143 route 59 instructions · bnc assembly instructions #381 • male solder type (3 piece...

6
INSTRUCTIONS INSTALLATION ASSEMBLY CONNECTING WITH QUALITY SINCE 1959 143 Route 59 P.O. Box 775 Hillburn, New York 10931 office:(845) 357-7510 fax: (845) 357-7630 website: http://www.czlabs.com e-mail: [email protected] UHF ASSEMBLY INSTRUCTIONS #401 • UG STANDARD SOLDER TYPE (PL-259) FOR CABLE TYPES RG-8/U, 9/U, 11/U, 63/U, 87A/U, 213/U, 214/U, 225/U 1 2 3 BNC ASSEMBLY INSTRUCTIONS #360 • TWIST-ON (1 PIECE CONSTRUCTION) FOR CABLE TYPES RG-6/U, 58/U, 59/U, 62/U 1 2 3 4 Slide coupling ring onto cable. Cut end of cable even and strip jacket, braid and dielectric to dimensions shown in table. All cuts are to be sharp and square. Do not nick braid,dielectric or center conductor. Tin exposed center conductor and braid, avoiding excessive heat. Screw the plug sub-assembly on cable. Solder assem- bly to braid through solder holes, making a good bond between braid and shell. Solder conductor to contact. Do not use excessive heat. For final assembly on straight plugs, move coupling ring forward and screw in place on plug sub-assembly. Strip cable as shown. Be careful not to nick center conductor or outer braid. Twist outer braid in a clockwise direction so that at least 1/32” of cable dielectric is bared, and braid is left flat. (stray or loose braid can cause shorts.) Gently insert center conductor into back end of connector, “feeling” it into the guide hole. (If center conductor is not properly in place, about 1/8”of center conductor will show at the back end. Reinsert until cable dielectric reaches position shown in illustration.) Push the cable firmly in place (as far as possible). Then screw the connector onto the cable in a clockwise direction until it stops. Assembly is complete. b c solder here a min. of cable dielectric Back end of connector and cable dielectric flush, center conductor in place. b d c STEP 1 STEP 2 STEP 3 STEP 4 STEP 1 STEP 2 a a = 1.25 (31.8) b = .687 (17.4) c = .625 (15.9) a = .813 (20.7) b = .250 (6.4) c = .563 (14.3) d = .031 (0.8)

Upload: others

Post on 18-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LY CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]

UHF ASSEMBLY INSTRUCTIONS#401 • UG STANDARD SOLDER TYPE (PL-259)

FOR CABLE TYPES RG-8/U, 9/U, 11/U, 63/U, 87A/U, 213/U, 214/U, 225/U

1

2

3

BNC ASSEMBLY INSTRUCTIONS#360 • TWIST-ON (1 PIECE CONSTRUCTION)

FOR CABLE TYPES RG-6/U, 58/U, 59/U, 62/U

12

3

4

Slide coupling ring onto cable. Cut end of cable evenand strip jacket, braid and dielectric to dimensionsshown in table. All cuts are to be sharp and square. Donot nick braid,dielectric or center conductor. Tin exposedcenter conductor and braid, avoiding excessive heat.

Screw the plug sub-assembly on cable. Solder assem-bly to braid through solder holes, making a good bondbetween braid and shell. Solder conductor to contact.Do not use excessive heat.

For final assembly on straight plugs, move coupling ringforward and screw in place on plug sub-assembly.

Strip cable as shown. Be careful not to nick center conductor or outer braid.

Twist outer braid in a clockwise direction so that at least 1/32” of cable dielectric is bared, and braid is leftflat. (stray or loose braid can cause shorts.)

Gently insert center conductor into back end of connector, “feeling” it into the guide hole. (If centerconductor is not properly in place, about 1/8”of centerconductor will show at the back end. Reinsert untilcable dielectric reaches position shown in illustration.)

