15075 rev 0
TRANSCRIPT
-
8/13/2019 15075 Rev 0
1/13
WSA/D1381 Rev 0/2003 15075/1 Mechanical Identification
SECTION 15075
MECHANICAL IDENTIFICATION
REVISION HISTORY
0 18.04.03 Mechanical IdentificationRichard
Smith
Steve
King
Richard
Smith
Rev Date Description Preparedby
Checkedby
Authorisedby
-
8/13/2019 15075 Rev 0
2/13
WSA/D1381 Rev 0/2003 15075/2 Mechanical Identification
1 GENERAL
1.1 SECTION INCLUDES
1.1.1 Include the General Conditions of the Contract as part of this section.
1.1.2 The Contractor shall become familiar with other sections of the Specifications affecting work
of this trade.
1.1.3 Furnish all labour, materials, plant, equipment and appliances and perform all necessary
operations required to execute the work of this section.
1.1.4 This section describes the requirements for the identification of mechanical services.
1.2 RELATED SECTIONS
1.2.1 This schedule is intended to be used as a helpful indication of the related sections within the
Project Specifications. It is not necessarily comprehensive or complete and it is the
Contractor's responsibility to ascertain all applicable sections required to understand the fullScope of Works intended.
15130 Pumps
15150 Pressure Pipeline
15720 Air Handling Units and Fan Coil Units
15830 Fans
15710 Heat Exchangers
15815 Ductwork and Accessories
15910 BEMS
15300 Fire Suppression and Sprinkler Systems
15090 Thermal Insulation
15190 Liquefied Petroleum Gas
1.3 REFERENCES
1.3.1 The minimum standards for products specified in this section shall be those standards referred
to or relevant BSI standards.
1.4 SUBMITTALS FOR REVIEW
1.4.1 Section 01300 - Submittals.
1.4.2 Submit full details of each method of identification and installation method in accordance with
the Contract Documents. Submissions shall indicate all dimensions, details of constructiondetails of installation, relation and connections with adjoining work.
1.5 QUALITY ASSURANCE
1.5.1 Perform Work in accordance with relevant British Standards and industry standard codes.
1.6 QUALIFICATIONS
1.6.1 No requirements
1.7 MOCK-UP
1.7.1 Provide full size mock up of each type of identification.
-
8/13/2019 15075 Rev 0
3/13
WSA/D1381 Rev 0/2003 15075/3 Mechanical Identification
1.8 ENVIRONMENTAL REQUIREMENTS
1.8.1 Identification labels and valve diagrams shall be suitable for the environment in which they
are installed.
1.9 WARRANTY
1.9.1 Section 01740 - Warranties and Bonds.
2 PRODUCTS
2.1 APPROVED MANUFACTURER OR PRODUCT
2.1.1 No particular preference.
2.2 GENERAL REQUIREMENTS
2.2.1 All pipe work and ductwork services shall be identified in accordance with BS1710.
2.2.2 All items of plant, equipment and apparatus shall be allocated and shall bear a unique
reference number (URN) in accordance with the Engineers site wide referencing system (see
appendix). If the site wide referencing system is deficient in any way the Contractor shall
suggest suitable modifications to the Engineer and seek approval for such modifications to be
used.
2.2.3 All plant, equipment and apparatus indicated on drawings prepared by the Contractor shall be
annotated with the URN.
2.2.4 All methods of identif ication shall be approved by the Engineer.
2.2.5 All identification shall be permanently applied in a manner approved by the Engineer.
2.3 ABOVE GROUND SERVICES IDENTIFICATION
2.3.1 The entire surface area of the liquefied petroleum (LPG), fuel oil, diesel oil, compressed air,
sprinkler, fire hose reel, cold water service, cooled cold water and condenser water services
shall be permanently identified with a colour in accordance with BS1710. This shall be
achieved by painting the entire pipeline with a primer coat (following proper preparation) and
then two coats of good quality paint or by employing a pipework system with self colour
properties or an approved sheath such as Yorkshire Kuterlux, in case of copper pipes. Paint,
self colour properties and sheaths shall be coloured as BS 1710.
2.3.2 All pipework in services subways or corridors shall have their entire surface area identified as
required by 2.3.1, above.
