19% increased drilling efficiency from 61% to 80% between 2010 and 2011

1
0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 0 20 40 60 80 100120140160180200220240260280300 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% January February March April May June July August September October November December 0 10 20 30 40 50 60 70 59 51 47 50 49 49 50 54 46 52 51 50 19% Increased drilling efficiency from 61% to 80% between 2010 and 2011 # OF WELLS MONITORED BY MONTH 2011 % OF EFFICIENCY BY MONTH 2011 CASE STUDY Reduced numbers of wells from critical to normal condition Reduce drilling risks using offset well events, logging trends analysis and cross plot in real time The RTOC provides engineering solutions to increase the control over the drilling process Real-time engineering empowers the client to prevent and control future drilling events TRAFFIC LIGHTS METHODOLOGY CRITICAL The well is classified in Critical status when the drilling operation conditions require significant changes within the original drilling program to reach the goal in the well ALERTS The well is classified in Alert status when operative conditions and time are not within range or according to the plan NORMAL The well is classified in Normal status when operative conditions and time are within range and according to the plan REAL TIME GEOPRESSURE IMPACT ON DRILLING OPERATIONS DECISION MAKING BY APPLYING REAL TIME METHODOLOGY COST-EFFECTIVE DECISION IN REAL TIME LATIN AMERICAN NATIONAL OIL COMPANY – RESULT 2011 The system will generate alarms indicating previous drilling events coming from the offset wells in relation to depth, trends and others real time variables DRILLING PERFORMANCE SYSTEM Pore Pressure and Fracture Gradient in real time 4 5 6 Depth vs Days Geological Column Well Schematic Real Plan 12 Alerts 09 Proposals 02 Programs 01 Recommendations 24 Average technical deliverables per well 61% 80% Investment (USD) Decision A Decision B Decision C SPWLA 2012 petroli nk SPWLA 53rd Annual Logging Symposium, June 16-20, 2012 Cartagena Colombia Ref: Ms. No. SPWLA-D-11-00175 Authors: MBA. Rafael Bermudez Martinez. [email protected] T: +1 713 686 3443 Eng. Concepcion Isidro Olan. [email protected] Petrolink Services Inc

Upload: rowan-ferrell

Post on 01-Jan-2016

13 views

Category:

Documents


0 download

DESCRIPTION

12 Alerts 09 Proposals 02 Programs 01 Recommendations. SPWLA 2012. 4. TRAFFIC LIGHTS METHODOLOGY. NORMAL The well is classified in Normal status when operative conditions and time are within range and according to the plan. p etrolink. ALERTS - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 19% Increased  drilling efficiency from 61% to 80%  between 2010  and  2011

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

7500

0 24 48 72 96 1201441681922162402642880

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

7500

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

January

February

March

April

May

June

July

August

September

October

November

December

0 10 20 30 40 50 60 70

59

51

47

50

49

49

50

54

46

52

51

50

19%Increased drilling efficiency from 61% to 80% between 2010 and 2011

# OF WELLS MONITORED BY MONTH 2011

% OF EFFICIENCY BY MONTH 2011

CASE STUDY

Reduced numbers of wells from critical to normal condition

Reduce drilling risks using offset well events, logging trends analysis and cross plot in real time

The RTOC provides engineering solutions to increase the control over the drilling process

Real-time engineering empowers the client to prevent and control future drilling events

TRAFFIC LIGHTS METHODOLOGY

CRITICALThe well is classified in Critical status when the drilling operation conditions require significant changes within the original drilling program to reach the goal in the well

ALERTSThe well is classified in Alert status when operative conditions and time are not within range or according to the plan

NORMALThe well is classified in Normal status when operative conditions and time are within range and according to the plan

REAL TIME GEOPRESSURE

IMPACT ON DRILLING OPERATIONS

DECISION MAKING BY APPLYING REAL TIME METHODOLOGY

COST-EFFECTIVE DECISION IN REAL TIME

LATIN AMERICAN NATIONAL OIL COMPANY – RESULT 2011

The system will generate alarms indicating previous drilling events coming from the offset wells in relation to depth, trends and others real time variables

DRILLING PERFORMANCE SYSTEMPore Pressure and Fracture Gradient in real time

4

5

6

Depth vs DaysGeological Column

Well Schematic

Rea

l

Pla

n12 Alerts

09 Proposals

02 Programs

01

Recommendati

ons

24 Average technical deliverables per well

61%

80%

Inve

stmen

t(USD

)

DecisionA

DecisionB

DecisionC

SPWLA 2012

p e t r o l i nk

SPWLA 53rd Annual Logging Symposium, June 16-20, 2012 Cartagena ColombiaRef: Ms. No. SPWLA-D-11-00175

Authors: MBA. Rafael Bermudez Martinez. [email protected] T: +1 713 686 3443Eng. Concepcion Isidro Olan. [email protected]

Petrolink Services Inc