    09Feb

    Sect. I Course 1

    LR INSURANCE, INC.Working together for a safer world

    LR INSURANCE INC

    ASME Boiler and Pressure Vessel Code

    General Requirements of

    ASME Section I 2013

    Rules For The Construction Of

    Power Boilers

    LR Insurance, Inc.Working together for a safer world

  • 8/11/2019 1_ ASME2013

    2/24

    09Feb

    Sect. I Course 2

    LR Insurance, Inc.Working together for a safer world

    Content

    1. Introduction, LR and LR Insurance Inc

    2. Organisation, Content and Structure of Section I

    3. General Requirements for all Methods of Construction

    4. Requirements for Methods of Fabrication

    Welding---Riveting---Brazing

    5. Requirements for Types of Boilers

    Watertube---Firetube---Feedwater Heater---Miniature---Electric---Organic Fluid Vaporizer---

    Heat Recovery Steam Generator

    6. Mandatory and Nonmandatory Appendices

    LR Insurance, Inc.Working together for a safer world

    Lloyds Register.

    The worlds first ship classificationSociety - founded in 1760

    We are not an insurance company anddo not have any connections with

    Lloyds of London

    We are a not for profit organisation we do not have any shareholders

    Our business is governed by ourGeneral Committee, the members of

    which are drawn from the industries

    which we serve

    Our purpose is to to promote safety of life and

    property

    to improve overall businessperformance in the industries we

    serve

    We achieve this by securing hightechnical standards of design,

    construction, maintenance and

    operation

  • 8/11/2019 1_ ASME2013

    3/24

    09Feb

    Sect. I Course 3

    LR Insurance, Inc.Working together for a safer world

    LR Insurance, Inc.

    Workingtogetherfor a safer world

    Workingtogetherfor a safer world

    ASME Section I General Information

    2013 Edition

    5 June 2014

  • 8/11/2019 1_ ASME2013

    4/24

    09Feb

    Sect. I Course 4

    Boilex Exhibition 5 June 2014

    ASME Certification Mark and Designators

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction - PG

    Organisation, Content and Structure of Section I

    General requirements for all methods of

    construction (PG)

    Requirements for methods of fabrication

    Welding (PW), Riveting (PR), Brazing (PB)

    Requirements for types of boilers Watertube Boilers - PWT Firetube Boilers - PFT Feedwater Heater - PFH Miniature Boiler - PMB Electric Boilers - PEB Organic Fluid Vaporizer - PVG Heat Recovery Steam Generators - PHRSG

    Mandatory and Nonmandatory Appendices

  • 8/11/2019 1_ ASME2013

    5/24

    09Feb

    Sect. I Course 5

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Service Limitations

    Boilers in which steam or vapouris generated at a pressure of more

    than 15 psig

    High temperature water boilersintended for operation at

    pressures exceeding 160 psig (1.1

    Mpa) and / or temperatures

    exceeding 120 C

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Materials

    Shall conform to one of the specifications givenin Section II and shall be limited to those that

    are listed in the Tables of Section II, Part D.

    Further limitations are given in PG-5 General,PG-6 to PG-14 for plates, forgings, castings, pipes

    and tubes, miscellaneous pressure parts, gage

    glass body, stays and rivets

  • 8/11/2019 1_ ASME2013

    6/24

    09Feb

    Sect. I Course 6

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Design

    Shall conform to the general design requirements and in

    addition to the specific requirements given in the applicable

    parts pertaining to the methods of construction

    Minimum thickness of any boiler plate under pressure shall be

    inch (6 mm) except for electric boilers constructed under

    PEB

    Minimum thickness of plates to which stays may be applied in

    other than cylindrical outer shell plates shall be 5/16 inch (8

    mm)

    When pipe larger than NPS 5 (DN 125) is used in lieu of

    plate for the shell of cylindrical components under

    pressure, its minimum wall shall not be less than the

    smaller of 1/4 in. (6 mm) or the minimum wall thickness of

    Standard wall pipe listed in ASME B36.10M, Table 1.

    When no rules are given and it is impossible to calculate, this

    may be done by appropriate analytical methods, the

    appropriate use of rules from other design codes or, as

    permitted by PG-18, by proof test.

