1. Introduction
1.1 Inor!"tion "#out t$% &it% '
"onstr6ction of mplo7ee State ns6rance (S) 2ospital 8 'edical "ollege at #oka,
$olkata, West 9engal
1. SCOPE O *OR+
The ;rief scope of work for "onstr6ction of S" 'edical "ollege and /< at #oka, $olkata
incl6ded in this tender shall incl6de (;6t not limited to) Renovation of =isting 2ospital +
96ilding, Renovation of =isting mergenc7!/D 9lock and adding ? new 2ospital 9lock
+ ad@acent to e=isting 2ospital 9locks, constr6ction of 'edical "ollege (A),N6rsing
"ollege (5),%6ditori6m c6m =am 2all 96ildings, constr6ction of 2ostel 9lock ,Residential
9lock % 8 9 and Directors Residences, Renovation of =isting Residential B6arters (?3?
Nos),constr6ction of 'iscellaneo6s 96ilding namel7
-
8/13/2019 1.Technical Specification
3/71
?E Cor the items not covered 6nder the specifications as stated a;ove, the work shall
;e done as per relevant S "odes
? Cor the items not covered 6nder an7 of the specifications stated a;ove, the work
shall ;e e=ec6ted as per 'an6fact6rerGs specifications!
-
8/13/2019 1.Technical Specification
4/71
The power s6ppl7 s7stem in the ;6ilding 8 retail o6tlet stations shall ;e made availa;le at
*3E!?*4 olts, E4 2H, %" 5 phase * wire, earthed ne6tral from local lectric S6ppl7
%6thorit7
%ll s6ppl7 and installation work shall ;e carried o6t as per specification and in accordance
with the constr6ction drawings and shall conform to reF6irements called for in the ndian
lectricit7 R6les 3+E with its latest amendment, ndian lectricit7 %cts and all relevant codes
and practices iss6ed ;7 the 96rea6 of ndian Standard as amended 6p&to&date The work shall
also compl7 with the provisions of the general or local set of legislat6res and reg6lations of
an7 local or other stat6tor7 a6thorit7 which ma7 ;e applica;le
The "ontractor for electrical work m6st possess valid lectrical contractorJs License endorsed
;7 the Licensing 9oard, Directorate of lectricit7 of concerned State
-
8/13/2019 1.Technical Specification
5/71
MATERIALS
'aterials shall ;e of the approved make 8 F6alit7 % list of materials of approved
;rand and man6fact6rer is indicated in the anne=6re f the list of materials mentioned
a;ove stip6lates two or more or alternative ;rands!makes of an7 prod6ct, the decision
as to which ;rand!make shall ;e 6sed in the work shall ;e taken ;7 the "ons6ltant!
mplo7er and the contractor shall provide the ;rand!make so selected witho6t an7
e=tra cost
n case, materials are reF6ired to ;e o;tained from an7 man6fact6rer other than those
listed on acco6nt of non&availa;ilit7 then prior approval from "ons6ltant will ;e
necessar7, s6pported ;7 relevant test certificates F6alif7ing the reF6ired standard
C6rther tests as directed ;7 the "ons6ltant shall also ;e carried o6t ;7 the contractor
at their own cost, if reF6ired
"ontractor shall o;tain approval from the "ons6ltant! mplo7er of sample of all
materials ;efore placing order and the approved sample shall ;e caref6ll7 preservedon the displa7 ;oard in an appropriate manner at the site office for verification ;7 the
"ons6ltant! mplo7er
Cor standard ;o6ght o6t items, the siHes man6fact6red ;7 the firms listed shall prevail
when there is discrepanc7 in the siHes mentioned in the sched6le witho6t an7 financial
ad@6stment
SPECIICATIONS
-nless specificall7 mentioned otherwise, all applica;le codes and standards p6;lished
;7 the 96rea6 of ndian Standard and all other s6ch p6;lication as ma7 ;e p6;lished
;7 them after constr6ction work starts, shall govern in respect of design,workmanship, F6alit7 and properties of material and method of testing
SAET/
%ll eF6ipment shall ;e complete with approved safet7 devices wherever a potential
haHard to personnel e=ists and with provision for safe access of personnel to and
aro6nd eF6ipment for operation and maintenance f6nctions
Special care shall ;e taken to ens6re against entr7 of rats, liHards and other creeping
reptiles which ma7 create electrical short circ6it inside live eF6ipment
DRA*INGS
n completion of all work the contractor shall f6rnish three copies of %mmonia print
along with the original tracing of the following K%s ;6ilt drawings to the "ons6ltant
witho6t an7 e=tra cost
: Wiring diagram for final power ! lighting distri;6tion s7stem showing the
rating! siHe of switchgear, ca;les, cond6its, lighting fi=t6res and all accessories for
individ6al installation
E
-
8/13/2019 1.Technical Specification
6/71
ii Detailed general arrangement drawings of the switch;oard complete with dimension in
metric 6nits
iii Drawings showing the ro6te of cond6its and ca;les with siHes, lengths, so6rces and
destination of all ca;les with the circ6it designation n6m;er, etc
iv Drawings showing the ;alancing of phases with connected load in each circ6its, etc
TEST CERTIICATES AND INSTRUCTIONS
-nless specificall7 mentioned otherwise, the contractor shall f6rnish, in d6plicate,
'an6fact6rerJs Test "ertificate with the deliver7 of the eF6ipment to the "ons6ltant and
nstr6ction 'an6al in nglish for operations and maintenance of eF6ipment wherever
reF6ired
TESTING AND COMMISSIONING
9efore each field test, the contractor shall o;tain the permission from the site engineer and all
tests shall ;e cond6cted in the presence of d6l7 a6thorised representative Records of each
test shall ;e prepared immediatel7 after the test and this record shall ;e signed ;7 contractorJs
representative cond6cting the test and the site engineer attending the test "opies of their
record in F6adr6plicate shall ;e handed over to the "ons6ltant! ngineer&in&"harge
% certificate in F6adr6plicate shall ;e f6rnished ;7 the contractor co6ntersigned ;7 the certified
s6pervisor 6nder whose direct s6pervision the installation was carried o6t and the ownerJs site
engineer This certificate shall ;e in the prescri;ed forms in addition to the test certificate
reF6ired ;7 the Local lectric S6ppl7 %6thorities Recommended completion certificateGs
Cormat is given in %ppendi= J%J
COMPLETION O *OR+
ach item of the electrical work shall ;e considered as complete in all respects onl7 after
o;taining permanent service connection from local power s6ppl7 a6thorit7, energiHing, testing
and final commissioning of the complete installation as directed ;7 the
"ons6ltant!ngineer&in&"harge
/a7ment on each item of electrical work shall ;e made as per meas6rement and proportionate to
the F6ant6m of work completed n the event of an7 disp6te with regard to the proportion of
work complete, the decision of the "ons6ltant! ngineer&in&"harge shall ;e final and ;inding tothe contractor
PREAM0LE TO T,E SC,EDULE O *OR+
The s6ccessf6l tenderer shall caref6ll7 go thro6gh the "la6ses of nvitation to Tender,
Specification, Sched6le of Work and drawings and shall incl6de in his rates an7 s6m he ma7
consider necessar7 to cover the f6lfillment of the vario6s cla6ses contained therein -nit prices
stated in the sched6le of work against the item of work shall ;e incl6sive of all installation,
accessories and cons6ma;les necessar7 to complete the said work within the contemplation of
