    International Cement Conference - Cemtech -Dubai - March 2011

    Page 1

    POLYSIUS in the Middle East &

    Africa

    Case Studies

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 2

    MARKET

    Middle East and Africa cement industry is undergoing a fast

    growth fuelled by

    Urbanisation: expanding populations in the need of improvement

    of living conditions leading to housing, infrastructure, etc.

    Industrialisation: developing industries also need building

    materials

    Boom on commodities: despite the recent financial crisis, a

    sustained boom on commodities and subsequent Mining Capital

    Expenditure providing funds for GDP growth and requirement for

    building materials

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    2/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 3

    TRENDSOther significant trends in the cement industry :

    Reduction of CAPEX of the cement plant projects. Cement

    industry being highly capitalistic, access to funds is a challenge,

    particularly after the recent financial crisis leading to debt

    reduction policies for the companies

    Reduction of OPEX: many customers are focusing on more

    efficient and innovative solutions to reduce the operating costs

    (power and calorific savings, use secondary fuels, increase in

    plant availability)

    Sustainable and environmentally friendly solutions

    Challenges to POLYSIUS Keep High Quality Standards

    with Optimized Costs

    Equipment Reliability

    Innovative Solutions

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 4

    DIVERSITY

    Remarkable is the variety of our customers, ranging f rom :

    major international historical companies (LAFARGE, HOLCIM ,

    ITALCEMENTI, etc.)

    middle-size historical cement companies (VICAT, CIMENTS

    MOLINS or SCHWENK ZEMENT, etc.)

    local players + significant number of new players

    state owned companies

    Corresponding organization, skills, technical and financial resources

    vary a lot from a company to another, and accordingly the

    requirements and expectations

    Challenges to POLYSIUS Flexibility and Adaptability

    Suitable Projects Schemes &

    Contractual Set up

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    3/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 5

    POLYSIUS IN THE

    MIDDLE EAST & AFRICA

    CASE STUDIES

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 6

    EGYPTIAN CEMENT Co - LINE 5 5 300 tpd

    ECC Line 5 - Overview of achieved quantities

    Mechanical Equipment 11 200 tons

    Electrical Equipment 750 tons

    Reinforced Concrete 45 000 m3

    Structural Steel 5 500 tons

    GA & Detailed Drawings 410

    Civil & Structural Drawings 1 750

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    4/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 7

    EGYPTIAN CEMENT Co - LINE 5 5 300 tpd

    Main Factors of Success:

    Fast and controlled project execution thanks to copy plant

    concept: reduced CAPEX & time for completion, rapid

    production ramp up > improved financial return

    Largely sized equipment allowing capacity increase of each

    line from 4300 to 5300 tpd clinker and no additional raw mill for

    line 5 thanks to reserves on first 4 raw mills

    Civil & Structural Design by POLYSIUS SAS with same

    suppliers through long lasting collaboration in France. Policy of

    Best Cost

    Large manufacturing & construction capabilities and efficiency

    of OCI

    Excellent complementarity with OCI, shared values

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 8

    MISR BENI SUEF CEMENT Co - LINE 2 5 300 tpd

    MBCC Line 2 - Overview of achieved quantiti es

    Mechanical Equipment 10 400 tons

    Electrical Equipment 750 tons

    Reinforced Concrete 33 000 m3

    Structural Steel 5 500 tons

    GA & Detailed Drawings 325

    Civil & Structural Drawings 1 150

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    5/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 9

    MISR BENI SUEF CEMENT Co - LINE 2 5 300 tpd

    MBCC main requirements for Line 2:

    High quality standards for the supplied equipment

    Project management of the full scope of supply & works by

    one Contractor

    Reduced investment and controlled overall budget

    Reduced time for completion

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 10

    MISR BENI SUEF CEMENT Co - LINE 2 5 300 tpd

    Advantages to MBCC & key criteria of successful project:

    Secured overall budget thanks to copy plant concept fixed

    price for supply contract + guaranteed quantities for concrete

    and structural steel

    Full project management by POLYSIUS as for a turnkey-type

    contract of the supply chain (inquiry, procurement, quality

    control, coordination, planning, supervision, commissioning

    and training)

    Use of suitable industrial resources in Egypt from civil &

    structural design to civil works, steel manufacturing and

    erection works

    Fast plant execution, rapid production ramp up to 5300 tpd of

    clinker > profit maximisation

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    6/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 11

    AL SAFWA CEMENT Co - GREENFIELD PLANT 5 000 tpdAl Safw a Cement - Overvi ew of achi eved

    quantities

    Mechanical Equipment 13 600 tons

    Electrical Equipment 700 tons

    Reinforced Concrete 70 000 m3

    Structural Steel 6 700 tons

    GA & Detailed Drawings 445

    Civil & Structural Drawings 1 800

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 12

    YAMAMA SAUDI CEMENT Co - 10 000 tpd LINE

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    7/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 13

    YAMAMA SAUDI CEMENT Co - 10 000 tpd LINE

    The main targets of the project were:

    Installation of additional 10.000 tpd clinker production capacity

    as well as 630 tph cement grinding capacity

    Implementation of most modern technologies to achieve

    highest reliability and energy efficiency

    Meeting most advanced environmental standards and legal

    regulations

    Execution of the construction works without major influences

    on the existing 6 production lines

    Meeting the challenging time schedule with early cement in

    one grinding unit after 16 months

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 14

    YAMAMA SAUDI CEMENT Co - 10 000 tpd LINE

    YAMAMA SAUDI CEMENT 10 000 tpd - Overview of achieved

    quantities

    Mechanical Equipment 31 000 tons

    Electrical Equipment 4 000 tons

    Reinforced Concrete 72 000 m3

    Structural Steel 25 000 tons

    GA & Detailed Drawings 262

    Civil & Structural Drawings 11 000

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    8/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 15

