    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    W

    cove

    Inv

    Plan

    400 kV Works

    1 400 kV Kirori (Hisar) 3x315

    2x100

    1x10/16

    400/220

    220/132

    132/11

    4N0940* 10300.00 2009-10 REC 350041

    2 400 kV double circuit line from Hisar TPS

    (Khedar) to proposed 400 kV substation

    Kirori (Hisar) with 85C conductor design.

    23 4L0874* 1250.00 2009-10 REC 350041

    3 400 kV double circuit line from Hisar TPS

    to 400 kV substation Fatehabad PGCIL.

    90 4L0875* 4500.00 2009-10 REC 350039

    4 Provision of Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation Kirori

    (Hisar)

    4G0877* REC 350041 Included in the cost of substati Cove

    S

    5 Daultabad (Gurgaon) 3x315 400/220 4N0997* 7539.68 2010-11 REC 350044

    6 400 kV D/C line from Jhajjar TPS to

    Daultabad (Gurgaon) with twin moose

    conductor with 85 C conductor design.

    140 4L0998* 7000.00 2010-11 REC 350045

    7 Ceation of 400 kV D/C line from

    Daultabad (Gurgaon) - 400 kV substation

    Sector 72, Gurgaon (PGCIL) with quad

    moose conductor in place of earlier

    approval of creation of this line with twin

    Moose conductor with 850C conductor

    design.

    48 4L1308*

    4L1063A

    2400.00 2010-11 REC 350045

    8 Two 400 kV bays at 400 kV GIS

    substation Sector-72 Gurgaon (PGCIL) byPGCIL at HVPNL cost.

    4D1064* 300.00 2010-11 REC 350045

    9 400 kV Nawada 2x315

    2x100

    1x100

    1x1

    400/220

    220/66

    220/33

    33/0.4

    4N1124* 8200.00 2010-11 World Bank

    Remarks

  • 8/22/2019 14_List of Works 2009-10

    2/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    W

    cove

    Inv

    Plan

    Remarks

    10 Provision of a Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation Nawada

    4G1054* Included in cost of substation Cove

    Sr

    11 LILO of 400 kV Samaypur - G. Noida line

    at proposed 400 kV substation Nawada

    (Faridabad)

    4 4L1241* 200.00 2010-11 Yet to be posed By PGCIL as deposit work of

    HVPNL.

    12 400 kV Nuhiyawali 2x315

    2x100

    1x16/20

    400/220

    220/132

    132/11

    4N1071* 7500.00 2010-11 World Bank Lower capacity 132/11 kV

    transformer can also be

    provided in place of 16/20MVA transformer if available

    13 LILO of one circuit of 400 kV D/C Hisar

    TPS- Fatehabad line at proposed 400 kV

    substation Nuhiyawali.

    170 4L1072* 7500.00 2010-11 World Bank

    14 Provision of a Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation Nuhiyawali.

    4G1073* Included in cost of substation Cove

    Sr

    15 Creation of two 400 kV bays at 400 kV

    substation Fatehabad (PGCIL) by PGCIL

    at HVPNL cost for 400 kV Hisar TPS

    Fatehabad D/C line with LILO of one

    circuit at Sirsa.

    4B1074* 300.00 2009-10 REC 350039

    16 Creation of two no. 400 kV bays at

    Dhanonda (Mohindergarh) HVPNL

    substation to receive Adani Power.

    4B1317* 1000.00 2011-12

    17 Creation of 400 kV Mohindergarh

    (Dhanonda) - Daultabad quad moose

    conductor D/C line.

    140 4B1318* 12250.00 2011-12 Being executed

    under PPP

    mode

    18 Creation of two no. 400 kV bays at

    Daultabad HVPNL substation to receive

    400 kV Mohindergarh (Dhanonda) -

    Daultabad quad D/C line.

    4B1319* 1000.00 2011-12 Cove

    Sr

  • 8/22/2019 14_List of Works 2009-10

    3/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    W

    cove

    Inv

    Plan

    Remarks

    19 Construction of Mohindergarh (Adani

    HVDC) - Mohindergarh (Dhanonda)

    HVPNL 400 kV D/C line with triple moose

    conductor as a dedicated transmission

    line to be constructed by M/s Adani Power

    Ltd.

    HPPC to convey to M/s Adani

    Power Ltd. The decision of

    26th standing committee

    meeting that for the power

    over and above the power to

    be supplied to Haryana,

    connectivity with CTU network

    through LILO of one circuit of

    Bhiwadi - Moga 400 kV D/C

    line could be considered. For

    tying-up connectivity and openaccess to CTU network, Adani

    Power would need to seek

    open access from CTU.HPPC

    to be informed to convey the

    above decision to M/s Adani.

    Not r

    be

    u

    Inv

    20 Deepalpur 2x315

    2x100

    1x16/202x2

    400/220

    220/132

    132/3333/0.4

    4N1334* 10000.00 2011-12 Being executed

    under PPP

    mode

    21 Provision of a Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation Deepalpur

    4G1335* Cove

    sr.

    22 Creation of 400 kV D/C line from Jhajjar

    TPS (Case 2) - Rohtak (400kV) -

    Deepalpur with quad moose conductor

    170 4G1336* 11900.00 2011-12 Being executed

    under PPP

    mode

    23 LILO of one circuit of 400 kV Abdullapur -Bawana line at Deepalpur

    4 4L1337* 200.00 2011-12 Being executedunder PPP

    mode

    24 Dhanonda 3x315 400/220 4N1338* 8000.00 2011-12 Posed to PFC

  • 8/22/2019 14_List of Works 2009-10

    4/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    W

    cove

    Inv

    Plan

    Remarks

    25 Provision of a Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation Dhanonda

    4G1339* Posed to PFC Cost included in substation Cove

    sr.

    26 Creation of Jhajjar TPS (Case-2) -

    Dhanonda 400 kV D/C line with twin

    moose conductor

    80 4L1340* 4000.00 2011-12 Posed to PFC

    27 To cancel earlier approval of LILO of one

    circuit of 400 kV Moga - Bhiwadi line at

    400 kV substation Dhanonda

    60 4L1341A

    28 Arrangement for meeting the pre-

    commissioning testing & start-up power

    requirement to CLP thermal power project

    by LILO of one circuit of 400 kV D/C Jharli

    (Aravali) - Daultabad line at CLP thermal

    power plant Jharli.

    4L1443* 300.00 2010-11 Yet to be posed

    29 Rohtak area 2x315 400/220 4N1342* 10000.00 2011-12 Being executed

    under PPP

    mode

    Enroute 400 kV Jhajjar -

    Deepalpur quad D/C line. The

    exact requirement of 220/132

    kV and/ or 220/33 kVtransformers at 400 kV

    substation Rohtak will be

    finalised after identification of

    land and underlying

    transmission system.

    30 Provision of a Diesel Generating set of

    suitable capacity for emergency auxiliary

    services in 400 kV substation in Rohtak

    area.

    4G1343* Cost included in substation Cove

    sr.

    31 400 kV D/C Bhiwani - Rohtak line withtwin moose conductor matching with

    commissioning of 765 kV PGCIL

    substation at Bhiwani.

    80 4L1344* 4000.00 2011-12 Yet to be posed To establish connectivity with765 kV substation to be

    constructed by PGCIL in

    Bhiwani area.

  • 8/22/2019 14_List of Works 2009-10

    5/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    W

    cover

    Inve

    Plan

    Remarks

    32 2 no. 400 kV bays at 765 kV substation

    Bhiwani for 400 kV D/C Bhiwani - Rohtak

    line

    4B1345* 1000.00 2011-12 Yet to be posed By PGCIL as deposit work of

    HVPNL on cost plus basis at

    applicable consultancy fees

    on the final actual executed

    cost of the work alongwith the

    applicable service tax on

    consultancy fee.

    33 400 kV D/C Kirori (Hisar) - Jind line with

    twin moose conductor matching with

    commissioning of 400 kV PGCILsubstation at Jind.

    80 4B1346* 4000.00 2011-12 Yet to be posed

    34 2 No. 400 kV bays at 400 kV substation

    Kirori for 400 kV D/C Kirori - Jind line.

    4B1347* 1000.00 2011-12 Yet to be posed

    35 2 No. 400 kV bays at 400 kV substation

    Jind PGCIL for 400 kV D/C Kirori - Jind

    line

    4B1348* 1000.00 2011-12 Yet to be posed By PGCIL as deposit work of

    HVPNL on cost plus basis at

    applicable consultancy fees

    on the final actual executed

    cost of the work alongwith

    applicable service tax on

    consultancy fee.

    Total (400 kV) 1089 126639.68

  • 8/22/2019 14_List of Works 2009-10

    6/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    220 kV Works

    1 Bhuna 2x100

    1x8

    220/132

    132/11

    2N0448*

    1N0449*

    2020.12 2009-10 REC 350031 Subs ta ti on commiss ioned wi th

    1x100 MVA 220/132 kV

    transform er o n 14.10.2008. 1x8

    MVA 132 /11 kV t rans f ormer

    commissio ned on 17.10.2008.

    2 Construction of YTPP - Nilokheri 220

    kV D/C

    140 2L0454* 2503.20 2009-10 REC 350030

    3 Construction of 220 kV D/C line with

    0.4 ACSR/ AAAC from 220 kV

    Cheeka to 220 kV substation Durala

    106 2L0742* 2385.00 2009-10 REC 350036

    4 Creation of two No. 220 kV bay at 220

    kV substation Cheeka for

    accommodating 220 kV D/C line from

    220 kV Cheeka to 220 kV substation

    Durala

    2B0743* 200.00 2009-10 REC 350036 C

    und

    5 220 kV Isharwal 1x100 220/132 2N0734* 2600.00 2009-10 REC 350033

    1x20/25 132/33 1N0735*

    1x10/16 132/11 1N0736*

    1x20/25 132/33 1A0939* REC 350042 For meeting the auxuiliary

    consumption demand of the

    substation.