the contract 9e7ond the 6nit prices no e=tra amo6nt will ;e paid for incidental contingent
work and materials
-
8/13/2019 1.Technical Specification
7/71
The F6antities mentioned in the sched6le of work are pro;a;le F6antities and it m6st
;e clearl7 6nderstood that the contract is not a l6mp s6m contract, that the pro;a;le
F6antities, the val6e of the entire tender are onl7 indicative and mplo7er does not in
an7 wa7 ass6re the tenderer or g6arantee that the act6al F6antit7 of work wo6ld
correspond to the pro;a;le F6antities in the tender
No change in 6nit rate will ;e admissi;le on an7 variation of F6antit7
T"2N"%L S/"C"%TN CR WRN< SMST'
SCOPE
This specification covers s6ppl7 of materials, erection and commissioning of
distri;6tion wiring, connection to distri;6tion ;oards, ca;le la7ing, earthing and
miscellaneo6s items %pplica;le provisions and conditions of contract shall govern the
work 6nder the section
-
8/13/2019 1.Technical Specification
8/71
The 3 %mps s6;&circ6it for power shall ;e connected to a ma=im6m one 3 %mp socket
o6tlet or two %mp socket o6tlets
% power circ6it shall alwa7s ;e originating from a distri;6tion ;oard or '"9 D9 and the same
shall r6n in a separate cond6it
The point wiring shall mean wiring from one wa7 of distri;6tion ;oard to point of 6tilisation of
electricit7 ie where the load is applied and this shall incl6de complete wiring from
distri;6tion ;oard, s6ppl7 and fi=ing of switch ;oard, controlling switches, ceiling rose,
;atten holder and socket o6tlet, etc
ns6lated or covered earthing cond6ctors where 6sed, shall have green ins6lation ;raiding or
covering as appropriate -nder no circ6mstances shall the colo6r green ;e 6sed for other
than earthing cond6ctor n addition where it is reF6ired, ca;les of different colo6rs ;e 6sed
Cor identification p6rposes the following s7stem shall ;e emplo7ed :
-nless otherwise mentioned in the sched6le of F6antities, single wa7 porcelain! ;akelite
terminal connectors with nickel plated ;rass inserts and screws to s6it the cond6ctor siHe
shall ;e 6sed for intermediate wiring! @oints in @6nction ;o=es and in switch ;oards or ;7 an7
other method approved ;7 the "ons6ltant! ngineer&in&"harge
Distri;6tion wiring in cond6it to light, fan, pl6g points etcshall ;e done in looping in s7stem
n this s7stem, no @oints or connections shall ;e made an7where of the s7stem e=cept atterminating points s6ch as, at terminals of switches, ceiling roses, etc and in case of
socket o6tlets, at the socket terminals ntermediate wiring @oints of ne6tral wire in
@6nction ;o=es will not ;e permitted
n the looping ;ack s7stem of wiring on hard wood ;atten, the wiring shall ;e done witho6t an7
@6nction or connector ;o=es on the line %ll intermediate @oints or connections shall ;e made in
the switch ;oard onl7 ntermediate wiring @oints of ne6tral wire in the @6nction ;o= will not ;e
permitted
"ND-T WRN. CENTRIUGAL CAST IRON (SPUN) PIPE '
53 Soil, waste, vent and anti&siphonage pipes, fittings and accessories shall
;e centrif6gal cast iron (sp6n) %ll pipes shall ;e straight and smooth and
their inside free from irreg6lar ;ore, ;low holes, cracks and other
man6fact6ring defects /ipes shall ;e centrif6gall7 cast (sp6n) iron soil
pipes conforming to S: 5++&3+*
5? Standard weight, dimensions and pig lead reF6ired for @oints shall ;e as
follows:
Cor pipes conforming to S:5++&3+* (centrif6gall7 sp6n " pipes)
SNo
Nominal
DiameterThickness
%ppro=imate mass
incl6ding mass of
Socket for pipe
length34m
nternal diameter
of socket
Depth of
lead
Weight
f lead 7arn
'm mm $g mm 'm $g
3 AE 5E 3?E ++ ?E 444
? 344 *4 3 3? ?E 4E4
5 3E4 E4 5*+ 3A ?E 3544
* ?44 4 E34 ?44
5A4 Tolerance:
%ccepta;le tolerance for pipes to S:5++ shall ;e as follows:
a) Wall thickness & 3EO
;) Length >?4 mm
c) Weight &34O
-
8/13/2019 1.Technical Specification
24/71
*5 %ccess door shall ;e made 6p with 5mm thick insertion r6;;er washer and
white lead The ;olts shall ;e l6;ricated with grease or white lead for eas7
removal later The fi=ing shall ;e air and water tight
?. I:ING '
E3 %ll vertical pipes shall ;e fi=ed ;7 'S clamps tr6l7 vertical 9ranch pipes shall
;e connected to the stack at the same angle as that of the fittings No collars
shall ;e 6sed on vertical stacks ach stack shall ;e terminated at top with a
cowl (terminal g6ard)
E? 2oriHontal pipes r6nning along ceiling shall ;e fi=ed on str6ct6ral ad@6sta;le
clamps of special design shown on the drawings or as directed 2oriHontal pipes
shall ;e laid to 6niform slope and the clamps ad@6sted to the proper levels so
that the pipes f6ll7 rest on them
E5 "ontractor shall provide all sleeves, openings, hangers, inserts d6ring the
constr6ction 2e shall provide all necessar7 information to the ;6ilding
"ontractor for making s6ch provisions in the str6ct6re as necessar7 %ll
damages shall ;e made good ;7 the "ontractor at his own cost to restore the
s6rfaces
@. CLAMPS '
3 2older ;at clamps shall ;e of standard design fa;ricated from 'S flats
*4=5mm thick and 3?mm dia 'S rod and mm n6ts and ;oltsP painted with two
coats of ;lack ;it6men paint ;efore fi=ing The clamps shall ;e fi=ed in cement
concrete 3:?:* mi= (3 cement : ? sand : * stone aggregate ?4mm nominal siHe)
;locks 344=344=344mm deep
? Where holder ;at clamps are to ;e fi=ed in R"" col6mn or slotted angles, walls
or ;eam the7 shall ;e fi=ed with *4=5mm flat iron K- t7pe clamps with anchor
fasteners of approved design
5 Str6ct6ral clamps shall ;e fa;ricated from 'S str6ct6ral mem;ers eg rods,
angles, channels, flats as per detailed drawing or as directed "ontractor shall
provide all n6ts, ;olts, welding material and paint the clamps with one coat ofred o=ide and two or more coats of ;lack enamel paint to give an even shade
* Wherever 'S clamps are reF6ired to ;e anchored directl7 to ;rick walls,
concrete sla;s, ;eams or col6mns, nothing e=tra shall ;e pa7a;le for clamping
arrangement, R"" ;lock and making good with cement concrete 3:?:* mi= (3
cement : ? sand : * stone aggregate ?4mm nominal siHe) as directed ;7 the
%rchitect!"ons6ltants
?*
-
8/13/2019 1.Technical Specification
25/71
. TRAPS '
A3 Cloor Trap:
Cloor trap shall ;e cast iron I/G Trap with or witho6t vent horn (deep
seal with an effective seal of E4 mm) n case of S6nken sla; in theToilets, the trap and waste pipes shall ;e set in cement concrete ;locks
of siHe 544mm = 544mm and of reF6ired depth, firml7 s6pported on the
str6ct6ral floor The ;locks shall ;e in 3 :? :* mi= (3 cement : ? coarse :
* stone aggregate ?4mm nominal siHe) and e=tended to *4mm ;elow
finished floor level "ontractor shall provide all necessar7 sh6ttering
and centering for the ;locks at no e=tra cost ) n case of flat sla;
instead s6nken sla; in the Toilets, "ontractor shall provide all sleeves,
openings, hangers, inserts d6ring the constr6ction for fi=ing the floor
traps and etc
A? -rinal Trap:
-rinal traps shall ;e cast iron / or S traps with or witho6t vent horn and
set in cement concrete ;lock specified 6nder "la6se A3 Cloor Trap
witho6t e=tra charge
A5 Cloor Trap nlet!
