    RP54 6.5.1, 1910.22(a)(1)

    7 Adequate lighting provided. Compliant RP54 9.14.7

    IIIB. MUD MIXING AREA1 Bagged material properly stacked and

    protected from the weather?

    Compliant1910.176(b)

    Confidential

    Page 5

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    6/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    2 Gloves, Aprons, Boots, or other PPE, asappropriate, available and in good

    condition?

    Compliant RP54 5.2.4, RP54 6.13.2, 1910.132(a),

    1910.133(a), 1910.134(a)(2), 1910.138(a)(1)

    3 Employees using all required PPE? N/A 1910.132(a), 1910.133(a), 1910.138(a)(1)

    4 All chemicals are properly labeled

    including PPE Required warning signs

    (Grouped or individual signs).

    Compliant

    1910.145(c)(2)(i), 1910.145(c)(3)

    5 Personal protective equipment properly

    maintained and in a clean & sanitary

    condition.

    Compliant

    RP54 6.13.2, 1910.132(a), 1910.134(h)(2)(i)

    6 Eye wash station and emergency shower;

    unobstructed and in close proximity,

    properly designed in good working order

    and lumed with a clean water su l ?

    Compliant

    1910.151(c) , Z358.1 5.4.2, RP54 4.4.1

    7 Adequate ventilation in mud mixing area? Compliant IADC

    8 Elevated loading door opening protected? Compliant 1910.23(c)(1)

    equa e g ng prov e omp an . .

    10 Housekeeping - Is area clean and free of

    debris and tripping hazards? Compliant1910.22(a)(1)

    11 Is the personnel required to mix or handle

    mud chemicals being properly trained

    regarding safe handling and use. Are they

    aware of the potential hazards and PPE

    measures required. Are MSDS's available

    to personnel prior to and during chemical

    mixin .

    Yes

    1910.1200 (g) (1)

    IIIC. MUD TANKS & PITS1 Adequate stairs with handrails properly

    secured?Compliant

    1910.24(h), 1910.23(d)(1)

    2 Adequate walkways and guardrails. Compliant 1910.23(c)(1)

    3 Guardrails installed on all raised platforms,

    walkways, etc above 48?Compliant

    1910.23(c)(1), 1910.23(d)(1)

    4 Walkways free from obstruction and/or

    damage?Compliant

    1910.23(c)(1)

    5 Guardrails provided on crossovers? Compliant 1910.23(c)(1)

    6 PPE Required warning signs erected

    (grouped or individual signs).

    Non

    Compliant

    1910.145(c)(2)(i), 1910.145(c)(3) Need to be signs on PPE

    Confidential

    Page 6

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    7/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    7 Chemical hazard warning signs erected? NonCompliant

    1910.145(c)(2)(i) Needs signs on chemical hazards

    8 Shale shakers, agitator shafts, and all other

    rotating equipment properly guarded? Compliant

    1910.23(c)(3)

    9 Explosion proof equipment, fixtures and

    wiring used. Class 1 Div 1/2. Data plates on

    equipment legible?

    Compliant

    1910.307(b)(1-3) & subsections, 1910.307(c),

    RP500 5.3, RP500 10.1-16

    10 Adequate lighting provided? Compliant RP54 9.14.7

    11 Employees using all required PPE? N/A 1910.132(a), 1910.133(a), 1910.138(a)(1)12 Jetting hoses properly secured if applicable

    CompliantRP54 9.11.2

    13 Personal protective equipment properly

    stored?Compliant

    RP54 6.13.2, 1910.132(a), 1910.134(h)(2)(i)

    14 Housekeeping - Is the area clean and free of

    debris and tripping hazards?Compliant

    1910.22(a)(1), RP54 6.5.1

    . , .

    16 Electric wiring in good condition? Compliant 1910.303(b)(1-2), 1910.303(c)

    17 Drive belts and shafts guarded? Compliant 1910.219(e)(1-6, 1910.219(c)(2)(i)

    18 Permitted and non permitted signage is in

    appropriate area'sYes

    IADC

    IV. MATERIAL HANDLING EQUIPMENT1 Material Handling Equipment (fork lift)

    operators trained and certified?Compliant

    1910.178(l)(1-8), B56.6 5.16, B56.6 5.17.1-4

    2 Personnel basket securely attached to

    forks? (If applicable).N/A

    1910.178(m)(12)(i), B56.6 5.15.1(b)

    3 Personnel wearing proper fall protection

    while in basket?Compliant

    B56.6 5.15.1(k)

    4 Backup alarm operational? Non

    Compliant

    B56.1 4.15.1, B56.6 5.13.1-2 No backup alarm on forklift not working. Need fixed.