Push the cable firmly in place (as far as possible). Then screw the connector onto the cable in a clockwisedirection until it stops. Assembly is complete.

b

c

solder here

a

min. of cable dielectric

Back end of connector and cable dielectricflush, center conductor in place.

b

d

c

STEP 1

STEP 2

STEP 3

STEP 4

STEP 1

STEP 2

aa = 1.25 (31.8) b = .687 (17.4) c = .625 (15.9)

a = .813 (20.7)b = .250 (6.4)c = .563 (14.3)d = .031 (0.8)

Page 2: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

BNC ASSEMBLY INSTRUCTIONS#381 • MALE SOLDER TYPE (3 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U, 223/U, BELDEN 9268

1

2

34

DROP CABLE PREPARATIONS#106 • “F” TYPE F-56 CONNECTOR (F-59/ALM)

FOR CABLE TYPE RG-6/U

56

123

74

Remove jacket material to 3/8”.

Fold braid back over jacket.

Remove foil and cut dielectric to length of 1/4”. Be carefulnot to nick copper jacket of center conductor. Removedielectric fuzz.

If using separate crimp ring, slide over folded back braid.

If foil is burred, twist so that corner at point A is smooth and provides a lead for the connector mandrel.

Install connector mandrel over foil and underneath the braid;trim braid if desired. point A should be approximately evenwith inner surface of connector.

Slide crimp ring into place over braid and adjacent to connector body. crimp with proper tool.

Slide clamp nut over cable. Strip cable to dimensionshown. Cut braid and dielectric square. Do not nickcenter conductor.

Slide contact assembly under braid and jacket untilbraid butts as shown. Use caution that braid slidesover contact assembly and not inside of it. Be surecenter conductor is visible through side hole of contact. Solder contact to center conductor. Contactmay be crimped on applicable connectors.

Insert into connector body.

Tighten clamp nut to a torque of 35 ibf-in.

a

b

cd

STEP 1A

STEP 1B

STEP 2

STEP 3

STEP 4

ab

A

a = .250 (6.4)b = .338 (8.6)c = .216 (5.5)d = .275 (7.0)

a = .375 (9.5)b = .250 (6.4)

INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LY CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]

Page 3: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LYTERMINATION INSTRUCTIONS

#350 • BNC CRIMP CONNECTOR (2 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U

#770 • TNC CRIMP CONNECTOR (2 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U

123

45

Run crimp sleeve down cable.

Trim cable as shown, being careful not to nick outerbraid.

Insert center conductor into the guide hole in the rear ofthe connector. Then screw the connector on the cable ina clockwise direction.

Push crimp sleeve into place, sandwiching the braidbetween the connector and sleeve.

Crimp the sleeve into place with the proper crimp tool.

b

a

aCrimp Sleeve

Crimped Sleeve

STEP 1, 2 & 3

STEP 4

STEP 5

a = .375 (9.5)b = .063 (1.6)

CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]

Page 4: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LYTERMINATION INSTRUCTIONS

#311 • BNC CRIMP CONNECTOR (3 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U, 213/U, 214/U, 225/U

#780 • TNC CRIMP CONNECTOR (3 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U, 213/U, 214/U, 225/U

#480 • MINI UHF CRIMP CONNECTOR (3 PIECE CONSTRUCTION)FOR CABLE TYPES RG-58/U, 59/U, 62/U, 213/U, 214/U, 225/U

12

3

Trim cable as shown, being careful not to nick the innerconductor or braid.

Slip crimp sleeve over cable. Place inner conductor into contact. Note that the end of contact and innerdielectric must be butting and square. Crimp withappropriate tool.

Flair outer braid and gently but firmly push the contactinto the connector housing until a gentle snap is felt, indicating the contact is in place. Slip the crimp sleeve in place, butting the flange against the connector body and crimp with appropriate tool.

acb

Crimp SleeveInspection Hole

Butt Square Crimp Area

Contact

STEP 1

STEP 2

STEP 3

Crimp Areaa = .406 (10.3)b = .313 (7.9)c = .156 (4.0)

CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]

Page 5: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LYTERMINATION INSTRUCTIONS

#423 • UHF CRIMP CONNECTOR (3 PIECE CONSTRUCTION)FOR CABLE TYPES RG-8/U, RG-58/U, 59/U, 62/U, 8X, MICRO 8/U

1

23

4

TERMINATION INSTRUCTIONS#601 • “N” SOLDER CLAMP CONNECTOR

FOR CABLE TYPES RG-8/U, 58/U, 59/U, 62/U, 213/U

12

3

Trim cable as shown, taking care not to nick the centerconductor or outer braid.