-
8/13/2019 1.Technical Specification
26/71
;) The pipes shall ;e c6t sF6are with sharp tools
c) The c6t ends of the pipes shall ;e filed! reamed and finished smooth
d) %n7 deformed ends shall ;e re&ro6nded
e) t shall ;e ens6red that the pipe ends shall enter the fittings and sockets to f6ll
depth of the @ointing area
f) The pipe work shall ;e assem;led in a manner s6ch that it does not entail
making of @oints in restricted locations
g) ach metal pipe spigot shall ;e centered with three lightl7 wedged pieces of
hardwood or folded lead
h) The @ointing s6rfaces shall ;e cleaned to remove an7 coatings or c6tting oils,etc
1. CI (LA) PIPE AND ITTING'
343 S6mp /6mp discharge /ipe!Rain Water horiHontal header!soil waste header
r6nning at 9asement ceiling!Rain Water /ipe r6nning 6ndergro6nd shall ;e
centrif6gall7 cast Qsp6n iron press6re pipe class L% conforming to S
3E5:?443
34? Dimension, Standard weight shall ;e as follows
No!in"7
Di"!%t%r DN
!!
0"ri"7
Soc%t
M"&& 2
Tot"7 or on% 6orin2 L%n2t$ L in 2
(A44ro%d i& L%n2t$)
DE!! E !!
M"&&
or1 M%t%r 2
>.@@ ! < !
-
8/13/2019 1.Technical Specification
27/71
345 Citting for " (L%) /ipe shall confirm to S : 3E5 1 3+A where
possi;le @6nction from ;ranch pipe shall ;e made ;7 a IMG Tee
11. CLEAN OUT PLUGS '
333 "ontractor shall provide cast ;rass clean o6t pl6gs as reF6ired "lean o6tpl6gs shall ;e threaded and provided with ke7 holes for opening "lean
o6t pl6gs shall ;e fi=ed to the pipe ;7 a
-
8/13/2019 1.Technical Specification
28/71
The soil pipe m6st ;e reasona;l7 clean and smooth an the diner s6rface, in case
the soil piping is in " material then s6pplier s6pplied ;6sh!adaptor shall ;e
6sed
The connector socket is p6shed f6ll7 home on to the pan spigot, the reafter theW" is placed in position gentl7 p6shing the fitment to ens6re that the connector
end filts into the spigot of the pipe
The pan connector m6st ;e p6shed in s6ch an wa7 as to ens6re that the seats and
fins t6rn inward to ens6re proper sealing
1
-
8/13/2019 1.Technical Specification
29/71
3A? 9efore 6se at site all " pipes shall ;e tested ;7 filling 6p with water for at least
54 min6tes %fter filling, pipes shall ;e str6ck with a hammer and inspected for
;low holes and cracks %ll defective pipes shall ;e re@ected and removed from
the site within * ho6rs
3A5 Soil and waste pipes shall ;e tested in sections after installation, ;7
filling 6p the stack with water %ll openings and connections shall ;e
s6ita;l7 pl6gged as approved ;7 the %rchitect!"ons6ltants The total
head in the stack shall ;e *Em at the highest point of the section 6nder
test The period of test shall ;e two (?) ho6rs minim6m as directed ;7 the
%rchitect!"ons6ltants f an7 leakage is visi;le, the defective part of the
work shall ;e c6t o6t and made good
3A* The "ontractor shall test all vent pipes ;7 a smoke testing machine
Smoke shall ;e p6mped into the stack after pl6gging all inlets andconnections The stack shall then ;e o;served for leakages and all
defective pipes and fittings removed or repaired as directed ;7 the
%rchitect!"ons6ltants
3AE % test register shall ;e maintained and all entries signed and dated ;7
"ontractor and %rchitect!"ons6ltants % proforma of the proposed test
register shall ;e s6;mitted to the %rchitect!"ons6ltants for approval
3A %ll pipes in wall chase or meant to ;e chased or ;6ried shall ;e h7dro
tested ;efore the chase is plastered or the pipe encased or ;6ried
1. UPVC PIPES ITTINGS'
1.1 UPVC PIPE AND ITTINGS OR RAIN *ATER DISPOSAL
S/STEM '
333 Rain water pipe shall ;e -/" SWR T7pe % conforming to S : 35E+?&
3++?
33? Dimension of SWR /ipe Cittings shall ;e as per DN 3+E53 and DN
3+E5* and conforms to S : 3*A5E&3+++
R6;;er ring shall ;e conforming to S : E5?
335 D'NSN C SWR //S "NCR'N< T S : 35E+?&3++?
S.No.
No!in"7
Out&id%
di"!%t%r(D)
!!
To7%r"nc%
O
Out&id%
di"!%t%r
*"77 T$icn%&&
T54% A (t) !!
*"77 T$icn%&&
T54% 0 (t) !!
Min in M"3 Min M"3
1. ? F.> 1. . >. >.
. B F.< 1.B .> >. >.>. 11 F.< . . >. >.
?+
-
8/13/2019 1.Technical Specification
30/71
. >.
-
8/13/2019 1.Technical Specification
31/71
minal
tside
meter
minal
'ean
6tside
Diameter
W%LL T2"$NSS
"lass 3
4?E 'pa
"lass ?
4* 'pa
"lass 5
4 'pa
"lass *
4 'pa
"lass E
34 'pa
"lass
3?E 'pa
'in 'a= 'in 'a= 'in 'a= 'in 'a= 'in 'a= 'in 'a= 'in 'a=
334 3344 334* 3 ?4 ?E 54 5A *5 *+ E 3 A3 AE A3?E 3?E4 3?E* 3 ?? ?+ 5* *5 E4 E * + 4 E +
3*4 3*44 3*4E ?4 ?* 5? 5 * EE 5 A5 AA + +E 334
34 344 34E ?5 ? 5A *5 E* ? A? 5 34? 34+ 3?
34 344 34 ? 53 *? *+ 3 A3 4 +? ++ 33* 3?? 3*3
?44 ?444 ?44 ?+ 5* * E5 A+ + 345 334 3?A 35 3EA
??E ??E4 ??EA 55 5+ E? 4 A 344 33E 3?* 3*5 3E5 3A
?E4 ?E44 ?E4 5 *? EA E E + 33? 3?+ 35 3E+ 3A4 3+
?4 ?44 ?4+ *3 * * A* +E 334 3?E 3** 3E* 3A 3+4 ?3+
53E 53E4 534 * E5 A? 5 34A 3?* 3*4 33 3A5 3++ ?3* ?*A
5EE 5EE4 5E3 E3 E+ 3 +* 3?4 35 3E 3? 3+ ?? ?*3 ?A
*44 *444 *43? E A +3 34E 35E 3E 3A ?4E ??4 ?E5 ?A? 535
Not%& '
3 The ta;le is ;ased on metric series of pipe dimension given in S
33!3 in respect of pipe dimensions and S DS **??