    5 Fork Lift equipped with seat belts? Compliant B56.1 5.3.19

    6 Seat belts in use by operators? Compliant B56.1 5.3.19

    7 Fork Lift inspected prior to use? (daily). Compliant 1910.178(p)(7), B56.6 6.5.1-2 Every tower, insure all paperwork available for inspections.

    V. Electrical Specific Inspection

    1 Are the breakers in the electrical panelproperty labeled?

    Yes 1910.303(f)

    Confidential

    Page 7

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    8/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    2 Are the electrical panels accessible? (Noboxes, etc. stacked in front of them?)

    Yes RP54 6.5.1

    3 Are the electrical lines in good condition?

    (No splices, cuts, black tape: look for things

    OSHA would look for)

    Yes

    1910.303(b)(1-2),1910.305(a)(2)(iii),

    RP54 10.2.3,RP54 9.13.3

    4 Are the electrical lines in good condition?

    (wire no pulled away from the connector,

    strain relief in place, etc.)

    Yes

    1910.303(b)(1-2),1910.305(a)(2)(iii), RP54

    10.2.3, RP54 9.13.3

    5 All power strips in the work area

    (Doghouse, SCR house, etc.) GFIC

    protected?

    No

    RP54 10.2.1, 1910.307(b)(1-2), RP500 5.3,

    RP500 6.1-2

    Vendor power strips need to be reviewed. Two separate power

    strips pointed out to Customer. Surge protector strips only, not

    GFIC strips.

    6 Do all lights have covers and are secure? Yes 1910.307(b)(1-2)

    7 Is the equipment on location properly

    grounded /bonded? (Have RM show you

    how grounding and bonding is tied into all

    mobile equipment.

    Yes

    RP54 9.14.11

    .

    1 Moving parts guarded? Compliant 1910.212(a)(1)2 Generators properly grounded? Non

    Compliant

    RP54 9.14.11 Ground clamp incorrect, hose clamp shown below

    3 Cover panels on electrical control boxes

    installed and closed?Compliant

    1910.305(b)(2), 1910.335(a)(2)(ii)

    4 All electrical controls marked as to their

    function and legible?Compliant

    1910.303(f)

    5 HIGH VOLTAGE warning signs

    erected?Compliant

    1910.145(c)(2)(i), 1910.305(b)(2)(ii)

    6 Insulating mats available at electricalpanels?

    NonCompliant

    1910.335(a)(2)(ii) Not installed

    7 Condition of electrical wiring, no splices or

    visible damage?Compliant

    1910.303(b)(1-2)

    8 Rig wiring properly installed to prevent

    abrasion, vehicular and foot traffic, burns,

    cuts and damage from other sources?

    Compliant

    1910.305(a)(2)(iii), RP54 10.2.3

    9 Unused electrical outlets covered? Compliant 1910.305(b)(1-3) One in electrical room not covered

    10 Air compressors properly guarded? Compliant 1910.212(a)(1)

    11 Air storage tanks equipped with pop-off

    valve?Compliant

    1910.169(b)(3)(i-iv)

    Confidential

    Page 8

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    9/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    12 Lockout/Tagout program utilized?Adequate Lockout/Tagout devices

    available?

    CompliantRP54 6.9.1, RP54 9.14.9

    13 Hearing Protection Required warning

    signs erected?Compliant

    1910.145(c)(2)(i)

    14 Hearing protection available? Non

    Compliant

    1910.95(a) Needs to have box of plugs available. No plugs available in high

    noise area.

    15 Adequate lighting installed?Compliant

    RP54 9.14.7, RP54 9.14.4, 1910.303(h)(3)(ii)

    16 Housekeeping - Is area clean and free ofdebris and tripping hazards?

    CompliantRP54 6.5.1

    17 Wires are note running along the ground Compliant RP54 10.2.3, 1910.305(a)(1)(iii) (G)

    18 All light fixtures properly guarded from

    damage?Compliant

    1910.307(b)(1-2)

    19 Receptacles and plugs in good condition? Compliant 1910.303(b)(1)

    20 Water hose used for washing area kept IADC

    away rom genera or s

    House?

    omp an

    21 Generator skid door props properly

    pinned?Compliant

    IADC

    VII. FIRE PROTECTION1 A minimum of 4 No.20 fire extinguishers

    with a Class BC rating available at the drill

    site. This a minimum requirement and

    operations may dictate use of more or

    lar er sized e ui ment.

    Compliant

    RP54 7.2.4, RP54 7.2.5

    2 Fire extinguishers fully charged, currentinspection, proper gauges, properly located

    at their assigned locations?