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Design

    Loadings are to be considered

    Hydrostatic head

    Other stresses that increase the average stress by more than 10 including

    Weight of component and its content

    Method of support

    Quality factors for steel castings to be considered

    Design formulas are given for

    Cylindrical components under internal pressure

    Dished heads (stayed and unstayed)

    Unstayed flat heads and covers

    Openings and compensations

    Stayed surfaces

    Ligaments (definite or not definite patterns)

  • 8/11/2019 1_ ASME2013

    7/24

    09Feb

    Sect. I Course 7

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Boiler external piping and boiler proper connections

    Boiler external piping

    Materials, design, fabrication, installation and testing :defined in ASME B 31.1 , Power Piping

    Boiler proper

    Common to steam, feedwater, blow-off and drain systems

    Requirements for miscellaneous pipe, valves and fittings

    Water level indicators

    Water columns Connections

    Pressure gauges

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Overpressure Protection Requirements

    Boiler (PG-67)

    each boiler shall have at least one pressure relief valve If more than 500 ft (47m) of bare tube water-heating

    surface, or an electric boiler has a power input of more than

    1,100 kW, it shall have two or more pressure relief valves

    Capacity of pressure relief valve(s) shall not allow the boiler

    to rise the pressure more than 6 above the highest

    pressure at which any valve is set and in no case to more

    than 6 above the MAWP

    Minimum relieving capacity for all type of boilers shall notbe less than the maximum designed steaming capacity at the

    MAWP of the boiler

    One or more pressure relief valves shall be set at or belowthe MAWP. Additional valves: setting shall not exceed the

    MAWP by more than 3

  • 8/11/2019 1_ ASME2013

    8/24

    09Feb

    Sect. I Course 8

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Overpressure Protection Requirements

    Superheater and Reheater (PG-68)

    Every attached superheater shall have one or morepressure relief valves in the steam flow path between the

    superheater outlet and the first stop valve

    Discharge capacity may be included in determining thenumber and size of the safety valves for the boiler

    Every separately fired superheater shall have one or moresafety valves having a discharge capacity equal to 6 lb/ft

    (29 kg/m) of steam per hour of superheater surface

    Every reheater shall have one or more safety valves withrelieving capacity of at least equal to the maximum steam

    flow for which the heater is designed

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Overpressure Protection Requirements

    Certification of Capacity of Safety and Safety Relief Valves

    Manufacturer of safety and safety relief valves need todemonstrate to ASME a QC Programme and to test and receive

    certification on the relieving capacity for each type of valve

    Capacity test are to be conducted at authorized places by themanufacturer and an ASME authorized observer

    Following tests by the manufacturer all tests will be repeated atthe test labs of the National Board in Ohio

    Agreement between the results of the 2 labs shall be within 2

    Upon completion of satisfactory tests and certification themanufacturer may stamp each valve with the V Code Symbol

    A Certified Individual of the manufacturer shall beresponsible to verify the documentation and to s ign the

    applicable Certificate of Conformance (Form P-8) for each safety

    or safety relief valve

  • 8/11/2019 1_ ASME2013

    9/24

    09Feb

    Sect. I Course 9

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Overpressure Protection Requirements

    MINIMUM REQUIREMENTS FOR PRESSURE RELIEF VALVES (PG-73)

    Pressure relief valves shall be either direct spring-loadedsafety valves, direct spring-loaded safety relief valves, or

    pilot-operated pressure relief valves.

    Power-actuated pressure relieving valves shall only be usedfor applications specified in PG-67.4.1.

    Deadweight or weighted lever safety valves or safety reliefvalves shall not be used.

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Fabrication, Inspection and Test

    Fabrication of all boilers shall conform to the generalfabrication requirements in PG and in addition to the specific

    requirements that pertain to the methods of construction

    used

    Plate identification to be kept or coded system to beused

    Out of roundness of cylindrical shell within a limit of 1

    Requirements for tube holes and holes for stays to beconsidered

    Corner joints to be MT or PT tested

    Each boiler, superheater, waterwall, economizer, any otherCode stamped item or component and boiler external piping

    to be inspected by an AI

    Duties of the AI are identified in PG-90.1

    Hydrostatic pressure tests

  • 8/11/2019 1_ ASME2013

    10/24

    09Feb

    Sect. I Course 10

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Certification and

    Stamping

    Guide to information

    appearing on Certificate

    of Authorization

    S Designator for Power Boiler

    A Designator for Assembly

    PP Designator for Power Piping

    M Designator for Miniature Boiler

    E Designator for Electric Boiler

    V Designator for Pressure Relief

    Valve for Boiler

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Contd Certification and Stamping