? The wall thickness of pipe is ;ased on a safe working stress of
'/a at ?Ao" The working press6re gets red6ced at s6stained higher
temperat6res ccasional rise in temperat6re, as in s6mmer, with
conc6rrent corresponding red6ction in temperat6re d6ring nights has
no deleterio6s effect on the working press6re of the pipes considering
the total life of pipe
. MEASUREMENT AND RATES '
?43
-
8/13/2019 1.Technical Specification
32/71
?4? /ipes :
a) The 6nit of meas6rement shall ;e linear metre to the nearest centimeter
;) %ll -/" 8 " soil, waste, vent, anti&siphonage and rain water pipes, %2-
Drainage 8 s6mp riser shall ;e meas6red net, when fi=ed correct to acentimeter, incl6ding all fittings along their length after fi=ing The length shall
;e taken along center line of the pipes and fittings No allowance shall ;e made
for the portions of pipe lengths entering the sockets of the ad@acent pipes or
fittings The a;ove shall appl7 to all cases ie whether pipes are fi=ed on wall
face or pillars or em;edded in masonr7 or pipes r6nning at ceiling level The
F6oted rate shall incl6de lead @ointing
c)
-
8/13/2019 1.Technical Specification
33/71
s7stem ("old Water S6ppl7 > 2ot Water S6ppl7) as reF6ired ;7 the drawings,
specified hereinafter and given in the Sched6le of B6antities
3? Witho6t restricting to the generalit7 of the foregoing, the water s6ppl7
s7stem shall incl6de the following :&
a) Water s6ppl7 works inside the ;6ilding etc incl6ding connection to
vertical stack ! main line
;) /ipe protection and painting
c) "onnections to all fi=t6res etc
d) 9all valve!;6tterfl7 valve!Non Ret6rn valve
. GENERAL RE=UIREMENTS '
?3 %ll materials shall ;e new and of the ;est F6alit7 conforming to
specifications %ll works e=ec6ted shall ;e to the satisfaction of the
/ro@ect 'anager
?? /ipes and fittings shall ;e fi=ed tr6l7 vertical, horiHontal or in slopes as
reF6ired in a neat workmanlike manner
?5 Short or long ;ends shall ;e 6sed on all main pipe lines as far as
possi;le -se of el;ows shall ;e restricted for short connections %s far
as possi;le all ;end shall ;e formed ;7 means of a h7dra6lic pipe
;ending machine for pipe 6p to E mm dia
?* /ipes shall ;e laid in a manner as to provide as far as possi;le eas7
accessi;ilit7 for repair and maintenance and shall not ca6se o;str6ction
in shafts, passage etc
?E alves and other app6rtenances shall ;e so located as to provide eas7
accessi;ilit7 for operations, maintenance and repairs
? /ipe shall ;e sec6rel7 fi=ed to wall and ceiling ;7 s6ita;le clamps at
intervals specified
>. GI PIPES9 ITTINGS AND VALVES '
53 %ll pipes inside the ;6ildings and where specified, o6tside the ;6ilding
shall ;e galvaniHed steel t6;es conforming to S: 3?5+ of "lass specified
When "lass is not specified the7 shall ;e 2eav7 "lass
5? Cittings shall ;e of mallea;le cast iron galvaniHed of approved make
ach fitting shall have man6fact6rerGs trade mark stamped on it Cittingsfor
-
8/13/2019 1.Technical Specification
34/71
-
8/13/2019 1.Technical Specification
35/71
gasket Where hot water or steam connections are made insertion gasket shall ;e
of s6ita;le high temperat6re grade and F6alit7 approved ;7 the
%rchitect!"ons6ltants 9olt hole dia for flanges shall conform to match the
specification for " sl6ice valve as per S:A4
-
8/13/2019 1.Technical Specification
36/71
-
8/13/2019 1.Technical Specification
37/71
-
8/13/2019 1.Technical Specification
38/71
-
8/13/2019 1.Technical Specification
39/71
+ 'ethods for random sampling
++? 2igh densit7 pol7eth7lene materials for mo6lding and e=tr6sion (first revision)
+
'ethod of anal7sis for the determination of specific and !or overall migration of
constit6ents of plastics materials and articles intended to come into contact with
food st6ffs (first revision)
3+? /ositive list of constit6ents of pol7eth7lene in contact with foodst6ffs,pharmace6ticals and drinking water
3+?/ol7eth7lene for its safe 6se in contact with foodst6ff, pharmace6tical and
drinking water
T"#7%-I C7"&&iic"tion o Pi4% M"t%ri"7
(Clause 5)
'aterial
-
8/13/2019 1.Technical Specification
40/71
/N 44 '/a
/N 34 344 '/a
/N 3?E 3?E '/a
/N 3 34 '/a
Not%' These pipes are recommended for ma=im6m water temperat6re of>*Eo" The pipes ma7 also ;e 6sed 6p to am;ient temperat6re of 1*4 o" The
recommended ma=im6m working press6re for the material at ?4o" in a pipe form
is E '/a for E4 7ears of life The creep r6pt6re strength of the pipe diminishes
with the increase in temperat6re a;ove ?Ao" and the working press6re sho6ld ;e
modified
A5* 2igh Densit7 /ol7eth7lene:
2igh densit7 pol7eth7lene (2D/) 6sed for the man6fact6rer of pipes shall
conform to designation /W%&*E&T&44 of S A5?: 3++? 2D/ conforming
to designation /W%&*E&T&43? of S A5?:3++? ma7 also ;e 6sed with the
e=ception that melt flow rating ('CR) shall not e=ceed 334 g!34 min6tes n
addition the material shall also conform to E? of S A5?:3++?
A5*3 The specified ;ase densit7 shall ;e ;etween +*4E $g!m5and +** $g!m5 (;oth
incl6sive) when determined at ?Ao" according to proced6re prescri;ed in %nne=
% of S A5?:3++? The val6e of the densit7 shall also not differ from the
nominal val6e ;7 more than 5$g!m5 as per E?33 of S A5?:3++?
A5*? The 'CR of the material shall ;e ;etween 4*3 and 334 (;oth incl6sive) when
tested at 3+4o" with nominal load of E $gf as determined ;7 method prescri;ed
in Aof S ?E54:3+5 The 'CR of the material shall also ;e within > ?4 percentof the val6e declared ;7 the man6fact6rer
A5*5 The resin shall ;e compo6nded with car;on ;lack The car;on ;lack content in
the material shall ;e within ?E > 4EO and the dispersion of car;on ;lack shall
;e satisfactor7 when tested according to the proced6re descri;ed in S
?E54:3+5
A5E %nti&o=idant:
The percentage of anti&o=idant 6sed shall not ;e more than 45 percent ;7 mass
of finished resin The anti&o=idant 6sed shall ;e ph7siologicall7 harmless andshall ;e selected from the list given in S 343*3:3+?
Di!%n&ion o ,DPE Pi4%& or M"t%ri"7 Gr"d% PE-@> "& 4%r IS
-
8/13/2019 1.Technical Specification
41/71
-
8/13/2019 1.Technical Specification
42/71
-
8/13/2019 1.Technical Specification
43/71
+4 *3 * E* ? A A ? +5 34? 33E
334 E4 EA AE 3 +? 344 33? 3?* 35+
3?E EA E AE E +? 34* 335 3?A 3*3 3E
3*4 * A5 * +E 345 33 3?A 3*? 3E 3A
34 A5 5 + 34 33 35? 3*E 3? 33 ?4?
34 ? +5 34 3?3 355 3*+ 35 3? ?45 ??
?44 +3 345 3?4 35* 3* 3E 33 ?4? ?? ?E3
??E 345 33 35E 3E3 3 3E ?4* ??A ?E* ??