    Non

    Compliant

    1910.157(c)(4) Tags missing inspection tags. Accumulator system for BOPsystem. One located in incorrect area as opposed to sign

    pointing to fire Extinguisher.

    3 Are crew members familiarized with the

    location of fire control equipment and

    trained in the use of such equipment?

    Yes

    1910.157(g)(1), 1910.157(g)(2)

    4 Portable containers for storing flammable

    liquids should be UL or FM approved or

    equivalent.

    Compliant

    1910.106(d)(2), RP54 8.1.1

    Confidential

    Page 9

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    10/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    5 Any area that has flammable containersstored should be posted with a sign, "NO

    SMOKING OR OPEN FLAME", or

    equivalent.

    Compliant

    RP54 7.1.2

    6 Spark arrestors or equivalent equipment

    shall be provided on all internal combustion

    engine exhausts located within 100' of the

    wellbore.

    N/A

    RP54 9.15.3 Not within 100 ft of well area

    VIII. FUEL & OTHER FLAMMABLE LIQUID STORAGE TANKS1 Fuel storage tanks properly located Compliant RP54 8.3.5, 1910.106(b)

    2 All storage valve connections identified as

    to their functionCompliant

    1910.106(b)

    3 Discharge nozzles, hoses, valves in good

    conditionCompliant

    1910.106(b)

    4 Piping and fuel lines in good condition Compliant 1910.106(b)

    5 Stationary ladders on storage tanks in good 1910.27(f)

    condition

    6 Adequate lighting provided Compliant RP54 9.14.77 "Flammable" warning signs erected on all

    sidesCompliant

    1910.145(2)(i), 1910.1200(f)(5-6), RP54

    7.1.2-6, RP54 8.4.1d

    8 "No Smoking" signs erected on all sidesCompliant

    RP54 7.1.2-6, 1910.145(c)(2)(i), RP54 8.4.1d

    9 B/C Class fire extinguisher available and

    identifiedCompliant

    RP54 7.1.2-6, 1910.145(c)(2)(i),

    1910.157(d)(1)

    10 Fuel tanks properly labeled, "NFPA Haz-

    Com", "Off Road Usage", "Flammable",

    "No Smoking"

    Compliant

    RP54 8.4.1d, 1910.1200(f)(4-5)

    11 Flammable warning signs erected on all

    sidesCompliant

    1910.145(2)(2)(i), 1910.1200(f)(5-6), RP54

    7.1.2-6, RP54 8.4.1d

    12 "No Smoking" signs erected on all sidesCompliant

    RP54 7.1.2-6, 1910.145(2)(i), RP54 8.4.1d

    13 Vapor release vents elevated & away from

    ignition sourcesCompliant

    1910.106(b)(2)(iv)(c), 1910.106(b)(2)(v)(g)

    14 B/C Class fire extinguisher available and

    identifiedCompliant

    RP54 8.4.1e, 1910.157(c)(1), 1910.157(d)(1)

    15 Housekeeping - Is area clean and free of

    debris and tripping hazardsCompliant

    RP54 6.5.1, 1910.22(a)(1)

    Confidential

    Page 10

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    11/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    16 All open valves/piping capped, bullplugged, etc.

    Compliant RP54 8.3.3

    IX. PIPE RACK AREA1 Ends of pipe racks and separate layers of

    pipe properly chocked?N/A

    1910.176(b), RP54 9.12.3 Pipe in use at this time

    2 Spacers used to separate layers of pipe N/A RP54 9.12.5

    3 Pipe racks are level and stable N/A IADC

    4 Pipe rack catwalk in good condition and at

    the same height?N/A

    IADC

    5 V-door slide in good condition including

    stops on V-door or catwalk?N/A

    IADC

    6 Derrick stand and ladder in good conditionN/A

    1910.27

    7 Adequate lighting provided N/A RP54 9.14.7

    8 Housekeeping - Is area clean and free of

    debris and tripping hazardsN/A

    1910.176(c), RP54 6.5.1

    Confidential

    Page 11

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    12/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    9 Drilling line from spool elevated off ground Compliant IADC Need to put guard on skid system. Was previously installed butremoved.

    10 Safety Warnings in place for Hydraulic

    Pipe Rack and verification of HPR

    inspection?

    N/A

    RAGAGEP Standard system with warnings available

    X. BLOW-OUT PREVENTERS1 BOP properly installed, 3rd party tested,

    and properly documented?Compliant

    RP54 6.4.1, RP54 6.4.41, RP 54 6.4.13

    2 All lines, valves, check valves and flow

    fittings should have a working pressure at

    least equal to the rated pressure of the ram

    BOP's in use. This equipment will be tested

    during the initial test of the BOP rams.