    Hard stamping is required however in addition each manufacturer shall

    furnish a metallic plate with the required data reproduced; this plate

    shall be readily visible from the operating floor or platform

    Location of stamping and required data is clearly defined

    External piping > NPS 2 (DN 50) to be properly stamped with ASME

    Certification Mark

  • 8/11/2019 1_ ASME2013

    11/24

    09Feb

    Sect. I Course 11

    LR Insurance, Inc.Working together for a safer world

    General Requirements for all Methods of Construction

    Manufacturers Data Report Forms

    P2 - for all types of boilers except watertube and electric

    P2A - for all types of electric boilers

    P2B - for electric superheaters and reheaters

    P3 - for watertube boilers, superheaters, waterwalls, economizer

    P3A - for engineering contractors having design responsibility

    P4 - for boiler parts

    P4A - for fabricated piping, shop and field welded

    P4B for field-installed mechanically assembled piping

    P5 - for all items of field assembled process steam generators (summary)

    P6 - supplementary sheet to record additional data

    P7 - for safety valves

    Data Reports are to be furnished to the purchaser, inspection agency and

    the authority at the place of location

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding Part PW

    General Welding Requirements

    Welding and qualification of procedures and

    personnel is the responsibility of the manufacturer

    and shall be in accordance with Section IX

    Code welding may be done by welders employed

    by the manufacturer or, under certain conditions,

    by welders not employed by the manufacturer

    Joints shall be full penetration butt welds, with

    some exceptions

    Joints between material of unequal thickness shall

    be tapered

  • 8/11/2019 1_ ASME2013

    12/24

    09Feb

    Sect. I Course 12

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Nondestructive Examination

    Unless exempted by table PW-11 all longitudinal

    and circumferential welded butt joints shall be

    RT examined through their entire length

    UT allowed only under special conditions

    RT and UT to be in accordance with Section V

    Qualification of personnel to SNT-TC-1A or CP-189

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Welded Connections

    Requirements for calculation of the weld strength to

    be considered including stress correction factors

    (PW-15)

    Welding details for connections are given in PW-16

    Full penetration from one or both sides Partial penetration from both sides

    Fillet welds from both sides

    Fillet and partial penetration welds on oppositesides

    Special requirements for necks and tubes up to and

    including NPS 6 (DN150) attached from one side only

  • 8/11/2019 1_ ASME2013

    13/24

    09Feb

    Sect. I Course 13

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Fabrication

    Alignment tolerances to be considered, see PW33

    Maximum reinforcement to be considered, see PW-35

    Repair of Defects

    Repair welding in general is allowed, even under

    special conditions without PWHT

    The area is to be MT or PT examined before and after

    repair welding

    Limits for repair are given for the maximum depthand size of the defective area

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Postweld Heat Treatment (PWHT)

    Applicable to boiler proper and parts thereof - not

    applicable to external piping

    All welded pressure parts shall be given a PWHT at a

    temperature specified for the various P-Number

    groupings , see tables PW-39 and PW-39.1

    Exemptions for heat treatment are given in the notes ofthe tables

    Weldments may be heat treated by any of the following

    methods

    Heating the complete assembly as a unit

    Heating sections of assemblies

    Local PWHT by heating a circumferential bandaround the weldment

  • 8/11/2019 1_ ASME2013

    14/24

    09Feb

    Sect. I Course 14

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Test Plates

    Test plates are required for cylindrical pressure parts such as drums and shells

    Test plates are not required for cylindrical pressure parts such as pipe, tubes and headers

    and all cylindrical pressure parts of P-No 1 materials

    Test plates shall be prepared from plate of the same material specification, same or

    greater thickness as the weld at the joint , same welding procedure

    Test plates be welded as continuation except for vessels with circumferential welds only

    When noncylindrical pressure parts are not integral with the vessel, a test plate shall be

    provided of a thickness not less than that of the parts

    For several pressure parts of any one design welded in succession of the same material

    covered by the WPS, a test plate is required for each 200 ft (60m)

    t of the thinnest and thickest plate shall not differ by more than inch (6mm)

    Test specimen (2 tension tests (1 transverse + 1 all weld metal) and 1 bend test

    transverse to the welded joint) are to be removed as specified and tested

    For plate thicknesses less than 5/8 inch (16mm) the all weld metal test may beomitted