?E4 33* 3? 3E4 3A 3* ?4E ?? ?E3 ?? 535
?4 3? 3*5 3 3A ?4 ??+ ?E5 ?3 53 5E4
53E 3** 33 3+ ?34 ?5? ?E ?E 53 5EE 5+5
5EE 3? 33 ?3? ?5 ?? ?+3 5?3 5E *44 **?*44 3? ?3? ?5+ ?AA ?+E 5*? 5? *3+ *E3 E?3
*E4 ?4E ?5 ?+ 53? 553 55 *4A *A3 E4 EA
E44 ?? ?E ?++ 5* 5 *? *E? E?? E* E3
E4 ?EE ?+ 55E 5 *3? *A E4 E* & &
54 ?A 555 5AA *5 ** E5 E+ EA & &
A34 5?5 5A* *?* *+4 E?5 4* & & & &
44 5* *?3 *A E?? E+ 4 & & & &
+44 *34 *A* E5 ?3 & & & & & &3444 *EE E? & & & & & & & &
.< INSTALLATION OR ,DPE PIPES'
A*3 9-TT WLDN< : % RL%9L 'T2D CR L%$/RC #NTS C
2D/ //S:
9-TT WLDN< is the most important @ointing method in 2D/ pipes This
method is known as a heat press6re related process ;7 which the pipe end
material of two pipes are melted together 6nder press6re creating a homogeno6spipe str6ct6re Simple in its idea, the ;6tt f6sion process demands high acc6rac7
to give the final prod6ct ie a 9-TT WLD 2owever, the method is ver7
simple and relia;le
3 The two pipes to ;e welded are clamped in a welding machine 8
are ;ro6ght in a=ial alignment
? nds of pipes are cleaned 6sing damp cloth and scraper to ens6re that welding
faces are free from d6st and other foreign materials
*5
-
8/13/2019 1.Technical Specification
44/71
5 The pipe ends are press6rised against the hot plate with a specified temperat6re
(;etween ?444& ?344"), press6re and specified time The pipe material melts
forming a circ6lar ;id on peripher7 of ;oth the pipe ends
* When the ends of pipes melted and ;id formation is over, the hot plate is removed and
the melted ends are pressed against each other to make a 96tt Weld The welding*press6re is specified and welded time as well When the weld has ;een cooled down
the pipes are taken o6t from the machine and preparation of ne=t @oint can start
4 %-T'%T" %R NT (%%):
%6tomatic air vents, shall ;e f6rnished at the top of main water risers, s6ppl7 and
ret6rn pipes
% sh6t&off valve shall ;e provided at the inlet of each a6tomatic air vent The o6tlet
shall ;e piped to the nearest drain
%ir Release alves shall ;e capa;le of a6tomaticall7 releasing acc6m6lated air from a
fl6id s7stem while that s7stem is in operation and 6nder press6re
To ass6re drop tight sh6t&off, a viton orifice ;6tton shall ;e 6sed to seal the valve
discharge orifice when the valve is in a closed position The orifice diameter will ;e
siHed for 6se within a given operating press6re range to ins6re ma=im6m discharge
capacit7
B. DUCTILE IRON PIPES ITTINGSD pipes ("lass $+) and fittings ("lass 3?) shall ;e in accordance with S 5?+ and S
+E?5 respectivel7 /ipes and fittings shall ;e proc6red from rep6ted man6fact6rers
The Contractoror their a6thoriHed representative shall at all reasona;le times have free
access to the place where the pipes and fittings are man6fact6red for the p6rpose of
e=amining and testing the pipes and fittings and for witnessing the test and
man6fact6ring
The pipes and fittings shall ;e stripped, with all preca6tions necessar7 to avoid warping
or shrinking defects The pipes and fittings shall ;e free from defects n the case of
spigot and socket pipes and fittings the socket shall ;e witho6t the centre ring
n the case of flanged pipes, the flanges shall ;e at the right angles to the a=is of thepipe and machined on face The ;olt holes shall ;e drilled and located s7mmetricall7
off the centre line The ;olt holes shall ;e concentric with the ;ore and ;olt holes
eF6all7 spaced The flanges shall ;e integrall7 cast with the pipes and fittings and the
two flanges of the pipe shall ;e correctl7 aligned
'aterials
The materials 6sed in the man6fact6re of pipes and fittings shall compl7 with
reF6irements specified in S 5?+ and S +E?5
**
-
8/13/2019 1.Technical Specification
45/71
Dimensions and Tolerances
The internal diameter, thickness and length of ;arrel, dimensions of pipes and fittings
shall ;e as per relevant ta;les of S 5?+!S +E?5 for different class of pipes and
fittings ach pipe shall ;e of 6niform thickness thro6gho6t its length
The tolerances for pipes and fittings regarding dimensions, mass, ovalit7 anddeviations from straight line in case of pipes shall ;e as per S 5?+!S +E?5
Testing
'echanical Tests
'echanical tests shall ;e carried o6t d6ring man6fact6re of pipes and fittings as
specified in S 5?+ ! S +E?5 The freF6enc7 and sampling of tests for each
;atch of pipes shall ;e in accordance with S 5?+ The test res6lts so o;tained
for all the pipes and fittings of different siHes shall ;e s6;mitted to the
"ontractor or his a6thoriHed representative The method for tensile tests and the
minim6m tensile strength reF6irement for pipes and fittings shall ;e as per S
5?+!S +E?5
9rinell 2ardness Test
Cor checking the 9rinell hardness, the test shall ;e carried o6t on the test ring or
;ars c6t from the pipes 6sed for the ring test and tensile test in accordance with
S 3E44 The test shall compl7 with the reF6irements specified in S 3E44!S
5?+
(a) Retests
f an7 test piece representing a lot fails in the first instance, two additional
tests shall ;e made on test pieces selected from two other pipes from the
same lot f ;oth the test res6lts satisf7 the specified reF6irements, the lotshall ;e accepted Sho6ld either of these additional test pieces fail to pass
the test, the lot shall ;e lia;le for re@ection
(;) 27drostatic Test
Cor h7drostatic test at works, the pipes and fittings shall ;e kept 6nder test
press6re as specified in S 5?+ ! S +E?5 for a period of minim6m 3E
seconds, d6ring which the pipes shall ;e str6ck moderatel7 with a A44 g
hammer for conformation of satisfactor7 so6nd The7 shall withstand the
press6re test witho6t showing an7 leakage, sweating or other defect of an7
kind The h7drostatic test shall ;e cond6cted ;efore s6rface coating and
lining
#oints
-
8/13/2019 1.Technical Specification
46/71
These shall have sockets which are integral with the pipe and incorporate
an elastomeric r6;;er ring gasket conforming to S 3??4n partic6lar
that the spigot end of the pipe shall ;e ens6red to ;e @ointed is smooth and
has ;een properl7 chamfered, so that the r6;;er ring as per S 3??4 and
S E5? is correctl7 positioned in line, ;efore the @oint is made The
r6;;er rings and an7 recommended l6;ricant shall ;e o;tained onl7thro6gh the pipe s6pplier
-
8/13/2019 1.Technical Specification
47/71
'arking shall ;e done as per S 5?+ and S +E?5 or an7 other relevant S codes
1. STERILIHATION O INSTALLATION'
343 The water s6ppl7 installation shall ;e steriliHed as per standards and as
follows :&
a) Tanks and pipes shall ;e filled and fl6shed o6t
;) %ll ;i; cocks (taps) shall ;e closed
c) Tanks and pipes shall ;e re&filled while adding a steriliHing admi=t6re
containing E4 parts chlorine to one million parts water
d) When the installation is filled all ;i; cocks (taps) shall ;e opened
progressivel7 and each allowed to r6n 6ntil the water smells of chlorine
e) The installation shall ;e topped 6p and more steriliHer added
f) The installation shall then ;e left for three ho6rs and shall then ;e tested
for resid6al chlorine, if none is fo6nd, the installation shall ;e drained and
the process repeated
g) The installation shall ;e finall7 drained and fl6shed with pota;le water;efore 6se
D) E:TERNAL SE*ERAGE STORM *ATER DRAINAGE '
1. Sco4% o *or'
33 Witho6t restricting to the generalit7 of the foregoing, the drainage s7stem
shall interalia incl6de:
a) Sewerage!Storm water drainage s7stem incl6ding, earth works for e=cavation,
disposal, ;ackfilling and compaction, pipe lines, manholes, catch ;asins andconnections to Rain water 2arvesting or connected as indicated ;7 the
%rchitect!"ons6ltants