    Compliant

    RP53 10.2.1

    3 Wheels and stems in place, if automatic

    device is not available?Compliant

    IADC

    4 BOP stack properly stabilized? Compliant RP54 6.4.10

    5 All hydraulic lines connected ?Compliant

    RP54 6.4.186 All unused hydraulic lines capped and

    secured?N/A

    RP54 6.4.18, RP53 10.2.1i

    7 Accumulator bottles labeled with contents,

    and other appropriate warning signs?Compliant

    1910.1200(f)(5-6)

    8 Accumulator valves in appropriate

    position, open or closed (never neutral),

    properly identified both purpose and

    position?

    Compliant

    RP54 7.2.2

    9 Gauges suitable for operating pressure anddrilling fluid service should be installed so

    that drill pipe and annulus pressures may

    be accurately monitored and readily

    observed at the station where well control

    operations are to be conducted.

    Compliant

    RP53 8.2i

    10 Choke manifold and line secured and

    accessible?Compliant

    RP54 6.4.18

    11 Blooey line with pilot installed if

    applicable?Compliant

    IADC

    Confidential

    Page 12

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    13/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    12 Adequate lighting provided? Compliant RP54 9.14.713 Warning signs erected (Flammable,

    Hard Hat, H2S, Eye Protection,

    Confined Space, Authorized Personnel)

    Non

    Compliant

    1910.145(c)(2)(i), RP54 7.1.2-3 Signs needs to be displayed . Fire extinguisher not with proper tag.

    Black tape on electrical cord and plug need to be replaced.

    14 Proper drainage provided and general

    housekeeping of koomey and cellar area?Compliant

    RP54 6.5.2

    15 Hydraulic lines protected? Compliant RP53 12.5.2 Armor core on lines.

    16 BOP spare parts (for the service intended)

    are carefully stored, maintained andreadily available. Including a complete set

    of ram rubbers, complete set of bonnet or

    door seals, plastic packing for BOP

    secondary seals. Ring gaskets to fit end

    connections. A spare annular BOP packing

    element and a complete set of seals. A

    Compliant

    RP53 6.4

    flexible choke or kill line if in use. "Ask

    Tool usher"17 Metal clad lines secured with adequate

    safety cables?Compliant

    "General Duty Clause" OSHA

    All additional questions (1-51) in

    Section 9 will be used at the discretion

    of the DCI customer and their

    individual needs.

    1 Floor mounted and remote accumulator

    controls available?Yes

    RAGAGEP

    2 Remote unit used to actuate pipe rams oncea week?

    Yes RAGAGEP

    3 Off floor controls are effective if floor unit

    is destroyed.Yes

    RAGAGEP

    4 Alternate power source exists for

    accumulator : Type_________________Yes

    RAGAGEP Electric, air, and nitrogen bottle accumulator exists

    5 Light on rig floor in plain view of driller? Yes RAGAGEP

    6 Operating ranges of accumulator pumps

    regulated from 2700 PSI to 3000 PSI?Yes

    RAGAGEP

    Confidential

    Page 13

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    14/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    7 Accumulator pump charging time less than15 minutes: Ensure 1000 PSI to 3000 PSI

    rise?

    YesRAGAGEP

    8 Accumulator fluid and strainers in good

    condition: Inspected_________________Yes

    RAGAGEP Tank in front of system that is in good condition. Attached to

    skid.

    9 Accumulator bottle isolation valve open? Yes RAGAGEP

    10 Accumulator pre-charge pressure _______

    Last inspected_________Yes

    RAGAGEP 1500 psi per charge

    11 Accumulator _________ Annular ________

    Manifold ________ (Pressures) Yes

    RAGAGEP

    12 Accumulator air pressure at least 75 PSI Yes RAGAGEP

    13 Drawings available showing BOP stack,

    lines, valves and manifold used?Yes

    RAGAGEP

    14 Assembly rating greater than or equal to

    casing burst pressure or formation Yes

    RAGAGEP

    rea own pressure w c ever s ess .

    15 WECO 1502 hammer unions used on

    surface casing valves? YesRAGAGEP

    16 Necessary manipulations of BOP stack can

    be made without going under rig floor? Yes

    RAGAGEP

    17 Well can be closed in quickly while

    observing and controlling casing pressure? Yes

    RAGAGEP

    18 Hydraulic or Manual locks on preventers:

    If manual, are hand wheels and shaftsattached?