2.3.3 In addition to those referred to in 2.3.1 and 2.3.2 above, all other pipework and ductwork
services that are concealed in risers and ceiling voids shall have their entire surface area
finished as required by the thermal insulation standard specification using standard materials /
colours, as specified.
2.3.4 In addition to those referred to in 2.3.1 and 2.3.2 above, all other pipework and ductwork
services that are exposed to view shall have their entire surface area finished as required by
the thermal insulation standard specification using the standard materials / colours, as
specified.
-
8/13/2019 15075 Rev 0
4/13
WSA/D1381 Rev 0/2003 15075/4 Mechanical Identification
2.3.5 All services, whether concealed or exposed to view shall be identified with identification
bands. These bands shall be coloured as BS1710 and shall also bear direction of flow arrows
and an abbreviation to identify the service.
2.3.6 Identification bands shall be applied in each riser section, at 15m centres in ceiling voids /
subways / service corridors and in locations in plantroom and laundry spaces where it is
possible to see an ID band for any service from any vantage point.
2.3.7 Standard abbreviations to be used on services identification bands shall include:
ChW Chilled water
HRChW Heat recovery chilled water
CW Condenser water
LTHW Low temperature hot water
HRLTHW Heat recovery low temperature hot water
HWS Hot water service
CWS Cold water service
CCWS Cooled cold water service
RUHWS Reuse hot water service
THWS Tempered hot water service
WHWS Waste water hot water service.
LPG Liquefied petroleum gas
CA Compressed air
St(10) 10 bar(g) steam
St(7.5) 7.5 bar(g) steam
St(5.5) 5.5 bar(g) steam
Cond Condensate (steam system)
Con Condensate (a-c system)
GS Gravity sewage
PS Pumped sewage
FHR Fire hose reel Sprinkler Sprinkler
SD Sprinkler drain
F Flow (liquid circulation systems)
R Return (liquid circulation systems)
CF Cold feed
Exp Expansion
PSA Primary supply air
PEA Primary extract air
SA Supply air
RA Recirculation air
EA Extract air
KEA Kitchen extract air
Exh Exhaust air IA Intake air
[D] Dirty
[C] Clean
2.4 BELOW GROUND SERVICES IDENTIFICATION
2.4.1 All below ground services shall be identified by a unique colour per service.
2.4.2 Refer to particular specification for details.
2.5 PLANT AND EQUIPMENT TALLY PLATES
2.5.1 All items of plant and equipment shall have a permanently fixed tally plate that shall include
-
8/13/2019 15075 Rev 0
5/13
WSA/D1381 Rev 0/2003 15075/5 Mechanical Identification
the following information as a minimum:
Makers name and contact details;
Date of manufacture;
Makers reference number that will allow item to be traced in future.
Working pressure (liquid items)
Test pressure (liquid items) Basic duty parameters;
Dry weight (if in excess of 1 tonne)
2.5.2 Where plant and equipment is insulated the tally plate shall be extended so that insulation can
be placed behind the plate.
2.6 VALVE, STRAINER, COCK AND STEAM TRAP IDENTIFICATION
2.6.1 Every valve, strainer, cock and steam trap shall be identified with a unique reference number
(URN) in accordance with the sitewide referencing system (see appendix)
2.6.2 Valve, strainer, cock and steam trap URNs shall be indicated on as built drawings and in O&Mmanuals.
2.6.3 Valve, strainer, cock and steam traps shall be identif ied with a brass or approved plastic fob
which shall be permanently engraved (10mm Arial font) with the URN. The fob shall be
permanently attached with a chain.
2.6.4 In addition to the URN, commissioning sets and metering stations shall have commissioned
flow rate (kg/s) and signal pressure (mm w.g.) engraved on the fob in 6mm Arial font.
2.6.5 In addition to the URN, differential pressure valves shall have the commissioned differential
pressure set point engraved onto the fob in 6mm Arial font.
2.6.6 All motorised and solenoid valves shall have a URN identification fob as described above. In
addition the fob shall have the valve flow rate (kg/s) permanently engraved onto it in 6mm
Arial font.