;) verflow from Rain Water 2arvesting /it shall ;e discharged to e=isting Storm
Water drain either ;7 gravit7 or ;7s6;mersi;le drainage p6mp
. G%n%r"7 R%uir%!%nt&'
?3 %ll material shall ;e of the ;est F6alit7 conforming to specification and s6;@ect to
the approval of the ngineer&in&charge
*A
-
8/13/2019 1.Technical Specification
48/71
?? Storm Water Drainage lines and open drains shall ;e laid to the reF6ired
gradients and profiles
?5 %ll drainage work shall ;e done in accordance with the local m6nicipal ;7e&laws
?* "ontractor shall o;tain necessar7 approval and permission for the drainage
s7stem from the m6nicipal or an7 other competent a6thorit7 if reF6ired
?E Location of all manholes, catch ;asin etc shall ;e got confirmed ;7 the
%rchitect!"ons6ltants ;efore the act6al e=ec6tion of work at site %s far as possi;le, no
drains or sewers shall ;e laid in the middle of road 6nless otherwise specificall7 shown on
the drawings or directed ;7 the %rchitect!"ons6ltants in writing
>. E3c""tion '
53 %lignment and
-
8/13/2019 1.Technical Specification
49/71
f the strata fo6nd as sl6sh7!with ;lock cotton soil etc, the "onstr6ction
'anager!"ons6ltants ma7 order the contractor to e=cavate to a greater depth than
that shown on the drawings and to fill 6p the e=cavation to the level of the sewer
with s6ch materials as decided ;7 "onstr6ction 'anager!"ons6ltants in writing
5E Refilling:
%fter the sewer or other works have ;een laid and proved to ;e water
tight, the trench or other e=cavation shall ;e refilled -tmost care shall ;e
taken in doing this, so that no damage is ca6sed to the sewer and other
permanent works Cilling in the trenches 6pto E4 cms a;ove the crown of
the sewer shall consist of the finest selected materials placed caref6ll7 in
3E cms la7ers watered to optim6m moist6re level and consolidated %fter
this has ;een laid, the trench and the other e=cavation shall ;e refilled
caref6ll7 in 3E cms la7ers with materials taken from the e=cavation, eachla7er ;eing watered and consolidated
5 "ontractor shall restore settlement and damages:
The contractor shall at his own cost make good promptl7 d6ring the whole
period the works are in hand, an7 settlements that ma7 occ6r in the
s6rfaces or roads, ;eams, footpaths, gardens, open spaces etc Whether
p6;lic or private ca6sed ;7 his trenches or ;7 his other e=cavations and he
shall ;e lia;le for an7 accidents ca6sed there;7
2e shall also at his own e=pense and charges, repair and make good an7
damage done to the ;6ilding and other properties
5A Disposal of S6rpl6s Soil:
The contractor shall at his own cost and charge, dispose off from the site
all s6rpl6s e=cavated material not reF6ired to ;e 6sed on the works
5 Tim;ering of Sewer and Trenches:
The contractor shall at all times s6pport efficientl7 and effectivel7 thesides of the sewer trenches and other e=cavations ;7 s6ita;le tim;ering
piling, sheeting, etc in loose or sand7 strata and ;elow the s6rface of the
s6; soil water ta;le witho6t e=tra cost
%ll tim;ering, sheeting and piling with their walls and s6pports shall ;e of
adeF6ate dimensions and strengths and f6ll7 ;road and str6tted so that
there is no risk of collapse or carr7ing in the walls of the trench
The "ontractor shall ;e held acco6nta;le and responsi;le for the
s6fficienc7 of all tim;ering, ;racing, sheeting and piling 6sed, and for all
damage to persons and propert7 res6lting from the improper F6alit7,strength, planning, maintaining or removing of the same
*+
-
8/13/2019 1.Technical Specification
50/71
5+ WDT2 C TRN"2 :
a) Recommended width of trenches at the ;ottom shall ;e as follows or
as specified in the "/WD !9S specification :&
344mm dia pipe 6ter dia of pipe > *Ecms
3E4mm dia pipe 6ter dia of pipe > *Ecms
?44&?E4 dia pipe 6ter dia of pipe > *Ecms
544mm dia pipe 6ter dia of pipe > *Ecms
*E4mm dia pipe 8 a;ove o6ter dia of pipe >*Ecms
;) Recommended width of trench at top shall ;e as follows or as specified in the
"/WD !9S specification :&
Depth 6p to 3Em & width of 9ottom width of top
Depth from 3Em to 5m & 9ottom width > (?0E44mm)
Depth Crom 5m to *E m & 9ottom width >(*0E44mm)
Depth Crom *Em to 4 m & 9ottom width > (0E44mm)
534 /rotection of =isting Services:
%ll pipes, water mains, ca;les etc enco6ntered in the co6rse of e=cavation shall ;e
caref6ll7 protected and s6pported
-
8/13/2019 1.Technical Specification
51/71
inserted, p6nched and ca6lked into the @oint and more cement mortar added 6ntil
the space of the @oint has ;een filled completel7 with tightl7 ca6lked mortar The
@oint shall then ;e finished off neatl7 o6tside the socket at an angle of *E degree
** "6ring:
The @oint shall ;e c6red for atleast seven da7s
*E Testing:
%ll lengths of the sewer and drain shall ;e f6ll7 tested for water tightness ;7
means of water press6re maintained for not less than 54 min6tes Testing shall
;e carried o6t from manhole to manhole %ll pipes shall ;e s6;@ected to a test
press6re of atleast 54 metres head of water at the highest point of the section6nder test The pipes shall ;e pl6gged prefera;l7 with standard drain pl6gs (with
r6;;er rings) on ;oth ends The 6pper end shall, however, ;e connected to a pipe
for filling with water and getting the reF6ired head
The contractor shall give a smoke test to the drains and sewers at his
own e=pense and charges, if directed ;7 the "onstr6ction
'anager!"ons6ltants
* Gu775 tr"4& '
*3
-
8/13/2019 1.Technical Specification
52/71
-
8/13/2019 1.Technical Specification
53/71
cement mortar 3:? (3 cement :? fine sand) which shall ;e rammed with ca6lking
tool
%fter a da7Js work an7 e=traneo6s material shall ;e removed from the
inside of the pipe and the newl7 made @oint shall ;e c6red
E The Testing of #oints, Refilling of Trenches:
The testing of @oints, refilling of trenches for concrete pipes shall ;e similar to
Specification for stone ware pipes
@. C%!%nt Concr%t% or Pi4% Su44ort '
a) Wherever specified or shown on the drawings, all pipes shall ;e s6pported on a ;ed, all
aro6nd or in ha6nches The thickness and mi= of the concrete shall ;e as given in theSched6le of B6antities Width of the ;edding shall ;e 6nder para Width of Trenches
;) -nless otherwise directed ;7 the %rchitect!"ons6ltants cement concrete for ;ed, all
aro6nd or in ha6nches shall ;e laid as follows:
-pto 3E m Depth -pto 5 m Depth 9e7ond 5 m Dept
Stoneware
/ipes in
open gro6nd (no s6; soil water)
%ll ro6nd (3:E:34) n ha6nches (3:E:34) n ha6nches (3:E:34
R"" or SW in s6; soil water %ll ro6nd (3:E:34) n ha6nches (3:E:34) n ha6nches (3:E:34
" /ipes (in all conditions) %ll ro6nd (3:5:) n ha6nches (3:5:) n ha6nches (3:5:
R"" /ipes or " pipes 6nder ;6ilding %ll ro6nd (3:5:) n ha6nches (3:5:) n ha6nches (3:5:
(3"ement, 5!E"oarase sand, !34 Stone aggregate *4 mm nominal siHe)
c) R"" pipes or " pipes shall ;e s6pported on ;rick masonr7 or precast R"" or in sit6
cradles as shown on the drawings or as directed ;7 the %rchitect!"ons6ltants
d) /ipes in loose soil or a;ove gro6nd shall ;e s6pported on ;rick or stone masonr7 pillars
as shown on the drawings or as directed ;7 the %rchitect!"ons6ltants
. M"n$o7%& "nd C$"!#%r& '
A3 %ll manholes, cham;ers and other s6ch works as specified shall ;e
constr6cted in ;rick masonr7 in cement mortar 3:E (3 cement: E coarse
sand) or as specified in the Sched6le of B6antities
A? %ll manholes and cham;ers, etc shall ;e s6pported on ;ase of cement
concrete of s6ch thickness and mi= as given in the Sched6le of
B6antities or shown on the drawings
A5 Where not specified, manholes shall ;e constr6cted as follows:
(%ll dimensions are clear internal dimensions in mm)
E5
-
8/13/2019 1.Technical Specification
54/71
SiHe of 'anholes T7pe of 'anhole +44=44
Rect
3?44=+44
Rect
+34 dia
"irc6lar
3E?4 dia
"irc6lar
'a=im6m Depth 3444 ?*44 ?E44 E444
%verage thickness of R"" sla; 3E4 3E4
Reinforcement %s directed ;7 %rchitect!"ons6ltants
SiHe of "over and Crame 44=*E4 E4dia E4dia E4diaWeight of "!SCR" "over and Crame5 kg light d6t7?4 kg heav7 d6t7?4 kg heav7 d6t7?4 kg heav7 d6t7
A* %ll manholes shall ;e provided with cement concrete ;enching in 3:?:*
nominal mi= (3 cement: ? coarse sand: * stone aggregate ?4mm nominal siHe) The ;enching
shall have slope of 3:34 towards the channel The depth of the channel shall ;e f6ll diameter of
the pipe 9enching shall ;e
finished with a floating coat of neat cement
AE %ll manholes shall ;e plastered with 3?!3Emm thick cement mortar 3:5 (3 cement: 5 coarse sand)
and finished with a floating coat of neat cement inside 'anhole shall ;e plastered o6tside as
a;ove ;6t with ro6gh plaster with waterproofing compo6nd
A %ll manholes with depths greater than 3m shall ;e provided with ?4 mm sF6are or ?E mm ro6nd
" foot rests set in cement concrete ;locks ?E4=344 mm in 3:?:* mi= (3 cement: ? coarse sand: *
stone aggregate ?4 mm nominal siHe), at 544 mm centre to centre verticall7 and staggered Coot
rests shall ;e coated with coal tar ;efore em;edding
AA %ll manholes shall ;e provided with cast iron covers and frames and em;edded in reinforced
cement concrete sla; Weight of cover, frame and thickness of sla; shall ;e as specified in the
Sched6le of B6antities or given a;ove
. T%&tin2 '
3 %ll testing shall ;e done in accordance with S:33A? and S:E5?+ e=cept as ma7 ;e modified
herein 6nder
? %ll lengths of the sewer!drain!pipelines shall ;e f6ll7 tested for water tightness ;7 means of water
press6re Testing shall ;e carried o6t from manhole to manhole %ll pipes shall ;e s6;@ected to a
test press6re of at least ?Em head of water The test press6re shall, however, not e=ceed m head
at an7 point The pipes shall ;e pl6gged prefera;l7 with 6pper end shall, however, ;e connected
to a pipe for filling with water and getting the reF6ired head The sewer!drain!pipeline shall ;e
filled with water and left to stand for ? ho6rs and topped 6p The leakage over 54 min6tes shall
then ;e meas6re and the loss in water shall not e=ceed ? litres!cm of diameter!km of pipeline
meas6red d6ring the last 34 min6tes of the period of test
5 Sewer lines shall ;e tested for straigheness ;7:
a) nserting a smooth ;all 3?mm less than the internal diameter of the pipe n the a;sence of
o;str6ctions s6ch as 7arn or mortar pro@ecting at the @oints the ;all sho6ld roll down the invert of
the pipe and emerge at the lower end,
;) means of a mirror at one end and a lamp at the other end f the pipe line is straight the f6ll circle
of light shall ;e seen otherwise o;str6ction or deviation shall ;e apparent
* % test register shall ;e maintained which shall ;e signed and dated ;7 the "ontractor and the
%rchitect!"ons6ltants
E The pipeline shall ;e covered onl7 after the testing is s6ccessf6ll7 completed
E*
-
8/13/2019 1.Technical Specification
55/71
B. M%"&ur%!%nt "nd R"t%& '
+3 Stoneware!R""!" pipes shall ;e meas6red for the finished
length of the pipeline per linear metre
Lengths ;etween manholes shall ;e recorded from inside face of one manhole to inside face of
other manhole
Length ;etween g6ll7 trap and manhole shall ;e recorded ;etween socket of pipe near
g6ll7 trap and inside face manhole Rate shall incl6de all items given in the Sched6le of
B6antities and specifications
+?
-
8/13/2019 1.Technical Specification
56/71
9S : ?4E "ode of practice for water s6ppl7 in ;6ildings
9S : ?34* Specification for water meter for ;o=es (domestic t7pe)
9S : ?5A5 Specification for water meters (;6lk t7pe)
9S : *333 (/art 3)"ode of practice for ancillar7 str6ct6res in sewerage s7stem:
/art 3 manholes
9S : E5?+ "ode of practice for sanitar7 pipe work a;ove gro6nd for
;6ildings
9S : *3+ (/art 3)ReF6irements for water filtration eF6ipment: /art 3 Ciltration
medi6m sand and gravel
9S : *3+ (/art ?) ReF6irements for water filtration eF6ipment: /art ? 6nder
drainage s7stem
9S : ++3? "oal tar ;ased coating materials and s6ita;le primers forprotecting iron and steel pipe lines
9S : 34E44 Drinking water 1 Specification
9S : 3?35 (/art 3)"ode of practice for pl6m;ing in m6lti&store7ed ;6ildings: /art
3 water s6ppl7
9S : 3??E3 "ode of practice for drainage of ;6ilding ;asements
9S : EEA? "ode of practice for sanitar7 pipe work
9S : A44Specification for design, installation, testing and maintenance
of services s6ppl7ing water for domestic 6se within ;6ildings
and their cartilages
9S : A44 "ode of practice for nstallation of Septic tanks
9S : 543 "ode of practice for ;6ilding drainage
E Pu!4& V%&&%7&
9S : 3E?4Specification for horiHontal centrif6gal p6mps for clear cold
fresh water
9S : E44 Specification for sewage and drainage p6mps
9S : 45*Specification for s6;mersi;le p6mp sets for clear, cold, freshwater
9S : *3Specification for horiHontal centrif6gal self priming p6mps
Pi4%& "nd ittin2&
9S : *ESpecification for pre&cast concrete pipes (with and witho6t
reinforcement)
9S : E3 Salt glaHed stone ware pipes and fittings
9S : 3E5"entrif6gall7 cast (sp6n) iron press6re pipes for water, gas and
E
-
8/13/2019 1.Technical Specification
57/71
sewage
9S : 3E5Aerticall7 cast iron press6re pipes for water, gas and sewage
9S : 3E5"ast ron fittings for press6re pipes for water, gas and sewage
9S : 3A?+Sand "ast iron spigot and socket soil, waste and ventilating
pipes, fittings and accessories
9S : 3A+ 'allea;le cast iron pipe fittings
9S : 3+A Line pipe
9S : 3+A+ 2igh test line pipe
9S: *+*2igh Densit7 /ol7eth7lene /ipes for pota;le water s6ppl7 and
Sewage etc
9S : ?*5 (/art 3)Dimensions for pipe threads for fastening p6rposes: /art 3
9asic profile and dimensions
9S : ?*5 (/art ?)Dimensions for pipe threads for fastening p6rposes: /art ?
Tolerances
9S : ?*5 (/art 5)Dimensions for pipe threads for fastening p6rposes: /art 5
Limits of siHes
9S : 5* /ipe n6ts
9S : 5++"entrif6gall7 cast (sp6n) iron spigot and socket soil, waste and
ventilating pipes, fittings and accessories
9S : *5* Specifications for washers for 6se with fittings for water
services
9S : *A33 'ethods for sampling steel pipes, t6;es and fittings
9S : 5+? Steel pipe flanges
9S : *3 "ast iron and mallea;le cast iron flanges for general
engineering p6rposes
9S : A33Specification for horiHontall7 cast iron do6;le flanged pipe for
water, gas and sewage
V"7%&
9S : AASpecification for copper allo7 gage, glo;e and check valves for
water works p6rposes
9S : A4Specification for sl6ice valves for water works p6rposes (E4
mm to 544 mm siHe)
9S : 3A45Specification copper allo7 float valves (horiHontal pl6nger
t7pe) for water s6ppl7 fittings
9S : ?+4Specification for sl6ice valves for water works p6rposes (5E4
mm to 3?44 mm siHe)
9S : 5+E4 Specification for s6rface ;o=es for sl6ice valves
9S : E53? (/art 3)Specification for swing check t7pe refl6= (non ret6rn) valves:part ? '6lti door pattern
EA
-
8/13/2019 1.Technical Specification
58/71
9S : E53? (/art ?)Specification for swing check t7pe refl6= (non ret6rn) valves:
part ? '6lti door pattern
9S : 3?++? (/art 3) Safet7 relief valves, spring loaded : Design
9S : 354+E 96tterfl7 valves for general p6rposes
*"t%r ,%"t%r&
S ?4? : 3++5Stationar7 storage t7pe electric water heaters 1 specifications
Pi4%& "nd ittin2&
N 34EA( Cormerl7 9S ?A3),
Ta;le I0G
Specification for "opper /ipes
N 3?E*&3( Cormerl7 9S * :
/art ?)