    6 220 kV D/C line with 0.4 ACSR from400 kV substation Mayyar (Hisar) to

    220 kV substation Isharwal

    106 2L0737* 2385.00 REC 350033 Reqiuired two No. 220 kV emanatingbays would be provided by PGCIL

    while erecting 3rd transformer. 2n d

    ckt comm issioned o n 28.01.2009

    Subs ta ti on commiss ioned wi th

    1x100 MVA 220/132 kV

    t rans f ormer on 04.03.2009.

    1x 10/16 MVA 132/11 kV

    t rans fo rmer commiss ioned on

    05.03.2009. 1x20/25 MVA 132/33

    kV T/F comm issioned on 27.05.09

  • 8/22/2019 14_List of Works 2009-10

    7/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    7 Stringing of 2nd Ckt. of Badshahpur

    (220 kV) - IMT Manaser (220 kV), 220

    kV line on D/C towers.

    11.6 2L0432* 104.05 2009-10

    8 220 kV bay one number at Badshahpur 2B0433* 100.00 2009-10 For accomodating 2nd 220 kV Ckt.

    between Badshahpur and IMT

    Manaser

    9 220 kV bay one number at IMT

    Manesar substation

    2B0434* 100.00 2009-10 For accomodating 2nd 220 kV Ckt.

    between Badshahpur and IMT

    Manaser

    10 2 Nos 220 kV line bays at 400 kV

    substation Bhiwadi by PGCIL.

    2B0848A NCRPB Being carried our by PGCIL as a

    regional work. Revised approval

    conveyed vide memo No. R

    600/Ch.161/HSS-152/ Bhiwadi

    dated 09.03.2009.

    11 220 kV Bastra (Gharaunda) 2x100

    1x4

    220/132

    132/11

    2N0837* 2880.49 2010-11 JICA through

    REC 350051

    HR-IC-DIS-

    035-2009-100845

    Suitable spare bays to be provided

    for further expansion both for

    transformers and lines.1x4 MVA T/F

    for auxiliary supply and supply tovillage Bastra.

    12 Construction of a new 220 kV D/C line

    with 0.4 sq ACSR from PTPP to

    proposed 220 kV substation Bastra

    50 2L0838* 1250.00 2010-11 JICA through

    REC 350053

    HR-IC-DIS-

    035-2009-

    13 2 No. 220 kV bays at 220 kV PTPP

    yard for PTPP-Bastra line

    2B0839* 214.00 2010-11 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-

    10085514 220 kV Sampla (Upgradation of 132

    kV substation Sampla)

    2x100 220/132 2N0948* 2421.88 2010-11 JICA through

    REC 350049

    HR-IC-DIS-

    035-2009-

    100843

  • 8/22/2019 14_List of Works 2009-10

    8/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    15 220 kV Samalkha (Upgradation of

    132 kV substation Samalkha)

    2x100 220/132 2N0949* 2268.78 2010-11 JICA through

    REC 350049

    HR-IC-DIS-

    035-2009-

    100843

    Additional land to be taken from

    Gram Panchayat on payment.

    The cost of replacement of

    equipment of 5 no. 220 kV bays of

    HVPNL at BBMB substation Panipat

    including erection, testing &

    commissioning and interconnection

    with Control Room & any work

    incidental thereto, shall be fully

    borne by HVPNL.The cost of replacement of

    equipment of 1 No. 220 kV bay of

    PGCIL at BBMB substation Panipat

    including erection, testing &

    commissioning and interconnection

    with Control Room & any work

    incidental thereto, shall not be

    charged to common pool. The issue

    of bearing this cost shall be taken up

    with PGCIL by HVPNL and in case

    PGCIL does not agree to bear this

    cost, the same shall be borne by

    HVPNL.

  • 8/22/2019 14_List of Works 2009-10

    9/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    16 220 kV Chhajpur 2x100

    1x4

    220/132

    132/11

    2N0950* 2748.44 2010-11 JICA through

    REC 350051

    HR-IC-DIS-

    035-2009-

    100845

    Land to be taken from Gram

    Panchayat on DC rates. The study

    for Residual Life Assessment of 220

    kV breakers and associated

    equipment to be replaced shall be

    got done by BBMB at the cost of

    HVPNL. Accordingly, HVPNL shall

    pay, for the said study and for the

    residual life left at present day cost

    minus depreciation for the serviceperiod, to BBMB and the cost of new

    equipment and interconnection with

    Control Room towards this

    replacement shall be charged to the

    common pool.

    The cost of 220 kV breakers and

    associated equipment already

    procured by BBMB, if any, shall be

    charged to HVPNL or PGCIL/HVPNLor to the common pool as per

    approval.

    All the equipment and material

    required for creation of proposed

    bays (two no. 220 kV and one no.

    400 kV substation) and for their

    interconnection with Control Room

    shall be supplied by HVPNL after

    getting their technical specification

    approved from BBMB.

  • 8/22/2019 14_List of Works 2009-10

    10/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    The expenditure on other

    additions/alterations/rearrangement

    etc. incidental to the construction of

    the proposed bays at BBMB Sewah

    shall be borne by HVPNL.

    The expenditure for future

    replacement and annual O&M

    charges in respect of proposed baysat BBMB Sewah shall be borne by

    HVPNL. BBMB shall, however, go

    ahead with procurement/

    replacement of equipment at

    HVPNLs cost, wherever necessary

    on technical grounds, the cost of

    which would be borne by HVPNL.

    The expenditure on account of

    dismantlement/ shifting of existingstructures/ features of any bay at

    BBMB Sewah, if any required to

    make way for the proposed bays,

    shall be borne by HVPNL.

    All other related works outside

    BBMB substation Panipat shall be

    carried out by HVPNL at their cost.

    The load shall be restricted to the

    present load drawn from the BBMBsubstation Panipat.

  • 8/22/2019 14_List of Works 2009-10

    11/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    After disbanding 33 kV system at

    400 kV substation BBMB Panipat the

    possibility to use two No. 220/66-33

    kV, 60 MVA transformers alongwith

    associated equipment, thus rendered

    spare, in BBMB system shall be

    explored by BBMB, otherwise it shall

    be obligatory for HVPNL to take

    them at present day cost minus

    depreciation for the service period.

    17 LILO of 220 kV D/C Rohtak-

    Bahadurgarh line at 220 kV proposed

    substation Sampla.

    47 2L0951* 1175.00 2010-11 JICA through

    REC 350052

    HR-IC-DIS-

    035-2009-

    100845

    18 Construction of a new 220 kV D/C line

    with 0.5 Sq. inch ACSR from proposed

    220 kV substation Sampla to proposed

    220 kV substation Samalkha. {The line

    is 220 kV Sampla - Mohana - Smalkha}

    56 2L0952* 1512.00 2010-11 JICA through

    REC 350052

    HR-IC-DIS-

    035-2009-

    100846

    19 220 kV Mohana (Sonepat) 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1125* 3762.19 2010-11 JICA through

    REC 350049

    HR-IC-DIS-035-2009-

    100843

    Provision of 10 No. 33 kV bays at

    220 kV substation Mohana. However

    initially only 6 No. 33 kV bays will beconstructed. for auxiliary supply

  • 8/22/2019 14_List of Works 2009-10

    12/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    20 Erection of 220 kV D/C line with 0.5

    Sq ACSR conductor from 400 kV

    substation Jajjy (PGCIL) to 220 kV

    substation Mohana.

    3 2L1126* 90.00 2010-11 Posed to

    NCRPB

    21 The already approved new 220 kV D/C

    line with 0.5 Sq.ACSR from proposed

    220 kV substation Sampla to proposed

    220 kV substation Samalkha will be

    LILOed at 220 kV substation Mohana.

    2 2L1127* Covered under Sr. No. 18

    22 Construction of a new 220 kV D/C line

    with 0.4 Sq. inch ACSR from proposed

    220 kV substation Samalkha to 220 kV

    substation Chhajpur.

    48 2L0953* 1200.00 2010-11 JICA through

    REC 350053

    HR-IC-DIS-

    035-2009-

    100847

    23 Construction of a new 220 kV D/C line

    with 0.4 Sq. inch ACSR from proposed

    400 kV substation BBMB Sewah to 220

    kV substation Chhajpur.

    32 2L0954* 800.00 2010-11 JICA through

    REC 350053

    HR-IC-DIS-

    035-2009-100847

    24 Creation of two no. 220 kV bay at 400

    kV substation BBMB Sewah to receive

    220 kV D/C line from Chhajpur to be

    carried out by BBMB.

    2B0955* 200.00 2009-10 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-

    100885

    25 220 kV Kaul (Upgradation of 132 kV

    substation)

    2x100 220/132 2N0975* 2540.19 2010-11 JICA through

    REC 350051

    HR-IC-DIS-035-2009-

    100845

  • 8/22/2019 14_List of Works 2009-10

    13/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    26 Construction of a new 220 kV D/C line

    with 0.4 Sq. inch ACSR from 220 kV

    substation Pehowa to proposed 220 kV

    substation Kaul.