    N/A

    RAGAGEP

    19 Clearance for tool joints between pipe rams

    (pipe can be stripped through rams).Yes

    RAGAGEP

    20 Is it possible to pump into well with blind

    rams closed?Yes

    RAGAGEP

    21 Blind rams equipped with cover but no

    lock?Yes

    RAGAGEP

    22 Choke flow line equipped with master

    valves on each choke manifold wing?Yes

    RAGAGEP

    23 Is the fill up line separate from the kill line?Yes

    RAGAGEP

    Confidential

    Page 14

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    15/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    24 Choke line straight, free of bends? Yes RAGAGEP25 Hydraulic choke equipped with emergency

    back- up. Type: ____________________Yes

    RAGAGEP

    26 Choke manifold pressure rating

    __________ Is it correct for this

    application?

    Yes

    RAGAGEP 10000 psi front end, 5000 psi on back side

    27 Upper Kelly valve or Top Drive Unit with

    manual & hydraulic valves?Yes

    RAGAGEP

    28 Is drill pipe float used? Yes RAGAGEP

    29 Are crossover subs available for IBOP &TIW?

    Yes RAGAGEP Canrig Top Drive, subs ready to go.

    30 Pit volume totalizer & recorder mounted in

    plain view of driller?Yes

    RAGAGEP

    31 Flow indicator available, if flow line can't

    be seen from rig floor?Yes

    RAGAGEP

    32 Pump stroke counter and/or trip tank forYes

    RAGAGEP

    use n cr ca o e ng c ec s

    33 Sufficient way to monitor casing wear? Yes RAGAGEP

    34 Maximum allowable surface pressures

    upon closing in well specified and posted?Yes

    RAGAGEP

    35 Surface casing held in tension until cement

    set to avoid misalignment?Yes

    RAGAGEP

    36 "on bottom" drills held at intervals, timed,

    & recorded on IADC?Yes

    RAGAGEP

    37 "while tripping" drills held at intervals,

    timed & recorded on IADC?Yes

    RAGAGEP

    38 "drill collar" drills held at intervals, timed& recorded on IADC?Yes RAGAGEP

    39 "out of hole" drills held at intervals, timed

    & recorded on IADC?Yes

    RAGAGEP

    40 Slow pump rates recorded hourly & after

    mud density changes?Yes

    RAGAGEP

    41 Pipe slugged with sufficient time allowed

    for fluid level to balance before TOOH?Yes

    RAGAGEP

    42 Flow checks made prior to TOOH, at the

    casing shoe & at collars?Yes

    RAGAGEP

    Confidential

    Page 15

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    16/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    43 During trips are ram-type BOP's operatedand choke and kill valves flushed? Yes

    RAGAGEP

    44 Is hole filled continuously from trip tank

    (preferred) is there a specified number of

    stands:

    Yes

    RAGAGEP

    45 Rig equipped with trip tank? Yes RAGAGEP

    46 Written trip records kept by crew? Yes RAGAGEP

    47 Crew instructed in procedures during trip

    if swabbing or lost circulation occurs?Yes

    RAGAGEP

    48 Are approved kill sheets used & updated

    daily?Yes

    RAGAGEP

    49 Leakoff pressure recalculated & posted

    after every mud density change?Yes

    RAGAGEP

    50 Maximum allowable mud density posted? Yes RAGAGEP

    51 DC, DP, hole & mud pump capacity figuresYes

    RAGAGEP

    ava a e

    XI. DERRICK & SUBSTRUCTURE1 Derrick/A-Frame assembly and

    substructure pins with keepers in place?Compliant

    RP54 9.2.8

    2 Derrick guyed, if applicable. N/A RP4G 13.1

    3 Condition of guy lines. N/A RP4G 13.1.1

    4 Clamps properly installed. N/A RP9B 3.7.4

    5 Does the derrick or mast have a name plate

    permanently attached to the derrick, that

    includes the manufacturer, model number

    and serial number, hookload capacity andwhether guying is applicable and if so the

    recommended u in attern.

    Compliant

    RP54 9.2.2

    6 Damage and/or corrosion visible in derrick

    and/or substructure? (waste metal). N/A

    RP54 9.16.1

    7 Condition of derrick ladder? Yes RP54 9.3.1-2

    8 Climb assist device available, in good

    condition, adequate number of clamps?Yes

    1910.27(d)(5)

    9 Boatswains chair available for hoisting

    personnel and utilized when necessary?Yes

    IADC

    Confidential

    Page 16

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    17/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    10 Full body harness with lanyard availableand in good condition?

    Yes 1910.132(c), RP54 5.5.1

    11 Fall protection devices in use: Derrick

    Board, Crown Section, Backside of derrick

    (stabber), Substructure?