2.6.7 Valve diagrams shall be sited on walls in locations agreed with the Engineer. These valve
diagrams shall provide an isometric or general arrangement layout of the services in the
vicinity of the chart and shall clearly indicate each valve, strainer, cock and steam trap URN.
Valve diagrams shall be heat sealed onto moisture resistant MDF with edges sealed with two
coats of matt black paint. Valve URNs, types and services shall also be indicated in tabular
format on the diagram.
2.7 AIR HANDLING UNIT, PRIMARY AIR HANDLER A ND FAN IDENTIFICATION
2.7.1 This section applies to all type of air handling unit (e.g PAH, AH) and fans (eg KEF, EF)
2.7.2 Each air handling unit and fan shall be identified with its URN using a permanent traffolite
label that shall be fixed to the casing of the unit in a prominent location. The label shall have
black 25mm Arial font on a white background.
2.7.3 A permanent engraved traffolite label shall be fixed onto the air handling unit/fan casing in a
location that corresponds with the each component inside. The label shall contain the
following information and shall have 6mm black Arial font on a white background:
Dampers
- Fixed or motorised- Number
-
8/13/2019 15075 Rev 0
6/13
WSA/D1381 Rev 0/2003 15075/6 Mechanical Identification
- Mixing or ON/Off
Filter
- Type (bag or panel)
- Grade (G2, G3.F7, F8, etc)
- Clean resistance (Pa)
- Max Dirty resistance (Pa)
Heating or Cooling Coils
- Duty (kW)
- Liquid temperatures (C)
- Airside resistance (Pa)
- Waterside resistance (kPa)
Fans
- Type
- Duty (m3/s)
- Fan static pressure (Pa)
- External total resistance to unit (Pa)- Motor rating (kW)
- Full load current (A)
Heat recovery device
- Type
- Duty (kW)
- Air side resistance (Pa)
- Electrical rating (kW)
2.8 VOLUME CONTROL DAMPERS
2.8.1 Volume control dampers shall be permanently marked with their setting. A permanent label
shall be affixed to the damper to indicate the flow rate that has been achieved during
commissioning.
2.9 PUMP IDENTIFICATION
2.9.1 All pumps shall bear a permanent label that shall identify their URN, design flow rate, design
head, no flow head, electrical motor rating and full load current.
2.9.2 Labels shall be as 2.7.2, above but in addition shall include the pump duty in kg/s and kPa
using 6mm Arial font.
2.10 FIRE EQUIPMENT IDENTIFICATION
2.10.1 Fire hose reel cabinets, dry riser stations and fire tender connection points shall be identified
in accordance with ROP Civil Defense requirements.
2.10.2 In addition, each fire hose reel shall be marked with a sequential reference number. A
separate numbering system shall be adopted for each building or building group. This number
shall be indicated on the door (bottom right hand corner) of each fire hose reel cabinet and
shall be prefixed FHR This identication shall be sign written or created with proprietary self
adhesive letters using a 20mm black Arial font.
2.10.3 Similarly, dry riser outlets shall be identified in the same way as fire hose reels but the prefix
shall be dry riser inlets shall leave prefix DR.
-
8/13/2019 15075 Rev 0
7/13
WSA/D1381 Rev 0/2003 15075/7 Mechanical Identification
2.10.4 Sprinkler zone valves shall be identified in the same way as fire hose reels but the prefix shall
be SZV
2.11 BUILDING ENERGY MANA GEMENT SYSTEM (BEMS) IDENTIFICATION
2.11.1 All MCCs, outstations, starters, variable speed drives, sensors, detectors, switches,
thermostats, actuators and items of head end equipment shall be clearly identified inaccordance with the site wide identification system. Where specific references are not
included in the site wide identification system the Contractor shall devise suitable references,
as required.
2.11.2 Identification shall be achieved by engraving of the item of equipment / apparatus of by
affixing (glue and screwed) engraved or proprietary, permanent, printed self-adhesive labels
(not as Dymo).
2.11.3 BEMS identification references shall be reflected in the Contractors material submittals,
working drawings, points schedules, as built documents and operating and maintenance
documents.