    CIMENTS DE LATLAS 2 x GREENFIELD PLANTS 3 600 tpd

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 16

    CIMENTS DE LATLAS 2 x GREENFIELD PLANTS 3 600 tpd

    The main requirements of CIMAT were:

    Efficient raw material preparation thanks to on line analyser, circular

    mixing bed and POLAB quality control

    A balance between energy efficient modern technology, such as raw

    grinding vertical roller mill, CC calciner for petcoke firing,

    POLYTRACK clinker cooler with intermediate roll crusher, and well

    proven solutions such as a cement grinding plant

    Efficient and environmental friendly solutions such as a single high

    temperature integrated bagfilter for both kiln and cooler dedusting

    without any use of water and cooling air; pyro processing design to

    allow use of secondary fuels

    Optimized design of multi-compartments cement silos to ensure

    flexibility of cement types production and reduced investment costs

    High quality level of the equipment manufacturing

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    9/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 17

    CIMENTS DE LATLAS 2 x GREENFIELD PLANTS 3 600 tpd

    Some of our challenges were to:

    Manage 2 big contracts, with significant constructions

    volumes to be achieved in a short period

    Deal with lengthened delivery times for main machinery at

    a period of time (2007 and 2008) where industry was

    booming with suppliers backlog at a record high level

    Deal with corresponding rising prices of metals and

    materials

    Properly select the capabilities of suppliers and contractorsto ensure a proper quality and planning

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 18

    CIMENTS DE LATLAS 2 x GREENFIELD PLANTS 3 600 tpd

    CIMAT cement plants - Overview of achieved quantities

    Ben Ahmed plant Beni Mel lal plant

    Mechanical Equipment 11 900 tons 12 100 tons

    Electrical Equipment 900 tons 900 tons

    Reinforced Concrete 66 000 m3 68 000 m3

    Structural Steel 9 500 tons 9 500 tons

    GA & Detailed Drawings 830 450

    Civil & Structural Drawings 3 350 3 000

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    10/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 19

    SOTACIB FERIANA WHITE CEMENT LINE 2 1 000 tpd

    SOTACIB White cement line 2 - Overview of achieved

    quantities

    Mechanical Equipment 4 600 tons

    Electrical Equipment 200 tons

    Reinforced Concrete 12 000 m3

    Structural Steel 2 100 tons

    GA & Detailed Drawings 440

    Civil & Structural Drawings 885

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 20

    SOTACIB FERIANA WHITE CEMENT LINE 2 1 000 tpd

    Specific competitive advantages to drive SOTACIB decision to

    award POLYSIUS SAS were:

    Innovative POLYSIUS design for white cement pyro processing

    with a drum cooler + POLYTRACK grate to ensure high level of

    whiteness and reduced heat consumption when comparing to

    existing technologies on the market Skills and experience of POLYSIUS SAS in turnkey projects

    particularly in Tunisia, where all last major turnkey plant

    expansion were achieved by POLYSIUS SAS (upgrading in

    Ciments de Djebel Oust, new line n2 for Socit des Ciments

    dEndifha and subsequent conversion to petcoke of the same

    plants)

    Strong cultural links that ease communication and mutual

    understanding

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    11/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 21

    SOTACIB KAIROUAN GREENFIELD PLANT 3 600 tpd

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 22

    SOCOCIM INDUSTRIES LINE 5 3 600 tpd

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    12/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 23

    SOCOCIM INDUSTRIES LINE 5 3 600 tpd

    SOCOCIM main requirements:

    Low Operating Cost solutions (low energy consumption

    power & heat design to use secondary fuels)

    Low Capital Expenditure

    Environmental friendly solutions

    Turnkey execution

    Short time for completion

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 24

    SOCOCIM INDUSTRIES LINE 5 3 600 tpd

    SOCOCIM line 5 - Overview of achieved

    quantities

    Mechanical Equipment 7 600 tons

    Electrical Equipment 500 tons

    Reinforced Concrete 41 500 m3

    Structural Steel 4 100 tons

    GA & Detailed Drawings 520

    Civil & Structural

    Drawings

    1 400

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    13/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 25

    CIMENTS DU SAHEL LINE 5 3 600 tpd

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 26

    OHORONGO CEMENT GREENFIELD PLANT 2 100 tpd

    OHORONGO CEMENT plant - Overview of

    achieved quantities

    Mechanical Equipment 7 600 tons

    Electrical Equipment 500 tons

    Reinforced Concrete 41 500 m3

    Structural Steel 4 100 tons

    GA & Detailed Drawings 520

    Civil & Structural

    Drawings

    1 400

  • 7/21/2019 16.00 Luc Rudowski, Polysius

    14/14

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 27

    CONCLUSION

    Variety of our Customers Requirements, Resources, Experience

    & Culture > Each Industrial Project is Specific

    Our Aim: to Fit Customers Requirements & Resources by

    providing a Comprehensive Range of Project Solutions &

    Contractual Set up

    Best Cost strategy > Outstanding quality of POLYSIUS

    products and services + optimise the CAPital EXpenditure

    Efficiency & reliability of our Products + Flexibility & Proximity of

    our Services & our Experience in Middle East and Africa > quick

    financial return to our customers.

    International Cement Conference - Cemtech -Dubai - March 2011

    Page 28