    Compliant

    1910.132(c), RP54 5.5.1

    12 Fall Protection Required warning signs

    erected?Compliant

    1910.145(c)(2)(i)

    13 Verify that contractor has a Cat. 1,2,3,4

    process in place to identify structural

    issues. The remaining questions aredesigned to identify any noticeable items

    from the floor or round.

    Compliant

    RAGAGEP

    14 Derrick/Tubing boards in good condition? Compliant RP54 9.2.17

    15 Guardrails installed on derrick board? Compliant RP54 9.3.17, RP54 5.5.1

    16 Pipe fingers in good condition, safety cables

    attached?Compliant

    RP54 9.2.17

    rown guar ra s ns a e omp an . . , . c

    18 Crown sheave guards in place? Compliant RP54 9.7.5

    19 Safety retainers in use on hinge pins? Compliant RP54 9.2.8

    20 Derrick hydraulic system free of leaks? (if

    applicable).N/A

    IADC

    21 Dead line properly anchored? Compliant RP54 9.6.5, RP9B 3.3.9

    22 Booms and boom lines in good condition? Compliant IADC

    23 Adequate lighting provided? Compliant RP54 9.14.7

    24 Derrick free of loose and unnecessary

    objects.Compliant

    RP54 8.2.5

    25 Derrick emergency escape line properlyinstalled, Geronimo on line, anchored with

    a clear path?

    Compliant RP54 6.10.1

    26 Tubulars, Drill Pipe, etc racked or hung in

    derrick are secured to prevent them from

    falling?

    Compliant

    RP54 6.12.1

    27 Mud standpipe secured, mudhose snubbed

    at both ends?Compliant

    IADC

    28 Rotary beams and all braces are in good

    condition?

    CompliantIADC

    XII. DRILL FLOOR AREA

    Confidential

    Page 17

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    18/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    1 OSHA poster posted in Dog House? No 1903.2(a)(1) Need fire, ambulance, closes hospital2 Emergency phone numbers posted in Dog

    House?N/A

    RP54 4.2.1 RP55 4.6

    3 Safety (stabbing) valve and handle with

    cross over sub if necessary properly located

    on floor?

    Yes

    RP54 6.4.2

    4 Remote BOP hydraulic controls accessible?Compliant

    IADC

    5 Rotary floor in good condition? Compliant IADC

    6 Rotary chain drive guarded? Compliant 1910.212(a)(1-3)7 All unused floor holes covered with a secure

    cover?Compliant

    1910.23(a)(8-9), RP54 9.1.1, RP54 9.3.20,

    RP54 9.3.21

    8 "Driller at or near controls unless the

    drawworks brake has been tied down or

    securing it with a catch lock, unless the

    drawworks is equipped with an automatic

    Yes

    RP54 9.4.4

    r er .

    9 Drillers controls properly

    labeled/identified? Compliant

    IADC

    10 Pipe slips & Dies in good condition? Compliant RP54 9.9.2

    11 Racking floor area in good condition? Compliant IADC

    12 V-door gate or net provided and in place? Non

    Compliant

    1910.23(c)(1) Gate or Net needed

    13 Air hoist lines properly guarded in good

    condition, line properly laid with functional

    line guide and brake?

    Compliant

    RP9B 3.2.7 1910.212(a)(1) RP9B 3.3.3

    14 Cathead friction surface in good condition?N/A

    RP54 9.5.1

    15 Cathead line divider/grip in good

    condition?N/A

    IADC

    16 Catline not worn or kinked? N/A RP54 9.5.10

    17 Kelly cock wrench and safety valve

    accessible?N/A

    IADC

    18 Drilling Line in good condition? Compliant RP9B, 3.3.3, RP9B, 3.3.10

    19 Tail rope being used, rigged up correctly

    and in good shape?

    CompliantIADC

    20 Drawworks properly guarded? Compliant RP54 9.4.2, RP54 9.6.4

    Confidential

    Page 18

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    19/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    21 Drill line slip/cut recorded on ton milebook?

    Compliant RAGAGEP

    22 Proper lay of drill line and sufficient wraps

    left on drum with blocks in down position?

    (minimum 10 wraps).

    Compliant

    RP9B 3.3.10(b)

    23 When were the Hydraulic or Hydromatic

    brakes last serviced and what is the

    contractor's maintenance schedule?

    Safe

    RAGAGEP

    24 Dog knot secure? Compliant IADC

    25 Adequate lighting provided? Compliant RP54 9.14.726 General housekeeping. Compliant RP54 6.5.1, 1910.22(a)(1)

    27 Minimum 2 exits from drill floor doghouse?Yes

    1910.36(b)(1)

    28 Drill floor doghouse doors installed

    properly?Yes

    1910.36(e)(2)

    29 Drinking water available? Compliant 1926.51

    a on rea y ava a e on

    Compliant

    . . ee n e og ouse

    31 Life basket/Fire Blanket available Compliant I.S. Life Basket in Dog House, No fire blanket on rig32 Factory ends of snub line? Compliant I.S.