2.12 HEAT EXCHANGERS (SEE OVER)
2.12.1 All heat exchangers shall bear a URN identification label as described for air handling units in
2.7.2 above. In addition the label shall provide the following information in 6mm Arial font.
Heat exchanger rating (kW)
Hot liquid inlet and outlet temperatures (oC)
Cold liquid inlet and outlet temperatures (oC)
3 EXECUTION
3.1 EXAMINATION
3.1.1 Verify site conditions under provisions of Section 01400.
3.1.2 Before ordering any materials/commencing work verify that building structure associated with
the system is within tolerance and take full account of shape configuration and material
properties of the structure.
3.2 HANDLING AND STORAGE
3.2.1 Deliver component parts to site, completely identified in accordance with shop and certified
drawings prepared for this work. Store in accordance with manufacturer's instructions, above
ground, properly protected from the weather and construction activities.
3.3 INSTALLATION
3.3.1 Before beginning installation in any area, examine all parts of the adjoining work into which
applicable work is to be placed. Should any conditions be found which will prevent the proper
execution of the work, installation shall not proceed in that area until such conditions are
corrected by the contractor.
3.4 FIELD QUALITY CONTROL
3.4.1 Provide field quality control under provisions of Section 01400 - Quality Control.
-
8/13/2019 15075 Rev 0
8/13
WSA/D1381 Rev 0/2003 15075/8 Mechanical Identification
3.5 CLEANING
3.5.1 Section 01710 - Cleaning installed work.
3.5.2 Remove any paint or concrete splatters after work is complete.
3.6 PROTECTION OF FINISHED WORK
3.6.1 Protect work under provisions of Section 01710.
3.7 STANDARD SPECIFICATION
3.7.1 This standard specification is intended to be used as a helpful indication of work within this
section. It is not necessarily comprehensive or complete and it is the Contractor's
responsibility to ascertain and complete the full works intended and as shown within the
drawings, specification and Contract or thereby implied.
-
8/13/2019 15075 Rev 0
9/13
WSA/D1381 Rev 0/2003 15075/9 Mechanical Identification
SITEWIDE REFERENCING SYSTEM - BUILDING SERVICES
Unique Identification Number (URN)
V 01 P 5 B URN presentation format :
V-01-P5(B)
BuildingComplexletter
(seeschedule1)
Subareacode
(seeschedule2)
Plant/equipmentcode
(seeschedule3)
Plantequipmenttype
sequentialnumber
Standbyplantdesignation
(A=
duty;B=
standby)
SCHEDULE 1 - BUILDING COMPLEX LETTER
V Village Hotel
T Town Hotel
C Castle Hotel
X Externals + Utility Compound
SCHEDULE 2 - SUB AREA CODE LETTER
B1 BasementG Ground floor
01 First floor
02 Second floor
03 Third floor
04 Fourth floor
R Roof
S Subway duct
STP Sewage Treatment Plant Compound
RO Reverse Osmosis Plant Hall
-
8/13/2019 15075 Rev 0
10/13
WSA/D1381 Rev 0/2003 15075/10 Mechanical Identification
SCHEDULE 3M - MECHANICAL BUILDING SERVICES LETTER CODES
2MV 2 port motorised valve
3MV 3 port motorised valve
A Duct mounted attenuatorPAH1 100% freshaire AHU with only supply fan
PAH2 100% fresh air with cooling and reheat and supply fan
PAH3 100% fresh air AHU with S&E fans and heat recovery
PAH4 100% freshaire AHU with S&E fans and double heat recovery
AH1 Recirculating AHU with 2 way mixing box and supply fan
AH2 Recirculating AHU with 3 way mixing box and S&E fans
AH3 Recirculating AHU with 3 way mixing box and S&E fans and heat recovery
AV Pressure accumulator vessel
AVV Anti vacuum valve
B Boiler
BS Booster setCA Duct mounted cross talk attenuator
CCE Cold room evaporator unit
CCU Cold room condensing unit
CDC Cold room door curtain
CDH Cold room door heater
CH Chiller
CHM Cold room heater mat