    40 2L0976* 1000.00 2010-11 JICA through

    REC 350053

    HR-IC-DIS-

    035-2009-

    100847

    27 Creation of 2 No. 220 kV bays at 220

    kV substation Pehowa for Pehowa-

    Kaul line.

    2B0977* 200.00 2010-11 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-

    100855

    28 Demolition of existing 17 Nos.

    residential structures in the colony at

    132 kV substation Kaul for utilizing

    space to facilitate upgradation of 132

    kV substation Kaul to 220 kV level.

    1G0986* 2010-11 No

    to b

    in I

    29 Demolition of existing control room at

    132 kV substation Kaul after making

    the new control room functional at 220

    kV substation Kaul.

    1G0987* 2010-11 No

    to b

    in I

    30 Construction of a new 220 kV D/C line

    with 0.4 Sq. inch ACSR from 220 kV

    substation Bastra to proposed 220 kV

    substation Kaul.

    100 2L0978* 2500.00 2010-11 JICA through

    REC 350053

    HR-IC-DIS-

    035-2009-

    31 Creation of 2 No. 220 kV bays at 220

    kV substation Bastra for Bastra - Kaul

    line.

    2B0979* 200.00 2010-11 JICA through

    REC 350051

    HR-IC-DIS-

    035-2009-

    C

    u

    32 220 kV Sector-72 Gurgaon 2x100

    1x100

    2x0.2

    220/66

    220/33

    33/0.4

    2N1083* 3000.00 2010-11 JICA through

    REC 350059

    HR-IC-DIS-

    035-2009-

  • 8/22/2019 14_List of Works 2009-10

    14/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    1. Wherever needed multi circuit

    towers will be used to take out 220

    kV & 66 kV lines from 220 kV

    substation sector-72 Gurgaon in

    view of Right of Way constraints.

    2. Out of six circuits equivalent to 0.5

    sqACSR being provided by PGCIL

    for HVPNL use, four 220 kV circuits

    will directly feed 220 kV substation

    sector-72 Gurgaon bus. Theremaining two circuits will be taken

    from 400 kV substation PGCIL to

    proposed 220 kV substation

    Kankerkheri (Nuh).

    Provision of 10 no. 33 kV bays at

    220 kV substation sector-72

    Gurgaon to enable DHBVNL to take

    out 10 no. 33 kV outgoing feeders to

    meet ultimate load requirement in

    surrounding area

    33 220 kV Kherikanker (Nuh) 1x100

    1x100

    2x0.2

    220/66

    220/33

    33/0.4

    2N1116* 2500.00 2011-12 Yet to be

    posed

    Provision of 10 No. 33 kV bays at

    220 kV substation Kheri Kanker

    (Nuh) to enable DHBVNL to take out

    10 No. 33 kV outgoing feeders to

    meet their ultimate load requirement

    in surrounding area.

  • 8/22/2019 14_List of Works 2009-10

    15/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    In view of scarcity of land around

    Sohna a part of the land offered by

    village Panchayat Kher Kanker

    (Approx. 32 acre) will be used for

    construction of 220 kV substation

    and the remaining land will be kept

    reserved for creation of a new 400

    kV substation in future keeping in

    view the development of load along

    KMP expressway and surroundingarea.

    34 220 kV Chormar 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1130* 2500.00 2010-11 JICA through

    REC 350055

    HR-IC-DIS-

    035-2009-

    100849

    7 nos. 220 kV bays, 6 nos. 132 kV

    bays and 5 nos. 33 kV bays.

    However, provision will be made for

    10 nos. each 220 kV , 132 kV and 33

    kV bays keeping the scope for future

    expansion. 2x0.2 T/F for auxiliary

    supply

    To allow DHBVN to connect

    proposed 33 kV S/Stn. Pipli (1x10

    MVA) with approx. 9 Kms new 33

    kV line from Chormar to Pipli &

    proposed 33 kV S/S Khokhar (1x10

    MVA) with approx. 16 kms new 33

    kV line from Chormar to Khokhar

    35 Construction of 220 kV D/C Fatehabad

    (400 kV)-Chormar line with 0.5 sq. inch

    ACSR

    192 2L1131* 5760.00 2010-11 JICA through

    REC 350057

    HR-IC-DIS-035-2009-

    100851

    36 Construction of 220 kV D/C

    Nuhiyanwali (400 kV)-Chormar line with

    0.5 sq. inch ACSR

    32 2L1132* 960.00 2010-11 Not Required Not to be executed .Covered under

    Chormar - Rania line via Nuhiyawali.

  • 8/22/2019 14_List of Works 2009-10

    16/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    37 Construction of 2 nos. 220 kV bays at

    400 kV substation Nuhiyanwali (Sirsa)

    for 220 kV D/C Nuhiyanwali (400kV)-

    Chormar line

    2B1133* 200.00 2010-11 No separate

    funds required.

    Covered under

    400 kV

    substation

    Nuhiyawali

    under World

    Bank project.

    38 Erection of following three 220 kV lines

    from proposed 220 kV substation

    sector-72 Gurgaon:-

    Wherever needed multi circuit

    towers wil l be used to take out 220

    kV & 66 kV lines from 220 kV

    substation sector-72 Gurgaon in

    view of Right of Way constraints.

    a) 220 kV D/C sector 72 Sector 20 (0.5

    Sq ACSR)

    48 2L1084* 1440.00 2010-11 JICA through

    REC 350048

    HR-IC-DIS-

    035-2009-100842

    b) 220 kV D/C sector 72 Sector 56 (0.5

    Sq ACSR)

    21 2L1085* 630.00 2010-11 JICA through

    REC 350048

    HR-IC-DIS-

    035-2009-

    100842

    c) 220 kV D/C sector 72 Sector 52 A

    (0.5 Sq ACSR)

    25 2L1086* 750.00 2010-11 JICA through

    REC 350048HR-IC-DIS-

    035-2009-

    100842

  • 8/22/2019 14_List of Works 2009-10

    17/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    39 Provision of two 220 kV bays at sector

    56 Gurgaon

    2B1089* 200.00 2010-11 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-

    100855

    40 Provision of two 220 kV bays at sector

    52 A Gurgaon

    2B1090* 200.00 2010-11 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-100855

    41 220 kV double circuit with 0.5 ACSR

    from 400 kV substation Kirori (Hisar) to

    proposed 220 kV substation Hansi area

    (Masudpur).

    48 2L0879* 1271.00 2009-10 REC 350064 Line test charged on 19.05.09

    42 220 kV A-4 Faridabad (Upgradation

    of 66 kV substation) GIS

    2x100 220/66 2U1056* 8500.00 2010-11 World Bank

    43 Construction of a new 220 kV D/C linewith 0.5 Sq. inch ACSR from proposed

    400 kV substation Nawada to 220 kV

    substation A-5 Faridabad.

    10 2L1057* 300.00 2010-11 World Bank

    44 Creation of two 220 kV bays at A-3

    Palla substation for 220 kV D/C A-3

    Palla to A-5 Faridabad line.

    2B1058* 200.00 2010-11 Yet to be

    posed

    C

    und

    45 Construction of a new 220 kV D/C line

    with 0.5 Sq. inch ACSR from A-3 Palla

    to A-5

    30 2L1059*

    6L0915A

    900.00 2010-11 World Bank In place of already approved 66 kV

    D/C A-3 Palla to A-5 line.

    46 220 kV A-5 Faridabad (Upgradation

    of 66 kV level)

    2x100 220/66 2U1055* 2010-11 World Bank

    47 LILO of one circuit of 220 kV D/C A-3

    Palla to A-5 line at proposed 220 kV

    substation A-4 Faridabad.

    8 2L1060* 2010-11 World Bank

    3000.00

  • 8/22/2019 14_List of Works 2009-10

    18/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    48 Loop in of Jind - Hisar IA 220 kV

    double circuit at 400 kV substation

    Kirori (Hisar) making it Jind Kirori

    double circuit line.

    25 2L0878* 750.00 2009-10 REC 350064 Line work completed on 01.04.200

    49 Construction of link between proposed

    220 kV substation Hansi to the LILO

    point of Jind - Hisar IA line in order to

    complete Hansi - Hisar IA line.

    7 2L0880* 240.00 2009-10 REC 350064 Line test charged on 19.05.09

    50 Creation of 220 kV double circuit with

    0.5 ACSR from 400 kV substation

    Kirori (Hisar) to under construction 220

    kV substation Bhuna.

    50 2L0881* 1250.00 2009-10 REC 350039 Line test charged on 31.03.2009

    51 Creation of two 220 kV line bays at 220

    kV substation Bhuna (under

    construction) to receive 220 kV D/C

    line from proposed 400 kV substation

    Kirori.

    2B0941* 200.00 2009-10 REC 350039 C

    u

    52 220 kV Sector-56 Gurgaon{Upgradation from 66 kV level}

    2x100 220/66 2U0903* 2803.00 2009-10 REC 350043

    53 LILO of 220 kV D/C Palli-sector-52A

    Gurgaon line at proposed 220 kV

    substation Sector-56 Gurgaon.

    2 2L0904* 45.00 2009-10 REC 350043

    54 220 kV Rangala Rajpur

    (Firozpurzirka)

    1x100

    1x100

    2x0.2

    220/66

    220/33

    33/0.4

    2N1139* 3000.00 2010-11 World Bank To make provision o f 10 N os. 220 kV

    bays including 3 no. spare bays, 10

    nos. 66 kV bays including 5 no.

    spare bays & 10 no. 33 kV baysincluding 4 no. spare bays at 220 kV

    substation Rangala Rajpur (Firojpur

    Zirka).