    33 First aid kit available in doghouse? Yes 1910.151(b)

    34 Non skid material used around rotary? Compliant RP54 9.3.11

    35 Guardrails installed along open edges of

    drill floor?Compliant

    RP54 9.3.17, 1910.23(c)(1)

    36 Tong body and jaws, keepers, counter

    weights, snub lines and jerk lines all in good

    condition?

    Compliant

    IADC

    37 Tong safety handles installed? Compliant IADC

    38 Crown-o-Matic device operational, logged

    on IADC?

    Non

    Compliant

    IADC Needs to be on system

    39 Safety signage posted? Yes IADC

    40 All overhead lights have safety cables? Compliant IADC

    Top Drive

    1 TD: Guard Bolts. Compliant RAGAGEP

    2 TD: Blower Motor Mounts. Compliant RAGAGEP

    3 TD: Oil Cooler Bolts. Compliant RAGAGEP4 TD: Housing To Frame Bolts. Compliant RAGAGEP

    5 TD: Lube Pump Assembly Mounts. Compliant RAGAGEP

    Confidential

    Page 19

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    20/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    6 TD: Guard Deflector.Compliant

    RAGAGEP7 TD: Link Tilt Cylinder Retainer. Compliant RAGAGEP

    8 TD: Link Tilt Mount. Compliant RAGAGEP

    9 TD: Bail Clamp Cylinder Pins. Compliant RAGAGEP

    10 TD: Lower Link Support Pins. Compliant RAGAGEP

    11 TD: Spark Arrestor Screen. Compliant RAGAGEP

    12 TD: Elevator Alarm Targets. Compliant RAGAGEP

    13 TD: BUW Mounts. Compliant RAGAGEP

    14 TD: BUW Positioning Cylinder. Compliant RAGAGEP

    15 TD: BUW Stop Pins (L-shaped pins). Compliant RAGAGEP16 TD: BUW Gripper Cylinder. Compliant RAGAGEP

    17 TD: BUW Slides. Compliant RAGAGEP

    18 TD: BUW Stabbing Guide. Compliant RAGAGEP

    19 TD: Tool Joint Clamp(s) & Bolts. Compliant RAGAGEP

    20 TD: Actuator Valve / Covers. Compliant RAGAGEP

    21 TD: LWCV Pinion Retainer Bolts. Compliant RAGAGEP

    Iron Roughneck

    1 Iron Roughneck (IR): HPU Showing 2200-2500 psi.N/A RAGAGEP

    2 IR: Line Control Port 1900-1950 psi. N/A RAGAGEP

    3 IR: Hydraulic Lines Not Leaking . N/A RAGAGEP

    4 IR: Unit Properly Stored If Not In Use. N/A RAGAGEP

    5 IR: Unit Turned Off When Not In Use. N/A RAGAGEP

    6 IR: Employees Properly Trained . N/A RAGAGEP

    7 IR: Employee Clear Of Unit If Moving. N/A RAGAGEP

    8 IR: Unit Has Clear Path For Operating. N/A RAGAGEP

    9 IR: Operator Controls Located Properly. N/A RAGAGEP10 IR: Preventive Maintenance (Daily) . N/A RAGAGEP

    XIII. HOISTING TOOLS, HOOKS, BAILS, ELEVATORS1 Traveling blocks in good condition? Compliant RP54 9.7.1

    2 Traveling blocks properly guarded? Compliant RP54 9.7.4

    3 Sheave guards in good condition? Compliant IADC

    4 Bales and/or links in good condition? Compliant RP54 9.7.1

    5 Elevators in good condition? Compliant RP54 9.7.1, RP54 9.7.8

    6 Hoisting hook equipped with safety latch or

    equivalent? CompliantRP54 9.7.3

    7 Crown block assembly secured? Compliant RP54 9.7.5

    Confidential

    Page 20

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    21/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    8Suspension cables and lifting chains are

    grade 8 and tagged? NonCompliant RP54 6.11.1 No tags on cable for Spinner. Cotter pin needs to change onoverhead shackle system. See picture on replacement part.

    9 Hoisting line inspected daily? Yes RP54 9.6.1

    XIV. HOTWORK AND CONFINED SPACES

    1 Hot work permitted utilizing customers Hot

    Work Process which meets minimum

    industry standards?