CPV Cold room pressure valve
CS Commissioning set
CT Cooling Tower
CVU Contant air volume unitDPV Differential pressure valve
EG Extract grille
ENM LTHW or ChW energy meter
EV Extract valve
FCUS Surface mounted, exposed to view fan coil unit
FCUV Void mounted fan coil unit
FH External fire hydrant
FS Fume scrubber
GCP Emergency gas control panel
GD Gas detector
GM Gas meterHDH Ductwork mounted humidity detector
HR Hose reel
HWC Hot water cylinder
HWD Wall mounted humidity detector
KC Kitchen canopy
LPGT Liquefied petroleum gas tank
MD Motorised damper
MGV Motorised gas valve (emergency)
MS Metering station
OG Ozone generator
P PumpPDD Ductwork pressure detector
-
8/13/2019 15075 Rev 0
11/13
WSA/D1381 Rev 0/2003 15075/11 Mechanical Identification
SCHEDULE 3M - MECHANICAL BUILDING SERVICES LETTER CODES
PDDD Ductwork differential pressure detector
PDPD Pipeline differential pressure detector
PDS Ductwork pressure switch
PHEX Plate heat exchanger
PPD Pipeline pressure detectorPPS Pipeline pressure switch
PRV Pressure reducing valve
PU Pressurisation / fill unit
PWC Chilled potable water cylinder
RO Reverse osmosis stream
SD Smoke damper
SD Supply diffuser
SF Sand filter
SG Steam generator
SPTP Sprinkler test point
SPV Sprinkler valveSV Safety valve
T Tank
TCD Tank contents detector
TDD Ductwork temperature detector
TG Transfer grille
TPD Pipeline temperature detector
TPS Pipeline mounted thermostat
TPSH Pipeline mounted thermostat (high limit)
TS Textile sock range
TWD Wall mounted temperature detector
TWT Wall mounted thermostatWM Water meter
WMS Water manifold set
WTP Water treatment plant
FL Fusible link (cable mounted)
OV Emergency oil shut off valve (gravity operated)
-
8/13/2019 15075 Rev 0
12/13
WSA/D1381 Rev 0/2003 15075/12 Mechanical Identification
SCHEDULE 3E - ELECTRICAL BUILDING SERVICES LETTER CODES
MCC Motor control centre
MSB Main switchpanel
SMDB Sub main distribution boardSG Standby generator
ERG Earthing rod group
EM Earthing mat
TR Transformer
RMU Ring main unit
DB Distribution board
FCPM Master fire alarm control panel
FCPR Repeater fire alarm control panel
FAHE Fire alarm head end
GLRU Guestroom lighting relay unit
ELSS Emergency lighting sub battery / control unitELHE Emergency lighting head end
UPS Passive uninterrupted power supply and battery unit
EM Sub electrical meter
PABXM Master PABX
PABXS Slave PABX
OFH Optic fibre hub
CPP Communication cable patch panel
DPP Data cable patch panel
TOS Telephone operator's station
TVSE TV Satellite dish farm and head end
TVHE TV system head end and primary amplification equipmentTVPPV TV system pay per view equipment
TVSD TV system sub distribution equipment
PMSHE PMS / POS head end equipment
PMSSE PMS / POS satellite equipment
LOCC Local optic fibre / copper converter
CCTVHE CCTV head end equipment
CCTVSE CCTV satellite equipment
BEMSHE Main BEMS human interface consule
BEMSIE Local BEMS human interface consule
BEMSLP BEMS laptop connection point
BEMSOS BEMS outstationDDB Distribution board with full scene dimming facility
MS Microphone station
AS Amplifier station
BGMS Background music sources
ICP Islamic clock and call to prayer unit
-
8/13/2019 15075 Rev 0
13/13
WSA/D1381 Rev 0/2003 15075/13 Mechanical Identification
SCHEDULE 3P - PUBLIC HEALTH BUILDING SERVICES LETTER CODES
BD Bidet
BTH BathFCT Faucet set
GI Grease interceptor
RV Anti shock reflux valve
SC Standard connection assembly type
SHT Sewage holding tank
SHV Shower valve
SP Sump pump
ST Shower tray
STP Sewage treatment plant
SVP Soil and vent pipe stack
SWP Sewage pumpU Urinal stall
WC Water closet pan
WCC Flushing cistern
WHB Wash hand basin
END OF SECTION