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Welding

    Hydrostatic Pressure Tests

    All welded parts are to be subjected to a hydrostatic test

    pressure of not less than 1,5 times the MAWP

    Test may be made either in the shop or field

    Welding of non pressure parts to pressure parts may be

    performed after hydro test without requiring another hydro

    test under the following conditions :

    Inspection by the AI

    Pressure part material limited to P1 materials

    Non pressure parts limited to carbon steel with C < 0,2or any P1 material

    Welding by stud or fillet welding, the throat notexceeding the lesser of 0,7 times the thickness of the

    pressure part or inch (6 mm)

    Minimum of 200 F (95 C) preheat shall be appliedwhen the pressure part thickness exceeds inch (19mm)

  • 8/11/2019 1_ ASME2013

    15/24

    09Feb

    Sect. I Course 15

    LR Insurance, Inc.Working together for a safer world

    Requirements for Boilers fabricated by Riveting or Brazing

    Fabrication by Riveting

    Manufacturers using riveted constructions shalluse the 1971 Edition of Section I

    Fabrication by Brazing

    This Part is similar organized as the Part for welding

    Brazing processes are specified

    Service restrictions due to temperature limits

    Brazing procedures and personnel to be qualified in accordance with Section IX

    Design to be in accordance with the rules of this Part and in conjunction withPG as well as the Part pertaining to the method of fabrication

    Joint efficiency factor for all joints shall be 1

    Visual examination required

    LR Insurance, Inc.Working together for a safer world

    Requirements for Watertube Boilers Part PWT

    This part is applicable to watertube boilers and parts thereof

    Is not applicable for external piping

    Design to be in accordance with PG and specific requirements of this part

    Material to conform to specification in Section II and for which stress values are given

    Tube wall thickness

    Either to be calculated or table PWT-10 may be used in lieu of the formulafor SA-178 Gr A, SA-192 and SA- 226 provided the maximum mean wall

    temperature does not exceed 700F (370C)

  • 8/11/2019 1_ ASME2013

    16/24

    09Feb

    Sect. I Course 16

    LR Insurance, Inc.Working together for a safer world

    Requirements for Watertube Boilers

    Tube connections

    Expanded and flared

    Expanded and beaded

    Expanded, flared, seal welded and re-expanded

    Expanded, seal welded and re-expanded or

    seal welded and expanded after welding

    Firing doors shall be of the inward-opening type unless

    such doors are provided with substantial and effective

    latching

    Minimum size of an access or fire door opening different

    for furnace dimensions greater 24 inch (600 mm) or

    smaller 24 inch

    12 x 16 inch (300 x 410 mm) or 15 inch (380 mm)when circular

    2 x 3 inch (70 x 89 mm) or 2 openings with aminimum size of 1 inch (25mm)

    LR Insurance, Inc.Working together for a safer world

    Requirements for Firetube Boilers Part PFT

    Design to be in accordance with PG and specific requirements of this part

    Material to conform to specification in Section II and for which stress values are given

    Attachment of heads and tubesheets

    By flanging and butt welding

    By fillet welding an outwardly or inwardly flanged tubesheet to the shell

    By welding an unflanged tubesheet to the shell

  • 8/11/2019 1_ ASME2013

    17/24

  • 8/11/2019 1_ ASME2013

    18/24

    09Feb

    Sect. I Course 18

    LR Insurance, Inc.Working together for a safer world

    Requirements for Firetube Boilers

    Fireside Access and Inspection Openings

    Size and types of access or fire door openings Size and types of inspection openings for the various boiler

    types

    Domes

    Welding, location and size to be considered

    Method of Support

    Design and attachment according to PG-22.1 + PG-55

    Piping, Fittings and Appliances

    Requirements for water level indicators, feed- and blow-offpiping to be considered

    Thickness of Furnaces and tubes under external pressureand MAWP

    Design temperature is a critical factor MAWP to be determined with PFT-51

    LR Insurance, Inc.Working together for a safer world

    Requirements for Feedwater Heater - PFH

    Design requirements

    If located within the limits of Section I piping, then

    Section I rules are applicable

    Construction to Section VIII Div.1 nevertheless possible,

    provided :