Specification for "opper Cittings
%ST' D ?* E "/" /ipes and Cittings
%ST' C *+5 "/" solvent cement
W2 Standard Cor Drinking water B6alit7
-
8/13/2019 1.Technical Specification
59/71
-
8/13/2019 1.Technical Specification
60/71
;6ried 6nder gro6nd shall ;e provided with protection of the o6ter s6rface, against soilcorrosion ;7 6sing one wrap of 5mm thick anticorrosion tape
44? 6ter s6rface of overgro6nd pipes shall ;e thoro6ghl7 cleaned of mill scale, r6st etc
;7 wire ;r6sh, there after, one coat of red lead primer shall ;e applied Cinall7 two
coats of s7nthetic enamel paint of approved colo6r shall ;e applied
4A44 9R%N"2 // WT2 NL
4A43 The 9ranch /ipe (%llo7 Steel) with NoHHle sho6ld conform to S:+45 The ;ranch pipe sho6ld
have male inlet connection of 5mm siHe at one end and other end sho6ld ;e threaded with a
noHHle of 3mm ;ore
444 2S WT2 "-/LN
-
8/13/2019 1.Technical Specification
61/71
-
8/13/2019 1.Technical Specification
62/71
operate with the installed t7pe ;6t shall initiate a mismatch (tro6;le) condition 6ntil
the proper t7pe is installed or the programmed sensor t7pe changed
A) ach sensor shall respond to Cire %larm /anel scan for information with an analog6e
representation of meas6red fire related phenomena (smoke densit7, particles of
com;6stion, temperat6re) S6ch response proves end&to&end sensor incl6ding the
operation of the sensor electronics
) The detector shall meet the reF6irements of either N E* or shall ;e listed with L/"9 t shall
;e possi;le to test the detectorGs working ;oth from the panel as well as locall7 ;7 means as
designed ;7 the "ontractor and approved ;7 the ngineer&in&charge The approved coverage
per detector for 6nhampered areas shall not ;e less than E4 SF ' The detector shall ;e
capa;le of ;eing reset a6tomaticall7 after an7 alarm condition
+) Addr%&&"#7% M"nu"7 C"77 Point&are proposed to ;e installed at each =it Staircase, Lo;;7
areas on each floor to compl7 with relevant standard ! norms or recommendation of local fire
;rigade a6thorit7
34) ach device shall ;e assigned a 6niF6e address via easil7 6nderstood decade (43 to ++) switch
%ddress selection via ;inar7 switches or ;7 @6mpers is not accepta;le Devices that take theiraddress from their position in the circ6it are 6naccepta;le ;eca6se if devices are later added,
e=isting addresses, descriptors and commands need to ;e reprogrammed
33) ach device shall contain screw terminals with rising plates for positive termination s6ita;le for
3E SFmm copper cond6ctor wire
3?) The Cire /anel shall ;e capa;le of displa7ing the address of the occ6rrence of the smoke and
shall ;e capa;le of activating 2ooters t shall have the provision for e=ternal act6ation like
ventilation fan control, fire damper control, if an7 and s7stem sho6ld provide pen /rotocol in
case connectivit7 is reF6ired with 9'S (96ilding 'anagement S7stem)
t shall ;e possi;le to program the Cire /anel s6ch that meaningf6l alphan6meric descriptions
can ;e assigned to each Detector %ddress This shall ;e 6sef6l in identif7ing the location of Cire
ver7 F6ickl7 and easil7
35) t is important to note the SSNT%L RB-R'NT from the s7stem mentioned as 6nder
%s it has ;een stated the SMST' RB-R'NT %R SSNT%L RRS/"T C
W2T2R %NM C T2 D"S R "'/NNTS 'NTND %R
/RSNTLM 9N< -SD %S /R 9LL C '%TR%L ! B-%NTTM R % C-T-R
R-BR'NT
ver7 detector sho6ld ;e loop powered and addressa;le ;7 itself
ver7 'an6al "all point sho6ld ;e loop powered and addressa;le ;7 itself
ver7 So6nder ! 2ooter sho6ld ;e loop powered and addressa;le ;7 itself
ver7 Linear 9eam Detector sho6ld ;e loop powered and addressa;le ;7 itselfver7 one 'onitor nterface (for connecting to "onventional detectors and Devices) sho6ld
;e loop powered and addressa;le ;7 itself
No separate power s6ppl7 sho6ld ;e 6sed for the So6nders ! 2ooters which are s6pposed to ;e
onl7 loop powered The s7stem th6s is general will ;e ;ased on onl7 loop ca;le
No separate %ddressa;le interface 6nit ! mod6le sho6ld ;e 6sed for the So6nders ! 2ooters
which are s6pposed to ;e self %ddressa;le t7pe
No separate %ddressa;le interface 6nit ! mod6le sho6ld ;e 6sed for the one 'onitor nterface
(for connecting to "onventional detectors and Devices) which are s6pposed to ;e self
%ddressa;le t7pe
ver7 'od6le in general 'onitor mod6le, 'ini ! 'icro 'onitor 'od6le, "ontrol 'od6le,
solator 'od6le etc sho6ld ;e loop powered and addressa;le ;7 itself
?
-
8/13/2019 1.Technical Specification
63/71
/anel config6ration sho6ld strictl7 follow N 1 E* in terms of fail6re of devices if F6antit7 are
more than E3?
The alarm so6nder shall consist of necessar7 solid state electronic circ6it or printed circ6it card,
s6ita;le to accept imp6lse from fire alarm panel f reF6ired, necessar7 line matching
transformer shall also ;e incl6ded with the so6nder The speaker of the so6nder shall prefera;l7
;e ho6sed in a s6ita;le ;o=
3E44 /% SMST'
3E43 S6ita;le /6;lic %ddress S7stem comprising micro phone 8 amplifier 6nit shall ;e
co6pled with the fire alarm s7stem in s6ch a wa7 that the /% S7stem will come into
operation in case of fire alarm, having the man6al override facilities
344 S%CTM S
-
8/13/2019 1.Technical Specification
64/71
-
8/13/2019 1.Technical Specification
65/71
? S:5E+ : 'ild Steel T6;es (?44mm and a;ove)
XXXXXXXX
APPROVED LIST O MATERIALS
SL.No NAME O ITEMS LIST O APPROVED
MANUACTURERS 8 0RAND 8
APPLICATORS
CIVIL
3 "ement -ltra&Tech, %"",
-
8/13/2019 1.Technical Specification
66/71
? %6tometic Sliding gate
-
8/13/2019 1.Technical Specification
67/71
-
8/13/2019 1.Technical Specification
68/71
-
8/13/2019 1.Technical Specification
69/71
-
8/13/2019 1.Technical Specification
70/71
;e e=ec6ted ;7 a6thoriHed vender of
godre@ or eF6ivalent)
IRE IG,TING AND PREVENTION
*OR+S
3 'S pipes #indal ! 9%NS%L ! T%T%
? Sl6ice!NR $alpana ! 2Sarkar ! en6s
5 %ir Release alve S6kan ! Leader
* Cire 27drant alve Newage!
-
8/13/2019 1.Technical Specification