    LIST OF WORKS (66 kV AND ABOVE) 2009 10

  • 8/22/2019 14_List of Works 2009-10

    19/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    55 220 kV D/C Kheri Kanker (Nuh)

    Rangala Rajpur (Firozpurzirka) with

    0.4 Sq. ACSR conductor.

    104 2L1140* 2600.00 2010-11 World Bank Out of six circuits equivalent to 0.5

    sq ACSR being provided by PGCIL

    for HVPNL use, four 220 kV circuits

    will directly feed 220 kV substation

    sector-72 Gurgaon bus. The

    remaining two circuits will be taken

    from 400 kV substation PGCIL to

    proposed 220 kV substation

    Kankerkheri (Nuh).

    56 220 kV D/C Palwal Rangala Rajpur

    (Firojpurzirka ) with 0.4 Sq ACSR

    conductor.

    110 2L1141* 2750.00 2010-11 World Bank

    57 Creation of 2 no. 220 kV bays at 220

    kV substation Kheri Kanker (Nuh) for

    new 220 kV D/C Kheri Kanker)

    Rangala Rajpur line.

    2B1142* 200.00 2011-12 Yet to be

    posed

    C

    und

    58 Creation of 2 No. 220 kV bays at 220

    kV substation Palwal for new 220 kVD/C Palwal Rangala Rajpur line.

    2B1143* 200.00 2010-11 Yet to be

    posed

    C

    und

    1x100 220/66 2N1149* 5200.00 2010-11 2x0.2 MVA 33/0.4 kV transformer for

    auxiliary supply

    1x100 220/33

    2x0.2 33/0.4

    1x100 220/66 2A1218*

    60 220 kV D/C 0.5 Sq" ACSR line from

    220 kV substation Daultabad to 220 kVsubstation Mau

    40 2L1150* 1000.00 2010-11 JICA through

    REC 350048HR-IC-DIS-

    035-2009-

    100842

    61 220 kV D/C 0.5 Sq" ACSR line from

    proposed 220 kV substation Kheri

    kanker to 220 kV substation Mau

    60 2L1151* 1500.00 2011-12 Yet to be

    posed

    Mau (Dharuhera)

    with total provision of 10 no. 33 kV

    bays to provide supply to upcoming

    33 kV substations of DHBVNL in

    nearby area.

    59 JICA through

    REC 350059

    HR-IC-DIS-

    035-2009-

    100853

    LIST OF WORKS (66 kV AND ABOVE) 2009 10

  • 8/22/2019 14_List of Works 2009-10

    20/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    62 LILO of one circuit of 220 kV D/C

    Badshahpur-Rewari line at 220 kV

    substation Mau on D/C towers.

    24 2L1152* 600.00 2010-11 JICA through

    REC 350057

    HR-IC-DIS-

    035-2009-

    100851

    The second circuit can be LILOed in

    future.

    63 Creation of 2 no. 220 kV bays at 220

    kV substation Kheri Kanker to

    accommodate 220 kV Mau - Kheri

    Kanker line.

    2B1153* 200.00 2011-12 Yet to be

    posed

    C

    und

    64 Creation of 2 no. 220 kV bays at 220

    kV substation Daultabad to

    accommodate 220 kV Mau

    Daultabad line.

    2B1154* 200.00 2010-11 JICA through

    REC 350061

    HR-IC-DIS-

    035-2009-

    100855

    65 Erection of 6 no. 33 kV bays at 220 kV

    substation Mau

    3B1157* 2010-11 C

    und

    Sector-20 Gurgaon (GIS) 2x100

    2x25/31.5

    2x0.2

    220/66

    66/11

    11/0.4

    2N1158* 9400.00 2010-11 2x0.2 MVA 11/.4 kV transformers for

    auxiliary supply.

    Advising DHBVNL that proposal of

    2x25/31.5 MVA 66/11 kV

    transformers has been agreed

    subject to condition that high

    capacity connectivity is used by

    DHBVNL for all 11 kV feeders so

    that the number of panels is kept to a

    minimum.

    JICA through

    REC 350062

    HR-IC-DIS-

    035-2009-

    100856

    66

    LIST OF WORKS (66 kV AND ABOVE) 2009 10

  • 8/22/2019 14_List of Works 2009-10

    21/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    Space will be kept reserved for

    creation of a 400 kV GIS substation

    at Sector-20 Gurgaon in future

    depending upon the availability of

    ROW for feeding 400 kV line.

    220 kV substation Samain (Tohana) 2x100

    1x100

    2x0.2

    220/33

    220/132

    33/0.4

    2N1162* 3500.00 2010-11 World Bank 2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply

    One 100 MVA 220/33 kV transformer

    shall be installed in the first instance

    while the second shall be installed as

    per load requirement in future for

    which space shall be provided in the

    switchyard.

    To make provision of 10 nos. 220 kV

    bays including 3 nos. spare bays, 5

    nos. 132 kV bays including 1 no.

    spare bay and 10 nos. 33 kVbays including 4 nos. spare bays at

    220 kV substation Samain (Tohana).

    68 220 kV D/C line from the proposed 400

    kV substation Kirori to proposed 220

    kV substation Samain (Tohana) with

    0.5 Sq" ACSR conductor.

    80 2L1163* 2000.00 2010-11 World Bank To allow DHBVNL to connect the

    proposed and already approved new

    33 kV substation Bithmara with the

    proposed 220 kV substation Samain

    (Tohana).

    69 220 kV D/C line from the proposed 220

    kV substation Samain (Tohana) toproposed 220 kV substation Masudpur

    (Hansi) with 0.5 Sq" ACSR conductor.

    100 2L1164* 2500.00 2010-11 World Bank

    67

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    22/170

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    Lula Ahir (Rewari) 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1165* 3500.00 2010-11 JICA through

    REC 350060

    HR-IC-DIS-

    035-2009-

    100854

    2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply, in the first

    instance, in the 24 acre land offered

    by Gram Panchayat of Lula Ahir

    To allow DHBVNL to connect

    existing 33 kV substations Jharoda

    (16 MVA) with approx. 3 km new 33

    kV line, Khushpura (9MVA) withapprox. 3 km new 33 kV line and

    Bishowa (8 MVA) with approx. 10

    km new 33 kV line by extending 33

    kV line from Jharoda to Bishowa

    respectively from proposed 220 kV

    substation Lula Ahir ( Rewari).

    To make provision of 10 no. 220 kV

    bays including 3 no. spare bays, 10

    nos. 132 kV bays including 5 nos.spare bays and 10 nos. 33 kV bays

    including 4 nos. spare bays at 220

    kV substation Lula Ahir.

    Additional 100 MVA 220/132 kV or

    220/33 kV transformer will be

    installed in future as per load

    requirement for which space shall be

    provided in the switchyard.

    71 LILO of 220 kV S/C Charkhi Dadri-

    Rewari line at the proposed 220 kV

    substation Lula Ahir with 0.4 sq inch

    ACSR.

    30 2L1166* 514.00 2010-11 JICA through

    REC 350057

    HR-IC-DIS-

    035-2009-

    100851

    70

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    23/170

    LIST OF WORKS (66 kV AND ABOVE) 2009 10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks

    c

    Inv

    Pla

    Dhanonda 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1168* 3400.00 2010-11 JICA through

    REC 350060

    HR-IC-DIS-

    035-2009-

    100854

    2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply in the first

    instance in the 34 acre land offered

    by Gram Panchayat of Dhanonda.

    To make provision of 10 no. 220 kV

    bays including 3 no. spare bays, 10

    nos. 132 kV bays including 5 nos.

    spare bays and 10nos. 33 kV baysincluding 4 nos. spare bays at 220

    kV substation Dhanonda

    (Mohindergarh)

    Additional 100 MVA 220/132 kV or

    220/33 kV transformer will be

    installed in future as per load

    requirement for which space shall

    be provided in the switchyard

    73 220 kV D/C line with 0.5 Sq" ACSR

    from the proposed 220 kV substation

    Lula Ahir (Rewari) to the proposed 220

    kV substation Dhanonda

    (Mohindergarh)

    40 2L1169* 1080.00 2010-11 JICA through

    REC 350057

    HR-IC-DIS-

    035-2009-

    100851

    Masudpur (Hansi ) 1x100 220/132 2N1175* 3000.00 2010-11 World Bank

    2N0882A

    1x100

    2x0.2

    220/33

    33/0.4

    Approval revised to provide one

    each transformer of 220/132 kV and

    220/33 kV rating in place of both of

    220/132 kV rating

    72

    74 2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply in the first

    instance, in the 17 acre land offered

    by Gram Panchayat of Masudpur.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    24/170

    LIST OF WORKS (66 kV AND ABOVE) 2009 10

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    Additional 100 MVA 220/132 kV or

    220/33 kV transformer will be

    installed in future as per load

    requirement for which space shall

    be provided in the switchyard

    To make provision of 10 no. 220 kV

    bays including 3 no. spare bays, 10

    nos. 132 kV bays including 5 nos.

    spare bays and 10 nos. 33 kV baysincluding 4 nos. spare bays at 220

    kV substation Masudpur (Hansi) .

    75 220 kV D/C Chormar-Rania line with

    0.5 Sq. inch ACSR via the proposed

    400 kV substation Nuhiyanwali (Sirsa).

    90 2L1180* 2430.00 2010-11 JICA through

    REC 350057

    HR-IC-DIS-

    035-2009-

    100851

    Sector-57 Gurgaon (GIS) 1x100

    1x100

    2x0.2

    220/66

    220/33

    33/0.4

    2N1197* 8500.00 2010-11 Erection of 10 no. 33 kV bays

    including 4 no. spare bays for

    feeding upcoming 33 kV substationsof DHBVN in sector-49, 62 and

    Faridabad Road area.