    Section VIII Div. 1 rules (UW-2c) are applied

    MAWP of the primary (feedwater) side limited

    Design temperature of tubes specified

    Heater to be stamped with U symbol and U-1Data Report required

    Nameplate per UG-119 with additional information

    Master Data Report with additional information

  • 8/11/2019 1_ ASME2013

    19/24

    09Feb

    Sect. I Course 19

    LR Insurance, Inc.Working together for a safer world

    Requirements for Miniature Boilers- Part PMB

    Limits of miniature boilers

    16 inch (400 mm) inside diameter of shell

    20 ft (1.9 m) heating surface

    5 ft (o.14 m) gross volume

    100 psig (7oo KPa) MAWP

    The rules in this part shall supplement PG requirements and take precedence over them

    when there is a conflict when any of the limits are exceeded, the rules for power boilers

    shall apply

    Materials and thickness requirements

    Materials to conform to specifications in Section II

    Seamless and welded shell from pipe not less than 3/16 inch (5.0 mm)

    Shells or heads made from plate not less than inch (6.0 mm) Heads used as tubesheets, with tubes expanded, not less than 5/16 (8.0mm)

    Due to small size, requirements for identification of material need not be met

    LR Insurance, Inc.Working together for a safer world

    Requirements for Miniature Boilers

    Design requirements

    Washout or inspection openings required depending on size

    Feedwater and blow-off connections required

    Water gage(s) to be attached at defined level

    All valves, pipe fittings and appliances connected shall be equal at least toclass 125 (PN 20) or class 150 (PN 20)

    Each boiler to be equipped with a sealed spring loaded safety valve of not

    less than NPS inch (DN 15)

    Steam stop valve required

    Hydrostatic pressure test

    Each boiler shall be subjected to a hydrostatic pressure test of 3 times theMAWP and shall be inspected while under pressure

    Different test pressures required for boilers with mechanically assembledboiler external piping or trim

  • 8/11/2019 1_ ASME2013

    20/24

    09Feb

    Sect. I Course 20

    LR Insurance, Inc.Working together for a safer world

    Requirements for Electric Boilers Part PEB

    This part contains special rules for construction of

    Electrode type boiler, in which heat is generatedby the passage of an electric current using water

    as the conductor

    Immersion resistance element type boiler in whichthe heat is generated by passage of an electric

    current through a resistance heating element

    immersed in water

    Not included are electric boilers where the heat is

    applied externally to the boiler pressure vessel by

    electric resistance heating elements, induction coils, or

    other electrical means

    LR Insurance, Inc.Working together for a safer world

    Requirements for Electric Boilers

    Electric boilers and parts thereof that do not exceed the limits of PMBs may be

    constructed using the applicable paragraphs of PMB in conjunction with this part

    The boiler pressure vessel may be constructed to Section VIII Div.1 provided

    Material of construction is clearly defined and as allowed in this part

    Inspection openings are provided

    Vessel shall be stamped with the Code Symbol Stamp U and the lettersUB

    Special entry on the Master Data Report P-2A

    Material and thickness requirements

    Materials are limited to certain specifications only

    Seamless or welded shell, plates or heads shall not be less than 3/16 (5mm)

    Welding

    If limits of PMB are not exceeded then PWHT , RT and remaining NDEdescribed in PG-93.1 are not required

  • 8/11/2019 1_ ASME2013

    21/24

    09Feb

    Sect. I Course 21

    LR Insurance, Inc.Working together for a safer world

    Requirements for Electric Boilers

    Design requirements

    Inspection openings required, except when a removable cover or internalelectric heating element is available

    Feedwater and blow-off piping size to be considered

    Water level indicators (gage glasses) to be provided

    Number and size of safety valves required depending on the power input

    Hydrostatic tests required

    Inspection and stamping of electric boilers is different for size, power input, typeof construction

    Under certain conditions AI need not to witness final examination orhydrostatic pressure test

    LR Insurance, Inc.Working together for a safer world

    Requirements for Organic Fluid Vaporizers Part PVG

    Material requirements

    Materials shall conform to specifications in Section II and the requirements inPart PG shall apply in all respects

    Design requirements

    General requirements of Part PG and specific requirements of this Part apply

    Design working pressure shall be at least 40 psi (280 KPa) above the operatingpressure at which it will be used

    Gage glasses shall be of the flat glass type with forged steel frames Suitable drain valves of the globe or angle type may be used

    Safety valves shall be of a totally enclosed type and shall not have a liftinglever

    The discharge capacity and minimum relieving capacity to be determined

    Testing and certification as under PG-69

    a rupture disc may be installed between the safety valve and the vaporizer special conditions to be considered

  • 8/11/2019 1_ ASME2013

    22/24

    09Feb

    Sect. I Course 22

    LR Insurance, Inc.Working together for a safer world

    Requirements for Heat Recovery Steam Generators Part PHRSG

    Scope

    HRSG has as its principle source of thermal energy a hot gas stream suchas the exhaust of gas or combustion turbine (considered synonymous andcover turbines burning liquid or gaseous fuels).