    N/A

    RP54 20.1.1, 1910.252(a)(2)(iv)

    2 Drilling Foreman trained on customers Hot

    Work and Confined Space permitting

    standards?

    N/A

    RAGAGEP

    3 Certified welders utilized? N/A RP54 20.1.4

    4 Appropriate protective attire worn for

    welding and cutting ops.N/A

    RP54 20.1.3, 1910.252(a)(2)(vi)

    5 Helmets with face shields used during

    operations?N/A

    RP54 20.2.1, 1910.252(b)(2)(i)(A-D)

    6 Fire extinguishing equipment available and RP54 20.2.2, RP54 20.2.3,

    fire watch utilized? 1910.252(b)(2)(i)(A-D)

    7 Confined spaces properly labeled?

    N/A

    1910.146(c)(2)

    1910.145(c)(2)(i)

    8 Confined Space Entry Permit issued by

    Drilling Foreman or rig contractor for CS

    entry?

    N/A

    RAGAGEP

    9 Permits are completed properly and filed at

    the job site?

    N/A

    1910.146(d)(1-14)

    1910.146(e)-(l)

    RP54 6.7.4(b)

    RP54 6.7.5(b)

    10 Gas detection devices are available and

    calibrated per manufactures specifications? N/A

    RP54 6.7.4(a)

    1910.146(c)(1)

    XV. ENVIRONMENTAL1 Sediment migrating off location? N/A RAPPS

    2 Gullies or ditches forming along location

    slopes?N/A

    RAPPS

    3 Re-vegetation less than 70%? N/A RAPPS

    4 BMPs not present on location? N/A RAPPS

    Confidential

    Page 21

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    22/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    5 BMPs need maintenance or removal? N/A RAPPS

    6 Reserve pit free of oil and trash? N/A RAGAGEP

    7 Reserve pit liner, good integrity, anchored

    properly?N/A

    RAGAGEP

    8 Reserve pit has sufficient free board? N/A RAGAGEP

    9 Reserve pit fall controls in place? N/A RAGAGEP

    10 Secondary containment (berms/ditches)

    adequate and maintained?Compliant

    RAGAGEP

    11 Pipe dope is lead free? Compliant 40CFR 261-262

    XVI. STAIRS, LADDERS, HANDRAILS & GUARDRAILS1 Adequate stairs provided off rig, min. of 2

    for drill floor?Compliant

    RP54 9.3.10, 1910.24(b)

    2 Stairs level, secure with no obstructions? Compliant RP54 9.3.9

    3 Adequate handrails provided on stairs with

    4 or more risers?Compliant

    RP54 9.3.8, 1910.24(h)

    4 Stair treads of uniform size made with non- RP54 9.3.9, 1910.24(d)

    skid material?

    5 Stair treads free of damaged?Compliant

    RP54 9.3.11 Bottom stair rung on shaker side of catwalk stairs needs to be

    repaired.

    6 Stairs properly installed and pinned if

    required?Compliant

    RP54 9.3.8

    7 Guardrails, Midrails, & Toeboards

    installed along all open side edges of floors,

    platforms, etc, 4ft above ground level.Compliant

    1910.23(c)(1), RP54 9.3.17

    XVII. ADDITIONAL FINDINGS

    1 N/A RAGAGEP2 N/A RAGAGEP

    3 N/A RAGAGEP

    4 N/A RAGAGEP

    5 N/A RAGAGEP

    6 N/A RAGAGEP

    7 N/A RAGAGEP

    8 N/A RAGAGEP

    9 N/A RAGAGEP

    10 N/A RAGAGEP

    Confidential

    Page 22

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012

  • 8/13/2019 2. Final Inspection Report With Codes Example

    23/23

    No. Condition Rating Standard Comments

    OIL AND GAS DRILLING LAND RIG

    INSPECTION FORM

    Definitions : SPCC (Spill Prevention, Control, and Contamination), SRL (Self Retracting Lanyard), HSE (Health, Safety, & Environmental), BOP (Blow Out Preventor), SCR (System Control Room), VFD

    (Variable Frequency Drive), RM (Rig Manager), TOOH (Trip out of hole), GFIC (General Fault Interuption circuit), JSA (Job Safety Analysis), OSHA (Occupational Safety and Health Administration), LOTO

    (Lock Out/Tag Out), SCBA (Self Contained breathing apparatus), RAGAGEP (Recognized And Generally Accepted Good Engineering Practice), RAPPS (Reasonable and prudent practices for stabilization

    (Clean Water Act))

    Confidential

    Page 23

    11/9/2012

    Form: DCI LR Audit (Comprehensive).xlsx

    Updated on 11/06/2012