    2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply

    The third transformer whether

    220/66 kV or 220/33 kV can be

    decided later on as the system

    develops. Space would be reserved

    for installation of the same.

    76 JICA through

    REC 350062

    HR-IC-DIS-035-2009-

    100856

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    25/170

    ( )

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    77 LILO of proposed 220 kV D/C Sector

    72 (220 kV) - Sector 52A Gurgaon line

    (on multi circuit towers) at 220 kV

    substation Sector 57 Gurgaon using

    0.5 Sq" ACSR conductor.

    1 2L1198* 27.00 2010-11 JICA through

    REC 350048

    HR-IC-DIS-

    035-2009-

    100842

    Gignow (Loharu) 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1205* 3000.00 2010-11 World Bank To make provision of 15 nos. 220 kV

    bays including spare, 12 nos 132 kV

    bays including spare and 10 nos. 33

    kV bays including spare at proposed220 kV substation Gignow.

    Provision of space shall be made to

    accommodate 3rd 100 MVA

    transformer, if required, in future.

    To allow DHBVNL to connect 33 kV

    substations Singhani (10 MVA),

    Baralu (10 MVA), Kari Dharni (10

    MVA), Sohansara (10 MVA) and

    Bishalwas (10 MVA) besides any

    other existing/ proposed 33 kV

    substation with proposed 220 kV

    substation Gignow. The left out 33

    kV substations Budhera (10 MVA)

    and Chahar Kalan (10 MVA) shall be

    fed from 132 kV substation Digawan

    Jattan after shifting of earlier

    substations Baralu and kari Dharni.

    2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply

    78

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    26/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    Permission for clearance of trees at

    site for 220 kV substation Gignow

    shall have to be arranged from

    Forest Department.

    Advising DHBVNL to create new 33

    kV substations matching their

    completion with the commissioning

    of feeding 220 kV or 132 kV

    substation.

    79 Construction of 220 kV D/C line with

    0.5 Sq" ACSR from proposed 220 kV

    substation Dhanonda (Mohindergarh)

    to proposed 220 kV substation Gignow

    (50 km)

    100 2L1206* 2700.00 2010-11 World Bank

    80 Construction of 220 kV D/C line with

    0.5 Sq" ACSR from proposed 220 kV

    substation Isharwal (under

    construction) to proposed 220 kVsubstation Gignow (30 km)

    100 2L1207* 1620.00 2010-11 World Bank

    Sagwan (Near Tosham) 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1212* 3000.00 2010-11 World Bank To make provision of 15 nos. 220 kV

    bays including spare, 12 nos. 132 kV

    bays including spare and 10 nos. 33

    kV bays including spare at 220 kV

    substation Sagwan.

    Provision of space to be made to

    accommodate 3rd 100 MVA

    transformer, if required, in future.

    81

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    27/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    To allow DHBVNL to connect 33 kV

    substations Baliyali (10 MVA), Dhani

    Mau (10 MVA), Bapora (10 MVA),

    Nigana Canal (16.3 MVA) and any

    other existing/ proposed 33 kV

    substation with proposed 220 kV

    substation Sagwan.

    Advising DHBVNL to create new 33

    kV substations matching their

    completion with the commissioning

    of feeding 220 kV or 132 kV

    substation.

    2x0.2 MVA 33/0.4 kV transformers

    for auxiliary supply

    82 LILO of both circuits of existing 220 kV

    D/C Hisar (400 kV substation Mayyar

    of PGCIL) - Isharwal line at the

    proposed 220 kV substation Sagwan

    by erecting about 40 km 220 kV D/C

    line (20 km either way) with 0.4 Sq"

    ACSR.

    40 2L1213* 2000.00 2010-11 World Bank

    Dadhi Bana 2N1419* 2500.00 2011-12 Yet to be posedSubject to f inalisation of land at

    village Dadhi Bana.

    2U1269A 220 kV Dadhi Bana aproved in place

    of earlier approval of upgradation ofexisting 132 kV substation Jhojju

    Kalan to 220 kV level conveyed vide

    R 543 daed 2.9.08 with 2x100 MVA

    220/132 kV transformers.

    83 1x100+

    1x100+

    2x.200

    220/132+

    220/33+

    33/.4

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    28/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    To make provision of 12 no. 220 kV

    bays including spare bays, 12 no.

    132 kV bays including spare bays

    and 15 no. 33 kV bays including

    spare bays at proposed 220 kV

    substation Dadhi Bana.

    To allow DHBVNL to feed following

    new 33 kV substations: i)

    Khudana (10 MVA) from proposed

    220 kV substation Dadhi Bana in

    place of earlier approved (R 567

    dated 03.11.2008) from 132 kV

    substation Jhojju Kalan.

    Ii) Mandola (10 MVA) and Changrod

    (10 MVA) from proposed 220 kV

    substation Dadhi Bana in place of

    earlier approved (R 543 dated

    02.09.2008) from proposed 132 kV

    substation Makrani. iii)

    Dhareru (10 MVA) from 132 kVsubstation dadri-II matching with

    shifting of load of 33 kV substation

    Makrana from 132 kV substation

    Dadri II to proposed 132 kV

    substation Makrani.

    84 Construction of 220 kV D/C Dhanonda

    Dadhi Bana line with 0.5 Sq" ACSR

    conductor

    38 2L1426*

    2L1270A

    2L1420A

    1140.00 2011-12 Yet to be posed

    85 Construction of 220 kV D/C Dadhi

    Bana - Gignow line with 0.5 Sq" ACSR

    conductor

    40 2L1427* 1200.00 2011-12 World Bank

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    29/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Pla

    86 Batta 1x100

    1x100

    2x0.2

    220/132

    220/33

    33/0.4

    2N1277* 3000.00 2010-11 Yet to be

    posed

    87 LILO of 220 kV Narwana Kaithal

    double circuit line at proposed 220 kV

    substation Batta.

    2L1278* 2010-11 Yet to be

    posed

    Informing Hon'ble CM Haryana about

    change in site and voltage level i.e.

    creating 220 kV substation Batta in

    place of upgradation of 33 kV

    Kalayat to 132 kV level.

    Raiwali 2x100

    1x12.5/16

    220/66

    66/11

    2N1322* 2500.00 2010-11 World Bank 1x12.5/16 MVA 66/11 kV transformer

    for auxiliary supply

    Additional 100 MVA 220/66 kV or

    220/33 kV transformer shall be

    installed in future as per load

    requirement for which space shall be

    provided in the switchyard.

    33 kV yard shall not be created at

    this stage but space shall be kept forthe same.

    To make provision of 15 no. 220 kV

    bays including spare bays, 15 nos.

    66 kV bays including spare bays and

    10 nos. 33 kV bays including spare

    bays at proposed 220 kV substation

    Raiwali.

    89 LILO of one circuit of 220 kV D/C Tepla

    - Madanpur line with 0.4 ACSR atproposed 220 kV substation Raiwali.

    10 2L1323* 225.00 2010-11 World Bank

    88

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    30/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    90 Construction of 220 kV D/C line with

    0.5 sq ACSR from 400 kV substation

    PGCIL (to be constructed near

    Barwala) to proposed 220 kV

    substation Raiwali.

    20 2L1324* 550.00 2010-11 World Bank The execution shall be in the time

    frame matching with commissioning

    of 400 kV PGCIL substation.

    91 Cancellation of earlier approved

    feeding of 220 kV substation Sector 20

    Gurgaon by creation of Daultabad -

    Sector 20 Gurgaon line with 220 kVD/C quad moose conductor as

    provided at Sr. No. 6 of approval

    issued by CE/ Planning HVPNL

    Panchkula vide memo No. R. 563/Ch-

    23/HSS-348 dated 30.10.2008.

    2L1320A No

    to b

    in In

    92 Sector-3 Gurgaon (GIS) In principle approval for creation

    of 220 kV GIS substation at sector

    3 Gurgaon subject to allotment of

    land for the same by HUDA

    93 Sector-2 Gurgaon (GIS) In-principle approval for up-

    gradation of existing 66 kV

    substation sector-2 Gurgaon to

    220 kV GIS substation in case

    suitable land is not made available

    by HUDA in adjoining sector-3

    Gurgaon subject to suitability of

    spare land at 66 kV substationsector-2 Gurgaon for the purpose

    of upgradation.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    31/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    94 220 kV D/C overhead line with twin

    moose AAAC conductor with total line

    length of 6.5 km approx. from

    Daultabad to Railway line.

    13 390.00 2011-12

    95 220 kV D/C line with power cable

    equivalent to twin moose AAAC

    conductor with total line length of 2.5

    km approx. from Railway line to

    proposed 220 kV GIS substation sector2 or 3 Gurgaon.

    5 2L1444* 1500.00 2011-12

    96 220 kV D/C line with power cable

    equivalent to single moose AAAC

    conductor with total line length of 6.5

    km approx. from proposed 220 kV GIS

    substation sector 2 or 3 Gurgaon to

    proposed 220 kV substation sector-20

    Gurgaon.

    13 3900.00 2011-12

    Rampur Kamboan 1x100 MVA

    1x100 MVA

    2x0.2 MVA

    220/66

    220/33

    33/0.4

    2N1370* 3501.00 2010-11 PFC 03403021 220kV substation Rampur Kamboan

    approved in place of Malikpur

    Bangar approved vide R574 dated

    8/12/08

    2N1235A Additional 100 MVA 220/66 kV

    transformer shall be installed in

    future as per load requirement for

    which space shall be provided in the

    switchyard.