    Requirements For Superheater And Reheater Condensate Removal

    Connections

    Each superheater and reheater shall be equipped with at least one automatedcondensate removal connection.

    Shall be designed so that when discharching, a high pressure is not developedwithin the collection device.

    Such piping shall extend through and include the second valve.

    Desuperheater Drain Spots

    Drain pot connection size shall be no smaller than one NPS less than the pipe

    is attached to. Certification

    Manufacturers Data Report in accordance with Part PG

    LR Insurance, Inc.Working together for a safer world

    APPENDICES

    Mandatory Appendices

    Mandatory Appendix I : Deleted

    Mandatory Appendix II : Standard Units For Use In Equations

    Mandatory Appendix III : Criteria for Reapplication of a Certification Mark

    Mandatory Appendix IV : Local Thin Areas in Cylindrical Shells and in

    Spherical Segments of Heads

    Mandatory Appendix V: Additional Rules for Boilers Fabricated byRiveting

    Mandatory Appendix VI: Establishing Governing Code Editions, Addenda,and Cases for Boilers and Replacement PartsApp.

  • 8/11/2019 1_ ASME2013

    23/24

    09Feb

    Sect. I Course 23

    LR Insurance, Inc.Working together for a safer world

    APPENDICES

    Nonmandatory Appendices

    App. A : Explanation Of Code Containing Matter Not Mandatory UnlessSpecifically Referred To In The Rules Of The Code

    Efficiency of Joints (Riveted)

    Braced and Stayed surfaces

    METHOD OF CHECKING PRESSURE RELIEF VALVE CAPACITY BY MEASURINGMAXIMUM AMOUNT OF FUEL THAT CAN BE BURNED

    AUTOMATIC WATER GAGES

    FUSIBLE PLUGS

    PROOF TESTS TO ESTABLISH MAXIMUM ALLOWABLE WORKING PRESSURE

    PRESSURE RELIEF VALVES FOR POWER BOILERS

    EXAMPLES OF METHODS OF COMPUTATION OF OPENINGS IN VESSEL SHELLS

    EXAMPLES OF COMPUTATION OF ALLOWABLE LOADING ON STRUCTURALATTACHMENTS TO TUBES

    PREHEATING (A-100) , HEATING AND COOLING RATES FOR POSTWELD HEATTREATMENT (A-101)

    ROUNDED INDICATION CHARTS

    METHODS FOR MAGNETIC PARTICLE EXAMINATION (MT)

    LR Insurance, Inc.Working together for a safer world

    APPENDICES

    Nonmandatory Appendices

    Appendix A : Explanation Of Code Containing Matter Not Mandatory UnlessSpecifically Referred To In The Rules Of The Code (continued)

    METHODS FOR LIQUID PENETRANT EXAMINATION (PT)

    QUALITY CONTROL SYSTEM

    ACCEPTANCE OF TESTING LABORATORIES AND AUTHORIZED OBSERVERS FORCAPACITY CERTIFICATION OF PRESSURE RELIEF VALVES

    DATA REPORT FORMS AND GUIDES

    CODES, STANDARDS, AND SPECIFICATIONS REFERENCED IN TEXT (A-360) Guide to Information Appearing on Certificate of Authorization (A-370)

    SAMPLE CALCULATIONS FOR EXTERNAL PRESSURE DESIGN

    GUIDANCE FOR THE USE OF U.S. CUSTOMARY AND SI UNITS IN THEASME BOILER AND PRESSURE VESSEL CODE

    Appendix B : Positive Material Identification Practice

  • 8/11/2019 1_ ASME2013

    24/24

    09Feb

    LR Insurance, Inc.Working together for a safer world

    MANY THANKS FOR YOUR ATTENTION

    LR INSURANCE, INC.Working together for a safer world

    The Lloyds Register Groupworks to enhance safety andapprove assets and systems atsea, on land and in the air because life matters.

    Services are provided by members of the Lloyds Register Group LloydsRegister, Lloyds Register EMEA and Lloyds Register Asia are exemptcharities under the UK Charities Act 1993.

    For more information, please contact:

    Chamni Mosagul

    LR Insurance, Inc.

    66 81 9352069

    Chamni.mosagul

    @lr.org