Run nut, washer, gland and ferrule over the cable, andflair the braid over the ferrule. Solder or crimp the contact to the center conductor.

Push the center contact into the body assembly, feel itsnap into place. With all the loose components in placecomplete the assembly by tightening the nut with awrench..

Run crimp ferrule over cable. Trim cable as shown.Avoid nicking the center conductor or outer braid (stray or loose braid may cause shorts).

Flair outer braid as shown

Firmly push stripped assembly into connector bodyuntil 1/8” to 3/16” of center conductor protrudes fromthe nose of the center pin contact

Slip crimp sleeve into place butting the flange againstthe connector body. Crimp the sleeve into place with theproper crimp tool. Crimp the center contact with theproper crimp tool and trim the excess center conductorfrom the center pin contact housing.

ba

STEP 1

STEP 2

STEP 3

STEP 4

STEP 1

STEP2

STEP 3

Nut Washer Gland Ferrule Contact

a

b

a = .188 (4.8)b = .219 (5.6)

a = 0.5 (12.7)b = 1.0 (25.4)

CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]

Page 6: 143 Route 59 INSTRUCTIONS · bnc assembly instructions #381 • male solder type (3 piece construction) for cable types rg-58/u, 59/u, 62/u, 223/u, belden 9268 1 2 3 4 drop cable

TWINAX TERMINATION INSTRUCTIONS#TC-1 • CRIMP/SOLDER TYPE

FOR TWINAX CABLES

1

2

3

4

5

Slide clamp nut and clamp gasket over cable end. V-groove in clamp gasket faces toward connector body.Strip cable to dimensions shown. Important: Do notnick insulation around center conductors. For solid corecables, lay braid back out of the way while trimmingcore; then lay braid down again to facilitate Step 2.

Slide braid clamp over braid until inner shoulder buttsagainst jacket. (Note: sharp edge of braid clamp goestoward V-groove in clamp gasket.) Fold braid backevenly over braid clamp as shown.

Slide sleeve over cable so that braid “bottoms” insidesleeve. Solder contacts to conductors, using minimumheat. Remove any excess solder. Alternative method:Crimp center contacts. Bend conductors and contactsout and back to obtain .250” (6.4 mm) spacing betweencontacts.

Insert contacts into rear of insulator. (Note: for Belden9207 and similar solid core cables, contact on barecopper conductor (or for Belden 8227 and similar airdielectric cables) the contact on white insulated conductor goes into hole with dot next to it. Slide insulator to butt against sleeve as shown.

Insert assembly into connector body, aligning slot ofinsulator with polarizing key in body. Tighten clamp nutto 50lb/in (5.7 N-m) torque. Do not twist connectorbody.

STEP 1

STEP 2

STEP 3

STEP 4

Clamp Nut

Washer Clamp Gasket

Braid Clamp

Sleeve MaleContacts

Insulator Housing

bBraid c

Bare CenterConductors

a

d

e

For cables with foil,trim foil flush with jacket.

For cables with filler,makesure filler is kept in center.

Do not mix filler in with braid.

Rear view of insulator

slot

Rear view of body

Arrow or dot guide for polarization.

key

STEP 5INST

RUCT

IONS

INS

TA

LL

AT

ION

AS

SE

MB

LY

a = .550 (14.0)b = .370 (9.5)c = .220 (5.6)d = .360 (9.2)e = .250 (6.4)

CONNECTING WITH QUALITY SINCE 1959

143 Route 59P.O. Box 775Hillburn, New York 10931office:(845) 357-7510fax: (845) 357-7630website: http://www.czlabs.come-mail: [email protected]