    97

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    32/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    c

    Inv

    Plan

    To make provision of 15 nos. 220 kV

    bays including spare bays, 15 no. 66

    kV bays including spare bays and 10

    no. 33 kV bays including spare bays

    at 220 kV substation Rampur

    Kamboan

    To allow UHBVNL to feed 33 kV

    substations Rampur Kamboj

    (proposed 10 MVA), Malikpur

    Banger (proposed 10 MVA), Dhimo(proposed 10 MVA), Ledi (proposed

    10 MVA) and Taharpur (proposed 10

    MVA) from proposed 220 kV

    substation Rampur Kamboan.

    98 LILO of one circuit of 220 kV D/C

    YTPP - Abdullapur line with 0.5 sq"

    ACSR at proposed 220 kV substation

    Rampur Kamboan. It is likely to

    construct 220 kV D/C line from 400 kV

    PGCIL substation (to be constructed

    near Barwala) to proposed 220 kV

    substation Rampur Kamboan via

    another proposed 220 kV ss being

    planned at village Sarawan

    40 2L1371*

    2L1236A

    1500.00 2010-11 PFC 03403021

    99 Erection of 220 kV D/C Sector 72 -

    Badshahpur line with 0.5 Sq inch

    ACSR

    10 2L1381* 300.00 2009-10 To be Posed

    100 Shifting of a portion of exisitngoverhead 66 kV D/C Badshahpur -

    Sohna line passing through 220 kV

    substation Badshahpur yard with 66 kV

    XLPE underground cable to provide

    space for erection of 220 kV bay.

    6G1382* 2009-10 To be posed

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    33/170

    Sr.

    No.

    Name of substation or line section Line

    Length

    (Ckt -

    km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangement

    Remarks W

    co

    u

    Inve

    Plan

    101 Erection of 2 no. 220 kV bays at 220

    kV substation Sector 72 Gurgaon for

    accomodating 220 kV D/C Sector 72-

    Badshahpur line.

    2B1383* 200.00 2009-10 To be posed

    102 2 no. 220 kV bays at 220 kV substation

    Badshahpur for acomodating 220 kV

    D/C Sector 72 - Badshahpur line

    2B1384* 200.00 2009-10 To be posed

    Total (220 kV) 2347.22 169186.34

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    34/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    132 kV Works

    A

    1 Jakhal 2x10/16 132/11 1U0467* 431.00 2009-10 REC 350023 One No 10/16 MVA, 132/11 kV T/F would

    be installed in the 1st instance and the 2nd

    susequently, as load grows

    2 132 kV S/C line from proposed 220

    kV substation Bhuna to 132 kV

    substation Jakhal in place of earlierapproved Tohana - Jakhal line

    25 1L0468* 369.00 2009-10 REC 350023 Proposed 132 kV S/S Jakhal would be

    constructed in the available space in the

    existing 33 kV substation Jakhal. Space forone 132 kV bay at 132 kV Jakhal shall be

    provided for future expansion/ use.

    3 Arya Nagar (Hissar) 1x10/16 132/11 1U0480* 633.00 2009-10 REC 350031

    4 Stringing of 2nd. ckt. of Beer (132

    kV)-to T-off point (Tower No.45) on

    already erected D/C Towers &

    Const. of 132 kV line bay at Beer

    (132 kV substation)

    3 1L0481* 17.00 2009-10 REC 350031

    5 132 kV S/C line on D/C towers from

    Location No. 45 (T-off point) to 132

    KV Arya Nagar S/S with associated

    bays at Arya Nagar

    20 1L0482* 496.00 2009-10 REC 350031

    6 Stringing of 2nd. ckt. f rom Hisar I.A

    to Arya Nagar (direct).

    38 1L0483* 211.00 2009-10 REC 350031

    132 kV bay one number at Hissar

    I.A substation.

    1B0484* 2009-10 REC 350031

    7 Dadri- Jhojjukalan S/C ine with 0.2Sq" ACSR in place of earlier

    approved 2nd Ckt. of Dadri-Atela

    16 1L0485* 254.00 2009-10 REC 350029

    7 b One 132 kV bay at Dadri 1B0486* 86.00 2009-10 REC 350029

    7 c Two 132 kV bays at Jhojjukalan 1B0487* 86.00 2009-10 REC 350029 One bay covered in the scheme

    Works to be executed with financial assistance from REC

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    35/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    8 132 kV S/C line from 220 kV

    Pehowa to 132 kV Malikpur and

    connecting it to present 132 kV

    Malikpur - Ismailabad line just

    beyond Malikpur.

    17 1L0493* 270.00 2009-10 REC 350029 I) Vacation of 132 kV bay at 132 kV

    Malikpur currently feeding 132 kV

    Ismailabad.

    II) First few spans of this line will be

    constructed with D/C towers to preserve the

    right of way for any new 132 kV emanating

    from adjacent bay to take care of future load

    growth requirement of the area.

    9 LILO of Tohana - Dharsul S/C lineat 220 kV substation Bhuna

    38 1L0497* 577.00 2009-10 REC 350031

    10 LILO of 132 kV Dharsul - Telewara

    S/C line at 220 kV substation Bhuna

    19 1L0498* 425.00 2009-10 REC 350031 Commissioned on 20.05.09

    11 132 kV S/C line from 220 kV

    proposed substation Bhuna to 132

    kV substation Uklana

    25 1L0511* 427.00 2009-10 REC 350031

    12 one No. 132 kV bay at 132 kV

    substation Uklana for

    accommodating Bhuna line

    1B0512* 56.00 2009-10 REC 350031

    13 LILO of 132 kV Karnal - Indri S/C

    line at 220 kV Nilokheri.

    20 1L0505* 280.00 2009-10 REC 350030

    14 Nagla Megha 2x10/16 132/11 1U0506* 712.00 2009-10 REC 350030 Commissioned with 1st T/F on 10.04.09

    & 2nd T/F Commissioned on 24.04.09

    15 132 kV Madhuban to Nagla Megha

    S/C line.

    7 1L0507* 111.00 2009-10 REC 350030 Commissioned on 9.3.09

    16 132 kV bay at 132 kV substation

    Madhuban for accommodating

    Nagla Megha line -1 No

    1L0508* 56.00 2009-10 REC 350030 Commissioned on 9.3.09

    17 Halluwas (Dadri Road Bhiwani) 10/16 132/11 1N0522* 531.00 2009-10 REC 350028 At 6 acre land given by Gram Panchayat

    free of cost.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    36/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    18 Feeding 132 kV Halluwas from 220

    kV substation Dadri by utilising idle

    portion of 132 kV S/C Dadri -

    Bhiwani line.

    1 1L0523* 17.50 2009-10 REC 350028 Earlier work of augmentation of 220 kV

    substation Bhiwani with additional 1x10/16

    MVA 132/11 kV transformer vide memo No.

    R. No. 298 / Ch.151/408/K-35 dated

    8.4.2005 be treated as cancelled.

    *Refurbishing of 132 kV bay at 220

    kV substation Dadri for Halluwas

    1B0524* 20.00 2009-10

    19 Additional 132 kV S/C line from the

    end of existing portion of Dadri-Bhiwani line upto the site of

    proposed 132 kV substation

    Halluwas with 0.2 Sq" ACSR.

    1 1L0525* 16.00 2009-10 REC 350028

    20 Bhutan Kalan 2x20/25 132/33 1U0533* 954.00 2009-10 REC 350031 To feed / connected to 33 kV substaions

    Bhutan, Bhuna and Bhirdana etc.

    1x5 33/11 1N0534* 2009-10 REC 350031

    21 132 kV S/C line on D/C towers from

    220 kV substation Bhuna to

    proposed 132 kV substation Bhutan

    Kalan with 0.2 Sq" ACSR

    15 1L0535* 372.00 2009-10 REC 350031 For auxiliary load of 220 kV Bhuna

    22 1x20/25 132/33 1U0761* 940 2009-10 REC 350035

    4 33/11 1U0762* REC 350035

    1x20/25 MVA 132/33 kV transformer beingproposed at 132 kV substation Kirmitch

    would feed existing 33 kV substation

    Kirmitch and any future/ proposed nearby

    substation by UHBVN.

    23 LILO of 132 kV Sagga Amin line

    at 132 kV substation Kirmitch.

    48 1L0763* 760 2009-10 REC 350035

    Kirmich

    (Upgradation from 33 kV level)

    With double bus arrangement to provide

    connectivity with both 220 kV Nissing and

    220 kV Nilokheri matching with

    commissioning of 220 kV substation

    Nilokheri and shifting of 132 kV substation

    Amin on 220 kV substation Nilokheri.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    37/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    24 132 kV S/C line on D/C tower from

    220 kV substation Nilokheri to

    proposed 132 kV substation

    Kirmitch

    18 1L0764* 465 2009-10 REC 350035

    25 Seka 2x20/25 132/33 1N0812* 1020.00 2009-10 REC 350035

    1x4 33/11 3N0813* 2009-10 REC 350035

    26 132 kV S/C line on D/C tower with0.4 sq ACSR from 220 kV

    substation Narnaul to proposed 132

    kV substation Seka.

    10 1L0814* 300.00 2009-10 REC 350035

    27 One No. 132 kV bay at 220 kV

    substation Narnaul for

    accommodating Narnaul Seka

    132 kV line

    60.00 2009-10 REC 350035

    28 132 kV S/C line with 0.2 sqACSR

    from 132 kV substation Ateli to 132

    kV substation Mundia Khera.

    11 1L0815* 210 2009-10 REC 350035

    29 132 kV S/C line with 0.2 sqACSR

    from proposed 132 kV substation

    Seka to 132 kV substation Ateli.

    20 1L0816* 380 2009-10 REC 350035

    Habri 1x20/25 132/33 1N0822* 930.00 2009-10 REC 350035 Matching with the augmentation of 220 kV

    substation Nissing with additional 1x100

    MVA 220/132 kV transformer.

    1x20/25 MVA 132/33 kV transformer being

    proposed at 132 kV substation Habri would

    feed load of existing 33 kV substation Habri

    (16 MVA) and proposed new 33 kV

    substation Deeg (10 MVA)

    Creation of two No. 132 kV bays at 132 kV

    substation Ateli and one No. bay at 132 kV

    substation Mundia Khera for accommodating of Seka Ateli and Ateli -

    Mundia Khera 132 kV lines -

    2x20/25 MVA 132/33 kV transformer being

    proposed at 132 kV substation Seka would

    feed 33 kV substations Shobhapur,

    Bhungarka and Bhilwara and any future/

    proposed nearby substation by DHBVN.

    30

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    38/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    1x20/25 132/33 1A0829* 2009-10 REC 350035 To facilitate feeding of proposed new 33 kV

    substation Barsana (10 MVA)

    31 132 kV S/C line on D/C towers with

    0.2 sq ACSR from 132 kV

    substation Rasina to proposed 132

    kV substation Habri.

    12 1L0823* 310.00 2009-10 REC 350035

    32 132 kV bays at 132 kV substation

    Rasina for accommodating S/C lineon D/C towers from 132 kV

    substation Rasina to proposed 132

    kV substation Habri.

    1B0824* 80.00 2009-10 REC 350035

    un

    33 Stringing of 3rd 132 kV circuit

    between 220 kV substation Bhiwani

    and 132 kV substation Jui.

    29 1L0783* 171 2009-10 REC 350036

    i 132 kV bay at 220 kV Bhiwani - For

    connecting to Jui (One No.)

    1B0784* 60 2009-10 REC 350036

    un

    ii 132 kV bay at 132 kV Jui - For

    connecting to Bhiwani (One No.)

    1B0785* 60 2009-10 REC 350036

    un

    34 132 kV S/C line from 220 kV

    substation Isharwal to 132 kV

    substation Jui with 0.2 sq" ACSR.

    36 1L0779* 660 2009-10 REC 350033

    35 132 kV S/C line 220 kV substation

    Isharwal to Miran with 0.2 sq"

    ACSR.

    12.5 1L0780* 242 2009-10 REC 350033

    36 132 kV S/C line 220 kV substation

    Isharwal to Tosham with 0.2 sq"

    ACSR.

    28 1L0781* 517 2009-10 REC 350033

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    39/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    37 132 kV S/C line 220 kV substation

    Isharwal to Behal with 0.2 sq"

    ACSR.

    21 1L0782* 393 2009-10 REC 350033

    38 132 kV bays at following

    substations:

    i 132 kV Jui - For connecting to

    Isharwal (One No.)

    1B0786* 65 2009-10 REC 350033

    ii 132 kV Miran - For connecting to

    Isharwal (One No.)

    1B0787* 65 2009-10 REC 350033

    iii 132 kV Tosham - For connecting to

    Isharwal (One No.)

    1B0788* 65 2009-10 REC 350033

    iv 132 kV Behal - For connecting to

    Isharwal (One No.)

    1B0789* 65 2009-10 REC 350033

    39 Bhusthala 2x20/25 132/33 1N0765* 800 2009-10 REC 350036 At the land being provided by gram

    Panchayat free of cost.

    2x200 kVA 33/0.4 3N0766* 2009-10 REC 350036 This substation will also cater to the load

    demand of Ajrana and surrounding area.

    40 132 kV D/C line from 220 kV

    substation Durala to 132 kV

    substation Bhusthala with 0.4 sq.

    inch ACSR

    25 1L0767* 375 2009-10 REC 350036

    41 132 kV S/C line on D/C towers from

    132 kV substation Bhusthala to 132

    kV substation Ismailabad with 0.4sq. inch ACSR

    12 1L0768* 300 2009-10 REC 350036

    42 One no.132 kV bay at 132 kV

    substation Ismailabad for

    accommodating above line.

    1B0769* 60 2009-10 REC 350036

    Construction of 33 kV bays (two per

    transformer of 132/33 kV rating) as and

    when required to meet the load requirement

    in the area.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    40/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    Adhon 2x20/25

    2x200 kVA

    132/33

    33/0.4

    1N0770*

    3N0771*

    800 2009-10 REC 350036 At the land being provided by gram

    Panchayat free of cost.

    2009-10 REC 350036 This substation will also cater to the load

    demand of Jhansa Road Kurukshetra and

    44 132 kV S/C line on D/C towers from

    220 kV substation Durala to 132 kV

    substation Adhon with 0.4 sq. inch

    ACSR

    3 1L0772* 75 2009-10 REC 350036

    45 Lukhi

    (Up gradation from 33 kV level)

    2x20/25

    2x200 kVA

    132/33

    33/0.4

    1U0773*

    3U0774*

    800 2009-10 REC 350036 This substation will also cater to the load

    demand of Lukhi, Jyotisar and surrounding

    area.

    46 132 kV S/C line on D/C towers from

    220 kV substation Durala to 132 kV

    substation Lukhi with 0.4 sq. inch

    ACSR

    9 1L0775* 225 2009-10 REC 350036

    47 LILO of 132 kV Pehowa Bhoreline at 132 kV substation Lukhi. 23 1L0776* 345 2009-10 REC 350036

    48 Bodhni

    (Up gradation from 33 kV level)

    2x20/25

    2x200 kVA

    132/33

    33/0.4

    1N0777*

    3U0811*

    800 2009-10 REC 350037

    49 LILO of S/C line 220 kV Pehowa

    132 kV Ismailabad line at 132 kV

    substation Bodhni.

    15 1L0778* 225 2009-10 REC 350037

    50 Provisison of double bus

    arrangement at existing 132 kV

    Bahadurgarh facilitating exchange

    of power on both 220 kV substation

    Narela & 220 kV substation

    Bahadurgarh side

    1G0473* 35 2009-10 NCRPB

    43

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    41/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    51 LILO of 132 kV RohtakDadri line

    at 132 kV substation Kalanaur in

    place of present T-off arrangement

    2 1L0536* 32.00 2009-10 NCRPB

    52 Stringing of 2nd ckt of

    RohtakMDUSampla 132 kV line

    with 0.2 sq. inch ACSR.

    21 1L0537* 124.00 2009-10 NCRPB 132 kV bays four numbers i.e. one No. each

    at 220 kV substations Rohtak & 132 kV

    substations Sampla and two Nos. at 132 kV

    substation MDU Rohtak for accommodating

    of stringing of 2nd ckt of Rohtak -MDU -Sampla 132 kV line

    53 132 kV Sataundi

    {Upgradation from 33 kV level}

    2X20/25 132/33 1N0845* 1000 2009-10 World Bank At the land offered free of cost by Gram

    Panchayat Sataundi adjacent to existing 33

    kV substation. Only one 132/33 kV T/F

    shall be commissioned in the first instance.

    The second T/F shall be added as the load

    grows.

    The existing 33 kV substation sataundi will

    continue to be fed from proposed 132 kVSataundi which will also feed proposed 33

    kV substations Bastra and raipur Jattan.

    54 LILO of one circuit of Bastra-Jundla

    line at proposed 132 kV substation

    Sataundi.

    12 1L0846* 268.00 2009-10 REC 350065 The route of bastra-Sataundi-Jundla line

    shall be selected in such a way that D/C line

    from Bastra reaches Sataundi and then

    proceeds to Jundla but only one of the

    circuits enters Sataundi; the other circuit by

    passes. Second circuit can be connected in

    future when required.

    55 Beholi 2x20/25

    2x500 kVA

    132/33

    33/0.4

    1N0958* 1000.00 2010-11 JICA through

    REC 350050

    HR-IC-DIS-

    035-2009-

    100844

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    42/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    56 Bega 2x20/25

    2x500 kVA

    132/33

    33/0.4

    1N0959* 800.00 2010-11 JICA through

    REC 350050

    HR-IC-DIS-

    035-2009-

    100844

    57 Naultha 1x20/25

    2x500 kVA

    132/33

    33/0.4

    1N0960* 800.00 2010-11 JICA through

    REC 350050

    HR-IC-DIS-

    035-2009-

    100844

    58 132 kV S/C line on D/C towers with

    0.4 Sq. inch ACSR from Samalkha-

    Beholi line.

    8 1L0962* 280.00 2010-11 JICA through

    REC 350054

    HR-IC-DIS-

    035-2009-

    100848

    59 132 kV S/C line on D/C towers with

    0.2 Sq. inch ACSR from Samalkha-

    Naultha line.

    16 1L0963* 448.00 2010-11 JICA through

    REC 350054

    HR-IC-DIS-

    035-2009-100848

    60 132 kV S/C line on D/C towers with

    0.2 Sq. inch ACSR from Samalkha

    to Bega.

    12 1L0964* 336.00 2010-11 JICA through

    REC 350054

    HR-IC-DIS-

    035-2009-

    100848

    61 LILO of 132 kV S/C line from 400

    kV substation Sewah to 132 kV

    substation Israna at 132 kVsubstation Naultha.

    4 1L0965* 40.00 2010-11 JICA through

    REC 350054

    HR-IC-DIS-035-2009-

    100848

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    43/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    62 132 kV S/C line on D/C towers with

    0.4 Sq. inch ACSR from Beholi to

    Chhajpur.

    13 1L0966* 455.00 2010-11 JICA through

    REC 350054

    HR-IC-DIS-

    035-2009-

    100848

    63 LILO of 132 kV S/C Chandoli-

    Chhajpur line at 220 kV substation

    Chhajpur.

    1 1L0968* 17.53 2010-11 Posed to

    NCRPB on

    05.05.2009

    64 132 kV S/C line on D/C tower with0.4 Sq. inch ACSR from 220 kV

    substation Chhajpur to 132 kV

    substation Sector-29, Panipat.

    9.7 1L0969* 331.06 2010-11 Posed toNCRPB on

    05.05.2009

    65 One no.132 kV bay at 132 kV

    substation Sector-29, Panipat for

    accommodating line from 220 kV

    substation Chhajpur.

    1B0970* 55.32 2010-11 Posed to

    NCRPB on

    05.05.2009

    un

    66 132 kV Kairu 1x20/25 132/33 1N1037* 800.00 2010-11 World Bank

    67 LILO of 132 kV Isharwal-Jui S/C lineat 132 kV substaion Kairu

    1L1038* World Bank

    68 132 kV Khurana 2x20/25 132/33 1N1043* 1000.00 2009-10 REC 350066 Matching with augmentation of 220 kV

    substation Cheeka by providing additional

    1x100 MVA 220/132 kV transformer.

    2x200 kVA 33/0.4 REC 350066 Initially 1x20/25 MVA 132/33 kV transformer

    would be installed at 132 kV substation

    Khurana to feed existing 33 kV substation

    Siwan gate Kaithal and Kawartan.

    2nd 20/25 MVA 132/33 kV transformers

    would be installed at 132 kV substation

    Khurana matching with creation of new 33

    kV substation by UHBVN to be proposed in

    the area for which the UHBVN may be

    asked to create new 33 kV substations.

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    44/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    69 2 Nos 33 kV bays at 132 kV

    subatation Khurana to

    accommodate 33 kV lines for

    feeding existing 33 kV substations

    Siwan gate Kaithal and Kwartan.

    3B1044*

    3B1045*

    75.00 2009-10 Included in the

    cost of

    subsstation

    un

    70 LILO of 132 kV Kaithal Sewan line

    at 132 kV substation Khurana.

    20 1L1046* 350.00 2009-10 REC 350066

    71 132 kV S/C line on D/C tower with0.2 sq ACSR from upcoming 132

    kV substation Kheri Gulam Ali to

    proposed 132 kV substation

    Khurana.

    10 1L1047* 280.00 2009-10 REC 350066

    72 132 kV line bay at 132 kV

    substation Kheri Gulam Ali for

    accommadating above line.

    1B1048* 120.00 2009-10 Included in the

    cost of

    subsstation

    un

    73 132 kV Dablain 1x16/20 132/33 1N1078* 800.00 2009-10 REC 350064

    74 LILO of 132 kV Narwana Uklana

    line at proposed 132 kV substation

    Dablain.

    2 1L1079* 50.00 2009-10 REC 350064

    75 Two numbers 33 kV bays at

    proposed 132 kV substation Dablain

    to feed existing 33 kV substation

    Dhanoda (9 MVA) and the already

    approved 33 kV substation Lochab

    (8 MVA) from it

    3B1080*

    3B1081*

    50.00 2009-10 REC 350064

    un

    76 LILO of 132 kV S/C Sirsa - Odhan

    line at proposed 400 kV substation

    Nuhiyawali.

    16 1L1075* 280.00 2009-10 JICA through

    REC 350058

    HR-IC-DIS-

    035-2009-

    100852

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    45/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    77 Kheri Gulam Ali 1x20/25

    1x200 kVA

    132/33

    33/0.4

    1N0934* 800.00 2009-10 REC 350064 Matching with the commissioning of 3rd 100

    MVA 220/132 kV transformer at 220 kV

    substation Cheeka to feed existing 33 kV

    substation Kheri Gulam Ali.

    78 132 kV S/C line on D/C towers with

    0.4 sq. inch ACSR from 220 kV

    substation Cheeka to the proposed

    132 kV substation Kheri Gulam Ali

    25 1L0935* 875.00 2009-10 REC 350064 Matching with the commissioning of 3rd 100

    MVA 220/132 kV transformer at 220 kV

    substation Cheeka.

    79 One number 132 kV bay at 220 kV

    substation Cheeka for

    accommodating Cheeka (220 kV) -

    Kheri Gulam Ali, 132 kV S/C line on

    D/C towers.

    1B0936* 60.00 2009-10 REC 350064

    un

    80 2nd 20/25 MVA 132/33 kV

    transformers proposed at 132 kV

    substation Kheri Gulam Ali

    1A0937* 200.00 2009-10 REC 350064 Matching with commissioning of proposed

    33 kV substation Naagal (Lader Keena),

    Serta and Atela/Budha Khera by UHBVN for

    which the proposal from UHBVN is still

    81 Conversion of existing 132 kV main

    and transfer bus into double bus at

    132 kV substation Safidon

    1G0491* 35.00 2008-09 Yet to be

    posed

    Work completed and commissioned.

    82 To provide Double bus arrangement

    at 132 kV substation Jui

    1G0492* 35.00 2008-09 Yet to be

    posed

    83 LILO of 132 kV S/C line between

    Gharaunda and Madhuban at 220

    kV substation Bastra.

    10 1L0840* 175.30 2009-10 REC 350065

    84 132 kV D/C line with 0.4 sqACSR

    from propopsed 220 kV substation

    Bastra to 132 kV substation

    Naglamegha.

    30 1L0841* 668.00 2009-10 REC 350065

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    46/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    85 Two No. 132 kV bays at 132 kV

    substation Naglamegha for Bastra-

    Naglamegha line.

    1B0842* 110.64 2009-10 REC 350065

    86 132 kV D/C line with 0.4 sqACSR

    from proposed 220 kV substation

    Bastra to 132 kV substation Jundla

    via Sataundi.

    44 1L0843* 980.00 2009-10 REC 350065

    87 Two 132 kV bays at 132 kV

    substation Jundla for Bastra-Jundla

    line.

    1B0844* 110.64 2009-10 REC 350065

    un

    88 Replacement of conductor between

    132 kV substation Rohtak and 132

    kV Sec-3, Sonepat Road Rohtak

    from existing 0.15 sq ACSR to

    maximum current carrying capacity

    conductor physically in the same

    range and which can be

    accommodated on the existing

    tower structures without requiring

    mid span installation (5.5 km.).

    11 1E0749* 55.00 2009-10 Yet to be

    posed

    89 132 kV S/C line with 0.2 Sq" ACSR

    from 132 kV substation Jalmana to

    132 kV substation Assandh

    14 1L0854* 280.00 2009-10 REC 350042

    a) 132 kV bay at 132 kV Jalmana - For

    connecting to Assandh (One No.)

    1B0855* 80.00 2009-10 REC 350042

    un

    b) 132 kV bay at 132 kV Assandh - For

    connecting to Jalnama (One No.)

    1B0856* 80.00 2009-10 REC 350042

    un

    LIST OF WORKS (66 kV AND ABOVE) 2009-10

  • 8/22/2019 14_List of Works 2009-10

    47/170

    Sr.

    No.

    Name of substation or line

    section

    Line

    Length

    (Ckt - km)

    Transformer

    Capacity

    (MVA)

    Voltage

    Ratio

    (kV)

    Code Tentative

    Cost in Rs

    lac

    Tentative

    completion

    Schedule

    Funds

    Arrangements

    Remarks

    In

    Pla

    90 Nidana 1x20/25 132/33 1N0860* 953.00 2009-10 REC 350065 With double bus arrangement matching with

    the augmentation of 220 kV substation

    Nissing with 1x100 MVA 220/132 kV

    transformer

    1x4 33/11 3N0861* 2009-10 REC 350065 1x20/25 MVA 132/33 kV transformer being

    proposed at 132 kV substation Naraina

    would feed load of existing 33 kV substation

    Taraori (16 MVA) and proposed 4 MVA

    33/11 kV transformer at proposed 132 kV

    substation Naraina.

    91 LILO of existing 132 kV idle line

    from 132 kV Karnal to 220 kV

    Nissing at proposed 132 kV

    substation Nidana

    12 1L0862* 211.00 2009-10 REC 350065 4 MVA 33/11 kV transformer is proposed to

    be provided for feeding village Naraina as

    land is being offered free of cost by local

    Panchayat for proposed 132 kV substation.

    Therefore, it will ensure an independent

    feeder to the concerned village and also to

    provide auxiliary supply.

    92 One 33 kV bay at 132 kV substationNidana for feeding the existing 33

    kV substation Taraori.

    3B0863* 25.00 2009-10 Included in thecost of

    subsstation

    un

    93 132 kV S/C line on D/C towers with

    0.4 ACSR from 400 kV substation

    Kirori (Hisar) to 132 kV substation

    Barwala.

    20 1L0943* 700.00 2009-10 REC 350039 2nd circuit shall be strung subsequently as

    per system requirement

    94 Creation of one 132 kV line bay at

    132 kV substation Barwala to

    receive 132 kV line from proposed400 kV substation Kirori.

    1B0944* 60.00 2009-10 REC 350039